PVSYST V6.

70 12/07/24 Page 1/3

Grid-Connected System: Simulation parameters


Project : Sir Rey
Geographical Site Manila/Naia Country Philippines
Situation Latitude 14.52° N Longitude 121.00° E
Time defined as Legal Time Time zone UT+8 Altitude 5m
Albedo 0.20
Meteo data: Manila/Naia Meteonorm 7.1 - Synthetic

Simulation variant : 30kWp


Simulation date 12/07/24 12h57

Simulation parameters System type No 3D scene defined


Collector Plane Orientation Tilt 15° Azimuth 180°
Models used Transposition Perez Diffuse Perez, Meteonorm
Horizon Free Horizon
Near Shadings No Shadings

PV Array Characteristics
PV module Si-poly Model JAP6-72-330/3BB
Original PVsyst database Manufacturer JA Solar
SolarEdge Power Optimizer Model P800p Unit Nom. Power 800 W
PV modules on one optimizer in series 1 in parallel 1
Nb. of optimizers In series 30 In parallel 2 strings
Total number of PV modules Nb. modules 60 Unit Nom. Power 330 Wp
Array global power Nominal (STC) 19.80 kWp At operating cond. 17.77 kWp (50°C)
Output of optimizers U oper 850 V I at Poper 21 A
Total area Module area 116 m² Cell area 105 m²

Inverter Model SE20KUS


Original PVsyst database Manufacturer SolarEdge
Characteristics Operating Voltage 850 V Unit Nom. Power 20.0 kWac
Inverter pack Nb. of inverters 1 units Total Power 20 kWac
Pnom ratio 0.84

PV Array loss factors


Array Soiling Losses Loss Fraction 3.0 %
Thermal Loss factor Uc (const) 29.0 W/m²K Uv (wind) 0.0 W/m²K / m/s
Wiring Ohmic Loss Global array res. 547 mOhm Loss Fraction 1.5 % at STC
Module Quality Loss Loss Fraction -0.8 %
Module Mismatch Losses Loss Fraction 0.0 % (fixed voltage)
Incidence effect, ASHRAE parametrization IAM = 1 - bo (1/cos i - 1) bo Param. 0.05

User's needs : monthly values


Jan. Feb. Mar. Apr. May June July Aug. Sep. Oct. Nov. Dec. Year
4043 3652 4043 3913 4043 3913 4043 4043 3913 4043 3913 4043 47608 kWh/mth
PVSYST V6.70 12/07/24 Page 2/3

Grid-Connected System: Main results


Project : Sir Rey
Simulation variant : 30kWp
Main system parameters System type Grid-Connected
PV Field Orientation tilt 15° azimuth 180°
PV modules Model JAP6-72-330/3BB Pnom 330 Wp
PV Array Nb. of modules 60 Pnom total 19.80 kWp
Inverter Model SE20KUS Pnom 20.00 kW ac
User's needs monthly values Global 47.6 MWh/year

Main simulation results


System Production Produced Energy 27.38 MWh/year Specific prod. 1383 kWh/kWp/year
Performance Ratio PR 82.79 % Solar Fraction SF 36.92 %

Normalized productions (per installed kWp): Nominal power 19.80 kWp Performance Ratio PR

7 1.0
Lc : Collection Loss (PV-array losses) 0.7 kWh/kWp/day PR : Performance Ratio (Yf / Yr) : 0.828
Ls : System Loss (inverter, ...) 0.08 kWh/kWp/day
6
Yf : Produced useful energy (inverter output) 3.79 kWh/kWp/day
0.8
[kWh/kWp/day]

5
Performance Ratio PR

0.6
4
Energy

3
0.4
Normalized

0.2
1

0 0.0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

30kWp
Balances and main results

GlobHor DiffHor T Amb GlobInc GlobEff E Load E User E_Grid


kWh/m² kWh/m² °C kWh/m² kWh/m² MWh MWh MWh
January 128.6 65.05 26.37 107.9 99.3 4.043 1.333 0.443
February 134.8 62.61 26.88 117.6 109.1 3.652 1.267 0.667
March 179.9 73.44 28.41 166.1 155.3 4.043 1.576 1.129
April 187.7 73.11 29.60 183.7 172.3 3.913 1.657 1.320
May 173.9 86.36 29.58 176.9 166.2 4.043 1.676 1.207
June 165.3 87.11 28.70 171.0 160.7 3.913 1.647 1.161
July 149.4 87.40 28.20 152.3 142.9 4.043 1.583 0.925
August 130.1 82.25 27.85 129.1 120.7 4.043 1.432 0.696
September 140.8 74.13 27.36 133.1 124.4 3.913 1.409 0.785
October 132.3 82.01 27.92 120.0 111.4 4.043 1.406 0.571
November 128.0 67.26 27.33 109.0 100.6 3.913 1.293 0.497
December 126.3 63.04 26.70 103.8 95.3 4.043 1.297 0.407
Year 1777.1 903.78 27.91 1670.5 1558.3 47.608 17.576 9.807

Legends: GlobHor Horizontal global irradiation GlobEff Effective Global, corr. for IAM and shadings
DiffHor Horizontal diffuse irradiation E Load Energy need of the user (Load)
T Amb Ambient Temperature E User Energy supplied to the user
GlobInc Global incident in coll. plane E_Grid Energy injected into grid
PVSYST V6.70 12/07/24 Page 3/3

Grid-Connected System: Loss diagram


Project : Sir Rey
Simulation variant : 30kWp
Main system parameters System type Grid-Connected
PV Field Orientation tilt 15° azimuth 180°
PV modules Model JAP6-72-330/3BB Pnom 330 Wp
PV Array Nb. of modules 60 Pnom total 19.80 kWp
Inverter Model SE20KUS Pnom 20.00 kW ac
User's needs monthly values Global 47.6 MWh/year

Loss diagram over the whole year

1777 kWh/m² Horizontal global irradiation

-6.0% Global incident in coll. plane


-0.1% Global incident below threshold
-3.8% IAM factor on global
-3.0% Soiling loss factor

1558 kWh/m² * 116 m² coll. Effective irradiance on collectors


efficiency at STC = 17.03% PV conversion

30.86 MWh Array nominal energy (at STC effic.)


-0.8% PV loss due to irradiance level

-8.0% PV loss due to temperature

-0.7% Optimizer efficiency loss


+0.7% Module quality loss

0.0% Module array mismatch loss


-0.7% Ohmic wiring loss
27.99 MWh Array virtual energy at MPP

-2.2% Inverter Loss during operation (efficiency)


0.0% Inverter Loss over nominal inv. power
0.0% Inverter Loss due to max. input current
0.0% Inverter Loss over nominal inv. voltage
0.0% Inverter Loss due to power threshold
0.0% Inverter Loss due to voltage threshold
27.38 MWh Available Energy at Inverter Output

30.03 MWh 17.58 MWh 9.81 MWh Dispatch: user and grid reinjection

From grid User to grid