Levels : R.L.
Deck Level 22.815 m
Abutment Cap top 20.41 m
Abutment wall top 18.78 m
Top of bearing level 20.715 m
Dirt wall
Top 22.815 m
Bottom 20.41 m
Soil in heel side 21.465 m
Soil in toe side 19.286 m
Return wall
Top 22.815 m
Bottom 15.28 m
Pile Cap
Top 15.28 m
Bottom 15.28 m
Bottom level of approach slab 21.465 m
Top level of approach slab 21.765 m
Bed block 20.66 m
Water Level (H.W.L) 17.466 m
River bed level 13.816 m
Dimensions :
Abutment wall
L 12.31 m
Depth Top 1.0 m @ RL 18.78
Bottom 1.0 m @ RL 15.28
Bed block
L 12.31 m
Width 0.8 m
Abutment cap
L 12.31 m
B 1.57 m @ RL 20.41
1.57 m @ RL 19.28
1.0 m @ RL 18.78
Dirt wall
L 12.31 m
B 0.45 m @ RL 20.410
0.45 m @ RL 21.465
0.3 m @ RL 22.165
0.55 m @ RL 22.415
0.55 m @ RL 22.82
Return wall
(Cantilever) thk. 0.5 m (combined thickness)
Length 5 m @ RL 22.815
5 m @ RL 21.315
0.4 m @ RL 18.035
0.4 m @ RL 15.280
Toe L 2.5 m
Heel L 2.5 m
Length of Pile cap 13 m
Base 6.0 m
Screen wall L 0 m
Thickness 0.35 m
Distance of Dirt wall back
from edge of toe 3.500 m
Project : Yallahs River Bridge
Soil data
Dry density of backfill soil gd 18 kN/m3
Saturated density of backfill soil gsat 20.4 kN/m3
Submersed density of backfill soil gsub 10.4 kN/m3
Ka with d 200 0.297
Thickness of approach slab 0.3 m
Live load surcharge 10 kN/m2 For HA loading
Equivalent height of surcharge 0.56 m For HA loading
CALCULATIONS FOR EARTH PRESSURE
a) Active Earth Pressure
ITEM H Pressure Length Force eL ML
kN/m2 m kN m kN-m
Upto HFL 5.349 28.60 12.31 941.46 3.97 3734.98
Foundation slab top 7.535 40.28 12.31
Rectangular Part 769.50 1.09 841.07
Triangular Part 157.24 0.72 113.43
Foundation level 7.535 40.28 12.31
Rectangular Part 0.00 0.00 0.00
Triangular Part 0.00 0.00 0.00
b = 0.0
y = 90
f = 30
f' = 30
gf' = 1.000
f'd = 30.00
d = 20
dd = 20.00
g = 18 kN/m3
g' = 18 kN/m3
q = 18.44
if b <= f'd-q
K = 0.6213
Static water force Ews = 0.000
Hydrodynamic water force Ewd = 0.000 when W.T below Abutment
H = 7.535
Ed = 285.715 kN/m
Total earth pressure force = 3517.148 kN
Horizontal component = 3305.251 kN
Vertical component = 1202.351 kN
b)Transverse
ITEM V Heq Veq eL eT ML MT
kN m m kN-m kN-m
On substructure 1187.705 5351.11
TOTAL 1187.705 5351.105
Project : Yallahs River Bridge
LOAD ON PILES :
1 mm
1200 mm 3000 mm Support S2
1500
300 mm
mm
Support S1
Section
1200
mm
Plan
1500
mm
14.7940686 Kn/m^2
10.875 Kn/m^2 10.875 Kn/m^2
Mu = 59.3061662 Kn-m
2.913513287 m
Loads on Landing
(1) Self weight of Slab = 6.25 Kn/m^2
(2) Finishes = 1 Kn/m^2
(3) Live Load = 0 Kn/m^2
Total = 7.25 Kn/m^2
Main Reinforcement
R = Mu / b (d^2) = 1.31955692 N/mm^2
For, f 30 N/mm^2 and fy= 500 N/mm^2 and value of Mu / b (d^2)
pt / 100 = fck / 2fy [1/ Ö1-(4.598 R/ fck) ]
= 0.003204845
Distributors
Ast(reqd) = 0.0012 x b x t = 300 mm^2 / metre width
Assumi 8 mm Dia. Bar Spacing Reqd. = 167.551608 mm c/c