A B C D E F G H

GENERAL NOTES

GENERAL NOTES:
A. SCOPE BREAK BETWEEN VENDOR AND BOROUGE 4 EPC CONTRACTOR IS INDICATED BY: C V
B. ALARMS REPEATED TO FIRE STATIONS.
P
P
NOTES:
1 1. SYSTEM DESIGN REQUIREMENT SHALL BE AS PER BGS-MU-200, BGS-MU-201. 1
4300-SZ-DM-660260099

2. DRAIN VALVE SHALL BE LOCATED AT THE LOWEST POINT. P


3. LOW FOAM EXPANSION SYSTEM IS PROVIDED FOR THE SEMIFIXED FOAM SYSTEM FOR THE 1-HEXENEL STORAGE TANK
4. 3" VALVED CONNECTION FOR TESTING, DRAINING & CLEANING OF SYSTEM
66-PP-152-260099

REFERENCES:
P
CONTRACTOR :

FOR GENERAL NOTES AND REFERENCES SEE DRG. PU-PP-152-01000-01÷15;


PIPING AND INSTRUMENTATION DIAGRAM-SYMBOLS, ABBREVIATIONS AND GENERAL NOTES.
BOROUGE :

BGS-MU-200 GENERAL SPECIFICATION FIRE PROTECTION DESIGN PHILOSOPHY.


BGS-MU-201 GENERAL SPECIFICATION WATER SPRAY FIRE PROTECTION SYSTEMS
P4-PH-567-00002 FIRE FIGHTING GENERAL SPECIFICATION PO & 1-HEXENE PLANT

HOLDS:
1. FIREWATER LINE SIZE IS PRELIMINARY AND IT SHALL BE CONFIRMED AFTER HYDRAULIC CALCULATION

2
4" P 2
4"-66-FW-26818-A2RU16-V
1003 2" NC
P P FIREFIGHTING LEGEND
P C V C V NOTE 2
D
4"-66-FW-26817-A2RU16-V P ITEM DESCRIPTION
LF LF
1003 3"x1-1/2" P 3"x1-1/2"
P P LF FOAM MAKER

V C V C FOAM POURER

4"
P
P

P
P

4"-66-FW-26819-A2RU16-V
4"-66-FW-26816-A2RU16-V

1003
3 3
1003
THIS INFORMATION IS NOT TO BE USED, DISCLOSED, OR REPRODUCED IN WHOLE OR IN PART TO ANYONE OUTSIDE OF ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE) AND ITS SUBSIDIARIES,

C
V

V
V

V
C

C
LF

LF

4"-66-FW-26640-A2RU16-V
THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE) OR ANY OF ITS LICENSORS.

3"x1-1/2" 3"x1-1/2" P

1003
4"
P

125-5-66-15 Fire Water Sprinkler Deluge System to Cyclohexane Tanks

4 4
P
EXCEPT PURSUANT TO A WRITTEN AGREEMENT WITH ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE).

P
P

V C V C
DIKE

4"-66-FW-26820-A2RU16-V
TR-TCMS-NSH-P00885
4"-66-FW-26815-A2RU16-V 3"x1-1/2" P 3"x1-1/2" P
1003 LF 1003 LF

P
C V C V
P P
P P

NC
2" NOTE 4

2" NC
NOTE 2
D
5 5
P

FIRE DEPARTMENT CONNECTION


4"X2-1/2"X2-1/2"

V
P 23-Mar-2023 APPROVED FOR DESIGN A.Waykole C.Balsano/S.Naik/
R.Santangelo/A.Pirani R.Soldinger

L 11-Mar-2022 ISSUED FOR COMPANY REVIEW A.Waykole T.Rossi/S.Soni/


R.Santangelo/A.Pirani T.Rossi

C
Prepared Checked Approved
Rev. Date Description
By By By

FOAM MAKER ABU DHABI POLYMERS COMPANY LIMITED


EQUIPMENT. SURFACE (BOROUGE)
AREA (m2)
NO. CONNECTION DES. PRESS. QTY K - FACTOR PETROCHEMICALS PROJECT
FLOW RATE (m3/h)
SIZE ( barg) COMPANY PROJECT NO PROJECT TITLE:
6 4700000900 BOROUGE 4 PROJECT - EPC PACKAGE 3 - 6
CONTRACTOR PROJECT NO
PURE & IMPURE
403.2 2-1/2" 5 6 123 4300 - PO
PO UNIT - RUWAIS, UAE
CYCLOHEXANE TANKS DIKE 99.2
P P DRAWING TITLE: PIPING AND INSTRUMENTATION DIAGRAM
P UNIT - 66 SPRINKLER AND DELUGE
WATER SPRAY & FOAM SYSTEM FOR PURE & IMPURE CYCLOHEXANE TANKS SHEET 1
BOROUGE DOCUMENT CLASS' N PROJECT DRAWING NO REV: P

CONTRACTOR: 4300-SZ-DM-660260099 SHEET UNIT: 66


1 BOROUGE: 66-PP-152-260099 OF AREA: 26
CADD SHEET
A B C D E F REF. 66-PP-152-260099-ISP SCALE: SIZE A1