Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

A B C D E F G H

GENERAL NOTES
SANITARY WASTE WATER
TO TREATMENT
90 mm-128-NY-29007-K0TU16-N
128-PP-152-290041 20095 NOTES:
9334
POTABLE WATER 1) PIPE SIZE INDICATED REFERS TO OUTSIDE DIAMETER AND PIPE MATERIAL IS HDPE (SDR 17)
125 mm-128-DW-29013-A0TU16-N IP-C-U4-P4-L-024 IP-C-P4-U4-L-051
19941 128-PP-152-290013
120
FROM U&O4 DETAIL "C" DETAIL "C"
4300-XZ-DM-128290101-03

1 1
128-0-05-02
128-0-09-04
BOROUGE : 128-PP-152-290101-03

GENERAL NOTES:
A) ALL FLARE LINES TO BE SLOPED TOWARDS THE FLARE HEADER WITH TOP ENTRY.

POTABLE WATER 128-0-05-02 B) SCOPE BREAK BETWEEN VENDOR AND BOROUGE 4 EPC CONTRACTOR IS INDICATED BY: C V
63 mm-128-DW-29072-A0TU16-N
20999
CONTRACTOR :

120 C) PACKAGE DETAILS REFER TO THE CURRENT CONFIGURATION AS REPRESENTED ON


TO 1-HX OPERATOR VENDOR DOCUMENTATION.
SHELTER
D) DELETED.
SAFETY SHOWER E) ALL INSTRUMENT TAG AND INTERLOCK NUMBERS ON THIS DRAWING HAVE THE PREFIX 128.

CHILLED SAFETY SHOWER


WATER
PO AND HX4

19905
F) DELETED.

CHILLED SAFETY SHOWER

58-PP-152-280106

58-PP-152-280106
G) DELETED.
H) DELETED.

58-PP-152-280106
I) DELETED.

POTABLE WATER
WATER
19906

19940
2
REFERENCES: 2
FOR GENERAL NOTES AND REFERENCES SEE DWG, FROM PU-PP-152-01000-01÷15.
128-0-05-02 PE6 (UNIT 132) PIPING AND INSTRUMENTATION DIAGRAM-SYMBOLS, ABBREVIATIONS AND GENERAL NOTES.
PE7 (UNIT 133)

125 mm-128-DW-29006-A0TU16-N
125 mm-128-DW-29048-A0TU16-N 125 mm-128-DW-29049-A0TU16-N 128-3-01-01 Cooling Water Supply to PE6-PE7 Wet End
PO COMMON
142 142
128-3-01-02 Cooling Water Return from PE6-PE7 Wet End

120
SANITARY WASTE WATER
TO TREATMENT
CHILLED SAFETY SHOWER 90 mm-128-NY-29013-K0TU16-N 128-3-02-01 Cooling Water Supply to PO Common - PE6-PE7 Dry End -
128-0-08-02 131-PP-152-00004 20094
1-HEXENE WATER 1-Hexene
90 mm-128-DW-29031-A0TU16-N 9334
128-0-09-04
(UNIT 125) 19936 125-PP-152-00105
142
128-3-02-02 Cooling Water Return from PO Common - PE6-PE7 Dry End -
1-Hexene
CHILLED SAFETY SHOWER
WATER
90 mm-128-DW-29030-A0TU16-N POTABLE WATER (TO HVAC)
125-PP-152-00105 19935 125 mm-128-DW-29052-A0TU16-N 128-0-08-01 Chilled Water Supply to PO and 1-Hexene Safety Showers
142 19919 131-PP-152-00003
UG AG 128-0-08-01
125 00152 120 128-0-05-02

90 mm-128-DW-29033-A0TU16-N 125 mmx90 mm


AG UG

90 mm-128-DW-29032-A0TU16-N 125 mmx90 mm


12"-128-SWR-29065-A2AU16-B 128-0-08-02 Chilled Water Return from PO and 1-Hexene Safety Showers
128 125
104 V
IP-C-P4-U4-L-047 COOLING WATER RETURN
3
128-1-01-04 128-0-05-02 Potable Water Supply to PO and Safety Shower package 3
(EMERGENCY) 128-3-02-02
125-PP-152-00104 19937 COOLING WATER RETURN
1600 mm-128-SWR-29063-J0TU16-N
COOLING WATER SUPPLY 131-PP-152-00003 19918 128-0-09-04 Sanitary Waste Water to Treatment
I P-C-U4-P4-L-020
THIS INFORMATION IS NOT TO BE USED, DISCLOSED, OR REPRODUCED IN WHOLE OR IN PART TO ANYONE OUTSIDE OF ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE) AND ITS SUBSIDIARIES,

(EMERGENCY) 102
19939 125-PP-152-00104 COOLING WATER SUPPLY

142
1600 mm-128-SWS-29063-J0TU16-N
142

125 00152 19917 131-PP-152-00003 128-1-01-04 Emergency Cooling Water Return from 1-Hexene
128-1-01-03 12"-128-SWS-29065-A2AU16-B 101
128-3-02-01
12"-138-SWS-29013-A2AU16-B
12"-138-SWR-29017-A2AU16-B

103 V 128-1-01-03 Emergency Cooling Water Supply to 1-Hexene


A2AW99B A2AW99B
DETAIL "C"
THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE) OR ANY OF ITS LICENSORS.

9144 128-3-02-02 NOTE 1


9143
103

COOLING WATER RETURN


104

500 mm-128-SWR-29016-J0TU16-N INTERFACE CONTRACTOR LEAD CONTRACTOR


19933 125-PP-152-00103
102
128 128 GRADE ELEVATION
COOLING WATER SUPPLY NOTE 1
500 mm-128-SWS-29012-J0TU16-N
125-PP-152-00103 19934
101
128-3-02-01
TO CRACKER AND UTILITIES
COOLING WATER RETURN

CIRCUIT 2
128-PP-152-290020 19943

128-PP-152-290020
COOLING WATER SUPPLY

4 4
EXCEPT PURSUANT TO A WRITTEN AGREEMENT WITH ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE).

FROM CRACKER AND


UTILITIES CIRCUIT 2

CHILLED SAFETY SHOWER


128-0-08-02 WATER
90 mm-131-DW-02001-A0TU16-N
19942

131-PP-152-09905-01 19916
142
CHILLED SAFETY SHOWER
128-0-08-01 WATER IP-XX
90 mm-128-DW-29033-A0TU16-N
19915 131-PP-152-09905-01
142
COOLING WATER RETURN
1800 mm-128-SWR-29067-J0TU16-N
131-PP-152-00003 19914
102 128-3-01-02
COOLING WATER SUPPLY
1800 mm-128-SWS-29067-J0TU16-N
1600 mm-128-SWR-29066-J0TU16-N

1600 mm-128-SWS-29066-J0TU16-N

19908 131-PP-152-00003
101
128-3-01-01
102

101

5 5
IP-C-U4-P4-L-046

IP-C-P4-U4-L-045
COOLING WATER RETURN
COOLING WATER RETURN

128-3-02-02
8631
8641

128-PP-152-290019

128-PP-152-290019
COOLING WATER SUPPLY

COOLING WATER SUPPLY

IP-C-U4-P4-L-018
IP-C-U4-P4-L-019

S.Naik/P.Perego/
Q 31-Aug-2023 APPROVED FOR CONSTRUCTION A.Waykole R.Soldinger
128-PP-152-290019

128-PP-152-290019

R.Santangelo/A.Pirani

P 14-Dec-2022 APPROVED FOR DESIGN A.Waykole S.Naik/P.Perego/


R.Santangelo/A.Pirani R.Soldinger

L 15-Feb-2022 ISSUED FOR COMPANY REVIEW A.Waykole P.Perego/S.Soni


/R.Santangelo/A.Pirani P.Perego

Prepared Checked Approved


Rev. Date Description
By By By
8637

8629

ABU DHABI POLYMERS COMPANY LIMITED


128-3-01-01
(BOROUGE)
128-3-01-02 TR-TCMS-NSH-P01451
128-3-02-01
PETROCHEMICALS PROJECT
COMPANY PROJECT NO PROJECT TITLE:
6 4700000900 BOROUGE 4 PROJECT - EPC PACKAGE 3 - 6
CONTRACTOR PROJECT NO
4300 - PO
PO UNIT - RUWAIS, UAE
DRAWING TITLE: PIPING AND INSTRUMENTATION DIAGRAM
UNIT 128 - INTERNAL CONNECTIONS (BOROUGE-4)
UTILITY LINES - UNDERGROUND
BOROUGE DOCUMENT CLASS' N PROJECT DRAWING NO REV: Q

CONTRACTOR: 4300-XZ-DM-128290101-03 SHEET UNIT: 128


1 BOROUGE: 128-PP-152-290101-03 OF AREA: 29
CADD SHEET
A B C D E F REF. 128-PP-152-290101-03-ISQ SCALE: SIZE A1

You might also like