GENERAL NOTES

GENERAL NOTES:
A) SIZE OF HEADER FOR EACH SINGLE SPRAY NOZZLE SHALL BE 1". SPRAY NOZZLE HEAD END
CONNECTION IS NPT MALE THREADED.
B) HORIZONTAL DRY PIPING. DOWNSTREAM OF THE BLOCK VALVE AND OF THE AUTOMATIC ON-OFF VALVE,
SHALL BE FITTED WITH ADEQUATE DRAIN FACILITIES; WEEP HOLES IN SPRAY HEADERS AND AUTOMATIC
1 DRAIN VALVES SHALL BE PROVIDED AT SELECTED LOCATIONS. ALL DRAINS SHOWN ON THIS P&ID ARE FOR 1
4300-SZ-DM-660260024

REFERENCE ONLY. FOR ACTUAL LOCATION REFER TO ISOMETRIC DRAWINGS.


66-PP-152-260024

C V
1"

1"x1/2"
CONTRACTOR :

DETAIL- "A"
BOROUGE :

(APPLICABLE FOR ALL SPRAY NOZZLES)

1-1/2" 1-1/2" Q
Q 1" 1" 1" DETAIL "A" Q
3"x2" 1-1/2"
1-1/2" 1-1/2"
1-1/2" 1-1/2"

1" Q
NC NOTES:
NOTE 1 3"x2" 2"
2 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 2
Q Q Q 1) INSPECTOR TEST VALVE 3/4" SHALL BE PROVIDED AT 1200 MM FROM GRADE LEVEL.
2"x1-1/2" VALVE SHALL BE DESIGNED TO SEAL IN CLOSED DIRECTION.
3"

TOP MIDDLE BOTTOM Q


2"x1-1/2" RING 2"x1-1/2" 2"x1-1/2" RING 2"x1-1/2" 2"x1-1/2" RING 2"x1-1/2" 1-1/2" 1-1/2"
Q
Q
1-1/2" 2"

2"x1-1/2" 2"
3"x2" 3"x2" Q
2"
Q
2" 2" 2" 2" 1" 1-1/2" 1-1/2"
2"x1-1/2" 3"x2" 2"x1-1/2"
3" 3" 3"x2" 3"x2" 3"x2" 3"x2"
3"
1-1/2" 1-1/2"
REFERENCES:
FOR GENERAL NOTES AND REFERENCES SEE DWG. FROM PU-PP-152-01000-01÷15;
2"x1-1/2" PIPING AND INSTRUMENTATION DIAGRAM-SYMBOL, ABBREVIATIONS AND NOTES.
3 1-1/2"x1" 3
3" 3" 3" 3" PUX-MR-572-00004 FIRE FIGHTING WATER SPRAY DELUGE / SPRINKLER SYSTEMS DATASHEETS
1" 1" 1-1/2" Q
3"-66-FW-26333-A2RU16-V 3"
BGS-MU-200 GENERAL SPECIFICATION FIRE PROTECTION DESIGN PHILOSOPHY
THIS INFORMATION IS NOT TO BE USED, DISCLOSED, OR REPRODUCED IN WHOLE OR IN PART TO ANYONE OUTSIDE OF ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE) AND ITS SUBSIDIARIES,

BGS-MU-201 GENERAL SPECIFICATION WATER SPRAY FIRE PROTECTION SYSTEMS


3" 1003 133-VV-407 P4-PH-567-00002 FIRE FIGHTING GENERAL SPECIFICATION PO & 1-HEXENE PLANT
3" 3" 2"-66-FW-26330-A2RU16-V PUX-PH-581-00009 DELUGE AND SPRINKLER SYSTEM TECHNICAL SPECIFICATION

3"-66-FW-26331-A2RU16-V

2"-66-FW-26332-A2RU16-V
PU-PH-407-00001 HYDRAULIC CALCULATION UNDERGROUND FIREWATER NETWORK PO, 1-HEXENE
4"x3" 6"x4" 6"x3" AND U&O
133-PH-407-00001 FIREFIGHTING SYSTEMS HYDRAULIC CALCULATION WATER SPRAY SYSTEM - PE7
6" PLANT WET AREA-1 (AREA 00, LOOP REACTOR & JACKET WATER, GAS PHASE REACTOR)
1003

1003

1003
133-HE-403 133-VV-003 Q
133-VV-014
THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE) OR ANY OF ITS LICENSORS.

3"x2" 6"x3"

8"x6"

8"x6" FIRE WATER


6" 6"-66-FW-26334-A2RU16-V 8" 8" 8"-66-FW-26329-A2RU16-V
66-PP-152-260021 26417
4 1003 1003 4
FROM MANIFOLD OF
(SYSTEM 66-SD-13301) Q
EXCEPT PURSUANT TO A WRITTEN AGREEMENT WITH ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE).

133-0-66-04 Fire Water Spray Deluge System 66-SD-13301

TR-TCMS-NSH-P01451

5 5

Q Q
RATE OF REQUIRED
SURFACE DELUGE APPLICATION FLOW DEMAND NO OF CONE P4-MR-106-000001 Q 14-Aug-2023 APPROVED FOR CONSTRUCTION A.Waykole C.Balsano/S.Naik/
R.Santangelo/A.Pirani R.Soldinger
SR.NO. EQUIPMENT NO. DESCRIPTION DIA(M) HEIGHT(M) AREA (M2) SYSTEM (LPM/SQ.M) (M3/HR) NOZZLES K FACTOR ANGLE TYPE COMMODITY / IDENT CODE 23-Mar-2023 APPROVED FOR DESIGN
P A.Waykole C.Balsano/S.Naik/
R.Santangelo/A.Pirani R.Soldinger

1 133-VV-014 HP FLARE KO DRUM 5.2 14.0 236.8 10.2 215.1 69 30.0 120º MEDIUM VELOCITY L 20-Sep-2022 ISSUED FOR COMPANY REVIEW A.Waykole T.Rossi/S.Soni/
R.Santangelo/A.Pirani T.Rossi

2 133-VV-003 LP FLARE KO DRUM 3.0 3.0 46.9 10.2 84.2 27 30.0 120º MEDIUM VELOCITY Rev. Date Description
Prepared Checked Approved
By By By
3 133-VV-407 GAS RECOVERY COMP SUC TANK 2.5 3.4 36.8 66-SD-13301 (8") 10.2 37.4 20 18.0 120º MEDIUM VELOCITY
4 133-HE-403 GAS REC COMP SUC COOLER 1.0 4.7 14.9 10.2 22.4 12 18.0 90 MEDIUM VELOCITY ABU DHABI POLYMERS COMPANY LIMITED
(BOROUGE)
TOTAL 359.2

Q PETROCHEMICALS PROJECT
COMPANY PROJECT NO PROJECT TITLE:
6 4700000900 BOROUGE 4 PROJECT - EPC PACKAGE 3 - 6
CONTRACTOR PROJECT NO
4300 - PO
PO UNIT - RUWAIS, UAE
DRAWING TITLE: PIPING AND INSTRUMENTATION DIAGRAM
UNIT 66 - SPRINKLER AND DELUGE,
WATER SPRAY DELUGE SYSTEM 66-SD-13301 , POLYETHYLENE (PE7)
BOROUGE DOCUMENT CLASS' N PROJECT DRAWING NO REV: Q

CONTRACTOR: 4300-SZ-DM-660260024 SHEET UNIT: 66


1 BOROUGE: 66-PP-152-260024 OF AREA: 26
CADD SHEET
A B C D E F REF. 66-PP-152-260024-ISQ SCALE: SIZE A1