REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGIONAL OFFICE VII
BOHOL III DISTRICT ENGINEERING OFFICE
GUINDULMAN, BOHOL

C.Y. 2024 PROJECT


DETAILED ENGINEERING DESIGN PLAN FOR THE
CONSTRUCTION OF 1STY2CL,MACALINGAN P/S,
LILA,BOHOL

SUBMITTED: RECOMMENDED: APPROVED:

HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ


CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
Luzon Strait

THE REPUBLIC OF THE PHILIPPINES


W E

S
Philippine Sea
Luzon

South china sea


THIS SITE
REGION VII

Mindoro

Samar

Panay
Leyte
Cebu
Bohol
Palawan
Negros Oriental
Siquijor
Sulu Sea

Mindanao

PERSPECTIVE
KEY MAP
SUMMARYOF QUANTITIES
QUANTITY/
ITEM No. DESCRIPTION UNIT REMARKS N
POW
A.1.1(8) PROVISION OF FIELD OFFICE FOR THE ENGINEERS ( RENTAL BASIS) MONTH 2.83

B.3(1) PERMITS and CLEARANCES LS 1.00


W E THIS SITE
B.5(1) PROJECT BILLBOARD/SIGNBOARD EACH 2.00 BOHOL PROVINCE
B.7(1) OCCUPATIONAL SAFETY and HEALTH PROGRAM LS 1.00

B.9(1) MOBILIZATION/DEMOBILIZATION LS 1.00 S


803 (1)a

804 (1)a
STRUCTURE EXCAVATION (COMMON SOIL)

EMBANKMENT FROM STRUCTURE EXCAVATION (COMMON SOIL)


m3

m3
66.73

43.88
Cebu
804 (2)a 3
EMBANKMENT FROM BORROW (COMMON SOIL) m 34.20

804 (7)

900 (1)b
GRAVEL FILL

STRUCTURAL CONCRETE (3000 psi,CLASS A, 14 DAYS)


m3

m3
3.38

76.66
Bohol
902 (1)a1 REINFORCING STEEL (DEFORMED),GRADE 40 KGS 11,861.57

903(2) FORMWORKS AND FALSEWORKS m² 191.82

1003(1)b4 6mm MARINE PLYWOOD ON WOOD FRAME CEILING m² 90.00

1003(17) CARPENTRY AND JOINERY WORKS (BLACKBOARD) LS 1.00

1009(1)a JALOUSIE WINDOWS (GLASS) m² 28.16

Siquijor
1010(2)b DOORS, WOOD PANEL m² 8.64

1038(1) REFLECTED INSULATION m² 126.00

1046(2)a1 100mm CHB NON LOAD BEARING (INCLUDING REINFORCING STEEL) m² 48.70

1046(2)a2 150mm CHB NON LOAD BEARING (INCLUDING REINFORCING STEEL) m² 143.60
REGION VII MAP
1027(1) CEMENT PLASTER FINISH m² 350.80

1032(1)a PAINTING WORKS (MASONRY/CONCRETE) m² 541.10

1032(1)b PAINTING WORKS (WOOD) m² 98.64

1032(1)c PAINTING WORKS (STEEL) m² 260.00

1014(1)a2 PRE-PAINTED METAL SHEETS (CORRUGATED TYPE LONG SPAN ABOVE 0.427mm) m² 216.00

1013(2)a FABRICATED METAL ROOFING ACCESSORY(RIDGE ROLL) GAUGE 26 (0.551mm) LN.M. 18.00 THIS SITE
1013(2)b FABRICATED METAL ROOFING ACCESSORY(FLASHING) GAUGE 26 (0.551mm) LN.M. 24.00 UBAY
1047(8)a STRUCTURAL STEEL,TRUSSES KG 1,880.00 DANAO

1047(8)b STRUCTURAL STEEL,PURLINS KG 1,166.00

1047(4)a METAL STRUCTURE ACCESSORIES (BOLTS AND RODS) EACH 224.00

1047(4)b METAL STRUCTURE ACCESSORIES (TURNBUCKLE) EACH 8.00

1047(5)d METAL STRUCTURE ACCESSORIES (STEEL PLATES) KG 376.00 SAGBAYAN ALICIA


DAGOHOY MABINI
1047(5)b METAL STRUCTURE ACCESSORIES (SAGRODS) KG 101.00

1047(5)c METAL STRUCTURE ACCESSORIES (CROSSBRACING) KG 37.00 BALILIHAN PILAR


CARMEN CANDIJAY
1051(1)a RAILING LS 1.00 SIERRA BULLONES
BATUAN
GUINDULMAN
1001(9) STORM DRAINAGE AND DOWNSPOUT LS 1.00 ANDA

1100(10) CONDUITS,BOXES & FITTINGS( CONDUIT WORKS/CONDUIT ROUGH-IN) LS 1.00 DUERO


BILAR
SEVILLA
1101(33) WIRES AND WIRING DEVICES LS 1.00 SIKATUNA N
JAGNA
1102(1) PANEL BOARD WITH MAIN AND BRANCH BREAKERS LS 1.00 GARCIA
HERNANDEZ
LIGHTING FIXTURES LS 1.00 LOBOC DIMIAO VALENCIA
1103(1)
LOAY LILA
W E
1200(1) VENTILATING EQUIPMENT LS 1.00 ALBURQUERQUE
1202(6)a1 FIRE EXTINGUISHER (4.54KG,ABC WITH BRACKET) SET 2.00

1208(1) FIRE ALARM SYSTEM LS 2.00 S

PROJECT NAME & LOCATION: SHEET CONTENTS: DRAFTED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT PERSPECTIVE DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE SUMMARY OF QUANTITIES
PREPARED:
A 2
MAPS
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S , LOCATION PLAN CARINA L. ABREA HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 2 14 32
GUINDULMAN, BOHOL LILA,BOHOL CHONA O. PELIGRINO ARCHITECT II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ARCHITECT II DATE: DATE: DATE: DATE:
NOTES :
REVISED GUIDELINES AS PER DO 11, SERIES OF 2022:
1. THE BILLBOARD STANDARD SHALL CONTAIN THE STATEMENT
"THIS IS WHERE YOUR TAXES GO" TOGETHER WITH THE LOGOS OF
THE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH), THE
BUREAU OF INTERNAL REVENUE (BIR) AND THE DEPARTMENT OF FINANCE (DOF)
PLACED IN THE UPPER PART OF THE BILLBOARD WITH THE DIMENSION AS SHOWN
IN THE ATTACHED LAYOUT DRAWING. THE SAID STATEMENT SHALL BE LOCATED ON
THE UPPER PART OF THE BILLBOARD WITH THE FONT SIZE OF 60MM.
2. THE NAME OF THE GOVERNMENT AGENCY AND LOGOS SHALL BE PRINTED
ON THE SAME WHITE BACKGROUND OF THE BILLBOARD AS SHOWN ON "ANNEX A".
3. THE NAME OF PROJECT AND LOCATION SHALL BE SEPARATED FOR CLARITY.
4. THE WORDS "CONTRACTOR" AND "IMPLEMENTING OFFICE/CONTACT NO."
SHALL BE CHANGED TO "NAME OF CONTRACTOR" AND "IMPLEMENTING OFFICE",RESPECTIVELY.
5. THE CONTACT NO. AND WEBSITE OF DPWH SHALL BE PLACED AT THE LOWER RIGHT SIDE.
ALL OTHER GUIDELINES OF D.O. NO. 21, SERIES OF 2017 SHALL REMAIN IN FORCE.
6. THE NEW BILLBOARD DESIGN LAYOUT, DIMENSION AND LETTER SIZES ON
WHITE BACKGROUND, AS SHOWN ON THE ATTACHED DRAWING, SHALL BE DEPICTED
ON A STANDARD BILLBOARD MEASURING 1220MM X 2440MM (4FT. X 8FT.) USING
12.50MM (1/2 INCH) THICK MARINE PLYWOOD OR TARPAULIN OF THE SAME SIZE
POSTED ON 5MM (3/16 INCH) MARINE PLYWOOD.
7. ALL EXISTING BILLBOARDS OF ON-GOING PROJECTS SHALL BE REPLACED WITH
NEW ONE ADOPTING THE ABOVE GUIDELINES.
8. FOR EACH BUILDING PROJECT, THE BILLBOARD SHALL BE INSTALLED IN FRONT
OF THE PROJECT SITE.
9. FOR EACH ROAD/BRIDGE/FLOOD CONTROL PROJECT, TWO BILLBOARDS SHALL Display Area
BE INSTALLED, ONE AT THE BEGINNING AND ONE AT THE END OF THE PROJECT.
10. FOR ROAD PROJECTS WITH LENGTH OF 10 KILOMETERS OR MORE, ADDITIONAL DISPLAY AREA

1220

1220
BILLBOARD SHALL ALSO BE INSTALLED AT EVERY 5-KILOMETER INTERVAL.
11. NAME(S) AND/OR PICTURE(S) OF ANY PERSONAGES SHOULD NOT APPEAR IN 50x50 Horizontal Coco Lumber
THE BILLBOARD. (1220 x 2440 x 12 MARINE PLYWOOD)
12. NO OTHER BILLBOARDS SHALL BE ALLOWED TO BE INSTALLED 100 METERS
BEFORE AND 100 METERS AFTER ALL DPWH PROJECTS AND IN-BETWEEN THE
PROJECT LIMITS OR WITHIN THE ROAD RIGHT-OF-WAY.
13. DPWH CONTRACTORS SHALL NOT BE ALLOWED TO PLACE NAMES OF
POLITICIANS OR CARRY POLITICAL BILLBOARD ON THEIR EQUIPMENT.

1.00 UNIT PROJECT BILLBOARD


Billboard 50x50 Horizontal Coco Lumber

1000

1000
Edge of Road
45°

50x50 Wooden Stake 50x50 Wooden Stake


Ground Level

Traffic Direction
500

500
ORIENTATION
1000 2440

TYPICAL FRAME ELEVATION FRONT ELEVATION


PROJECT NAME & LOCATION: SHEET CONTENTS: TRACED FROM STANDARD BOD PLAN: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE PREPARED:
A 3
DETAIL OF BILLBOARD
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S ,
CARINA L. ABREA HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 3 14 32
GUINDULMAN, BOHOL LILA,BOHOL CHONA O. PELIGRINO ARCHITECT II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ARCHITECT II DATE: DATE: DATE: DATE:
DISPLAY AREA
(TARPAULIN ON 2400mm x 2400mm x 5mm MARINE PLYWOOD)

2400

2400
50 x 50 HORIZONTAL
COCO LUMBER

50 x 50 HORIZONTAL
COCO LUMBER

1.00 UNIT COA BILLBOARD

FACE OF
BILLBOARD

1000

1000
EDGE OF ROAD
45°

50 x 50 WOODEN
STAKE GROUND LEVEL
TRAFFIC DIRECTION

ORIENTATION

500

500
1000 2400
TYPICAL FRAME ELEVATION FRONT ELEVATION

PROJECT NAME & LOCATION: SHEET CONTENTS: TRACED FROM STANDARD BOD PLAN: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE DETAIL OF BILLBOARD PREPARED:
A 4
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S ,
CARINA L. ABREA HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 4 14 32
GUINDULMAN, BOHOL LILA,BOHOL CHONA O. PELIGRINO ARCHITECT II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ARCHITECT II DATE: DATE: DATE: DATE:
BUILDING CONSTRUCTION DIMENSION BUILDING CONSTRUCTION DIMENSION
MATERIALS MATERIALS
SAFETY SIGNAGE (WIDTH X HEIGHT,FEET) SAFETY SIGNAGE (WIDTH X HEIGHT,FEET)

DANGER DEEP 3' X 2'


EXCAVATION

PROPER PPE
SIGNAGE 4' X 8'
CONSTRUCTION 3' X 2'
ENTRANCE

1. TARPAULIN 1. TARPAULIN
2. 21'' PLYWOOD (BACK FRAME) AUTHORIZED 2. 21'' PLYWOOD (BACK FRAME)
3' X 2'
3. MISCELLANEOUS (NAILS,TIE PERSONNEL ONLY 3. MISCELLANEOUS (NAILS,TIE
WIRES AS HANGERS,ETC.) WIRES AS HANGERS,ETC.)

SAFETY FIRST 4' X 4'


(SF-1)
WELDING/ 3' X 2'
HOT WORK AREA

SAFETY FIRST TEMPORARY


3' X 2'
(SF-2) MATERIALS 3' X 2'
STACKING AREA

PROJECT NAME & LOCATION: SHEET CONTENTS: TRACED FROM STANDARD BOD PLAN: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE PREPARED:
A 5
DETAIL OF SIGNAGES
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S ,
CARINA L. ABREA HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 5 14 32
GUINDULMAN, BOHOL LILA,BOHOL CHONA O. PELIGRINO ARCHITECT II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ARCHITECT II DATE: DATE: DATE: DATE:
C B A
(0.60mm THK)
7000 PRE-PAINTED RIDGE ROLL
1250 2500 3500 3500 1250
1200 1200
TOP OF PARAPET 1100

VARIES
1100
APEX LINE 100mm THK. CHB PARAPET
OF TRUSS WALL WITH PLAIN CEMENT

1800
PLASTER(PAINT FINISH)
TOP LINE OF 100mm THK. R.C. PARAPET WALL
ROOF BEAM W/ 200mmX150mm PRECAST MOULDING,

5119
PAINTED FINISH (SEE DETAIL)
HANDRAIL 150mm THK. CHB WALL WITH PLAIN

3000
CEMENT PLASTER(PAINT FINISH)

CLASSROOM
FFL

319
FINISH GRADE LINE

1 2 3 4 5 2 TYPICAL SIDE ELEVATION


A-6
18000
4500 4500 4500 4500
2 LINE OF ROOF ABOVE
A-9
1250

W-1 W-1 W-1 W-1


A WF1 WF1
SCHEDULE OF FINISHES
FLOOR FINISHES

FL1 PLAIN CEMENT W/ FLOOR HARDENER, SMOOTH FINISH


3500

1 WF1 1 FL1a NON-SKID PLAIN CEMENT FINISH


A-7 A-7
FL1 FL1 FL2 NON-SKID PLAIN CEMENT FINISH W/ 12mm GROOVE @
EVERY 100mm O.C.

CLASSROOM 1 CLASSROOM 2
7000

ELEV. 319.00 mm ELEV. 319.00 mm 1 WALL FINISHES


WF1 A-9 WF1 100mm/150mm THK. CHB INTERIOR WALL W/ PLAIN CEMENT,
PLASTER PAINTED FINISH (SUBMIT COLOR SCHEMES FOR
APPROVAL)
3500

CEILING FINISHES
CL1 6mm MARINE PLYWOOD
ON 50mmx50mm CEILING JOIST

D-1 D-1 D-1 D-1


WF1 WF1
B
WF1 WF1

19 mm 19 mm 19 mm 19 mm
DROP W-2 W-2 DROP DROP W-2 W-2 DROP
2500

UP
C O R R I D O R

FLOOR PLAN
FL1a FL1a ELEV. 300.00 mm

C 450mm HIGH CONC. SEATING 450mm HIGH CONC. SEATING 1


UP SLOPE 1:12 A-6
LINE OF ROOF ABOVE FL2

PROJECT NAME & LOCATION: SHEET CONTENTS: TRACED FROM STANDARD BOD PLAN: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE FLOOR PLAN PREPARED:
A 6
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S , TYPICAL SIDE ELEVATION
CARINA L. ABREA HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 6 14 32
GUINDULMAN, BOHOL LILA,BOHOL CHONA O. PELIGRINO ARCHITECT II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ARCHITECT II DATE: DATE: DATE: DATE:
(0.50mm THK) PRE-PAINTED RIDGE ROLL,
PREPAINTED PREFORMED G.I.(0.40mm THK)
PRE-PAINTED LONGSPAN CORR.
G.I. ROOFING SHEET
(SEE SCHED. OF FINISH)
1 2 3 4 5 100mm THK. R.C. PARAPET WALL
W/ 200mmX150mm PRECAST MOULDING,
18000 PAINTED FINISH (SEE DETAIL)
4500 4500 4500 4500
TOP OF PARAPET
150mm THK. CHB WALL WITH PLAIN
APEX LINE OF TRUSS
CEMENT PLASTER(PAINT FINISH)
1800

200 200

1000
TOP LINE OF
ROOF BEAM
5119

F F F F F F F F F F F F F F F F

D-1
3000

D-1 D-1 W-2 W-2


W-2

CLASSROOM W-2 D-1


FFL
319

FINISH GRADE LINE

1 FRONT ELEVATION
A-7 (0.50mm THK) PRE-PAINTED RIDGE ROLL,
PREPAINTED PREFORMED G.I.(0.40mm THK)
PRE-PAINTED LONGSPAN CORR.
G.I. ROOFING SHEET
(SEE SCHED. OF FINISH)
5 4 3 2 1
18000
4500 4500 4500 4500
TOP OF PARAPET

APEX LINE OF TRUSS


1800

100mm THK. R.C. PARAPET WALL

600
TOP LINE OF
ROOF BEAM W/ 200mmX150mm PRECAST MOULDING,
5119

F F F F F F F F F F F F F F F F
PAINTED FINISH (SEE DETAIL)
3000

150mm THK. CHB WALL WITH


CLASSROOM
FFL
W-1 W-1 W-1 W-1 PLAIN CEMENT PLASTER(PAINT FINISH)
319

FINISH GRADE LINE

2 REAR ELEVATION
A-7

PROJECT NAME & LOCATION: SHEET CONTENTS: TRACED FROM STANDARD BOD PLAN: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE FRONT ELEVATION PREPARED:
A 7
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S , REAR ELEVATION
CARINA L. ABREA HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 7 14 32
GUINDULMAN, BOHOL LILA,BOHOL CHONA O. PELIGRINO ARCHITECT II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ARCHITECT II DATE: DATE: DATE: DATE:
1 2 3 4 5
18000
4500 4500 4500 4500

CH. 2650.00 mm CH. 2650.00 mm

1250
CL1 CL1
A

3500
2 2 2 2 2 2
7000
3500

2 2 2 2 2 2

B
CH. 2600.00 mm CH. 2600.00 mm
2500

1 1 1 1
CL1 CL1

C CH. 2650.00 mm CH. 2650.00 mm


CL1 CL1
25mmX25mmX300mm WOOD SLATS @
25mm CLEAR SPA CEILING VENTILATION
(PROVIDE WIREMESH INSIDE). TYPICAL

1 REFLECTED CEILING PLAN


A-8

PROJECT NAME & LOCATION: SHEET CONTENTS: TRACED FROM STANDARD BOD PLAN: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE PREPARED:
A 8
REFLECTED CEILING PLAN
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S ,
CARINA L. ABREA HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 8 14 32
GUINDULMAN, BOHOL LILA,BOHOL CHONA O. PELIGRINO ARCHITECT II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ARCHITECT II DATE: DATE: DATE: DATE:
1 2 3 4 5
9000 9000
4500 4500 4500 4500
R.C. GUTTER W/ CEMENT BASE
WATERPROOFING

PLS. REFER TO UTCP SCHOOL BLDGS.

1250
R.C. GUTTER
STL ANGLE SUPPORTS
A
0.60mm THK. RIDGE ROLL PREPAINTED,
3500

SLOPE 0.60mm THK. PRE-PAINTED G.I. END


SLOPE RF1 WALL FLASHING (TYP. EACH SIDES
7000

5
3500

A-6
RF1

B SLOPE SLOPE
2500

C
1250

R.C. GUTTER

2100 5050 2100


9250
R.C. GUTTER W/ CEMENT BASE
WATERPROOFING
1 ROOF PLAN
A-9

PROJECT NAME & LOCATION: SHEET CONTENTS: TRACED FROM STANDARD BOD PLAN: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE PREPARED:
A 9
CONSTRUCTION OF 1STY2CL,MACALINGAN P/S , ROOF PLAN
BOHOL 3RD DISTRICT ENGINEERING OFFICE CARINA L. ABREA HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 9 14 32
GUINDULMAN, BOHOL LILA,BOHOL CHONA O. PELIGRINO ARCHITECT II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ARCHITECT II DATE: DATE: DATE: DATE:
1 A B C 2
A-11 A-11
1250 7000 1250
1200
1200 3500 3500 2500 1100

VARIES
TOP OF PARAPET (0.50mm THK)
APEX LINE OF TRUSS PRE-PAINTED RIDGE ROLL

1800
100mm THK. R.C PARAPET WALL
WITH PLAIN CEMENT PLASTER (PAINT FINISH)
TOP LINE OF ROOF BEAM

5119
FINISH CEILING LINE
50mm x50mm CEILING JOIST

3000
6mm MARINE PLYWOOD

2600
CORRIDOR
CLASS ROOM

CLASSROOM 2
FINISH FLOOR LINE
319

FINISH GRADE LINE

1 CROSS SECTION HANDRAIL

A-10

1 2 3 4 5
PRE-PAINTED METAL SHEETS (CORRUGATED 18000
TYPE LONG SPAN ABOVE 0.427mm)
9000 9000
4500 4500 4500 4500

VARIES
TOP OF PARAPET

APEX LINE OF TRUSS

1800
TOP LINE OF RB

5119
FINISH CEILING LINE
150mm THK. CHB WALL WITH F F F F F F F F F F F F F F F F

PLAIN CEMENT PLASTER(PAINT FINISH)

3000
CLASS ROOM 1 CLASS ROOM 2

2600
W-1 W-1 W-1 W-1 CLASSROOM
FINISH FLOOR LINE

319
FINISH GRADE LINE

2 LONGITUDINAL SECTION
A-10

PROJECT NAME & LOCATION: SHEET CONTENTS: TRACED FROM STANDARD BOD PLAN: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE CROSS SECTION PREPARED:
A 10
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S , LONGITUDINAL SECTION
CARINA L. ABREA HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 10 14 32
GUINDULMAN, BOHOL LILA,BOHOL CHONA O. PELIGRINO ARCHITECT II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ARCHITECT II DATE: DATE: DATE: DATE:
2 6mm MARINE PLYWOOD
600
0
600 600 60 600
0
60 600

C
TOP LINE OF ROOF BEAM
EL: +3000mm 0
60
50mm x50mm CEILING JOIST
350 FINISH CEILING HEIGHT
EL: +2600mm
100 250
50mm DIA S/S HOR. HANDRAIL
EMBEDDED IN COLUMN 3 DETAIL - 3
300 150 A-11
50mm x50mm CEILING JOIST
750mm HIGH PARAPET WALL,
PLASTERED, PAINTED FINISH
12
00
OUTSIDE 450mm HIGH CONC. SEATING,
PLASTERED, PAINTED FINISH 00
900

6mm MARINE PLYWOOD


24
750

PART OF CORRIDOR 12
00
450

100mm THK. COMPACTED


CORRIDOR GRAVEL FILL W/ SOIL BINDER 50mm x50mm CEILING JOIST
FINISH FLOOR LN. EL: +300mm
5 ISOMETRIC (CEILING DETAIL)
300

EL: +000mm A-11 NTS


FINISH GRADE LN. EARTHFILL

4 DETAIL - 4 A
100mm THK. R.C. PARAPET WALL
W/ 100mmX150mm PRECAST
C
A-11
(CONC. SEATING) MOULDING PAINTED FINSIH 1250
1200 50
100mm THK. R.C. PARAPET WALL W/
200mmX150mm PRECAST MOULDING, 1100 100
1250 PAINTED FINISH

50 1200 100mm THK. CHB PARAPET WALL

100
1100 W/ .50mm THK.

400
100

100
PRE-PAINTED G.I. SHEET WALL

100
FLASHING (TYP. TO ALL SIDES)

100

200
R.C. GUTTER W/ CEMENT

1400
200

BASE WATERPROOFING

600
400
(0.40mm THK) TOP LINE OF ROOF BEAM
PRE-PAINTED LONGSPAN CORR. G.I. EL: +3000mm
400
1000

ROOFING SHEET (SEE SCHED. OF FINISH)


600

TOP LINE OF ROOF BEAM

200
EL: +3000mm

400
EAVES CEILING HT.

50 150
200

EL: +2650mm
EAVES R.C. BEAM (VERIFY STRUCTURAL)
CEILING HT.
50 150
200

EL: +2650mm 100mmØ DS W/ BASKET STRAINER


50mm x50mm CEILING JOIST
ON 6mm MARINE PLYWOOD 2 DETAIL - 2
1 DETAIL - 1 A-11
A-11 6mmX6mm DRIP MOULD O.C.

PROJECT NAME & LOCATION: SHEET CONTENTS: TRACED FROM STANDARD BOD PLAN: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE DETAILS PREPARED:
A 11
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S , ISOMETRIC OF CEILING
CARINA L. ABREA HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 11 14 32
GUINDULMAN, BOHOL LILA,BOHOL CHONA O. PELIGRINO ARCHITECT II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ARCHITECT II DATE: DATE: DATE: DATE:
2 DETAIL OF GRILLES
A-12

75 75 2800 DESCRIPTION:
12mm TUBULAR STEEL DOWEL 1400 1400 2000
EMBEDDED IN 150mm THK. CHB 1000 1721 12mm TUBULAR STEEL
WALL , SPACED @ 700 O.C. FOR 703 697 697 703 500 500 500 500 BAR GRILLES, PAINTED
W-1 AND W-2 FINISH, EQUALLY
50

F F F F SPACED @ O.C.

127 119 119 119 119 119 119 119 119 119 119 119 119 119

127 119 119 119 119 119 119 119 119 119 119 119 119 119
100
LOCATION:
CLASSROOMS
12mm TUBULAR STEEL BAR NO. OF SETS: 10 SETS EACH
GRILLES PAINTED FINISH, FOR W-1 & W-2

1800
EQUALLY SPACE O.C. FOR W-1 W-1 W-2

1800
AND W-2 GENERAL NOTES:
680
VERIFY ACTUAL DIMENSION
- & NO. OF SETS
BEFORE FABRICATION.
250 750 750 250 - MAKE ACTUAL SHOP

355 697 697 697 354 DRAWING FOR ARCHITECT'S


APPROVAL.
VERIFY JALOUSIE
WINDOW
INSIDE OUTSIDE
440

PART OF
CLASSROOM
4 EQUAL PARTS = 2600 TAG NO. 900 TAG NO.
W-1 3 EQUAL PARTS= 1800 TAG NO. W-2 100 300 100 300 100 D-1
300

300
DESCRIPTION:

300
F F F F F F F DESCRIPTION: F DESCRIPTION:
JALOUSIE WINDOW W/ JALOUSIE WINDOW W/

100
KD &
6mmCLEAR GLASS 6mmCLEAR GLASS BLADES TERMITE-TREATED
14 BLADES

14 BLADES
BLADES ON

475
ON 50mmX150mm KD WOOD PANEL DOOR TYPE
50mmX150mm KD
680

& TERMITE-TREATED HINGED DOOR &


WOOD &

100
TERMITE-TREATED ( (YAKAL/GUIHO) OR FIXED GLASS

2400
CONCRETE JAMB & STEEL TRANSOM IN

475
YAKAL/GUIHO) OR

2100
CONCRETE JAMB & GRILLES (SEE DETAIL) 50mmX150mm WOOD

100
STEEL GRILLES (SEE JAMB/FRAME AND
100

(REFER TO MANUFACTURER'S SPECIFICATION) DETAIL) (REFER TO MANUFACTURER'S LEVER-TYPE KNOB


SPECIFICATION)
800

LOCATION: LOCATION:

900
50

800
LOCATION:

750
CLASSROOMS CLASSROOMS CLASSROOMS
CLASSROOM CLASSROOM
FINISH FLOOR LINE NO. OF SETS: 2 SETS FINISH FLOOR LINE NO. OF SETS: 2 SETS NO. OF SETS: 2 SETS

100
1 SCHED. OF DOORS & WINDOWS
A-12

PROJECT NAME & LOCATION: SHEET CONTENTS: TRACED FROM STANDARD BOD PLAN: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE SCHEDULE OF DOORS AND WINDOWS
PREPARED:
A 12
DETAIL OF GRILLES
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S ,
DETAIL OF PWD RAMP CARINA L. ABREA HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 12 14 32
GUINDULMAN, BOHOL LILA,BOHOL CHONA O. PELIGRINO ARCHITECT II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ARCHITECT II DATE: DATE: DATE: DATE:
4 5
2875 4500
1800 1075 4339 1800 175
2
300 600 475 125 600 600 600 600 300 1500
100mm THK. CONC. SLAB/RAMP
HR1 100 100 100 W/ NON-SKID PLAIN CEMENT
100 100 100 FINISH W/ 12mmX12mm GROOVE
3 @ EVERY 100mm O.C.
HR2 PART OF CORRIDOR
A-13

100
C 450mm HIGH CONC. SEATING @ 600mm O.C. W/ S/S CAPPING

75

100
300
130
FINISH GRADE LINE

100
100
2 LANDING 100mm THK. COMPACTED

600

1630
A-13 LANDING SLOPE 1:12 EL: +0.300mm GRAVEL FILL W/ SOIL BINDER
EL: +0.000mm EARTHFILL

1200
LINE OF ROOF ABOVE

600
LINE OF ROOF ABOVE
3 DETAIL - 1 (PWD RAMP)
A-13

100
600 475 125 600 600 600 600 600 600 600 250
1500 300
1075 2520 100
1800 3600 2150
2 DET. PLAN OF PWD RAMP
A-13
4 4500
5
1075 2525 1800 175
600 475

200
125
600 600 600 600
FL2 @ 600mm O.C. W/ 75MM
EMBEDDMENT W/ S/S CAPPING

100mm THK. CONC. SLAB/RAMP

900
IN NON-SKID PLAIN CEMENT
PAINTED FINISH W/ 6mm

700
HR1
GROOVE @ EVERY 100mm O.C.

HR2
CORRIDOR LANDING
FINISH FLOOR LN. EL: +0.300mm
150

200
100mm THK. COMPACTED

75
GRAVEL FILL W/ SOIL BINDER
200

900
900

VARIES
300
750

700
CORRIDOR LANDING
900

FINISH FLOOR LINE 100


EL: +0.300mm
700

LANDING EL: +0.000mm

300
EL: +0.000mm FINISH GRADE LN.
FGL
4
4 DETAIL - 2 (PWD RAMP)
A-6 A-13
1 SECTION - 1 (PWD RAMP) 3 DETAIL OF PWD RAMP
A-13
A-13 SCALE: 1:75m

PROJECT NAME & LOCATION: SHEET CONTENTS: TRACED FROM STANDARD BOD PLAN: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

DETAILED ENGINEERING DESIGN PLAN FOR THE


REGIONAL OFFICE VII DETAIL OF PWD RAMP PREPARED:
A 13
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S ,
CARINA L. ABREA HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 13 14 32
GUINDULMAN, BOHOL LILA,BOHOL CHONA O. PELIGRINO ARCHITECT II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ARCHITECT II DATE: DATE: DATE: DATE:
4800 6 mm THK.MARINEPLYWOOD

2400
3 TOP COVER
19 X 50 mm WOOD
50 2400 50
BLACKBOARD EDGE FRAMING

6 X 1200 X 2400 mm LAWANIT

50
BLACKBOARD (PAINTED-DEPED SPECS.)

50X50mmVERTICAL AND HORIZONTALSECONDARY


WOODEN FRAMES, SPACED AS SHOWN

19 X 50 mm WOOD

1200
BLACKBOARD EDGE FRAMING

19 X 50 mm WOOD
BLACKBOARD EDGE FRAMING

1294

1200
12 mm THK. SOLID WOOD CHALK DUST
247 CATCHER (PAINTED-DEPED SPECS.)

50
125

88
6 X 1200 X 2400 mm LAWANIT

25
SECONDARY = 750 H
ELEMENTARY = 650 H

63
6

63
BLACKBOARD

50
75
VERIFY HEIGHT

12 mm THK. PULL-OUT CHALK DUST BOX (PAINTED-DEPED SPECS.)

25
150
12 mm THK. SOLID WOOD CHALK DUST CATCHER

125

SECONDARY = 750 H
ELEMENTARY = 650 H
12
(PAINTED-DEPED SPECS.)
100

VERIFY HEIGHT
12 mm THK. PULL-OUT
FIN. CLASSROOM FLOOR LINE CHALK DUST BOX
150 mm THK. CHB WALL 150
ELEVATION (FRONT VIEW)
FIN. WORKSHOP FLOOR LINE

250
50x50mm VERTICAL AND HORIZONTAL SECONDARY
WOODEN FRAMES, SPACED AS SHOWN
4900

50 X 75mmVERTICAL
MAIN WOODEN FRAME 81
2450 2450 50 X 75mmVERTICAL
MAIN WOODEN FRAME SECTION (SIDE VIEW)100
50 2400 600 600 600 600 6mmTHK.MARINE
PLYWOOD 50x50mm HORIZONTAL SECONDARY
150 mm THK. CHB WALL 50 50 6
BACKING WOODEN FRAMES, SPACED AS SHOWN 13

6x1200x2400mm LAWANIT BLACKBOARD


3 (PAINTED-DEPED SPECS.)
82 69

100
150

19x50mm WOOD BLACKBOARD EDGE FRAMING


19

19

31
81

IN
12 mm THK. SOLID WOOD CHALK DUST 6 X 1200 X 2400 mm LAWANIT 19 X 50 mm WOOD BLACKBOARD EDGE FRAMING 10x10mm2 S/S MESH SCREEN
12 mm THK. PULL-OUT CHALK CATCHER (PAINTED-DEPED SPECS.) BLACKBOARD (PAINTED-DEPED SPECS.)
150 S/S MESH SCREEN
50x75mm VERTICAL MAIN WOODEN FRAME

25
PLAN (SECTIONAL VIEW)

125
112

88
138
12mm THK. PULL-OUT CHALK DUST BOX HOUSING 12 mm THK. PULL-OUT CHALK DUST BOX
150

150mm THK. CHB WALL

4900
6mm THK. MARINE 50 X 50 mm VERTICAL AND HORIZONTAL
PLYWOOD TOP COVER 2450 2450 DETAIL SECTION (CHALK DUST BOX) SECONDARY WOODEN FRAMES,
SPACED AS SHOWN
75
2400 600 600 600 600 50 50mmx75mm VERTICAL
150mm THK, CHB WALL 50 MAIN WOODEN FRAME

3
68

100
150

31
38

CHALK DUST BOX WITH 10 X 10 mm 12 mm THK. SOLID WOOD CHALK DUST 6 mm THK. MARINE
150
S/S MESH SCREEN CATCHER (PAINTED-DEPED SPECS.) PLYWOOD BACKING
12 mm THK. X 100 mm SOLID WOOD CHALK DUST
CATCHER (PAINTED-DEPED SPECS.)
PLAN (TOP VIEW) 12 mm THK. X 25 mm SOLID WOOD CHALK DUST
19mmx50mm WOOD CATCHER SIDING (PAINTED-DEPED SPECS.)

DETAIL OF BLACKBOARD BLACKBOARD EDGE


FRAMING 6 X 1200 X 2400 mm LAWANIT BLACKBOARD
(PAINTED-DEPED SPECS.)

12 mm THK. PULL-OUT CHALK DUST BOX

12mm THK. WOOD CHALK


DUST BOX HOUSING
SCREEN

CHALK DUST BOX DETAIL (ISOMETRIC VIEW)


PROJECT NAME & LOCATION: SHEET CONTENTS: TRACED FROM STANDARD BOD PLAN: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

DETAILED ENGINEERING DESIGN PLAN FOR THE


REGIONAL OFFICE VII PREPARED:
A 14
CONSTRUCTION OF 1STY2CL,MACALINGAN P/S , DETAIL OF BLACKBOARD
BOHOL 3RD DISTRICT ENGINEERING OFFICE CARINA L. ABREA HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 14 14 32
GUINDULMAN, BOHOL LILA,BOHOL CHONA O. PELIGRINO ARCHITECT II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ARCHITECT II DATE: DATE: DATE: DATE:
GENERAL CONSTRUCTION NOTES
GENERAL NOTES NOTES ON CONCRETE MIXES & PLACING
3. IF SLABS ARE REINFORCED BOTHWAYS BARS ALONG THE SHORTER SPAN SHALL BE PLACED
1.ALL CONCRETE SHALL DEVELOP A MIN.COMPRESSIVE STRENGTH AT THE END OF TWENTY EIGHT
1.0 STANDARDS AND REFERENCES (28) DAYS W/ CORRESPONDING MAXIMUM SIZE AGGREGATE & SLUMP AS FOLLOWS,
BELOW THOSE ALONE THE LONG SPAN AT THE CENTER AND OVER THE LONGER SPAN FOR
THE FOLLOWING SHALL GOVERN THE DESIGN FABRICATION AND CONSTRUCTION OF THE PROJECT. REINFORCING BARS NEAR THE SUPPORTS.THE SPACING OF THE BARS AT THE COLUMN STRIPS
MAX. SIZE OF SHALL NOT BE MORE THAN ONE AND A HALF (1 21) SLAB THICKNESS.
1.1 NATIONAL STRUCTURAL CODE OF THE PHILIPPINES (N.S.C.P. 2015) VOL.1,SEVENTH EDITION. LOCATION 28 DAYS STRENGTH MAX SLUMP
AGGREGATE 4. TEMPERATURE BARS FOR SLAB SHALL BE GENERALLY PLACED NEAR THE FACE IN TENSION AND
2.0 DESIGN CRITERIA ALL OTHERS,INCLUDING
SHALL NOT BE LESS THAN 0.0025xGROSS-SECTIONAL AREA (Ag)OF THE SLAB.
3000 PSI (20.7 MPa) 20mm 100mm (SEE SCHEDULE BELOW)
2.1 LOADINGS SUSPENDED SLABS JOINT HOOP SPACE @ ''2Sh''WHEN
COLUMNS 3000 PSI (20.7 MPa) 20mm 100mm THERE ARE BEAMS HAVING WIDTH OF
A. DEAD LOAD
20mm 100mm AT LEAST ONE-HALF THE COLUMN

D
BEAMS,SLABS 3000 PSI (20.7 MPa)
CONCRETE 23.56 kN/m³ 20mm 100mm SCHEDULE OF MINIMUM SLAB REINFORCEMENT WIDTH & DEPTHS NOT LESS THAN

D JOINT REINF.
SLAB ON FILL 2500 PSI (17.5 MPa)
STEEL 76.93 kN/m³ THREE QUARTERS OF THE DEEPEST
150mm THK. CHB WALL 2.73 kPa 2. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS MINIMUM TEMPERATURE BARS BEAM THAT FRAME INTO FOUR
20mm 100mm 10mm Ø @ 250mm EACHWAY

CONF.REINF.
100mm THK. CHB WALL 2.11 kPa SUSPENDED SLABS SIDES OF THE COLUMN.ALL OTHER
B. LIVE LOAD SLAB ON GRADE 40mm 10mm Ø @ 250mm EACHWAY CONDITIONS USE HOOPS @ "Sh'' CENTERS.
125mm
25mm

Sh
ROOF 1.00 kPa WALLS ABOVE THE GRADE 150mm 10mm Ø @ 250mm EACHWAY
CLASSROOMS 1.90 kPa BEAMS STIRRUPS AND COLUMN TIES 40mm

COLUMN TIE AS
PER SCHEDULE
175mm 10mm Ø @ 250mm EACHWAY
TOILETS 1.90 kPa WHERE CONCRETE IS EXPOSED TO FOR COL. BAR SPLICES SEE TABLE
200mm 10mm Ø @ 250mm EACHWAY
CORRIDORS ABOVE,STIARS 3.80 kPa EARTH BUT POURED AGAINST FORMS 50mm OF MIN.LAP SPLICE LENGTH OF
CORRIDORS ON GROUND 4.80 kPa WHERE CONCRETE IS DEPOSITED 5. UNLESS OTHERWISE NOTED IN THE PLANS ALL BEDDED SLABS SHALL BE RENFORCED WITH 10mmØ COLUMN REINFORCEMENT
DIRECTLY AGAINST EARTH 75mm

CONF.REINF.
C. WIND LOAD AT 250mm O.C. EACH WAY TO CENTER OF SLAB AND CONSTRUCTION JOINTS FOR SAME SHALL
NOT BE LESS THAN 3.65 METER APART.
BUILDING CATEGORY =1 (ESSEBTIAL FACILITIES)

Sh
3. CONCRETE SHALL BE DEPOSITED IN ITS FINAL POSITION W/OUT SEGREGATION. RE-HANDLING

D
EXPOSURE=D (FLAT,UNOBSTRUCTED AREAS AND WATER SURFACES OR PLACING SHALL BE DONE PREFERABLY WITH BUGGIES,BUCKETS OR WHEELBARROWS, 6. PROVIDE EXTRA REINFORCEMENTS FOR CORNER SLAB (TWO ADJACENT DISCONTINUOES EDGES) NOTE:

JOINT REINF.
MAXIMUM WIND VELOCITY,V=340 KPH NO CHUTES WILL BE ALLOWED EXCEPT TO TRANSFER CONCRETE FROM HOPPERS TO BUIGGIES AS SHOWN BELOW. ALL CONCRETE REINF.DETAIL SHOULD
WHEELBARROWS OR BUCKETS IN WHICH CASE THEY SHALL NOT EXCEED SIX (6) METERS 7.CONCRETE SLAB REINFORCEMENT BE PROPERLY SUPPORTED WITH 10mm STEEL CHAIR BE DONE IN ACCORDANCE WITH ACI
P=qh [(GCpf)-(GCpi)] (DESIGN WIND PRESSURE) IN AGGREGATE LENGTH. DETAILING MANUAL (LATEST EDITION)

CONF.REINF.
OR APPROVED EQUIVALENT SPACED AT 1.0 METER ON CENTER BOTHWAYS.
WHERE: qh= VELOCITY PRESSURE (kPa) 4. NO DEPOSITING OF CONCRETE SHALL BE ALLOWED WITHOUT THE USE OF VIBRATORS UNLESS
AUTHORIZED IN WRITING DESIGNER AND ONLY FOR UNUSUAL CONDITIONS WHERE VIBRATIONS

D
GCpf= EXTERNAL PRESSURE COFFECIENT
GCpf= INTERNAL PRESSURE COFFECIENT ARE EXTREMELY DIFFICULT TO ACCOMPLISH. Ø12x1000 LONG AT
5. ALL ANCHOR BOLTS,DOWELS,AND OTHER INSERTS SHALL BE PROPERLY POSITIONED & SECURED MID-DEPTH OF SLAB
D.SEISMIC LOAD IN PLACE PRIOR TO PLACING OF CONCRETE.
V= Cvl W (DESIGN BASE SHEAR)
6. ALL CONCRETE SHALL BE KEPT MOST FOR A MINIMUM OF SEVEN CONSECUTIVE DAYS IMMEDIATELY DOWN INTO EDGE BEAM EXTENDED AT EACH CORNER TYPICAL COLUMN ELEV.SHOWING
AFTER POURING BY THE USE O WET BURLAP,FOG SPRAYING,CURING COMPOUNDS OR OTHER 4-Ø 12@ 1800 LONG TOP BARS BEND 1-Ø 12 TOP &
RT
APPROVED METHODS. BARS MIN.OF 1,200(4'-0'') INTO BARS
BOTT.BARS DOWELS AND TIES SPACING
Vmax= 2.50Cal W Vmin=0.11 CalW 7. STRIPPING OF FORMS AND SHORES:
RT 4-Ø12 BOTT,BARS
Vmin= 0.80ZNvl W (ZONE 4) FOUNDATION------------------------------------------------------------------------------------------------ 24 HOURS

400
R LAP SPLICE LENGTH:
SUSPENDED
AT ANY LEVEL NO MORE THAN
WHERE: W= TOTAL DEAD LOAD 0
SUSPENDED SLAB EXCEPT WHEN_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 8 DAYS 60 SLAB 38mm ALTERNATE BARS SHOULD BE
T=NATURAL PERIOD = Ct (h) OPENING CLEAR SPLICED MIN.DISTANCE BET.
ADDITIONAL LOADS ARE IMPOSED 0
WHERE: C=NUMERICAL COEFFICIENT 60 TWO ADJACENT BARS SPLICES
WALLS_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 21 DAYS
h=BUILDING HEIGHT SHALL BE 600mm

400
BEAMS_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 14 DAYS
I=IMPORTANCE FACTOR = 1.50 L
R=NUMERICAL FACTOR = 8.50 COLUMNS_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 21 DAYS

CONF. REINF.TIES LAT.TIES H (CLEAR HEIGHT OF COL.)


SEISMIC COEFFICIENT Cv=0.44 Nv IN TWO WAY SLAB EXTEND

WITHIN CENTER
8. THE CONTRACTOR SHALL SUBMIT THE SCHEDULE OF POURING AND THE LOCATION OF THE 60 BARS UP TO BEAM SUPPORT

HALF OF ''H''
Ca=0.64 Nv CONSTRUCTION JOINTS TO THE STRUCTURAL ENGINEER AT LEAST (4) DAYS PRIOR TO THE 0
NEAR SOURCE FACTOR (5km) Nv=1.6 0.25L
POURING FOR APPROVAL. OMIT TRIMMER BARS WHERE
Na = 1.2 TYPICAL CORNER SLAB DETAIL OPENING IS FRAMED BY BEAM TOP BARS @ SUPPORT (CONT.)
9. THE CONCTRACTOR SHALL FURNISH AND MAINTAIN ADEQUATE FORMS AND SHORINGS UNTIL THE REQ'D.BOTT.BARS @ SUPPORT
Z=SEISMIC ZONE = 0.40(ZONE 4)
S=SOIL TYPE = D
CONCRETE MEMBERS HAVE ATTAINED THEIR WORKING CONDITION AND STRENGTH. TYPICAL SLAB

JT. REINF.
OPENING DET.
2.2 DESIGN STRESSES NOTES ON FOOTINGS
A. CONCRETE COMPRESSIVE STRENGTH @ 22 DAYS:
a. FOOTINGS,COLUMNS,BEAMS AND SLABS f'c = 20.7 MPa(3,000 psi)
1. FOOTINGS ARE DESIGNED FOR AN ALLOWANCE SOIL BEARING PRESSURE OF 96 KPa (2000psf). NOTES ON COLUMNS BOTTOM BARS
CONTRACTOR SHALL REPORT TO THE ENGINEER,IN WRITING,THE ACTUAL SOIL CONDITIONS 0.165L SPLICE AT MID SPAN
b. SLAB ON FILL f'c = 17.5 MPa(2,500 psi) UNCOVERED AND CONFIRM ACTUAL BEARING CAPACITY OF SOIL BEFORE DEPOSITING CONCRETE. 1. PROVIDE EXTRA SETS OF TIES AT 100 O.C. FOR TIED COLUMN REINFORCEMENT ABOVE
B. REINFORCING STEEL BARS AND BELOW BEAM-COLUMN CONNECTIONS FOR A DISTANCE FROM FACE OF CONNECTION 0.22L EXTRA TOP BARS
2. FOOTING SHALL REST ATLEAST 1500mm BELOW NATURAL GRADE LINE UNLESS OTHERWISE @ SUPPORT
a.FOR BARS 16mm AND GREATER (INTERMEDIATE GRADE DEFORMED BAR) f'y = 275 MPa(40,000 psi) EQUAL TO GREATER OF THE OVERALL THICKNESS OF COLUMN,61 THE CLEAR HEIGHT OF
INDICATED IN PLANS.NO FOOTING SHALL REST ON FILL
b.FOR BARS LESS THAN 16mm (STRUCTURAL GRADE DEFORMED BAR) COLUMN OR 450mm.
f'y = 230 MPa(33,000 psi) 3. MINIMUM COCNRETE PROTECTION FOR REINFORCEMENT SHALL BE 75mm CLEAR FOR CONCRETE 2. COLUMN TIES SHALL BE PROTECTED EVERYWHERE BY A COVERING OF CONCRETE CAST
C. STRUCTURAL STEEL ASTM-A36 DEPOSITED THE GROUND AND 50mm FOR CONCRETE DEPOSITED AGAINST A FORMWORK.
MONOLITHICALLY WITH THE CORE WITH A MINIMUM THICKNESS OF 40mm AND NOT LESS
FOR TRUSSES,BRACINGS,& STRUTS f'y = 248 MPa(36,000 psi) 4. IN CASES WHERE THE SOIL CONDITION IS SUCH THAT THE MINIMUM ALLOWABLE SOIL PRESSURE
THAN 40 TIMES THE MAXIMUM SIZE OF COARSE AGGREGATE IN MILLIMETERS. TYPICAL DETAIL OF COL.LAP SPLICE
D. PURLINS OF 96KPa (2000 psf) CAN NOT BE ATTAINED AT A PRACTICAL DEPTHS THE USE OF MICROPILES,
COLD FORMED LIGHT f'y = 248 MPa(36,000 psi) BORED PILES,OR DRIVEN PILES MAY BE ADOPTED IN LIEU OF STANDARD ISOLATED FOOTINGS.
3. WHERE COLUMNS CHANGE IN SIZE,VERTICAL REINFORCEMENT SHALL BE OFFSET AT A & EXT. GIRDER TO COL. CONNECT.
SLOPE MONOLITHICALLY WITH THE CORE WITH MINIMUM THICKNESS OF 40mm AND
E. MASONRY UNIT (CHB)
NOT LESS THAN 40 TIMES THE MAXIMUM SIZE COARSE AGGREGATE IN MILLIMETERS
NON-LOADING BEARING CHB WALLS fm' = 3.45 MPa(500 psi) NOTES ON REINFORCEMENT 4. UNLESS OTHERWISE INDICATED IN THE PLANS,LAP SPLICES FOR VERTICAL COLUMN
F. WELDS E-60XX ELECTRODE REINFORCEMENT SHALL BE MADE WITHIN THE CENTER HALF OF COLUMN HEIGHT,AND
G. STRUCTURAL BOLTS ASTM-A307 a.Ft= 96.60 mPa(14,000 psi) 1. UNLESS OTHERWISE NOTED IN PLANS, THE YIELD STRENGTH OF REINFORCING BARS SHALL BE:
b.Ft= 69.60 mPa(10,000 psi) A.
THE SPLICE LENGTH SHALL BE LESS THAN 40 BAR DIAMTERS.WELDING OR APPROVED
FOOTINGS,FOOTING BEAMS AND GIRDERS _ _ _ _ _ _ _ _ _ _ _ _ _fy = 275 MPa (40,000 psi) NOTES ON BEAMS AND GIRDERS
MECHANICAL DEVICES MAY BE USED PROVIDED THAT NOT MORE THAN ALTERNATE BARS
B. COLUMNS AND SHEAR WALLS _ _ _ _ _ _ _ _ _ _ _ _ _fy = 275 MPa (40,000 psi) 1. UNLESS,OTHERWISE NOTED IN PLANS,CAMBER ALL BEAMS AND GIRDER AT
ARE WELDED OR MECHANICALLY SPLICED AT ANY LEVEL AND THE VERTICAL DISTANCES
3.0 IN THE INTERPRETATION OF THE DRAWING,INDICATED DIMENSIONS SHALL GOVERN C. BEAMS GIRDER _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _fy = 275 MPa (40,000 psi) BETWEEN THESE WELDS OR SPLICES OF ADJACENT BARS IS NOT LESS THAN 600mm
LEAST 6mmØ FOR EVERY 4.50M OF SPAN,EXCEPT CANTILEVERS FOR WHICH
DISTANCES AND SIZES SHALL NOT BE SCALED FOR CONSTRUCTIONS PURPOSES. D. NON-LOAD BEARING WALL PARTITIONS,BEDDED SLABS,FLOOR & ROOF SLABS, THE CAMBER SHALL BE AS NOTED IN PLANS OR AS ORDERED BY THE ENGINEER
PARAPETS,CATCH BASIN,SIDE WALK _ _ _ _ _ _ _ _ _ _ _ _ _ _fy = 275 MPa (40,000 psi) BUT IN NO CASE LESS THAN 20mm FOR EVERY 3.0M OF FREE SPAN.
4.0 IN REFERENCES TO OTHER DRAWINGS,SEE ARCHITECTURAL DRAWINGS FOR DEPRESSIONS IN FLOOR
2. ALL REINFORCING BARS SIZE 10mm OR LARGER SHALL BE DEFORMED IN ACCORDANCEE WITH THE ASTM A-706 2. TYPICAL BARS BENDING AND CUTTING DETAILS FOR BEAMS SHALL BE AS
SLABS,OPENINGS IN THE WALLS AND SLABS,INTERIOR PARTITIONS,LOCATIONS OF DRAINS ECT. SHOWN IN FIG. B-1
BARS SMALLER THAN 10mm MAY BE PLAIN.
5.0 IN CASE OF DISCREPANCIES AS TO THE LAYOUT,DIMENSIONS AND ELEVATIONS BETWEEN THE 3. SPLICES SHALL BE SECURELY WIRED TOGETHER & SHALL LAP OR EXTEND IN ACCORDANCE WITTH TABLE B
STRUCTURAL PLANS AND ARCHITECTURAL DRAWINGS,THE CONTRACTORS SHALL NOTIFY BOTH THE
STRUCTURAL ENGINEER AND ARCHITECTS.
(TABLE OF LAP SPLICE & ANCHORAGE LENGTH) UNLESS OTHERWISE SHOWN ON DRAWINGS,SPLICES SHALL BE H
STAGGERED WHENEVER POSSIBLE.
6.0 ALL CONCRETE WORKS AND CONCRETE REINFORCEMENTS SHALL BE DONE IN ACCORDANCE WITH THE CROSS - TIE

350mm MAX
ACI.318-14M BUILDING CODE REQUIREMENT AND ALL STRUCTURAL STEEL WORKS ACCORDING WITH THE NOTES ON CONCRETE SLABS L1 L2
WITH THE AISC-05 IN SO FAR AS THEY DO NOT CONFLICT WITH THE LOCAL BUILDING CODE REQUIREMENT. 1. ALL SLAB REINFORCEMENTS SHALL BE 20mm CLEAR MINIMUM FROM BOTTOM AND FROM THE TOP OF SLAB L1 1/3 L1 1/3 L2 1/3 L2 1/3
7.0 ACI REFERS TO AMERICAN CONCRETE INSTITUTE,AISC REFERS TO AMERICAN INSTITUTE OF STEEL 2. UNLESS OTHERWISE SHOWN,REINFORCEMENT IN CONTINOUS ELEVATED SLAB SHALL BE CUT AS FOLLOWS: 1. UNLESS, OTHERWISE NOTED IN PLANS, CAMBER ALL BEAMS

10

H
d
CONSTRUCTION AND ASTM REFERS TO AMERICAN SOCIETY FOR TESTING MATERIALS.

m
in
8.0 CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE SHOWN OR

.
BENT BAR
NOTED.MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS.
L1 L2
9.0 SHOP DRAWING WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEELS,MISCELLANEOUS L1 1/5 L1 1/5 L2 1/5
TOP BARS
L2 1/5
L1/4 L1/4 L2/4
IRON,PRE-CAST CONCRETE,ETC. SHALL BE SUBMITTED FOR ENGINEERS APPROVAL BEFORE FABRICATION. TOP BAR 2 Ø 12mm SIDE BARS WEB BARS
10. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS,SILLS,STOOLS EQUIPMENT AND BOTTOM BARS

MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL,ELECTRICAL AND MECHANICAL DRAWINGS.
FIGURE B-1
11. ALL RESULTS OF THE MATERIAL TESTING FOR CONCRETE,REINFORCING BARS & STRUCTURAL STEEL MUST
BE NOTED & APPROVED BY THE MATERIALS ENGINEER/STRUCTURAL DESIGNER
BOTTOM BAR

PROJECT NAME & LOCATION: SHEET CONTENTS: TRACED FROM STANDARD BOD PLAN: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

REGIONAL OFFICE VIIDETAILED ENGINEERING DESIGN PLAN FOR THE GENERAL


PREPARED:
S 15
CONSTRUCTION OF 1STY2CL,MACALINGAN P/S , CONSTRUCTION NOTES
BOHOL 3RD DISTRICT ENGINEERING OFFICE LOUIEL IAN R. LOMOTOS HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 1 10 32
GUINDULMAN, BOHOL LILA,BOHOL JOHN GLENN F. CADENAS ENGINEER II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEERING ASSISTANT DATE: DATE: DATE: DATE:
GENERAL CONSTRUCTION NOTES
TABLE 'A' TABLE 'B'
NOTES ON STIRRUPS
REINFORCING CONCRETE LINTEL BEAMS IN SEE CONSTRUCTION NOTES 4-Ø16 VERT.BARS
TENSION BARS TENSION BARS CONCRETE BLOCK WALLS FOR MASONRY WALL
1. ALL REINFORCEMENT SHALL BE BENT COLD UNLESS
4-Ø16 VERT.BARS

550
TABLE OF LAP SPLICE & ANCHORAGE LENGTH (mm) TABLE OF LAP SPLICE & ANCHORAGE LENGTH (mm) REINFORCEMENTS(TYPICAL) OTHERWISE PERMITTED BY THE STRUCTURAL ENGINEER.

550
FIN.FLR.LVL.
LINTELS IN BLOCK WALLS

600 (MIN.) VARIES


BAR SIZES fc'=20.7MPa(300psi) fc'=27.6MPa(4000psi) BAR SIZES fc'=20.7MPa(300psi) fc'=27.6MPa(4000psi) 2. AS SHOWN IN THE DESIGN DRAWINGS OR
(DEFORMED MM) (DEFORMED MM) CLEAR TOTAL MIN. HEIGHT OF REINFORCEMENT NAT.GRD.LVL.
EMBEDMENT LAPPED EMBEDMENT LAPPED EMBEDMENT LAPPED EMBEDMENT LAPPED
SPAN LENGTH fc' LINTEL DOWEL BARS TO MATCH PERMITTED BY THE STRUCTURAL ENGINEER.
(mm)
Ø10 300 300 300 300 Ø10 225 300 200 300 (L) (L+0.40M) (MPa) BOTTOM TOP STIRRUPS CHB VERTICAL BARS 550 550 3. TIES & CLOSE STIRRUPS MUST BE AT 135.
Ø12 300 300 300 300 Ø12 275 300 250 300 Ø10 BOTT.BARS @300 O.C.
180 DEG. HOOKS
TYPICAL CONNECTION DETAIL

250
1.20 M 1.60 M 200 1-Ø10 1-Ø10 Ø6 mm @ 200mm
Ø16 300 400 300 400 Ø16 350 400 325 400 Dbar

D+12db
1.50 M 1.90 M 14.0 200 1-Ø10 1-Ø10 Ø6 mm @ 200mm 3-Ø10 BOTT.BARS
Ø20 400 550 350 500 Ø20 450 500 475 500 1.80 M 2.20 M 200 1-Ø12 1-Ø10 Ø6 mm @ 200mm OF R.C. WALL AT CORNERS
Ø25 600 800 550 750 Ø25 625 550 625 400
550
2.10 M 2.50 M 250 1-Ø12 1-Ø10 Ø6 mm @ 200mm
Ø28 750 1000 650 850 Ø28 625 675 625 675 Ø6 mm @ 200mm
4db OR 65mm
2.40 M 2.90 M 17.0 250 1-Ø12 1-Ø10
Ø32 950 1300 850 1100 Ø32 700 775 700 775 2.70 M 3.10 M 250 1-Ø16 1-Ø12 Ø10 mm @ 200mm
DOWEL TO MATCH NOTES ON WELDS
3.00 M 3.40 M 300 1-Ø16 1-Ø12 Ø10 mm @ 200mm CHB VERT.BARS 90 DEG. HOOKS
NOTES: NOTES: 1. USE E60xx ELECTRODES FOR ALL MEMBERS WELDED Dbar
3.30 M 3.70 M 20.0 300 1-Ø16 1-Ø12 Ø10 mm @ 200mm
1.TOP PLAIN BARS,MULTIPLY VALUE BY 2
2. NOT MORE THAN 33% OF THE BARS SHALL BE
1.TOP PLAIN BARS,MULTIPLY VALUE BY 2
2. NOT MORE THAN 33% OF THE BARS SHALL BE 3.60 M 4.00 M 300 1-Ø20 1-Ø12 Ø10 mm @ 200mm
2. WELDS SHALL DEVELOP THE FULL STRENGTH OF MEMBERS JOINED
300
SPLICED WITHIN THE REQUIRED LAP LENGTH SPLICED WITHIN THE REQUIRED LAP LENGTH UNLESS OTHERWISE SHOWN OR DETAILED IN THE DRAWINGS

DOWEL

L
12db
(TYP.)
3. VALUES GIVEN ABOVE CAN ALSO BE USED FOR COLUMNS

400
12 THK. EXPANSION JOINT
WITH MASTIC FILLER
FIN.FLR.LVL. D
NOTES ON STRUCTURAL STEEL

250
1. STRUCTURAL STEEL TO BE USED FOR FABRICATION AND ERECTION OF THIS
3. IF THE BEAM REINFORCING BARS END IN A WALL,THE CLEAR DISTANCE FROM THE BAR TO THE FURTHER 1-Ø16 VERT. BARS 6-Ø10 BARS(AS SHOWN) STRUCTURAL SHALL COMPLY WITH ALL THE PERTINENT PROVISION OF AISC

(DOWEL)
MAIN BAR END HOOKS
FACE OF THE WALL IS NOT LESS THAN 25mm.EMBEDMENT LENGTH SHALL BE SHOWN IN A TABLE 'A' FOR Ø10 BOTT.BARS@ 300 O.C
SPECIFICATION FOR THE DESIGN,FABRICATION AND ERECTION OF STRUCTURAL

400
CHB WALL 400 (ALL GRADES)
TENSION BARS AND TABLE 'B' FOR COMPRESSION BARS UNLESS SPECIFIED IN PLAN. TOP BARS AND SHALL 1-Ø16 VERT. BARS
FOR SIZE AND SPACING STEEL FOR BUILDING LATEST EDITION. BAR SIZE DIAMETER 180° HOOK 90°HOOK
NOT BE SPLICED WITHIN THE COLUMN OR TWO STIRRUPS SHALL BE PROVED AT ALL SPLICES. OF HOR. & VERT.BARS 2. ALL STRUCTURAL STEEL SHAPES SHALL CONFORM TO ASTM A36 STRUCTURAL (DEFORMED) (mm)
FOR SIZE AND SPACING D+2db L L
4. IF THERE ARE TWO OR MORE LAYERS OF REINFORCING BARS,USED 25mm BAR SEPARATORS SPACED AR 1.00M OF HOR. & VERT.BARS SEE CONSTRUCTION NOTES. STEEL UNLESS OTHERWISE INDICATED.
ON CENTER ON NO CASE SHALL THERE BE THAN TWO (2) SEPARATORS BETWEEN LAYERS OF BARS DOWEL TO MATCH 10 mmØ 60 75 125 150
SEE CONSTRUCTION NOTES. 3. ALL WELDED CONNECTIONS SHALL DEVELOP THE FULL STRENGTH OF THE
CHB VERT. BARS
5. MINIMUM CONCRETE PROTECTION FOR REINFORCING BARS OR STEEL SHAPES BE AS SHOWN IN FIGURE B-2 MEMBERS CONNECTED. 12 mmØ 75 100 150 200
CHB WALL WHERE DEPRESSED
UNLESS ELSEWHERE. SLAB OCCURS 4. UNLESS OTHERWISE SPECIFIED ALL WELDING RODS SHALL CONFORM WITH
300 16 mmØ 95 125 175 250

CORNER WALL OPENING OR END WALL E60 ELECTRODES.

DOWEL
(TYP.) 20 mmØ 115 150 200 300

400
5. ALL BOLTS USED UNLESS OTHERWISE SPECIFIED SHALL BE ASTM A 307 BOLTS.
25 mmØ 150 200 230 450
FIN.FLR.LVL.

250
28 mmØ 240 300 350 550
MAIN REINFORCEMENT MAIN REINFORCEMENT
CHB WALL R.C. COLUMN OR WALL 6-Ø10BARS(AS SHOWN) NOTES ON EMBEDDED PIPES: 32 mmØ 300 335 450 600
t OR 1/4D

SLEEVES FOR UTILITY DOWEL BARS TO Ø10BOTT.BARS@ 300 OC. 1. ALL EMBEDED PIPES FOR UTILITIES ETC. THAT PASS THRU BEAMS SHALL NOT
SLEEVES FOR UTILITY 400
t

1-Ø16 VERT, BARS EXCEED 100mm IN DIAMETER OR 1/3 BEAM DEPTH WHICHEVER IS LESS,UNLESS,
PIPES MAX.1/5 D PIPES MAX.1/5 D MATCH CHB HOR.BARS
D

12 THK. EXPANSION JOINT 12 THK. EXPANSION JOINT TYPICAL CHB FOOTING DETAILS OTHERWISE APPROVED IN WRITING BY THE STRUCTURAL ENGINEER.
WITH MASTIC FILLER 2. NO PIPES SHALL BE ALLOWED TO PASS THRU BEAMS VERTICALLY.
PROVIDE 3-Ø10 EXTRA
STIRR.EACH SIDE OF SLEEVES
PROVIDE 3-Ø10 EXTRA
STIRR.EACH SIDE OF SLEEVES
WITH MASTIC FILLER (WHERE APPLICABLE) 3. NO PIPES SHALL BE EMBEDDED IN COLUMNS. 135 DEG. HOOK

L
LE

(DOWEL)
TYP.DET.FOR SLEEVES TYP.DET.FOR SLEEVES

400
FOR SIZE AND SPACING NOTES ON CONSTRUCTION JOINTS IN CONRETE
THRU CONCRETE BEAM THRU CONCRETE BEAM OF HOR. & VERT.BARS 400 1. WHERE A CONSTRUCTION JOINT IS TO BE MADE, THE SURFACE OF CONCRETE D

6d
FIG.B-2 FIG.B-3
SEE CONSTRUCTION NOTES. (DOWEL) SHALL BE CLEANED AND ALL LAITANCE AND STANDING WATER REMOVED SHEAR

b
VERIFY DEPRESSION
30 BAR Ø 30 BAR Ø KEY SHALL BE PROVIDE AT THE JOINT.
INTERSECTION WALL INTERSECTING R.C.COLUMN OR WALL (min.) (min.) L1

D=FOR BEAM
t=FOR SLAB
6. WHEN A BEAM CROSSES A GIRDER, REST BEAM ON TOP OF GIRDER BARS,BEAM REINFORCING BARS SHALL BE L
MAIN REINFORCEMENTS
SYMMETRICAL ABOUT THE CENTER LINE WHENEVER POSSIBLE. TYPICAL CONNECTION DETAIL OF MASONRY WALL TO BE CONTINOUS (TOP & BOTT.BARS)
7. GENERALLY,NO SPLICES SHALL BE PERMITTED AT POINTS WHERE CRITICAL BENDING STRESSES OCCUR,SPLICES
MAIN REINFORCEMENTS WHERE JOINTS IS AT POINT OF
WHERE SO PERMITTED SHALL BE INDICATED IN TABLE 'A' AND 'B'. WELDED SPLICES SHALL DEVELOP IN TENSION AT
TO BE CONTINOUS STRESS,PROVIDE SHEAR RODS
LEAST 125% OF THE SPLICED YIELD STRENGTH OF THE BAR NOT MORE THAN 50% OF THE BARS AT ANY ONE SECTION WITH ENGINEERS APPROVAL
STIRRUP AND THE TIE HOOKS
(ALL GRADES)
IS ALLOWED TO BE SPLICED THEREIN. 200 (MIN) 200 (MIN) D=FOR BEAM Ø10x1000 LONG @ 300 O.C. BAR SIZE DIAMETER 180° HOOK 90°HOOK
2t=FOR SLAB 30ØBAR 30ØBAR
40 (MIN.) 50 (MIN.) (DEFORMED) (mm) D+2db L L
30 BAR Ø(min.)

D/3
Ø10 STIRRUPS 10 mm Ø 40 125 85 100
NOTES ON CONCRETE HOLLOW BLOCKS WALLS TYPICAL DETAIL FOR BEAM

D/3
@ 150 O.C.

t/3

D
115

t/3
12 mm Ø 50 165 115

t
OR SLAB CHANGE SOFFIT

t/3
1. UNLESS OTHERWISE SHOWN IN PLANS ALL CONCRETE HOLLOW BLOCKS AND CERAMIC BLOCKS SHALL BE
16 mm Ø 65 200 140 150
REINFORCED CHB WALL FOR SIZE AND SPACING SLAB BEAM
AS SHOWN IN THE SCHEDULE OF CONCRETE HOLLOW BLOCKS AND CERAMIC BLOCK REINFORCEMENT. OF HOR. & VERT.BARS 20 mm Ø 115 300 165 300

2. PROVIDE 150mmx300mm STIFFENER COLUMN REINFORCED WITH 4-12mm WITH 10mmØ TES AT 150mm ON OPENING
SEE CONSTRUCTION NOTES
TYPICAL SLAB & BEAM 32 mm Ø 150 335 230 405

(DOWEL)
Ø1-16 VERT.BARS
CENTER TYPICAL
CONSTRUCTION JOINT DET.

400
DOWEL BARS TO MATCH
WHERE CONCRETE HOLLOW BLOCK TERMINATES AND AT EVERY 3.00M LENGTH OF CONCRETE HOLLOW CHB VERT.BARS
BLOCK
WALLS UNLESS NOTED IN STRUCTURAL PLANS.
2-Ø12 TOP BARS NOTES ON CONCRETE WALLS
200
FIN.FLR.LVL.
2-Ø12 BOTT. BARS 1. ALL WALLS SHALL BE REINFORCED ACCORDING TO THE FOLLOWING
SCHEDULE OF WALL REINFORCEMENT UNLESS OTHERWISE INDICATED IN NOTE:
ELEVATION SECTION THE PLANS. PROVIDE THESE ADDITIONAL BARS FOR
NOTES ON CONCRETE HOLLOW BLOCKS WALLS REINFORCEMENTS TYP. DET. LINTEL BEAM AT CHB WALL OPENING WALL REINFORCEMENT VERTICAL
ALL OPENING PLUS BARS (NOT SHOWN)
PARALLEL TO SIDE OF OPENING EQUAL
BLOCK THICKNESS REINFORCEMENT NOTES THICKNESS HORIZONTAL VERTICAL REMARKS SECTION TO THE NUMBER OF TERMINATED BARS
HORIZONTAL LAPPED
A. MINIMUM LAPS AT SPLICE= 0.25M 100mm Ø10mm @ 250mm O.C. Ø10mm @ 300mm O.C. HORIZONTAL BARS AT OPENING.
VER.BARS SEE ARCHITECTURAL & NECHANICAL
B. PROVIDE RIGHT ANGLED 125mm Ø10mm @ 200mm O.C. Ø10mm @ 250mm O.C. AT CENTERS VERTICAL
75mm 10mmØ EVERY 3RD LEVEL 10mmØ @ 600mm O.C. DOWEL BARS TO
BARS STAGGED OUT PLANS FOR SLAB OPENING LOCATION.
REINFORCEMENT AT FLR.SLAB OR BEAM MATCH VERT. BARS 150mm Ø12mm @ 250mm O.C. Ø12mm @ 300mm O.C. HOR.BARS
125mm 10mmØ EVERY 3RD LEVEL 10mmØ @ 600mm O.C. CORNERS 0.92m LONG
400 (DOWEL)

C. WHERE CHB OR CER.BLK.WALL DOWELS


VERIFY ARCHITECTURAL

150mm 10mmØ EVERY 3RD LEVEL 10mmØ @ 600mm O.C. 1. ALL JOINTS AND CELLS REINFORCING BARS SHALL HAVE 25mm CLEAR CONCRETE COVER FROM FACE OF DOOR
WITH THE SAME SIZE AS VER. OR HOR.
REINFORCEMENT SHALL BE PROVIDED
CONTAINING WALL EXCEPT FOR WALLS IN CONTACT WITH THE GROUND WHERE A MINIMUM OF OPENING
200mm 12mmØ EVERY 3RD LEVEL 10mmØ @ 600mm O.C. REINFORCING BARS 60mm SHALL BE PROVIDED AND FOR EXPOSED FACES OF FORMED WALLS WHERE
SHALL BE FILLED WITH
CONCRETE GROUT. THE MINIMUM SHALL BE 50mm CLEAR.\ 38mm CLEAR WINDOW
2.FOR REINFORCEMENTS 2. CARRY VERTICAL BARS AT LEAST 60mm ABOVE FLOOR LEVEL TO PROVIDE FOR OPENING
SEE CONSTRUCTION SPLICES WHEN NECESSARY STOP AT 50mm BELOW TOP SLAB OR SOLID BAND
NOTES.
WHERE THE WALL ENDS VERTICAL AND HORIZONTAL BARS SHALL BE SPLICED BY
1-Ø16 CONT.HOR.BARS
LAPPING A DISTANCE EQUAL TO 30 DIAMETERS AND WIRED SECURELY WITH 16 G.L.
FOR FLOOR SLAB ONLY WIRE PROVIDED THAT SPLICES IN ADJACENT BARS ARE STAGGERED AT LEAST
1.50M O.C.
3. UNLESS OTHERWISE NOTED IN THE PLANS, ALL OPENINGS IN WALLS 250mm OR TYP. EXTERIOR WDW.& DOOR OPENING
TYP.SECTION OF MASONRY THICKER SHALL BE REINFORCED AROUND WITH 2-20mm BARS. FOR 225mm, 200mm,
175mm, 150mm THICK WALLS, USE 2-16mm®. FOR 125mm AND 100mm THICK WALLS,
PARTITION REINFORCEMENTS USE 2-12mm@ BARS. ALL WALLS SPANNING SHALL HAVE VERTICAL
REINFORCEMENT BENT A U-FORM LIKE STIRRUPS AND SPACED ACCORDING TO THE
SCHEDULE UNLESS OTHERWISE NOTED.

PROJECT NAME & LOCATION: SHEET CONTENTS: TRACED FROM STANDARD BOD PLAN: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

DETAILED ENGINEERING DESIGN PLAN FOR THE


REGIONAL OFFICE VII GENERAL
PREPARED:
S 16
CONSTRUCTION OF 1STY2CL,MACALINGAN P/S , CONSTRUCTION NOTES
BOHOL 3RD DISTRICT ENGINEERING OFFICE LOUIEL IAN R. LOMOTOS HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 2 10 32
GUINDULMAN, BOHOL LILA,BOHOL JOHN GLENN F. CADENAS ENGINEER II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEERING ASSISTANT DATE: DATE: DATE: DATE:
GRID 1

10mmØ @ 300mm O.C.CHAIR BARS 3600


TOP LINE OF ROOF BEAM

100
10mmØ @ SPACED AS SHOWN,NOSING BARS

50

400
400
10mmØ @ 300mm O.C,
MAIN BARS

300
100mm THK. WELL COMPACTED GRAVEL FILL

300
10mmØ @ SPACED AS, 10mmØ@ 400mm
SHOWN,TEMP.BARS
R.C. RAMP O.C.,EACHWAY,TEMP.BARS
3000
10mmØ EXTRA TIES,@ 100mm O.C. 100mm THK.
WELL-COMPACTED
100 GRAVEL FILL 3 DETAIL SECTIONS OF STAIR ON FILL AND R.C. RAMP
S-3 100 100
STAIR ON FILL

GROUND F.L. 50
35 35
1 2 3 4 5
VARIES 419

FINISH G.L.

9000 9000
NATURAL G.L.

FTB FTB 4500 4500 4500 4500


1200
1500

7-16mmØ EACHWAY WF-1

WF-1
50

F-1,C-1 F-1,C-1 F-1,C-1 F-1,C-1 F-1,C-1


300

75
100

100mm THK. WELL-COMPACTED WF-1


GRAVEL FILL
1500 FTB-1 FTB-1 FTB-1 FTB-1
ELEVATION
1500

WF-1
575 350 575
75mm,clr

FL3

STIFFENER-1

STIFFENER-1

STIFFENER-1
STIFFENER-1

STIFFENER-1
575

FTB-2

FTB-2

FTB-2

FTB-2
CONCRETE PLATFORM
1500

350

FTB FTB
SLAB ON FILL

WF-1
12-20mmØ VERT. BARS t= 100mm+500mm
575

7-16mmØ BARS WITH 10mmØ TIES 1 @50,


EACHWAY 5@100, REST @ 150mm O.C. O.C.EACHWAY
F1,C1 10mmØTEMP.BARS
PLAN
FTB-1 FTB-1 FTB-1 FTB-1
2 DETAIL OF COLUMNS AND FOOTINGS
S-3

WF-1

FTB-3

FTB-3

FTB-3

FTB-3

FTB-3
F-1,C-1 F-1,C-1 F-1,C-1 F-1,C-1

4-16mmØ 3-16mmØ 5-16mmØ 3-16mmØ 6-16mmØ 3-16mmØ WF-1 FTB-1 FTB-1 FTB-1 FTB-1
400

400

400

400

400

400

3-16mmØ 4-16mmØ 3-16mmØ 5-16mmØ 3-16mmØ 6-16mmØ F-1,C-1


250 250 250 250 250 250 F-1,C-1 F-1,C-1 F-1,C-1
@SUPPORT @MIDSPAN @SUPPORT @MIDSPAN @SUPPORT @MIDSPAN
10mmØ STIRRUPS 1@50,10@75,REST @ 150mm O.C. 10mmØ STIRRUPS 1@50,6@100,REST @ 150mm O.C. 10mmØ STIRRUPS 1@50,6@100,REST @ 150mm O.C.

FTB-1 FTB-2 FTB-3


4 DETAIL FOOTING TIE BEAMS
S-3 1 FOUNDATION PLAN
PROJECT NAME & LOCATION: SHEET CONTENTS: TRACED FROM STANDARD BOD PLAN: CHECKED:
S-3 SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT FOUNDATION PLAN DRAFTSMAN I

DETAILED ENGINEERING DESIGN PLAN FOR THE


REGIONAL OFFICE VII DETAIL OF COLUMN
PREPARED:
S 17
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S , DETAIL OF TIE BEAMS
LOUIEL IAN R. LOMOTOS HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 3 10 32
GUINDULMAN, BOHOL LILA,BOHOL DETAIL OF STAIRS JOHN GLENN F. CADENAS ENGINEER II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEERING ASSISTANT DATE: DATE: DATE: DATE:
10mmØ TIES 1 @ 50,5@ 4-12mmØ VERT.BARS
1 2 100,REST @ 200mm W/10mmØ
TIES;1@50,3@100,REST@
4500 2-16mmØTOP.BARS
300 200mm O.C.

250
L/4+12Ø L/4+12Ø 2-16mmØBOTT.BARS

150 50
250

250
TOP LINE OF 4-16mmØ 2-16mmØ
ROOF BEAM 4-16mmØ 10mmØ TIES 1 @ 50,5@ LRB-1
100,REST @ 150mm
10mmØ TIES 1 @ 50,2@ 300
400 3-16mmØ 100,REST @ 150mm FTB

400

250
4-16mmØ
2-16mmØ 4-16mmØ 2-16mmØ 2-16mmØ
50 50
10mm dia, 1- 50mm, 200 300 4-12mmØ VERT.BARS
9-75mm, rest @
GB-1 W/10mmØ
150mm O.C. RB-1 PC-1 TIES;1@50,3@100,REST@
L/5-12Ø L/5-12Ø
L
4 DETAIL OF GB-1,LRB-1& PC-1 150mm O.C.

A RB-1 B S-4 C
7000 2500
4-16mmØ,CON'T. 4-16mmØ,CON'T. FTB
L/4+12Ø L/4+12Ø
4-16mmØ

50
SEE PARAPET
TOP LINE OF 8-16mmØ 4-16mmØ 8-16mmØ 4-16mmØ DETAILS

400
ROOF BEAM
400

400

100
8-16mmØ 4-16mmØ
2-16mmØ 4-16mmØ 4-16mmØ 2-16mmØ
10mm dia, 3- 50mm,
20-100mm, rest @ 10mm dia, 1- 50mm,
10mm dia,STIRR. 1- 50mm,
5 STIFFNER DETAIL
L/5-12Ø 150mm O.C. L/5-12Ø 10-100mm, rest @ 4 @ 100,REST @ S-4
150mm O.C. 150mm O.C.
L
CB-1 RB-2 RB-3 CB-1

ELEVATION 1 ROOF BEAM DETAILS


S-4 10mmØ STIRR. 10mmØ STIRR. 10mmØ STIRR.
150 150
4-16mmØ 2-16mmØ 4-16mmØ

400

400

400
2-16mmØ 4-16mmØ 2-16mmØ
150
10mmØ @EVERY 3RD LAYER, 10mmØ @600mm O.C., 250
HOR.BARS 150mmTHICK R.C. WALL
VERT.BARS 250 250
GROUND F.L. 10mmØ VERT BARS 200 EACH FACE SUPPORT & MIDSPAN
SUPPORT MIDSPAN
FINISH G.L. 175 175
10mmØ TIEBARS @ 200mm O.C.
RB-1 CB-1
10mmØ @600mm O.C.,
NATURAL G.L. VERT.BARS TYPICAL
10mmØ STIRR. 10mmØ STIRR. 10mmØ STIRR.
100100100

10mmØ @EVERY 3RD LAYER, 2-10mmØ


300

350

HOR.BARS
100mm THK. WELL-COMPACTED
GRAVEL FILL 4-16mmØ 4-16mmØ 4-16mmØ
10mmØx650mm LONG@ 10mmØ @ 300mm O.C.
4-16mmØ
250

400

400

400
600mm O.C.,DOWEL BARS 3-10mmØ 100 300 100
100mm THK. WELL-COMPACTED 4-16mmØ
4-16mmØ
100

FTB 4-16mmØ 4-16mmØ


10mmTHK. WELL-COMPACTED
GRAVEL FILL
10mmØ@ 300mm O.C.
WF-2
GRAVEL FILL 400
250 250 250
C.H.B. WALL ON FTB
WF-1
2 DETAILS OF WALL FOOTINGS SUPPORT MIDSPAN SUPPORT & MIDSPAN
S-4 RB-2 RB-3
PROJECT NAME & LOCATION: SHEET CONTENTS: TRACED FROM STANDARD BOD PLAN: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE PREPARED:
S 18
CONSTRUCTION OF 1STY2CL,MACALINGAN P/S , DETAILS
BOHOL 3RD DISTRICT ENGINEERING OFFICE LOUIEL IAN R. LOMOTOS HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 4 10 32
GUINDULMAN, BOHOL LILA,BOHOL JOHN GLENN F. CADENAS ENGINEER II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEERING ASSISTANT DATE: DATE: DATE: DATE:
A A
1250
1100 100 50 1250
12mmØ VERT.BARS @ 200mm O.C., 1100 100 50
WITH 5-10mmØ HOR.BARS,SPACED
12mmØ VERT.BARS @ 200mm O.C.,
AS SHOWN
WITH 3-10mmØ HOR.BARS,SPACED

100
100mm THK WITH 10mmØ AS SHOWN
BOTT.BARS @ 250mm O.C.,WITH
4-10mmØ SPACED AS SHOWN
100mm THK WITH 10mmØ
BOTT.BARS @ 250mm O.C.,WITH

100
4-10mmØ SPACED AS SHOWN

900

500
10mmØ VERT.BARS @ 250mm O.C., 10mmØ VERT.BARS @ 250mm O.C.,
WITH 2-10mmØ HOR.BARS,SPACED TOP LINE OF
WITH 2-10mmØ HOR.BARS,SPACED
AS SHOWN ROOF BEAM
AS SHOWN

400

400
RB-1 GB-1 RB-1 GB-1
CB-1
CB-1
DETAIL A DETAIL B
2 DETAIL OF R.C. GUTTER
A
S-5 B C
TOP OF PARAPET CHB
VAR.

3
APEX OF TRUSS S-7
L-100x100x6mm
THK.ANGULAR BASE PLATE
SEE DETAILS
FOR PARAPET SEE DETAILS
FOR PARAPET
1800

LRB
-1 -1
LRB PC-1
TOP LINE OF
ROOF BEAM
400

GB-1 RCB-1 RB-2 RB-2 RCB-1 GB-1


CHB

7000 2500

1 END-WALL DETAIL
S-5
PROJECT NAME & LOCATION: SHEET CONTENTS: TRACED FROM STANDARD BOD PLAN: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE DETAIL OF R.C. GUTTER PREPARED:
S 19
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S ,
END - WALL DETAIL LOUIEL IAN R. LOMOTOS HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 5 10 32
GUINDULMAN, BOHOL LILA,BOHOL JOHN GLENN F. CADENAS ENGINEER II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEERING ASSISTANT DATE: DATE: DATE: DATE:
1 2 3 4 5
18000

9000 9000
4500 4500 4500 4500
10mmØ SAGRODS @
MIDDLE THIRDS(STAGGERED)
GB-1 GB-1
1200

GB-1 GB-1
CB-1

CB-1

CB-1

CB-1

CB-1
A RB-1 RB-1 RB-1 RB-1

ROOFING
3500

3500

RB-2
RB-2

RB-2
RB-2

RB-2
7000

RB-1 RB-1 RB-1 RB-1


LRB-1 (ABOVE)

TRUSS-1

TRUSS-1
TRUSS-1

TRUSS-1
PC-1
3500

6mmØ J-BOLT SPACED AS


SHOWN AT ALL PURLINS

B RB-1 RB-1 RB-1 RB-1


RB-3

RB-3

RB-3

RB-3

RB-3
2500

ISOMETRIC VIEW OF
C CONNECTION OF ROOFING
RB-1 RB-1 RB-1 RB-1
2 TO PURLINS
CB-1
1200

CB-1

CB-1

CB-1
CB-1

GB-1 GB-1 S-6


12mmØ CROSS BRACING
150x50x25x1.5mm WTH STD.TURN BUCKLE
LC-PURLINS@ 500mm O.C.

1 ROOF FRAMING PLAN


S-6 SCALE: 1:100MTS

PROJECT NAME & LOCATION: SHEET CONTENTS: TRACED FROM STANDARD BOD PLAN: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT ROOF FRAMING PLAN DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE S 20


ISOMETRIC VIEW OF CONNECTION OF PREPARED:
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S ,
ROOFING TO PURLINS LOUIEL IAN R. LOMOTOS HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 6 10 32
GUINDULMAN, BOHOL LILA,BOHOL JOHN GLENN F. CADENAS ENGINEER II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEERING ASSISTANT DATE: DATE: DATE: DATE:
1 2 3 4 5
18000
9000 9000
4500 4500 4500 4500

GB-1 GB-1

1200
GB-1 GB-1

CB-1

CB-1

CB-1

CB-1

CB-1
A RB-1 RB-1 RB-1 RB-1

RB-2

RB-2
3500

RB-2
RB-2

RB-2
LRB-1 (ABOVE)

LRB-1 (ABOVE)
7000

RB-1 RB-1 RB-1 RB-1


PC-1

PC-1
RB-2
RB-2

RB-2
3500

B RB-1 RB-1 RB-1 RB-1


RB-3

RB-3

RB-3

RB-3

RB-3
2500

C RB-1 RB-1 RB-1 RB-1


1200

CB-1

CB-1
CB-1

CB-1
CB-1

GB-1 GB-1 GB-1 GB-1

1 ROOF BEAM FRAMING PLAN


S-7 SCALE: 1:100MTS

PROJECT NAME & LOCATION: SHEET CONTENTS: TRACED FROM STANDARD BOD PLAN: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE S 21


ROOF BEAM FRAMING PLAN PREPARED:
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S ,
LOUIEL IAN R. LOMOTOS HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 7 10 32
GUINDULMAN, BOHOL LILA,BOHOL JOHN GLENN F. CADENAS ENGINEER II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEERING ASSISTANT DATE: DATE: DATE: DATE:
SCHEDULE OF MEMBERS AND WELDS
L1 6mm GUSSET PL ,TYPICAL
SIZE OF WELDS
TRUSS MEMBERS
STITCH WELD
MARK LENGTH,mm REMARKS
SIZES THICKNESS

L3
L1 L2 L3

A 2 s - 63 x 63 x 6mm 6mm FULL WELD


TRUSS MEMBER
B 2 s - 63 x 63 x 6mm 6mm 125 100 50 L2
C 6mm 125 100 50
2 s - 50 x 50 x 6mm 2 REFERENCE WELD DETAIL
D 2 s - 50 x 50 x 6mm 6mm 100 75 50
S-8

A B C
7000 2500
1
350 S-9
350
500
500 4
APEX LINE OF TRUSS 500
500 S-9
500 500
500
500 A A 500
500
500
500
500
500 A
A 1
1800

500 S-10
500
D C D 350
350 D
C
A C D A
D
C C
A D A
C D
TOP LINE OF C
ROOF BEAM
B B 3 B B B B B 2 B
2
400

S-9 S-9
S-9

1187 1187 1187 1187 1125 1125 1250 1250

DETAIL ELEVATION OF TRUSS


NOTES ON ROOF CONSTRUCTION:

1. IN ACTUAL FABRICATION OF STEEL TRUSSES,MEMBERS MEETING AT POINT SHALL HAVE


2
THEIR GRAVITY AXIS INTERSECT AS NEARLY AS PRACTICABLE AT COMMON POINT.
2. THE CONTRACTOR SHALL PROVIDE TEMPORARY ERECTION BRACINGS AND SHORING,AND
MAKE ACTUAL MEASUREMENTS IN THE FIELD PRIOR TO FABRICATION/INSTALLATION OF
S-8
ALL TRUSSES.
3. THE FABRICATOR/CONTRACTOR SHALL SUBMIT SHOP DETAILED DRAWINGS PRIOR TO
FABRICATION OF TRUSSES FOR APPROVAL OF THE DIRECTOR,BUREAUS OF DESIGN.

PROJECT NAME & LOCATION: SHEET CONTENTS: TRACED FROM STANDARD BOD PLAN: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE DETAILS PREPARED:
S 22
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S ,
LOUIEL IAN R. LOMOTOS HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 8 10 32
GUINDULMAN, BOHOL LILA,BOHOL JOHN GLENN F. CADENAS ENGINEER II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEERING ASSISTANT DATE: DATE: DATE: DATE:
CL
CL
ROOFING CL W.M.
CL
W.M.
W.M.

300
250

T.C.
150
T.C. T.C. 6mm THICK GUSSET
PL , TYPICAL 350

250
6mm THICK
GUSSET PL ,

250
TYPICAL BIGGER SIZE
W.M. W.M. OF WASHER
B.C.
W.M. 200 200 W.M.
W.M. B.C. 300 PURLINS
NUT

1 DETAIL 1 2 DETAIL 2 3 DETAIL 3 4 DETAIL 4


NEOPRENE
S-9 S-9 S-9 S-9 GASKET

J-SHAPED BOLT

FULL 6mm 50 100 FULL 6mm 50 100


WELD WELD

FULL 6mm
5 ROOFING FIXER
TYP.
6mm
TYP.
6mm WELD
S-9
50 100 50
50 100 50

CL CL

FULL 6mm
FULL TYP.
WELD 6mm WELD 6mm

50 50
T.C. 10mm THICK STEEL
T.C. FULL
10mm THICK STEEL BUCKLE P , W/18mmØ
12mmØ STEEL CROSS- WELD 6mm
10mm THICK STEEL 12mmØ STEEL CROSS- HOLES; TYPICAL
BRACINGS, W/ STANDARD BUCKLE P , W/18mmØ
BUCKLE PL , W/18mmØ BRACINGS, W/ STANDARD HOLES; TYPICAL 12mmØ STEEL CROSS-
TURN-BUCKLE TURN-BUCKLE
HOLES; TYPICAL BRACINGS, W/ STANDARD
TURN-BUCKLE
ALONG GRID LINE A & D
AT APEX OF TRUSS 6 DETAIL CONN. OF CROSS-BRACING
S-9

PROJECT NAME & LOCATION: SHEET CONTENTS: TRACED FROM STANDARD BOD PLAN: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

DETAILED ENGINEERING DESIGN PLAN FOR THE


REGIONAL OFFICE VII PREPARED:
S 23
CONSTRUCTION OF 1STY2CL,MACALINGAN P/S ,
DETAILS
BOHOL 3RD DISTRICT ENGINEERING OFFICE LOUIEL IAN R. LOMOTOS HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 9 10 32
GUINDULMAN, BOHOL LILA,BOHOL JOHN GLENN F. CADENAS ENGINEER II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEERING ASSISTANT DATE: DATE: DATE: DATE:
250
C
150
A C
10mmØx 125mm LONG 300
ANCHOR 2-12mmx150mm LONG ANCHOR BOLTS
BOLTS @ EACH SIDE 2-6mmØx40mm MACHINE BOLTS W/STD. SPACED @ 500mm O.C.
NUTS & WASHERS,SPACED AS SHOWN
125x75x50x6mm STEEL PL JOINT
CONNECTOR,FULL WELD TO LC PURLINS
ANGULAR BASE PLATE

250
230
LRB-1 L-100x100x6mm
THK.ANGULAR BASE PLATE

6mm THK. GUSSET PL


250x300x16mm THK.STEEL
125x300x16mm THICK STEEL BASE P,
L WITH
2-20mmx300mm LONG
BASE P,WITH
L 2-20mmØx300mm
LONG ANCHOR BOLTS
RB-1 GB-1
ANCHOR BOLTS;EACH 3 DETAIL CONN.OF PURLINS TO END-WALL
SIDE S-10

ELEVATION ELEVATION
0.49mm (BMT) LONGSPAN J BOLTS @
PRE-PAINTED
EVERY 3RD CORR.
RB-1 CORR.ROOFING(0.50mm TCT)
R.C. GUTTER 2-1/2

19mm CORR.(MIN)
SIDE LAP
RB-1

6mmØ J-BOLT SPACED AS SHOWN


250
80 90 80 PANEL 1 PANEL 2 LC PURLIN
125
62.5 62.5
10mmØ x125mm LONG
ANCHOR BOLTS @ EACH 4 ROOF PANEL SIDE LAP DETAIL 5 J-BOLT SPACING
BOTTOM SIDE S-10 S-10

50
CHORD

300
300

C
L

50
10mmØ SAGRODS W/
250x300x16mm THK.STEEL
STANDARD NUT & WASHER
125x300x16mm THICK STEEL 2Ls-50x50x5mm W.M. BASE P,
L WITH
BASE P,WITH
L 2-20mmØx300mm 2-20mmx300mm LONG

PLAN
LONG ANCHOR BOLTS ANCHOR BOLTS;EACH

PLAN SIDE

1 DETAIL OF TRUSS ANCHORAGE @ GRID LN.A&D 2 DETAIL OF TRUSS ANCHORAGE @ GRID LN.C LC PURLINS
S-10
S-10

125x125x50x4mm
125
10mmØ SAGRODS @ MIDDLE
125 30 30
LONG CLIP ANGLE WELDED
TO TOP CHORD AND BOLTED TO PURLIN 2Ls-90x90x6
THIRD,STAGGERED 125x125x50x6mm STEEL PL 30 30 125x125x50x6mm STEEL PL 6 150x150x6mm SPLICE PLATE
150
JOINT CONNECTOR,FULL CONNECTOR (FULL WELD)
JOINT CONNECTOR,FULL
WELD TO TOP CHORD STAGGERED
WELD TO TOP CHORD
LC PURLINS LC PURLINS
ROO LC PURLINS
FING
50 25

50 25

150
25

25
150

150
50

50

4-6mmØ x40mm MACHINE 4-6mmØ x40mm MACHINE


T.C. T.C. BOLTS W/ STD.NUTS & T.C. BOLTS W/ STD.NUTS &
4-6mmØ x40mm MACHINE BOLTS W/ WASHERS,SPACED AS SHOWN
STD.NUTS & WASHERS,SPACED AS
WASHERS,SPACED AS SHOWN
SHOWN SUPPORTED BY TRUSS IN BETWEEN TRUSSES
DETAIL CONN.OF PURLIN TO TOP CHORD 6 DETAIL OF PURLIN TO SAG ROD CONNECTION
7
S-10
8 DETAIL OF PURLIN SPLICE S-10
S-10

PROJECT NAME & LOCATION: SHEET CONTENTS: TRACED FROM STANDARD BOD PLAN: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE PREPARED:
S 24
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S , DETAILS
LOUIEL IAN R. LOMOTOS HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 10 10 32
GUINDULMAN, BOHOL LILA,BOHOL JOHN GLENN F. CADENAS ENGINEER II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEERING ASSISTANT DATE: DATE: DATE: DATE:
CLASSROOM 1 CLASSROOM 2

"DP" 3
DP

B
TO NEAREST
C.O.

UP

PROPOSED OVERHEAD ELECTRICAL


SERVICE ENTRANCE (REFER TO
ELECTRICAL RISER DIAGRAM)
M NOTE: VERIFY EXACT LOCATION
1 POWER LAYOUT
E-1

PROJECT NAME & LOCATION: SHEET CONTENTS: DRAFTED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE POWER LAYOUT
PREPARED:
E 25
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S ,
HENRY G. DALEN HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 1 3 32
GUINDULMAN, BOHOL LILA,BOHOL VANISSA MAE A. BALABA CHIEF,PLANNING AND DESIGN SECTION CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEER I DATE: DATE: DATE: DATE:
DCFS CCFS DCFS CCFS

CF CF CF CF
2 2 C 2 2 2 C 2
D G D G
E F E F

2 2
DP DP
1
DP CF CF CF CF
2 B 2 A 2 2 B 2 A 2

E F G E F G
"DP"
BCFS ACFS BCFS ACFS
ES FGS2 ES FGS2

A A

1 1 1 1
A A A A

1 LIGHTING LAYOUT
E-2

PROJECT NAME & LOCATION: SHEET CONTENTS: DRAFTED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE LIGHTING LAYOUT
PREPARED:
E 26
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S ,
HENRY G. DALEN HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 2 3 32
GUINDULMAN, BOHOL LILA,BOHOL VANISSA MAE A. BALABA CHIEF,PLANNING AND DESIGN SECTION CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEER I DATE: DATE: DATE: DATE:
2-8.0mm² THHN IN 25mm
SCHEDULE OF LIGHTING FIXTURES AND LAMPS
dia. PVC INSTALLATION/
SYMBOLS DESCRIPTION
MOUNTING
UNGROUNDED
SERVICE ONE (1) - 1x20W LED LIGHTING FIXTURE WITH LOUVER TYPE LUMINAIRE WITH ALUMINUM SURFACED CEILING
1
CONDUCTOR REFLECTOR MOUNTED
GROUNDED
SERVICE TWO (2) - 2x20W LED LIGHTING FIXTURE WITH LOUVER TYPE LUMINAIRE WITH ALUMINUM SURFACED CEILING
GENERAL NOTES:
DP 2
CONDUCTOR 40AT REFLECTOR MOUNTED

NOTE: ALL FLUORESCENT LIGHTING FIXTURES SHALL BE EQUIPPED WITH A HIGH POWER FACTOR, PRE-HEAT
1. ALL ELECTRICAL WORKS SHALL BE DONE IN ACCORDANCE WITH THE PROVISION OF THE WITH STARTER AND THERMALLY PROTECTED BALLAST, COMPLETE WITH ALL NECESSARY ACCESSORIES ,
LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE, EXISTING APPLICABLE ORDINANCES,

20AT
16AT

16AT
WIRED AND READY TO USE.
RULES AND REGULATIONS OF THE LOCAL GOVERNMENT AND WITH THE REQUIREMENTS OF
THE LOCAL POWER COMPANY.
2. THE TYPE OF SERVICE POWER SUPPLY TO BE USED SHALL BE SINGLE-PHASE, 2-WIRE, 230 V,
60 HERTZ,AC

ckt 2

ckt 3
ckt 1
3. THE CONTRACTOR SHALL VERIFY AND ORIENT THE ACTUAL LOCATION OF SERVICE
ENTRANCE FOR CONNECTION TO THE POWER COMPANY SERVICE POINT
4. UNLESS OTHERWISE SPECIFIED, THE MINIMUM SIZES OF WIRE AND GALVANIZED RIGID BLACK WIRE
STEEL CONDUIT TO BE USED SHALL BE 3.5 mm2, THHN AND 15mm NOMINAL DIAMETER ,
RESPECTIVELY. LIKEWISE ALL ELECTRICAL WIRES SHALL BE COLOR CODED.
5. ALL LIGHTING CIRCUIT HOME RUNS AND CONVENIENCE OUTLETS SHALL BE WIRED WITH NOT NEUTRAL BUS TERMINAL GROUNDING BUS TERMINAL
LESS THAN 3.5mm2 IN SIZE.
6. WHEREVER REQUIRED AND NECESSARY, PULL OR JUNCTION BOXES SHALL BE INSTALLED
AT CONVENIENT AND INCONSPICUOUS LOCATION, ALTHOUGH SUCH BOXES ARE NOT SHOWN
ON THE PLAN NOR MENTIONED IN THE SPECIFICATIONS. EQUIPMENT GROUNDING
7. ALL NON-CURRENT CARRYING METAL PARTS OF ELECTRICAL EQUIPMENT SHALL BE CONDUCTOR

BONDING CONDUCTOR
PROPERLY GROUNDED IN ACCORDANCE WITH THE PROVISIONS OF THE LATEST PHILIPPINE

ckt 2

ckt 2
ckt 3

ckt 3
ckt 1

ckt 1
ELECTRICAL CODE.
8. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND OF THE APPROVED TYPE FOR
LOCATION AND PURPOSE.
WHITE WIRE GREEN WIRE
9. STANDARD TYPE OF ACCESSORIES, SPLICING DEVICES, TERMINATIONS AND OTHER
APPURTENANCES FOR THE ENTIRE FOR THE ENTIRE ELECTRICAL INSTALLATION SHALL BE
USED.
10. ALL WALL OUTLETS SHALL BE INSTALLED AT THE FOLLOWING HEIGHTS ABOVE THE FINISHED
FLOOR LEVEL, UNLESS NOTED IN THE PLAN.
a) WALL SWITCHES @ 1300 mm
b) WALL CONVENIENCE OUTLETS @ 300 mm
11. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT AND IMMEDIATE SUPERVISION
DISTRIBUTION PANEL
OF A DULY REGISTERED ELECTRICAL ENGINEER.

ELECTRICAL SYMBOLS: LOUVER TYPE LUMINAIRE with


CEILING LIGHT OUTLET
REFER TO SCHEDULE OF
ALUMINUM REFLECTOR
LIGHTING FIXTURES AND LAMPS
CEILING LIGHT OUTLET
SCHEDULE OF LOADS
CF CEILING FAN, 60 WATTS, 230V, 60Hz
SCF CEILING FAN CONTROL SWITCH MOUNTING: SURFACE PANEL:PB WITH GROUND AND NEUTRAL MAIN:40 AT, 1P, RAIL TYPE

S SINGLE POLE WALL SWITCH IN ONE SWITCH PLATE ENCLOSURE: NEMA-1 BUSBAR TERMINAL SYSTEM: 230V AC, 1 Ø, 60 HZ
(10 AMP., 230 VOLTS)
LOCATION: AS SHOWN KAIC:6 (MAIN AND BRANCHES)
S2 2 SINGLE POLE WALL SWITCHES IN ONE SWITCH PLATE
(10 AMP., 230 VOLTS) CIRCUIT BREAKER
CKT # OF
LOAD DESCRIPTION LOAD VA CURRENT VOLTAGE SIZE OF WIRE CONDUIT
S3W THREE WAY SWITCH NO. OUTLETS AT P
DUPLEX CONVENIENCE OUTLET, GROUNDING TYPE, 20A, 250VOLTS 1 LIGHTING OUTLETS 16 1600 6.96 230 16 1 2 - 3.5mm² THW, 1-2.0mm² THW (G) 15 mm PVC
"WP" DENOTES WEATHERPROOF OUTLET
2 CEILING FAN OUTLETS 8 800 3.48 230 16 1 2 - 3.5mm² THW, 1-2.0mm² THW (G) 15 mm PVC
SINGLE CONVENIENCE OUTLET, GROUNDING TYPE
"EF" DENOTES EXHAUST FAN (15 AMP., 230 VOLTS)
3 CONVENIENCE OUTLETS 8 1440 6.26 230 20 1 2 - 5.5mm² THW, 1-3.5mm² THW (G) 20 mm PVC
CONCEALED OR EMBEDDED CONDUIT RUN

UNDERGROUND OR UNDERFLOOR CONDUIT RUN


TOTAL CONNECTED LOAD 3840 40 1 2 - 8.0mm² THW, 1-5.5mm² THW (G) 25 mm PVC
CIRCUIT HOMERUN

DISTRIBUTION PANELBOARD

M ELECTRIC SERVICE METER


ELECTRICAL CALCULATION:
ELECTRIC SERVICE ENTRANCE 1. Total Load: 2. Service Entrance Conductor:
Lighting & Convenience Receptacle load 3840 VA I (service entrance) = continuous x 125%
GROUNDING SYSTEM 1st 3000 VA @ 100% DF 3000 I (service entrance) = 14.32 x 1.25 = 17.90 A
Remainder @ 35% DF 294 USE: 2 - 8.0mm² THW in 25mm PVC
Demand Load = 3294 1- 5.5mm2 THW as grounding conductor
I (demand load) = 3294/230 = 14.32 A
3. Service Equipment:
Inverse Time Circuit Breaker
Total Computed Net Continuos Load (TNCL) I=I(demand) + 250% (highest motor load)
Demand Load + ACU Load I=14.32+(0x2.50)
3294 + 0 =3294 I=14.32 A
I (continuous) = TNCL/230 USE: 1 - 40AT, 1 Pole, Miniature Ckt. Breaker (MCB), 240V for
I (continuous) = 3294/230= 14.32 A Main Breaker NEMA 1 Enclosure, Rail Type Panel board

PROJECT NAME & LOCATION: SHEET CONTENTS: DRAFTED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT GENERAL NOTES DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE


SCHEDULE OF LIGHTING FIXURES AND LAMPS
DISTRIBUTION PANEL PREPARED:
E 27
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S , ELECTRICAL SYMBOLS HENRY G. DALEN HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 3 3 32
GUINDULMAN, BOHOL LILA,BOHOL SCHEDULE OF LOADS AND COMPUTATION VANISSA MAE A. BALABA CHIEF,PLANNING AND DESIGN SECTION CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEER I DATE: DATE: DATE: DATE:
1 2 3 4 5
(TYPICAL)

(PROVIDE STAINLESS STEEL DD DD DD DD DD


PROTECTION SCREEN)

SLOPE SLOPE

B SLOPE SLOPE

R.C. GUTTER W/ CEMENT BASE


WATERPROOFING

2 ROOF PLAN ( DRAINAGE LAYOUT)


P-1

PROJECT NAME & LOCATION: SHEET CONTENTS: DRAFTED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE DRAINAGE LAY-OUT PREPARED:
P 28
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S ,
CARINA L. ABREA HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 1 3 32
GUINDULMAN, BOHOL LILA,BOHOL CHONA O. PELIGRINO ARCHITECT II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ARCHITECT II DATE: DATE: DATE: DATE:
CLASSROOM 1 CLASSROOM 2

C O R R I D O R

UP

1 FLOOR PLAN ( & DRAINAGE LAYOUT)


P-2

PROJECT NAME & LOCATION: SHEET CONTENTS: DRAFTED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE DRAINAGE LAY-OUT PREPARED:
P 29
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S ,
CARINA L. ABREA HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 2 3 32
GUINDULMAN, BOHOL LILA,BOHOL CHONA O. PELIGRINO ARCHITECT II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ARCHITECT II DATE: DATE: DATE: DATE:
LEGEND:

PVCDP- POLYVINYL CHLORIDE DRAIN PIPE(SERIES 1000)


(ASTM D2729/ASTM D3311,ISO 4435/ASTM D2564)
DD- DECK DRAIN

DD

DD

DD
DD

DD

DD
DD

CLASSROOM
1

DD

C
O
R CLASSROOM
R
ID
O 2
R

( DRAINAGE LINE LAYOUT)


ISOMETRIC DIAGRAM
NTS

PROJECT NAME & LOCATION: SHEET CONTENTS: DRAFTED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE DETAIL OF CATCH BASIN
PREPARED:
P 30
ISOMETRIC DIAGRAM
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S ,
CARINA L. ABREA HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 3 3 32
GUINDULMAN, BOHOL LILA,BOHOL CHONA O. PELIGRINO ARCHITECT II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ARCHITECT II DATE: DATE: DATE: DATE:
GENERAL FIRE DETECTION SYSTEM NOTES:
1. ALL WORKS FOR FIRE DETECTION, ALARM, AND COMMUNICATION SYSTEMS SHOULD BE DONE IN APPLIANCES FOR FIRE ALARM SYSTEMS OF THE NATIONAL FIRE ALARM CODE (NFPA 72) AND DESIGN
ACCORDANCE WITH THE LATEST EDITION OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) CODES GUIDELINES, CRITERIA AND STANDARD, VOLUME 6 - PUBLIC BUILDINGS AND OTHER RELATED STRUCTURES.
NO. 72, NATIONAL FIRE ALARM AND SIGNALING CODE AND THE PHILIPPINE ELECTRICAL CODE.
ALARM BELLS SHALL BE A CAST OR PRESSED STEEL UNDERDOME TYPE, FINISHED IN RED AND A TREMBLING
2. ALL WORKS SHALL BE EXECUTED IN-CLOSE COORDINATION WITH ALL OTHER TRADES. THE ARCHITECT AND TYPE WITH A GONG DIAMETER OF 150MM.
THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY CONFLICT.
THE STROBE LIGHT SHALL BE A HIGH DENSITY FLASHING TYPE WITH A FLASH RWATE OF 50 TO 80 FLASHES PER
3. WORKMANSHIP SHALL BE EQUAL TO THE BEST STANDARD PRACTICED ADOPTED AND RECOGNIZED IN THIS MINUTE. THE LENS COVER OF THE LIGHT SHALL BE RED OR AMBER IN COLOUR.
TRADE.
A SUFFICIENT NUMBER 0F AUDIBLE NOTIFICATION APPLIANCES SHALL BE USED TO PRODUCE A MINIMUM
4. ALL MATERIALS, DEVICES, AND EQUIPMENT SHALL BE NEW AND SHALL BE IN CONFORMANCE WITH THE SOUND LEVEL OF 65 dBA, OR 10 dBA ABOVE THE AMBIENT NOISE LEVEL AND SHALL HAVE DURATION OF AT
LEAST 30 SECONDS. THE SOUND LEVEL PRODUCED BY AUDIBLE NOISE COMBINED SHALL NOT EXCEED 115
10 LBS. CO FIRE
PHILIPPINE STANDARDS OR LISTED BY AND ORGANIZATION WHICH IS ACCEPTABLE TO THE AUTHORITY
HAVING JURISDICTION. dBA. EXTINGUISHER
5. THE FIRE ALARM CONTROL PANEL (FACP) SHALL BE THE CENTRAL PROCESSING UNIT OF THE SYSTEM,
RECEIVE AND ANALYZE THE SIGNALS FROM FIRE SENSORS, PROVIDE AUDIBLE AND VISUAL INFORMATION TO
THE USER, INITIATE AUTOMATIC ALARM RESPONSE SEQUENCES, AND PROVIDE THE MEANS ON HOW THE
USER SHOULD INTERACT WITH THE SYSTEM.
m m
IT SHALL BE PROGRAMMABLE, EQUIPPED WITH PANEL MOUNTED LCD TEXT DISPLAY WHICH WILL INDICATE
THE LOCATION OF THE ALARM AND FAULT, AND RESETS EVENTS SHOWING THE DATA AND TIME WITH THE 50
ZONE AND THE LOOP NUMBER. LEGEND:
IT SHALL BE CAPABLE OF INDIVIDUALLY SELECTING THE PHONE CIRCUITS FOR COMMUNICATION IN TWO-WAY
FIRE DETECTION & ALARM SYSTEM 6mm x 50mm

800mm (H)
TELEPHONE COMMUNICATION SYSTEM.

WIRING AND EQUIPMENT, INCLUDING ALL CIRCUITS CONTROLLED AND POWERED BY THE CONTROL PANEL,
FLAT BAR
SHALL CONFORM TO THE REQUIREMENTS OF ARTICLE 7.60 - FIRE ALARM SYSTEMS OF THE PHILIPPINE SYMBOL DESCRIPTION QUANTITY
ELECTRICAL CODE. WALL BRACKET
6. POWER FOR THE FIRE CONTROL PANEL AND FIRE ALARM BATTERY SHALL BE OBTAINED FROM THE MAINS
SUPPLY AND IN ACCORDANCE WITH CHAPTER 4 - FUNDAMENTALS OF FIRE ALARM SYSTEMS OF THE FACP FIRE ALARM CONTROL PANEL (CONVENTIONAL TYPE) 1
NATIONAL FIRE ALARM CODE (NFPA 72), ARTICLE 7.60 - FIRE ALARM SYSTEMS OF THE PHILIPPINE ELECTRICAL 12mmØ
CODE AND DESIGN GUIDELINES, CRITERIA AND STANDARD, VOLUME 6 - PUBLIC BUILDINGS AND OTHER
RELATED STRUCTURES. BOLT SCREW
SMOKE DETECTOR (OPTICAL, WITH BASE) 5
7. THE PRIMARY POWER SUPPLY SHALL BE FROM THE ELECTRIC UTILITY COMPANY, NORMALLY DIRECT OR
DERIVED 220 - 240 VAC SINGLE PHASE. A PARALLEL CONNECTION OF AUTOMATIC VOLTAGE REGULATOR (AC)
17
IS NECESSARY TO REGULATE THE INCOMING POWER SUPPLY (HIGH AND LOW VOLTAGE) TO THE FACP.
MANUAL CALL POINT (WITH ISOLATOR, RED) 3 5m
8. THE SECONDARY POWER SUPPLY SHALL CONSIST OF GEL CELL OR NICKEL CADMIUM BATTERIES WITH A m
CHARGER. IT SHALL HAVE A SUFFICIENT CAPACITY TO OPERATE UNDER NORMAL NON-ALARM CONDITION FOR
A MINIMUM OF 24 HOURS, AND AT THE END OF THAT PERIOD, CAPABLE OF OPERATING ALL ALARM
NOTIFICATION APPLIANCES AND EMERGENCY COMMUNICATIONS SYSTEMS FOR A PERIOD OF 5 MINUTES. SOUNDER BEACON (OPEN-AREA, RED) 3

1500
THE CHARGER SHALL BE AUTOMATIC IN DESIGN, ADJUSTS THE CHARGE RATE TO THE CONDITION OF THE
BATTERIES. ALSO, THE TERMINAL VOLTAGE SHALL BE TEMPERATURE COMPENSATED TO SUIT THE BATTERY
WALL
FE FIRE EXTINGUISHER 5
MANUFACTURER'S DATA. THE BATTERY CHARGING FACILITIES SHALL BE SUITABLE FOR THE BATTERY TYPE
USED. FIN. FLOOR LINE
FOR CONTINUOUS OPERATION OF THE SYSTEM, CHECKING OF RECHARGED BATTERIES (12 VOLT DC AND EL EMERGENCY LIGHT 2
2-SETS 12 VOLT DE) SHOULD BE DONE YEARLY, OR NECESSARY REPLACEMENT OF BATTERIES.
WALL BRACKET
9. AUTOMATIC AND MANUAL INITIATING DEVICES SUCH AS MANUAL PULL STATIONS AND AUTOMATIC WALL MOUNTED
DETECTORS SHALL PROVIDE A RELIABLE MEANS TO SIGNAL OTHER EQUIPMENT WHICH ARE ARRANGED TO
MONITOR THE DEVICES AND TO INITIATE A RESPONSE TO THOSE SIGNALS.

THE DEVICES TO BE USED SHALL MEET THE REQUIREMENTS OF CHAPTER 5 - INITIATING DEVICES OF THE

FIRE EXTINGUISHER DETAIL


NATIONAL FIRE ALARM CODE (NFPA 72) AND DESIGN GUIDELINES, CRITERIA AND STANDARD, VOLUME 6 -
PUBLIC BUILDINGS AND OTHER RELATED STRUCTURES.

10. SMOKE DETECTORS SHALL BE DESIGNED FOR DETECTION OF ABNORMAL DENSITIES BY THE USE OF
PHOTOELECTRIC OR IONIZATION PRINCIPLE AND SHALL HAVE A TIME DELAY TO PREVENT FALSE ALARM.

11. MANUAL FIRE DETECTION IS ACHIEVED THROUGH THE ACTIVATION OF FIRE ALARM MANUAL PULL
STATION OR CALL POINT. MANUAL PULL STATIONS SHALL BE WALL MOUNTED WITH CLEARLY VISIBLE
OPERATING INSTRUCTIONS PROVIDED ON THE COVER AND THE WORD "FIRE" SHALL APPEAR ON THE FRONT
STATIONS.
EL EL
12. NOTIFICATION APPLIANCES FOR FIRE ALARM SYSTEMS SUCH AS AUDIBLE (BELLS, HORNS AND SPEAKERS)
AND VISIBLE (STROBE LIGHTS) APPLIANCES SHALL BE CONTRIBUTE TO FIRE PROTECTION BY PROVIDING
STIMULI FOR INITIATING EMERGENCY ACTION AND BY PROVIDING INFORMATION TO USERS, EMERGENCY
RESPONSE PERSONNEL, AND OCCUPANTS. NOTIFICATION APPLIANCES SHALL MEET THE REQUIREMENTS OF
CHAPTER 7 - NOTIFICATION

FE FE

1 FIRE DETECTION AND ALARM SYSTEM LAY-OUT


F-1
PROJECT NAME & LOCATION: SHEET CONTENTS: DRAFTED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT FIRE DETECTION AND ALARM SYSTEM LAY-OUT
DRAFTSMAN I

DETAILED ENGINEERING DESIGN PLAN FOR THE


REGIONAL OFFICE VII FIRE ETINGUISHER DETAIL PREPARED:
F 31
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S , GENERAL FIRE DETECTION SYSTEM NOTES
CARINA L. ABREA HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 1 1 32
GUINDULMAN, BOHOL LILA,BOHOL LEGEND CHONA O. PELIGRINO ARCHITECT II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ARCHITECT II DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILLIPINES
EL EL
DEPARTMENT OF INTERIOR & LOCAL GOV'T

BUREAU OF FIRE PROTECTION


MUNICIPALITY OF LILA
PROVINCE OF BOHOL

FSES
RC 091 060
SECTION 135 Para (A)

(FALSAMP)

SYMBOLS and SPECIFICATION

ESCAPE ROUTE

EVACUATION AREA
1 GROUND FLOOR FALSAMP
F-1 EL EMERGENCY LIGHT

FIRE EXTINGUISHER

PANEL BOARD

GENERAL FALSAMP NOTES : FIRE EXIT

ALL WORK PLACE ARE REQUIRED TO HAVE A FIRE EXTINGUISHERS,


WHICH HAVE TO BE CLEARLY LABELLED AND ACCESSIBLE. USUALLY A NOTICE IS RECOMMENDATION
PLACE ABOVE THE FIRE EXTINGUISHER INDICATING CLEARLY AND BRIEFLY WHICH FOR APPROVAL :
TYPE OF FIRE IT CAN BE PUT OUT.
STANDARDS FOR THE SELECTION: PLACEMENT AND TESTING OF
PORTABLE FIRE EXTINGUISERS ARE ISSUED BY THE NATIONAL FIRE PROTECTION
ASSOCIATION. THE STANDARDS ESTABLISHED THE MINIMUN REQUIREMENTS FOR
ALL TYPES AND SIZES OF EXTINGUISHERS THAT ARE LISTED AND RATED BY
TESTING LAVORATORIES AGAINST STANDARD TEST FIRES OF THE TYPES THEY ARE
DESIGNED TO CONTROL. EACH EXTINGUISHER IS RATED AS TO BOTH TYPE AND SIZE
OF THE FIRE EXTINGUISHED.
EXTINGUISHERS IS RATED EXTINGUISHED AND FLAMMABLE LIQUIDS FIRE THAT IS 20
TIMES THE SIZE OF THE FIRE THAT EXTINGUISHES RATED 1-8 WOULD EXTINGUISH. APPROVED BY:
EXTINGUISHERS THAT CANNOT EXTINGUISH THE MINIMUM SIZE TEST FIRES ARE
NOT LISTED OR RATED. SOME EXTINGUISHERS WILL PUT OUT ONLY 1 CLASS OF
FIRE.
TOWN FIRE MARSHAL

PROJECT NAME & LOCATION: SHEET CONTENTS: DRAFTED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES MOEL C. DIANGO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DRAFTSMAN I

REGIONAL OFFICE VII DETAILED ENGINEERING DESIGN PLAN FOR THE GROUND FLOOR FALSAMP PREPARED:
F 32
BOHOL 3RD DISTRICT ENGINEERING OFFICE CONSTRUCTION OF 1STY2CL,MACALINGAN P/S ,
CARINA L. ABREA HENRY G. DALEN GENEROSO Y. SISON JR. MAGITING A. CRUZ 1 1 32
GUINDULMAN, BOHOL LILA,BOHOL CHONA O. PELIGRINO ARCHITECT II CHIEF,PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ARCHITECT II DATE: DATE: DATE: DATE: