Professional Documents
Culture Documents
4300-SZ-DM-660260101_P
4300-SZ-DM-660260101_P
GENERAL NOTES
EXTRUSION TRANSFORMER
EXTRUSION TRANSFORMER
EXTRUSION TRANSFORMER
EXTRUSION TRANSFORMER
EXTRUSION TRANSFORMER
EXTRUSION TRANSFORMER
GENERAL NOTES:
66-PP-152-260102
66-PP-152-260102
66-PP-152-260102
66-PP-152-260102
66-PP-152-260102
133-XE-705-EP-752B PE7
133-XE-705-EP-752A PE7
132-XE-705-EP-752B PE6
132-XE-705-EP-752A PE6
132-XE-705-EP-703 PE6
133-XE-705-EP-703 PE7
SYSTEM 66-SD-13374
SYSTEM 66-SD-13373
SYSTEM 66-SD-13274
SYSTEM 66-SD-13273
SYSTEM 66-SD-13275
SYSTEM 66-SD-13375
A) ALL INSTRUMENTS ARE PREFIXED BY 132 & 133.
B) SCOPE BREAK BETWEEN VENDOR AND BOROUGE 4 EPC CONTRACTOR IS INDICATED BY : C V
FIRE WATER
FIRE WATER
FIRE WATER
FIRE WATER
FIRE WATER
FIRE WATER
C) ALARM REPEATED TO FIRE STATIONS.
D) THE A2AU16-B PIPES WILL BE COATED ON SITE WITH POLYURETHANE
26551
26552
26553
26554
28677
28679
1 ACCORDING TO "COATING FOR UNDERGROUD STEEL PIPE" BGS-MY-001.: 1
4300-SZ-DM-660260101
NOTES:
6"-66-FW-26729-A2RU16-V
6"-66-FW-26728-A2RU16-V
6"-66-FW-26727-A2RU16-V
6"-66-FW-26726-A2RU16-V
6"-66-FW-26914-A2RU16-V
6"-66-FW-26915-A2RU16-V
1. TYPICAL DETAIL OF DELUGE VALVE ARRANGEMENT REFER TO P&ID 66-PP-152-260001.
1003
1003
1003
1003
1003
1003
2. 3" VALVED CONNECTION FOR TESTING, DRAINING & CLEANING OF SYSTEM.
CONTRACTOR :
NOTE 7
NOTE 7
NOTE 7
NOTE 7
NOTE 7
NOTE 7
CORRESPONDING EQUIPMENT COVERED BY THE VALVE.
6. THE AUTOMATIC VALVE MANIFOLD SHALL BE AT LEAST 15 M AWAY FROM THE SPRAY SYSTEM.
7. A WEEP HOLE FOR POCKETS/LOW POINTS FOR DRAINING PURPOSE SHALL BE PROVIDED DOWNSTREAM OF DELUGE VALVE.
NOTE 8 OUTLET OF WEEP HOLE SHALL BE CONNECTED TO NEARBY CLEAN WATER TRENCH.
8. A SLOPE OF 1:200 OR STEEPER SHALL BE FITTED WITH ADEQUATE DRAIN FACILITY.
1"
2 2
D
REFERENCES :
NOTE 8 FOR GENERAL NOTES AND REFERENCES SEE DWG, FROM PU-PP-152-01000-01÷15
PIPING AND INSTRUMENTATION DIAGRAM-SYMBOLS, ABBREVIATIONS AND NOTES.
BGS-MU-200 GENERALS SPECIFICATION FIRE PROTECTION DESIGN PHILOSOPHY
6" BGS-MU-201 GENERALS SPECIFICATION WATER SPRAY FIRE PROTECTION SYSTEMS
BGS-IS-003 GENERAL SPECIFICATION FIRE AND GAS DETECTION SYSTEM
D
P4-PH-567-00002 FIRE FIGHTING GENERAL SPECIFICATION PO & 1-HEXENE PLANT
P4-PH-563-00001 FIRE & GAS SYSTEM GENERAL SPECIFICATION PO & 1-HEXENE PLANT
NOTE 8 PUX-PH-581-00009 DELUGE & SPRINKLER SYSTEM TECHNICAL SPECIFICATION
P4-PH-169-00001 FIRE PROTECTION GENERAL LAYOUT PO & 1-HEXENE PLANT
PU-PH-407-00001 HYDRAULIC CALCULATION UNDERGROUND FIREWATER NETWORK PO, 1-HEXENE AND U&O
1"
D
3 3
1" 1" 1"
D D D
THIS INFORMATION IS NOT TO BE USED, DISCLOSED, OR REPRODUCED IN WHOLE OR IN PART TO ANYONE OUTSIDE OF ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE) AND ITS SUBSIDIARIES,
6"-66-FW-26730-A2RU16-V
6"-66-FW-26731-A2RU16-V
6"-66-FW-26732-A2RU16-V
6"-66-FW-26733-A2RU16-V
6"-66-FW-26917-A2RU16-V
6"-66-FW-26916-A2RU16-V
TR-TCMS-NSH-P00885
1003
1003
1003
1003
1003
1003
THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE) OR ANY OF ITS LICENSORS.
66-XXX-VX
66-XXX-VX
66-XXX-VX
66-XXX-VX
66-XXX-VX
66-XXX-VX
LO LO LO LO LO LO
WL WL WL WL WL WL
C V C V C V C V C V C V
NC NC NC NC NC NC
3" 3" 3" 3" 3" 3"
NOTE 2 NOTE 2 NOTE 2 NOTE 2 NOTE 2 NOTE 2 133-0-65-02 Fire Water Underground for Extrusion Building
NC 3" NC 3" 3" NC 3" 3" 3"
4 133-3-66-16 Automatic Deluge Valves Manifold to Extrusion Transformer 4
NOTE 3 3"X2-1/2'' NOTE 3 3"X2-1/2'' NOTE 3 3"X2-1/2'' NOTE 3 3"X2-1/2'' NOTE 3 3"X2-1/2'' NOTE 3 3"X2-1/2''
EXCEPT PURSUANT TO A WRITTEN AGREEMENT WITH ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE).
C RED. FLG. RED. FLG. RED. FLG. RED. FLG. RED. FLG. RED. FLG.
133-3-66-17 Fire Water Spray Deluge System 66-SD-13374
A2AU16 A2RU16
V
INSTRUMENT AIR NOTE 5
2"-133-IA-00538-A0KU01-V 2"x1-1/2" 133-3-66-18 Fire Water Spray Deluge System 66-SD-13373
26589 133-PP-152-09095 FO FO FO FO FO FO
401
FROM INSTRUMENT AIR NOTE 1 KV NOTE 1 KV NOTE 1 KV NOTE 1 KV NOTE 1 KV NOTE 1 KV
+ + + + + +
HEADER 132-3-66-16 Fire Water Spray Deluge System 66-SD-13274
7002 7001 7002 7001 7019 7019
FML 133-0-15-01 Instrument Air [To be confirmed after unit 133 markup]
FIRE WATER NOTE 4 FML
8"-65-FW-26780-A2AU16-B LO
5 28625 65-PP-152-260001-03 66-XXXX-V1 5
1002 LO
FROM MAIN FIRE WATER UG AG 66-XXXX-V1 KPG KPG
RING UNIT 65 UNIT 66
C V 0014 0015 V C
V 3/4" V V
3/4" T C 3/4" T C
FIRE WATER NOTE 4 FML FML FML
8"-65-FW-26734-A2AU16-B 8"-66-FW-26735-A2AU16-V
26584 65-PP-152-260001-03
1002 LO 1002 LO LO
FROM MAIN FIRE WATER UG AG 66-XXXX-V1 66-XXXX-V1 66-XXXX-V1
RING UNIT 65 UNIT 66 66-NF-13309
1" D P 24-Mar-2023 APPROVED FOR DESIGN A.Waykole C.Balsano/S.Naik/
R.Santangelo/A.Pirani R.Soldinger