A B C D E F G H

GENERAL NOTES

131-SF-0006 131-SF-0005 GENERAL NOTES


HD HD A) SCOPE BREAK BETWEEN VENDOR AND BOROUGE 4 EPC
CONTRACTOR IS INDICATED BY: V C

B) DIAMETERS SHOWN FOR L0TU16 REFERS TO HDPE NOMINAL SIZE PIPE.

6"-65-FW-26244-A2AU16-B
20304 65-PP-152-260001-02

20310 65-PP-152-260001-02
6"-65-FW-26717-A2AU16-B
TO POLYOLEFINS PE AREA

TO POLYOLEFINS PE AREA
4300-SZ-DM-650260001-04

1 1

SIZE EQUIVALENCE TABLE

1002
1002
FIRE WATER PIPES AND FITTINGS
65-PP-152-260001-04

SHEET 2 OF 4

SHEET 2 OF 4
FIRE WATER

FIRE WATER
HDPE NOMINAL SIZE HDPE NOMINAL OD HDPE NOMINAL ID EQUIVALENT CARBON
(INCH) (MM) (MM) STEEL NOMINAL SIZE (INCH)
2 63 49 2
4 125 97 4

355 mm-65-FW-26006-L0TU16-N
20"-65-FW-26446-A2AU16-V
630 mm-65-FW-26001-L0TU16-N

180 mm-65-FW-26716-L0TU16-N

180 mm-65-FW-26005-L0TU16-N

20"-65-FW-26447-A2AU16-V
CONTRACTOR :

6 180 140 6
BOROUGE :

8 225 175 -

1002
10 250 194 8

1002
1001
1001

1001

1001

630 mmx500 mm

630 mmx500 mm

710 mmx630 mm
630 mmx500 mm
630 mmx500 mm
12 315 245 10
14 355 276 12
16 400 311 -
20" 20"
630 mm-65-FW-26015-L0TU16-N 630 mm-65-FW-26015-L0TU16-N 630 mm-65-FW-26201-L0TU16-N 710 mm-65-FW-26202-L0TU16-N 18 450 350 14
65-PP-152-260001-01 27108
1001 1001 1001 1001 20 500 389 16

180 mm-65-FW-26774-L0TU16-N
450 mm-65-FW-26028-L0TU16-N
125 mm-65-FW-26032-L0TU16-N
630 mm-65-FW-26773-L0TU16-N
125 mm-65-FW-26665-L0TU16-N

65-SV-2650 65-SV-2649 22 560 422 18

2 Q 24 630 490 20 2
Q

1001
180 mm-65-FW-26034-L0TU16-N 28 710 535 24

1001
1001
65-PP-152-260001-01 29457

1001
1001

1001 32 800 603 28

Q
NOTES
1) HYDRANTS WILL BE EQUIPPED WITH 2 X 2 ½" VALVE HOSE CONNECTIONS WITH INSTANTANEOUS
COUPLINGS AND 2 X 4" VALVED PUMPER CONNECTIONS.

6"-65-FW-26035-A2AU16-B
6"-65-FW-26775-A2AU16-B
14"-65-FW-26374-A2AU16-B
2) MONITORS SHALL BE INSTALLED AT LEAST 15M FROM THE AREA TO BE COVERED.

4"-65-FW-26033-A2AU16-B
4"-65-FW-26664-A2AU16-B

3) ALL UNDERGROUND GATE VALVES SHALL BE CAR SEALED IN OPEN POSITION. ALL UNDERGROUND GATE
VALVES AND ASSOCIATED TRANSITION PIECE JOINTS SHALL BE INSTALLED INSIDE PIT. ALL GATE VALVES

1002
1002
630 mmx500 mm SHALL BE PROVIDED WITH EXTENDED SPINDLE AND POST INDICATOR.

1002
1002
1002

Q 4) THE A2AU16-B PIPES WILL BE COATED IN SITE WITH POLYURETHANE, ACCORDING TO


20" ``COATING FOR UNDERGROUND STEEL PIPE BGS-MY-001''.
65-SV-2651 20"-65-FW-26576-A2AU16-N
5) RISERS ON TRANSITION FROM UNDERGROUND PIPING TO ABOVE GROUND PIPING SHALL BE EQUIPPED
1002 WITH PROTECTION AGAINST PHYSICAL DAMAGE
6) TYPICAL HYDRANT WITH MONITOR CONNECTION, BUTTERFLY VALVE TO BE PROVIDED ON THE 6" STANDPIPE IS IN
630 mmx500 mm Q
HOSE REEL FOR MAN PIPE
RACK
FIRE WATER

VENDOR SCOPE.

HOSE REEL FOR


PURIFICATION COMMON

MANUAL MANIFOLD FOR


PURIFICATION COMMON
FIRE WATER

FIRE WATER
AREA PIPE RACK
26746

24446

26659
HD HD
65-PP-152-260011

65-PP-152-260002

66-PP-152-260035
3 3

HD
THIS INFORMATION IS NOT TO BE USED, DISCLOSED, OR REPRODUCED IN WHOLE OR IN PART TO ANYONE OUTSIDE OF ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE) AND ITS SUBSIDIARIES,

131-SG-0010 131-SG-0009
COCATALYST
(TEAL) AREA

Q
V
6"

131-SG-0011 (INSULATION KIT TYPICAL)

AG
C
180 mm-65-FW-26030-L0TU16-N 6"-65-FW-26031-A2AU16-B
HD 6"

UG
1001 1002
THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE) OR ANY OF ITS LICENSORS.

A2AU16-B LOTU16

Q 7) TYPICAL HYDRANT CONNECTION, BUTTERFLY VALVE TO BE PROVIDED ON THE 6" STANDPIPE IS IN VENDOR SCOPE.
630 mm-65-FW-26564-L0TU16-N

52 HD

PURIFICATION COMMON AREA Q


V
6"
1001

(INSULATION KIT TYPICAL)

AG
C
4 4
6"

UG
EXCEPT PURSUANT TO A WRITTEN AGREEMENT WITH ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE).

A2AU16-B LOTU16
TR-TCMS-NSH-P01451
131-SG-0004 131-SG-0005
180 mm-65-FW-26086-L0TU16-N 6"-65-FW-26205-A2AU16-B
131-SG-0001 HOLD :

65-PP-152-260002
HD 1. FIRE WATER LINE SIZE IS PRELIMINARY AND IT SHALL BE CONFIRMED AFTR HYDRAULIC CALCULATION.

PURIFICATION COMMON
1001 1002
65-SP-26002

65-SP-26002
REFERENCE :
AREA PIPE RACK
Q HOSE REEL FOR
FIRE WATER

FOR GENERAL NOTES AND REFERENCES SEE DWG. FROM PU-PP-152-01000-01÷15;


131-0-65-02DIAGRAM-SYMBOLS,
Fire Water Underground forAND
POGENERAL
Common (Process Area)
HD

HD
PIPING AND INSTRUMENTATION ABBREVIATIONS NOTES.
24456

131-SG-0002
180 mm-65-FW-26088-L0TU16-N 6"-65-FW-26089-A2AU16-B B4-LP-201-00001 : OVERALL PLOT PLAN ALL UNITS OF BOROUGE 4
HD BGS-MU-200 : FIRE PROTECTION DESIGN PHILOSOPHY
1001 1002 132-0-65-01 Fire Water Underground for PE6 Substations
6"-65-FW-26085-A2AU16-B

6"-65-FW-26081-A2AU16-B
4"-65-FW-26083-A2AU16-B

P4-PH-567-00002 : FIRE FIGHTING GENERAL SPECIFICATION PO & 1-HEXENE PLANT


Q 65-PP-152-260001-01 : PIPING & INSTRUMENTATION DIAGRAM UNIT 65-
FIREWATER UNDERGROUND SYSTEM POLYOLEFINS PE UNIT SHEET 2 OF 4
1002

1002
1002

131-SG-0003 65-PP-152-260001-02 : PIPING & INSTRUMENTATION DIAGRAM UNIT 65-


180 mm-65-FW-26090-L0TU16-N 6"-65-FW-26091-A2AU16-B FIREWATER UNDERGROUND SYSTEM POLYOLEFINS PE UNIT SHEET 2 OF 4
HD
1001 1002 65-PP-152-260001-03 : PIPING & INSTRUMENTATION DIAGRAM UNIT 65-
FIREWATER UNDERGROUND SYSTEM POLYOLEFINS PE UNIT SHEET 3 OF 4
5
630 mmx500 mm Q 65-PP-152-250009 : PIPING & INSTRUMENTATION DIAGRAM UNIT 65- 5
FIREWATER SYSTEM UNDERGROUND SYSTEM AND DERIVATIVES UNIT
180 mm-65-FW-26084-L0TU16-N

180 mm-65-FW-26080-L0TU16-N
125 mm-65-FW-26082-L0TU16-N

20" 65-PP-152-280009-02 : PIPING & INSTRUMENTATION DIAGRAM UNIT 65-


Q
20"-65-FW-26577-A2AU16-V 65-SV-2652 FIREWATER SYSTEM UNDERGROUND SYSTEM UTILITY AREA SHEET 2 OF 4
P4-PH-169-00001 : FIRE PROTECTION GENERAL LAYOUT PO & 1-HEXENE PLANT
1002
DOCUMENT NOTE :
1001

1001
1001

630 mmx500 mm CONTENT OF THIS DOCUMENT WAS PART OF 4300-SZ-DM-650260001-01-ISL 65-PP-152-260001-01 REV L
TO B4 DERIVATIVES AREA
630 mm-65-FW-26025-L0TU16-N
65-PP-152-260009-01 23505
1001
630 mm-65-FW-26025-L0TU16-N

FIRE WATER 630 mm-65-FW-26024-L0TU16-N


65-PP-152-260001-01 27107
1001 Q 31-Aug-2023 APPROVED FOR CONSTRUCTION A.Waykole C.Balsano/S.Naik/
R.Santangelo/A.Pirani R.Soldinger

P 22-Mar-2023 APPROVED FOR DESIGN A.Waykole C.Balsano/S.Naik/


R.Santangelo/A.Pirani R. Soldinger
1001

Prepared Checked Approved


Rev. Date Description
By By By

ABU DHABI POLYMERS COMPANY LIMITED


(BOROUGE)

PETROCHEMICALS PROJECT
TO B4 UTILITIES AREA
FIRE WATER
65-PP-152-280009-03 20424

COMPANY PROJECT NO PROJECT TITLE:


6 4700000900 BOROUGE 4 PROJECT - EPC PACKAGE 3 - 6
CONTRACTOR PROJECT NO
4300 - PO
PO UNIT - RUWAIS, UAE
DRAWING TITLE: PIPING AND INSTRUMENTATION DIAGRAM
UNIT 65 - FIREWATER
FIRE WATER NETWORK POLYOLEFINS PE UNIT SHEET 4 OF 4
BOROUGE DOCUMENT CLASS' N PROJECT DRAWING NO REV: Q

CONTRACTOR: 4300-SZ-DM-650260001-04 SHEET UNIT: 65


1 BOROUGE: 65-PP-152-260001-04 OF AREA: 26
CADD SHEET
A B C D E F REF. 65-PP-152-260001-04-ISQ SCALE: SIZE A1