SO01.PPC.D18.W12.M03.Y2024

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

F-3 (IMS-SP-07) SBCW - 'UltraTech PPC' Issue Date:27.03.

2024
`

UltraTech Cement
TEST CERTIFICATE
FOR

Portland Pozzolana Cement


(Fly Ash based)

Test & Compliance


Particulars Test Results Requirements of
CHEMICAL REQUIREMENTS
IS:1489-2015(Part 1)
4.0(100-X)
32.50 ________ Max
1. Insoluble Residue (% by mass) __________ X+
100
(x = Declared % of Fly Ash)
0.60 X Min
2. Magnesia (% by mass) 2.00
__________ 6.00 Max
3. Sulphuric Anhydride (% by mass) 1.90
__________ 3.50 Max
4. Loss on Ignition (% by mass) 1.20
__________ 5.00 Max
5. Total Chlorides (% by mass) 0.014
__________ 0.100 Max

PHYSICAL REQUIREMENTS
1. Fineness (m2/kg) 348
__________ 300 Min
2. Standard Consistency (%) 31.0
__________
3. Setting Time (minutes)
a.Initial 150
__________ 30 Min
b.Final 250
__________ 600 Max
4. Soundness
a.Le-Chat Expansion (mm) 1.0
__________ 10.0 Max
b.Autoclave Expansion (%) 0.11
__________ 0.8 Max
5. Compressive Strength (MPa)
a.72 +/- 1hr.(3 days) 23.6
__________ 16 Min
b.168 +/- 2 hr.(7 days) 29.6
__________ 22 Min
c.672 +/- 4 hr.(28 days) UT
__________ 33 Min
6. Drying Shrinkage (%) UT
__________ 0.15 Max
7. % of Fly Ash addition 35.00
__________ 15.00 Min
35.00 Max
The above cement complies with the requirements of
IS:1489-2015(Part 1) for Portland Pozzolana Cement (Fly Ash based)
*Amount of Fly Ash addition in finished cement does not vary
more than +/ - 3% from the declared value.
Date of Dispatch : 18.03.2024
Week no : 12 of 2024
HOD(QC)
UltraTech Cement Limited
CIN:L26940MH2000PLC128420
Works: Sonar Bengla Cement Works, Village Dhalo West Bengal- 742227

You might also like