Download as pdf or txt
Download as pdf or txt
You are on page 1of 13

ANNEX “A”

(Form for Barangay)

MANILA BAY CLEAN-UP, REHABILITATION, AND PRESERVATION PROGRAM


Date: June 24, 2024

CONDUCT OF WEEKLY CLEAN-UP DRIVE


BARANGAY: SAN ISIDRO II MUNICIPALITY: PAOMBONG

A. BARANGAY CLEAN-UP DRIVE

Date Barangay Water Body/ Length Volume of


Waterway covered Covered Waste
(if applicable) (in meters) Collected
(in kilograms)

June 24, 2024 San Isidro II Sitio Tawiran to Sitio 500 meters 23 kilograms (non-bio)
Hangga provincial road 15 kilograms (compost
wastes)
Sitio Hangga creek
(5 sacks)

Details on Disposal Other Remarks


• The barangay garbage collectors brought the Ensure compliance with the Manila Bay Clean-up,
waste collected to the transfer station Rehabilitation, and Preservation Program and the
Kalinisan sa Bagong Pilipinas Program

B. PHOTO DOCUMENTATION

BEFORE AFTER
1|P age
DURING

2|P age
BEFORE AFTER

DURING

3|P age
BEFORE AFTER
DURING

4|P age
BEFORE AFTER

DURING

5|P age
BEFORE AFTER

DURING

6|P age
OTHER DURING PICTURES

7|P age
8|P age
9|P age
10 | P a g e
C. LIST OF ATTENDEES & TOTAL NO. – 41 FROM GROUP 1 & 2 OF SB, VOLUNTEER WORKERS,
AND 2 COMMUNITY SERVICE

11 | P a g e
12 | P a g e
Prepared by:

NICANOR V. PASCO June 24, 2024


Committee Chair on Environment Date

Certified Correct:

CHRISTIAN V. CORONEL June 24, 2024


Punong Barangay Date

13 | P a g e

You might also like