Professional Documents
Culture Documents
Elevation 02
Elevation 02
SECOND FLOOR
LEVEL
+6,750 +6,750
SECOND FLOOR
ALUMINIUM LEVEL
DOOR TO BE CONCRETE CANOPY TO
APPROVED BY DETAILS
FIRST FLOOR LEVEL
ARCHITECT +3,600
+3,600
FIRST FLOOR LEVEL
GROUND FLOOR
LEVEL
0.00 0.00
GROUND FLOOR
LEVEL
1,266
4,070 679 4,128 4,759 12,127 4,895 11,943 224 4,928 6,073 22 8,970 28,668 5,992 3,830 1,798
BASEMENT FLOOR
LEVEL
-3,000 -3,000
BASEMENT FLOOR
LEVEL
AMENDMENTS
Architectural stamp
:
B16 B15 B14 B13 B12 B11 B10 B9 B8 B7 B6 B5 B4 B3 B2 B1
1,798 3,830 5,992 28,668 8,992 6,073 5,152 11,943 4,895 12,127 4,759 1,266 4,128 1,499 3,251
WATER TANKS AS SPECIFIED BLUE GLASS WINDOW FITTED TO
BY SERVICE ENGINEER ALUMINIUM FRAMES,TO ARCH APP
+15,050 ROOF TOP LEVEL HVAC COOLING MACHINE AS 230MM THICK BLOCK
SPECIFIED BY ARCHITECT WORK PLASTERED AND WATER TANKS AS SPECIFIED
+14,050 PARAPET WALL LEVEL PAINTED BY WEATHER BY SERVICE ENGINEER
GUARD PAINT TO
ARCH APP
SECOND FLOOR
LEVEL
+6,750 +6,750
SECOND FLOOR
CONCRETE CANOPY TO ALUMINIUM LEVEL
DETAILS DOOR TO BE
APPROVED BY
FIRST FLOOR LEVEL
ARCHITECT +3,600
+3,600
FIRST FLOOR LEVEL
GROUND FLOOR
LEVEL
0.00 0.00 Project
GROUND LEVEL
1,266
BASEMENT FLOOR
1,798 3,830 5,992 28,668 8,970 22 6,073 4,928 224 11,943 4,895 12,127 4,759 4,128 679 4,070
PROPOSED MBEYA CONFERENCE
LEVEL CENTER TO BE BUILT ON PLOT
-3,000 -3,000
BASEMENT FLOOR NO .......BLOCK.....TAZARA AREA IN
LEVEL
MBEYA
REAR SIDE ELEVATION
SCALE 1: 100 Client
Drawing title
MBEYA CONFERENCE CENTER
PROJECT NO
E-MAIL. vjosemella09@gmail.com