Emergency Response / Rescue Plan for
Confined space
After make ensuring that following controls are put in place then confined space entry allowed.
● Review the rescue protocol outlined in the space specific hazard assessment.
● Inspect and set-up all needed rescue equipment. Stage all rescue technicians’ equipment at the point
ofentry.
● Our workers will enter inside tank safely when make sure all necessary reasonable control measure
is put in place.
● Stand by man (SBM)/ Hole watcher monitor the activity by verbally or visually.

Method of Rescue
The Supervisor will be responsible for coordinating any emergency response.
The N&S emergency response plan for this Tank is below.

If any worker Injured/Unconscious inside the tank, then following action should be taken

● Make verbal contact with the employee to help them stay calm.

● SBM (stand by man) stop the work and inform to the rescuers rescue the victim person.

● All rescue equipment (such as breathing apparatus) is present at nearest to entrance point to
recovering the victim person.

● Workers perform duty inside the tank free of safety belt and lifeline.

● When a victim person injured/unconscious inside the tank then rescuer’s wearing their BA set
and rescue him by either pushing/lifting to the entrance point and the other two rescuers recover
him from manhole.

● After rescue the victim person shifted to suitable fresh air environment by stretche.
● Inform to the emergency response team of SHELL all about the accident and submit one copy of
accident investigation report to management with on seven days.

● Work will continue after the situation becomes normal.

Confined Space Rescuer Team

● Qamar Shah (SCBA Operator)


● Ghulam Nabi (Rescuer)
● Syed Akber (Rescuer)
● Worker (Stretcher operator)
● Worker (Stretcher operator)
Naseem & son
1.0. Confined Space Location
Shell SKP .

2.0. Personnel Involved


The activity will be performed in the presence of 1 supervisor, 1 tank entrants and 1
stand by personal.

3.0. Trained Personnel


All Personnel are trained in confined space working and confined space rescue should
be trained.

4.0. Rescue Equipment


Stretcher, SCBA, First Aid Kit and a DCP Fire Extinguisher. Rescue equipment
will be set up at the work location before tank entry and will remain in position for the
duration of the work. All equipment will be visually inspected and confirmed as in
good working order prior to work beginning. Any changes necessary to adapt to
conditions on the day of the work will be risk assessed and agreed prior to the work
beginning.
Naseem & son
Emergency Response/ Rescue Plan for Working at Height

Procedure for rescuing a suspended worker:

• All work will be immediately stopped


• Make verbal contact with the employee to help him stay calm
• The rescuers will start the rescue operation while the on-duty supervisor will inform the
Emergency Response Coordinators and the First Aid Team
• 2 rescuers wearing safety harness will climb up to the platform with stretcher
• They will attach the stretcher with one end of the lifeline
• The rescuers on the scaffold will then release the D-ring of victim’s harness to free him
from the lanyard
• The 2 on-ground rescuers will confirm that they have full control of the lifeline and that
the lifeline successfully supporting the victim
• The rescuers will ease the victim into the stretcher
• The on-ground rescuers will gradually lower the victim to the ground level
• The victim will be sat on the ground for 15 minutes with his legs stretched to avoid any
impacts from fall trauma
• The first aid team will provide first aid to the victim and if needed, the victim may be
transported toa nearby hospital
• Before shifting victim to hospital inform to terminal in charge
• The supervisor will consult the ERP before resuming any activity

Rescue Team:

• First Aider Syed Akber


• Ground Rescuer Ghulam Nabi, Qamar Shah
• Stretcher Operator Workers

Rescue Equipment:

• Lifeline
• Stretcher
• 2 sets of safety harness
• First aid kit
Naseem & son
Fire / Evacuation Emergency Procedure
Lay down Area / Temporary site facilities

IN CASE OF EMERGENCY CONTROLLED EVACUATION

1. Leave the area and close doors In Non-fire situations threatening safety, such as
2. Activate wall mounted fire alarm building services interruption or hazardous
material spill, building are evacuated under
3. Fire watcher will extinguish fire or another person if
he can do direction of fire warden and emergency response
team. The fire alarm should not be used toFIRE and
4. Report any information about fire to Shell
Safety Department evacuates a building without approval.

IF YOU ARE ON FIRE (Hot Work) IF UNABLE TO EVACUATE


STOP where you are, DROP to floor or ground Call Emergency Number and ROLL
your body to smother the fire. Shell Emergency Number and N&S ERP fire watcher
will contain the fire Administration for emergency.
on spot by using fire extinguisher.

WHEN FIRE ALRM SOUNDS

1. calmly evacuate the building / container and Proceed to Assembly Point


3. Use an alternate route, if you encounter smoke or fire.
4. Follow instruction of emergency response services and fire wardens.
5. Report anyone suspected remaining in the facility.
6. Reach to the assembly point leaving clear access for emergency services
7. Do not re-enter until authorized by fire / HSSE Department
Naseem & son
Alternative Incident
Commander
Incident Commander

M Ramzan
A.Basit

Worker to move
stretcher attank
Rescuer entrance coordinator)

Syed Akber/Gulam Qamar


Nabi A.basit

Stretcher

Workers
Naseem & son
Emergency Contact Numbers

Sr. No Details Contact No.

1 Project Manager 0300-2149743

2 Incident Commander 0300-6006886

3 Alternative Incident Commander 03343286748

4 Ambulance 115/0726-513867

5 Civil Hospital Shikarpur 0726–920028

6 Rural Health Center Khanpur 0726-571010

7 Blood Bank Sukkur 071-561592

8 Hira Hospital Sukkur 071-561455

9 Fire Brigade 16
10 Police 15
11 Dr. Latif Dino 0302-3356417

12 Rescue 1122
13 Civil Hospital Khanpur 0311-8120585
14 Fire 072-6920248
Naseem & son
ERP for Injured Person

If a worker injured at work site in depot

(1) Immediately stop the work.


Keep the victim as calm and comfortable as possible.
Do not move a seriously injured person unless there is a life-threatening situation.
(2) Our rescue team (stretcher man) rescues the victim and moves him to a safe area where first aider will
examine the victim and give him first aid.
It is important that severe bleeding be attended too quickly. Rapid loss of blood may lead to shock and loss of
consciousness; therefore, the first aider must know how to stop the flow of blood immediately.
If victim is bleeding severely from an accident, it is important that ERT to quickly assess the situation and act
accordingly.
If it is immediately apparent that professional help is needed, assign a co-worker calling for help.
(3) If the victim feeling not better, then move him to nearest hospital for further treatment.
Naseem & son
ERP for Spill
1. Isolate the spill area and alert others in the area.
2. Restrict access
3. Alert people in area
4. Wear protective equipment (Nitrile Gloves, Cartridge Respirator & Safety Glasses).
4. Remove flammable, equipment ignition sources (burners, motors, anything that could cause a spark)
5. Usage of spill kit for cleanup of oil spillage
6. Do not spread rapidly
7. Do not endanger people or the environment by direct contact.
8. Product Can be managed safely by Manual Handling
training of people
9. Maintain a call list of individuals who should be notified in an emergency.

Incident Investigation and Reporting


A comprehensive Incident Investigation Report needs to be prepared, to evaluate the actual emergency
response and the effectiveness of the emergency response actions.