CALCULATION OF CPEF - L.H.S (HIGH SPEED) DATE : July 12, 2024

Duct size length between take-


FLOW Duct size (in) Eq Dia Velocity inside duct Velocity inside Eq.fittings Friction loss(in wg) Total friction loss
Section (mm) off Fittings Total length(ft)
(L/s) branch (fpm) length (ft) per 100 ft of duct
W H W H inch L(m) L(ft) (fpm) m/s in (wg) Pa
1250 900 250 36 10 19.8 26.8 87.9 1283 6.52 87.9 0.109 0.096 23.8
1-2
1250 900 250 36 10 19.8 0.0 1283 6.52 ELBOW 90 (3 PCS) 24 24.0 0.109 0.026 6.5
2500 900 400 36 16 25.7 1.7 5.5 1516 7.70 5.5 0.108 0.006 1.5
2-3
1250 900 250 36 10 19.8 0.0 1283 6.52 1283.0 TEE From Carrier Chart 0.000 0.092 23.0
3750 1250 400 50 16 29.8 5.7 18.5 1699 8.63 18.5 0.113 0.021 5.2
3-4
1250 900 250 36 10 19.8 0.0 1283 6.52 1283.0 TEE From Carrier Chart 0.000 0.092 23.0
BASEMENT

6250 1600 500 64 20 37.6 8.1 26.6 1775 9.02 26.6 0.092 0.024 6.1
4-5 6250 1600 500 64 20 37.6 0.0 1775 9.02 ELBOW 90 (1 PCS) 15 15.0 0.092 0.014 3.4
2500 900 400 36 16 25.7 0.0 1516 7.70 1516.1 TEE From Carrier Chart 0.000 0.129 32.1
7500 1600 550 64 22 39.6 2.4 7.7 1914 9.72 7.7 0.099 0.008 1.9
5-6
1250 900 250 36 10 19.8 0.0 1283 6.52 1283.0 TEE From Carrier Chart 0.000 0.092 23.0
8750 1600 600 64 24 41.6 18.1 59.4 2026 10.29 59.4 0.104 0.062 15.4
6-7 8750 1600 600 64 24 41.6 0.0 2026 10.29 ELBOW 90 (2 PCS) 36 36.0 0.104 0.038 9.4
1250 900 250 36 10 19.8 0.0 1283 6.52 1283.0 TEE From Carrier Chart 0.000 0.092 23.0
10000 1600 650 64 26 43.5 56.6 185.6 2118 10.76 185.6 0.108 0.200 49.7
7-8 10000 1600 650 64 26 43.5 0.0 2118 10.76 ELBOW 90 (3 PCS) 54 54.0 0.108 0.058 14.5
1250 900 250 36 10 19.8 0.0 1283 6.52 1283.0 TEE From Carrier Chart 0.000 0.092 23.0
30000 3500 750 140 30 66.2 3.0 9.8 2745 13.95 9.8 0.106 0.010 2.6
8-9 10000 1600 650 64 26 43.5 0.0 2118 10.76 2118.3 TEE From Carrier Chart 0.000 0.252 62.7
GROUND

10000 1600 650 64 26 43.5 0.0 2118 10.76 2118.3 TEE From Carrier Chart 0.000 0.252 62.7
10000 800 1300 32 52 44.3 1.0 3.3 2046 10.40 3.3 0.099 0.003 0.8
9-10
10000 800 1300 32 52 44.3 0.0 2046 10.40 ELBOW 90 (1 PCS) 19 19.0 0.099 0.019 4.7
10-11 10000 1200 850 48 34 44.0 4.2 13.8 2072 10.52 13.8 0.102 0.014 3.5
11-12 30000 6900 5100 276 204 258.7 1.1 3.6 180 0.91 3.6 0.000 0.000 0.0
Over All Friction Loss through duct 1.69 421
Considering factor of safety (10%) 0.17 42
SUB TOTAL 1.86 464
W H Flow rate (L/s) Velocity (m/s)
Extract Grille 1000 350 1250 3.57 0.06 14
VCD 900 250 1250 5.56 0.07 17
VCD 1600 650 10000 9.62 0.20 50
SMD 1600 650 10000 9.62 0.08 20
NRD 1200 850 10000 9.80 0.18 45
LOUVER 6900 5100 30000 0.85 0.20 50
TOTAL ESP 1.92 660
FAN Selected 2.81 700