Dear Sir,
This is with reference to the received data and telephonic confirmation regarding data from your end.
We have prepared the IFA drawing of VUP at Ch. 33+990 for Madgaon Bypass project. Please note
that, as per your confirmation, the RHS side RE wall has been designed as full height submerge wall and
LHS side RE wall has been designed as submerged with 3.50m surcharge RE wall.
Please find enclosed 3 sets of IFA drawings of VUP at CH.33+990 for onward submission to
client/consultant for approval.
S. No. Drawing Number Sheet No. Date Rev. No.
1 TAInd-W/22979/33990/PLAN-01 01 0F 01 10-02-2023 00
2 TAInd-W/22979/33990/GA-01 01 TO 06 10-02-2023 00
3 TAInd-W/22979/33990/GA-02 01 TO 04 10-02-2023 00
4 TAInd-W/22979/33990/GA-03 01 TO 06 10-02-2023 00
5 TAInd-W/22979/33990/GA-04 01 TO 05 10-02-2023 00
6 TAInd-W/22979/33990/WW-01 01 0F 01 10-02-2023 00
7 TAInd-W/22979/33990/DET-01 01 TO 03 10-02-2023 00
8 TAInd-W/22979/33990/DS-01 01 TO 03 10-02-2023 00
9 TAInd-W/22979/33990/DS-02 01 TO 02 10-02-2023 00
You are kindly requested to send us one approved copy of the same for our record & reference.
Yours faithfully,
For Reinforced Earth India Pvt Ltd
Pramod Karpe
Assistant Manager – Design