SUBSTATION

SR.NO A-A B-B C-C D-D TRENCH


1 VCB ROOM TO TR 1, 2, 3, 4 14 - - 5 D-D
5.6 - - - 8%
28.4 - - -
2 SWITCH YARD TO VCB ROOM - - - 7
3 MPCC ROOM - 57 - -
B-B
4 MPCC ROOM B-B TO APFC PANEL 1.9 - - - 37%
1.9 - - -
1.9 - - -
5 MPCC ROOM B-B TO DG 1, 2, 3, 4 3.8 - - -
10.3 - - -
15.3 - - -
TOTAL 83.1 57 0 12 152.1

PLANT TRENCH
SR.NO A-A B-B C-C D-D
1 METERING ROOM TO DP YARD - - - 3
2 DP YARD TO SUBSTATION DP YARD - - - 174
- - - 287
PLANT TRE
- - - 23.7
- - - 2.1 D-D
3 TO SUB-STATION - 416 95 - 29%
- 112 268 -
- 16.2 11 -
- - 166 -
ROAD CROSING 22 - 53 -
4 B-B TRENCH TO LPCC 1 ROOM 4.2 - - -
5 B-B TRENCH TO LPCC 2 ROOM 12.8 - - -
6 B-B TRENCH TO LPCC 3 ROOM 4.2 - - -
7 B-B TRENCH TO LPCC 4 ROOM 2.7 - - - C-C
8 B-B TRENCH TO LPCC 5 ROOM 4.2 - - - 36%
TOTAL 43.2 544.2 593 489.8 1670.2

A-A B-B C-C D-D


TOTAL 126.3 601.2 593 501.8 1822.3
TRENCH SUMMARY
D-D
8%

B-B
37%

A-A
55%

PLANT TRENCH SUMMARY


A-A
3%
D-D
29% B-B
33%

C-C
36%