Zoning
Zoning
1st Lift
2nd Lift
3rd Lift
4th Lift
Inclusion
•1st Lift Columns
•Beams, V-Brace, Cross Bracing and Floor Joist
El. +1.15mtrs - +13.80mtrs
Ground Floor, Podest 1, Podest 2, 2nd Floor and 3rd Floor
•2nd Lift Columns
•Beams, V-Brace, Cross Bracing and Floor Joist
El. +13.80mtrs, +26.30mtrs
4th Floor, 5th Floor and 6th Floor