Professional Documents
Culture Documents
Sections
Sections
1 2 3 4 5 6 7 8 9 10 11 12 13 14
2,663 3,238 4,483 3,844 2,483 8,546 7,439 3,242 3,222 3,230 12,116 7,995 7,993
slope formation layer washed gravel 100mm thick
WATER TANKS AS SPECIFIED
20MM thick waterproofing bituminous layer
BY SERVICE ENGINEER
insulation HVAC COOLING MACHINES WATER TANKS AS SPECIFIED
slope formation layer washed gravel 100mm thick
150MM thick RCC slab BY SERVICE ENGINEER
CONCRETE COPING LEVEL 20MM thick waterproofing bituminous layer HVAC COOLING MACHINES D-03
230MM THICK BLOCK
+15,050 gravel ballast
2,600150 75
insulation WORK PLASTERED
1,142
900
+14,050 AND PAINTED BY
ROOF SLAB TOP LEVEL
150MM thick RCC slab 3,026 WEATHER GUARD
gravel ballast PAINT TO APPROVAL
3,500
+11,050 +11,050 COPING STONE
PARAPET WALL LEVEL LIFT HEADROOM LIFT HEADROOM
LEVEL
6,551
+9,900 +9,900
THIRD FLOOR THIRD FLOOR LEVEL
1,000
LEVEL
2,250
3,000
3,000
3,000
3,000
3,000
3,000
1,700
VOID VOID
SECOND 5,300 OFFICES
3,000 150
300
2,168
CINEMA HALL 4,471 3,074 4,497 LEVEL
3,457 11,756
3,000
3,000
VOID
RENTABLE SPACE
FIRST FLOOR
1,122
600
600
2,400 600
1,100
11,423
900
7,850
2,000
3,000
3,000
3,000
3,000
750
RENTABLE
2,600
3,460
DINNING HALL
GROUND KITCHEN SPACE
ESCALATOR ESCALATOR SPACES
FLOOR LEVEL 2,183
D-05
0.00 0.00
GROUND LEVEL
1,900
450 450 900
450
2,121 880
862
3,000
3,000
2,137
BASEMENT PARKING
230
230
AMENDMENTS
75
1,054
20MM thick waterproofing bituminous layer LEVEL
WATER TANKS AS SPECIFIED
insulation BY SERVICE ENGINEER HVAC COOLING MACHINES WEATHER GUARD +14,050 ROOF SLAB TOP Architectural stamp
:
PAINT TO APPROVAL LEVEL
900
150MM thick RCC slab
3,500
+11,050 COPING STONE
LEVEL
2,850 150
+9,900 +9,900
THIRD FLOOR LEVEL
150
THIRD FLOOR LEVEL
2,486
stair
3,000
EXHIBITION HALL O1 10,165 case STEPPED AUDITORIUM VOID
47,790
+6,750 SECOND FLOOR LEVEL +6,750 SECOND FLOOR LEVEL
lift shaft
3,000
3,000
3,000
3,000
3,000
case
+3,600 +3,600 FIRST FLOOR LEVEL Consultant:
600
FIRST FLOOR LEVEL
18,000
3,000
MULTIPURPOSE HALL 04
3,000
3,000
stair AUDITORIUM
case STAGE AUDITORIUM LARGE STORE
600
PARKING
230
LEVEL
150mm THICK OVERSITE CONCRETE lift pit
LEVEL
WELL COMPACTED SOIL FOUNDATION 50mm THICK BLINDING PROPOSED MBEYA CONFERENCE
AS PER STRUCTURAL ENG. SPECIFICATIONS 300mm THICK HARDCORE
CENTER TO BE BUILT ON PLOT
NO .......BLOCK.....TAZARA AREA IN
WELL COMPACTED SOIL FOUNDATION
MBEYA
AS PER STRUCTURAL ENG. SPECIFICATIONS
Client
Drawing title
MBEYA CONFERENCE CENTER
.
REG;22100434040078 MOB+255 768 807 760
Project no
.
E-MAIL. vjosemella09@gmail.com