GENERAL NOTES

GENERAL NOTES:
A) SIZE OF HEADER FOR EACH SIGNAL SPRAY NOZZLE SHALL BE 1". SPRAY NOZZLE HEAD END
CONNECTION IS NPT MALE THREADED.
B) HORIZONTAL DRY PIPING. DOWNSTREAM OF THE BLOCK VALVE AND OF THE AUTOMATIC ON-OFF VALVE,
SHALL BE FITTED WITH ADEQUATE DRAIN FACILITIES; WEEP HOLES IN SPRAY HEADERS AND AUTOMATIC
1 DRAIN VALVE SHALL BE PROVIDED AT DIFFERENT LOCATIONS ALL DRAINS SHOWN ON THIS P&ID ARE FOR 1
4300-SZ-DM-660260025

REFERENCE ONLY. FOR ACTUAL LOCATION REFER TO ISOMETRIC DRAWINGS.


66-PP-152-260025

2" 2"x1-1/2" 1-1/2"x1"


1" C V
1" 1/2"
3/4"
CONTRACTOR :

3"x2" 1"x1/2"
NC
BOROUGE :

DETAIL- "A"
2" NOTE 1
Q (APPLICABLE FOR ALL SPRAY NOZZLES)
2"x1-1/2" 1-1/2"x1" 1"

DETAIL "A"

133-XP-303-PC-303 1ST LOOP 133-XP-320-PC-320 2ND 2" 2"x1-1/2" 1-1/2"x1"


1"
CIRCULATION PUMP LOOP CIRCULATION PUMP
4"x3" NOTES:
2 1. INSPECTOR TEST VALVE 3/4" SHALL BE PROVIDED AT 1200 MM FROM GRADE LEVEL. 2
1" VALVE SHALL BE DESIGNED TO SEAL IN CLOSED DIRECTION.
1"
1" 4"x3" 2"x1-1/2" 1-1/2"x1" Q
2" 1"

8"x4"
Q

REFERENCES:
2"x1-1/2" 1-1/2"x1"
2" 1"
2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" FOR GENERAL NOTES AND REFERENCES SEE DWG N. FROM PU-PP-152-01000-01÷15;
PIPING AND INSTRUMENTATION DIAGRAM-SYMBOL, ABBREVIATIONS AND NOTES.
1-1/2" 1-1/2" 1-1/2" 1-1/2" LOOP REACTOR 133-RP-302 & 133-RP-303 3"x2" 1"
2" 2" PUX-MR-572-00004 FIRE FIGHTING WATER SPRAY DELUGE / SPRINKLER SYSTEMS DATASHEETS
CONCRETE STRUCTURE GROUND FLOOR 2" 2"x1-1/2" 1-1/2"x1" 1" BGS-MU-200 GENERAL SPECIFICATION FIRE PROTECTION DESIGN PHILOSOPHY
3"x2" 4"x2" 6"x4" 8"x6" BGS-MU-201 GENERAL SPECIFICATION WATER SPRAY FIRE PROTECTION SYSTEMS
P4-PH-567-00002 FIRE FIGHTING GENERAL SPECIFICATION PO & 1-HEXENE PLANT
PUX-PH-581-00009 DELUGE AND SPRINKLER SYSTEM TECHNICAL SPECIFICATION
3/4" 4"x2" 4"x2" 4"x2" 4"x2" 6"x2" 6"x2" 6"x2" 6"x2" 6"x2" Q PU-PH-407-00001 HYDRAULIC CALCULATION UNDERGROUND FIREWATER NETWORK PO, 1-HEXENE AND U&O
NOTE 1 F1 F3 F5 F7 F9 F11 F13 133-PH-407-00001 FIREFIGHTING SYSTEMS HYDRAULIC CALCULATION WATER SPRAY SYSTEM - PE7 PLANT WET AREA-1
NC 133-VV-306 DUMP COLLECTING TANK (AREA 00, LOOP REACTOR & JACKET WATER, GAS PHASE REACTOR)
133-PH-407-00002 FIREFIGHTING SYSTEMS HYDRAULIC CALCULATION WATER SPRAY SYSTEM - PE7 PLANT WET AREA-2
(RECOVERY COMPRESSOR AND STRUCTURE)
8"
3 3
1" 1" 1" 1" 1" 1"
THIS INFORMATION IS NOT TO BE USED, DISCLOSED, OR REPRODUCED IN WHOLE OR IN PART TO ANYONE OUTSIDE OF ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE) AND ITS SUBSIDIARIES,

3"
2" 2" 2" 2" 2" 2" 2" 2" 2"
Q
F2 F4 F6 F8 F10 F12 F14
THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE) OR ANY OF ITS LICENSORS.

8"
1" 1" 1" 1" 1" 1"

4"x2" 4"x2" 4"x2" 4"x2" 6"x2" 6"x2" 6"x2" 6"x2" 6"x2"


4"x3" 8"x6" FIRE WATER
6"x4" 8" 8"-66-FW-26335-A2RU16-V
66-PP-152-260022 26431 133-3-66-13 Fire Water Spray Deluge System 66-SD-13331
1003
133-RP-302

133-RP-303

DELUGE MANIFOLD OF
4 VALVE (SYSTEM 4
66-SD-13331)
EXCEPT PURSUANT TO A WRITTEN AGREEMENT WITH ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE).

133-RP-303 LOOP REACTOR BOTTOM FLANGES


133-RP-302 LOOP REACTOR BOTTOM FLANGES
1" 1-1/2"
Q
TR-TCMS-NSH-P01451

1" 1-1/2"x1"
Q

5 Q 5
CO BOTTLE CO BOTTLE

SURFACE DELUGE RATE OF REQUIRED NO. OF CONE P4-PH-106-00001 COMMODITY


SR. NO. EQUIPMENT. NO. DESCRIPTION DIA(M) HEIGHT(M) APPLICATION FLOW DEMAND NOZZLES K FACTOR ANGLE TYPE
AREA (M2) SYSTEM / IDENT CODE
(LPM/SQ.M) (M3/HR)

1 133-RP-302 &133-RP-303 LOOP REACTOR CONCRETE STRUCTURE GROUND FLOOR 25.000 10.000 250 16.3 361.2 44 79.0 120 MEDIUM VELOCITY
C.Balsano/S.Naik/
Q 14-Aug-2023 APPROVED FOR CONSTRUCTION A.Waykole R.Santangelo/A.Pirani R.Soldinger
2 133-XP-303-PC-303 1 ST. LOOP CIRCULATION PUMP 2.000 8.760 17.520 20.4 39.9 6 64.0 90 MEDIUM VELOCITY P 23-Mar-2023 APPROVED FOR DESIGN A.Waykole C.Balsano/S.Naik/
R.Santangelo/A.Pirani R.Soldinger

133-XP-320-PC-320 2 ND. LOOP CIRCULATION PUMP 66-SD-13331 (8") 6 L 23-Sep-2022 ISSUED FOR COMPANY REVIEW A.Waykole T.Rossi/S.Soni/
T.Rossi
3 2.000 8.760 17.520 20.4 39.9 64.0 90 MEDIUM VELOCITY R.Santangelo/A.Pirani

Prepared Checked Approved


- CO BOTTLES (3 SETS) Rev. Date Description
4 Q 6.100 1.000 6.100 12 11.2 6 18.0 90 MEDIUM VELOCITY By By By

5 133-RP-302 LOOP REACTOR BOTTOM 1.700 1.700 20.230 10.2 22.4 12 18.0 90 MEDIUM VELOCITY ABU DHABI POLYMERS COMPANY LIMITED
(BOROUGE)
6 133-RP-303 LOOP REACTOR BOTTOM 1.700 1.700 26.010 10.2 29.9 16 18.0 90 MEDIUM VELOCITY

7 133-VV-306 DUMP COLLECTING TANK 9.000 10.000 90.000 10.2 74.8 24 30.0 120 MEDIUM VELOCITY PETROCHEMICALS PROJECT
COMPANY PROJECT NO PROJECT TITLE:
6 TOTAL 579.5 4700000900 BOROUGE 4 PROJECT - EPC PACKAGE 3 - 6
CONTRACTOR PROJECT NO
Q 4300 - PO
PO UNIT - RUWAIS, UAE
DRAWING TITLE: PIPING AND INSTRUMENTATION DIAGRAM
UNIT-66, SPRINKLER AND DELUGE,
WATER SPRAY DELUGE SYSTEM 66-SD-13331, POLYETHYLENE (PE7)
BOROUGE DOCUMENT CLASS' N PROJECT DRAWING NO REV: Q

CONTRACTOR: 4300-SZ-DM-660260025 SHEET UNIT: 66


1 BOROUGE: 66-PP-152-260025 OF AREA: 26
CADD SHEET
A B C D E F REF. 66-PP-152-260025-ISQ SCALE: SIZE A1