14.06.24_IR BOXN rake unloading report
14.06.24_IR BOXN rake unloading report
No of No of No of Avg. Avg.
Free Total
Station Rakes Rakes Rakes in Cycle Unloading Remarks
Time Dem Hrs
Received Delayed Free Time Time Time
Telangana 1 1 0 05:00 16:00 14:45 11:00 CHP SYSTEM PROBLEMS(BELT STOP) AND SAC PROBLEM(TOP CLAMP PROBLEM).
BRBCL, Nabinagar 1 1 0 07:00 13:15 11:40 06:15 No Reason Provided By Station
MUNL, Meja 3 3 0 05:00 13:10 07:16 24:30 No Reason Provided By Station
Dadri 4 4 0 07:00 10:08 04:46 12:35 System Design Issue.
1.Double tippling of all wagons due to very wet and sticky coal. 2. Heavy rain during
Bongaigaon 1 1 0 07:00 09:00 06:35 02:00 unloading of rake..
Unchahar 4 2 2 07:00 08:47 07:03 08:40 Bunching problem & cascading efect.
skirt damage and Conv-24A & Knuckle fallen. Conv-24A & SR-3 in PTW. SAC 2 Go switch
Barh 7 3 4 07:00 07:58 06:07 07:30 problem & MD time.
KBUNL, Kanti 2 1 1 07:00 07:50 06:05 01:40 Incomplete Facility. Chp system handling constraints & Sampling.
APCPL, Jhajjar 5 4 1 07:00 07:06 03:58 10:30 No Reason Provided By Station
PAYLOADER N/A,JCB-2 NTS, BOULDER REMOVAL FROM GRILL.. CON-1B DECK SHEET PTW
ISSUED AND CON-1A UNDER PTW , CON-1A TIS AFTER PTW CLOSED.. WT5 NTLS FEEDBACK
NOT COMING,TIPPLING STOPPED DUE TO RAIN.. SAC#1 NOT GETTING DECOUPLE AT C
POSN 2 TIMES ADJUSTMENT DONE BY MM,GRILL CLEANING DUE TO BIG BOULDERS,
TIPPING STOPPED DUE TO RAIN.. TIPPLING KEPT STOPPED AS 3 WT RUNNING WITH THREE
CRUSHER, CONV#4A MOTOR TRIPPING. DRIBBLE CONV#3 NOT GETTING START,WT#3
CRADEL GETTING STOP @90 DEGREE,SOME WAGONS TIPPLED IN MANUAL MODE.. THREE
TIPPLERS WERE IN SERVICE AND 3 CRUSHERS AVAILABLE, MBF-1 was under permit. Tippling
Kudgi 8 7 1 05:00 06:57 06:15 15:40 strated after comlpetion of WT-4.
NPGCL, Nabinagar 5 0 5 07:00 06:44 03:31 00:00
Barauni 1 0 1 09:00 06:25 06:25 00:00 Incomplete Facility.
Tanda 9 1 8 07:00 06:12 04:18 00:15
Khargone 6 2 4 05:00 05:15 04:43 01:45 CR-01 available. RBF-01 B under PTW & Single CR available.
APRON FEEDER PROBLEM 30 min., CHP SYSTEM PROBLEMS 20 min., Sampling Delay 10
min.. conv trip due to conveyor changeover 15 min , some polythene piece remove from (
6 to 7 wagons) non OHE AREA 20 min.. (FREE TIME) conveyor trip due to 11B BSS &
Gadarwara 8 1 7 05:00 05:07 04:29 01:00 conveyor change over from stacking to direct cunkering & stone picking 40 min.
Mouda 6 1 5 05:00 04:50 03:53 02:00 WT-2 UNDER PTW.
Simhadri 5 0 5 05:00 04:38 04:38 00:00
Solapur 1 0 1 05:00 04:20 02:23 00:00
Kahalgaon 2 1 1 09:00 10:45 09:35 03:55 System Design Issue.
Total 79 33 46 109:15
13:15
13:10
16:48
11:40
10:45
10:08
14:24
09:35
09:00
08:47
07:58
07:50
12:00
07:16
07:03
07:06
06:57
06:44
06:35
06:25
06:25
06:15
06:12
06:07
06:05
05:15
05:07
09:36
04:50
04:46
04:43
04:38
04:38
04:29
04:18
04:20
03:58
03:53
03:31
07:12
02:23
04:48
02:24
00:00