Contract No.

: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 1

BILL NO. 1

PRELIMINARIES

SECTION A - GENERAL (GCC 2015)

FIXED-CHARGE AND VALUE-RELATED ITEMS

1 Fixed charges (10 Months) Item

2 Time-related charges (10 Months) Item

3 Time-related charges (10 Months) Item

Establishment of facilities on the site

Facilities for Engineer

4 (a) Furnished offices (Engineer's office - minimum


area 12m2, Boardroom - minimum area 25m2) Item

5 (b) Name board No

Facilities for Contractor

6 (a) Offices and storage sheds Item

7 (b) Ablution and latrine facilities Item

8 (c) Tools and equipment Item

9 (d) Water supply, electric power and communication Item

10 Other fixed-charge obligations (list) Item

11 Removal of site establishment Item

12 Other time-related obligations (Contractor to state) (10


Months) Item

Carried Forward R

Section No. 1
Bill No. 1
Preliminaries and General

-1-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

TIME-RELATED ITEMS

13 Contractual requirements (10 Months) Item

Operation and maintenance of facilites on site, for duration


of construction, except where otherwise stated

Facilities for Engineer

14 (a) Furnished offices (Engineer's office - minimum


area 12m2, Boardroom - minimum area 25m2) (10
Months) Item

15 (b) Name board (10 Months)


No

Facilities for Contractor

16 (a) Offices and storage sheds (10 Months)


Item

17 (b) Ablution and latrine facilities (10 Months)


Item

18 (c) Tools and equipment (10 Months)


Item

19 (d) Water supply, electric power and communication (10


Months)
Item

20 Other fixed-charge obligations (list) (10 Months)


Item

21 Supervision for duration of construction (if applicable)


(10 Months) Item

22 Company and head office over-head costs for the


duration of the contract (10 Months) Item

23 Obtaining and maintaining in good standing, of


wayleaves for the duration of the Contract (10 Months) Item

Carried Forward R

Section No. 1
Bill No. 1
Preliminaries and General

-2-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

VALUE RELATED ITEMS

Establishment of facilities on the site

Facilities for Engineer

24 (a) Furnished offices (Engineer's office - minimum


area 12m2, Boardroom - minimum area 25m2) Item

25 (b) Name board No

Facilities for Contractor

26 (a) Offices and storage sheds Item

27 (b) Ablution and latrine facilities Item

28 (c) Tools and equipment Item

29 (d) Water supply, electric power and communication Item

30 Other fixed-charge obligations (list) Item

31 Removal of site establishment Item

32 Other time-related obligations (Contractor to state) Item

DAYWORK Schedule

Labour during normal working hours

33 Unskilled labour Hrs

34 Semi-skilled labour Hrs

35 Skilled labour Hrs

Extra-over item for charges and overheads

36 Unskilled labour Hrs

37 Semi-skilled labour Hrs

Carried Forward R

Section No. 1
Bill No. 1
Preliminaries and General

-3-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

38 Skilled labour Hrs

Construction Plant

Tipper trucks

39 6m³ capacity Hrs

40 10m³ capacity Hrs

41 Backhoe loaders (Mass 7 - 8 ton) Hrs

42 Bulldozer (Mass 20 - 25 ton,Power 135 - 165 kW) Hrs

43 Tracked Excavator (Mass 18 - 22 ton,Power 70 - 105


kW) Hrs

44 Generator (15kVA) Hrs

45 Grader (Mass 16 - 20 ton) Hrs

46 Wheel Loader (Mass 10 - 13 ton) Hrs

47 Milling machine (W350 or equivalent) Hrs

Rollers

48 HIEDYC Roller 12 to 25 tonne Hrs

49 Pneumatic Roller (14 - 21 ton) Hrs

50 Single drum vibratory padfoot roller (7 - 10 ton) Hrs

51 Single drum vibratory padfoot roller (10 - 14 ton) Hrs

52 Single drum vibratory smooth roller (7 - 10 ton) Hrs

53 Single drum vibratory smooth roller (10 - 14 ton) Hrs

54 Pedestrian roller (500 - 550kg, width 390mm) Hrs

55 Pedestrian roller (1000 - 1500kg, width 900mm) Hrs

56 Compressor (185 cfm) including 2 drills and hoses Hrs

Carried Forward R

Section No. 1
Bill No. 1
Preliminaries and General

-4-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

57 Concrete Mixer (250 litre) Hrs

Rollers

58 Capacity 50 ton Hrs

59 Capacity 100 ton Hrs

TEMPORARY WORKS

60 Detour (construction and maintenance) (10 Months)


Item

61 Dealing with traffic (or accommodation of traffic) (10


Months) Item

Existing services

62 (a) Excavation by hand in soft material to expose


existing services Item

63 (b) Temporary protection of existing services Item

Temporary road traffic signs, markings and access to


detours as per South African Road Traffic Signs Manual

64 1200mm x 1200mm triangular signs, TW336 or TW330,


self-supporting (2 no. sandbags included) Item

65 1200mm diameter circular signs, TR104 or TR201-60,


self- supporting (2 no. sandbags included) Item

66 Flagperson Item

67 Portable Stop and Go signs Item

68 Plastic New Jersey barrier Item

69 Traffic cones Item

70 Danger plates and dileneators Item

71 Movable barricade/road sign combination Item

Carried Forward R

Section No. 1
Bill No. 1
Preliminaries and General

-5-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

SECURITY

72 Provision of necessary security to protect the works,


plant and equipment for the duration of the Contract (6
Months)
Item

OCCUPATIONAL HEALTH AND SAFETY

Compliance with the Occupational Health and Safety Act


and applicable regulations,

73 Provision of a Health and Safety plan Item

74 Provision of a Health and Safety file Item

75 Provision of a safety officer (Full time) (10 Months) Item

76 Health and Safety training (monthly) (10 Months) Item

77 Provision of personal protective clothing and equipment


(10 Months) Item

78 Provision of safety fences, signage and barricades. Item

Carried to Final Summary R

Section No. 1
Bill No. 1
Preliminaries and General

-6-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 2

BILL NO. 1

EARTHWORKS (PROVISIONAL)

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

EXCAVATION, FILLING, ETC

Excavation in earth not exceeding 2m deep

1 Holes m3 56

Extra over all excavations for carting away

2 Surplus material from excavations and/or stock piles on


site to a dumping site to be located by the contractor m3 56

Risk of collapse of excavations

3 Sides of trench and hole excavations not exceeding


1,5m deep m2 187

Keeping excavations free of water

4 Keeping excavations free of all water other than


subterranean water Item

Carried Forward to Summary of Section No. 2 R

Section No. 2
Bill No. 1
Earthworks (Provisional)

-7-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 2

BILL NO. 2

CONCRETE, FORMWORK AND


REINFORCEMENT

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

REINFORCED CONCRETE

35MPa/19mm concrete

1 Bases m3 13

2 Stub Columns m3 5

TEST BLOCKS

3 Making and testing 150 x 150 x 150mm concrete


strength test cube (Provisional) No 30

SMOOTH FORMWORK (DEGREE OF


ACCURACY II)

Smooth formwork to sides

4 Stub Columns N.E 1.5m deep m2 48

5 Edges, risers, ends and reveals not exceeding 300mm


high (Provisional) m 144

REINFORCEMENT (PROVISIONAL)

High tensile steel reinforcement to structural


concrete work

6 8mm Diameter bars in lintels t 0.16

7 10mm Diameter bars t 0.16

Carried Forward R

Section No. 2
Bill No. 2
Concrete, Formwork and Reinforcement

-8-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

8 12mm Diameter bars t 0.16

Carried Forward to Summary of Section No. 2 R

Section No. 2
Bill No. 2
Concrete, Formwork and Reinforcement

-9-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 2

BILL NO. 3

ROOF COVERINGS ETC

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

PROFILED METAL SHEETING AND


ACCESSORIES

0.58mm Thick IBR Chromadek roof sheeting on steel


purlins colour: Dark Dolphin ontop of the sheet and
Pebble Grey underside of the sheet

1 Roof covering with pitch not exceeding 25 degrees m2 180

Carried Forward to Summary of Section No. 2 R

Section No. 2
Bill No. 3
Roof Covering

-10-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 2

BILL NO. 4

STRUCTURAL STEELWORK

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

STEEL COLUMNS AND BEAMS

Welded beams in single lengths with flat section


bearer and connection plates bolted to concrete
columns

1 152 x 152 x 37.2 kg/m H-section columns t 2.96

2 203 x 203 x 86.4 kg/m H-section Columns for roof


support t 4.88

3 203 x 106 x 5mm x 13.48 kg/m Square hollow section


beams t 1.47

4 IPE 200 x 22.4kg/m Rafter I-section beams cut to


shape t 2.11

PURLINS, GIRTS, BRACING, ETC

Purlins and girts bolted to steel

5 70 x 50 x 20 x 3mm x 4.6 kg/m Cold formed lipped


channel to purlins t 1.69

Bolts to columns, beams, etc

6 152 x 152mm Mild Steel base plate No 30

7 M16 chemical expansion bolt No 120

8 Column kicker bars cast into concrete No 60

Carried Forward to Summary of Section No. 2 R

Section No. 2
Bill No. 4
Structural Steelwork

-11-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 2

BILL NO.5

PLUMBING AND DRAINAGE


(PROVISIONAL)

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

RAINWATER DISPOSAL

0.58mm thick Galvanised Z275 sheet iron valley


gutters and fittings complete fixed to structural steel
frames

1 200 x 200mm Eaves gutters with beaded front edge to


match existing m 56

2 Extra for 75 x 100mm Rectangular Down pipes at


2600mm length No 12

Carried Forward to Summary of Section No. 2 R

Section No. 2
Bill No. 5
Plumbing and Drainage (Provisional)

-12-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 2

BILL NO. 6

PAINTWORK

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

ON METAL

Spot priming defects in pre primed surfaces with


zinc chromate primer and applying one undercoat
and two coat high gloss enamel paint on steel

1 On structural steel work t 14.46

2 On gutters, down pipes n.e. 300mm girth m 90

Carried Forward to Summary of Section No. 2 R

Section No. 2
Bill No. 6
Paintwork

-13-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

SECTION SUMMARY - Construction of 6 x Type 1 - Traders Stalls


Bill Page Amount
No No
1 Earthworks (Provisional) 7

2 Concrete, Formwork and Reinforcement 9

3 Roof Covering 10

4 Structural Steelwork 11

5 Plumbing and Drainage (Provisional) 12

6 Paintwork 13

Carried to Final Summary R

Section No. 2

-14-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 3

BILL NO. 1

EARTHWORKS (PROVISIONAL)

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

EXCAVATION, FILLING, ETC

Excavation in earth not exceeding 2m deep

1 Holes m3 240

Extra over all excavations for carting away

2 Surplus material from excavations and/or stock piles on


site to a dumping site to be located by the contractor m3 240

Risk of collapse of excavations

3 Sides of trench and hole excavations not exceeding


1,5m deep m2 799

Keeping excavations free of water

4 Keeping excavations free of all water other than


subterranean water Item

Carried Forward to Summary of Section No. 3 R

Section No. 3
Bill No. 1
Earthworks (Provisional)

-15-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 3

BILL NO. 2

CONCRETE, FORMWORK AND


REINFORCEMENT

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

REINFORCED CONCRETE

35MPa/19mm concrete

1 Bases m3 55

2 Stub Columns m3 20

TEST BLOCKS

3 Making and testing 150 x 150 x 150mm concrete


strength test cube (Provisional) No 128

SMOOTH FORMWORK (DEGREE OF


ACCURACY II)

Smooth formwork to sides

4 Stub Columns N.E 1.5m deep m2 205

5 Edges, risers, ends and reveals not exceeding 300mm


high (Provisional) m 614

REINFORCEMENT (PROVISIONAL)

High tensile steel reinforcement to structural


concrete work

6 8mm Diameter bars in lintels t 0.86

7 10mm Diameter bars t 0.86

Carried Forward R

Section No. 3
Bill No. 2
Concrete, Formwork and Reinforcement

-16-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

8 12mm Diameter bars t 0.86

Carried Forward to Summary of Section No. 3 R

Section No. 3
Bill No. 2
Concrete, Formwork and Reinforcement

-17-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 3

BILL NO. 3

ROOF COVERINGS ETC

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

PROFILED METAL SHEETING AND


ACCESSORIES

0.58mm Thick IBR Chromadek roof sheeting on steel


purlins colour: Dark Dolphin ontop of the sheet and
Pebble Grey underside of the sheet

1 Roof covering with pitch not exceeding 25 degrees m2 737

Carried Forward to Summary of Section No. 3 R

Section No. 3
Bill No. 3
Roof Covering

-18-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 3

BILL NO. 4

STRUCTURAL STEELWORK

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

STEEL COLUMNS AND BEAMS

Welded beams in single lengths with flat section


bearer and connection plates bolted to concrete
columns

1 152 x 152 x 37.2 kg/m H-section columns t 12.62

2 203 x 203 x 86.4 kg/m H-section Columns for roof


support t 19.93

3 203 x 106 x 5mm x 13.48 kg/m Square hollow section


beams t 7.65

4 IPE 200 x 22.4kg/m Rafter I-section beams cut to


shape t 9.01

PURLINS, GIRTS, BRACING, ETC

Purlins and girts bolted to steel

5 70 x 50 x 20 x 3mm x 4.6 kg/m Cold formed lipped


channel to purlins t 6.91

Bolts to columns, beams, etc

6 152 x 152mm Mild Steel base plate No 128

7 M16 chemical expansion bolt No 512

8 Column kicker bars cast into concrete No 256

Carried Forward to Summary of Section No. 3 R

Section No. 3
Bill No. 4
Structural Steelwork

-19-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 3

BILL NO.5

PLUMBING AND DRAINAGE


(PROVISIONAL)

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

RAINWATER DISPOSAL

0.58mm thick Galvanised Z275 sheet iron valley


gutters and fittings complete fixed to structural steel
frames

1 200 x 200mm Eaves gutters with beaded front edge to


match existing m 230

2 Extra for 75 x 100mm Rectangular Down pipes at


2600mm length No 64

Carried Forward to Summary of Section No. 3 R

Section No. 3
Bill No. 5
Plumbing and Drainage (Provisional)

-20-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 3

BILL NO. 6

PAINTWORK

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

ON METAL

Spot priming defects in pre primed surfaces with


zinc chromate primer and applying one undercoat
and two coat high gloss enamel paint on steel

1 On structural steel work t 61.76

2 On gutters, down pipes n.e. 300mm girth m 410

Carried Forward to Summary of Section No. 3 R

Section No. 3
Bill No. 6
Paintwork

-21-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

SECTION SUMMARY - Construction of 32 x Type 2 - Traders Stalls


Bill Page Amount
No No
1 Earthworks (Provisional) 15

2 Concrete, Formwork and Reinforcement 17

3 Roof Covering 18

4 Structural Steelwork 19

5 Plumbing and Drainage (Provisional) 20

6 Paintwork 21

Carried to Final Summary R

Section No. 3

-22-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 4

BILL NO. 1

EARTHWORKS (PROVISIONAL)

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

EXCAVATION, FILLING, ETC

Excavation in earth not exceeding 2m deep

1 To reduce levels m3 124

2 Holes m3 22

3 Ground beams m3 36

Extra over all excavations for carting away

4 Surplus material from excavations and/or stock piles on


site to a dumping site to be located by the contractor m3 183

Risk of collapse of excavations

5 Sides of trench and hole excavations not exceeding


1,5m deep m2 75

Keeping excavations free of water

6 Keeping excavations free of all water other than


subterranean water Item

FILLING ETC

G5: Earth filling supplied by the contractor


compacted to 93% Mod AASHTO density

7 Under floors, steps, pavings, etc m3 124

SOIL POISONING

Carried Forward R

Section No. 4
Bill No. 1
Earthwork (Provisional)

-23-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

Soil insectiside

8 Under floors etc including forming and poisoning shallow


furrows against foundation walls etc, filling in furrows
and ramming m2 414

Carried Forward to Summary of Section No. 4 R

Section No. 4
Bill No. 1
Earthwork (Provisional)

-24-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 4

BILL NO. 2

CONCRETE, FORMWORK AND


REINFORCEMENT

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

REINFORCED CONCRETE

30MPa/19mm concrete

1 Ground beams m3 38

2 Surface beds m3 62

REINFORCED CONCRETE

35MPa/19mm concrete

3 Bases m3 5

4 Stub Columns m3 2

TEST BLOCKS

5 Making and testing 150 x 150 x 150mm concrete


strength test cube (Provisional) No 30

CONCRETE SUNDRIES

Finishing top surfaces of concrete smooth with a


power float

6 Surface beds, slabs, etc m2 414

SMOOTH FORMWORK (DEGREE OF


ACCURACY II)

Carried Forward R

Section No. 4
Bill No. 2
Concrete, Formwork and Reinforcement

-25-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

Smooth formwork to sides

7 Stub Columns N.E 1.5m deep m2 19

8 Edges, risers, ends and reveals not exceeding 300mm


high (Provisional) m 58

REINFORCEMENT (PROVISIONAL)

High tensile steel reinforcement to structural


concrete work

9 8mm Diameter bars in lintels t 0.07

10 10mm Diameter bars t 0.07

11 12mm Diameter bars t 0.07

Fabric reinforcement

12 Ref 888 fabric reinforcement in surfacebeds, etc m2 893

Carried Forward to Summary of Section No. 4 R

Section No. 4
Bill No. 2
Concrete, Formwork and Reinforcement

-26-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 4

BILL NO. 3

MASONRY

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

SUPERSTRUCTURE

Brickwork of NFP bricks in class II mortar

1 Piers m3 2

2 Half brick walls m2 282

3 One brick walls m2 301

4 One brick walls in beamfilling m2 44

BRICKWORK SUNDRIES

Brickwork reinforcement

5 75mm Wide reinforcement built in horizontally m 1 106

6 150mm Wide reinforcement built in horizontally m 1 341

FACE BRICKWORK

Face bricks (Prime Cost Amount R 4 500.00/1000)


pointed with flush horizontal and vertical joints

7 Extra over brickwork for external face brickwork m2 360

8 Extra over brickwork for internal face brickwork m2 564

Carried Forward to Summary of Section No. 4 R

Section No. 4
Bill No. 3
Masonry

-27-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 4

BILL NO. 4

WATERPROOFING

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

DAMP-PROOFING OF WALLS AND FLOORS

One layer of 375 micron "Consol Plastics Brikgrip


DPC" embossed damp proof course

1 In walls m2 38

One layer of 250 micron "Consol Plastics Gunplas


USB Green" waterproof sheeting sealed at laps with
"Gunplas Pressure Sensitive Tape"

2 Under surface beds m2 414

Carried Forward to Summary of Section No. 4 R

Section No. 4
Bill No. 4
Waterproofing

-28-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 4

BILL NO. 5

ROOF COVERINGS ETC

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

PROFILED METAL SHEETING AND


ACCESSORIES

0.58mm Thick IBR Chromadek roof sheeting on steel


purlins colour: Dark Dolphin ontop of the sheet and
Pebble Grey underside of the sheet

1 Roof covering with pitch not exceeding 25 degrees m2 512

Carried Forward to Summary of Section No. 4 R

Section No. 4
Bill No. 5
Roof Covering

-29-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 4

BILL NO. 6

STRUCTURAL STEELWORK

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

STEEL COLUMNS AND BEAMS

Welded beams in single lengths with flat section


bearer and connection plates bolted to concrete
columns

1 120 x 60 x 4mm x 11.54 kg/m Square hollow section


Rafter t 4.28

2 127 x 254 x 37mm Structural T section t 0.81

3 203 x 203 x 46.2 kg/m H-section Columns for roof


support t 1.17

4 203 x 203 x 46.2 kg/m H-section ring beams t 9.65

5 203 x 106 x 5mm x 13.48kg/m thick plate fixed to side of


I-section beams t 1.92

PURLINS, GIRTS, BRACING, ETC

Purlins and girts bolted to steel

6 150 x 65 x 20 x 3mm x 4.6 kg/m Cold formed lipped


channel to purlins t 2.96

Bolts to columns, beams, etc

7 240 x 240mm Mild Steel base plate No 12

8 M16 chemical expansion bolt No 48

9 Column kicker bars cast into concrete No 24

Carried Forward to Summary of Section No. 4 R

Section No. 4
Bill No. 6
Structutral Steelwork

-30-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 4

BILL NO. 7

METALWORK

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

STEEL ROLLER SHUTTERS ETC

"Expanda" or similar approved galvanised steel


roller shutters fixed to steel beams

1 Chain operated roller shutter door slatted on 100mm


steel guide for opening 2470mm wide x 2125mm high
with extruded T-Bar, endlocked 100 x 8mm slats,
120mm wide guides including end plates, slide bolts
fixed to shipping containers No 24

2 Chain operated roller shutter door slatted on 100mm


steel guide for opening 3000mm wide x 2125mm high
with extruded T-Bar, endlocked 100 x 8mm slats,
120mm wide guides including end plates, slide bolts
fixed to shipping containers No 36

SUNDRY STEELWORK

"Mentis Grating" or similar approved welded mesh

3 S40 Mentis Grating Rectagrid with 25 x 4.5 bearer bars,


with 25 x 5 flatbar welded frame, to be welded to rafters
and side support members m2 15

Carried Forward to Summary of Section No. 4 R

Section No. 4
Bill No. 7
Metalwork

-31-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 4

BILL NO.8

PLUMBING AND DRAINAGE


(PROVISIONAL)

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

RAINWATER DISPOSAL

0.58mm thick Galvanised Z275 sheet iron valley


gutters and fittings complete fixed to structural steel
frames

1 200 x 200mm Eaves gutters with beaded front edge to


match existing m 74

2 Extra for 75 x 100mm Rectangular Down pipes at


2600mm length No 12

Carried Forward to Summary of Section No. 4 R

Section No. 4
Bill No. 8
Plumbing and Drainage (Provisional)

-32-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 4

BILL NO.9

PAINTWORK

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

ON FLOATED PLASTER

One coat alkali resistant primer, one undercoat and


two coats "Dulux" water based pearglow or similar
approved

1 On internal walls m2 564

ON METAL

Spot priming defects in pre primed surfaces with


zinc chromate primer and applying one undercoat
and two coat high gloss enamel paint on steel

2 On structural steel work t 20.46

3 On gutters, down pipes n.e. 300mm girth m 108

Carried Forward to Summary of Section No. 4 R

Section No. 4
Bill No. 9
Paintwork

-33-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

SECTION SUMMARY - Construction of 6 x Type 4 - Traders Stalls


Bill Page Amount
No No
1 Earthwork (Provisional) 24

2 Concrete, Formwork and Reinforcement 26

3 Masonry 27

4 Waterproofing 28

5 Roof Covering 29

6 Structutral Steelwork 30

7 Metalwork 31

8 Plumbing and Drainage (Provisional) 32

9 Paintwork 33

Carried to Final Summary R

Section No. 4

-34-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 5

BILL NO. 1

EARTHWORKS (PROVISIONAL)

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

EXCAVATION, FILLING, ETC

Excavation in earth not exceeding 2m deep

1 To reduce levels m3 30

2 Holes m3 7

3 Ground beams m3 12

Extra over all excavations for carting away

4 Surplus material from excavations and/or stock piles on


site to a dumping site to be located by the contractor m3 49

Risk of collapse of excavations

5 Sides of trench and hole excavations not exceeding


1,5m deep m2 25

Keeping excavations free of water

6 Keeping excavations free of all water other than


subterranean water Item

FILLING ETC

G5: Earth filling supplied by the contractor


compacted to 93% Mod AASHTO density

7 Under floors, steps, pavings, etc m3 30

SOIL POISONING

Carried Forward R

Section No. 5
Bill No. 1
Earthworks (Provisional)

-35-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

Soil insectiside

8 Under floors etc including forming and poisoning shallow


furrows against foundation walls etc, filling in furrows
and ramming m2 99

Carried Forward to Summary of Section No. 5 R

Section No. 5
Bill No. 1
Earthworks (Provisional)

-36-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 5

BILL NO. 2

CONCRETE, FORMWORK AND


REINFORCEMENT

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

REINFORCED CONCRETE

30MPa/19mm concrete

1 Ground beams m3 11

2 Surface beds m3 15

REINFORCED CONCRETE

35MPa/19mm concrete

3 Bases m3 2

4 Stub Columns m3 1

TEST BLOCKS

5 Making and testing 150 x 150 x 150mm concrete


strength test cube (Provisional) No 10

CONCRETE SUNDRIES

Finishing top surfaces of concrete smooth with a


power float

6 Surface beds, slabs, etc m2 99

SMOOTH FORMWORK (DEGREE OF


ACCURACY II)

Carried Forward R

Section No. 5
Bill No. 2
Concrete, Formwork and Reinforcement

-37-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

Smooth formwork to sides

7 Stub Columns N.E 1.5m deep m2 6

8 Edges, risers, ends and reveals not exceeding 300mm


high (Provisional) m 19

REINFORCEMENT (PROVISIONAL)

High tensile steel reinforcement to structural


concrete work

9 8mm Diameter bars in lintels t 0.02

10 10mm Diameter bars t 0.02

11 12mm Diameter bars t 0.02

Fabric reinforcement

12 Ref 888 fabric reinforcement in surfacebeds, etc m2 214

Carried Forward to Summary of Section No. 5 R

Section No. 5
Bill No. 2
Concrete, Formwork and Reinforcement

-38-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 5

BILL NO. 3

MASONRY

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

SUPERSTRUCTURE

Brickwork of NFP bricks in class II mortar

1 Piers m3 0.4

2 Half brick walls m2 71

3 One brick walls m2 79

4 One brick walls in beamfilling m2 11

BRICKWORK SUNDRIES

Brickwork reinforcement

5 75mm Wide reinforcement built in horizontally m 275

6 150mm Wide reinforcement built in horizontally m 353

FACE BRICKWORK

Face bricks (Prime Cost Amount R 4 500.00/1000)


pointed with flush horizontal and vertical joints

7 Extra over brickwork for external face brickwork m2 92

8 Extra over brickwork for internal face brickwork m2 141

Carried Forward to Summary of Section No. 5 R

Section No. 5
Bill No. 3
Masonry

-39-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 5

BILL NO. 4

WATERPROOFING

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

DAMP-PROOFING OF WALLS AND FLOORS

One layer of 375 micron "Consol Plastics Brikgrip


DPC" embossed damp proof course

1 In walls m2 10

One layer of 250 micron "Consol Plastics Gunplas


USB Green" waterproof sheeting sealed at laps with
"Gunplas Pressure Sensitive Tape"

2 Under surface beds m2 99

Carried Forward to Summary of Section No. 5 R

Section No. 5
Bill No. 4
Waterproofing

-40-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 5

BILL NO. 5

ROOF COVERINGS ETC

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

PROFILED METAL SHEETING AND


ACCESSORIES

0.58mm Thick IBR Chromadek roof sheeting on steel


purlins colour: Dark Dolphin ontop of the sheet and
Pebble Grey underside of the sheet

1 Roof covering with pitch not exceeding 25 degrees m2 124

Carried Forward to Summary of Section No. 5 R

Section No. 5
Bill No. 5
Roof Covering

-41-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 5

BILL NO. 6

STRUCTURAL STEELWORK

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

STEEL COLUMNS AND BEAMS

Welded beams in single lengths with flat section


bearer and connection plates bolted to concrete
columns

1 120 x 60 x 4mm x 11.54 kg/m Square hollow section


Rafter t 1.43

2 127 x 254 x 37mm Structural T section t 0.27

3 203 x 203 x 46.2 kg/m H-section Columns for roof


support t 0.39

4 203 x 203 x 46.2 kg/m H-section ring beams t 2.57

5 203 x 106 x 5mm x 13.48kg/m thick plate fixed to side of


I-section beams t 0.46

PURLINS, GIRTS, BRACING, ETC

Purlins and girts bolted to steel

6 150 x 65 x 20 x 3mm x 4.6 kg/m Cold formed lipped


channel to purlins t 0.70

Bolts to columns, beams, etc

7 240 x 240mm Mild Steel base plate No 4

8 M16 chemical expansion bolt No 16

9 Column kicker bars cast into concrete No 8

Carried Forward to Summary of Section No. 5 R

Section No. 5
Bill No. 6
Structural Steelwork

-42-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 4

BILL NO. 7

METALWORK

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

STEEL ROLLER SHUTTERS ETC

"Expanda" or similar approved galvanised steel


roller shutters fixed to steel beams

1 Chain operated roller shutter door slatted on 100mm


steel guide for opening 2470mm wide x 2125mm high
with extruded T-Bar, endlocked 100 x 8mm slats,
120mm wide guides including end plates, slide bolts
fixed to shipping containers No 8

2 Chain operated roller shutter door slatted on 100mm


steel guide for opening 3000mm wide x 2125mm high
with extruded T-Bar, endlocked 100 x 8mm slats,
120mm wide guides including end plates, slide bolts
fixed to shipping containers No 8

SUNDRY GALVANISED STEELWORK

"Mentis Grating" or similar approved welded mesh

3 S40 Mentis Grating Rectagrid with 25 x 4.5 bearer bars,


with 25 x 5 flatbar welded frame, to be welded to rafters
and side support members m2 5

Carried Forward to Summary of Section No. 5 R

Section No. 5
Bill No. 7
Metalwork

-43-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 5

BILL NO.8

PLUMBING AND DRAINAGE


(PROVISIONAL)

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

RAINWATER DISPOSAL

0.58mm thick Galvanised Z275 sheet iron valley


gutters and fittings complete fixed to structural steel
frames

1 200 x 200mm Eaves gutters with beaded front edge to


match existing m 18

2 Extra for 75 x 100mm Rectangular Down pipes at


2600mm length No 4

Carried Forward to Summary of Section No. 5 R

Section No. 5
Bill No. 8
Plumbing and Drainage (Provisional)

-44-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 5

BILL NO.9

PAINTWORK

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

ON FLOATED PLASTER

One coat alkali resistant primer, one undercoat and


two coats "Dulux" water based pearglow or similar
approved

1 On internal walls m2 141

ON METAL

Spot priming defects in pre primed surfaces with


zinc chromate primer and applying one undercoat
and two coat high gloss enamel paint on steel

2 On structural steel work t 6.82

3 On gutters, down pipes n.e. 300mm girth m 29

Carried Forward to Summary of Section No. 5 R

Section No. 5
Bill No. 9
Paintwork

-45-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

SECTION SUMMARY - Construction of 2 x Type 5 - Traders Stalls


Bill Page Amount
No No
1 Earthworks (Provisional) 36

2 Concrete, Formwork and Reinforcement 38

3 Masonry 39

4 Waterproofing 40

5 Roof Covering 41

6 Structural Steelwork 42

7 Metalwork 43

8 Plumbing and Drainage (Provisional) 44

9 Paintwork 45

Carried to Final Summary R

Section No. 5

-46-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 6

BILL NO. 1

EARTHWORKS (PROVISIONAL)

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

EXCAVATION, FILLING, ETC

Excavation in earth not exceeding 2m deep

1 Holes m3 11

2 Ground beams m3 0.4

Extra over all excavations for carting away

3 Surplus material from excavations and/or stock piles on


site to a dumping site to be located by the contractor m3 12

Risk of collapse of excavations

4 Sides of trench and hole excavations not exceeding


1,5m deep m2 37

Keeping excavations free of water

5 Keeping excavations free of all water other than


subterranean water Item

Carried Forward to Summary of Section No. 6 R

Section No. 6
Bill No. 1
Earthworks (Provisional)

-47-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 6

BILL NO. 2

CONCRETE, FORMWORK AND


REINFORCEMENT

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

REINFORCED CONCRETE

30MPa/19mm concrete

1 Ground beams m3 0.4

REINFORCED CONCRETE

35MPa/19mm concrete

2 Bases m3 3

3 Stub Columns m3 1

4 Vanity slabs, cupboard slabs, cover slabs, etc m3 1

TEST BLOCKS

5 Making and testing 150 x 150 x 150mm concrete


strength test cube (Provisional) No 5

CONCRETE SUNDRIES

Finishing top surfaces of concrete smooth with a


steel trowel including rounding edges to form a
bullnose finish

6 Vanity slabs, cupboard slabs, cover slabs, etc m2 4

SMOOTH FORMWORK (DEGREE OF


ACCURACY II)

Carried Forward R

Section No. 6
Bill No. 2
Concrete, Formwork and Reinforcement

-48-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

Smooth formwork to soffits

7 Vanity slabs, cupboard slabs, cover slabs, etc. propped


up not exceeding 1500mm high m2 4

Smooth formwork to sides

8 Vanity slabs, cupboard slabs, cover slabs, etc. propped


up not exceeding 1500mm high m2 4

9 Edges, risers, ends and reveals not exceeding 300mm


high m 10

Smooth formwork to sides

10 Stub Columns N.E 1.5m deep m2 10

11 Edges, risers, ends and reveals not exceeding 300mm


high (Provisional) m 29

REINFORCEMENT (PROVISIONAL)

High tensile steel reinforcement to structural


concrete work

12 8mm Diameter bars in lintels t 0.04

13 10mm Diameter bars t 0.04

14 12mm Diameter bars t 0.04

Fabric reinforcement

15 Ref 888 fabric reinforcement in surfacebeds, etc m2 4

Carried Forward to Summary of Section No. 6 R

Section No. 6
Bill No. 2
Concrete, Formwork and Reinforcement

-49-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 6

BILL NO. 3

MASONRY

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

SUPERSTRUCTURE

Brickwork of NFP bricks in class II mortar

1 One brick walls m2 6

BRICKWORK SUNDRIES

Brickwork reinforcement

2 150mm Wide reinforcement built in horizontally m 71

Carried Forward to Summary of Section No. 6 R

Section No. 6
Bill No. 3
Masonry

-50-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 6

BILL NO. 4

ROOF COVERINGS ETC

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

PROFILED METAL SHEETING AND


ACCESSORIES

0.58mm Thick IBR Chromadek roof sheeting on steel


purlins colour: Dark Dolphin ontop of the sheet and
Pebble Grey underside of the sheet

1 Roof covering with pitch not exceeding 25 degrees m2 44

Carried Forward to Summary of Section No. 6 R

Section No. 6
Bill No. 4
Roof Covering

-51-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 6

BILL NO. 5

STRUCTURAL STEELWORK

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

STEEL COLUMNS AND BEAMS

Welded beams in single lengths with flat section


bearer and connection plates bolted to concrete
columns

1 120 x 80 x 4mm x 11.54 kg/m Square hollow section


Rafter t 0.24

2 75 x 75 x 3mm Square Hollow section t 0.08

3 203 x 203 x 46.2 kg/m H-section Columns for roof


support t 0.59

4 203 x 203 x 46.2 kg/m H-section ring beams t 0.72

5 203 x 106 x 5mm x 13.48kg/m thick plate fixed to side of


I-section beams t 0.23

PURLINS, GIRTS, BRACING, ETC

Purlins and girts bolted to steel

6 125 x 65 x 20 x 2.5mm x 4.6 kg/m Cold formed lipped


channel to purlins t 0.14

Bolts to columns, beams, etc

7 240 x 240mm Mild Steel base plate No 6

8 M16 chemical expansion bolt No 24

9 Column kicker bars cast into concrete No 12

Carried Forward to Summary of Section No. 6 R

Section No. 6
Bill No. 5
Structural Steelwork

-52-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 6

BILL NO. 6

METALWORK

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

SUNDRY GALVANISED STEELWORK

"Mentis Grating" or similar approved welded mesh

1 S40 Mentis Grating Rectagrid with 25 x 4.5 bearer bars,


with 25 x 5 flatbar welded frame, to be welded to rafters
and side support members m2 38

2 E.O for 1000 x 2125mm high S40 Mentis Grating gates


welded to steel steel columns No 2

Carried Forward to Summary of Section No. 6 R

Section No. 6
Bill No. 6
Metalwork

-53-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 6

BILL NO. 7

PLASTERING

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

INTERNAL PLASTER

Cement plaster on brickwork

1 On walls m2 11

Carried Forward to Summary of Section No. 6 R

Section No. 6
Bill No. 7
Plastering

-54-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 6

BILL NO. 8

TILING

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

WALL TILING

Allow a (PC Sum of R 250/m2) for ceramic wall tiles


including tile grount, adhesive and spacers colour
to architects approval

1 On walls in isolated panes, splashbacks, etc m2 11

Carried Forward to Summary of Section No. 6 R

Section No. 6
Bill No. 8
Tiling

-55-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 6

BILL NO.9

PLUMBING AND DRAINAGE


(PROVISIONAL)

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

RAINWATER DISPOSAL

0.58mm thick Galvanised Z275 sheet iron valley


gutters and fittings complete fixed to structural steel
frames

1 200 x 200mm Eaves gutters with beaded front edge to


match existing m 7

2 Extra for 75 x 100mm Rectangular Down pipes at


2600mm length No 2

SOIL DRAINAGE

uPVC pipes

3 110mm Pipes laid in and including trenches not


exceeding 1m deep m 50

Extra over uPVC pipes for fittings

4 110mm Bend No 3

5 110mm Junction No 2

6 110mm Access bend No 2

7 110mm Access junction No 1

uPVC gulleys

8 110mm Dished gulley not exceeding 750mm deep No 1

Carried Forward R

Section No. 6
Bill No. 9
Plumbing and Drainage (Provisional)

-56-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

SANITARY FITTINGS

"Vanstone Precast" or similar approved wash


troughs

9 "P2-2901" 670mm x 500mm x 340mm deep reinforced


concrete single compartment wash trough No 8

WASTE UNIONS, ETC

"Vulcathene" or similar approved

10 "504" 32mm Unslotted waste, 85mm flange and 89mm


shank No 8

TRAPS, ETC

"Marley" or similar approved

11 40 x 50mm Deep seal "P" or "S" trap No 8

TAPS, VALVES, ETC

Brass

12 22mm Stopcock No 8

"Cobra Watertech"

13 200-20 Plain bibtap RB No 8

SANITARY PLUMBING

uPVC pipes

14 50mm Pipes m 7

Extra over uPVC pipes for fittings

15 50mm Bend No 8

16 50mm Junction No 8

17 50mm Access bend No 8

Carried Forward R

Section No. 6
Bill No. 9
Plumbing and Drainage (Provisional)

-57-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

Sundries

18 Testing waste pipe system Item

WATER SUPPLIES

Class 6 uPVC pressure pipes

19 25mm Pipes laid in and including trenches m 50

Extra over uPVC pressure pipes for solvent welded


pressure fittings

20 25mm Fittings No 40

Class 0 copper pipes

21 22mm Pipes chased into brick wall m 15

TESTING

22 Testing water pipe system Item

Carried Forward to Summary of Section No. 6 R

Section No. 6
Bill No. 9
Plumbing and Drainage (Provisional)

-58-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 6

BILL NO.10

PAINTWORK

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

ON METAL

Spot priming defects in pre primed surfaces with


zinc chromate primer and applying one undercoat
and two coat high gloss enamel paint on steel

1 On structural steel work t 3.50

2 On gutters, down pipes n.e. 300mm girth m 12

Carried Forward to Summary of Section No. 6 R

Section No. 6
Bill No. 10
Paintwork

-59-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

SECTION SUMMARY - Construction of 1 x Wash bay


Bill Page Amount
No No
1 Earthworks (Provisional) 47

2 Concrete, Formwork and Reinforcement 49

3 Masonry 50

4 Roof Covering 51

5 Structural Steelwork 52

6 Metalwork 53

7 Plastering 54

8 Tiling 55

9 Plumbing and Drainage (Provisional) 58

10 Paintwork 59

Carried to Final Summary R

Section No. 6

-60-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 7

BILL NO. 1

ALTERATIONS (PROVISIONAL)

STANDARD PREAMBLES
The contractor is refered to the Model Preambles for
Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

REMOVAL OF EXISTING WORK

Breaking up and removing reinforced concrete


including cutting off and removing reinforcement

1 Concrete barrier kerbs m 4 840

Taking out and removing paving etc

2 Interlocking paving m2 15 200

CAREFULLY REMOVE AND SET ASIDE FOR


RE-USE

Taking off and set aside sundry metal work for later
use or to be handed over to the client

3 Steel Traders stalls average 2000 x 1500mm x 2000mm


high No 150

Sundries

Taking out and removing pre cast concrete work etc.

4 Precast concrete bollards Item

Carried Forward to Summary of Section No. 7 R

Section No. 7
Bill No. 1
Alterations (Provisional)

-61-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 7

BILL NO. 2

FENCE (PROVISIONAL)

STANDARD PREAMBLES
The contractor is refered to the Model Preambles for
Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

FENCING

"Cochrane Clearvu Fence" high security fence

1 2100mm high powder coated Cochrane Clearvu fence


colour: Anthracite Grey and taper locking post to be set
at 3 390mm maximum centre to centre as per
manufacturers specification. Posts shall be 2600mm
long with 600 x 400 x 400mm deep 15Mpa concrete
bases including excavation, carting away and concrete.
Panels shall be 3 305mm width x 2100mm high. m 234

2 1200 x 2100mm Single Gate with Clearvu Panels fixed


to steel posts to match the fence No 1

3 6000 x 2100mm Double Gates with Clearvu Panels


fixed to steel posts to match the fence No 1

Carried Forward to Summary of Section No. 7 R

Section No. 7
Bill No. 2
Fencing (Provisional)

-62-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 7

BILL NO. 3

GREASE TRAP AND SEPTIC TANK


(PROVISIONAL)

STANDARD PREAMBLES
The contractor is refered to the Model Preambles for
Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

EARTHWORKS

EXCAVATION, FILLING, ETC

Excavation in earth not exceeding 2m deep

1 To reduce level m3 10

Back excavation of vertical sides of excavation in


earth for working space including backfilling
compacted to 98% Mod AASHTO density

2 Exceeding 4,5m and not exceeding 6m deep for placing


and removing formwork to surface beds etc 1000mm
away from excavated face m2 20

Extra over trench and hole excavations in earth for


excavation in

3 Soft rock m3 1

4 Hard rock m3 1

Extra over all excavations for carting away

5 Surplus material from excavations and/or stock piles on


site to a dumping site to be located by the contractor m3 10

Risk of collapse of excavations

6 Sides of trench and hole excavations exceeding 1,5m


deep m2 20

Carried Forward R

Section No. 7
Bill No. 3
Grease Trap and Septic Tank (Provisional)

-63-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

Keeping excavations free of water

7 Keeping excavations free of all water other than


subterranean water Item

Coarse river sand filling supplied by the contractor

8 Clean washed river sand mixed with 8:1 cement layed


dry in 200mm layers
m3 4

SOIL POISONING

Soil insectiside

9 Under floors etc including forming and poisoning shallow


furrows against foundation walls etc, filling in furrows
and ramming m2 28

MASONRY

Brickwork of NFX bricks (14 MPa nominal


compressive strength) in class I mortar

10 One brick walls m2 20

Brickwork reinforcement

11 150mm Wide reinforcement built in horizontally m 235

WATERPROOFING

DAMP-PROOFING OF WALLS AND FLOORS

One layer of 250 micron "Consol Plastics Gunplas


USB Green" waterproof sheeting sealed at laps with
"Gunplas Pressure Sensitive Tape"

12 Under surface beds m2 9

CONCRETE, FORMWORK AND


REINFORCEMENT

REINFORCED CONCRETE

Carried Forward R

Section No. 7
Bill No. 3
Grease Trap and Septic Tank (Provisional)

-64-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

30MPa/19mm concrete

13 Surface beds on waterproofing m3 1

14 Slabs m3 1

Finishing top of surfaces of concrete smooth with


wood float

15 Surface beds, slabs, etc m2 17

ROUGH FORMWORK (DEGREE OF ACCURACY


III)

Rough formwork to soffits

16 Rough formwork to soffit of slabs propped up to a height


exceeding 1.5m and not exceeding 3.5m high m2 9

Rough formwork to form

17 Opening not exceeding 1m girth through not exceeding


300mm slab No 2

REINFORCEMENT

High tensile steel reinforcement to structural


concrete work

18 Various diameter bars t 0.25

TEST BLOCKS

19 Making and testing 150 x 150 x 150mm concrete


strength test cube (Provisional) No 2

PLASTERING

SCREEDS

Screeds with compressive strength of 15 MPa steel


trowelled on concrete

20 Average 100mm thick on floors to falls m2 9

Carried Forward R

Section No. 7
Bill No. 3
Grease Trap and Septic Tank (Provisional)

-65-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

One coat 3:1 cement plaster on brick walls

21 On walls m2 20

PLUMBING AND DRAINAGE


(PROVISIONAL)

Heavy duty uPVC pipes Class 34 in Class B bedding


including excavations, bedding, backfilling,
compacting to 95% Mod AASHTO density, risk of
collapse and dewatering of trenches:

22 110mm Pipe and excavation exceeding 1m deep but n.e


1.5m m 4

23 110mm pipe weep holes build into brick wall m 2

MANHOLE COVERS ETC

24 Double seal cast iron manhole cover and frame type 8B-
SABS 1973 for 1140 x 915mm opening No 2

GREASE TRAPS ETC

"H.A.C Fatmaster" or similar approved grease traps

25 7 Litre per second ( 1000 Meals per day) Fatmaster with


double Militrap and Type: 3CR12 Steel body and Lids,
Fibreglass Baskets from H.A.C Industrial Agents No 1

TESTING

26 Testing septic tank system Item

Carried Forward to Summary of Section No. 7 R

Section No. 7
Bill No. 3
Grease Trap and Septic Tank (Provisional)

-66-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 7

BILL NO. 4

LANDSCAPING (PROVISIONAL)

STANDARD PREAMBLES
The contractor is refered to the Model Preambles for
Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

EXCAVATION, FILLING, ETC

Excavation in earth not exceeding 2m deep

1 Holes m3 220

Garden soil filling supplied by the contractor

2 In flower boxes m3 107

Ground Preparation

3 Cultivation and preparation of areas to be planted m2 108

Topsoil,Compost, Lime and fertilizer

4 Import and spreading of topsoil m3 54

5 Compost in plant beds, holes for trees, shrubs, etc m3 30

6 Import and spread mulch m3 5

7 Organic fertilizer kg 265

8 Super Phosphate kg 60

9 Vermiculite m3 30

10 19mm stone gravel m3 15

Carried Forward R

Section No. 7
Bill No. 4
Landscaping (Provisional)

-67-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

Trees

11 200 Litre Wild Olive - Olea Europa African 2 m high


No 62

12 1000 Litre Wild Olive - Olea Europa African 8m high


No 36

WATERPROOFING

One layer of 250 micron "Consol Plastics Gunplas


USB Green" waterproof sheeting sealed at laps with
"Gunplas Pressure Sensitive Tape"

13 To sides of tree holes m2 715

Bidum

14 Bidum A4 Geotextile Membrane m2 159

Sundries

15 100mm diameter drainex pipe slotted in to planter box


with concrete encasement at the bottom m 128

16 Watering of trees after planting until practical completion ltr 2 574

Carried Forward to Summary of Section No. 7 R

Section No. 7
Bill No. 4
Landscaping (Provisional)

-68-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 7

BILL NO. 5

PAVING AND WALKWAYS (PROVISIONAL)

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

EARTHWORKS

Excavation in earth not exceeding 2m deep

1 Open face excavations in earth to reduce levels m3 9 041

Extra over trench and hole excavations in earth for


excavation in

2 Extra over open face excavations in earth for


excavations in soft rock m3 1 404

3 Extra over open face excavations in earth for


excavations in hard rock m3 1 702

Extra over all excavations for carting away

4 Extra over all excavations for carting away surplus


material from excavations and/or stockpile on site to a
dumping site to be located by the Contractor m3 9 041

Keeping excavations free of water

5 Allow for keeping all excavations entirely free from water


and mud Item

Earth filling supplied by the contractor

6 Imported C4 material to comply with minimum CBR 15


and maximum PI 12, imported from commercial sources
and compacted to 95% modified AASHTO density m3 2 260

Carried Forward R

Section No. 7
Bill No. 5
Paving and Walkways (Provisional)

-69-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

7 Imported G5 sub-base layer from commercial source in


layers of 150mm thick compacted to 95% Mod AASHTO
density m3 2 260

8 Imported G7 sub-base layer from commercial source in


layers of 150mm thick compacted to 93% Mod AASHTO
density m3 6 781

Compaction of surfaces

9 Compaction of ground surface under pavings, etc


including scarifying for a depth of 150mm, breaking
down over size material, adding suitable material where
necessary and compact to 93% modified AASHTO
density m2 15 068

Coarse river sand filling supplied by the contractor

10 25mm thick layer clean, dry, riversand layer treated with


an approved weed killer at the rate of 50 gram per
square metre, spread and levelled to receive paving
blocks (elsewhere) m2 15 068

Tests

11 Tests to determine the degree of compaction, etc. of


ground or filling No 500

PRECAST CONCRETE

Corobrik Burgundy Paver 220 x 110 x 50mm colour:


Red laid with butt joints on 50mm thick river sand
bed with sand swept into joints including
preparation of ground or filling

12 50mm paving blocks m2 7 725

Corobrik Cederberg paver 220 x 110 x 50mm colour:


Yellow laid with butt joints on 50mm thick river sand
bed with sand swept into joints including
preparation of ground or filling

13 50mm paving blocks m2 3 826

Carried Forward R

Section No. 7
Bill No. 5
Paving and Walkways (Provisional)

-70-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

Vanstone Jap Concrete slab 600 x 300 x 60mm


colour: Grey laid with butt joints on 50mm thick river
sand bed with sand swept into joints including
preparation of ground or filling

14 60mm paving blocks m2 583

Vanstone standard concrete cobble 110 x 100 x


50mm Colour: Charcoal laid with butt joints on
50mm thick river sand bed with sand swept into
joints including preparation of ground or filling

15 50mm paving blocks m2 283

Standard concrete interlocking paving blocks 110,8


x 221,2 x 80mm Colour: Dark Grey laid with butt
joints on 50mm thick river sand bed with sand swept
into joints including preparation of ground or filling

16 80mm paving blocks m2 2 651

KERBS, CHANNELS, ETC

17 Kerb (SABS 927) fig 3 Barrier kerb with 150 x 150 x


300mm unreinforced concrete haunching at back of
each joint including excavation, backfilling, etc m 2 915

18 Kerb (SABS 927) fig 10 Edge Restraint kerb with 150 x


150 x 300mm unreinforced concrete haunching at back
of each joint including excavation, backfilling, etc m 1 925

PRECAST CONCRETE FURNITURE

"WilsonStone" or similar approved precast concrete


benches and tables

19 The Turin bench 1600mm long x 450 high x 450mm


wide colour to be grey concrete with special smooth and
fair finish grade I accuracy mounted into 500 x 500 x
500mm 25 Mpa concrete bases including excavation,
cart away and concrete. No 8

Carried Forward R

Section No. 7
Bill No. 5
Paving and Walkways (Provisional)

-71-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

20 The block seat 500mm x 500 x 450mm wide colour to


be grey concrete with special smooth and fair finish
grade I accuracy mounted into 500 x 500 x 500mm 25
Mpa concrete bases including excavation, cart away and
concrete. No 40

21 Precast concrete round table 1100mm diameter with


760mm high pedestal colour to be grey concrete with
special smooth and fair finish grade I accuracy mounted
into 500 x 500 x 500mm 25 Mpa concrete bases
including excavation, cart away and concrete. No 10

"Lovisa Concrete" or similar approved precast


concrete tree grid ring

22 600 x 600 x 50mm concrete piece tree ring grid ring


mounted to sides of tree trunks No 392

GALVANISED STEEL FURNITURE

"Lovisa Concrete" or similar approved galvanised


steel furniture

23 Galvanised steel bollard 120mm Diameter x 900mm


long from final pave level with 3 galvanised steel rings
the be welded on top of the bollard with yellow reflector
tape on top and mounted to 500 x 500 x 500mm 25 Mpa
concrete base including excavation, Carting away and
concrete including filling bollard with concrete as per
Architectural detail No 115

24 Perforated galvanised steel litter bin 400mm Diameter x


560mm high with two legs at 760mm height mounted to
500 x 500 x 500mm 25 Mpa concrete base including
excavation, Carting away and concrete. Including filling
both steel legs with concrete as per Architectural detail No 73

PAINT ON PRECAST CONCRETE

'Tile Doctor' URO SEAL twin pack aliphatic


polyurethane product with a application rate of 8 -
10m2 per litre according to the manufactures
specification

25 On paving blocks m2 2 791

Carried Forward to Summary of Section No. 7 R

Section No. 7
Bill No. 5
Paving and Walkways (Provisional)

-72-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 7

BILL NO. 6

STAIRCASES (PROVISIONAL)

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

ALTERATIONS, ETC

Breaking down and removing brickwork etc

1 One bark wall m2 10

Hacking up / off and removing ceramic floor and


wall tiles including preparing surfaces for new
screed, plaster or tile etc. (elsewhere measured)

2 Floor tiles m2 48

EXCAVATION, FILLING, ETC

Excavation in earth not exceeding 2m deep

3 Holes m3 3

4 Trenches m3 8

Extra over trench and hole excavations in earth for


excavation in

5 Soft rock m3 1

6 Hard rock m3 5

Extra over all excavations for carting away

7 Surplus material from excavations and/or stock piles on


site to a dumping site to be located by the contractor m3 11

Carried Forward R

Section No. 7
Bill No. 6
Staircases (Provisional)

-73-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

Risk of collapse of excavations

8 Sides of trench and hole excavations not exceeding


1,5m deep m2 30

Keeping excavations free of water

9 Keeping excavations free of all water other than


subterranean water Item

Earth filling supplied by the contractor

10 Imported G5 sub-base layer from commercial source in


layers of 150mm thick compacted to 95% Mod AASHTO
density m3 31

CONCRETE, FORMWORK AND


REINFORCEMENT

REINFORCED CONCRETE

30MPa/19mm concrete

11 Ground beams m3 3

REINFORCED CONCRETE

35MPa/19mm concrete

12 Bases m3 1

13 Stub Columns m3 1

14 Slabs, lands, cover slabs, etc m3 3

15 Staircases, etc m3 4

TEST BLOCKS

16 Making and testing 150 x 150 x 150mm concrete


strength test cube (Provisional) No 5

CONCRETE SUNDRIES

Carried Forward R

Section No. 7
Bill No. 6
Staircases (Provisional)

-74-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

Finishing top surfaces of concrete smooth with a


steel trowel including rounding edges to form a
bullnose finish

17 Vanity slabs, cupboard slabs, cover slabs, etc m2 39

SMOOTH FORMWORK (DEGREE OF


ACCURACY II)

Smooth formwork to soffits

18 slabs, cupboard slabs, cover slabs, etc. propped up not


exceeding 2000mm high m2 7

Smooth formwork to sides

19 Edges, risers, ends and reveals not exceeding 300mm


high m 57

Smooth formwork to sides

20 Stub Columns N.E 2.0m deep m2 7

REINFORCEMENT (PROVISIONAL)

High tensile steel reinforcement to structural


concrete work

21 8mm Diameter bars in lintels t 1.13

22 10mm Diameter bars t 1.13

23 12mm Diameter bars t 1.13

MASONRY

SUB-STRUCTURE

Brickwork of NFX bricks in class II mortar

24 One brick walls m2 43

SUPERSTRUCTURE

Carried Forward R

Section No. 7
Bill No. 6
Staircases (Provisional)

-75-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

Brickwork of NFP bricks in class II mortar

25 One brick walls m2 30

BRICKWORK SUNDRIES

Brickwork reinforcement

26 150mm Wide reinforcement built in horizontally m 859

PLASTERING

SCREEDS

Screeds on concrete

27 25mm Thick on floors and landings m2 51

EXTERNAL PLASTER

Cement plaster on brickwork

28 On walls m2 66

CORNER PROTECTORS, DIVIDING STRIPS,


ETC

29 PMJ100 M-Trim PVC movement joint m 13

TILING

WALL TILING

Allow a (PC Sum of R 250/m2) for 200 x 200mm


gloss wall including tile grount, adhesive and
spacers colour to architects approval

30 On walls in isolated panes, splashbacks, etc m2 66

FLOOR TILING

Allow a (PC Sum of R 250/m2) for 600 x 600mm


Porcelain tiles including spacers, grout and
adhesive. Colour to Architects approval

31 On floors and staircases m2 51

Carried Forward to Summary of Section No. 7 R

Section No. 7
Bill No. 6
Staircases (Provisional)

-76-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 7

BILL NO. 7

STORMWATER DRAINAGE (PROVISIONAL)

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

RE-SURFACING OF ROAD SURFACE

Clean road surface by means of:

1 Mechanical Broom m2 1 760

Prime coat with Type MC30 Cutback bitumen

2 On road surfaces m2 1 760

Tack coat with 30% stable grade emulsion

3 On road surfaces m2 1 760

ASPHALT SURFACING

30mm Thick medium continously graded


asphalt surfacing

4 60/70 Penetration grade bitumen m2 1 760

ROAD MARKING

5 Solid road lines 100mm wide m 750

6 Broken road lines 100mm wide m 300

7 Painted island with "stop" road marking No 3

8 Painted island with pedestrian crossing road marking No 8

9 Traffic arrow 1 000 x 300mm wide extreme No 25

Carried Forward R

Section No. 7
Bill No. 7
Roadworks (Provisional)

-77-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

ROAD SIGNS

Standard "STOP" sign with standard 50mm diameter


galvanised mild steel fixing post bedded into and
including bases, including all necessary mass
concrete, excavations, etc.

10 Stop sign (R1) No 8

11 Yield sign (R2.1) No 8

Carried Forward to Summary of Section No. 7 R

Section No. 7
Bill No. 7
Roadworks (Provisional)

-78-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 7

BILL NO. 8

STORMWATER DRAINAGE (PROVISIONAL)

PREAMBLES

The contractor is revered to the Model Preambles for


Trades (2008 edition) as issued the Association of
South African Quantity Surveyors before pricing this bill

Class 100D concrete pipes in Class C bedding:

1 450mm Diameter pipes laid in and including excavation,


risk of collapse, working space, hoisting in position,
backfilling with selected excavated material, cart away
surplus material and shoring to pipe trenches exceeding
1m and not exceeding 2m deep. m 451

2 Kerb inlet as be civil engineers drawing TPM004-2018-


SW02 Including excavations, shoring, carting away,
220mm brick wall, 20 Mpa concrete to slab and footing,
formwork, and 600 x 600mm heavy duty cover and
frame No 18

Connection

3 Allow a PC Sum of R50 000.00 for Connecting to the


existing storm water grid inlet and manholes Item 50 000.00

Carried Forward to Summary of Section No. 7 R

Section No. 7
Bill No. 8
Storm Water Drainage (Provisional)

-79-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

SECTION SUMMARY - External Works


Bill Page Amount
No No
1 Alterations (Provisional) 61

2 Fencing (Provisional) 62

3 Grease Trap and Septic Tank (Provisional) 66

4 Landscaping (Provisional) 68

5 Paving and Walkways (Provisional) 72

6 Staircases (Provisional) 76

7 Roadworks (Provisional) 78

8 Storm Water Drainage (Provisional) 79

Carried to Final Summary R

Section No. 7

-80-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Item Quantity Rate Amount


No

SECTION 8

BILL NO. 1

PROVISIONAL AMOUNTS AND


BUDGETARY ALLOWANCES ETC

PROVISIONAL SUMS FOR SELECTED SUB-


CONTRACT WORKS

PUBLIC ART METALWORK

1 Provide the sum of R100 000.00 (One Hundred


Thousand Rand Only) for supply and installation of
public art metalwork to Architectural designs and
specification Item 100 000.00

2 Profit Item

3 Attendance Item

ROAD SIGNALS

4 Provide the sum of R800 000.00 (Eight Hundred


Thousand Rand) for installation of new road signals Item 800 000.00

5 Profit Item

6 Attendance Item

7 Provide the sum of R50 000.00 (Fifty Hundred


Thousand Rand) for repositioning of existing road
signals Item 50 000.00

8 Profit Item

9 Attendance Item

REPOSITIONING OF BILL BOARDS

10 Provide the sum of R100 000.00 (One Hundred


Thousand Rand) for repositioning of existing Bill board Item 100 000.00

11 Profit Item

Carried Forward R

Section No. 8
Bill No. 1
Provisional Sums

-81-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

12 Attendance Item

BUDGETARY ALLOWANCES

Community Liaisons Officer (CLO)

13 Provide the sum of R 120 000.00 (One Hundred and


Twenty Thousand Rands) for appointment of a CLO for
the duration of the project Item 120 000.00

14 Add profit on the above item Item

Refurbishment of existing Ablutions

15 Provide the sum of R 200 000.00 (Two Hundred


Thousand Rands) for Refurbishment of existing
ablutions Item 200 000.00

16 Add profit on the above item Item

Reconfiguration of existing Taxi bays

17 Provide the sum of R 500 000.00 (Five Hundred


Thousand Rands) for Reconfiguration of existing taxi
bays Item 500 000.00

18 Add profit on the above item Item

Underground Detection and Relocation of Services

19 Provide the sum of R 3 000 000.00 (Three Million Rands


only) for detection of underground services and
relocation of services Item 3 000 000.00

20 Add profit on the above item Item

Enterprise Development

21 Provide the sum of R 500 000.00 (Five Hundred


Thousand Rands only) for enterprise development Item 500 000.00

22 Add profit on the above item Item

Carried Forward R

Section No. 8
Bill No. 1
Provisional Sums

-82-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

Brought Forward R

Training of Local Labour

23 Provide the sum of R 500 000.00 (Five Hundred


Thousand Rands only) for training of local labour Item 500 000.00

24 Add profit on the above item Item

SMME Mentor

25 Provide the sum of R 500 000.00 (Five Hundred


Thousand Rands only) for SMME mentor appointment Item 500 000.00

26 Add profit on the above item Item

CSI (Corporate Social Investment)

27 Provide the sum of R 200 000.00 (Two Hundred


Thousand Rands only) for Corporate Social Investment Item 200 000.00

28 Add profit on the above item Item

Carried to Final Summary R

Section No. 8
Bill No. 1
Provisional Sums

-83-
Contract No.: LTOD/CN006
Refurbishment of Lenasia TOD
For Johannesburg Development Agency

FINAL SUMMARY
Section Page Amount
No No
1 Preliminaries and General 6

2 Construction of 6 x Type 1 - Traders Stalls 14

3 Construction of 32 x Type 2 - Traders Stalls 22

4 Construction of 6 x Type 4 - Traders Stalls 34

5 Construction of 2 x Type 5 - Traders Stalls 46

6 Construction of 1 x Wash bay 60

7 External Works 80

8 Provisional Sums 83

Sub-total (A)
Sub- R

Part B: SMME Work Packages

The Main contractor to select and extract the scope of


works to be issued to SMME's amounting to 30% of the
Offer Price and allow for Profit, Attendance and 5%
Preliminaries and General as per items below.

Profit an work carried out by SMME's Item

Attendance on work carried out by SMME's Item

5% Preliminaries and General on work carried out by


SMME's Item

Sub-Total (B) R

Part C: Electrical Installation

Total brought forward from pricing Electrical Installation


excluding VAT ( See attached Electrical Installation Bill
of quantities) Item

Sub-Total (C) R

ADD: Value added Tax at 15% R

Carried to Form of Tender R

-84-