GENERAL NOTES
128-SK-0001 128-SK-0003 128-SK-0005 128-SK-0007 128-SK-0009 128-SK-0011 128-SK-0013 128-SK-0015 GENERAL NOTES:
C V
A) SCOPE BREAK BETWEEN VENDOR AND BOROUGE 4 EPC CONTRACTOR IS INDICATED BY :
B) PRESSURE REGULATING VALVE TO GET PRESSURE OF 3.5 BARg AT THE NOZZLE OUTLET, SHALL BE
PROVIDED BY TOGETHER WITH HOSE REEL
V
1 1
4300-SZ-DM-650260011
C
NOTE 1
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
LO LO LO LO LO LO LO
BOROUGE : 65-PP-152-260011
Q Q Q Q Q Q Q
CONTRACTOR :
D
NOTES:
3/4"
FIRE WATER NO FIRE WATER 1) VALVE SHALL BE LOCATED AT ACCESIBLE LOCATION.
4"-65-FW-28977-A2AU16-B NOTE 1 4"-65-FW-26661-A2AU16-V NOTE 1 4"-65-FW-26662-A2AU16-V 4" 4"-65-FW-26408-A2AU16-B
26735 65-PP-152-280009-01 65-PP-152-260009-01 26734 2) RISER ON TRANSITION FROM UNDER GROUND PIPING TO ABOVE GROUND PIPING SHALL BE EQUIPPED WITH
1002 4" 1002 NO 1002 NOTE 1 1002 PROTECTION FROM PHYSICAL DAMAGE, WHERE NECESSARY, AND ISOLATION KIT.
FIRE WATER NETWORK UG AG NO 4" AG UG FIRE WATER NETWORK
2 NOTE 1 3/4" 3/4" 3/4" NOTE 1 2
NOTE 2
NOTE 2
D D D
Q Q Q Q Q Q Q Q
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
LO LO LO LO LO LO LO LO
NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1
C
C
REFERENCES:
V
V
FOR GENERAL NOTES AND REFERENCES SEE DWG. FROM PU-PP-152-01000-01÷15;
PIPING AND INSTRUMENTATION DIAGRAM-SYMBOLS, ABBREVIATIONS AND NOTES.
BGS-MU-200 : GENERAL SPECIFICATION FIRE PROTECTION DESIGN PHILOSOPHY
P4-PH-567-0002 : FIRE FIGHTING GENERAL SPECIFICATION PO & HHEXENE PLANT
3 DS-PUX-572-SF-00003 : FIRE FIGHTING NETWORK EQUIPMENT AND ACCESSORIES DATA SHEETS. 3
128-SK-0002 128-SK-0004 128-SK-0006 128-SK-0008 128-SK-0010 128-SK-0012 128-SK-0014 128-SK-0016
P4-PH-203-00001 : HSE EQUIPMENT AND ESCAPE ROUTES OF P4 GENERAL LAYOUT
THIS INFORMATION IS NOT TO BE USED, DISCLOSED, OR REPRODUCED IN WHOLE OR IN PART TO ANYONE OUTSIDE OF ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE) AND ITS SUBSIDIARIES,
131-SK-0016 131-SK-0018 131-SK-0020 131-SK-0022 131-SK-0024 131-SK-0026 131-SK-0028 131-SK-0030 131-SK-0032 131-SK-0034
133-0-65-03 Fire Water Underground for PE7 Polymerization
4 4
EXCEPT PURSUANT TO A WRITTEN AGREEMENT WITH ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE).
V
C
C
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
LO LO LO LO LO LO LO LO LO LO
NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1
Q Q Q Q Q Q Q Q Q Q
TR-TCMS-NSH-P01451
C.Balsano/S.Naik/
Q 27-Sep-2023 APPROVED FOR CONSTRUCTION A.Waykole R.Santangelo/A.Pirani R.Soldinger
1-1/2"
1-1/2"
R.Santangelo/A.Pirani
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
LO LO LO LO LO LO LO LO LO LO
NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1 Prepared Checked Approved
Rev. Date Description
By By By
C C C C C C C C C C
ABU DHABI POLYMERS COMPANY LIMITED
(BOROUGE)
V V V V V V V V V V
PETROCHEMICALS PROJECT
COMPANY PROJECT NO PROJECT TITLE:
6 4700000900 BOROUGE 4 PROJECT - EPC PACKAGE 3 - 6
CONTRACTOR PROJECT NO
4300 - PO
PO UNIT - RUWAIS, UAE
131-SK-0015 131-SK-0017 131-SK-0019 131-SK-0021 131-SK-0023 131-SK-0025 131-SK-0027 131-SK-0029 131-SK-0031 131-SK-0033
DRAWING TITLE: PIPING AND INSTRUMENTATION DIAGRAM
UNIT 65 - FIREWATER, HOSE REELS RACK
FOR INTERCONNECTING PIPE RACK OF 1-HEXENE & PO Q
BOROUGE DOCUMENT CLASS' N PROJECT DRAWING NO REV: Q