Professional Documents
Culture Documents
4300-SZ-DM-660260016_P
4300-SZ-DM-660260016_P
GENERAL NOTES
66-PP-152-260019
66-PP-152-260019
TO WATER SPRAY DELUGE
133-XE-705 LUBE OIL UNIT
66-PP-152-260019
SYSTEM 66-SD-13371
SYSTEM 66-SD-13271
SYSTEM 66-SD-13272
SYSTEM 66-SD-13372
EXTRUDER MOTOR
EXTRUDER MOTO
A) ALL INSTRUMENTS ARE PREFIXED BY 133 & 132.
FIRE WATER
FIRE WATER
FIRE WATER
B) SCOPE BREAK BETWEEN VENDOR AND BOROUGE 4 EPC CONTRACTOR IS INDICATED BY :
FIRE WATER
C V
C) ALARM REPEATED TO FIRE STATIONS.
26460
26465
26463
26466
D) THE A2AU16-B PIPES WILL BE COATED ON SITE WITH POLYURETHANE
1 ACCORDING TO "COATING FOR UNDERGROUD STEEL PIPE" BGS-MY-001.: 1
4300-SZ-DM-660260016
NOTES:
BOROUGE : 66-PP-152-260016
4"-66-FW-26282-A2RU16-V
4"-66-FW-26285-A2RU16-V
4"-66-FW-26283-A2RU16-V
4"-66-FW-26284-A2RU16-V
1. TYPICAL DETAIL OF DELUGE VALVE ARRANGEMENT REFER TO P&ID 66-PP-152-260001.
1003
2. FOR DETAILED FIRE AND GAS LOGICS, REFER TO 'CAUSE AND EFFECT MATRIX FOR FIRE AND GAS
1003
1003
1003
SYSTEM' DOC.NO.133-IS-163-00001
CONTRACTOR :
NOTE 9
NOTE 9
NOTE 9
NOTE 9
6. EACH DELUGE VALVE AND PNEUMATIC PANEL TO BE CLEARLY LABELED TO IDENTIFY THE FIRE ZONE AND
CORRESPONDING EQUIPMENT COVERED BY THE VALVE.
NOTE 11 NOTE 11 7. THE AUTOMATIC VALVE MANIFOLD SHALL BE AT LEAST 15 M AWAY FROM THE SPRAY SYSTEM.
8. THE MANUAL VALVE MANIFOLD SHALL BE AT LEAST 30 M AWAY FROM THE SPRAY SYSTEM.
9. A WEEP HOLE FOR POCKETS/LOW POINTS FOR DRAINING PURPOSE SHALL BE PROVIDED DOWNSTREAM OF DELUGE VALVE.
1"
NOTE 11 OUTLET OF WEEP HOLE SHALL BE CONNECTED TO NEARBY CLEAN WATER TRENCH.
NOTE 11
D 10. EACH MANUAL VALVE TO BE CLEARLY LABELED TO IDENTIFY THE FIRE ZONE AND CORRESPONDING EQUIPMENT
2 COVERED BY THE VALVE. 2
11. A SLOPE OF 1:200 OR STEEPER SHALL BE FITTED WITH ADEQUATE DRAIN FACILITY.
1"
NOTE 11 NOTE 11
D
1"
NOTE 11 NOTE 11
D REFERENCES :
4"-66-FW-26279-A2RU16-V
4"-66-FW-26280-A2RU16-V
4"-66-FW-26281-A2RU16-V
FOR GENERAL NOTES AND REFERENCES SEE DWG, FROM PU-PP-152-01000-01÷15
1" PIPING AND INSTRUMENTATION DIAGRAM-SYMBOLS, ABBREVIATIONS AND NOTES.
D BGS-MU-200 GENERALS SPECIFICATION FIRE PROTECTION DESIGN PHILOSOPHY
1003
1003
1003
4"-66-FW-26278-A2RU16-V
BGS-MU-201 GENERALS SPECIFICATION WATER SPRAY FIRE PROTECTION SYSTEMS
BGS-IS-003 GENERAL SPECIFICATION FIRE AND GAS DETECTION SYSTEM
P4-PH-567-00002 FIRE FIGHTING GENERAL SPECIFICATION PO & 1-HEXENE PLANT
1003
P4-PH-563-00001 FIRE & GAS SYSTEM GENERAL SPECIFICATION PO & 1-HEXENE PLANT
PUX-PH-581-00009 DELUGE & SPRINKLER SYSTEM TECHNICAL SPECIFICATION
4"-66-FW-26274-A2RU16-V
4"-66-FW-26275-A2RU16-V
4"-66-FW-26276-A2RU16-V
4"-66-FW-26277-A2RU16-V
P4-PH-169-00001 FIRE PROTECTION GENERAL LAYOUT PO & 1-HEXENE PLANT
65-PP-152-260001-03 P&ID UNIT 65 - FIREWATER FIRE WATER NETWORK POLYOLEFINS PE UNIT SHEET 3 OF 3
V C V C V C V C
PU-PH-407-00001 HYDRAULIC CALCULATION UNDERGROUND FIREWATER NETWORK PO, 1-HEXENE AND U&O
1003
1003
1003
1003
3 3" NC 3" NC 3" NC 3" NC 3
2-1/2" 2-1/2" 2-1/2" 2-1/2"
NOTE 4 NOTE 4 NOTE 4 NOTE 4
3"X2-1/2" 3"X2-1/2" 3"X2-1/2" 3"X2-1/2"
3" NC 3" NC
THIS INFORMATION IS NOT TO BE USED, DISCLOSED, OR REPRODUCED IN WHOLE OR IN PART TO ANYONE OUTSIDE OF ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE) AND ITS SUBSIDIARIES,
66-XXX-VX
66-XXX-VX
66-XXX-VX
LO LO LO
C V C V C V C V NOTE 2 NOTE 2 NOTE 2 NOTE 2
133-7-66-29 Fire Water Manual Valves Manifold to PE6 Extrusion
THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE) OR ANY OF ITS LICENSORS.
3/4" V 3/4" V
66-NF-13307
FIRE WATER INLINE FILTER
TYPE : BUCKET/BASKET
CAPACITY (m3/hr) : 800% OF INLET PIPE DIAMETER P 23-Mar-2023 APPROVED FOR DESIGN A.Waykole C.Balsano/S.Naik/
R.Santangelo/A.Pirani R.Soldinger
MOC (BODY / FILTER) : Carbon Steel / SS316L ABU DHABI POLYMERS COMPANY LIMITED
INSUL : NONE (BOROUGE)
DELUGE VALVE INSTRUMENTS LIST HOLD 1
F&G ARCHITECTURE FOR HOLD 1 PETROCHEMICALS PROJECT
DETECTOR TYPE REMARKS
66-NF-13308 AUTOMATIC DELUGE SYSTEM COMPANY PROJECT NO PROJECT TITLE:
6
FIRE WATER INLINE FILTER WATER SPRAY MANIFOLD DELUGE VALVE PROTECTED WATER SPRAY KPCV KFO KPG KY KPG KY KPT KPT KPT KMS KHD
4700000900 BOROUGE 4 PROJECT - EPC PACKAGE 3 - 6
DELUGE VALVE TAG UNIT NO CONTRACTOR PROJECT NO
DELUGE SYSTEM NO. SIZE (INCH) SIZE (INCH) EQUIPMENT P&ID IA IA IA IA FW IA IA FW FW A/B/C A/B 4300 - PO
PO UNIT - RUWAIS, UAE
TYPE : BUCKET/BASKET 133-XE-705 LUBE OIL UNIT - 1ST STAGE EXTRUDER MOTOR LINEAR HEAT
CAPACITY (m3/hr) :
66-SD-13371 133-KV-7009 133 8 4
133-XE-705 LUBE OIL UNIT -2ND STAGE EXTRUDER MOTOR
66-PP-152-260019 7021 7003 7022 7013 7023 7014 7024 7025 7026 7015 7003
DETECTOR
DRAWING TITLE: PIPING AND INSTRUMENTATION DIAGRAM
800% OF INLET PIPE DIAMETER
DES. DP (bar) : LINEAR HEAT UNIT 66 - SPRINKLER AND DELUGE AUTOMATIC AND
66-SD13372 133-KV-7010 133 8 4 66-PP-152-260019 7027 7004 7028 7016 7029 7017 7030 7031 7032 7018 7004
PE7 EXTRUSION HOT OIL UNIT DETECTOR MANUAL WATER SPRAY SYSTEMS MANIFOLD POLYETHYLENE (PE6/PE7) EXTRUSION BLDGS.
DESIGN PRESSURE (barg) : 16
DESIGN TEMPERATURE (°C) : 5/87 °C 66-SD-13271 132-KV-7009 132 132-XE-705 LUBE OIL UNIT -2ND STAGE EXTRUDER MOTOR 66-PP-152-260019 7021 7003 7022 7013 7023 7014 7024 7025 7026 7015 7003 LINEAR HEAT BOROUGE DOCUMENT CLASS' N PROJECT DRAWING NO REV: P
8 4 132-XE-705 LUBE OIL UNIT - 1ST STAGE EXTRUDER MOTOR DETECTOR
MOC (BODY / FILTER) : Carbon Steel / SS316L CONTRACTOR: 4300-SZ-DM-660260016 SHEET UNIT: 66
66-SD-13272 132-KV-7010 LINEAR HEAT
INSUL : NONE 132 8 4 PE6 EXTRUSION HOT OIL UNIT 66-PP-152-260019 7027 7004 7028 7016 7029 7017 7030 7031 7032 7018 7004
DETECTOR 1 BOROUGE: 66-PP-152-260016 OF AREA: 26
CADD SHEET
A B C D E F REF. 66-PP-152-260016-ISP SCALE: SIZE A1