PROJECT : PROPOSED B + G + 11 FLOORS + ROOF RESIDENTIAL BUILDING ON PLOT NO 5.4(3431213) AT AL WASL, DUBAI, UAE.

CLIENT : M/s. MEERAS & M/s. DUBAI HOLDING


CONSULTANT : M/s. DEWAN ARCHITECT & ENGINEERS
MAIN CONTRACTOR : M/s. ENGINEERING CONSTRUCTION & RECONSTRUCTION COMPANY
MEP CONTRACTOR : M/s. REMCO

CALCULATION OF CPEF - R.H.S (HIGH SPEED) DATE : July 12, 2024

Duct size length between take-


FLOW Duct size (in) Eq Dia Velocity inside duct Velocity inside Eq.fittings Friction loss(in wg) Total friction loss
Section (mm) off Fittings Total length(ft)
(L/s) branch (fpm) length (ft) per 100 ft of duct
W H W H inch L(m) L(ft) (fpm) m/s in (wg) Pa
1250 900 250 36 10 19.7670999 5.9 19.4 1283 6.52 19.4 0.109 0.021 5.2
1-2
1250 900 250 36 10 19.7670999 0.0 1283 6.52 ELBOW 45 (2 PCS) 8 8.0 0.109 0.009 2.2
2500 900 400 36 16 25.7161866 21.9 71.7 1516 7.70 71.7 0.108 0.078 19.3
2-3 2500 900 400 36 16 25.7161866 0.0 1516 7.70 ELBOW 90 (1 PCS) 10 10.0 0.108 0.011 2.7
1250 900 250 36 10 19.7670999 0.0 1283 6.52 1283.0 TEE From Carrier Chart 0.000 0.092 23.0
5000 1600 400 64 16 33.0832623 16.9 55.3 1832 9.31 55.3 0.114 0.063 15.7
5000 1600 400 64 16 33.0832623 0.0 1832 9.31 ELBOW 90 (1 PCS) 14 14.0 0.114 0.016 4.0
3-4 5000 1600 400 64 16 33.0832623 0.0 1832 9.31 ELBOW 45 (2 PCS) 14 14.0 0.114 0.016 4.0
1250 900 250 36 10 19.7670999 0.0 1283 6.52 1283.0 TEE From Carrier Chart 0.000 0.092 23.0
1250 900 250 36 10 19.7670999 0.0 1283 6.52 1283.0 TEE From Carrier Chart 0.000 0.092 23.0
6250 1600 550 64 22 39.6456369 1.5 4.9 1595 8.10 4.9 0.070 0.003 0.9
4-5
1250 900 250 36 10 19.7670999 0.0 1283 6.52 1283.0 TEE From Carrier Chart 0.000 0.092 23.0
7000 1600 550 64 22 39.6456369 4.5 14.8 1786 9.07 14.8 0.087 0.013 3.2
5-6
1250 900 250 36 10 19.7670999 0.0 1283 6.52 1283.0 TEE From Carrier Chart 0.000 0.092 23.0
8750 1600 600 64 24 41.6214489 33.0 108.1 2026 10.29 108.1 0.104 0.113 28.1
6-7 8750 1600 600 64 24 41.6214489 0.0 2026 10.29 ELBOW 90 (1 PCS) 18 18.0 0.104 0.019 4.7
1250 900 250 36 10 19.7670999 0.0 1283 6.52 1283.0 TEE From Carrier Chart 0.000 0.092 23.0
10000 1600 650 64 26 43.5114495 46.3 151.9 2118 10.76 151.9 0.108 0.163 40.7
10000 1600 650 64 26 43.5114495 0.0 2118 10.76 ELBOW 90 (2 PCS) 40 40.0 0.108 0.043 10.7
7-8
10000 1600 650 64 26 43.5114495 0.0 2118 10.76 ELBOW 45 (2 PCS) 20 20.0 0.108 0.022 5.4
1250 900 250 36 10 19.7670999 0.0 1283 6.52 1283.0 TEE From Carrier Chart 0.000 0.092 23.0
8-9 10000 1250 800 50 32 43.457514 1.0 3.3 2124 10.79 3.3 0.108 0.004 0.9
30000 2850 1350 114 54 84.3194304 3.0 9.8 1692 8.60 9.8 0.031 0.003 0.8
9-10 8750 1600 600 64 24 41.6214489 0.0 2026 10.29 2025.6 TEE From Carrier Chart 0.000 0.230 57.3
11250 1600 650 64 26 43.5114495 0.0 2383 12.11 2383.0 TEE From Carrier Chart 0.000 0.319 79.3
10000 850 1150 34 46 43.1090868 8.0 26.2 2158 10.96 26.2 0.113 0.030 7.4
10-11 10000 850 1150 34 46 43.1090868 0.0 2158 10.96 ELBOW 90 (2 PCS) 40 40.0 0.113 0.045 11.2
10000 850 1150 34 46 43.1090868 0.0 2158 10.96 ELBOW 45 (4 PCS) 40 40.0 0.113 0.045 11.2
11-12 30000 7300 2925 292 117 197.012132 0.7 2.3 310 1.57 2.3 0.000 0.000 0.0
Over All Friction Loss through duct 1.91 476
Considering factor of safety (10%) 0.19 48
SUB TOTAL 2.10 523
W H Flow rate (L/s) Velocity (m/s)
Extract Grille 1000 350 1250 3.57 0.06 14
VCD 900 250 1250 5.56 0.07 17
VCD 1600 650 10000 9.62 0.20 50
SMD 1250 800 10000 10.00 0.10 25
NRD 850 1150 10000 10.23 0.19 48
LOUVER 7300 2925 30000 1.40 0.20 50
TOTAL ESP 2.16 727
FAN Selected 3.01 750