FINANCE DEPARTMENT

MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024)


DISTRICT RAWALPINDI
Prepared & Compiled by Haroon Tahir
haroon.aro.fd@gmail.com
TABLE OF CONTENTS
Ch.No. Chapter Page No.
1 Carriage 3 to 20
2 Loading, Unloading & Stacking 21 to 23
3 Earthwork (Excavation & Embankment) 24 to 30
4 Dismantling (Demolition) 31 to 35
5 Mortar. 36 to 37
6 Concrete 38 to 47
7 Brickwork 48 to 53
8 Stone Masonry 54 to 56
9 Roofing 57 to 62
10 Flooring. 63 to 69
11 Surface Rendering 70 to 74
12 Wood Work 75 to 85
13 Painting & Varnishing. 86 to 91
14 Lining of Canals 92 to 93
15 Sheet Piling 94 to 94
16 Protection & Diversion Work 95 to 102
17 Outlets 103 to 104
18 Road & Road Structure 105 to 113
19 Plumbing, Sanitary Installation & Gas Fittings 114 to 122
20 Surface Drainage. 123 to 124
21 Sewerage 125 to 129
22 Sinking of Wells 130 to 132
23 Tubewell & Water Supply 133 to 154
24 Electric Installation 155 to 193
25 Iron Work 194 to 202
26 Miscellaneous 203 to 207
27 Heating Ventilation & Air Conditioning (HVAC) 208 to 213
1. CARRIAGE
Note: 1 The rates are applicable to carriage of material on pacca roads only.
For kacha roads an allowance of 25% extra shall be allowed for 2nd and subsequent mileage (Km) rates. Rate
upto 1st mile (1st Km) is however common to both kacha and pacca roads.

Note: 2 For hilly areas 80% above the rates in the plain areas shall be allowed for total mileage (Km) covered.

Note: 3 In case of articles longer than 15 ft. (4.6 m) carried in trucks, the following rates shall be allowed:-

i) Above 15 ft. to 25 ft. (4.6 to 7.6 m) :- Total rates to be paid for 15 ft. to 25 ft. (4.6 to 7.6 m) length will be 1.5 times of the
rate given in the Composite Schedule of Rates.

ii) Above 25 ft. (7.6 m) :- The total rate to be paid for above 25 ft. (7.6 m) length will be 2 times of the rate given in the
Composite Schedule of Rates.

The length measured shall not be the actual length, but the length of the form of consignment as actually
received.

Note: 4 The term 'mile' (Km) whenever used is to mean statute mile (Km).

Note: 5 The rates include loading and unloading of material from the conveyance and stacking as directed.

Note: 6 The rates for carriage by boat or steamer shall be the same as by any other mechanical means on land.
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite
1 Carriage of 100 Cft. (2.83 cu.m) of all materials like stone 16.1 Add 20% extra for the item
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or "Recouping of Reserve Stock of stone
150 Cft. (4.25 cu.m) of timber, by truck or by any other for Flood Protection Work in
means owned by the contractor. Irrigation Department".
1st chain (1st 30 m) Chain 431.50 30M 431.50
2nd chain (2nd 30 m) Chain 79.10 30M 79.10
3rd to 10th chain (60 to 300 m) Chain 49.35 30M 49.35
1000 to 3000 ft. (300 to 900 m) 1000 ft. 484.75 300 M 484.75
1st Km Km 362.90
2nd Km Km 173.15
3rd Km Km 135.80
4th Km Km 96.75
5th Km Km 90.35
6th Km Km 88.90
7th Km Km 82.95
8th Km Km 82.05
9th Km Km 77.15
10th Km Km 72.40
11th Kms to 200Kms Km 63.50
201 Kms to 250 Kms Km 3.30
251 Kms & susequent Kms Km 2.10

Chap-1 (Carriage) Page 3


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite
2 Carriage of 5 tons of all material like coal, stone lime 16.1 Cement carried in containers other
(unslaked), etc. B.G. Rail fastenings, points and crossing, than bags will be paid according to
Bridge Girders, pipes, sheets, Rail, M.S. bars, etc. etc. this item. The word "pipes" covers
by truck or any other means owned by the contractor. G.I,C.I,R.C.C. and P.C.C.
1st chain (1st 30 m) Chain 431.50 30M 431.50
2nd chain (2nd 30 m) Chain 79.10 30M 79.10
3rd to 10th chain (60 to 300 m) Chain 49.35 30M 49.35
1000 to 3000 ft. (300 to 900 m) 1000 Ft. 484.75 300M 484.75
1st Km Km 362.90
2nd Km Km 173.15
3rd Km Km 135.80
4th mile
1st Km Mile 584.00 Km 96.75
5th
2ndKm
mile 154.30 Km 90.35
6th Km
3rd mile Mile 141.55 Km 88.90
7th
4th Km
mile 130.30 Km 82.95
8th
5th Km
mile 121.20 Km 82.05
9th mile
6th Km 114.10 Km 77.15
10th
1 Km 80.40 Km 72.40
11th Kms to 200Kms Km 63.50
201 Kms to 250 Kms Km 3.30
251 Kms & susequent Kms Km 2.10
3 Carriage of 100 maunds of fuel wood by truck 16.1
or any other means owned by the contractor:
1st chain (1st 30 m) Chain 431.50 30 M 431.50
2nd chain (2nd 30 m) Chain 79.10 30 M 79.10
3rd to 10th chain (60 to 300 m) Chain 49.35 30 M 49.35
1000 to 3000 ft. (300 to 900 m) 1000 ft 484.75 300 M 484.75
1st Km Km 362.90
2nd Km Km 173.15
3rd Km Km 135.80
4th mile
1st Km Mile 584.00 Km 96.75
5th
2ndKm
mile 154.30 Km 90.35
6th
3rd Km
mile 141.55 Km 88.90
7th mile
4th Km 130.30 Km 82.95
8th
5th Km
mile 121.20 Km 82.05
9th Km Km 77.15
6th mile 114.10
10th Kmand subsequent miles Km 72.40
7th mile 80.40
11th & subsequent Kms Km 63.50

Chap-1 (Carriage) Page 4


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite
4 Carriage of 1000 Nos. bricks 10"x5"x3" (250x125x75 mm) ditto Reduce the rate by 33% in case of
or 1000 Nos. tiles 12"x6"x2" (300x150x50 mm) by truck or carriage of 1000 Nos. tiles size
any other means owned by the contractor :- 12"x6"x1¼" (300 x 150 x 30 mm).
1st chain (1st 30 m) Chain 431.50 30 M 431.50
2nd chain (2nd 30 m) Chain 79.10 30 M 79.10
3rd to 10th chain (60 to 300 m) Chain 49.35 30 M 49.35
1000 to 3000 ft. (300 to 900 m) 1000 Ft 484.75 300 M 484.75
1st Km Km 362.90
2nd Km Km 173.15
3rd Km Km 135.80
4th mile
1st Km Mile 584.00 Km 96.75
5th
2ndKm
mile 154.30 Km 90.35
6th Km
3rd mile 141.55 Km 88.90
7th
4th Km
mile 130.30 Km 82.95
8th mile
5th Km 121.20 Km 82.05
9th
6th Km
mile 114.10 Km 77.15
10th Kmand subsequent miles
7th mile 80.40 Km 72.40
11th & subsequent Kms Km 63.50
5 Carriage of 100 cft. (2.83 cu.m) of all material like stone, 16.1 Material trolly to be supplied by the
aggregate, spawl, kankar lime(unslaked), surkhi, etc. or Government and maintained and run
150 cft. (4.25 cu.m) of timber, by means of material trolly. by the contractor.
1st chain (1st 30 m) Chain 431.50 30 M 431.50
2nd chain to 10th chain (2nd 30 m to 300 m) Chain 79.10 30 M 79.10
1000 to 3000 ft. (300 to 900 m) 1000 Ft. 484.75 300 M 484.75
1st Km Km 297.60
2nd Km Km 230.35
3rd Km Km 127.35
4th mile
1st Km Mile 478.95 Km 101.50
5th
2ndKm
mile 185.15 Km 90.00
6th
3rd Km
mile 159.90 Km 86.55
7th Km Km 73.45
8th Km Km 72.65
9th
6th Km
mile 114.10 Km 68.30
10th Km and subsequent miles
7th mile 80.40 Km 64.10
11th Kms to 200Kms Km 58.05
201 Kms to 250 Kms Km 3.30
251 Kms & susequent Kms Km 2.10
6 Carriage of 5 tons of all material like coal, stone lime 16.1 Material trolly to be supplied by the
(unslaked), etc. B.G. Rail fastening, points and crossing, Government and maintained and run
Bridge girders, pipes, sheets, Rail, M.S. bars, etc. etc. by by the contractor.
means of material trolly.
1st chain (1st 30 m) Chain 431.50 30 M 431.50
2nd chain (2nd 30 m) Chain 79.10 30 M 79.10
1000 to 3000 ft. (300 to 900 m) 1000 Ft. 484.75 300 M 484.75

Chap-1 (Carriage) Page 5


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite
1st Km Km 297.60
2nd Km Km 230.35
3rd Km Km 127.35
4th Km Km 101.50
5th Km Km 90.00
6th Km
3rd mile and subsequent miles 159.9 Km 86.55
7th
4th Km
mile 130.30 Km 73.45
8th Km Km 72.65
9th Km Km 68.30
10th Km q Km 64.10
11th Kms to 200Kms Km 58.05
201 Kms to 250 Kms Km 3.30
251 Kms & susequent Kms Km 2.10
7 Carriage of 100 maunds of fuel wood, by means of ditto Material trolly to be supplied
material trolly. by the Government and
1st chain (1st 30 m) Chain 431.50 30 M 431.50 maintained and run by the
2nd chain (2nd 30 m) Chain 79.1 30 M 79.10 contractor.
1000 to 3000 ft. (300 to 900 m) 1000 Ft 484.75 300 M 484.75
1st Km Km 297.60
2nd Km Km 230.35
3rd Km Km 127.35
4th Km
1st mile Mile 478.95 Km 101.50
5th
2ndKm
mile 185.15 Km 90.00
6th Km q Km 86.55
7th Km Km 73.45
4th mile 130.30
8th
5th Km
mile 121.20 Km 72.65
9th
6th Km
mile 114.10 Km 68.30
10th Km and subsequent miles
7th mile 80.40 Km 64.10
11th & subsequent Kms Km 58.05
8 Carriage of 1000 Nos. tiles 12"x6"x2" (300x150x50 mm), ditto Material trolly to be supplied by the
by means of material trolly. Government and maintained and run
1st chain (1st 30 m) Chain 431.50 30 M 431.50 by the contractor.
2nd chain (2nd 30 m) Chain 79.10 30 M 79.10
1000 to 3000 ft. (300 to 900 m) 1000 Ft 484.75 300 M 484.75
1st Km Km 297.60
2nd Km Km 230.35 16.1
3rd Km Km 127.35
4th mile
1st Km Mile 478.95 Km 101.50
5th
2ndKm
mile 185.15 Km 90.00
6th Km q Km 86.55
7th
4th Km
mile 130.30 Km 73.45
8th.
5th mile 121.20 Km 72.65
9th Km Km 68.30

Chap-1 (Carriage) Page 6


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite
6th mile 114.10
10th Km and subsequent miles
7th mile 80.40 Km 64.10
11th & subsequent Kms Km 58.05
9 Carriage of 1000 No. bricks, 9"x4½"x3" ditto
(225x113x75 mm) or 8"x4"x4" (200x100x100
mm) (nominal)
1st chain (1st 30 m) Chain 353.54 30 M 353.54
2nd chain (2nd 30 m) Chain 77.65 30 M 77.65
3rd to 10th chain (60 to 300 m) Chain 40.50 30 M 40.50
1000 to 3000 ft. (300 to 900 m) 1000 Ft 396.87 300 M 396.87
1st Km Km 297.50
2nd Km Km 141.60
3rd Km Km 111.20
4th mile
1st Km Mile 478.75 Km 79.80
5th
2ndKm
mile 126.45 Km 76.30
6th Km
3rd mile 119.75 Km 74.60
7th
4th Km
mile 106.80 Km 67.95
8th
5th Km
mile 99.30 Km 67.20
9th Km Km 63.15
6th mile 93.45
10thmile
7th Kmand subsequent miles 65.95 Km 59.25
11th & subsequent Kms Km 51.90
10 Carriage of 1000 No. tiles 9"x4½"x1½" 16.1
(225x113x38 mm).
1st chain (1st 30 m) Chain 213.37 30 M 213.37
2nd chain (2nd 30 m) Chain 39.07 30 M 39.07 16.1
3rd to 10th chain (60 to 300 m) Chain 24.21 30 M 24.21
1000 to 3000 ft. (300 to 900 m) 1000 Ft 239.75 300 M 239.75
1st Km Km 179.55
2nd Km Km 85.70
3rd Km Km 67.20
4th Km
1st mile Mile 288.95 Km 47.80
5th
2ndKm
mile 76.40 Km 44.40
6th
3rd Km
mile 69.50 Km 43.70
7th
4th Km
mile 64.50 Km 41.05
8th
5th Km
mile 59.90 Km 40.60
9th Km Km 38.15
6th mile 56.50
10th Kmand subsequent miles
7th mile 39.70 Km 35.90
11th & subsequent Kms Km 31.40
11 Carriage of 1 Cwt. (50 Kg) cement in bags. ditto
1st chain (1st 30 m) Chain 8.14 30 M 8.14
2nd chain (2nd 30 m) Chain 0.97 30 M 0.97
3rd to 10th chain (60 to 300 m) Chain 0.47 30 M 0.47
1000 to 3000 ft. (300 to 900 m) 1000 Ft 4.78 300 M 4.78

Chap-1 (Carriage) Page 7


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite
1st mile
1st Km Mile 7.20 Km 4.45
2nd mile
2nd Km 2.40 Km 3.10
3rd
3rd Km
mile subsequent miles 1.25 Km 1.40
4th Km and subsequent kilometers. Km 0.85
12 Carriage of 100 Nos. empty cement bags including 16.1
bundling.
1st 1000 (300 m) ft. 1000 Ft 118.92 300 M 118.92
1000 to 3000 (300 to 900 m) ft. 1000 Ft 14.81 300 M 14.81
1st Km Km 10.95
1st mile Mile 17.60
2nd
2nd Km
mile to 6th mile Mile 1.95 Km 12.95
3rd Km and subsequent miles
7th mile 9.80 Km 5.10
4th Km & subsequent Kms Km 4.95
13 Carriage of 100 (2.83 cu.m) cft. of Sarkanda or pilchi, frash ditto Previous lead of collection not
or brushwood, by boat or road :- to be deducted from the next
lead of carriage.
1st chain (1st 30 m) Chain 176.53 30 M 176.53
2nd chain (2nd 30 m) Chain 79.10 30 M 79.10
3rd to 10th chain (60 to 300 m) Chain 24.21 30 M 24.21
1000 to 3000 ft. (300 to 900 m) 1000 Ft 199.15 300 M 199.15
1st mile
1st Km Mile 256.95 Km 173.55
2nd Km Km 85.70
2nd mile 215.70
3rd
3rd Km
mile 183.90 Km 67.20
4th
4th Km
mile 136.90 Km 47.80
5th
5th Km
mile 115.05 Km 44.40
6th mile
6th Km 93.45 Km 43.70
7th
7th Km
mile and subsequent miles 65.95 Km 41.05
8th Km Km 40.60
9th Km Km 38.15
10th Km Km 35.90
11th Km & subsequent Km 31.40
14 Carriage of light machinery weighing upto 3 tonne Ton Tonne ditto
upto 1000 ft. (300 metre) 1000 Ft 1440.87 300 M 1,440.87
Exceeding 1000 to 5000 ft (300 to 1500metre) 1000 ft. 349.12 300 M 349.12
1st mile
1st Km Mile 574.55 Km 357.05
2nd
2nd Km
Km 168.85
mile 121.95
3rd
3rd Km
mile 117.55 Km 117.60
4th
4th Km
mile 95.90 Km 78.05
5th Km Km 75.00

Chap-1 (Carriage) Page 8


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite
6th mile
6th Km 77.50 Km 72.15
7th
7th Km
mile and subsequent miles 62.90 Km 62.25
8th Km Km 62.05
9th Km Km 61.45
10th Km Km 49.25
11th Km & susequent Km 45.25
15 Carriage of small consignments weighing upto 5 maunds 16.1 For consignment weighing 5 to 10
(job rates) : maunds, rate be increased by 25%;
and for consignments weighing 10
Consig- to 20 maunds, rate be increased by
Upto 1000 ft. (300 metre) ment/ 117.01 Consign- 117.01 100%.
1000 ft. ment/
Exceeding 1000 to 3000 ft. (300 to 900 1000 ft. 80.24 300 M 80.24
metre)
1st Km Consign- 55.90
1st mile Consign- 89.95 ment/ Km
2nd Km ment/Mile ditto 35.55
2nd mile and subsequent miles " 18.90
3rd Km & subsequent ditto 12.45
16 Carriage of consignments job.
i) Cooly load for distance:-
Each Each
a) Upto 5 Km Consignment 117.10 Consignment 117.10
b) Above 5 to 13 Km " 300.90 ditto 300.90
ii) Carriage of consignments odd jobs. Each Each
a) Donkey load for distance upto 500 feet. Consignment 10.85 Consignment 10.85
b) Upto 1000 feet. " 16.45 ditto 16.45
c) Upto ½ Mile/ 0.8 Km " 20.80 ditto 20.80
d) Upto one Mile/ 1.6 Km " 26.00 ditto 26.00
e) Upto three Miles/ 4.8 Km " 45.95 ditto 45.95
f) Exceeding 3 Miles/ 16 km " 82.25 ditto 82.25
Each Each
iii) Cart load for a distance :- Consign- Consig-
ment nment
a) upto 4 Miles/ 6.4 Km " 89.85 ditto 89.85
b) Exceeding 4 Miles(6.4 Km) to10 Miles(16 Km) " 163.55 ditto 163.55
iv) Camel load for a distance:-
a) upto 4 Miles/ 6.4 Km.) " 66.45 ditto 66.45
b) exceeding 4 to 12 mills (6.4 Km to 19.2 Km) " 100.75 ditto 100.75
17 Hire charges of:- 1. This item will be allowed with
prior concurrence of Superintending
i) truck (10 Ton Capacity) Per day 4000.00 Per day 4,000.00 Engineer.
2. The rate includes pay of driver

Chap-1 (Carriage) Page 9


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite
ii) tractor with trolly Per day 12960.00 Per day 1,000.00 and cleaner only. The repairs shall
be the responsibility of the owner
iii) tractor without trolly Per day 12960.00 Per day 800.00 and the cost of lubrication, fuel,
loading and unloading shall be paid
by the borrower.
18 Carriage of bitumen, tar or other lubricants, in drums: 16.1
0 Kilometer to 100 Kilometers Per Ton 1,284.55
0 Kilometer to 200 Kilometers Per Ton 1,672.35
0 Kilometer to 250 Kilometers Per Ton 95.80 Per Ton 1,942.35
251 to susequent Kilometers
2nd mile 18.00 Per Ton 17.80
3rd mile 29.40
19 Carriage of Asbestos cement pipes BSS Class 'B" with
comet joint and rubber ring, including loading, unloading
and stacking (rate per 100 Rft. (30 m pipes):-
i) 3" (75 mm) i/d pipes:-
1st chain (1st 30 m) Chain 17.05 30 M 17.05
2nd chain (2nd 30 m) Chain 3.10 30 M 3.10
3rd to 10th chain (60 to 300 m) Chain 1.95 30 M 1.95
1000 to 3000 ft. (300 to 900 m) 1000 ft. 19.15 300 M 19.15
1st Km Km 14.30
2nd Km Km 6.80
3rd Km Km 5.35
1st mile Mile 23.05
4th
2ndKmmile 6.10 Km 3.80
5th
3rd Km
mile 5.60 Km 3.55
6th Km
4th mile 5.15 Km 3.45
7th
5th Km
mile 4.80 Km 3.25
8th
6th Km
mile 4.50 Km 3.15
9th
7th Km
mile and subsequent miles 3.15 Km 3.05
10th Km Km 2.85
11th Km & Susequent Km 2.75
ii) 4" (100 mm) i/d pipes:-
1st chain (1st 30 m) Chain 22.30 30 M 22.30
2nd chain (2nd 30 m) Chain 4.10 30 M 4.10
3rd to 10th chain (60 to 300 m) Chain 2.55 30 M 2.55
1000 to 9000 ft. (300 to 900 m) 1000 ft. 25.05 300 M 25.05
1st Km Km 18.75
1st mile Mile 30.20
2nd
2nd Km
mile 8.00 Km 8.90
3rd
3rd Km
Km 7.00
mile 7.30
4th Km
4th mile 6.75 Km 4.95
5th
5t Kme 6 5 Km 4.65

Chap-1 (Carriage) Page 10


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite
6th
6th Km
mile 5.90 Km 4.50
7th Km Km 4.25
7th mile and subsequent miles 4.15
8th Km Km 4.15
9th Km Km 3.95
10th Km Km 3.70
11th Km & subsequent Km Km 3.60
iii) 6" (150 mm) i/d pipes:-
1st chain (1st 30 m) Chain 33.45 30 M 33.45
2nd chain (2nd 30 m) Chain 6.15 30 M 6.15
3rd to 10th chain (60 to 300 m) Chain 3.85 30 M 3.85
1000 to 9000 ft. (300 to 900 m) 1000 ft. 37.60 300 M 37.60
1st Km Km 28.15
2nd Km Km 13.40
3rd Km Km 10.50
1st mile Mile 45.30
4th
2ndKmmile 11.95 Km 7.50
5th
3rd Km
mile 11.00 Km 7.00
6th Km
4th mile 10.10 Km 6.90
7th Km Km 6.40
5th mile 9.40
8th
6th Km
mile 8.85 Km 6.25
9th Km Km 5.95
7th mile and subsequent miles 6.25
10th Km Km 5.60
11th Km & subsequent Km Km 5.15
iv) 8" (200 mm) i/d pipes:
1st chain (1st 30 m) Chain 56.65 30 M 56.65
2nd chain (2nd 30 m) Chain 10.40 30 M 10.40
3rd to 10th chain (60 to 300 m) Chain 6.50 30 M 6.50
1000 to 3000 ft. (300 to 900 m) 1000 ft. 63.60 300 M 63.60
1st Km Km 47.65
2nd Km Km 23.95
3rd Km
1st mile Mile 76.65 Km 18.15
4th
2ndKm
mile 20.25 Km 12.90
5th Km
3rd mile 18.55 Km 12.05
6th
4th Km
mile 17.10 Km 11.85
7th
5th Km
mile 15.90 Km 11.10
8th
6th Km
mile 14.95 Km 10.85
9th mile
7th Km and subsequent miles 10.55 Km 9.35
10th Km Km 2.65
11th Km & subsequent Km Km 2.40
v) 10" (250 mm) i/d pipes:-
1st chain (1st 30 m) Chain 76.1 30 M 76.10
2nd chain (2nd 30 m) Chain 13.95 30 M 13.95

Chap-1 (Carriage) Page 11


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite
3rd to 10th chain (60 to 300 m) Chain 8.70 30 M 8.70
1000 to 3000 ft. (300 to 900 m) 1000 ft. 85.50 300 M 85.50
1st Km Km 64.00
2nd Km Km 30.45
3rd Km
1st mile Mile 103.00 Km 23.85
4th
2ndKm
mile 27.20 Km 16.95
5th Km
3rd mile 24.95 Km 15.80
6th
4th Km
mile Mile 23.00 Km 15.55
7th mile
5th Km 21.40 Km 14.80
8th
6th Km
mile 20.10 Km 14.60
9th
7th Km
mile and subsequent miles 14.20 Km 13.75
10th Km Km 12.90
11th Km & subsequent Kms Km 11.25
vi) 12" (300 mm) i/d pipes:
1st chain (1st 30 m) Chain 98.95 30 M 98.95
2nd chain (2nd 30 m) Chain 18.15 30 M 18.15
3rd to 10th chain (60 to 300 m) Chain 11.30 30 M 11.30
1000 to 3000 ft. (300 to 900 m) 1000 ft. 111.20 300 M 111.20
1st Km Km 83.25
2nd Km Km 40.55
3rd Km Km 31.40
4th mile
1st Km Mile 133.95 Km 22.05
5th Km Km 20.55
2nd mile 35.40
6th Km Km 20.25
7th
4th Km
mile 29.90 Km 18.90
8th
5th Km
mile 27.80 Km 18.70
9th
6th Km
mile 26.15 Km 17.55
10th Kmand subsequent miles
7th mile 18.45 Km 16.45
11th Km & subsequent Kms Km 14.55
vii) 16" (400 mm) i/d pipes:-
1st chain (1st 30 m) Chain 162.20 30 M 162.20
2nd chain (2nd 30 m) Chain 29.75 30 M 29.75
3rd to 10th chain (60 to 300 m) Chain 18.55 30 M 18.55
1000 to 3000 ft. (300 to 900 m) 1000 ft. 182.25 300 M 182.25
1st Km Km 136.45
2nd Km Km 65.30
3rd Km Km 51.00
1st mile Mile 219.55
4th
2ndKmmile 58.00 Km 36.35
5th
3rd Km
mile 53.20 Km 33.95
6th Km Km 33.35

Chap-1 (Carriage) Page 12


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite
7th
5th Km
mile 45.55 Km 31.15
8th
6th Km
mile 42.90 Km 30.80
9th
7th Km
mile and subsequent miles 30.20 Km 28.95
10th Km Km 27.20
11th Km & subsequent Kms Km 23.90
viii) 18" (450 mm) i/d pipes:-
1st chain (1st 30 m) Chain 208.45 30 M 208.45
2nd chain (2nd 30 m) Chain 38.20 30 M 38.20
3rd to 10th chain (60 to 300 m) Chain 23.85 30 M 23.85
1000 to 3000 ft. (300 to 900 m) 1000 ft. 234.15 300 M 234.15
1st Km Km 175.35
2nd Km Km 83.65
3rd Km Km 65.60
1st mile Mile 282.15
4th Km Km 46.75
2nd mile 74.55
5th Km Km 43.65
3rd mile 68.35
6th Km Km 42.95
4th mile 62.95
7th Km Km 40.10
5th mile 58.55
8th
6th Km
mile 55.10 Km 39.65
9th
7th Km
mile and subsequent miles 38.85 Km 37.25
10th Km Km 34.95
11th Km & subsequent Kms Km 30.60
ix) 20" (500 mm) i/d pipes:-
1st chain (1st 30 m) Chain 221.25 30 M 221.25
2nd chain (2nd 30 m) Chain 40.55 30 M 40.55
3rd to 10th chain (60 to 300 m) Chain 25.30 30 M 25.30
1000 to 3000 ft. (300 to 900 m) 1000 ft. 248.60 300 M 248.60
1st Km Km 186.10
2nd Km Km 88.75
3rd Km
1st mile Mile 299.50 Km 69.65
4th Km Km 49.60
2nd mile 79.15
5th
3rd Km
mile 72.60 Km 46.35
6th Km Km 45.55
4th mile 66.80
7th
5th Km
mile 62.15 Km 42.50
8th
6th Km
mile 58.50 Km 42.05
9th
7th Km
mile and subsequent miles 41.20 Km 39.55
10th Km Km 37.10
11th Km & subsequent Kms Km 32.65

Chap-1 (Carriage) Page 13


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite
x) 24" (600 mm) i/d pipes:-
1st chain (1st 30 m) Chain 245.15 30 M 245.15
2nd chain (2nd 30 m) Chain 44.95 30 M 44.95
3rd to 10th chain (60 to 300 m) Chain 28.05 30 M 28.05
1000 to 5000 ft. (300 to 1500 m) 1000 ft. 275.40 300 M 275.40
1st Km Km 206.20
2nd Km Km 98.30
3rd Km
1st mile Mile 331.80 Km 77.10
4th Km Km 55.45
2nd mile 87.65
5th
3rd Km
mile 80.40 Km 51.25
6th
4th Km
mile Mile 74.05 Km 50.45
7th Km Km 47.10
5th mile 68.90
8th Km Km 46.60
9th Km Km 43.80
7th mile and subsequent miles 45.70
10th Km Km 41.10
11th Km & subsequent Kms Km 36.00
20 Carriage of PVC pipes B.S.S. Class 'B' including loading,
unloading and stacking (Rate per 1000 ft.) (300 metre) :-
i) 3" (75 mm) i/d pipes:-
1st chain (1st 30 m) Chain 33.40 30 M 33.40
2nd chain (2nd 30 m) Chain 6.10 30 M 6.10
3rd to 10th chain (60 to 300 m) Chain 3.80 30 M 3.80
1000 to 3000 ft. (300 to 900 m) 1000 ft. 37.50 300 M 37.50
1st Km Km 28.10
2nd Km Km 13.40
3rd Km
1st mile Mile 45.20 Km 10.50
4th Km Km 7.50
5th
3rd Km
mile 10.95 Km 7.00
6th Km
4th mile 10.10 Km. 6.85
7th Km Km 6.40
5th mile Mile 9.40
8th
6th Km
mile 8.85 Km 6.35
9th Km Km 5.95
7th mile and subsequent miles 6.20
10th Km Km 5.60
11th Km & subsequent Kms Km 5.10
ii) 4" (100 mm) i/d pipes:-
1st chain (1st 30 m) Chain 51.45 30 M 51.45
2nd chain (2nd 30 m) Chain 9.45 30 M 9.45
3rd to 10th chain (60 to 300 m) Chain 5.90 30 M 5.90
1000 to 3000 ft. (300 to 900 m) 1000 ft. 57.80 300 M 57.80
1st Km Km 43.25
2nd Km Km 20.80

Chap-1 (Carriage) Page 14


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite
3rd Km
1st mile Mile 69.60 Km 16.20
4th Km
2nd mile 18.40 Km 11.45
5th Km
3rd mile 16.85 Km 10.70
6th Km
4th mile 15.55 Km 10.50
7th Km Km 9.80
5th mile 14.45
8th Km Km 9.70
6th mile 13.60
9th
7th Km
mile and subsequent miles 9.60 Km 9.10
10th Km Km 8.55
11th Km & subsequent Kms Km 7.95
iii) 5" (125 mm) i/d pipes:-
1st chain (1st 30 m) Chain 70.20 30 M 70.20
2nd chain (2nd 30 m) Chain 12.85 " 12.85
3rd to 10th chain (60 to 300 m) Chain 8.05 " 8.05
1000 to 3000 ft. (300 to 900 m) 1000 ft. 78.85 300 M 78.85
1st Km Km 59.05
2nd Km " 28.30
3rd Km " 22.25
1st mile Mile 95.00
4th Km
2nd mile 25.10 " 15.90
5th
3rd Km
mile 23.00 Km. 14.60
6th
4th Km
mile Mile 21.20 " 14.40
7th
5th Km
mile 19.70 " 13.45
8th
6th Km
mile 18.55 13.30
9th
7th Km
mile and subsequent miles 13.10 12.45
10th Km 11.70
11th Km & subsequent Kms 10.30
iv) 6" (150 mm) i/d pipes:
1st chain (1st 30 m) Chain 96.75 30 M 96.75
2nd chain (2nd 30 m) Chain 17.75 30 M 17.75
3rd to 10th chain (60 to 300 m) Chain 11.05 30 M 11.05
1000 to 3000 ft. (300 to 300 m) 1000 ft. 108.70 300 M 108.70
1st Km. Km. 81.35
2nd Km Km. 38.80
3rd Km
1st mile Mile 130.95 Km. 30.45
4th
2ndKm
mile 34.60 Km. 21.70
5th Km
3rd mile 31.75 Km. 20.25
6th
4th Km
mile 29.20 Km. 19.95
7th
5th Km
mile 27.20 Km. 18.60
8th
6th Km
mile 25.60 Km. 18.40
9th
t Kme a d subseque t es 8 00 Km. 17.30

Chap-1 (Carriage) Page 15


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite
10th Km Km. 16.25
11th Km & subsequent Kms Km. 14.25
v) 8" (200 mm) i/d pipes:-
1st chain (1st 30 m) Chain 169.65 30 M 169.65
2nd chain (2nd 30 m) Chain 31.10 30 M 31.10
3rd to 10th chain (60 to 300 m) Chain 19.40 30 M 19.40
1000 to 3000 ft. (300 to 900 m) 1000 ft. 190.60 300 M 190.60
1st Km Km 142.70
2nd Km Km 68.10
3rd Km Km 53.40
1st mile Mile 229.65
4th Km Km 38.05
2nd mile 60.70
5th
3rd Km
mile Mile 55.65 Km 35.55
6th mile
4th Km 51.25 Km 34.95
7th
5th Km
mile 47.65 Km 32.65
8th
6th Km
mile 44.85 Km 32.30
9th Km q Km 30.35
10th Km Km 28.45
11th Km & subsequent Kms Km 24.95
vi) 10" (250 mm) i/d pipes:-
1st chain (1st 30 m) Chain 263.10 30 M 263.10
2nd chain (2nd 30 m) Chain 48.25 30 M 48.25
3rd to 10th chain (60 to 300 m) Chain 30.10 30 M 30.10
1000 to 3000 ft. (300 to 900 m) 1000 ft. 295.55 300 M 295.55
1st Km Km 221.30
2nd Km Km 105.55
3rd Km Km 82.80
1st mile Mile 356.10
4th
2ndKmmile 94.10 Km 59.00
5th
3rd Km
mile 86.30 Km 55.10
6th Km Km 54.20
7th
5th Km
mile 73.90 Km 50.55
8th mile
6th Km 69.55 Km 50.05
9th
7th Km
mile and subsequent miles 49.00 Km 47.05
10th Km Km 44.15
11th Km & subsequent Kms Km 38.75
vii) 12" (300 mm) i/d pipes:-
1st chain (1st 30 m) Chain 370.35 30 M 370.35
2nd chain (2nd 30 m) Chain 67.90 30 M 67.90
3rd to 10th chain (60 to 300 m) Chain 42.40 30 M 42.40
1000 to 3000 ft. (300 to 900 m) 1000 ft. 416.10 300 M 416.10
1st Km Km 311.50
2nd Km Km 148.60

Chap-1 (Carriage) Page 16


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite
3rdmile
1st Km Mile 501.30 Km 116.55
4th Km
2nd mile Mile 132.45 Km 83.05
5th
3rd Km
mile 121.50 Km 77.55
6th Km
4th mile 111.85 Km 76.30
7th Km Km 71.20
5th mile 104.05
8th
6th Km
mile 97.95 Km 70.45
9th Km q Km 66.20
10th Km Km 62.10
11th Km & subsequent Kms Km 54.60
viii) 14" (350 mm) i/d pipes:-
1st chain (1st 30 m) Chain 482.10 30 M 482.10
2nd chain (2nd 30 m) Chain 88.40 30 M 88.40
3rd to 10th chain (60 to 300 m) Chain 55.15 30 M 55.15
1000 to 3000 ft. (300 to 900 m) 1000 ft. 541.60 300 M 541.60
1st Km Km 405.45
2nd Km Km 193.40
3rd Km
1st mile Mile 652.50 Km 151.70
4th
2ndKm
mile 172.40 Km 108.05
5th Km
3rd mile 158.15 Km 100.95
6th
4th Km
mile Mile 145.60 Km 99.30
7th
5th Km
mile 135.45 Km 92.70
8th Km Km 91.70
9th
7th Km
mile and subsequent miles 89.80 Km 86.20
10th Km Km 80.90
11th Km & subsequent Kms Km 71.10
21 Carriage of PVC pipes B.S.S. Class 'D' including loading,
unloading and stacking (Rates per 1000 ft.):-
i) 2" (50 mm) i/d pipes:-
1st chain (1st 30 m) Chain 24.40 30 M 24.40
2nd chain (2nd 30 m) Chain 4.50 30 M 4.50
3rd to 10th chain (60 to 300 m) Chain 2.80 30 M 2.80
1000 to 3000 ft. (300 to 900 m) 1000 ft. 27.45 300 M 27.45
1st Km Km 20.55
2nd Km Km 9.80
3rd Km
1st mile Mile 33.05 Km 7.70
4th Km Km 5.45
5th
3rd Km
mile 8.00 Km 5.10
6th
4th Km
mile 7.35 Km 5.00
7th Kme
5t 6 85 Km 4.70

Chap-1 (Carriage) Page 17


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite
8th
6th Km
mile 6.45 Km 4.60
9th
7th Km
mile and subsequent miles 4.55 Km 4.35
10Km Km 4.10
11th Km & subsequent Kms Km 3.60
ii) 2½" (63 mm) i/d pipes:-
1st chain (1st 30 m) Chain 38.00 30 M 38.00
2nd chain (2nd 30 m) Chain 6.95 30 M 6.95
3rd to 10th chain (60 to 300 m) Chain 4.35 30 M 4.35
1000 to 3000 ft. (300 to 900 m) 1000 ft. 42.65 300 M 42.65
1st Km Km 31.95
2nd Km Km 15.30
3rd Km
1st mile Mile 51.40 Km 12.00
4th
2ndKm
mile 13.60 Km 8.55
5th Km
3rd mile 12.45 Km 8.00
6th
4th Km
mile 11.45 Km 7.85
7th
5th Km
mile 10.65 Km 7.35
8th
6th Km
mile 10.05 Km 7.05
9th
7th Km
mile and subsequent miles 7.10 Km 6.70
10Km Km 6.30
11th Km & subsequent Kms Km 5.65
iii) 3" (75 mm) i/d pipes:-
1st chain (1st 30 m) Chain 52.65 30 M 52.65
2nd chain (2nd 30 m) Chain 9.65 30 M 9.65
3rd to 10th chain (60 to 300 m) Chain 6.00 30 M 6.00
1000 to 3000 ft. (300 to 900 m) 1000 ft. 59.15 300 M 59.15
1st Km Km 44.30
2nd Km Km 21.15
3rdmile
1st Km Mile 71.25 Km 16.55
4th
2ndKm
mile 18.80 Km 11.80
5th
3rd Km
mile 17.25 Km 11.05
6th
4th Km
mile 15.90 Km 10.85
7th
5th Km
mile Mile 14.80 Km 10.15
8th
6th Km
mile 13.90 Km 10.05
9th Km Km 9.35
7th mile and subsequent miles 9.80
10th Km Km 8.75
11th Km & subsequent Kms Km 7.75

Chap-1 (Carriage) Page 18


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite
iv) 4" (100 mm) i/d pipes:-
1st chain (1st 30 m) Chain 87.10 30 M 87.10
2nd chain (2nd 30 m) Chain 15.95 30 M 15.95
3rd to 10th chain (60 to 300 m) Chain 9.95 30 M 9.95
1000 to 3000 ft. (300 to 900 m) 1000 ft. 97.85 300 M 97.85
1st Km Km 73.25
2nd Km Km 34.95
3rd Km Km 27.40
1st mile Mile 117.90
4th
2ndKmmile 31.15 Km 19.55
5th
3rd Km
mile 28.60 Km 18.25
6th
4th Km
mile 26.30 Km 17.95
7th
5th Km
mile 24.50 Km 16.80
8th Km Km 16.55
6th mile 23.05
9th
7th Km
mile and subsequent miles 16.25 Km 15.55
10th Km Km 14.55
11th Km & subsequent Kms Km 12.95
v) 5" (125 mm) i/d pipes:-
1st chain (1st 30 m) Chain 130.20 30 M 130.20
2nd chain (2nd 30 m) Chain 23.85 30 M 23.85
3rd to 10th chain (60 to 300 m) Chain 14.90 30 M 14.90
1000 to 3000 ft. (300 to 900 m) 1000 ft. 146.25 300 M 146.25
1st Km Km 109.50
2nd Km Km 52.25
3rd Km Km 40.95
1st mile Mile 176.20
4th
2ndKmmile 46.55 Km 29.20
5th
3rd Km
mile 42.70 Km 27.25
6th Km
4th mile 39.30 Km 26.80
7th
5th Km
mile 36.60 Km 25.00
8th Km Km 24.75
6th mile 34.45
9th Km Km 23.30
7th mile and subsequent miles 24.25
10th Km Km 21.75
11th Km & subsequent Kms Km 19.30
vi) 6" (150 mm) i/d pipes:-
1st chain (1st 30 m) Chain 187.60 30 M 187.60
2nd chain (2nd 30 m) Chain 34.40 30 M 34.40
3rd to 10th chain (60 to 300 m) Chain 21.45 30 M 21.45
1000 to 3000 ft. (300 to 900 m) 1000 ft. 210.75 300 M 210.75
1st Km Km 157.75
2nd Km Km 75.25

Chap-1 (Carriage) Page 19


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite
3rd Km
1st mile Mile 253.90 Km 59.05
4th Km
2nd mile 67.10 Km 42.05
5th Km
3rd mile 61.55 Km 39.30
6th Km
4th mile 56.65 Km 38.65
7th
5th Km
mile 52.70 Km 36.05
8th
6th Km
mile 49.60 Km 35.65
9th mile
7th Km and subsequent miles 34.95 Km 33.55
10th Km Km 31.45
11th Km & subsequent Kms Km 27.70
22 Hand shunting loaded Railway wagons or
trucks:-
a) upto ¼ mile / ¼ Km Each 533.50 Each 333.45
b) upto ½ mile / ½ Km No 965.80 No 603.65
c) upto ¾ mile / ¾ Km " 1303.90 " 814.95
d) upto 1 (1.6 Km) mile " 1551.60 " 969.75
e) 2nd mile and subsequent miles/ Each Each
2nd and subsequent kilometres No/Mile 1030.65 No/Km 644.15
23 Hand shunting empty Railway wagons or trucks.

a) upto ¼ mile / ¼ Km Each 309.45 Each 193.40


b) upto ½ mile / ½ Km No. 512.80 No. 320.50
c) upto ¾ mile / ¾ Km " 676.20 " 422.65
d) upto 1 mile / 1 Km " 811.65 " 507.30
e) 2nd mile and subsequent miles/ Each Each
2nd and subsequent kilometres No/Mile 506.05 No/Km 316.30

Chap-1 (Carriage) Page 20


2. LOADING, UNLOADING & STACKING
1 The rate for loading into and unloading from mobile trucks, trollies and boats, etc. will be the same as for Railway wagons.

MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (Metric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

1 Loading or unloading into or from Railway wagons, lead 100 Cft. 1504.80 P.Cu.m 531.50
within one chain, (30m) shingle, sand, ballast, surkhi, ashes,
kankar, brick bats, coal, lime or 1,000 Nos. tiles size
12"x6"x2" (300x150x50 mm) or 9"x4½"x1½"
(225x113x37mm) properly laid & stacked.
2 Loading or unloading bricks into or from Railway wagons
laid and stacked, lead within one chain:-
a) Bricks 10" (250 mm) size. 1000 Nos. 1881.00 1000 Nos. 1881.00
b) Bricks 9" (225 mm) or smaller size. 1000 Nos. 1504.80 1000 Nos. 1504.80
3 Loading or unloading into or from Railway wagons cement 100 Bags 1881.00 100 Bags 1881.00
in bags (from inside or outside the godown) and stacking
within one chain (30 m)
4 Loading or unloading into or from Railway wagons empty 100 Nos. 180.60 100 Nos. 180.60
cement bags (from inside or outside the godown) and
stacking.
5 Loading or unloading into or from Railway wagons (from 100 Mds. 1128.60 100 Kg 30.25
inside or outside the godown) and stacking, white lime in
bags.
6 Loading or unloading into or from Railway wagons Per 902.90 Per 888.60
Structural Steel, R.S. joists, broad, narrow or meter gauge Tonne Tonne
rail and rail fastenings, etc.
7 Loading or unloading 45 gallon (204.57 Litres) drums full Each 112.85 Each 112.85
into or from Railway wagons, lead upto one chain.
8 Loading or unloading packages of all sorts, upto one Cwt Each 56.45 Each 56.45 Except cement in jute or
(50 Kg). paper bags.
9 Loading or unloading sleepers other than wooden,
including stacking lead within one chain:-
a) Broad gauge sleepers 100 Nos. 3762.00 100 Nos. 3762.00
b) Metre gauge and narrow gauge sleepers. 100 Nos. 1881.00 100 Nos. 1881.00
10 Loading or unloading timber logs or timber for shuttering, Per 470.25 Per 462.8
into or from Railway wagons of any gauge, including Ton Tonne
stacking lead within one chain (30 m)
11 Loading or unloading bhoosa in Railway wagons lead upto 100 Mds. 4514.4 100 Kg 120.95
150 ft. (45 m)
12 Loading or unloading timber scrap or wooden plugs, into or Per 752.40 Per 740.50
from Railway wagons, and stacking within one chain lead. Ton Tonne

Chap-2 (Loading/Unloading) Page 21


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (Metric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

13 Loading or unloading pitching stone or spawl from Railway 100 Cft. 556.80 cu.m 196.65
wagons of any gauge (including clearing 5 ft. (1500 mm)
away from the rail).
14 Loading or unloading building stone (including clearing 5 ft. 100 Cft. 722.30 cu.m 255.10
(1.5 m) away from rails).
15 Unloading oil, bitumen tar, etc.
a) Crude oil (to be pumped from tank wagon into tank). 1000 1881.00 100 41.40
Gallon litres
b) Crude oil (drained by gravity). 1000 1881.00 100 41.40
Gallon litres
c) Crude oil materials from railway wagons. 100 Cft. 240.75 cu.m 85.05
d) Fuel oil from tank into empty drums, including Per 668.80 Per 658.25
stacking within one chain (30 m). Ton Tonne
e) Petrol (2 gallon tin) 100 Nos. 948.00 100 Nos. 948.00 The rate includes checking
and weighing the tins.
f) Kerosene oil (4 gallon tin) 100 Nos. 1881.00 100 Nos. 1881.00
16 Removing and stacking within one chain
(30 m) lead:
a) Stone, spawl, brick bats, shingle, sand, lime, 100 Cft. 752.40 cu.m 265.75
surkhi, ashes, kankar and coat, etc.
b) Bricks. 1000 Nos. 2006.40 1000 Nos. 2006.40
c) Broad gauge wooden sleepers. 100 Nos. 1203.85 100 Nos. 1203.85
d) Metre gauge or narrow gauge wooden sleepers. 100 Nos. 716.55 100 Nos. 716.55
e) Rails girders, pipes, cement etc. Per 334.40 Per 329.10
Ton Tonne
f) Bridge and crossing timbers, etc. 100 No. 4012.80 100 No. 4012.80
17 Loading into wagons girders, rails, permanent way Per 752.40 Per 740.50
material (except wooden sleepers) iron work, M.S. bars, Ton Tonne
pipes, etc. including lead one chain (30 M) and stacking
inside wagons.
18 Unloading from wagons girders, rails, permanent way Per 429.95 Per 423.15
material (except wooden sleepers) iron work, M.S. bars, Ton Tonne
pipes, etc. lead upto one chain (30 m) but excluding
stacking.
19 Loading into wagons wooden broad gauge sleepers, 100 Nos. 3009.60 100 Nos. 3009.60
including one chain (30 m) lead and stacking,.
20 Unloading wooden broad gauge sleepers from wagons, 100 Nos. 1433.15 100 Nos. 1433.15
including one chain (30 m) lead and stacking.
21 Loading metre gauge or narrow gauge wooden sleepers, 100 Nos. 1504.80 100 Nos. 1504.80
including one chain (30 m) lead and stacking inside
wagons.

Chap-2 (Loading/Unloading) Page 22


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (Metric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

22 Unloading metre gauge or narrow gauge wooden sleepers, 100 Nos. 792.00 100 Nos. 792.00
including one chain (30 m) lead but excluding stacking.
23 Loading bridge and crossing timbers, including one chain 100 Nos. 6019.20 100 Nos. 6019.20
(30 m) lead and stacking.
24 Unloading bridge and crossing timbers, including one 100 Nos. 3009.60 100 Nos. 3009.60
chain (30 m) lead but excluding stacking.
25 Loading or unloading bitumen, asphalt or tar in drums, into Per 451.45 Per 444.30
or from railway wagons, lead upto one chain (30 m). Ton Tonne

Chap-2 (Loading/Unloading) Page 23


3. EARTHWORK (EXCAVATION & EMBANKMENT)
1 Special allowances for the hardness, wetness and slush:-
The grant of allowances for hard, very hard, wet and slush will be subject to Superinteding Engineer's approval. Specific instructions regarding grant of such
allowances may be issued by the various Administrative Departments and Statutory Bodies. The earth requiring repeated blows of Kassi to break it and of
which dry bulk density is not less than 1.5, will be treated as hard.
2 Deduction for shrinkage from bank measurements:-
The following allowances should be provided for material which is not rammed, or equally consolidated:-
a) Deduction for shrinkage from the bank measurements when the earthwork is done by manual labour.......... 10%
b) Deduction for settlement from the bank measurement when the earthwork is done by machines................... 3 to 6%

Before the work is let out to be done by tractors, scrapers, etc. deduction ranging between 3% to 6% should be agreed to with the contractors.
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite

1 Earthwork excavation undressed lead upto a single throw 17.1 to 17.5


of Kassi, phaorah or shovel:-
a) In ashes, sand, soft soil or silt clearance. 1000 Cft. 5,643.00 -- Per Cum 199.30 --
b) In ordinary soil. 1000 Cft. 6,771.60 -- Per Cum 239.15 --
2 Earthwork excavation in ashes, sand and soft soil or silt 1000 Cft. 8,276.40 -- Per Cum 292.30 -- 17.1 to 17.5
clearance, undressed lead upto 50 ft (15 metre).
3 Bed clearance and dressing slopes of drains to required 17.1 to 17.5 The rate is applicable where the earth
sections including the removal of weeds, roots, etc. of the bed to be removed is of the
disposal of excavated materials within 50 ft. (15 metre) lead. type of ordinary soil. When it is silt or
a) Excavated material undressed. 1000 Cft. 10,533.60 -- Per Cum 372.05 -- 1 or 2 above, whichever is applicable.
b) Excavated material dressed in the specified manner. 1000 Cft. 11,375.75 -- Per Cum 401.80 -- the drains of each category.
4 Borrowpit excavation undressed lead upto 100 ft (30 metre).
a) Ordinary soil 1000 Cft. 10,533.60 - Per Cum 372.05 -
b) Hard soil 1000 Cft. 12,941.30 - Per Cum 457.10 -
5 Earthowrk in ordinary soil for embankments lead upto 100 * 411-1 to The rate includes hire charges of
ft. (30 m), including ploughing and mixing with blade grade 411-13 and machinery, cost of fuel, lubricants, pay
or disc harrow or other suitable equipment, and 301-1 & of driver and cleaner. The rate also
compaction by mechanical means at optimum moisture 202-3 includes clearing and grubbing
content and dressing to designed section, complete in all where necessary.
respects:-
i) 95% to 100% maximum modified AASHTO dry density. 1000 Cft. 11,479.80 13,295.80 Per Cum 405.45 469.60
ii) 90% maximum modified AASHTO dry density. 1000 Cft. 11,479.80 13,013.25 Per Cum 405.45 459.65
iii) 85% maximum modified AASHTO dry density. 1000 Cft. 11,479.80 12,730.70 Per Cum 405.45 449.65
6 Regular excavation dressed. 1000 Cft. 7,771.65 -- Per Cum 274.50 -- * 411-2
7 Earthwork excavation in open cutting upto 5'-0" (1.5 m) 17.1 to
depth for storm water channels, drains, sullage drains in 17.5
open areas, roads, streets, lanes, including under pinning of
walls and shoring to protect existing works, shuttering and
timbering the trenches, dressed to designed level and
dimensions, trimming, removal of surface water from
trenches, back filling and surplus excavated material
disposed of and dressed within 50 ft. (15 m) lead:-

Chap-3 (Earthwork) Page 24


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite

i) ordinary 1000 Cft. 13,207.90 13,366.90 Per Cum 466.50 472.10


ii) hard 1000 Cft. 15,615.60 15,774.60 Per Cum 551.55 557.15
iii) very hard 1000 Cft. 18,173.75 18,332.75 Per Cum 641.90 647.50
iv) gravel & shingle 1000 Cft. 30,539.50 30,698.50 Per Cum 1,078.65 1,084.25
8 Earthwork excavation in open cutting 5.01 ft. (1.5 m) to 17.1 to
10.0 ft. (3.0 mm) depth for storm water channels, drains, 17.5
sullage drains in open areas, roads, streets, lanes, including
under pinning of walls and shoring to protect existing works,
shuttering and timbering the trenches, dressed to designed
level and dimensions, trimming, removal of surface water
from trenches, back filling and surplus excavated material
disposed of and dressed within 100 ft. (30 m) lead:-
i) ordinary 1000 Cft. 14,322.00 14,638.20 Per Cum 505.85 517.00
ii) hard 1000 Cft. 16,729.70 17,045.90 Per Cum 590.90 602.05
iii) very hard 1000 Cft. 19,287.85 19,604.05 Per Cum 681.25 692.40
iv) gravel & shingle 1000 Cft. 33,158.40 33,474.60 Per Cum 1,171.15 1,182.30
9 Excavation in shingle or gravel formation and rock, not 17.1 to 17.5
requiring blasting, undressed lead upto 100 ft (30 m).
i) Dry 1000 Cft. 28,591.20 -- Per Cum 1,009.85 --
ii) Wet 1000 Cft. 33,105.60 -- Per Cum 1,169.30 --
iii) In flowing water 1000 Cft. 42,134.40 -- Per Cum 1,488.20 --
10 Earthwork excavation in irrigation channels, drains, etc. to
designed section, grades and profiles, excavated material 17.1 to 17.5
disposed off and dressed within 50 ft. (15 m) lead:-
i) ordinary 1000 Cft. 12,064.80 -- Per Cum 426.15 --
ii) hard 1000 Cft. 14,472.50 -- Per Cum 511.15 --
iii) very hard 1000 Cft. 17,030.65 -- Per Cum 601.50 --
iv) gravel & shingle 1000 Cft. 30,148.80 -- Per Cum 1,064.85 --
11 Excavation in rock dressed to designed section, grades and
profiles, excavated material disposed off within 100 ft. (30 m) 17.1 to 17.5 Tools and plants shall be the liability
and lift upto 5'-0" (1.5 m). of the contractor.
a) Soft rock, slate, shale, schist laterite work, with pick and 1000 Cft. 28,723.20 -- Per Cum 1,014.50 --
crow bar.
b) Medium hard rock, requiring occasional blasting. 1000 Cft. 46,744.35 47,406.75 Per Cum 1,651.00 1,674.40
12 a) Excavation in hard rock requiring blasting and disposal
of excavated material (blasted material) upto 50 ft. (15 17.1 to 17.5 1) Tools and plants required shall be
m) lead, (including dressing and leveling to designed the liability of the Contractor
section,e tc. complete).
i) Grade I 1000 Cft. 27,614.40 28,276.80 Per Cum 975.35 998.75 2) Reduce the rate by 8% if the
ii) Grade II 1000 Cft. 29,937.60 31,041.60 Per Cum 1,057.40 1,096.40 excavated section is not dressed or
iii) Grade III 1000 Cft. 35,851.20 37,176.00 Per Cum 1,266.25 1,313.05 levelled to designed section.
iv) Grade IV 1000 Cft. 39,877.20 41,422.80 Per Cum 1,408.45 1,463.05
v) Grade V 1000 Cft. 44,061.60 45,828.00 Per Cum 1,556.25 1,618.65
vi) Grade VI 1000 Cft. 47,335.20 49,322.40 Per Cum 1,671.90 1,742.05
b) Excavation in hard rock requiring blasting, but blasting
prohibited, and disposal of excavated material within 50 17.1 to 17.5 1) Tools and plants required shall be
ft. (15 m) lead (including dressing and levelling to the liability of the contractor.
designed section, etc. complete):-

Chap-3 (Earthwork) Page 25


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite

i) Grade I 1000 Cft. 55,228.80 56,553.60 Per Cum 1,950.70 1,997.45 2) Reduce the rate by 8% if the
ii) Grade II 1000 Cft. 59,875.20 62,083.20 Per Cum 2,114.80 2,192.80 excavated section is not dressed or
iii) Grade III 1000 Cft. 71,702.40 74,352.00 Per Cum 2,532.55 2,626.10 levelled to designed section.
iv) Grade IV 1000 Cft. 79,754.40 82,845.60 Per Cum 2,816.95 2,926.10
v) Grade V 1000 Cft. 88,123.20 91,656.00 Per Cum 3,112.50 3,237.30
vi) Grade VI 1000 Cft. 94,670.40 98,644.80 Per Cum 3,343.75 3,484.15
13 Rehandling of earthwork:
a) Lead upto a single throw of Kassi, phaorah or shovel 1000 Cft. 3,762.00 -- Per Cum 132.85 -- 17.1 to 17.5
b) Upto a lead of 50 ft. (15 m). 1000 Cft. 5,266.80 -- Per Cum 186.00 --
14 Rehandling of gravel work or excavated rock, 1000 Cft. 15,048.00 -- Per Cum 531.50 -- 17.1 to 17.5
lead upto 50 ft.( 15 m)
15 Filling, watering and ramming earth under floors:- 17.1 to 17.5
i)with surplus earth from foundation, etc. 1000 Cft. 7,563.60 -- Per Cum 267.15 --
ii)
with new earth excavated from outside, 1000 Cft. 16,250.80 -- Per Cum 574.00 --
lead upto one chain (30 m).
16 Extra for every 50 ft. (15 m) additional lead or part thereof :- This rate shall be applicable upto
1000 ft. total distance, including the
i) for earhtwork soft, ordinary, hard and very hard. 1000 Cft. 126.00 -- Per Cum 4.45 -- lead covered in the item of earthwork
ii) for gravel, shingle or rock. 1000 Cft. 150.20 -- Per Cum 5.30 --
17 Transportation of earth all types when the total distance, This rate will be paid inaddition to the
including the lead covered in the item of work, is more than rate of earthwork, without deducting
1000 ft. (300 m) the lead covered in the item of
a) upto ¼ mile (400 m). 1000 Cft. 6,678.00 -- Per Cum 235.85 -- earthwork
b) for every 330 ft. (100 m) additional lead or part thereof,
beyond ¼ mile (400 m) upto one mile. (1.6 Km.) 1000 Cft. 69.85 -- Per Cum 2.45 --
c) for every ¼ mile (400 m) additional lead or part thereof,
beyond one mile (1.6 Km.) upto 5 mile (8 Km). 1000 Cft. 385.75 -- Per Cum 13.65 --
d) for every ½ mile (800 m) additional lead
or part thereof, beyond 5 miles (8 Km). 1000 Cft. 367.70 -- Per Cum 13.00 --
18 Dressing and levelling of earhtwork to designed section, etc. 17.10 to 17.5
complete:-
a) Ashes, sand, silt or soft soil. 1000 Cft. 486.80 -- Per Cum 17.20 --
b) Ordinary or hard soil. 1000 Cft. 946.20 -- Per Cum 33.40 --
c) Gravel work or soft rock not requiring 1000 Cft. 2,283.60 -- Per Cum 80.65 --
blasting.
19 Dowel dressing. Per 444.40 -- Per Metre 14.60 -- 17.1 to 17.5 This rate is in addition to payment for
Chain dressed earhtwork.
20 a) Dressing slopes of banks or ground surface. 100Sft. 198.25 -- Per Sqm 21.35 -- 17.1 to 17.5 To be paid only when exclusively
dressing is done and no earthwork is
carried out in embankment or cutting.
b) Dressing of earthwork (done by machinery or otherwise 100Sft. 354.75 -- Per Sqm 38.15 -- i) The surface area dressed is to be
and left undressed) to designed section. taken for measurement.

Chap-3 (Earthwork) Page 26


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite

ii) The item is applicable where the


dressing is done by the contractor
other than the one who executed the
work.
21 Excavation in foundation of building, bridges and other
structures, including dagbelling, dressing, refilling in layers around 17.1 to 17.5 If refilling is not required, reduce labor
structure with excavated earth, watering and ramming lead rate by Rs 1330.60/- P.%0 Cft or
upto one chain (30 m) lift upto 5 ft (1.5m). Rs 47/- P.Cu.m and surplus earth will
1) By M anual be adjusted accordingly.
i) in sand, ashes or loose soil 1000 Cft. 13,569.60 -- Per Cum 479.30 --
ii) in ordinary soil. 1000 Cft. 15,840.00 -- Per Cum 559.45 --
iii) in hard soil or soft murum. 1000 Cft. 17,727.60 -- Per Cum 626.15 --
2) a) By Excavator
i) Sand,ashes or loose soil 1000 Cft. 4,514.40 6,889.35 Per Cum 159.25 243.05
ii) Ordinary soil 1000 Cft. 8,276.40 10,794.00 Per Cum 292.00 380.80
iii) Hard soil or Soft murum 1000 Cft. 8,652.60 11,866.75 Per Cum 305.25 418.65
b) Lift from 5ft (1.5m) to 15 ft (4.5 m):-
i) Sand,ashes or loose soil 1000 Cft. 5,266.80 8,235.45 Per Cum 185.80 290.55
ii) Ordinary soil 1000 Cft. 9,781.20 12,928.20 Per Cum 345.10 456.10
iii) Hard soil or Soft murum 1000 Cft. 10,157.40 14,175.05 Per Cum 358.35 500.10
c) Lift above 15 ft (4.5 m):-
i) Sand,ashes or loose soil 1000 Cft. 6,019.20 9,581.60 Per Cum 212.35 338.05
ii) Ordinary soil 1000 Cft. 11,286.00 15,062.40 Per Cum 398.15 531.40
iii) Hard soil or Soft murum 1000 Cft. 11,662.20 16,483.40 Per Cum 411.45 581.55
22 Cutting hard rock such as granite, ballast, hard lime stone or 1000 Cft. 121,783.20 135,839.15 Per Cum 4,301.40 4,797.85 17.1 to 17.5 Tools and plants required shall be the
sand stone, etc. with chisels and hammers, for small liability of the contractor.
foundations.
23 Extra for excavation requiring shoring. 1000 Cft. 1,993.20 2,525.40 Per Cum 70.40 89.20 17.1 to 17.5 Composite rate includes materials,
i.e. plank, etc.
24 Compaction of earthwork (soft, ordinary or hard soil) :- 17.1 to 17.5
a) Mixing, moistening earth to optimum moisture content 1000 Cft. 1,788.35 -- Per Cum 63.15 --
in layers for compaction, etc. complete.
b) Compaction by rolling with animal driven
roller/hand rammed:
i) soft or sandy soil 1000 Cft. 2,257.20 -- Per Cum 79.70 --
1) The rate does not include hire
ii) ordinary soil 1000 Cft. 2,633.40 -- Per Cum 93.00 -- charges of the roller.
2) Roller to be 'supplied by
iii) hard soil 1000 Cft. 3,009.60 -- Per Cum 106.30 -- Government
iv) admixture of shingle 1000 Cft. 3,385.80 -- Per Cum 119.60 --

c) Ramming earthwork (all types of soil). 1000 Cft. 2,257.20 -- Per Cum 79.70 --

d) Ramming earhtwork behind retaining walls. 1000 Cft. 3,009.60 -- Per Cum 106.30 --

Chap-3 (Earthwork) Page 27


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite

25 Compaction of earthwork with power road roller, including 17.1 (a)


ploughing, mixing, moistening earth to optimum moisture * 411-5 and The rate also includes hire charges of
content in layers, etc. complete: 202-3 machinery, cost of fuel, lubricant, pay
of driver and cleaner, etc.
i) 95% to 100% maximum modified AASHTO dry density. 1000 Cft. -- 1,816.00 Per Cum - 64.15
ii) 90% maximum modified AASHTO dry density. 1000 Cft. -- 1,533.45 Per Cum - 54.15
iiii) 85% maximum modified AASHTO dry density. 1000 Cft. -- 1,250.90 Per Cum - 44.20
26 Extra for wet earthwork. 1000 Cft. 5,266.80 -- Per Cum 186.00 -- 17.1 to 17.5 That will support a man's weight.
27 Extra for slush or Daldal including dewatering. 1000 Cft. 12,038.40 -- Per Cum 425.20 -- 17.1 to 17.5 That will not support a man's weight.
28 Extra for puddling. 1000 Cft. 9,444.60 -- Per Cum 333.60 -- 17.1 to 17.5
29 Earthwork on small rain water drains, along canal banks, 100 Rft. 1,429.55 -- P. Metre 46.90 -- 17.1 to 17.5
roads and plantation drains, dressed, etc. complete.
30 Filling and compacting soil, earth and boulders behind 1000 Cft. 13,543.20 -- Per Cum 478.35 -- 17.1 to 17.5
retaining walls (including excavation of soil and lead upto 50
ft.( 15 m).
31 Dag bailing 3" (75 mm) deep. Per mile 5,659.30 -- Per Km 3,517.30 -- 17.1 to 17.5 Dag bailing for layout of borrow pit, to
be done by contractors at their own cost.
32 Turfing slopes of banks or lawns with grass sods including 100Sft. 2,508.00 -- Per Sqm 269.85 -- 17.1 to 17.5
ploughing, laying, setting and watering (Turf got from within a
distance of 5 miles (8 Km.) and maintenance for 15 days).
33 Berm cutting:- 17.1 to 17.5
a) lead upto a single throw of Kassi, phaora or shovel 1000 Cft. 6,771.60 -- Per Cum 239.15 --
(without dressing).
b) upto 50 ft(15 m)lead (including dressing). 1000 Cft. 12,064.80 -- Per Cum 426.15 --
34 Berm trimming both sides of channels:- 17.1 to 17.5
a) upto 3½ ft. (1.06 m) depth. Per Mile 17,600.00 -- Per Km. 11,000.00 --
b) exceeding 3½ ft. to 5 ft. (1.06 to 1.5 m) depth. Per Mile 24,893.00 -- Per Km. 15,558.15 --
c) exceeding 5 ft. to 8 ft. (1.5 to 2.4 m) depth Per Mile 38,709.00 -- Per Km. 24,193.15 --
35 Ploughing and levelling borrowpits. 17.1 to 17.5 Area ploughed to be measured.
i) upto 3 ft. (0.9 m) depth. Per Acre 3,762.00 -- Per Hect. 9,296.10 --
ii) above 3 ft. (0.9 m) depth. Per Acre 7,524.00 -- Per Hect. 18,592.20 --
36 Making boundary or service roads, including dag-belling, 17.1 to 17.5
leveling and dressing:
i) in unploughed land:
a) from 10.0 ft. to 20.0 ft. (3 to 6 m) wide. Per Chain 1,892.00 -- Per Metre 62.05 --
b) from 20.1 ft. to 40.0 ft. (6.10 to 12 m) wide. Per Chain 2,530.00 -- Per Metre 83.00 --
ii) in ploughed land:
a) from 10.0 ft. to 20.0 ft. (3 to 6 m) wide. Per Chain 1,946.05 -- Per Metre 63.85 --
b) from 20.1 ft. to 40.0 ft. (6.10 to 12 m) wide. Per Chain 2,584.05 -- Per Metre 84.75 --

Chap-3 (Earthwork) Page 28


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite

37 Earthwork by boats, including hire of boats:- 17.1 to 17.5 For ordinary soil.
i) Digging and loading into boats, upto 50 ft. (15 m) lead. 1000 Cft. 11,286.00 -- Per Cum 398.60 --
ii) Carriage by boats upto 10 chains (300 m). 1000 Cft. 2,863.70 -- Per Cum 101.15 --
iii) Extra for every additional one chain (30 m) or part 1000 Cft. 300.95 -- Per Cum 10.65 --
thereof beyond 10 chains (300 m).
iv) Unloading earth from boats. 1000 Cft. 5,266.80 -- Per Cum 186.00 --
38 Unloading earth from B.G. trucks and clearing 5 ft. (1.5 m) 1000 Cft. 4,514.40 -- Per Cum 159.45 -- 17.1 to 17.5
from rail.
39 Earthwork by tramway, digging and loading in trucks, upto 50 1000 Cft. 10,533.60 -- Per Cum 372.05 -- 17.1 to 17.5
ft. (15 m) lead.
40 Unloading earth from B.G. trucks and spreading upto 1000 Cft. 8,464.50 -- Per Cum 298.95 -- 17.1 to 17.5
15 ft. (4.5 m) from rail.
41 Supplying clean and screened river or pit sand within 5 100Cft. 1,472.90 1,527.90 Per Cum 520.25 539.65 17.1 to 17.5 The rate incudes:-
chains (150 m). i) removal of top crust of earth
over burden
ii) royalty to the government or cost
to the private owner.
42 Earth work excavation in open cutting for sewers and manholes as 17.1 to 17.5 The rate does not include back filling
shown in drawing including shuttering of wooden vertical planks, struts * * 13.1 & 13.4 after laying of sewer, which is payable
and beams, dressing to correct section and dimension separately.
according to templates and levels and removing surface water in all
types of soil except shingle, gravel and rock. If wooden planks, beams and struts are not
used at site, the Composite Rates may be
reduced by
i) 0 ft. to 7.0 ft. (0 to 2.10 m) depth 1000 Cft. 11,855.50 17,364.55 Per Cum 418.75 613.30 i) Rs.4416.40 P.%0 Cft or Rs.156.00 P.Cum
ii) 7-01 ft. to 15.0 ft. (2.15 to 4.5 m) depth 1000 Cft. 18,544.00 24,979.65 Per Cum 654.95 882.30 ii) Rs.5163.80 P.%0 Cft or Rs.182.40 P.Cum
iii) above 15.0 ft. (4.5 m) depth 1000 Cft. 20,353.10 26,433.85 Per Cum 718.85 933.65 iii) Rs.4880.90 P.%0 Cft or Rs.172.40
43 Earthwork excavation of trenches in open cutting for sewers 17.1 to 17.5 The rate does not include back filling
and manhole chambers, etc. below sub-soil water level to * * 13.3 & after laying of sewer, which is payable
correct section and dimensions according to templates and 13.5 separately.
levels, including shoring, timbering and shuttering of M.S.
sheets on both sides of the trenches:

i) 0 ft. to 4.0 ft. (0 to 1.20 m) depth below SSWL. 1000 Cft. 17,666.00 24,908.15 Per Cum 623.95 879.75
ii) 4.01 ft. to 8.0 ft. (1.22 to 2.4 m) depth below SSWL. 1000 Cft. 22,084.70 31,953.70 Per Cum 780.05 1,128.60
iii) Exceeding 8 ft. (2.4 m) depth below SSWL. 1000 Cft. 33,127.05 44,006.10 Per Cum 1,170.05 1,554.30
44 Excavation of trenches in all kinds of soil, except cutting 1000 Cft. 11,299.20 -- Per Cum 399.10 -- 17.1 to 17.5 The rate does not include back filling
rock, for watersupply pipelines upto 5 ft. (1.5 m) depth * * 8.1 after laying of pipe line, which is
from ground level, including trimming, dressing sides, payable separately.
leveling the beds of trenches to correct grade and cutting
pits for joints, etc. complete in all respects.

Chap-3 (Earthwork) Page 29


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite

45 Cutting and removing trees within a distance of 100 ft. (30 m)


a) upto 2½ ft. (760 mm) girth. Each 2,247.30 -- Each 2,247.30
b) above 2½ ft. to 6 ft. (760 to 1800 mm) girth. Each 4,372.50 -- Each 4,372.50
46 Uprooting stump and removing within 100 ft. (30 m) from 2 ft. Each 2,821.50 -- Each 2,821.50
to 6 ft. (600 to 1800 mm) girth.
47 Jungle clearance and removing within 100 ft. (30 m).
The compaction of area will be restored to its
a) light 1000 Sft. 376.20 -- Per Sqm 4.05 -- original value without any extra payment.
b) thick 1000 Sft. 752.40 -- Per Sqm 8.10 --
48 Uprooting Sarkanda growth and disposal within 100 ft. (30 m) 100Sft. 180.60 -- Per Sqm 19.45 --

49 Ploughing 3 times. Per Acre 1,528.30 -- Per Hect. 3,776.55 --

50 Leveling, dressing and making lawns. 100Sft. 752.40 -- Per Sqm 80.95 --

51 Turfing lawns (excluding cost of turf). 100Sft. 638.00 -- Per Sqm 68.65 --
52 Earthwork in excavation of drains, irrigation channels through
excavator / drag lines in all kind of soil and conditions(dry,wet
slush,daldal and under water) including its disposal and
preparation of working pad for operation of machinery.
(Rates includes 100 ft lead) 1000 Cft. -- 4,955.00 Per Cum -- 175.00

* Specification number correspond to Book of "Specification for Road & Bridge Construction, 1971".
** Specification number correspond to Book of "Building & Roads Department Specification Vol. II, 1966 (Public Health Works).

Chap-3 (Earthwork) Page 30


4. DISMANTLING (DEMOLITION)
1 Rates for all finished works include the removal of surplus debris, unused material and byproducts.

2 The rates for dismantling roofs or upper storey floor, include the dismantling of all materials, except roof
supports such as beams and trusses.
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

Stone Work

1 Dismantling dry stone masonry. 100Cft. 1,279.10 Per Cum 451.80 18.1

2 Dismantling stone masonry in mud mortar. 100Cft. 1,881.00 Per Cum 664.35 ditto

3 Dismantling stone masonry in lime or cement mortar. 100Cft. 4,514.40 Per Cum 1,594.50 ditto Add extra 13%, 32% and 51% on
labour rates only for 2nd, 3rd, 4th
and subsequent floors respectively.

4 a) Dismantling dry stone or spawl pitching. 100Cft. 2,257.20 Per Cum 797.25 ditto

b) Dismantling stone or spawl pitching (mud grouted). 100Cft. 2,859.10 Per Cum 1,009.85 ditto

5 Dismantling stone or spawl pitching and apron in silted 100Cft. 3,762.00 Per Cum 1,328.75 ditto
condition.

6 Dismantling stone pitching, cement or lime grouted. 100Cft. 6,019.20 Per Cum 2,126.00 ditto

7 Dismantling stone in crates:

a) wooden crates 100Cft. 3,009.60 Per Cum 1,063.00

b) wire crates 100Cft. 3,762.00 Per Cum 1,328.75

8 Dismantling stone ware drain including base concrete. 100Cft. 2,106.70 Per Cum 744.10 ditto

Brick Work

9 Dismantling mud/pise walling. 100Cft. 752.40 Per Cum 265.75 18.1

10 Dismantling sun dried brick masonry. 100Cft. 1,881.00 Per Cum 664.35 ditto

11 Dismantling dry brick masonry. 100Cft. 1,279.10 Per Cum 451.80 ditto

12 Dismantling brick work in mud mortar. 100Cft. 2,633.40 Per Cum 930.10 18.1 Add extra 13%, 32% and 51% on
labour rates only for 2nd, 3rd, 4th
13 Dismantling brick work in lime or cement mortar. 100Cft. 6,395.40 Per Cum 2,258.85 ditto and subsequent floors respectively
against item No. 12, 13, 14 & 15.

14 Dismantling cement block masonry. 100Cft. 5,643.00 Per Cum 1,993.10 ditto

Chap-4 (Dismantling) Page 31


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

15 Dismantling Dhajji walling. 100Cft. 1,504.80 Per Cum 531.50 18.1

Concrete

16 Dismantling mud concrete. 100Cft. 3,009.60 Per Cum 1,063.00 ditto

17 Dismantling lime concrete. 100Cft. 4,138.20 Per Cum 1,461.60 Add extra 13%, 32% and 51% on
labour rates only for 2nd, 3rd, 4th
18 Dismantling lime or cement concrete, under water. 100Cft. 15,800.40 Per Cum 5,580.70 and subsequent floors respectively
against item No. 17, 19 & 20.

19 a) Dismantling cement concrete plain 100Cft. 8,276.40 Per Cum 2,923.25 ditto
1:4:8.
b) Dismantling cement concrete plain 100Cft. 13,543.20 Per Cum 4,783.45
1:3:6.
c) Dismantling cement concrete 1:2:4 100Cft. 16,552.80 Per Cum 5,846.45
plain.
d) Dismantling cement concrete with brick 100Cft. 4,514.40 Per Cum 1,594.50
aggregate.
e) Dismantling D.P.C. of cement concrete 100Cft. 2,257.20 Per Cum 797.25
1½" thick (40 mm) and clearing the site.

20 Dismantling cement concrete reinforced, 100Cft. 27,086.40 Per Cum 9,566.90 ditto
separating reinforcement from concrete,
cleaning and straightening the same.

Roofing

21 Dismantling sirki sarkanda or thatched 100Sft. 902.90 Per Sqm 97.15 18.1
roofing, supported on battens or bellies.

22 a) Dismantling 1st class tile roofing. 100Sft. 2,257.20 Per Sqm 242.90 Add extra 13%, 32 and 51% on
labour rate only for 2nd, 3rd, 4th
b) Dismantling 2nd class tile roofing. 100Sft. 1,881.00 Per Sqm 202.40 ditto and subsequent floors respectively
against items No. 22, 25, 26 and 28.

23 Dismantling from any height, asbestos sheets and ridge 100Sft. 1,240.80 Per Sqm 133.50 18.1
coping.

24 a) Dismantling roof of wooden planks and battens, from 100Sft. 992.65 Per Sqm 106.80 ditto
any height.

b) Dismantling wooden ceiling above 20' (6.0 m) height 100Sft. 3,880.80 Per Sqm 417.55 ditto
in difficult position, including lifting with care and
special scaffolding along live electric wires and with
machines underneath.

Chap-4 (Dismantling) Page 32


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

25 Dismantling jack arch roofing, including removal of joists. 100Sft. 3,009.60 Per Sqm 323.85 18.1

26 Dismantling R.B. roof complete with mud and plaster, 100Sft. 3,762.00 Per Sqm 404.80 ditto
including separating reinforcement, cleaning and
straightening the same.

27 a) Stripping and stacking slate or tiles from the truss 100Sft. 1,881.00 Per Sqm 202.40
roofing.

b) Stripping and stacking C.I. sheet roof. 100Sft. 1,739.25 Per Sqm 187.15

c) Extra for dismantling C.I. sheet roof above 20 ft. (6m) 100Sft. 2,329.80 Per Sqm 250.70
in difficult position, including lifting with special
scaffolding along live electric wire with machine
underneath.

28 Dismantling slates or tiles including battens, purlins and 100Sft. 3,009.60 Per Sqm 323.85 18.1
planking.

Flooring

29 Dismantling brick or flagged flooring without 100Sft. 1,279.10 Per Sqm 137.65 18.1 Add extra 13%, 32% and 51% on
concrete foundation. labour rates only for 2nd, 3rd, 4th
and subsequent floors respectively
30 Dismantling plank or wooden block flooring, 100Sft. 1,881.00 Per Sqm 202.40 ditto against items No. 29 and 30.
etc.

31 Disjoining R.C.C. pipes inside the trench and dismantling i) The rate does not include the
and removing the pipes from the trench and stacking them cost of excavation and refilling of
outside:- trench, or the demolition of any
masonry or brick work.
a) 6" to 12" (150 to 300 mm) diameter Per Rft 49.65 Per Metre 162.85
b) 13" to 24" (325 to 600 mm) diameter Per Rft 79.75 Per Metre 261.60 ii) Bends, elbows, sluice valves,
c) 25" to 36" (625 to 900 mm) diameter Per Rft 93.40 Per Metre 306.35 etc. should not be paid for extra if
d) Above 36" (Above 900 mm) diameter Per Rft 132.90 Per Metre 435.90 fixed in the length of pipe line that
is being dismantled.

WOOD WORK
32 a) Removing door with chowkat. Per 648.45 Per 648.45 18.1 Add extra 13%, 32% and 51% on
No. No. labour rates only for 2nd, 3rd, 4th
b) Removing windows and sky lights with chowkat. ditto 505.55 ditto 505.55 and subsequent floors respectively
against items No. 32, 33, 34, 35 &
36.
33 Removing ventilators and wooden sunshade, etc. Per No. 265.00 Per No. 265.00 ditto

34 a) Dismantling wooden beams upto 12' (3.65m) Per No. 470.25 Per No. 470.25 ditto
length.

Chap-4 (Dismantling) Page 33


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

b) Dismantling wooden beams from 12.1' to 23' Per No. 752.40 Per No. 752.40
(3.65 to 7.0 m) length.

35 a) Dismantling wooden partition Jaffry work etc. 100Sft. 886.30 Per Sqm 95.35 18.1

b) Dismantling wooden trusses. 100Kg 2,668.80 100Kg 2,668.80

36 Dismantling wooden palisade fencing. Per Rft 72.05 Per Metre 236.30 ditto

I ron work

37 Dismantling iron work of trusses, sheds, water tanks, etc. 100Kg 2,652.45 100Kg 2,652.45 18.1 Add extra 13%, 32% and 51% on
excluding cutting of rivets. labour rates only for 2nd, 3rd, 4th
and subsequent floors respectively
against items No. 37 and 38.

38 Dismantling rolled steel beams or iron rails, etc. 100Kg 1,234.85 100Kg 1,234.85 ditto

39 Dismantling iron latrine. Per Unit/ 2,857.80 Per Unit/ 2,857.80 ditto
2 Seats 2 Seats

40 Dismantling tees, bends or sluice valves upto 12" Each per 60.05 Each per 24.00 ditto
(300 mm) bore. inch bore cm bore

41 a) Dismantling B.G. water column. Each 18,711.00 Each 18,711.00 ditto

b) Dismantling M.G. or N.G. water column. Each 12,457.50 Each 12,457.50 ditto

42 Dismantling all type of wire fencing, including rolling wire 100Lft. 1,279.10 Per Metre 41.95 18.1
into bundles and collecting material.

M iscellaneous

43 Dismantling wire netting of tennis courts and frame work. 100Sft. 601.90 Per Sqm 64.75 18.1

44 Dismantling cloth ceiling and supporting timber. 100Sft. 1,128.60 Per Sqm 121.45 ditto

45 Dismantling and removing road metalling. 100Cft. 3,009.60 Per Cum 1,063.00 ditto

46 Dismantling and removing road pavement, etc., including 100Cft. 4,017.80 Per Cum 1,419.10 ditto
screening and stacking of byproducts upto one chain lead
(30 metre).

47 Removing mud plaster from walls. 100Sft. 313.50 Per Sqm 33.75 ditto Add extra 13%, 32% and 51% on
labour rates only for 2nd, 3rd, 4th
48 Removing cement or lime plaster. 100Sft. 627.00 Per Sqm 67.45 ditto and subsequent floors against item
No. 47, 48, 49, & 50 respectively

Chap-4 (Dismantling) Page 34


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

49 Scraping:- 18.1

a) White wash or colour wash. 100Sft. 376.20 Per Sqm 40.50

b) Ordinary distemper, oil bound distemper, ditto 1,128.60 Per Sqm 121.45
or paint of wall.

50 Dismantling glazed or encaustic tiles, etc. 100Sft. 3,458.40 Per Sqm 372.10 18.1

51 Scraping boulders. 100Cft. 5,266.80 Per Cum 1,860.25 18.1

52 Cleaning lime or cement mortar of old stones 100Cft. 2,633.40 Per Cum 930.10 18.1
to be used in masonry.

Electric Wiring

53 Dismantling light, fan and call bell point Per 112.75 113.95 Per 112.75 113.95
including casing and capping/strip open type, point point
and making good damaged surface (building
portion).

54 Dismantling plug point and making good Per 96.65 97.70 Per 96.65 97.70
damaged surface (building portion). point point

55 Dismantling G.I./M.S. conduit/G.I. flexible/PVC pipes or


conduit wiring, etc. of all sizes including making good
damaged surface (building portion):-

i) on surface Per Rft 20.65 20.85 Per Meter 67.75 68.40


ii) recessed in wall Per Rft 43.95 44.30 Per Meter 144.15 145.30

Chap-4 (Dismantling) Page 35


5. MORTAR
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI
Dry Material Required for Dry Material Required for
100 Cft. Wet (Ready) Mortar One Cum Wet (Ready) Mortar
S. No. Ratio of Mortar Cement Lime Cement Lime Sand
(50 Kg) Putty Sand (50 Kg.) Putty Cum.
Bag Cft. Cft. Bag. Cum
1 2 3 4 5 6 7 8
1 Cement : Sand
1 : 2 33.48 82 11.83 0.82
1 : 3 23.11 85 8.16 0.85
1 : 4 18.37 90 6.49 0.90
1 : 5 14.70 90 5.19 0.90
1 : 6 13.61 100 4.81 1.00
1 : 7 11.68 100 4.12 1.00
1 : 8 10.21 100 3.61 1.00

2 Cement : Lime : Sand


1 : 1 : 6 12.25 15.0 90 4.33 0.15 0.90
1 : 1 : 7 10.70 13.1 92 3.78 0.13 0.92
1 : 1 : 8 9.39 11.5 92 3.32 0.12 0.92
1 : 1 : 9 8.52 10.44 94 3.00 0.10 0.94
1 : 1 : 10 7.67 9.4 94 2.71 0.09 0.94
1 : 2 : 8 9.19 22.5 90 3.25 0.23 0.90
1 : 2 : 9 8.16 20.0 90 2.88 0.20 0.90
1 : 2 : 10 7.67 18.8 94 2.71 0.19 0.94
1 : 2 : 12 6.39 15.66 94 2.26 0.16 0.94
1 : 3 : 12 6.26 23.0 92 2.21 0.23 0.92
1 : 3 : 14 5.47 20.1 94 1.93 0.20 0.94
1 : 3 : 16 4.82 17.7 94 1.70 0.18 0.94
1 : ¼ : 3 23.11 7.0 85 8.16 0.07 0.85

3 Lime : Sand
1 : 2 43 86 0.43 0.86
1 : 3 31 93 0.31 0.93

Chap-5 (Mortar) Page 36


5. MORTAR
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI
Dry Material Required for 100 Cft. Dry Material Required for
Wet (Ready) Mortar one M 3 Wet (Ready) Mortar
S. Ratio of Mortar Clay Lime Sand Surkhi Cinder Clay Lime Sand Surkhi Cinder
No. (Putty) (Putty)
Cft. Cft. Cft. Cft. Cft. M3 M3 M3 M3 M3
1 2 3 4 5 6 7 3 4 5 6 7

4 Mud 135 1.35

5 Lime : Surkhi
2 : 3 49.00 - 73.5 - 0.49 - 0.74 -
1 : 2 40.75 - 81.5 - 0.41 - 0.82 -
1 : 3 30.30 - 91.0 - 0.30 - 0.91 -

6 Lime : Sand : Surkhi


1 : 1 : 1 40.50 40.5 40.5 - 0.41 0.41 0.41

7 Lime : Cinder
1 : 1 57.0 - 57.0 - 0.57 - - 0.57

Wet material required for 100 Cft. Wet material required for 1M³ (35.32 Cft)
masonry (including wastage): masonry ( including wastage) :

1 Brick M asonry :
a) Mud Mortar 35.00 Cft 0.35 M3
b) Cement, Sand 25.00 Cft 0.25 M3
c) Cement, Lime (Putty) Sand 25.00 Cft 0.25 M3
d) Lime (Putty) Sand 25.00 Cft 0.25 M3

2 Stone M asonry :
a) Random rubble, uncoursed
i) Foundation and Plinth 45.00 Cft 0.45 M3
ii) Superstructure 40.00 Cft 0.40 M 33
iii) Coursed 35.00 Cft 0.35 M
b) Ashlar Block in course or Scabled masonry 30.00 Cft 0.30 M3
c) Ashlar fine masonry 20.00 Cft 0.20 M3

(1) Cement 1 Cft. = 40.8233 Kg


Notes : (2) Unslaked lime 1.7 Cft. = 37.3242 Kg
(3) Slaked lime 2.5 Cft. = 37.3242 Kg
(4) Quick lime 40 Kg Will yield 2.6 Cft. lime putty.

Chap-5 (Mortar) Page 37


6. CONCRETE
1. Rates for all finished works include the removal of surplus debris, unused material and by products.
2. If concrete mixer or high frequency vibrator, etc. is supplied by the Government, all charges including depreciation will be recovered from the contractor.
3. Subsequent carriage of crushed stone aggregate and bajri will be paid according to the following:
a) The carriage for the whole distance to the site of work shall be calculated on the basis of the rates of the actual means of transport used in carriage, i.e. road and / or rail, as the case may be.
b) It shall be payable from the nearest approved quarry to site of work.
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

1 Mud concrete in foundation including watering and ramming, 100Cft 8,319.95 15,273.95 Per Cum 2,938.60 5,394.75
The stone ballast, crushed bajri, round shingle
using brick or stone ballast 1½" (40 mm) gauge.
from nallah, or brick ballast may be used
according to site requirement or as directed
2 Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 100Cft 5,643.00 12,705.00 Per Cum 1,993.10 4,487.40
by the engineer incharge.
mm) gauge.

3 Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 20.1 -do-
50 mm) gauge, in foundation and plinth:-
(a) Ratio 1: 3: 6 100Cft 10,972.50 39,695.70 Per Cum 3,875.50 14,020.50
(b) Ratio 1: 4: 8 100Cft 10,972.50 34,473.30 Per Cum 3,875.50 12,175.95
(c) Ratio 1:5:10 100Cft 10,972.50 31,698.90 Per Cum 3,875.50 11,196.05
(d) Ratio 1: 6:12 100Cft 10,972.50 29,577.30 Per Cum 3,875.50 10,446.70
(e) Ratio 1: 6: 18 100Cft 10,972.50 27,610.50 Per Cum 3,875.50 9,752.05
(f) Ratio 1: 7:20 100Cft 10,972.50 26,555.10 Per Cum 3,875.50 9,379.25
4 Extra on item No. 3 above, for sedimentation tank or filter
beds of Public Health Engineering Works: The stone ballast, crushed bajri,
round shingle from nallah, or brick
(a) in bed 100Cft 3,537.60 - Per Cum 1,249.50 - ballast may be used according to
their comparative cheaper rates in
(b) on slope 100Cft 5,266.80 - Per Cum 1,860.25 - various areas of the Province.
5 Cement concrete plain including placing, 20.1
compacting, finishing and curing
complete (including screening and
washing of stone aggregate):
(a) Ratio 1: 1:2 100Cft 12,995.40 69,317.40 Per Cum 4,590.00 24,482.90
(b) Ratio 1: 1½: 1½ 100Cft 12,995.40 69,066.60 Per Cum 4,590.00 24,394.30
(c) Ratio 1: 1½: 3 100Cft 12,995.40 55,007.40 Per Cum 4,590.00 19,428.60
(d) Ratio 1: 2: 3 100Cft 12,995.40 52,633.80 Per Cum 4,590.00 18,590.25
(e) Ratio 1: 3: 3 100Cft 12,995.40 47,025.00 Per Cum 4,590.00 16,609.25
(f) Ratio 1: 2: 4 100Cft 12,995.40 47,262.60 Per Cum 4,590.00 16,693.15
(g) Ratio 1: 2: 6 100Cft 12,995.40 41,188.20 Per Cum 4,590.00 14,547.65
(h) Ratio 1: 3: 6 100Cft 12,995.40 40,007.40 Per Cum 4,590.00 14,130.60
(i) Ratio 1: 4: 8 100Cft 12,995.40 34,710.60 Per Cum 4,590.00 12,259.80
6 Providing and laying reinforced cement concrete (including 20.4 1) The rate includes rendering floor
prestressed concrete), using Ordinary Portland Cement / Sulphate surface smooth, and the plastering
resisting cement / Slag cement as may be required; coarse sand and done for making up all surfaces
screened graded and washed aggregate, in required shape and design, after removing centring.
including forms, moulds, shuttering, lifting, compacting,
curing, rendering and finishing exposed surface, complete

Chap-6 (Concrete) Page 38


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

(but excluding the cost of steel reinforcement, its fabrication 2) Plastering done under soffit of
and placing in position, etc.):- R.C.C. roof slab meant for human
habitation buildings shall be paid
(a) (i) Reinforced cement concrete in roof slab, beams, extra.
columns lintels, girders and other structural members laid in
situ or precast laid in position, or prestressed members cast 3) This item shall not be applicable
in situ, complete in all respects:- to factory made units.
(1) Type A (nominal mix 1:1:2) Per Cft 274.25 956.65 Per Cum 9,686.50 33,788.90 4) Composite rate shall be reduced by Rs:
(2) Type B (nominal mix 1: 1½: 3) Per Cft 274.25 814.75 Per Cum 9,686.50 28,776.95 22.50 P.Cft & Rs: 32.60 P.Cft if chenab sand
(3) Type C (nominal mix 1: 2: 4) Per Cft 274.25 738.10 Per Cum 9,686.50 26,069.70 and local sand respectively is used.
(a) (ii) Reinforced cement concrete in retaining/ Shear walls laid in situ or
precast laid in position, or prestressed members cast in situ (Formwork on
both sides) , complete in all respects:
(a) Type A (nominal mix 1:1:2)
(i) Upto 9" thick (Avg) Per Cft 274.25 971.05 Per Cum 9,674.85 34,258.10
(ii) More Than 9" thick (Avg) Per Cft 246.30 910.50 Per Cum 8,689.89 32,122.75
(b) Type B (nominal mix 1:1-1/2:3)
(i) Upto 9" thick (Avg) Per Cft 274.25 823.30 Per Cum 9,674.85 29,045.30
(ii) More Than 9" thick (Avg) Per Cft 246.30 762.75 Per Cum 8,689.89 26,909.93
(c) Type C (nominal mix 1:2:4)
(i) Upto 9" thick (Avg) Per Cft 274.25 748.95 Per Cum 9,674.85 26,422.15
(ii) More Than 9" thick (Avg) Per Cft 246.30 688.40 Per Cum 8,689.90 24,286.80
(a)(iii) Reinforced cement concrete in slab of rafts / strip foundation,
base slab of column and retaining walls; etc and footing beams,
other structural members other than those mentioned in
6(a) (i)&(ii) above not requiring form work (i.e. horizontal
shuttering) complete in all respects:-
(1) Type A (nominal mix 1: 1: 2) Per Cft 205.25 816.65 Per Cum 7,249.45 28,844.10
(2) Type B (nominal mix 1: 1½: 3) Per Cft 205.25 667.25 Per Cum 7,249.45 23,567.25
(3) Type C (nominal mix 1: 2: 4) Per Cft 205.25 590.75 Per Cum 7,249.45 20,865.30
(b) Precast reinforced cement concrete and prestressed reinforced
cement concrete in columns, beams, lintels, stair cases, shelves, etc.
(1) Type A (nominal mix 1: 1: 2) Per Cft 267.30 925.60 Per Cum 9,441.05 32,692.20
(2) Type B (nominal mix 1:1½: 3) Per Cft 267.30 783.05 Per Cum 9,441.05 27,657.35
(3) Type C (nominal mix 1: 2: 4) Per Cft 267.30 707.00 Per Cum 9,441.05 24,971.25
(c) Erecting and fixing in position, precast cement concrete
or stone slab in roofs or lintels, etc. lift upto 20 ft., (6m) Per Cft 118.45 141.75 Per Cum 4,183.65 5,006.60
including all charges.
(d) Add extra labour for R.C. concrete in Per Cft 56.45 -- Per Cum 1,993.80 -
2nd and subsequent storeys.
7 Providing and casting in situ bored reinforced concrete piles * 851-1 Composite rate shall be reduced by Rs: 22.50
with type C concrete (nominal mix 1: 2: 4 ) , using 10% extra to P.Cft & Rs: 32.60 P.Cft if chenab sand and
cement in dry mix, and course sand, including all labour and 851-10 local sand respectively is used.
material (except the cost of steel reinforcement and its

Chap-6 (Concrete) Page 39


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

labour for bending and laying in position, etc. which will be


paid separately, including, screening & washing of shingle
and curing:-
i) 18 " (450 mm) dia pile Per Rft 1,503.05 2,228.60 Per Metre 4,930.00 7,309.80
ii) 20" (500 mm) dia pile Per Rft 1,859.90 2,753.45 Per Metre 6,100.45 9,031.30
iii) 22" (550 mm) dia pile Per Rft 2,361.25 3,423.00 Per Metre 7,744.90 11,227.45
iv) 24" (600 mm) dia pile Per Rft 3,080.10 4,365.30 Per Metre 10,102.75 14,318.25
8 Providing and casting in situ bored reinforced concrete piles using i. Composite rate shall be reduced by Rs:
Ordinary portland cement / Sulphate resisting cement or as may be 22.50 P.Cft & Rs: 32.60 P.Cft if chenab sand
required, incuding screening, washing of aggregates, mixing of and local sand respectively is used.
constituents using batching plant, Transportation by Transit Mixer,
Pouring in the required proportion to achieve a nominal cylinderical ii. If percussion boring is used based on the
strength in the field as per ACI-214, with the specified consistency. i/c the bore log/strata, derive rate accordingly with
cost of labour, boring, equipment/machinery, plateform (except the cost the permission of Superintending Engineer.
of steel reinforcement, its labour for bending and laying in position and
boat plateform etc. which will be paid separately) excluding the cost of
admixture as approved and directed by the Engineer Incharge
In ordinary soil
(a) 3000 PSI
(i) 0.46 m / 18 inch Per Rft. 1,173.95 1,921.40 Per Metre 3,850.50 6,302.15
(ii) 0.51 m / 20 inch Per Rft. 1,260.25 2,183.00 Per Metre 4,133.60 7,160.25
(iii) 0.56 m / 22 inch Per Rft. 1,414.25 2,530.90 Per Metre 4,638.65 8,301.35
(iv) 0.61 m / 24 inch Per Rft. 1,562.75 2,891.60 Per Metre 5,125.80 9,484.35
(iii) 0.76 m / 30 inch Per Rft. 2,057.95 4,134.25 Per Metre 6,750.10 13,560.35
(iv) 0.91 m / 36 inch Per Rft. 2,911.10 5,900.95 Per Metre 9,548.50 19,355.15
(v) 1.07 m / 42 inch Per Rft. 3,747.20 7,816.80 Per Metre 12,290.80 25,639.15
(vi) 1.22 m / 48 inch Per Rft. 3,990.85 9,306.20 Per Metre 13,090.00 30,524.30
(vii) 1.37 m / 54 inch Per Rft. 4,249.60 10,976.90 Per Metre 13,938.70 36,004.20
(viii) 1.52 m / 60 inch Per Rft. 5,898.20 14,203.40 Per Metre 19,346.10 46,587.10
(ix) 1.68 m / 66 inch Per Rft. 6,750.80 16,800.10 Per Metre 22,142.65 55,104.30
(x) 1.83 m / 72 inch Per Rft. 7,352.75 19,312.25 Per Metre 24,117.00 63,344.20
(xi) 1.98 m / 78 inch Per Rft. 7,979.35 22,015.15 Per Metre 26,172.25 72,209.65
(xii) 2.13 m / 84 inch Per Rft. 9,131.90 25,410.10 Per Metre 29,952.70 83,345.05
(b) 4000 PSI
(i) 0.46 m / 18 inch Per Rft. 1,173.95 2,097.95 Per Metre 3,850.50 6,881.30
(ii) 0.51 m / 20 inch Per Rft. 1,260.25 2,401.00 Per Metre 4,133.60 7,875.20
(iii) 0.56 m / 22 inch Per Rft. 1,414.25 2,794.45 Per Metre 4,638.65 9,165.80
(iv) 0.61 m / 24 inch Per Rft. 1,568.15 3,210.75 Per Metre 5,143.50 10,531.30
(iii) 0.76 m / 30 inch Per Rft. 2,063.20 4,629.65 Per Metre 6,767.25 15,185.25
(iv) 0.91 m / 36 inch Per Rft. 2,911.10 6,606.90 Per Metre 9,548.50 21,670.60
(v) 1.07 m / 42 inch Per Rft. 3,624.15 8,654.50 Per Metre 11,887.25 28,386.70
(vi) 1.22 m / 48 inch Per Rft. 3,990.85 10,561.15 Per Metre 13,090.00 34,640.55
(vii) 1.37 m / 54 inch Per Rft. 4,249.60 12,565.15 Per Metre 13,938.70 41,213.70
(viii) 1.52 m / 60 inch Per Rft. 5,898.20 16,164.25 Per Metre 19,346.10 53,018.80
(ix) 1.68 m / 66 inch Per Rft. 6,750.80 19,172.80 Per Metre 22,142.65 62,886.80
(x) 1.83 m / 72 inch Per Rft. 7,352.75 22,135.95 Per Metre 24,117.00 72,605.90
(xi) 1.98 m / 78 inch Per Rft. 7,979.35 25,329.00 Per Metre 26,172.25 83,079.20
(xii) 2.13 m / 84 inch Per Rft. 9,131.90 29,253.50 Per Metre 29,952.70 95,951.40

Chap-6 (Concrete) Page 40


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

9
Placing, compacting, finishing and curing of concrete using Ordinary
Portland Cement / Sulphate resisting cement / Slag cement as may be
required; including screening, washing of aggregates and mixing of
constituents using batching plant, Transportation by transit mixer, pouring
with pump in the required proportions to achieve a nominal cylindrical
strength in the field as per ACI 214, with the specified consistency. i/c the
cost of shuttering, compaction with Viberator, excluding the cost of
Admixture, as approved and directed by the Engineer Incharge.
(a) Reinforced cement concrete in roof slab, beams, columns lintels, For item no. 9 (a) only:
girders and other structural members laid in situ or precast laid in i. In case of any special shuttering
position, or prestressed members cast in situ, complete in all respects:- requirement such as domes, box /curved
girders, transoms, waffle slabs etc. or where
no shuttering is required, the composite rate
shall be reduced by Rs. 94.05 P.Cft or
Rs.3317.20 P.Cum.
(i) 7000 PSI Per Cft 159.65 948.05 Per Cum 5,632.00 33,447.15 ii. The rate of special shuttering (if required)
(ii) 6000 PSI Per Cft 159.65 912.95 Per Cum 5,632.00 32,209.00 shall be approved separately by the
(iii) 5000 PSI Per Cft 159.65 876.25 Per Cum 5,632.00 30,914.15 competent authority.
(iv) 4000 PSI Per Cft 159.65 847.65 Per Cum 5,632.00 29,905.80
(vi) 3000 PSI Per Cft 159.65 747.80 Per Cum 5,632.00 26,382.50
(b) Retaining/ Shear walls laid in situ or precast laid in position, or
prestressed members cast ( Formwork on both sides)
i) 7000 PSI
(i) Upto 9" thick Per Cft 153.30 928.35 Per Cum 5,409.20 32,751.55
(ii) More Than 9" Thick Per Cft 153.30 910.10 Per Cum 5,409.20 32,107.75
ii) 6000 PSI
(i) Upto 9" thick Per Cft 153.30 893.25 Per Cum 5,409.20 31,513.40
(ii) More Than 9" Thick Per Cft 153.30 875.00 Per Cum 5,409.20 30,869.60
iii) 5000 PSI
(i) Upto 9" thick Per Cft 153.30 856.55 Per Cum 5,409.20 30,218.50
(ii) More Than 9" Thick Per Cft 153.30 838.30 Per Cum 5,409.20 29,574.70
iv) 4000 PSI
(i) Upto 9" thick Per Cft 153.30 827.95 Per Cum 5,409.20 29,210.20
(ii) More Than 9" Thick Per Cft 153.30 809.70 Per Cum 5,409.20 28,566.40
v) 3000 PSI
(i) Upto 9" thick Per Cft 153.30 728.10 Per Cum 5,409.20 25,686.90
(ii) More Than 9" Thick Per Cft 153.30 709.85 Per Cum 5,409.20 25,043.05
( c) Substructure (Foundations, Raft, Strip and Footing Beams)
(i) 7000 PSI Per Cft 86.80 804.65 Per Cum 3,061.95 28,388.35
(ii) 6000 PSI Per Cft 86.80 769.55 Per Cum 3,061.95 27,150.25
(iii) 5000 PSI Per Cft 86.80 732.85 Per Cum 3,061.95 25,855.35
(iv) 4000 PSI Per Cft 86.80 704.30 Per Cum 3,061.95 24,847.00
(vi) 3000 PSI Per Cft 86.80 604.40 Per Cum 3,061.95 21,323.70

Chap-6 (Concrete) Page 41


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

10 Providing, laying, compacting and curing Cyclopean/plum/rubble concrete


in (40:60) ratio (plum:Concrete) using pre-mixed Cement Concrete of
specified ratio by using Ordinary Portland Cement including screening
washing of aggregate ;mixing of constituents by using batching
plant,transported by transit mixer and pouring under gravity,with specified
consistency i/c the cost of compaction with Viberator but excluding the
cost of Admixture and carriage charges, as approved and directed by the
Engineer Incharge.
i. 1:3:6 P.Cft 76.50 322.05 Per Cum 2,698.70 11,362.30
ii. 1:2:4 P.Cft 76.50 371.15 Per Cum 2,698.70 13,093.60
11 Fabrication of mild steel reinforcement deformed bar cage of specified * 851.5 The overlap will be paid extra vide FD
yield strength for R.C.C bored piles including cutting bending, lowering of Notification No.RO(TECH)FD2-11/2010
cage with crane in position, welding and fastening, including the cost of dated 08.03.2010.
binding wire, Crane machine (also includes removal of rust from the bars)
as approved and directed by the Engineer Incharge.
i) Grade-40 Per Cwt. 168.45 15,958.55 100 Kg 331.55 31,414.45
ii) Grade-60 Per Cwt. 168.45 16,141.75 100 Kg 331.55 31,775.10
12 Fabrication of mild steel reinforcement for cement concrete, * 821 The rate includes wastage, overlaps
including cutting, bending, laying in position, making joints and steel chairs, etc. complete in all respect.
and fastenings, including cost of binding wire and labour
charges for binding of steel reinforcement (also includes
removal of rust from bars):-
(a) Plain bars Per Cwt. 1,080.75 17,571.20 100 kg 2,127.45 34,589.00
(b) Deformed bars
(i) (Grade-40) Per Cwt. 1,080.75 18,040.60 100 kg 2,127.45 35,513.00
(ii) (Grade-60) Per Cwt. 1,080.75 18,241.75 100 kg 2,127.45 35,908.95
13 Precast cement concrete solid or face blocks (1:2:4), Per Cft 209.90 550.50 Per Cum 7,413.65 19,443.65 20.2 The cost includes mortar (1:5) and labour for
including cost of templates. fixing at any height.
14 Precast cement concrete hollow blocks (1: 2: 4) , including Per Cft 212.95 440.95 Per Cum 7,521.40 15,574.35 20.2 The cost includes mortar (1:5) and labour for
cost of templates and constructing walls thereof. fixing at any height.
15 Providing and fixing ornamental cement jali 2" (50 mm) thick Per Sft 86.45 147.55 Per Sqm 930.20 1,587.65 20.1 to
(1: 2: 4), without steel. 20.4
16 Extra labour for laying concrete plain or reinforced:
(a) above 30' (6 m) upto 40'(12 m) height 100Cft 6,019.20 - Per Cum 2,126.00 -
(b) for every additional 10'(3 m) height. 100Cft 3,762.00 - Per Cum 1,328.75 -
17 Extra labour for work of weirs, rail or road bridges, syphons, and 100Cft 1,504.80 - Per Cum 531.50 -
concreting in superstructure
18 Making reinforced cement concrete spout, including fixing in Each 1,080.75 1,503.55 Each 1,080.75 1,503.55 20.4
position (2½' x 6" x5") (760 mmx150 mm x 125 mm)
19 Making holes upto 3"(75 mm) dia 18"(450 mm) depth in cement Per hole 2,593.80 - Each 2,593.80 - 20.1
concrete or stone masonry walls and repairing.
20 Extra labour for skipping concrete in wells. 100Cft 9,152.00 - Per Cum 3,232.50 - 20.1
21 Nicking concrete surface:
(a) Cement concrete surface 100Sft 976.80 - Per Sqm 105.10 -
(b) Lime concrete surface 100Sft 322.35 - Per Sqm 34.70 -

Chap-6 (Concrete) Page 42


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

22 Preparing, watering and ramming surface for laying concrete


(for Headworks only):-
(a) Horizontal floor 100Sft 923.20 - Per Sqm 99.35 -
(b) Glacis and crest 100Sft 1,353.00 - Per Sqm 145.60 -
(c) Inverted filters 100Sft 432.30 - Per Sqm 46.50 -
23 Fabrication of high tensile steel prestressing cables for 100 Kg. 13,148.00 79,358.25 100 Kg. 13,148.00 79,358.25 * 811-1 The rate includes wastage in
prestressed (post tensioned) concrete, including assembling by to cutting and breakage in stressing,
drawing the H.T. wire through metal spacer plate, inserting in helix 811-11 etc.
core and taping or tying, sheathing in longitudinally welded metal
corrugated sheath, positioning , anchorage with male and female
set of anchorage cone, forming ducts for transverse cable,
stressing cables with jack at both ends as per stressing schedule,
maintaining stressing record and supply the same in the approved
proforma to the Engineer-in-charge, making loop at blind end,
including all materials required for it, grouting the cable ducts with
cement, cutting projected ends and making good recesses, etc.,
complete in all respects.
24 Fabrication of High Tensile steel reinforcement for prestressed 100kg 7,652.70 73,748.90 100kg 7,652.70 73,748.90 1) The rate includes wastage in
(pretension) concrete work, including inserting wire in moulds, cutting and breakage in stressing,etc.
providing M.S. shear bars, spacers and lift hooks, male and
female anchorage, tie down, struts, stressing cables, maintaining 2) Quantity of H. T. wire will form
stress record and supply the same in approved proforma to the basis of payment.
Engineer-in-charge, cutting wires and projecting ends and making 3) This item shall not be applicable
good recesses, etc., complete in all respects. to factory made units.
25 Lifting, transporting and placing precast prestressed concrete Beam,
Girder and other members (excluding battens) etc., in position on the
bridge to correct alignment and level, etc., complete in all respect as
directed by the Engineer Incharge. Per Ton 149.50 1,796.65 Per Ton 149.50 1,796.65
26 Providing and laying foam concrete 3 inch (75 mm) thick, Per Sft. 83.65 177.70 Per Sqm 900.05 1,912.05
using cement sand in the ratio of 1:2 and aluminium powder
at the rate of 0.2% of the cement, sand mix,
27 Providing and fixing 6 in(150 mm). wide curved sheet of
required shape fixed on face of the construction joint with G.I.
screw,1.5 in (40 mm) long to cover construction joints
vertically:-
i) aluminium sheet 1/16 in(1.5 mm) thick Per Rft. 44.55 178.70 Per Metre 146.10 586.15
ii) G.I. sheet, 18 SWG Per Rft. 45.65 291.45 Per Metre 149.75 955.95
28 Providing and fixing 1/8" (3 mm) thick 3" (75 mm) wide aluminium
strip on horizontal and vertical expansion joints in walls, columns,
ceilings and floors etc., including cost of clips/screws etc.,
complete in all respects:-
a) On interior surface (without mastic strip) Per Rft. 40.70 174.85 Per Metre 133.50 573.50
b) On exterior surface (with mastic strip) Per Rft. 40.70 189.25 Per Metre 133.50 620.75
29 Providing and fixing 1/16" (1.5 mm) thick copper flashing on Per Sft. 43.25 213.20 Per Sqm 465.35 2,294.05
expansion joints complete in all respects.

Chap-6 (Concrete) Page 43


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

30 Providing and fixing 6 in (150 mm) wide G.I. sheet 18SWG. Per Rft. 15.10 231.85 Per Metre 49.55 760.45
stopper to expansion joint.
31 Providing embeding 10" (250 mm) wide ¼" (6 mm) thick Per Rft. 61.05 421.05 Per Metre 200.25 1,381.00
rubber water stopper in expansion joints of R.C.C. roof
slab complete in all respects.
31A Providing and embedding 10" (250mm) wide PVC water stopper in
expansion joints of RCC structures (Retaining walls, water tanks, Slabs)
complete in all respect.
i) 6 mm thick P.Rft 61.05 417.45 Per Metre 200.25 1,369.25
ii) 10 mm thick P.Rft 61.05 777.45 Per Metre 200.25 2,550.05
32 Filling expansion joints with bitumen. sand & saw dust in Per Rft P.Metre/
ratio 1:2:2. per inch 9.40 39.85 Per 25 mm 30.85 130.70
width width
33 Filling expansion joints with bitumen. Per Rft. 158.75 - Per Metre 520.70 -
34 Laying asphaltic mixture in expansion joints. Per Rft. 131.65 - Per Metre 431.80 - Material to be paid on actuals.
35 Providing and fixing theremopore (foamed polythene)
sheet in horizontal and vertical expansion joints:
a) 1" (25 mm) thick thermopore sheet Per Sft. 17.30 28.55 Per Sqm 186.15 307.20
b) 1½" (40 mm) thick thermopore sheet Per Sft. 17.30 34.25 Per Sqm 186.15 368.55
36 Providing and laying damp proof course of cement concrete
1:2: 4(using cement, sand and shingle), including bitumen
coating :-
(a) with one coat bitumen and one coat polythene sheet
500gauge
i) 1½" thick (40 mm) 100Sft 3,885.20 11,624.65 Per Sqm 418.05 1,250.80
ii) 2" thick (50 mm) 100Sft 3,885.20 12,987.30 Per Sqm 418.05 1,397.45
iii) 3" thick (75 mm) 100Sft 4,048.00 16,153.35 Per Sqm 435.55 1,738.10
(b) with 2 coats of bitumen:
i) 1½" thick (40 mm) 100Sft 3,885.20 12,104.40 Per Sqm 418.05 1,302.45
ii) 2" thick (50 mm) 100Sft 3,885.20 13,465.70 Per Sqm 418.05 1,448.90
iii) 3" thick (75 mm) 100Sft 4,048.00 16,631.75 Per Sqm 435.55 1,789.60
37 Providing and laying damp proof course with cement sand
plaster and bitumen coating:-
(a) with one coat of bitumen and one coat of polythene sheet
500 gauge :-
i) Ratio 1: 4
a) ½" thick (13 mm) 100Sft 3,641.00 7,884.75 Per Sqm 391.75 848.40
b) ¾" thick (20 mm) 100Sft 3,641.00 8,619.30 Per Sqm 391.75 927.45
ii) Ratio 1:3
a) ½ " thick (13 mm) 100Sft 3,641.00 8,121.90 Per Sqm 391.75 873.90
b) ¾ " thick (20mm) 100Sft 3,641.00 8,899.10 Per Sqm 391.75 957.55
iii) Ratio 1:2
a) ½ " thick (13 mm) 100Sft 3,641.00 8,351.45 Per Sqm 391.75 898.60

Chap-6 (Concrete) Page 44


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

b) ¾ " thick (20 mm) 100Sft 3,641.00 9,444.90 Per Sqm 391.75 1,016.25
(b) with 2 coats of bitumen:-
i) Ratio 1: 4
a) ½" thick (13 mm) 100Sft 3,641.00 7,907.75 Per Sqm 391.75 850.85
b) ¾" thick (20 mm) 100Sft 3,641.00 8,641.45 Per Sqm 391.75 929.80
ii) Ratio 1:3
a) ½ " thick (13 mm) 100Sft 3,641.00 8,152.75 Per Sqm 391.75 877.25
b) ¾ " thick (20 mm) 100Sft 3,641.00 8,930.00 Per Sqm 391.75 960.85
iii) Ratio 1:2
a) ½ " thick (13 mm) 100Sft 3,641.00 8,742.65 Per Sqm 391.75 940.70
b) ¾ " thick (20 mm) 100Sft 3,641.00 9,905.70 Per Sqm 391.75 1,065.85
38 Providing and laying vertical damp proof course with cement
sand plaster and bitumen coating:-
(a) with one coat of bitumen and one coat of polythene sheet
500 gauge:
i) Ratio 1: 4
a) ½" thick (13 mm) 100Sft 3,641.00 7,522.70 Per Sqm 391.75 809.45
b) ¾" thick (20 mm) 100Sft 3,641.00 8,258.95 Per Sqm 391.75 888.65
ii) Ratio 1:3
a) ½ " thick (13 mm) 100Sft 3,641.00 7,761.55 Per Sqm 391.75 835.15
b) ¾ " thick (20 mm) 100Sft 3,641.00 8,538.80 Per Sqm 391.75 918.80
iii) Ratio 1:2
a) ½ " thick (13 mm) 100Sft 3,641.00 8,351.45 Per Sqm 391.75 898.60
b) ¾ " thick (20 mm) 100Sft 3,641.00 9,514.50 Per Sqm 391.75 1,023.75
(b) with 2 coats of bitumen:-
i) Ratio 1: 4
a) ½" thick (13 mm) 100Sft 3,641.00 7,906.20 Per Sqm 391.75 850.70
b) ¾" thick (20 mm) 100Sft 3,641.00 8,641.45 Per Sqm 391.75 929.80
ii) Ratio 1:3
a) ½ " thick (13 mm) 100Sft 3,641.00 8,144.05 Per Sqm 391.75 876.30
b) ¾ " thick (20 mm) 100Sft 3,641.00 8,921.25 Per Sqm 391.75 959.95
iii) Ratio 1:2
a) ½ " thick (13 mm) 100Sft 3,641.00 8,734.15 Per Sqm 391.75 939.80
b) ¾ " thick (20 mm) 100Sft 3,641.00 9,896.90 Per Sqm 391.75 1,064.90
39 Grouting concrete between, the grooves of gates, including 100Cft 17,424.00 - Per Cum 6,154.15 -
shuttering.
40 Chiesel dressing concrete surface on sides of grooves. 100Sft 537.25 - Per Sqm 57.80 -
41 Laying and ramming dry ballast or kankar. 100Cft 6,113.25 - Per Cum 2,159.20 -
42 Hoisting and placing in position R.C.C. shelves. Each 193.90 - Each 193.90 -
43 Breaking brick ballast, screening and stacking:-
(a) 2"(50 mm) ring 100Cft. 4,702.50 - Per Cum 1,660.90 -
(b) 1½ "(40 mm) ring 100Cft. 5,266.80 - Per Cum 1,860.25 -

Chap-6 (Concrete) Page 45


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

(c) 1" (25 mm) ring 100Cft. 6,113.25 - Per Cum 2,159.20 -
(d) Jhama ballast ¾"(20 mm) ring 100Cft. 7,053.75 - Per Cum 2,491.40 -
44 Supplying and fixing broken glasses on court yard walls, Per Rft 146.75 241.15 Per Metre 481.35 790.95
including 1:3: 6 cement concrete coping.
45 Crushing stone ballast by machine. 100Cft 4,702.50 - Per Cum 1,660.90 -
This does not include the charges for working
of crushers, but includes manual labour for
carriage of stone to crusher within three
chains (90 m) and also stacking the product
after crushing within three chains (90 m).
46 Breaking stone ballast screened and stacked:-
(a) 2" ring (50 mm) 100Cft. 5,266.80 - Per Cum 1,860.25 -
(b) 1½ " ring (40 mm) 100Cft. 6,113.25 - Per Cum 2,159.20 -
(c) 1" ring (25 mm) 100Cft. 7,053.75 - Per Cum 2,491.40 -
d) ½ " ring (13 mm) 100Cft. 9,405.00 - Per Cum 3,321.85 -
(e)1/8" to ¼" ring (3 mm to 6 mm) 100Cft. 15,988.50 - Per Cum 5,647.15 -
47 Screening and stacking stone ballast shingle or bajri, etc. 100Cft. 1,504.80 - Per Cum 531.50 -
48 Washing ballast, bajri or shingle. 100Cft. 1,504.80 - Per Cum 531.50 -
49 Erecting and carting sun shades of precast R.C. concrete
upto 5' x 2½' (1.50 m x 0.76 m) Each 846.10 - Each 846.10 -
50 Extra for Kentledge and loading arangements for test pile to ensure Per Cwt. 1.45 25.45 Per Ton 32.40 560.85
structural and Geotechnical soundness of pile upto a maximum test load
applying in stages i/c the hiring of machinary required for complete job
and furnishing a report in this regard by a qualified/authorized Geo
Technical Engineer by studying the data of at least seven days as approved
and directed by the Engineer Incharge.
51 Making Temporary floating plateform comprising of required Nos. of Each 12,969.00 100,055.00 Each 12,969.00 100,055.00
unifloats in running water / pond to place machinery, manpower and
proper access complete in all respect as approved and directed by the
Engineer Incharge.
52 Providing and fixing precast Edge Kerb Stone (4"to 6" thick), of 3500 PSI * 1203-1
Compressive Strength, embeded in PCC 1:2:4 over lean concrete 1:4:8 etc to
complete in all respect. 1203-3
a) Without Painting
(i) 14" high Per Rft 150.35 598.85 Per Meter 493.10 1,964.30
(ii) 18" high Per Rft 154.60 614.35 Per Meter 507.10 2,015.15
b) With Painting
(i) 14" high Per Rft 193.25 687.10 Per Meter 633.85 2,253.65
(ii) 18" high Per Rft 197.50 702.60 Per Meter 647.85 2,304.50
53 Providing & fixing precast Edge Kerb Stone (4" to 6" thick) and 14" high
of Compressive Strength of 3500 PSI laid in cement sand mortar (1:3)
over pre-laid brick masonary for drain cum footpath etc complete in all
respect.
(i) Without painting Per Rft 132.65 480.45 Per Meter 435.10 1,575.85
(ii) With painting Per Rft 175.55 568.65 Per Meter 575.85 1,865.25

Chap-6 (Concrete) Page 46


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

54 Providing and laying Kerb Block / RCC Barrier of Concrete having


compressive strength of 4000 PSI ratio (1:1.25:2.25) of required size with
Slip form Paver / power kerber machine, batching plant, excluding the
cost of additive / super plasticizer, steel reinforcement and its labour for If batching plant is not used, reduce labour &
bending and laying in position as specified etc complete in all respect. composite rates:-
a) Kerb Block Per Cft 119.10 647.25 Per Cum 4,206.95 22,860.15 a) Rs.26.35 P.Cft or Rs.930.40 P.CUM
b) R.C.C Barrier
(i) Single Face Per Cft 95.40 623.55 Per Cum 3,370.25 22,023.45 b-i) Rs. 19.90 P.Cft or Rs. 702.15 P.CUM
(ii) Double Face Per Cft 97.80 625.90 Per Cum 3,453.95 22,107.15 b-ii) Rs. 20.70 P.Cft or Rs. 731.10 P.CUM
55 Providing and mixing water reducing admixture as defined in ASTM C-94
in order to achieve the required consistancy / workablility measured by the i. The use of Plasticizer/ Super Plasticizer will
slump or to acheive specified strength in the ratio as proposed by the be subject to the permission of
designer in the concrete mix design etc. complete in all respect as Superintending Engineer.
approved and directed by Engineer incharge. ii. Used in the ratio of (0.05% to 1.00%) by
a) Super Plasticizer Per Gallon 19.65 919.75 Per Ltr. 4.30 202.30 weight of cement.
b) Plasticizer Per Gallon 19.65 608.80 Per Ltr. 4.30 133.90

Specification numbers correspond to book of standard specification of Road and Bridge Construction, "1971"

Chap-6 (Concrete) Page 47


7. BRICK WORK
1 Rates for all finsihed works include the removal of surplus debris, unused material and byproducts.
2 The rates apply to all sizes of bricks, including the modular bricks of size 8"x4"x4" (200x100x100 mm) nominal.
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
1 Pacca brick work in mud mortar in buildings: 21.1 Masonry of boundary wall to be
to considered as masonry other than
i) in foundation and plinth 100Cft. 7,652.55 30,706.35 P. Cum 2,702.90 10,845.50 21.4 building.
ii) in ground floor 100Cft. 10,134.15 33,187.95 P. Cum 3,579.40 11,722.00
The composite rate is to be
reduced by 7% and 14%, if 2nd or
3rd class bricks are used.
2 Add extra labour on item No. 1 for brick work in:-

i) first floor 100Cft. 1,993.20 -- P. Cum 704.00 -


ii) second floor 100Cft. 4,474.80 -- P. Cum 1,580.50 -
iii) third floor 100Cft. 6,956.40 -- P. Cum 2,457.00 -
iv) fourth & subsequent floors 100Cft. 11,167.20 -- P. Cum 3,944.25 -
3 Pacca brick work in mud mortar other than building:- 21.1 to Same remarks as against
21.4 item No. 1 above
i) upto 20 ft. (6.1 m) height 100Cft. 10,431.70 33,485.50 P. Cum 3,684.50 11,827.10
ii) extra labour for every 5 ft. (1.5 m) 100Cft. 1,993.20 -- P. Cum 704.00 -
additional height, or part thereof.
4 Pacca brick work in foundation and plinth in:- ditto Same remarks as against
item No. 1 above.
i) Cement, sand mortar:-
Ratio 1:2 100Cft. 8,388.80 44,820.80 P. Cum 2,962.85 15,830.70
Ratio 1:3 100Cft. 8,388.80 41,643.80 P. Cum 2,962.85 14,708.60
Ratio 1:4 100Cft. 8,388.80 39,737.60 P. Cum 2,962.85 14,035.30
Ratio 1:5 100Cft. 8,388.80 38,466.80 P. Cum 2,962.85 13,586.45
Ratio 1:6 100Cft. 8,388.80 37,512.00 P. Cum 2,962.85 13,249.25
Ratio 1:7 100Cft. 8,388.80 36,887.00 P. Cum 2,962.85 13,028.50
Ratio 1:8 100Cft. 8,388.80 36,338.05 P. Cum 2,962.85 12,834.60
ii) lime, cement sand mortar:- 21.1 The rate of lime mortar also
includes grinding of mortar.
Ratio 1:1:6 100Cft. 8,388.80 39,276.35 P. Cum 2,962.85 13,872.40
Ratio 1:1:7 100Cft. 8,388.80 38,490.35 P. Cum 2,962.85 13,594.80
Ratio 1:1:8 100Cft. 8,388.80 37,857.70 P. Cum 2,962.85 13,371.35
Ratio 1:1:9 100Cft. 8,388.80 37,325.60 P. Cum 2,962.85 13,183.40
Ratio 1:1:10 100Cft. 8,388.80 36,926.90 P. Cum 2,962.85 13,042.60

iii) lime, sand mortar 1:2 100Cft. 8,388.80 38,155.50 P. Cum 2,962.85 13,476.50 ditto ditto

chapter-7(Brickwork) Page 48
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
5 Pacca brick work in ground floor:- ditto i) The composite rate is to
be reduced by 7% and 14%,
i) cement, sand mortar:- if 2nd or 3rd class bricks are
used.
Ratio 1:2 100Cft. 11,083.80 47,515.80 P. Cum 3,914.80 16,782.60 ii) Masonry of boundary wall
Ratio 1:3 100Cft. 11,083.80 44,338.80 P. Cum 3,914.80 15,660.45 to be considered as masonry
Ratio 1:4 100Cft. 11,083.80 42,432.60 P. Cum 3,914.80 14,987.20 other than building.
Ratio 1:5 100Cft. 11,083.80 41,161.80 P. Cum 3,914.80 14,538.35
Ratio 1:6 100Cft. 11,083.80 40,207.00 P. Cum 3,914.80 14,201.10
Ratio 1:7 100Cft. 11,083.80 39,582.00 P. Cum 3,914.80 13,980.35
Ratio 1:8 100Cft. 11,083.80 39,029.60 P. Cum 3,914.80 13,785.25
ii) lime, cement, sand mortar:- The rate of lime mortar also
includes grinding of mortar.
Ratio 1:1:6 100Cft. 11,083.80 41,971.35 P. Cum 3,914.80 14,824.30
Ratio 1:1:7 100Cft. 11,083.80 41,198.70 P. Cum 3,914.80 14,551.40
Ratio 1:1:8 100Cft. 11,083.80 40,552.70 P. Cum 3,914.80 14,323.20
Ratio 1:1:9 100Cft. 11,083.80 40,020.60 P. Cum 3,914.80 14,135.30
Ratio 1:1:10 100Cft. 11,083.80 39,624.05 P. Cum 3,914.80 13,995.20
iii) lime, sand mortar 1:2 100Cft. 11,083.80 40,850.50 P. Cum 3,914.80 14,428.40 The rate of lime mortar also
includes grinding of mortar.
6 Add extra labour on item No. 5 for brickwork
in:-
i) first floor 100Cft. 1,993.20 -- P. Cum 704.00 -
ii) second floor 100Cft. 3,729.00 -- P. Cum 1,317.10 -
iii) third floor 100Cft. 6,956.40 -- P. Cum 2,457.00 -
iv) fourth & subsequent floors 100Cft. 9,306.00 -- P. Cum 3,286.90 -
7 Pacca brick work other than building upto 10ft. (3 m) 21.1 i) The composite rate is to be
height. to reduced by 7% and 14%, if 2nd or
21.5 3rd class bricks are used.
i) cement, sand mortar:-
ii) Workshops, godowns,, bins,
Ratio 1:2 100Cft. 9,724.00 46,156.00 P. Cum 3,434.50 16,302.30 house type godowns, reservoirs,
Ratio 1:3 100Cft. 9,724.00 42,979.00 P. Cum 3,434.50 15,180.20 filter beds, storage tanks, wells,
Ratio 1:4 100Cft. 9,724.00 41,072.80 P. Cum 3,434.50 14,506.90 screening chambers, collecting
Ratio 1:5 100Cft. 9,724.00 39,802.00 P. Cum 3,434.50 14,058.05 tanks, manholes etc. are to be
Ratio 1:6 100Cft. 9,724.00 38,847.15 P. Cum 3,434.50 13,720.80 treated as masonry other than
Ratio 1:7 100Cft. 9,724.00 38,222.20 P. Cum 3,434.50 13,500.10 buildings.
Ratio 1:8 100Cft. 9,724.00 37,673.25 P. Cum 3,434.50 13,306.20
ii) lime, cement, sand mortar:- The rate of lime mortar also
includes grinding of mortar.
Ratio 1:1:6 100Cft. 9,724.00 40,611.50 P. Cum 3,434.50 14,344.00
Ratio 1:1:7 100Cft. 9,724.00 39,825.55 P. Cum 3,434.50 14,066.40
Ratio 1:1:8 100Cft. 9,724.00 39,192.90 P. Cum 3,434.50 13,842.95
Ratio 1:1:9 100Cft. 9,724.00 38,660.45 P. Cum 3,434.50 13,654.85
Ratio 1:1:10 100Cft. 9,724.00 38,262.10 P. Cum 3,434.50 13,514.15
iii) lime, sand mortar 1:2 100Cft. 9,724.00 39,490.70 P. Cum 3,434.50 13,948.10 ditto

chapter-7(Brickwork) Page 49
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

8 Add extra labour on item No. 7, for every 10ft.(3 m) 100Cft. 1,661.00 -- P. Cum 586.65 -
additional height, or part thereof.

9 Extra labour for arch work in brick masonry, including 100Cft. 3,069.00 -- P. Cum 1,083.95 - 21.5
labour for centring and decentring.
10 Extra for pacca brick work in steining of wells or any other 100Cft. 2,035.00 3,412.60 P. Cum 718.75 1,205.35 21.1 The composite rate is to be
circular masonry. to reduced by 7% and 14%, if 2nd or
21.4 3rd class bricks are used.
11 Extra labour for profile and flared walls. 100Cft. 700.05 -- P. Cum 247.25 -

12 Extra labour for pacca brick work in piers and abutment:-

i) from 10ft. to 20ft. (3 m to 6 m) height 100Cft. 986.85 -- P. Cum 348.55 -


ii) above 20 ft. (6 m) height. 100Cft. 1,993.20 -- P. Cum 704.00 -
13 Extra for face work (half brick thick) using special bricks 100Cft. 6,116.80 P. Cum 2,160.45 This item is to be executed only
instead of first class bricks. under the written permission of
Superintending Engineer.

14 Reinforced brick work in lintel of openings, laid in 1:3 Per Cft. 331.65 700.75 P. Cum 11,713.40 24,750.50
cement mortar, including all labour, material, forms,
moulds, lifting & shuttering, etc, (but excluding cost and
labour of steel reinforcement which shall be paid for
separately).
15 Extra for dressing or chamfering bricks for:-
a) special architectural bricks 100 Nos. 6,372.45 - 100 Nos. 6,372.45 -
b) all other purposes 100 Nos. 3,186.20 - 100 Nos. 3,186.20 -
16 Perforated pacca brick walling half brick thick, in ground 21.1 The composite rate is to be
floors:- to reduced by 7% and 14%, if 2nd or
21.4 3rd class bricks are used.
i) mud mortar 100 Sft. 5,059.55 10,831.40 P. Sqm 544.40 1,165.45
ii) cement, sand mortar:-

Ratio 1:2 100 Sft. 6,665.45 15,781.85 P. Sqm 717.20 1,698.15


Ratio 1:3 100 Sft. 6,665.45 14,986.75 P. Sqm 717.20 1,612.55
Ratio 1:4 100 Sft. 6,665.45 14,511.05 P. Sqm 717.20 1,561.40
Ratio 1:5 100 Sft. 6,665.45 14,193.35 P. Sqm 717.20 1,527.20
Ratio 1:6 100 Sft. 6,665.45 13,970.10 P. Sqm 717.20 1,503.20
Ratio 1:7 100 Sft. 6,665.45 13,796.85 P. Sqm 717.20 1,484.55
Ratio 1:8 100 Sft. 6,665.45 13,669.45 P. Sqm 717.20 1,470.85
iii) lime, cement sand mortar The rate of lime mortar also
includes grinding of mortar.
Ratio 1:1:6 100Sft. 6,665.45 14,395.75 P. Sqm 717.20 1,549.00
Ratio 1:1:7 100Sft. 6,665.45 14,199.75 P. Sqm 717.20 1,527.90
Ratio 1:1:8 100Sft. 6,665.45 14,054.60 P. Sqm 717.20 1,512.30
Ratio 1:1:9 100Sft. 6,665.45 13,906.15 P. Sqm 717.20 1,496.30
Ratio 1:1:10 100Sft. 6,665.45 13,821.20 P. Sqm 717.20 1,487.15

chapter-7(Brickwork) Page 50
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
iv) lime, sand mortar 1:2 100Sft. 6,665.45 14,110.15 P. Sqm 717.20 1,518.25 ditto
17 Add extra labour on item No. 16 for pacca brick work in:-
i) first floor 100Sft. 1,006.35 - P. Sqm 108.30 -
ii) second floor 100 Sft. 2,227.65 - P. Sqm 239.70 -
iii) third floor 100 Sft. 3,487.95 - P. Sqm 375.30 -
iv) fourth & subsequent floors 100 Sft. 5,378.20 - P. Sqm 578.70 -
18 Perforated pacca brick walling one brick thick, in ground 21.1 The composite rate is to be
floor: to reduced by 7% and 14%, if 2nd or
21.4 3rd class bricks are used.
i) mud mortar 100Sft. 7,116.10 18,643.00 P. Sqm 765.70 2,006.00
ii) cement, sand mortar:-

Ratio 1:2 100 Sft. 10,016.40 28,232.40 P. Sqm 1,077.75 3,037.80


Ratio 1:3 100 Sft. 10,016.40 26,643.90 P. Sqm 1,077.75 2,866.90
Ratio 1:4 100 Sft. 10,016.40 25,690.80 P. Sqm 1,077.75 2,764.35
Ratio 1:5 100 Sft. 10,016.40 25,055.40 P. Sqm 1,077.75 2,695.95
Ratio 1:6 100 Sft. 10,016.40 24,608.90 P. Sqm 1,077.75 2,647.90
Ratio 1:7 100 Sft. 10,016.40 24,261.35 P. Sqm 1,077.75 2,610.50
Ratio 1:8 100 Sft. 10,016.40 23,991.20 P. Sqm 1,077.75 2,581.45
iii) lime, cement, sand mortar:- The rate of lime mortar also
Ratio 1:1:6 100Sft. 10,016.40 25,460.20 P. Sqm 1,077.75 2,739.50 includes grinding of mortar
Ratio 1:1:7 100 Sft. 10,016.40 25,059.05 P. Sqm 1,077.75 2,696.35
Ratio 1:1:8 100 Sft. 10,016.40 24,751.20 P. Sqm 1,077.75 2,663.25
Ratio 1:1:9 100 Sft. 10,016.40 24,484.85 P. Sqm 1,077.75 2,634.55
Ratio 1:1:10 100 Sft. 10,016.40 24,292.30 P. Sqm 1,077.75 2,613.85
iv) lime, sand mortar 1:2 100Sft. 10,016.40 24,893.45 P. Sqm 1,077.75 2,678.55 ditto

19 Add extra labour on item No. 18 for perforated pacca brick


work in:-
i) first floor 100Sft. 1,494.90 -- P. Sqm 528.00 -
ii) second floor 100 Sft. 2,796.75 -- P. Sqm 987.85 -
iii) third floor 100 Sft. 5,217.30 -- P. Sqm 1,842.75 -
iv) fourth & subsequent floors 100 Sft. 6,979.50 -- P. Sqm 2,465.20 -
20 Fire brick masonry in fireclay mortar:- 21.1
to
i) upto 20 ft. (6.10 m) height including all charges. Per Cft. 126.45 1,234.80 P. Cum 4,466.45 43,612.30 21.2

ii) Extra for every 5 ft. (1.5 m) additional height, or part 100Cft. 1,993.20 -- P. Cum 704.00 - A&C No.I dated 2.9.1998
thereof.
21 First class brick walling laid in 1:3 cement sand mortar,
reinforced with 1" (25 mm) wide 18 gauge hoop iron:- 21.19
i) 4½" (113 mm) thick walling with hoop iron, bonding 6" 100Sft. 5,638.05 23,219.05 P. Sqm 606.65 2,498.35
(150 mm) apart.
ii) 4½" (113 mm) thick walling with hoop iron, bonding 100Sft. 5,045.70 20,360.10 P. Sqm 542.90 2,190.75
12" (300 mm) apart.

chapter-7(Brickwork) Page 51
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
iii) 3" (75 mm) thick walling with hoop iron, bonding 6" 100 Sft. 4,461.60 18,036.40 P. Sqm 480.05 1,940.70
(150 mm) apart.
iv) 3" (75 mm) thick walling with hoop iron, bonding 12" 100 Sft. 3,569.30 14,626.60 P. Sqm 384.05 1,573.80
(300 mm) apart.
22 Ghilafi work (1½ brick thick wall) 100Cft. 10,195.40 23,954.45 P. Cum 3,601.00 8,460.70 21.18
23 Dry brick pitching 100Cft. 6,204.00 28,884.00 P. Cum 2,191.25 10,201.85 21.1
24 Sun dried bricks in mud mortar 100Cft. 8,580.00 13,044.30 P. Cum 3,030.45 4,607.25 21.16

25 Pise wall (mud walling) 100Cft. 4,976.40 -- P. Cum 1,757.65 - 21.17


26 Eave brick moulded, weathered and throated with back 21.1 to 21.2
brick or drip course cornice, in 1:3 cement mortar:-
i) 3" (75 mm) thick drip course cornice Per Rft 64.35 134.90 Per Metre 211.05 442.45 correction vide A&C No.I
ii) 4½" (113 mm) thick drip course cornice. Per Rft 73.00 240.75 Per Metre 239.45 789.65 dated 2.9.98
iii) 4½" (113 mm) thick eave brick with back brick. Per Rft 49.65 261.80 Per Metre 162.85 858.70
27 Laying dressed or moulded brick cornices in 1:6 cement 21.1 to 21.2
mortar, plastering or painting complete:-
i) 1 brick Per Rft 73.00 111.30 Per Metre 239.45 365.05
ii) 2 bricks Per Rft 107.60 224.85 Per Metre 352.95 737.50
iii) 3 bricks Per Rft 143.55 340.35 Per Metre 470.85 1,116.35
iv) 4 bricks Per Rft 180.60 454.10 Per Metre 592.35 1,489.45

28 Cleaning bricks dismantled from kacha pacca masonry 1,000 2,633.40 -- 1,000 2,633.40 -
Nos Nos
29 Scraping bricks dismantled from pacca masonry 1,000 4,965.85 -- 1,000 4,965.85 -
Nos Nos
30 Providing and laying 2" (50 mm) thick and 15" (375 mm) Per Rft 270.20 467.50 Per Metre 886.25 1,533.40
projected tile band, laid in 1:2 cement sand mortar, with
hoop iron 1" (25 mm) wide 18 gauge flat iron sheet 9"
apart.
31 First class brick tiles clad by laying tiles in stretcher This item is to be executed only
course in cement sand mortar reinforced with 18 SWG under the written permission of the
hoop iron strips bonding placed at 2.0' (600 mm) apart Superintending Engineer.
horizontally, and at 1.0' (300 mm) interval vertically.
i) 1:3 100Sft. 5,045.70 21,170.00 P. Sqm 542.90 2,277.90
ii) 1:4 100Sft. 5,045.70 20,407.50 P. Sqm 542.90 2,195.85

32 Chamfering sides of head regulators and masonry walls to Per Sft. 144.10 -- P. Sqm 1,550.50 -
increase width.
33 Replacing kallar eaten bricks Each 112.75 126.90 Each 112.75 126.90
34 Repairing corners of bridges and other hydraulic masonry Each 720.50 930.95 Each 720.50 930.95
works
35 Extra labour for drains of bath rooms, etc. Per Rft 61.05 -- Per Metre 200.25
36 Maroo corners Each 390.70 -- Each 390.70 Payable in addition to brick work
Corner Corner

chapter-7(Brickwork) Page 52
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

37 Providing and laying fair face Gutka cladding laid in (1:2) cement / red Carriage charges of Gutka shall be paid
posso mortar having 1/4" thick groove finish i/c cost of 8 SWG wire in seprately
shape of 8 placed horizontally and vertically at 36" and 18" c/c respectively
i/c cutting charges as per approved drawing , complete in all respect as
approved and directed by the Engineer Incharge.
i. 2-1/4" x 2-1/4" x 9" Per Sft 106.85 261.80 P.Sqm 1,149.55 2,817.00
ii. 2-1/4" x 3" x 9" Per Sft 96.05 226.60 P.Sqm 1,033.30 2,438.35

38 Providing and laying 4-1/2" thick fair face Special brick Cladding Per Sft 100.55 269.65 P.Sqm 1,081.95 2,901.55 21.1
(9"x4-1/2"x3") laid in (1:3) cement / red posso mortar having 1/4" thick
groove finish i/c the cost of 8 SWG wire in shape of 8 placed horizontally
and vertically at 36" and 18" c/c respectively i/c cutting charges as per
approved drawing, complete in all respect as approved and directed by the
Engineer Incharge.

chapter-7(Brickwork) Page 53
8. STONE MASONRY
1 The composite rates do not include the carriage of stone or spawl which will be paid separately by road and/or rail whichever means of
transport is adopted. The supply and carriage to site of work of all other materials is included in the composite rates.

2 The payment of carriage of stone or spawl will be made on the basis of the actual stack measurement (without any reduction factor) of the
stone or spawl carried.

3 Where the stone or spawl is issued from stock and the contractor is paid for its carriage and/or labour only; or where the stone or spawl is
supplied, carried or handled by the contractor in which no laying is required, the actual stack measurement (without any reduction factor)
shall form the basis of the payment of supply or carriage of stone or spawl. The quantity of finished and completed item of work shall form
the basis of laying.

4 Rates for all finished work include the removal of surplus debris, unused material and byproducts.

MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

1 Random, rubble masonry (uncoursed), in foundation and 22.10,


plinth: 22.11

a) dry masonry 100 Cft. 10,527.00 12,447.00 P. Cum 3,718.15 4,396.30


b) in mud mortar 100 Cft. 13,167.00 15,567.60 P. Cum 4,650.60 5,498.50
c) in lime, sand mortar 1:2 100 Cft. 20,130.00 31,158.00 P. Cum 7,109.90 11,005.00
d) in cement, sand mortar
i) ratio 1:3 100 Cft. 20,130.00 37,912.50 P. Cum 7,109.90 13,390.70
ii) ratio 1:4 100 Cft. 20,130.00 35,053.20 P. Cum 7,109.90 12,380.80
iii) ratio 1:6 100 Cft. 20,130.00 31,780.70 P. Cum 7,109.90 11,224.95
iv) ratio 1:8 100 Cft. 20,130.00 29,970.00 P. Cum 7,109.90 10,585.40
2 Coursed rubble masonry hammer dressed, in foundation 22.8
and plinth:
a) dry masonry 100 Cft. 12,969.00 14,889.00 P. Cum 4,580.65 5,258.80
b) in mud mortar 100 Cft. 18,249.00 20,649.60 P. Cum 6,445.55 7,293.45
c) in lime, sand mortar 1:2 100 Cft. 22,440.00 32,452.10 P. Cum 7,925.80 11,462.10
d) in cement, sand mortar:
i) ratio 1:3 100 Cft. 22,440.00 39,270.00 P. Cum 7,925.80 13,870.15
ii) ratio 1:4 100 Cft. 22,440.00 36,728.40 P. Cum 7,925.80 12,972.45
iii) ratio 1:6 100 Cft. 22,440.00 33,818.40 P. Cum 7,925.80 11,944.65
iv) ratio 1:8 100 Cft. 22,440.00 32,218.80 P. Cum 7,925.80 11,379.70
3 Random rubble masonry (uncoursed) in 22.10
ground floor or 20 ft.(6 m) height, building/other
than building.
a) dry masonry 100 Cft. 11,748.00 13,668.00 P. Cum 4,149.40 4,827.55
b) in mud mortar 100 Cft. 15,807.00 18,207.60 P. Cum 5,583.05 6,430.90
c) in lime, sand mortar 1:2 100 Cft. 21,829.50 32,857.50 P. Cum 7,710.20 11,605.25
d) in cement, sand mortar:
i) ratio 1:3 100 Cft. 21,829.50 39,612.00 P. Cum 7,710.20 13,990.95

chapter-8(Stone masonary) Page 54


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

ii) ratio 1:4 100 Cft. 21,829.50 36,752.70 P. Cum 7,710.20 12,981.05
iii) ratio 1:6 100 Cft. 21,829.50 33,480.20 P. Cum 7,710.20 11,825.20
iv) ratio 1:8 100 Cft. 21,829.50 31,669.50 P. Cum 7,710.20 11,185.65
4 Coursed rubble masonry hammer dressed, in ground floor 22.8
or 20 ft. (6 m) height, building/other than building.
a) dry masonry 100 Cft. 15,130.50 17,050.50 P. Cum 5,344.10 6,022.25
b) in mud mortar 100 Cft. 22,572.00 24,951.25 P. Cum 7,972.45 8,812.80
c) in lime, sand mortar 1:2 100 Cft. 25,212.00 35,224.15 P. Cum 8,904.90 12,441.15
d) in cement, sand mortar:
i) ratio 1:3 100 Cft. 25,212.00 42,042.00 P. Cum 8,904.90 14,849.25
ii) ratio 1:4 100 Cft. 25,212.00 39,500.40 P. Cum 8,904.90 13,951.55
iii) ratio 1:6 100 Cft. 25,212.00 36,590.40 P. Cum 8,904.90 12,923.75
iv) ratio 1:8 100 Cft. 25,212.00 34,990.80 P. Cum 8,904.90 12,358.75
5 Ashlar block in course or scabbled masonry (including 22.5
dressing, etc.,) in ground floor or 20 ft. (6 m) height, &
building/other than building. 22.6
a) in lime, sand mortar 1:2 100 Cft. 66,561.00 75,406.60 P. Cum 23,509.35 26,633.60
b) in cement, sand mortar:
i) ratio 1:3 100 Cft. 66,561.00 79,910.80 P. Cum 23,509.35 28,224.50
ii) ratio 1:4 100 Cft. 66,561.00 78,004.60 P. Cum 23,509.35 27,551.25
iii) ratio 1:6 100 Cft. 66,561.00 75,844.25 P. Cum 23,509.35 26,788.20
6 Ashlar fine masonry (including dressing, etc.) in ground 22.3
floor or 20 ft. 6 m) height, building/other than building. (A) to (C)
&
a) in lime, sand mortar 1:2 100 Cft. 121,126.50 128,105.60 P. Cum 42,781.90 45,246.90 22.4
b) in cement, sand mortar:
i) ratio 1:3 100 Cft. 121,126.50 130,357.70 P. Cum 42,781.90 46,042.35
ii) ratio 1:4 100 Cft. 121,126.50 129,403.15 P. Cum 42,781.90 45,705.20
iii) ratio 1:6 100 Cft. 121,126.50 128,344.55 P. Cum 42,781.90 45,331.30
7 Extra labour on items 3, 4, 5 & 6 above for work in:-

i) first floor 100 Cft. 2,812.95 - P. Cum 993.55 -


ii) second floor 100 Cft. 6,256.80 - P. Cum 2,209.90 -
iii) third floor 100 Cft. 9,775.90 - P. Cum 3,452.85 -
iv) fourth floor 100 Cft. 15,459.85 - P. Cum 5,460.40 -
8 Extra labour on items 3,4,5 & 6 above for every 5 ft.(1.5 m) 100 Cft. 2,481.60 - P. Cum 876.50 -
additional height, other than building, or part thereof.
9 Extra labour for arch work in stone masonry, including 100 Cft. 7,197.40 - P. Cum 2,542.10 - 22.12
centering and decentring, etc.
10 Extra labour for:- 22.7
a) coping and caps, etc. 100 Cft. 35,164.80 - P. Cum 12,420.20 -
b) cornice & string course 100 Rft. 35,164.80 - Rm. 1,153.40 -

chapter-8(Stone masonary) Page 55


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

11 Dressing stones:- 22.2


i) This rate of dressing shall be paid
a) hammer dressed 100 Sft. 13,530.00 - P. Sqm 1,455.85 - only when the supply of undressed
b) rough tooled dressed 100 Sft. 25,555.20 - P. Sqm 2,749.75 - stone is made.
c) chisel dressed 100 Sft. 30,967.20 - P. Sqm 3,332.05 - ii) In case of masonry, dressing is
d) fine dressed 100 Sft. 64,178.40 - P. Sqm 6,905.60 - already included and this rate shall
not be added thereto.
iii) Only dressed surface of stone
shall be measured.
12 Dhajji walling 5"x5" (125 mmx125 mm) thick deodar 100 Sft. 26,703.20 56,553.40 P. Sqm 2,873.25 6,085.15 22.13
framing with stone laid in 1:6 cement sand mortar, and 1:4
cement sand plaster on both sides.
13 Providing and fixing stone blocks from 2 Cft. Per Cft. 1,166.40 1,226.90 P. Cum 41,197.25 43,334.10
(0.6 cu.m) to 6 Cft (0.17 cu.m). each
including lift upto 20 ft. (6 m)
14 Providing and fixing stone blocks, under 2 Per Cft. 665.60 738.05 P. Cum 23,509.00 26,067.95
Cft. (06 cu.m) each including lift upto 20 ft.
(6 m)

chapter-8(Stone masonary) Page 56


9. ROOFING
Rates for all finished works include the removal of surplus debris unused material and byproducts.
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
1 First class tile roofing, consisting of 4" (100 mm) earth 100Sft. 18,073.45 32,430.30 P. Sqm 1,944.70 3,489.50 23.1 Add extra 13%, 32% & 51% on
and 1" (25 mm) mud plaster with Gobri leeping over ½" (13 labour rates only or 6%, 15% & 23%
mm) thick cement plaster 1:6 with 34 lbs. per %Sft or on composite rates for 2nd, 3rd, 4th
1.72 Kg/sq.m hot bitumen coating sand blinded, provided & sub- sequent floors, respectively.
over 2 layers of tiles 12"x6"x1¼" (300x150x30 mm) laid in
1:6 cement mortar with ½" (13 mm) thick sand wiched
layer of 1:6 cement mortar, including 1:2 cement pointing
underside of tiles, complete, including curing, etc.
2 Second class tile roofing consisting of 4" (100 mm) earth 100Sft. 13,939.20 24,460.60 P. Sqm 1,499.85 2,631.95 23.2 ditto
and 1" (25 mm) mud plaster with Gobri leeping over ½" (13
mm) thick cement plaster 1:6 with 34 lbs. per %Sft or
1.72 Kg/sq.m of hot bitumen coating sand blinded,
provided over one layer of 12"x6"x2" (300x150x50 mm)
tiles laid in 1:6 cement mortar, including 1:2 cement
pointing underneath of tiles complete including curing, etc.
3 Covering mud roof with coal tar, and fine sand. 100Sft. 763.30 2,333.85 P. Sqm 82.15 251.10 23.1 to 23.2 ditto

4 Filling spaces in between:-


a) Wooden battens over beams, filled with 100Sft. 1,441.00 9,017.30 P. Sqm 155.05 970.25 Add extra 13%, 32% & 51% on
deodar wood pieces (spacers). roof area labour rates only or 6%, 15% &
b) RCC battens, filled with CC block 1:3:6. -ditto- 2,673.00 3,542.20 287.60 381.15 23% on composite rates for 2nd,
c) Spaces filled with bricks. -ditto- 741.05 1,849.55 79.75 199.00 3rd, 4th & sub- sequent floors,
respectively.
5 Single layer of tiles 9"x4½"x1½" (225x113x40 mm) laid 100Sft. 4,428.60 13,859.60 P. Sqm 476.50 1,491.30 23.1 ditto
over 4"(100 mm) earth and 1" (25 mm) mud plaster without
Bhoosa, grouted with cement sand 1:3 on top of RCC roof
slab, provided with 34 lbs. per %Sft. or 1.72 Kg/Sq.m
bitumen coating sand blinded.
6 Jack arch roofing 4½" (113 mm) thick laid in 1:5 cement 23.3 to For steel part and its erection etc.
mortar, including an average depth of 4" (100 mm) cement 23.5 items 10 & 14 under Chapter IRON
concrete in haunches and over crown, with 3" (75 mm) WORK be referred.
earth and 1" (25 mm) plaster, soffits of arches cement
plaster 1:6 and ½" (13 mm) thick. The rate also includes Add extra 13%, 32% & 51% on
bitumen coating, centring, laying skew bricks in cement labour rates only or 6%, 15% & 23%
mortar (1:3), and encasing exposed flanges of the joints on composite rates for 2nd, 3rd, 4th
with fine cement concrete 1:2:4 using stone aggregate:- & sub- sequent floors, respectively.
a) cement concrete in haunches 1:6:12. 100Sft. 19,879.20 46,188.40 P. Sqm 2,139.00 4,969.85
b) cement concrete in haunches 1:3:6. ditto 19,879.20 49,542.20 P. Sqm 2,139.00 5,330.75
7 Jack arch roofing 4½" (113 mm) thick laid in 1:5 cement 23.3 For steel part and its erection etc.
mortar, including an average depth of 4" (100 mm) cement to items 10 & 14 under Chapter IRON
concrete in haunches and over crown, with ½" (13 mm) 23.5 WORK be referred.
cement plaster 1:6 on top (except earth filling mud plaster
chapter-9(Roofing) Page 57
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
and gobri) soffit of arches cement plastered. The rate also Add extra 13%, 32% & 51% on
includes bitumen coating, centring, laying skew bricks in labour rates only or 6%, 15% & 23%
cement sand mortar (1:3), and encasing exposed flanges on composite rates for 2nd, 3rd, 4th
of the joints with fine cement concrete 1:2:4 using stone & sub- sequent floors, respectively.
aggregate:-
a) cement concrete in haunches 1:6:12. 100Sft. 16,156.80 46,559.55 P. Sqm 1,738.45 5,009.80
b) cement concrete in haunches 1:3:6. ditto 16,156.80 45,156.00 P. Sqm 1,738.45 4,858.80

8 Extra for vaulted jack arch roofing. 100Sft. 3,907.20 P. Sqm 420.40 - ditto

9 Jack arch roofing of shingle and cement concrete 1:3:6, 100Sft. 22,506.00 39,986.15 P. Sqm 2,421.65 4,302.50 23.3 ditto
4½" (113 mm) thick at crown, with ½" (13 mm) cement to
plaster including cost of supplying, erecting and 23.5
dismantling centring.

10 Earth filling over roof including watering, ramming with 1" 23.1 Add extra 13%, 32% & 51% on
(25 mm) mud plaster finished, with gobri leeping: to labour rates only or 6%, 15% & 23%
23.3 on composite rates for 2nd, 3rd, 4th
a) 3" (75 mm) thick earth filling and 1" (25 mm) mud 100Sft. 1,923.00 2,720.45 P. Sqm 206.90 292.70 & sub- sequent floors, respectively.
plaster
b) 4" (100 mm) thick earth filling and 1" (25mm) 100Sft. 2,518.55 3,422.85 P. Sqm 271.00 368.30
mud plaster
11 1/8" (3 mm) thick gobri leeping on roofs or floors. 100Sft. 271.90 337.55 P. Sqm 29.25 36.30 ditto ditto

12 Two coats of bitumen laid hot using 34 lbs. per %Sft, or 100Sft. 1,504.80 4,775.20 P. Sqm 161.90 513.80 23.1
1.72 Kg per square metre over roof and blinded with sand
at one Cft. per %Sft. (0.003 cu.m per sq.m)
13 Providing & Fixing corrugated galvanized iron sheets with G.I. bolts, 23.7 Add extra 13%, 32% & 51% on
nuts, limpet and bitumen washers, wind ties, complete in labour rates only or 6%, 15% & 23%
all respects without valleys and ridges:- on composite rates for 2nd, 3rd, 4th
& sub- sequent floors, respectively,
a) 20 BWG 100Sft. 2,882.00 50,582.35 P. Sqm 310.10 5,442.65 on items 13 to 18.
b) 22 BWG 100Sft. 2,882.00 43,799.70 P. Sqm 310.10 4,712.85
c) 24 BWG 100Sft. 2,882.00 35,481.40 P. Sqm 310.10 3,817.80

14 Khassi parnalas in cement, sand mortar 1:2, 12" (300 Rft. 204.60 261.55 Per Metre 671.10 857.90 23.10
mm) outside width finished smooth with a floating coat of
neat cement.
15 Khuras on roof 2'x2'x6" (600 x 600 x 150 mm) Each 768.25 1,170.80 Each 768.25 1,170.80 23.10
16 Bottom Khuras of brick masonry in cement mortar 1:6, Each 768.25 2,310.95 Each 768.25 2,310.95 23.10
4'x2'x4½" (1200x600x113 mm) over 3" (75 mm) cement
concrete 1:4:8.
17 Plain galvanized iron sheets 22 SWG rain water down pipe
including clamp and fixing in position.

a) 4" (100 mm) diameter down pipe Per Rft. 162.35 502.95 Per Metre 532.50 1,649.70
b) 5" (125 mm) diameter down pipe Per Rft. 162.35 584.15 Per Metre 532.50 1,916.00

chapter-9(Roofing) Page 58
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
18 Plain galvanized iron sheet flashing, 22 gauge. Per Sft. 162.35 425.85 P. Sqm 1,746.90 4,582.15 23.11
19 Providing and fixing 1/16" (1.5 mm) thick lead flashing over Per Sft. 48.85 211.20 P. Sqm 525.65 2,272.50
roof expansion joint complete in all respects.
20 Cast iron rain water downpipe fixed in position, excluding Add extra 13%, 32% & 51% on
heads and shoes, but including painting and clamps, etc:- labour rates only or 6%, 15% & 23%
on composite rates for 2nd, 3rd, 4th
a) 4" dia (100 mm) cast iron down pipe. Per Rft. 144.10 493.90 Per Metre 472.65 1,620.00 & sub- sequent floors, respectively,
b) 3" (75 mm) cast iron down pipe. Per Rft. 144.10 450.70 Per Metre 472.65 1,478.30 on items 19 to 24
21 Rain water down pipe cast iron head fixed in place, Each 608.85 1,403.05 Each 608.85 1,403.05
including cost of clamp holdfast and painting.
22 Shoes, bends or offsets for cast iron rain water down pipe, Each 216.15 702.65 Each 216.15 702.65
including fixing and painting.
23 Plain GI sheet iron spouts fixed in position, including Each 676.50 1,075.20 Each 676.50 1,075.20 23.10
painting.
24 Laying ½" (13 mm) thick deodar ceiling complete, 100Sft. 15,411.00 74,058.10 P. Sqm 1,658.20 7,968.65 26.1
including sawing, planing and fixing.
25 Flat sheet roof with galvanized iron plain sheets, including
battens, rolls, screws, clips etc. (Planking to be paid for
separately):-
a) 22 BWG sheets roofing 100Sft. 9,154.20 54,462.65 P. Sqm 985.00 5,860.20 23.60
b) 24 BWG sheets roofing 100Sft. 9,154.20 49,211.05 P. Sqm 985.00 5,295.10
26 Asbestos cement corrugated sheet roofing including 100Sft. 6,204.00 22,088.40 P. Sqm 667.55 2,376.70 23.8
necessary overlaps, and GI hook bolts, nuts, screws,
washers and bitumen washers, etc. (excluding valleys and
ridges, etc).
27 Extra labour for erection of GI sheets, flat sheet or 100Sft. 724.70 -- P. Sqm 78.00 - 23.6
asbestos sheet roofing, above 20' (6.10 m) height in
difficult position, including lifting with care and special
scaffolding along live electric wires.
28 Fixing asbestos cement sheet ridges and valleys ¼" Per Rft. 74.25 186.60 Per Metre 243.55 612.05 23.8
(6 mm) thick.
29 Plain galvanized iron sheet ridging, including fixture, 23.6
timber for ridge roll and ridge sheeting:-
a) 6" (150 mm) lap and 18" (450 mm) Per Rft. 202.95 1,503.55 Per Metre 665.70 4,931.65
overall, of 22 gauge G.I sheet ridging.
b) 9" (225 mm) lap and 24" (600 mm) Per Rft. 259.40 1,462.85 Per Metre 850.85 4,798.15
overall, of 24 gauge G.I sheet ridging.
c) 12" (300 mm) lap and 30" (750 mm) Per Rft. 259.40 1,697.45 Per Metre 850.85 5,567.65
overall, of 22 gauge G.I sheet ridging.
30 Plain 22 gauge G.I sheet gutter semi circular Per Rft. 129.70 507.55 Per Metre 425.40 1,664.75 23.11
8" (200 mm) dia meter.
31 Making masonry ventilators in cement, sand Each 2,882.00 4,030.05 Each 2,882.00 4,030.05
mortar 1:4
32 Fixing water spouts or parnalas. Each 864.60 -- Each 864.60 - 23.10

chapter-9(Roofing) Page 59
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
33 Making drip course 2"x½" (50x13 mm) under RCC slab edges Per Rft. 36.45 39.90 Per Metre 119.55 130.85
in outer opening, in cement, sand mortar 1:2.

34 Supplying and laying of twin G.I sheet 20 SWG duly Per Sft. 105.60 944.90 P. Sqm 1,136.25 10,167.10
painted with bitumen, with polythene film in between 300
gauge, to provide a sliding joint under the bearing of the
beams, including 3" (75 mm) long, 3/8" (10 mm) dia bar to
act as holdfast on wall and beam.

35 Providing and laying roof insulation, comprising of single


layer of tiles 9"x4½"x1½" (225x113x40 mm) grouted with
cement sand mortar 1:3 laid over 2" (50 mm) thick earth
(including mud plaster) over thermopore sheet, over
polythene sheet 300 gauge over a layer of bitumen,
complete in all respects:-
i) Thermopore sheet ½ " (13 mm) thick 100Sft. 6,831.00 17,680.00 P. Sqm 735.00 1,902.35
ii) Thermopore sheet ¾ " (20 mm) thick 100Sft. 6,831.00 18,562.00 P. Sqm 735.00 1,997.25
iii) Thermopore sheet 1" (25 mm) thick 100Sft. 6,843.20 19,078.20 P. Sqm 736.35 2,052.80
36 Providing and fixing AC rain water down pipe 4" (100 mm) Rft. 43.25 448.35 Per Metre 141.85 1,470.60
dia, with shoe, T-bend, clamp, etc.
37 Making jharries in existing brick masonry for providing Rate will be increased by 1.5 time
recesses for bearing of RCC roof slab, including repairing for stone masonry or plain; concrete;
the damaged face:- and 2 times for reinforced cement
concrete.
i) for slabs upto 6" (150 mm) thick Rft. 48.85 53.85 Per Metre 160.25 176.65
ii) for slabs exceeding 6" to 12" (150 to 300 mm) thick. Rft. 82.65 91.80 Per Metre 271.10 301.10
38 Making recess in existing brick masonry for bearing of Rates will be increased by 1.5 times
beam, girder, R.S. Joist, etc. including repairing damaged for stone masonry and plain
face:- cement concrete and two times
for reinforced cement concrete.
i) upto 1.0' (300 mm) height of girder or beam. Each 203.50 220.25 Each 203.50 220.25
ii) for every 6" (150 mm) additional height or part thereof. Each 97.70 105.70 Each 97.70 105.70
39 Hoisting RS. Beams and wooden beams and placing in Each 808.50 - Each 808.50 -
position.
40 Hoisting and placing in position sahl ballies, over roof. Each 123.50 - Each 123.50 -
41 Hoisting precast R.C.C/prestressed concrete
battens and placing in position.
a) 5' to 6' (1.50 to 1.83 m) long Each 115.50 - Each 115.50 -
b) 6' to 7' (1.83 to 2.13 m) long Each 161.70 - Each 161.70 -
c) 7' to 8' (2.13 to 2.44 m) long Each 202.15 - Each 202.15 -
d) 8' to 9' (2.44 to 2.74 m) long Each 269.50 - Each 269.50 -
e) above 9' (2.74 m) length Each 323.40 - Each 323.40 -
42 Hoisting and placing in position R.C. trough: Applicable only to roof trough
(inverted tees & trough) for height of
a) upto 10' (3 m) in length Each 323.40 - Each 323.40 - 1st storey only.
b) 10' to 11' (3 to 3.36 m) in length Each 404.25 - Each 404.25 -
c) 11' to 12' (3.36 to 3.66 m) in length Each 539.00 - Each 539.00 -
chapter-9(Roofing) Page 60
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
d) 12' to 13' (3.66 to 3.96 m) in length Each 621.90 - Each 621.90 -
e) 13' to 14' (3.96 to 4.26 m) in length Each 673.75 - Each 673.75 -
f) 14' to 15' (4.26 to 4.57 m) in length Each 735.00 - Each 735.00 -
g) 15' to 16' (4.57 to 4.88 m) in length Each 808.50 - Each 808.50 -
h) 16' to 17' (4.88 to 5.19 m) in length Each 898.35 - Each 898.35 -
i) 17' to 18' (5.19 to 5.49 m) in length Each 1,155.00 - Each 1,155.00 -
j) 18' to 19' (5.49 to 5.80 m) in length Each 1,243.85 - Each 1,243.85 -
k) 19' to 20' (5.80 to 6.10 m) in length Each 1,347.50 - Each 1,347.50 -
43 Hoisting and placing in position R.C. inverted battens:-
i) upto 10' (3.05 m) span Each 249.15 - Each 249.15 -
ii) from 10' to 12' (3.05 to 3.66 m) span Each 553.65 - Each 553.65 -
iii) from 12' to 13' (3.66 to 3.96 m) span Each 664.40 - Each 664.40 -
iv) from 13' to 14' (3.96 to 4.26 m) span Each 830.50 - Each 830.50 -
v) from 14' to 15' (4.26 to 4.57 m) span Each 906.00 - Each 906.00 -
vi) from 15' to 16' (4.57 to 4.88 m) span Each 996.60 - Each 996.60 -
vii) from 16' to 18' (4.88 to 5.49 m) span Each 1,245.75 - Each 1,245.75 -
viii) from 18' to 20' (5.49 to 6.10 m) span Each 1,993.20 - Each 1,993.20 -
44 Reinforced cement concrete spout, including fixing in Each 1,152.80 1,720.00 Each 1,152.80 1,720.00
position, with top and bottom Khurras.

45 Providing and Laying Insulation material of Extruded Polystyrene XPS in


Rigid Insulation / Foam Board on roof or walls, Density 32-38Kg/M,
compressive strength 250-400 kpa, R-value 5 per inch thickness and water
obsorption (1% by volume, closed cell type structure) i/c cutting and
placing in position. complete in all respect.
a) 1" thick % Sft 957.00 8,517.00 P.Sqm 102.95 916.45
b) 1-1/2" thick % Sft 957.00 11,163.00 P.Sqm 102.95 1,201.15
c) 2" thick % Sft 957.00 14,061.00 P.Sqm 102.95 1,512.95
46 Providing and applying torch-on water proofing bitumenous membrane of 23.1
specified thickness (made of Roof-Grip/ Euro Bit) duly lapped/connected
by heating with Torch over ps-6 primer i/c preparation/smoothen the
surface complete in all respect as approved and directed by the Engineer
Incharge
a) Plain
i) 3 mm thick Per Sft 18.90 147.30 P.Sqm 203.50 1,585.10
ii) 4 mm thick Per Sft 18.90 155.70 P.Sqm 203.50 1,675.45
b) Aluminum Foiled
i) 3 mm thick Per Sft 18.90 156.90 P.Sqm 203.50 1,688.40
ii) 4 mm thick Per Sft 18.90 165.30 P.Sqm 203.50 1,778.75
47 Providing and applying 15-20 micron thick high density (40 gm/m2) Per Sft 24.30 108.80 P.Sqm 261.65 1,170.55
plain/self adhesive super polyshield combined reinforced (Polyster &
fiberglass) fabric memberane for water proofing, applied over a layer of
hot bitumen (grade 60/70) @ 8 kg/100 Sft and sandwiched with a 2nd
layer of bitumen @ 8 kg/100 sft (grade 60/70) duly sand blended i/c
preparation of surface complete in all respect as approved and directed by
the Engineer Incharge

chapter-9(Roofing) Page 61
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
48 Providing and fixing false ceiling comprises of Gypsum board laminated
sheet of size 2'x2'/2'x3'/ 3'x3'of specified design and thickness i/c cost of
fixtures i.e galvanized angle 1" x 1" at wall sides, galvanized tee 1¼" x
1"and 1 ½” x 1” both at 4’ c/c ( made of Taiwan CKM or equivalent),
hanging with G.I/Copper wire 16 SWG, G.I hook, Rawal Plug etc:
complete in all respects as approved and directed by the Engineer Incharge.

i) 6 mm thick Per Sft 27.00 141.95 P.Sqm 290.70 1,527.65


ii) 7.5mm thick Per Sft 27.00 150.80 P.Sqm 290.70 1,622.55
iii) 9 mm thick Per Sft 27.00 152.75 P.Sqm 290.70 1,643.65
iv) 12 mm thick Per Sft 27.00 159.85 P.Sqm 290.70 1,719.80
49 P/L false ceiling comprising of 5/8" thick plaster of paris sheet of required Per Sft 45.05 137.20 P.Sqm 484.55 1,476.40
size in approved design with one line of 6" wide niche all around , hanging
with Copper wire (16 SWG) duly enriched with POP and flaxen i/c the cost
of making space for rope light /screws/jute/making holes for lights and
rawal plugs complete in all respects as approved and directed by the
Incharge.(Measurement will be made as per carpet Area).
50 Per Sft 85.70 176.50 P.Sqm 922.10 1,899.15 23.1
Providing and laying high density single profile spanish glazed tappered
barrel type of 4"- 5-1/2" dia Terra Cotta Khaprail Tile dipped or sealed
with a water repellent, with Terra Cotta base plate ( 10"x16"), resistant to
salt attack laid with laps and duly interlocked on slopping roof over 1/2"
thick (1:3) cement sand mortar i/c cost of all material and labour complete
in all respect as approved and directed by the Engineer Incharge.

chapter-9(Roofing) Page 62
10. FLOORING
Rates for all finished works include the removal of surplus debris, unused material and byproducts
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
1 Laying Murum flooring, consisting of 1"(25 mm) layer of 100 Sft. 7,821.00 10,782.30 Per Sqm 841.55 1160.20
fine powdery or flakey variety of Murum, laid over 6"(150
mm) good hard layer of Murum spreaded over 9"(225 mm)
thick sub-base comprising of hand packed rubble or
broken bricks properly watered and rammed, provided over
well rammed earth.
2 Earth flooring, consisting of 6"(150 mm) thick consolidated 100 Sft. 2,664.75 3,198.75 Per Sqm 286.75 344.20 24.1
layer of moistened earth, including ramming.

3 Supplying and filling sand under floor; or plugging in wells. 100Cft. 627.00 4,107.00 Per Cum 221.45 1,450.60
4 Providing, laying, watering and ramming brick or stone ballast 1½" 100 Cft. 6,022.50 13,312.50 Per Cum 2,127.15 4,702.00
to 2"(40 mm to 50 mm) gauge mixed with 25% sand, for
floor foundation, complete in all respects.

5 Mud flooring, consisting of 6"(150 mm) thick consolidated 100 Sft. 4851.00 5,891.25 Per Sqm 521.95 633.90 24.2
layer of moistened earth and finished off with 1"(25 mm)
mud plaster and gobri leeping.
6 Dry brick paving laid flat, sand grouted, including 100 Sft. 2558.15 8,676.25 Per Sqm 275.25 933.55 24.12
preparation of bed by watering, ramming and bringing the
same to proper camber, by ½"(13 mm) thick mud plaster.
7 Dry brick on edge paving, sand grouted, including 100 Sft. 4610.75 13,703.65 Per Sqm 496.10 1,474.50 24.12
preparation of bed by watering, ramming & bringing the
same to proper camber, by ½ "(13 mm) thick mud plaster.
8 Grouting 4½"(113 mm) dry brick work with cement mortar 100 Sft. 2494.80 3,793.80 Per Sqm 268.45 408.20
ratio 1: 5
9 Flat brick flooring laid in 1:6 cement mortar, over a bed of 100 Sft. 4488.00 12,837.60 Per Sqm 482.90 1,381.35 24.4
3/4" (20 mm) thick cement mortar, 1:6.
10 Brick on edge flooring, laid in 1:6 cement mortar, over a 100 Sft. 5,728.80 17,824.55 Per Sqm 616.40 1,917.90 24.4
bed of ¾" (20 mm) thick cement mortar 1:6.
11 Brick tiles (12"x6"x2") (300x150x50mm) laid in 1:6 100 Sft. 5,610.00 11,715.60 Per Sqm 603.65 1260.60 ditto
cement mortar, over a bed of ¾" (20 mm) thick cement
mortar 1:6.
12 Brick ties (9"x4½"x1½")(225 mm x 113 mm x 40 mm) laid 100 Sft. 6,220.50 13,626.90 Per Sqm 669.35 1,466.25 24.4
flat in 1:3 cement mortar, over a bed of 3/4"(20 mm) thick
cement mortar 1:6.
13 Cement tiles (8"x8"x¾")(200 x 200 x 20 mm) laid flat in 100 Sft. 3,732.65 22,788.05 Per Sqm 401.65 2,452.00 24.7
1:2 cement mortar, over 3/4" (20 mm) thick bed of cement
mortar 1:2.

chapter-10(Flooring) Page 63
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

14 Cement concrete tiles laid in 1:2 cement mortar, over 24.8


3/4" (20 mm) thick bed of cement mortar 1:2:-
(a) 12"x12"x1" (300 x 300 x 25 mm) 100 Sft. 3,732.65 15,230.35 Per Sqm 401.65 1,638.80
(b) 9"x9"x¾" (225 x 225 x 20 mm) 100 Sft. 3,732.65 20,322.65 Per Sqm 401.65 2,186.70
(c) 6"x6"x¾"(150 x 150 x 20 mm) 100 Sft. 3,732.65 29,174.40 Per Sqm 401.65 3,139.15
15 Coloured cement tiles (8"x8"x¾")(200 x 200 x 20 mm) of 100 Sft. 3,732.65 22,869.05 Per Sqm 401.65 2,460.70 24.7
approved dark shade laid flat in 1:2 cement mortar, over
¾" (20 mm) bedding mortar of 1:2.
16 Providing and laying topping of cement concrete 1:2:4, 24.9 If glass or marble strips are used
including surface finishing and dividing in panels:- for panelling, it will be paid extra as
per item No. 41 or 42.
(a) 1"(25 mm) thick 100 Sft. 4,184.40 7,246.80 Per Sqm 450.25 779.75
(b) 1¼"(30 mm) thick 100 Sft. 4,184.40 7,931.40 Per Sqm 450.25 853.40
(c) 1½"(40 mm) thick 100 Sft. 5,220.60 9,652.20 Per Sqm 561.75 1,038.60
(d) 1¾"(45 mm) thick 100 Sft. 5,220.60 10,364.90 Per Sqm 561.75 1,115.25
(e) 2"(50 mm) thick 100 Sft. 6,256.80 12,253.45 Per Sqm 673.25 1,318.45
(f) 2¼"(56 mm) thick 100 Sft. 6,444.90 13,072.65 Per Sqm 693.45 1,406.60
(g) 2½"(62 mm) thick 100 Sft. 7,293.00 14,385.35 Per Sqm 784.75 1,547.85
(h)2¾"(70 mm) thick 100 Sft. 7,293.00 15,312.35 Per Sqm 784.75 1,647.60
(i) 3"(75 mm) thick 100 Sft. 7,293.00 16,106.90 Per Sqm 784.75 1,733.10
17 Providing and laying conglomerate flooring (two coat work) 24.10 If glass or marble strips are used
with top layer of ½"(13mm) thick wearing surface, for panelling, it will be paid extra as
consisting of one part of cement and 2 parts of stone per item No. 41 or 42.
chips passing 3/16"(6 mm) sieve, over bottom layer of
cement concrete 1:3:6, including surface finishing and
dividing in panels:-
(a) 1½"(40 mm) thick 100 Sft. 6,189.15 10,579.15 Per Sqm 665.95 1,138.30
(b) 1¾"(45 mm) thick 100 Sft. 6,189.15 11,048.30 Per Sqm 665.95 1,188.80
(c) 2"(50 mm) thick 100 Sft. 7,835.85 13,364.90 Per Sqm 843.15 1,438.05
18 Add extra in cement concrete floor topping, if finished with 100 Sft. 1,441.00 2,844.70 Per Sqm 155.05 306.10
pigment and polishing.
19 Extra labour for each storey above ground, for mosaic, 100 Sft 1,128.60 - Per Sqm 121.45 - On items 19-25 & 29-34
conglomerate, tiles, stone and wooden floor.
20 Flag stone flooring in lime mortar 1:2, over ¾"(20 mm) 24.5
bedding mortar, in platforms and floors, etc.
(a) 2"(50 mm) thick 100 Sft. 12,410.00 20,789.00 Per Sqm 1335.30 2,236.90
(b) 3"(75 mm) thick 100 Sft. 12,410.00 21,771.60 Per Sqm 1335.30 2,342.60

chapter-10(Flooring) Page 64
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
21 Asphalt flooring , including preparation of proper base 24.10
remelting, setting out, and finishing complete:-
(a) 1"(25 mm) thick topping 100 Sft. 4,983.00 35,115.10 Per Sqm 536.15 3,778.40
(b) ½"(13 mm) thick topping 100 Sft. 3,920.40 19,294.20 Per Sqm 421.85 2,076.05
(c) ¼"(6 mm) thick topping 100 Sft. 2,906.65 11,044.95 Per Sqm 312.75 1,188.45
3
22 1 /8"(35 mm) thick mosaic flooring, consisting of 3/8"(10 If glass or marble strips are used
mm) mosaic topping of one part of cement and marble for panelling, it will be paid extra as
powder in the ratio of 3:1 and two parts of marble chips, per item No. 41 or 42.
laid over 1"(25 mm) thick flooring of 1:2:4 cement concrete
including rubbing and polishing complete :-
(a) using grey cement 100 Sft. 19,075.30 29,539.45 Per Sqm 2,052.50 3,178.45
(b) using white cement 100 Sft. 19,075.30 30,216.35 Per Sqm 2,052.50 3,251.30
23 1½"(40 mm) thick mosaic flooring, consisting of ½ "(13 If glass or marble strips are used
mm) mosaic topping of one part of cement and marble for panelling, it will be paid extra as
powder in the ratio of 3:1 and two parts of marble chips, per item No. 41 or 42.
laid over 1"(25 mm) thick floor of 1:2:4 cement concrete,
including rubbing and polishing complete with finishing :-
(a) using grey cement 100 Sft. 19,075.30 29,894.50 Per Sqm 2,052.50 3,216.65
(b) using white cement 100 Sft. 19,075.30 32,893.55 Per Sqm 2,052.50 3,539.35
24 Providing and laying superb quality Ceramic tile floors of Master/ 24.7
Stile brand or approved equivalent manufacturer of specified
size,Glossy/Matt/Texture of approved Color and Shade as per
approved design with adhesive bond, over 3/4" thick (1;2) cement
sand plaster i/c the cost of sealer for finishing the joints i/c cutting
grinding complete in all respects and as approved and directed by the
Engineer Incharge.
i) 12"x18"/12"x24"/10"x24" /8"x24"/12"x36" Per Sft 74.40 318.90 Per Sqm 800.70 3,431.30
ii) 10"x13" Per Sft 74.40 284.90 Per Sqm 800.70 3,065.25
iii) 6"x6" Per Sft 74.40 262.20 Per Sqm 800.70 2,821.25
iv) 4"x4" Per Sft 74.40 262.20 Per Sqm 800.70 2,821.25
25 ditto
Providing and laying superb quality Ceramic tiles dado of Master/
Stile brand or approved equivalent manufacturer of specified
size,Glossy/Matt/Texture skirting/dado of approved Color and Shade
with adhesive bond over 1/2"thick (1:2) cement plaster i/c the cost of
sealer for finishing the joints i/c cutting grinding complete in all
respects as approved and directed by the Engineer Incharge.
i) 12"x18"/12"x24"/10"x24" /8"x24"/12"x36" Per Sft 74.40 391.00 Per Sqm 800.70 4,207.35
ii) 10"x13" Per Sft 74.40 374.65 Per Sqm 800.70 4,031.10
iii) 6"x6" Per Sft 74.40 339.35 Per Sqm 800.70 3,651.45
iv) 4"x4" Per Sft 74.40 321.70 Per Sqm 800.70 3,461.65
26 Rubbing and polishing old grit/ mosaic floor, including 100 Sft. 3,841.20 4,220.75 Per Sqm 413.30 454.15 The composite rate will be reduced
repairing voids, uneven surface, complete in all respects. by Rs. 184.00 per % Sft or Rs.19.80 per
Sq. metre respectively, if no
polishing is done.

chapter-10(Flooring) Page 65
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
27 Rubbing and polishing grit floor, including repairing voids, 100 Sft. 4,070.90 4,505.00 Per Sqm 438.05 484.75 The composite rate will be reduced
uneven surface, complete in all respects by Rs. 184.00 per % Sft or Rs.19.80 per
Sq. metre respectively, if no
polishing is done.
28 Cleaning and washing mosaic or marble floor with caustic 100 Sft. 560.10 712.15 Per Sqm 60.25 76.65 24.6
soda mixture.
29 Shisham wood boarding or strip flooring 3/4" (20mm) thick 100 Sft. 12,210.00 209,418.80 Per Sqm 1313.80 22,533.45 24.13
(sawn to required size) tongued and grooved or splayed
rebated fixed with brass screws on deodar wood battens
1½ "x2"(40 x 50 mm),size placed at 12"(300 mm) centre
to centre, including two coats of bitumen laid hot on the
base.
30 Deodar wood boarding or strip flooring 3/4" (20 mm) thick 100 Sft. 12,969.00 171,893.50 Per Sqm 1395.45 18,495.75 ditto
(sawn to required size) tongued and grooved or splayed
rebated fixed with brass screws on deodar wood battens
1½"x2"(40 x 50 mm) size , placed at 12"(300 mm) centre,
to centre including two coats of bitumen laid hot on the
base.
31 Teak wood boarding or strip flooring ½" (13 mm) "thick 100 Sft. 11,275.00 264,802.70 Per Sqm 1213.20 28,492.75 ditto
(sawn to required size) to tongued and grooved screwed
on deodar wood battens 1½ " x2"(40 x 50 mm) size,
placed at 12"(300 mm) centre to centre, including 2 coats
of bitumen laid hot on base.
32 Shisham wood block flooring 1"(25 mm) thick cut to 100 Sft. 12,028.50 261,488.40 Per Sqm 1294.25 28,136.15 24.13
required size, fixed on a layer of asphalt bitumen laid on
base.
33 Teak wood block 1"(25 mm) thick cut to required size, 100 Sft. 11,275.00 481,979.70 Per Sqm 1213.20 51,861.00 ditto
fixed on a layer of asphalt bitumen laid on base.
34 Laying wooden paving of hard wood on edge in coal tar ditto
and asphalt:- 100 Sft. Per Sqm
Per Inch per cm
(a) Shisham wood thickness 7,018.00 165,752.50 thickness 755.15 17,834.95
(b) Kikar wood ditto 7,018.00 49,438.30 ditto 755.15 5,319.55
35 Tile skirting laid in 1:2 cement mortar, over ¾"(20 mm)
thick cement mortar, 1:2 including cement washing and
filling joints complete:-
(a) cement tiles 100 Sft. 6,108.50 26,277.20 Per Sqm 657.30 2,827.45
(b) mosaic tiles 100 Sft. 10,065.00 36,904.75 Per Sqm 1083.00 3,970.95
36 Providing grey cement skirting or dado 3/8"(10 mm) thick
including rounding of corner and straight ening of top edge
and finishing to smooth surface afterplastering :-
(a) 1:2 cement, sand mortar 100 Sft. 7,661.80 9,315.55 Per Sqm 824.40 1,002.35
(b) 1:3 cement, sand mortar 100 Sft. 7,661.80 8,827.65 Per Sqm 824.40 949.85
(c) Extra if skirting or dado is finished 100 Sft. 470.25 1,204.65 Per Sqm 50.60 129.60
with pigment of any colour.

chapter-10(Flooring) Page 66
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
37 Mosaic dado or skirting with one part of cement and
marble powder in the ratio of 3:1 and two parts of marble
chips, laid over ½"(13 mm) thick cement plaster 1:3,
including rubbing and polishing, complete with finishing:
(a) using grey cement:
i) 3/8"(10 mm) thick 100 Sft. 9,577.25 16,945.50 Per Sqm 1030.50 1,823.35
ii) ½"(13 mm) thick 100 Sft. 9,577.25 19,134.55 Per Sqm 1030.50 2,058.90
(b) using white cement :
'i) 3/8"(10 mm) thick 100 Sft. 9,577.25 19,237.25 Per Sqm 1030.50 2,069.95
ii) ½"(13 mm) thick 100 Sft. 9,577.25 20,048.95 Per Sqm 1030.50 2,157.25
38 Providing and laying superb quality Porcelain glazed tiles of Master/ 24.7 If matt tile will be used, reduce composite rate
Stile brand or approved equivalent manufacturer, skirting/dado of by Rs. 15/- P.Sft.
specified size, Color and Shade with adhesive/ bond over 1/2"thick
(1:2) cement plaster i/c the cost of matching sealer for finishing the
joints, cutting grinding complete in all respect as approved and
directed by the Engineer Incharge.
a) Full body Glazed Tile
(i) 400 mmX400 mm Per Sft 74.40 391.00 Per Sqm 800.70 4,207.35
(ii) 600mm x600 mm Per Sft 74.40 457.80 Per Sqm 800.70 4,925.90
(iii) 600mmx 1200 mm Per Sft 74.40 514.50 Per Sqm 800.70 5,536.00
b) Half body Tile
(i) 400mm x400 mm Per Sft 74.40 321.70 Per Sqm 800.70 3,461.65
(ii) 300mm x300 mm Per Sft 74.40 278.90 Per Sqm 800.70 3,000.70

39 Providing and laying 3/8" thick Prepolished Marble skirting/risers 24.7


having uniform texture (spot less) of size 24"x6" of approved quality
and shade with adhesive bond over 3/4" thick (1:2) cement sand
mortor complete in all respect i/c the cost of matching sealer to finish
the joints as approved and directed by the Engineer Incharge.

i) China Verona Per Sft 96.05 342.55 Per Sqm 1,033.30 3,685.65
40 Providing & Laying 1" thick Cove skirting terrazzo tile of specified
size best quality in approved design with adhesive bond laid over a
bed of 1/2" thick (1:2) cement sand mortar i/c the cost of matching
sealer for finishing the joints i/c cutting, grinding, rubbing, filling
complete in all respect as approved and directed by the Engineer
incharge (Without Polishing).
a) Size 4"x4"x12"
i) Grey Per Rft 32.00 194.70 Per Meter 105.00 638.70
ii) Coloured Per Rft 32.00 216.30 Per Meter 105.00 709.45
b) Size 4"x4"x24"
i) Grey Per Rft 32.00 218.55 Per Meter 105.00 716.80
ii) Coloured Per Rft 32.00 242.35 Per Meter 105.00 794.95

chapter-10(Flooring) Page 67
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
41 Providing and laying 1" thick terrazzo tile for specified colour & size
full body, best quality with minimum 5000 PSI in approved design
with adhesive bond over 3/4" thick 1:3 cement plaster i/c the cost of
sealer for finishing the joints i/c cutting, grinding, rubbing, filling.
Complete in all respect as approved and directed by the Engineer
incharge. (Without Polishing)
a) Size 12"x12"x1"
i) Grey P.Sft 104.10 352.40 Per Sqm 1,120.20 3,791.65
ii) Coloured P.Sft 104.10 446.90 Per Sqm 1,120.20 4,808.45
b) Size 24"x24"x1"
i) Grey P.Sft 104.10 415.40 Per Sqm 1,120.20 4,469.55
ii) Coloured P.Sft 104.10 509.90 Per Sqm 1,120.20 5,486.35
42 Rubber flooring, consisting of 12"x12"x1/8" Per Sft. 52.65 258.25 Per Sqm 566.50 2,778.75 24.14 The cost of base for rubber flooring
(300x300x3mm) rubber tiles, laid on firm foundation. is not included in the rate and is
payable separately.
43 Providing and fixing glass strip 5mm thick and 1½" Per Rft. - 8.30 Per Metre - 27.20 Labour for fixing already included in
(40 mm) wide, for dividing the mosaic flooring into panels. items No. 15, 16, 21and 22 of this
Chapter.
44 Providing and fixing marble strip of any shade for dividing
the mosaic flooring into panels
3
a) sSize 1½" x /8" (40 x 10 mm) Per Rft. - 39.60 Per Metre - 129.90
b) Size 1½" x ¼" (40 x 6 mm) Per Rft. - 33.00 Per Metre - 108.25
45 Providing and laying Tuff Pavers, having 7000 PSI, crushing strength
of approved manufacturer, over 2" to 3" sand cushion i/c grouting
with sand in joints i/c finishing to require slope . complete in all
respect.
(50% Grey / 50% Coloured)
a) 50-mm thick Per Sft 36.15 169.60 Per Sqm 388.90 1,824.95
b) 60-mm thick Per Sft 36.15 194.85 Per Sqm 388.90 2,096.80
c) 80-mm thick Per Sft 36.15 225.00 Per Sqm 388.90 2,420.80
46 Providing and laying superb quality Porcelain glazed tiles flooring of 24.7 If matt tile will be used, reduce composite rate
Master/ Stile brand or approved equivalent manufacturer of specified by Rs. 15/- P.Sft.
size in approved design,Color and Shade with adhesive/bond over
3/4"thick (1:3) cement plaster i/c the cost of sealer for finishing the
joints i/c cutting grinding complete in all respect as approved and
directed by the Engineer Incharge.
a) Full body Glazed tiles
(i) 400 mm x 400 mm Per Sft 74.40 370.70 Per Sqm 800.70 3,988.80
(ii) 600mmx 600 mm Per Sft 74.40 456.40 Per Sqm 800.70 4,910.70
(iii) 600mmx 1200 mm Per Sft 74.40 514.35 Per Sqm 800.70 5,534.35
b) Half body Tile (Semi Glazed)
(i) 400mmx400mm Per Sft 74.40 321.55 Per Sqm 800.70 3,460.05
(ii) 300mmx300mm Per Sft 74.40 274.95 Per Sqm 800.70 2,958.40
c) Non-Skid Chequred Tiles
(i) 300mmx300mm Per Sft 74.40 278.75 Per Sqm 800.70 2,999.10

chapter-10(Flooring) Page 68
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
47 Providing and laying 3/8 inch thick superb class Multani tiles of Per Sft 114.85 1,339.60 Per Sqm 1,235.70 4,393.90 24.7
specified size and design of approved Color and Shade with adhesive
bond, over 1/2"thick (1:2) cement plaster i/c the cost of sealer for
finishing the joints i/c cutting grinding complete in all respects and as
approved and directed by the Engineer Incharge.
48 Providing and laying flooring with China Verona Marble having 24.7
uniform texture (Spotless) of required size and specified thickness,
with adhesive bond over 3/4" thick bedding of (1:2) cement sand
mortor i/c the cost of matching sealer,cutting, grinding and chemical
polishing complete in all respect as approved and directed by the
Engineer Incharge.
i) 1/2" thick(12"x12"/12"x24") Per Sft 87.15 461.20 Per Sqm 937.50 4,962.60
ii) 3/4" thick (12"x24"/12"x36") Per Sft 87.15 630.05 Per Sqm 937.50 6,779.30
49 Providing and laying 3/4" thick full width Prepolished Marble slab for 24.7
Vanities / Shelves / Treads/Window Cills , having Uniform texture
(Spotless) with adhesive bond over 3/4" thick (1:2) cement sand
mortor i/c the cost of matching sealer complete in all respects as
approved and directed by the Engineer Incharge.
i) China Verona Per Sft 74.40 698.30 Per Sqm 800.70 7,513.60
ii) Ziarat White Per Sft 74.40 2,204.00 Per Sqm 800.70 23,714.90
50 Extra for Bevelling charges of marble edge in approved design Per Rft 36.65 36.95 P.Mtr 120.15 121.15
complete in all respects i/c the cost of Carborandam disc as approved
and directed by the Engineer Incharge.
51 Extra cost for making hole in Marble slab for fixtures, Sink,burners, Each 732.60 972.60 Each 732.60 972.60
basin Vanities i/c cost of bevelling of internal edge as approved and
directed by the Engineer Incharge.
52 Providing and laying Prepolished Granite of specified thickness and 24.7
shade of full width of approved quality laid with adhesive bond over
3/4" thick (1:2) cement sand mortor bed , complete in all respect as
approved and directed by the Engineer Incharge.
(i) 3/4" thick Per Sft 117.65 1,239.85 Per Sqm 1,265.85 13,340.60
(ii) 1/2" thick Per Sft 117.65 1,176.85 Per Sqm 1,265.85 12,662.70

chapter-10(Flooring) Page 69
11. SURFACE RENDERING
1 PLASTERING, POINTING, WHITE WASHING, COLOUR WASHING AND DISTEMPERING, ETC.
2 Rates for all finished works include the removal of surplus debris, unused material and byproducts.
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

1 Mud plaster on walls (excluding Gobri leeping) upto 20' 25.7


(6.00 m) height:-
a) ½" (13 mm) thick 100 Sft. 1,161.05 1,405.15 P.Sqm 124.95 151.20
b) 1" (25 mm) thick 100 Sft. 1,626.50 2,114.65 P.Sqm 175.00 227.55
2 Mud plaster on floor or roof (excluding Gobri leeping):- ditto Add extra 13%, 32% and 51% above
the labour rates only or 6%, 15% &
a) ½" (13 mm) thick 100 Sft. 1,046.75 1,290.85 P.Sqm 112.65 138.90 23% on the composite rates for 2nd,
3rd, 4th and subsequenct floors,
b) 1" (25 mm) thick 100 Sft. 1,046.75 1,534.90 P.Sqm 112.65 165.15 respectively.
3 Cement lime plaster 1:7:12 (cement, lime and sand) upto 25.1 to 25.6
20' (6.00 m) height.
a) ¼" (6 mm) thick 100 Sft. 3,352.80 4,021.90 P.Sqm 360.75 432.75
b) ½" (13 mm) thick 100 Sft. 3,352.80 4,690.30 P.Sqm 360.75 504.70
4 Cement Neru plaster 1:2 (cement and sand) upto 20' ditto
(6.00 m) height:-
a) ¼" (6 mm) thick 100 Sft. 3,352.80 4,664.75 P.Sqm 360.75 501.95
b) ½" (13 mm) thick 100 Sft. 3,352.80 5,500.00 P.Sqm 360.75 591.80
5 2" (50 mm) stucco cement plaster 1:2:4 (cement, sand 100 Sft. 8,432.15 15,412.10 P.Sqm 907.30 1,658.35 ditto
and shingle) upto 20' (6.00 m) height.
6 Providing and laying machine sprayed plaster ½" (13 mm) ditto
thick, using cement and chips zero gauge, over the
existing plastered and roughened surface, upto 20' (6.00
m) height:-
i) ratio 1:1 100 Sft. 2,916.15 10,752.15 P.Sqm 313.80 1,156.95
ii) ratio 1:1½ 100 Sft. 2,916.15 11,116.95 P.Sqm 313.80 1,196.20
iii) ratio 1:2 100 Sft. 2,916.15 11,320.95 P.Sqm 313.80 1,218.15
7 Cement plaster 1:2 upto 20' (6.00 m) height:- 25.1
to
a) 3/8" (10 mm) thick 100 Sft. 3,352.80 5,006.55 P.Sqm 360.75 538.70 25.6
b) ½" (13 mm) thick 100 Sft. 3,352.80 5,497.20 P.Sqm 360.75 591.50
c) ¾" (20 mm) thick 100 Sft. 4,217.40 7,524.85 P.Sqm 453.80 809.65
8 Cement plaster 1:3 upto 20' (6.00 m) height:- ditto
a) 3/8" (10 mm) thick 100 Sft. 3,352.80 4,518.65 P.Sqm 360.75 486.20
b) ½" (13 mm) thick 100 Sft. 3,352.80 4,907.30 P.Sqm 360.75 528.05
c) ¾" (20 mm) thick 100 Sft. 4,217.40 6,549.10 P.Sqm 453.80 704.70

chapter-11(Surface Rendering) Page 70


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

9 Cement plaster 1:4 upto 20' (6.00 m) height:- ditto


a) 3/8" (10 mm) thick 100 Sft. 3,352.80 4,387.45 P.Sqm 360.75 472.10
b) ½" (13 mm) thick 100 Sft. 3,352.80 4,669.45 P.Sqm 360.75 502.45
c) ¾" (20 mm) thick 100 Sft. 4,217.40 6,269.30 P.Sqm 453.80 674.60
10 Cement plaster 3/8" (10 mm) thick under soffit of R.C.C. ditto i) This item shall be applicable to
roof slabs only, upto 20' height. buildings meant for human
habitation only, such as buildings
like residences, offices,
a) 1:2 100 Sft. 3,841.20 5,823.05 P.Sqm 413.30 626.55 educational institutions and
b) 1:3 100 Sft. 3,841.20 5,333.45 P.Sqm 413.30 573.90 hospitals, etc. It shall not be
c) 1:4 100 Sft. 3,841.20 5,202.25 P.Sqm 413.30 559.75 admissible on godowns; bins;
agriculture, poultry and animal
sheds; cycle stands; garrages; etc.
ii) The thickness of the plaster will
not be more than 3/8" (10 mm)
thick.
11 Cement plaster 1:5 upto 20' (6.00 mm) height:- 25.1 to 25.6
a) 3/8" (10 mm) thick 100 Sft. 3,352.80 4,273.20 P.Sqm 360.75 459.80
b) ½" (13 mm) thick 100 Sft. 3,352.80 4,471.20 P.Sqm 360.75 481.10
c) ¾" (20 mm) thick 100 Sft. 4,217.40 6,058.20 P.Sqm 453.80 651.85

12 Cement plaster 1:6 upto 20' (6.00 mm) ditto


height:-
a) 3/8" (10 mm) thick 100 Sft. 3,352.80 4,110.00 P.Sqm 360.75 442.25
b) ½" (13 mm) thick 100 Sft. 3,352.80 4,356.95 P.Sqm 360.75 468.80
c) ¾" (20 mm) thick 100 Sft. 4,217.40 5,731.80 P.Sqm 453.80 616.75
13 Applying floating coat of cement 1/32" (0.8 mm) thick. 100 Sft. 1,994.50 2,647.30 P.Sqm 214.60 284.85 25.4 to 25.6

14 Lime pointing flush upto 20' (6.00 m) height including 100 Sft. 2,488.20 3,034.70 P.Sqm 267.75 326.55 25.8
raking joints, in lime, sand mortar 1:2.
15 Lime pointing struck joints on walls, upto 20' (6.00 m) 100 Sft. 3,841.20 4,387.70 P.Sqm 413.30 472.10 ditto
height, including raking joints in lime sand mortar 1:2.
16 Cement pointing flush upto 20' (6.00 m) heihgt:- ditto

a) ratio 1:2 100 Sft. 3,352.80 4,590.50 P.Sqm 360.75 493.95


b) ratio 1:3 100 Sft. 3,352.80 4,303.70 P.Sqm 360.75 463.10

17 Cement pointing 1:2 flush on floor. 100 Sft. 2,488.20 3,725.90 P.Sqm 267.75 400.90 ditto
18 Cement pointing struck joints, on walls, upto
20' (6.00 m) hiehgt:-
a) ratio 1:2 100 Sft. 3,841.20 5,078.90 P.Sqm 413.30 546.50
b) ratio 1:3 100 Sft. 3,841.20 4,792.10 P.Sqm 413.30 515.65

chapter-11(Surface Rendering) Page 71


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

19 Pointing flush on stone work, upto 20' (6.00 m) height. 25.8


a) in lime mortar 1:2 (lime, sand) 100 Sft. 3,088.80 3,830.15 P.Sqm 332.35 412.10
b) in cement mortar 1:3 100 Sft. 3,088.80 4,039.70 P.Sqm 332.35 434.65
c) on stone work raised:-
i) in lime mortar 1:2 100 Sft. 5,794.80 6,536.15 P.Sqm 623.50 703.30
ii) in cement mortar 1:3 100 Sft. 5,794.80 6,745.70 P.Sqm 623.50 725.85
20 Raking and washing joints of stone masonry 100 Sft. 1,953.60 - P.Sqm 210.20 - ditto
(old work).
21 Raking and washing joints of brick masonry (old work). 100 Sft. 976.80 - P.Sqm 105.10 - ditto
22 Priming coat of chalk under distemper. 100 Sft. 345.85 398.25 P.Sqm 37.20 42.85 25.11
23 Distempering:- ditto
a) new surface:-
i) one coat 100 Sft. 377.10 865.95 P.Sqm 40.60 93.20
ii) two coats 100 Sft. 557.50 1,199.35 P.Sqm 60.00 129.05
iii) three coats 100 Sft. 737.90 1,532.75 P.Sqm 79.40 164.90
b) old surface:-
i) one coat 100 Sft. 344.50 680.40 P.Sqm 37.05 73.20
ii) two coats 100 Sft. 557.50 893.35 P.Sqm 60.00 96.15
24 Colour washing:- 25.10
a) new surface:-
i) one coat 100 Sft. 324.70 504.80 P.Sqm 34.95 54.30
ii) two coats 100 Sft. 487.10 750.20 P.Sqm 52.40 80.70
b) old surface:-
i) one coat 100 Sft. 324.70 441.10 P.Sqm 34.95 47.45
ii) two coats 100 Sft. 487.10 677.95 P.Sqm 52.40 72.95
25 White washing:- 25.9
a) new surface:-
i) one coat 100 Sft. 324.70 472.00 P.Sqm 34.95 50.80
ii) two coats 100 Sft. 487.10 707.60 P.Sqm 52.40 76.15
iii) three coats 100 Sft. 629.90 923.60 P.Sqm 67.80 99.40
b) old surface:-
i) one coat 100 Sft. 324.70 435.10 P.Sqm 34.95 46.80
ii) two coats 100 Sft. 487.10 670.70 P.Sqm 52.40 72.15
26 Gobri leeping:- 25.7
a) on walls 100 Sft. 384.90 402.95 P.Sqm 41.40 43.35
b) over roofs 100 Sft. 326.30 344.35 P.Sqm 35.10 37.05
27 Striking joints of burnt bricks in lime or cement mortar. 100 Sft. 488.40 - P.Sqm 52.55 - 25.8 Payable with fresh masonry, when
the face of the work is not to be
plastered/pointed.
28 Extra for lime, mud or cement plaster and pointing from 100 Sft. 610.65 - P.Sqm 65.70 -
20' (6.00 m) and above for each additional 10' (3.00 m)
height or part thereof.
29 Caulking joints of sleeper wall, with sand and coaltar. 100 Sft. 1,729.20 2,811.60 P.Sqm 186.05 302.55

chapter-11(Surface Rendering) Page 72


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

30 Caulking joints of sleepers, withmud and chopped straw. 100 Sft. 1,729.20 1,791.70 P.Sqm 186.05 192.80
31 Extra cost of labour and material for red oxide pigment in 100 Sft. 610.50 1,150.50 P.Sqm 65.70 123.80
cement pointing to match with the colour of bricks.
32 Providing grooved cement sand plaster 1:3 over existing
plastered and roughened surface upto 20' (6.00 m) height.

i) 3/8" (10 mm) thick 100 Sft. 3,841.20 5,007.05 P.Sqm 413.30 538.75
ii) ½" (13 mm) thick 100 Sft. 3,841.20 5,395.70 P.Sqm 413.30 580.60
33 Providing and fitting expanded metal edge bead for Rft. 29.05 99.95 Per Metre 95.30 327.85
corners, with nails on both sides of edges.
34 Petty repairs to fire place.
i) Single Each 605.20 742.40 Each 605.20 742.40
ii) Double Each 1,210.45 1,484.85 Each 1,210.45 1,484.85
35 Petty repair to main rooms. Each 1,250.05 1,616.45 Each 1,250.05 1,616.45 Area above 100 Sft (10.76 sq.m)
36 Petty repair to small rooms. Each 625.00 808.15 Each 625.00 808.15 Area upto 100 Sft (10.76 sq.m)
37 Petty repair to verandah. Each 1,250.05 1,542.95 Each 1,250.05 1,542.95
The height will be taken from the
38 Extra labour for white washing, colour washing, priming coat 100 Sft. 54.10 - P.Sqm 5.80 - floor, roof or ground uderneath as
and distempering, etc. from 20' (6.00 m) height and above, Per Per the case may be on the side
requiring scaffolding, for every additional 10' (3.00m) height coat coat towards which the work is to be
or part thereof. done.
39 Preparing surface and applying Graffiato Weather Coating Per Sft 54.05 82.10 P.Sqm 581.45 883.60 25.1& 25.6
( Co-polymer emulsion) of approved colour & shade with weather
resistant pigment, highly water repellant with Metalic Spatula having top
class finish by smoothing with a plastic Spatula, on a base coat (Primer)
over well cleaned plastered surface complete in all respect as approved
and directed by the Engineer Incharge.
40 Providing & applying 1.5 mm thick fine textured high quality Sandtex Per Sft 54.05 79.85 P.Sqm 581.45 859.05 25.1& 25.6
Coating formed of special Acrylic base protective decorative coating of
approved colour & shade with trowel having top class finish over well
cleaned plastered surface i/c preparation and cleaning the surface,
complete in all respect as approved and directed by the Engineer
Incharge.
41 Providing and fixing 3/4"(19mm) thick Sand Stone (12"x24") on interior Per Sft 96.05 307.55 P.Sqm 1,033.30 3,309.00
and exterior wall and cladding of approved quality and shade, laid over
pre-plastered surface with adhesive bond complete in all respect i/c the
cost of matching sealer to finish the joints as approved and directed by
the Engineer Incharge.

chapter-11(Surface Rendering) Page 73


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

42 Providing and laying ½" thick washed Terrazzo on walls in required Per Sft 52.80 137.00 P.Sqm 568.15 1,473.85
colour & shade with one part of cement and marble powder 3:1 and two
parts of marble chips, using white cement with additives laid over pre-
plastered surface i/c cost of all types of labour, scaffolding, applying at
any height in any floor over well cleaned plastered surface i/c
preparation and cleaning the surface, complete in all respect, as per
specifications, as approved and directed by the Engineer Incharge.
43 Providing and Fixing MS Diamond Wire Mesh of 24 guage (6" Wide) for Per Rft 7.25 25.95 Per Meter 23.85 85.15
horizontal and vertical joints of concrete interfacing masonry with nails,
washers etc., i/c cost of all type labour and material, as shown on
drawings, as per spicifications, complete in all respects, , as approved
and directed by the Engineer Incharge.

chapter-11(Surface Rendering) Page 74


12. WOOD WORK
1 No extra rate is to be paid for sawing as the rates are inclusive of these.
2 Rates for all finished works include the removal of surplus debris, unused material and byproducts.

MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

1 Plain wood work sawn, wrought, planed and fixed 26.1


inposition, including cost of nails and screws etc.
a) Deodar wood Per Cft. 2,148.95 15,489.10 P. Cum 75,900.90 547,075.00
b) Shisham wood Per Cft. 2,442.00 19,095.40 P. Cum 86,251.45 674,449.55

2 Plain wood work for regulation karries or needles, etc. 26.1


including sawing, planning, wroughting wood and providing
and fixing steel parts of karries i.e. end strip and rods, etc.
a) Deodar wood Per Cft. 1,391.95 15,213.05 P. Cum 49,163.65 537,324.95
b) Shisham wood Per Cft. 1,391.95 18,438.65 P. Cum 49,163.65 651,253.10
3 First class teak wood wrought joinery in doors and 26.1
windows, etc. panelled, panelled and glazed or fully to
glazed and fixed in position, including chowkat, holdfast, 26.3
tower bolt, chocks, rubber stop, cleats/G.I. clamps, &
chords with hooks, nails, screws, etc. complete 26.7
(excluding sliding bolt and lock):-
i) 2" (50 mm) thick Per Sft. 358.40 8,903.00 P.Sqm 3,856.40 95,796.30
ii) 1¾" ( 45 mm) thick Per Sft. 358.40 8,287.00 P.Sqm 3,856.40 89,168.10
iii) 1½" (40 mm) thick Per Sft. 358.40 7,685.70 P.Sqm 3,856.40 82,698.15
4 First class teak wood wrought joinery in wire gauze doors 26.8 i) This also includes the cost of
and windows with frames 22 SWG galvanized iron wire to wood required for extra thickness of
2
gauze 12x12 meshes to square inch, (5x5 meshes in cm ) 26.10 chowkat.
including brass fittings, sash bars, etc. complete:- ii) If 24 SWG wire gauge is used,
the composite rate shall be
a) teak wood framing 1¾" (45 mm) thick with wire gauze reduced by Rs. 6.20 per sft. and
fixed in position:- Rs.66.90 per sq.m.
i) without springs or spring hinges. Per Sft. 67.85 3,698.15 P.Sqm 730.05 39,792.10
ii) with springs or spring hinges. Per Sft. 67.85 3,714.20 P.Sqm 730.05 39,964.80
b) teak wood framing 1½" (40 mm) thick, with wire
gauze fixed in position:-
i) without springs or spring hinges. Per Sft. 67.85 3,404.80 P.Sqm 730.05 36,635.65
ii) with springs or spring hinges. Per Sft. 67.85 3,423.00 P.Sqm 730.05 36,831.50
c) G.I. wire gauze 22 SWG, 12x12 meshes per square Per Sft. 122.10 1,003.10 P.Sqm 1,313.80 10,793.35
2
inch, (5x5 meshes per cm ) fixed to chowkat with ¾"
(20 mm) teak wood strips and screws.
d) G.I. wire gauze 22 SWG, 12x12 meshes per square Per Sft. 114.45 3,520.65 P.Sqm 1,231.50 37,882.20
2
inch (5x5 meshes per cm ) fixed with ½" (13 mm) strip
on separate frame of teak wood 2"x2" (50x50 mm),
for windows, etc.

chapter-12(Wood Work) Page 75


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

5 P/F expanded metal ½" to ¾" (13 to 20 mm) mesh, 16 Per Sft. 152.65 1,654.15 P.Sqm 1,642.50 17,798.65
Guage, fixed to chowkat with 1" (25 mm) teak wood cover
strips and screw etc., complete.
6 Providing and fixing expanded metal ½" (13 mm) to ¾" Per Sft. 152.65 2,538.15 P.Sqm 1,642.50 27,310.50
20 mm), 16 gauge, fixed to chowkat with 1" (25 mm)cover
moulding and screws, including teak wood frame 2"x2"
(50 mm x 50 mm)

7 Providing and fixing 1st class solid wood wrought joinery in panelled or 26.1 to
panelled and glazed doors and windows of specified thickness with 1" 26.3 & 26.7
thick solid wood panels with step and 1-1/2"x2-1/2" beadings all around
the panels i/c the cost of Tower bolt and handles complete in all respect
(Excluding the cost of sliding bolt,lock and chowkats (frame), etc.) as
approved and directed by the Engineer Incharge
a) Deodar wood Door
(i) 2" thick (50 mm) Per Sft 452.20 3,693.45 P.Sqm 4,865.90 39,741.45 For doors without beadings around the
(ii) 1-3/4" thick (45 mm) Per Sft 452.20 3,454.75 P.Sqm 4,865.90 37,172.90 panels, Reduce Composite rate by Rs 393.15
(iii) 1-1/2" thick (40 mm) Per Sft 452.20 3,216.00 P.Sqm 4,865.90 34,604.30 P.sft or Rs 4229.95 P.Sq Mtr.
b) Ash wood Door
(i) 2" thick (50 mm) Per Sft 542.65 3,589.80 P.Sqm 5,839.10 38,626.20 For doors without beadings around the
(ii) 1-3/4" thick (45 mm) Per Sft 542.65 3,365.85 P.Sqm 5,839.10 36,216.65 panels, Reduce Composite rate by Rs 360.00
(iii) 1-1/2" thick (40 mm) Per Sft 542.65 3,141.90 P.Sqm 5,839.10 33,807.10 P.sft or Rs 3873.60 P.Sq Mtr.
c) Oak wood Door
(i) 2" thick (50 mm) Per Sft 542.65 3,001.65 P.Sqm 5,839.10 32,297.55 For doors without beadings around the
(ii) 1-3/4" thick (45 mm) Per Sft 542.65 2,822.50 P.Sqm 5,839.10 30,369.90 panels, Reduce Composite rate by Rs 288.00
(iii) 1-1/2" thick (40 mm) Per Sft 542.65 2,643.35 P.Sqm 5,839.10 28,442.30 P.sft or Rs 3098.90 P.Sq Mtr.
d) Yellowpine wood Door
(i) 2" thick (50 mm) Per Sft 542.65 2,060.55 P.Sqm 5,839.10 22,171.75 For doors without beadings around the
(ii) 1-3/4" thick (45 mm) Per Sft 542.65 1,953.10 P.Sqm 5,839.10 21,015.15 panels, Reduce Composite rate by Rs 172.80
(iii) 1-1/2" thick (40 mm) Per Sft 542.65 1,845.60 P.Sqm 5,839.10 19,858.60 P.sft or Rs 1859.30 P.Sq Mtr.
8 P/F 1½" (40mm) thick semi solid panelled or panelled and glazed doors 26.1 to
comprising of solid wood styles and rails of specfied width and panels of 26.3 & 26.7
2.5 mm thick veneer ply matching with wood used with grooves , pasted
on both sides of 1" thick Lasani wood panel with tapered edges i/c the cost
of tower bolt ,handles complete in all respect (Excluding the cost of
chowkat frame,sliding bolt and lock) as approved and directed by Engineer For doors without beadings around the
Incharge panels, Reduce the :-.
i) Composite rate by Rs 393.10 P.sft or Rs
(i) Deodar Wood Per Sft 320.20 2,425.30 P.Sqm 3,445.60 26,096.15
4229.95 P.Sq Mtr
ii) Composite rate by Rs 345.60 P.sft or Rs
(ii) Ash Wood Per Sft 320.20 2,313.55 P.Sqm 3,445.60 24,893.60
3718.65 P.Sq Mtr
iii) Composite rate by Rs 288.00 P.sft or Rs
(iii) Oak Wood Per Sft 320.20 1,974.85 P.Sqm 3,445.60 21,249.55
3099.00 P.Sq Mtr
iv) Composite rate by Rs 236.15 P.sft or Rs
(iv) Yellowpine Wood Per Sft 320.20 1,433.00 P.Sqm 3,445.60 15,419.05
2541.05 P.Sq Mtr

chapter-12(Wood Work) Page 76


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

9 Deodar wood framed, braced and battened doors and 26.1, 26.2
windows, complete with iron fittings and fixed in position, & 26.4
including chowkats:-
a) 2¼" (56 mm) thick, with 1¼" (30 mm) Per Sft. 407.00 2,887.65 P.Sqm 4,379.30 31,071.10
battens and 1" (25 mm) planks.
b) 1¾" (40 mm) thick with 1" (25 mm) ditto 375.70 2,466.85 P.Sqm 4,042.55 26,543.30
battens and ¾" (20 mm) planks.
10 1" (25 mm) thick battneded doors and windows fitted in Per Sft. 464.00 1,571.30 P.Sqm 4,992.65 16,907.20
position, complete with iron fittings, without chowkats.
11 Deodar battened ledged and braced doors and windows 26.1, 26.2
2¼" (56 mm) thick (1¼" (30 mm) thick ledge braces and 26.4 to
1" (25 mm) thick battens complete with iron fittings, Per Sft. 438.30 2,784.65 P.Sqm 4,716.10 29,962.85 26.6
chowkats and fixed in position.
12 a) Deodar wood framed with braces and 22 SWG G.I. 26.1, 26.2 If 24 gauge G.I. sheet is used, the
sheet facing, including holdfast, wooden beadings, & 26.4 composite rate will be reduced by
hinges, and locking arrangements as directed by the Re.4.70 per Sft. (Rs. Per 50.60
Engineer incharge:- Sq.m) for G.I. facing on one side
and Rs.9.40 per Sft. (Rs.101.20
i) G.I. sheet facing on one side. Per Sft. 190.80 1,951.80 P.Sqm 2,053.00 21,001.35 per Sq.m) for G.I. sheet facing on
ii) G.I. sheet facing on both sides. Per Sft. 209.85 2,078.00 P.Sqm 2,258.00 22,359.30 both sides.
b) Partal wood framed with braces and 22 SWG G.I.
sheet facing, including holdfast, wooden beadings, -ditto-
hinges and locking arrangements, as directed by the
Engineer-in-charge:-
i) G.I. sheet facing on one side. Per Sft. 190.80 770.55 P.Sqm 2,053.00 8,291.10
ii) G.I. sheet facing on both sides. Per Sft. 209.85 896.75 P.Sqm 2,258.00 9,649.05
13 First class deodar wood wrought joinery work in wire 26.8 to i) This also includes the cost of
gauze doors and windows, with 22 SWG G.I. wire gauze, 26.10 wood required for extra thickness
2
12x12 meshes per square inches (5x5 per cm ) including of chowkat.
iron fittings etc. complete:-
ii) If 24 SWG wire gauze is used
a) deodar wood framing 1¾" (45 mm) thick with wire the composite rate shall be
gauze fixed in position:- reduced by Rs.4.70 per sft or
Rs.50.60 per sq.m.
i) without springs or spring hinges. Per Sft. 203.50 1,625.80 P.Sqm 2,189.65 17,493.60
ii) with springs or spring hinges. Per Sft. 203.50 1,644.00 P.Sqm 2,189.65 17,689.45
b) deodar wood framing 1½" (40 mm) thick, with wire
gauze fixed in position:-
i) without springs or spring hinges Per Sft. 203.50 1,516.45 P.Sqm 2,189.65 16,317.00
ii) with springs or spring hinges Per Sft. 203.50 1,529.20 P.Sqm 2,189.65 16,454.20
c) G.I. wire gauze 22 SWG, 12x12 meshes per square
2
inch, (5x5 in cm ) fixed to chowkat, with ¾" Per Sft. 152.65 561.55 P.Sqm 1,642.50 6,042.30
('20 mm) thick deodar wood strip and screws.

chapter-12(Wood Work) Page 77


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

d) G.I. wire gauze 22 SWG 12x12 meshes per square


2
inch, (5x5 meshes in cm ) fixed to chowkat, with ½" Per Sft. 228.95 1,451.50 P.Sqm 2,463.50 15,618.15
(13 mm) strip on separate frame of deodar wood 2" x
2" (50 mm x 50 mm).
14 Making and fixing trellis doors and windows of deodar Per Sft. 339.15 1,860.20 P.Sqm 3,649.25 20,015.75 26.1
wood, complete. 26.2
15 Providing and fixing mild steel chowkat of doors, windows,
C.window, etc. including holdfast, making and threading
holes for hinges, etc. complete:-
a) M.S. angle iron 1½"x 1½"x ¼" (40x40x6 mm) welded Per Sft. 81.30 485.35 P.Sqm 874.80 5,222.35
with M.S. flat 2"x ¼" (50 mm x 6 mm)
b) M.S. tee iron 1½"x 1½"x ¼" (40x40x6 mm) welded Per Sft. 81.30 370.55 P.Sqm 874.80 3,987.10
with M.S. flat 2"x ¼" (50 mm x 6 mm)
16 Providing and fixing M.S. sheet hollow pressed frame of
doors, windows, C. windows, etc. (chowkat only) of 20
SWG welded with M.S. flat 6"x 1¼" x 1/8" (150
mmx30mmx3mm) M.S. holdfast 9"x1"x1/8"
(225mmx25mmx3mm) welded/screwed 4" (100 mm) long
iron hinges, including filling chowkat with cement sand
mortar 1:8 and embedding holdfast in cement concrete
1:2:4, complete in all respects:
a) single rebate Per Sft. 120.80 483.95 P.Sqm 1,299.80 5,207.30
b) double rebate Per Sft. 142.60 554.70 P.Sqm 1,534.40 5,968.55
17 Providing and fixing 2" wide MS/ GI Chowkat singel/double rebate made
of 16 SWG MS sheet pressed/welded / supported with M.S. flat 1-
1/4"x1/8" i/c 6"long M.S. Flat 1"x1/8"hold fasts (6-Nos) welded/
screwed, punching of lock hole covered with MS Box,coating with antirust
paint including filling with cement sand mortar (1:8) and embedding hold
fast in cement concrete (1:2:4) ,complete in all respect as approved and
directed by Engineer Incharge.
(i) 15 " wide Per Sft 174.45 913.75 P.Sqm 1,876.85 9,831.70
(ii) 10.5 " wide Per Sft 174.45 789.05 P.Sqm 1,876.85 8,490.25
(iii) 5.5 " wide Per Sft 174.45 558.85 P.Sqm 1,876.85 6,013.45
18 Extra for providing and fixing iron double spring hinges, Per Sft. 11.65 122.90 P.Sqm 125.35 1,322.40 26.2
with brass fittings (it shall include brass finger plate, 6" door area door area
(150 mm) tower bolt).
19 Providing and fixing brass spring hinges to wire gauzed Each 244.20 784.20 Each 244.20 784.20
doors.
20 Extra for brass fittings to doors and windows, except for
hinges, which shall be of iron:-
i) deodar wood panelled or panelled and glazed or fully glazed. Per Sft. 7.00 91.50 P.Sqm 75.30 984.55
ii) deodar wood wire gauzed shutters. Per Sft. 7.00 57.60 P.Sqm 75.30 619.80

chapter-12(Wood Work) Page 78


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

21 Extra for providing and fixing approved quality rim lock Each 732.60 1,596.60 Each 732.60 1,596.60
adjustable over the style surface.
22 Providing and fixing, approved quality mortice lock. Each 610.50 1,114.50 Each 610.50 1,114.50
23 Providing and fixing, expended metal ½" to ¾" (13 mm to
20 mm) mesh 16 gauge.
a) fixed to chowkat with 1" (25 mm) thick deodar wood Per Sft. 152.65 826.15 P.Sqm 1,642.50 8,889.35
strip and screws, etc.
b) fixed with 1" (25 mm) cover moulding and screws, Per Sft. 152.65 1,151.25 P.Sqm 1,642.50 12,387.45
including deodar wood frame 2"x2" (50 x 50 mm)

24 a) Providing and fixing deodar wood almirah 9" to 12" For hollow frame shutter with
(225 mm to 300 mm) depth, including boxing with Per Sft. 488.40 5,313.35 P.Sqm 5,255.20 57,171.55 commercial ply on one side, the
back, shelves, shutter and brass fittings, etc. composite rate shall be reduced by
complete. Rs.54.00 per Sft;or Rs.580.00
per Sqm and for hollow frame
shutter with commercial ply on
both sides, the composite rate
shall be reduced by Rs.22.80 per
Sft. or Rs.245.00 per Sq. metre.
b) Providing and fixing deodar wood almirah 9" to 12"
(225 mm to 300 mm)depth with shelves, shutters, Per Sft. 366.30 2,205.50 P.Sqm 3,941.40 23,731.20
brass fittings, etc., without boxing and back,
complete.
25 Providing and fixng class room almirah consiting of 1" (25 Per Sft. 274.50 1,277.15 P.Sqm 2,953.35 13,742.20
mm) thick solid flush shutter with deodar wood lipping ¼" (6 mm)
thick all around (Approved Factory Manufactured) fixed in deodar
wood frame 3"x1" (75mm x 25mm) including full hinges
C.P. fittings with RCC (1:1½:3) shelves 1½" (40 mm) thick
including 3 coats of painting.
26 Providing and fixing wooden box type wardrobe 22" (550 If hollow flush door leaves 1" thick
mm) deep including ¾" (20 mm) thick boxing and shelves, (25 mm) with commercial ply
hanger rods, hard board back drawers, brass fittings, (3 ply) on both sides of deodar
locking arrangements, handles, internal bolts, shoe rods, wood frame and partal wood
etc. including three coats of enamel paint:- bracing and deodar wood lipping is
used, the composite rate will be
reduced by Rs.13.00 per Sft. or
i) Partal wood boxing and deodar wood shelves and leaves, etc. Per Sft. 563.55 2,822.65 P.Sqm 6,063.65 30,371.55 Rs.140.00 per Sq. metre.
ii) Deodar wood boxing, and deodar wood shelves and leaves, etc. Per Sft. 549.45 3,929.90 P.Sqm 5,912.10 42,285.95
27 Providing and fixing wardrobe 22" (550 mm) deep Per Sft. 218.60 1,947.25 P.Sqm 2,352.30 20,952.20
consisting of RCC shelves 1½" (40 mm) thick including ½"
thick vinboard boxing and back (one side ply) vinboard
shutter ¾" (20 mm) thick including deodar wood lipping ¼"
(6 mm) on all edges, fixes including deodar wood frame
3"x1" (75mm x 25mm) with hanger rod in centre position
drawers at bottom and openable shutter on upper portion
including full hinges C.P. fitting and painting 3 coats Complete.

chapter-12(Wood Work) Page 79


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

28 Providing and fixing 3"x4-1/2" chowkat for doors, windows and C.


windows, including holdfast, etc.
a) Teak wood Per Sft. 108.55 3,069.85 P.Sqm 1,167.80 33,031.75
b) Deodar wood Per Sft. 67.85 1,216.50 P.Sqm 729.90 13,089.55
c) Shisham wood Per Sft. 81.40 1,201.15 P.Sqm 875.85 12,924.20
d) Ash Wood Per Sft. 108.55 1,208.50 P.Sqm 1,167.80 13,003.45
e) Yellowpine Wood Per Sft. 108.55 647.35 P.Sqm 1,167.80 6,965.30
f) Oak Wood Per Sft. 108.55 992.65 P.Sqm 1,167.80 10,681.10
29 Making and fixing deodar wood planking in eave boards, 26.1
etc. planed on both sides, rebated and fixed including 26.2
nails and screws, bolts and brackets:-
a) 1" (25 mm) thick Per Sft. 122.10 1,216.85 P.Sqm 1,313.80 13,093.05
b) ¾" (20 mm) thick Per Sft. 122.10 942.65 P.Sqm 1,313.80 10,142.95
c) ½" (13 mm) thick Per Sft. 122.10 669.65 P.Sqm 1,313.80 7,205.20
30 Making and fixing deodar wood shelves, including ditto
brackets:-

i) 1" (25 mm) thick Per Sft. 122.10 1,216.85 P.Sqm 1,313.80 13,093.05
ii) 1½" (40 mm) thick Per Sft. 122.10 1,764.05 P.Sqm 1,313.80 18,980.95
iii) 2" (50 mm) thick Per Sft. 122.10 2,311.25 P.Sqm 1,313.80 24,868.80
31 a) Making and fixing cleats for doors and windows, Each 146.50 489.85 Each 146.50 489.85 26.1 and
including hinges and screws. 26.2
b) Making and fixing cleats with brass hooks for roof Each 195.35 450.55 Each 195.35 450.55
ventilators.
c) Providing and fixing door stops of 1½" (40 mm) dia Each 20.35 178.85 Each 20.35 178.85
rubber block.
d) Providing and fixing G.I. hook with clamps for doors. Each 6.50 44.00 Each 6.50 44.00
32 Hard wood railing of any shape and design, including ditto
bends and corners, fixed in position, including polishing
complete as directed.
a) Shisham wood Per Rft. 559.65 1,660.55 Per Metre 1,835.55 5,446.60
b) Teak wood ditto 415.15 4,004.25 ditto 1,361.65 13,133.95
33 Deodar wood dado or picture rail 3"x1½" (75x40 mm) as Per Rft. 207.55 914.45 Per Metre 680.85 2,999.40 26.1
per approved design including moulding and fixed in place, 26.2
cost of screws, nails, plugs, and painting complete.
34 Sawing wood by hand:-
a) Soft wood (deodar, kail or chir). 100Sft. 2,442.00 - P.Sqm 262.75 -
b) Hard wood (shisham, kikar, teak or 100Sft. 3,256.00 - P.Sqm 350.35 -
sahl).
35 Sawing wood by machine:
a) Soft wood 100Sft. 1,440.78 - P.Sqm 155.05 -
b) Hard wood 100Sft. 2,165.25 - P.Sqm 233.00 -
36 Making and fixing sun-shade of deodar wood including Per Sft. 170.95 1,474.25 P.Sqm 1,839.30 15,862.80 26.1
fixing brackets.

chapter-12(Wood Work) Page 80


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

37 Making and fixing 1" (25 mm) thick kail or chir wooden ditto
notice board with frame. Per Sft. 203.50 449.70 P.Sqm 2,189.65 4,838.75
38 Making deodar punkha pole 10'x6"x6" Each 732.60 32,760.60 Each 732.60 32,760.60 ditto
(3.0 m x 150 mm x 150 mm)
39 Dismantling and refixing eave boards. Per Rft. 52.35 -- Per Metre 171.70 --
40 Making wooden stair-cases complete 2' to 3' (600 to 900 Per Rft. 796.40 9,207.55 Per Metre 2,612.20 30,200.75 26.1
mm) wide frame 1½" (40 mm) thick planks of deodar
wood, including hand rails.
41 Providing and fixing partition, including frame work:-
a) Sheets on one side of framework:-
i) Hard board 100Sft. 3,815.65 52,390.70 P.Sqm 410.55 5,637.25
ii) Ply wood ¼" (6 mm) thick 100Sft. 3,815.65 47,854.70 P.Sqm 410.55 5,149.15
iii) Masonite 100Sft. 3,815.65 50,374.70 P.Sqm 410.55 5,420.30
b) Sheets on both sides of frame work:-
i) Hard board 100Sft. 4,578.75 61,291.15 P.Sqm 492.65 6,594.95
ii) Ply wood ¼" (6 mm) thick 100Sft. 4,578.75 68,387.45 P.Sqm 492.65 7,358.50
iii) Masonite 100Sft. 4,578.75 57,259.15 P.Sqm 492.65 6,161.10
42 Providing and fixing ceiling, including frame work:-
i) Hard board 100Sft. 7,339.05 31,538.50 P.Sqm 789.70 3,393.55
ii) Chip board 100Sft. 7,339.05 35,858.50 P.Sqm 789.70 3,858.35
iii) Ply wood ¼" (6 mm) thick 100Sft. 7,339.05 29,498.50 P.Sqm 789.70 3,174.05
iv) Masonite 100Sft. 7,339.05 29,618.50 P.Sqm 789.70 3,186.95
43 Providing and fixing thermopore false ceiling, including In case acoustic thermopore sheet is used,
wooden frame panelling, cost of M.S. clamps, making composite rate will be increased by Rs.15.00
holes in walls and repairing damaged surface, complete in per Sft.
all respects:-
a) Deodar wood frame panelling:
i) ¾" (20 mm) thick 100Sft. 8,284.40 39,649.85 P.Sqm 891.40 4,266.35
ii) 1" (25 mm) thick 100Sft. 8,284.40 40,024.90 P.Sqm 891.40 4,306.70
b) Partal wood frame panelling:
i) ¾" (20 mm) thick 100Sft. 8,284.40 23,584.85 P.Sqm 891.40 2,537.75
ii) 1" (25 mm) thick 100Sft. 8,284.40 24,088.85 P.Sqm 891.40 2,591.95
44 a) Fixing door, including chowkats. Each 1,080.75 - Each 1,080.75 -
b) Fixing windows, including chowkats. Each 540.40 - Each 540.40 -
45 a) Glazing with panes (16 oz. to 18 oz.,) Per Sft. 87.20 212.45 P.Sqm 938.45 2,286.10 26.12
including cost of putty.
b) Glazing with panes (16 oz. to 18 oz.) Per Sft. 109.90 318.75 P.Sqm 1,182.40 3,429.70
using deodar wooden fillets and putty.
46 Glazing with panes (24 oz. to 26 oz.), using Per Sft. 161.20 334.85 P.Sqm 1,734.45 3,602.95 26.12
putty and deodar wooden fillets.
47 a) Cutting to required size and fixing glass Per Sft. 61.05 62.20 P.Sqm 656.90 669.50
panes with putty
chapter-12(Wood Work) Page 81
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

b) Cutting to required size and fixing glass panes with Per Sft. 91.60 164.60 P.Sqm 985.35 1,771.10
wooden fillets and putty.
48 Glazing with plate glass 1/4" (6 mm) thick including the cost
of deodar wood fillets and putty:-
a) Glazing upto 8 sft (0.75 sq.m) Per Sft. 140.40 507.50 P.Sqm 1,510.85 5,460.75
b) Glazing exceeding 8 Sft (0.75 sq.m) but not exceeding 24 sft Per Sft. 140.40 507.70 P.Sqm 1,510.85 5,462.95
(2.25 sq.m).
49 Providing and fixing 1½" (40 mm) thick hollow flush doors Teak ply would be used under the
and windows with commercial ply (3 ply) on both faces of written permission of the
deodar wood shutter frame 1¼" (30 mm) thick and partal superintending Engineer, and the
wood braces at about 3" (75 mm) apart and deodar wood composite rate of using teak ply
lipping 1½"x3/8" (40 mmx10 mm) fixed with M.S. chowkat will be increased by Rs.22.00 per
(frame) including chromium plated fittings, etc. complete Sft and Rs.220.00 per Sq.m
in all respects (without sliding bolt or lock):-
i) M.S. angle iron 1½"x1½"x¼", welded Per Sft. 361.80 2,013.85 P.Sqm 3,892.75 21,668.80
(40 mmx40 mmx 6mm) with M.S. flat
2"x¼" (50 mm x 6 mm)
ii) M.S. tee iron 1½"x1½"x¼", welded Per Sft. 361.80 1,899.05 P.Sqm 3,892.75 20,433.75
(40 mmx40 mmx 6mm) with M.S. flat
½"x¼" (13 mm x 6 mm)
50 P/F 1-1/2" thick solid flush door comprising of 2.5 mm thick Commercial Per Sft 220.50 640.65 P.Sqm 2,372.35 6,893.15 26.1 to It C.P. Finger plate and kick plate are not
ply compressed over 2.5 mm thick commercial ply over 1" thick packing 26.3 & 26.7 provided/ fixed, the composite rate will be
wood in style and rails under proper pressure i/c the cost of nails, tower reduced by Rs.15.20 P.Sft.
bolt , handles, glue, sawing charges, Painting charges, sand papering and
3/8" thick matching wooden lipping as approved and directed by the
Engineer Incharge.
51 P/F 1-1/2" thick solid flush door comprising of 2.5 mm thick Per Sft 315.20 954.35 P.Sqm 3,391.55 10,268.60 26.1 to
Deodar/Ash/Oak ply with grooves , compressed over 2.5 mm thick 26.3 & 26.7
commercial ply over 1" thick packing wood in style and rails under proper
pressure i/c the cost of nails, tower bolt , handles, glue, sawing charges and
lacquar polishing to show the grains of ply properly, sand papering and
3/8" thick matching wooden lipping as approved and directed by the
Engineer Incharge.
52 Providing and laying 24 SWG aluminum kick plate 4" (100 Per Rft. 73.25 102.95 Per Metre 240.30 337.70
mm) high, fixed with screws 4" (100 mm) centre to centre,
on bottom rail of flush doors only of commercial ply.
53 Providing and fitting curtain railing to doors and windows, Per Rft. 30.55 447.05 Per Metre 100.10 1,466.35
comprising of TOSO-elite Japan made superior type of
railing or equivalent, fixed over 4"x¾" (100mmx20mm)
deodar wood strip, including painting.
54 Providing and fixing G.I. wire gauze 22 SWG, 12x12 Per Sft. 62.15 247.10 sq.m 668.85 2,658.90 It 24 SWG wire gauze is used, the
2
meshes per square inch, (5x5 meshes in cm ) fixed to composite rate shall be reduced by
steel window, complete with flat iron patti ½"x 1/8" (13 Rs.6.60 per Sft. or Rs.71.00 P.SQM
mmx3 mm) and machine made screws.

chapter-12(Wood Work) Page 82


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

55 Providing and fixing wooden moulding stopper 2½"x5/8"


(63 x 16 mm) on door frame fitted with ply of approved
quality complete in all respects.
a) Teak wood moulding Per Sft. 76.30 628.25 P.Sqm 821.10 6,760.05
b) Deodar wood moulding Per Sft. 76.30 243.80 P.Sqm 821.10 2,623.45
56 Providing and fixing deodar wood dolly frame having Rate shall be paid as per surface
1½"x1½" (40 x 40 mm) vertical and horizontal double post area of dolly frame
with 1½"x1½" (40 x 40 mm) full width of james braces at e-g 0.75' x (3.5' + (2 x 7))
12" (300 mm) including filling of the spaces in between
braces with 1:3:6 PCC fixing ply of approved quality
including holdfasts complete in all respects.
a) Teak wood ply Per Sft. 187.85 1,170.20 P.Sqm 2,021.25 12,591.25
b) With commercial ply Per Sft. 187.85 1,098.90 P.Sqm 2,021.25 11,824.20
57 Providing and fixing ornamental wooden architrave 1st Class
3" x 1½" tapered to ¼" all along the door frame complete in all
respect.
a) Teak wood architrave 1st Class Per Sft. 33.10 406.40 P.Sqm 356.25 4,373.00
b) Deodar wood architrave 1st Class Per Sft. 33.10 174.75 P.Sqm 356.25 1,880.50
c) Yellow Pine Wood Architrave 1st Class Per Sft. 33.10 102.25 P.Sqm 356.25 1,100.20
d) Ash Wood Architrave 1st Class Per Sft. 33.10 175.45 P.Sqm 356.25 1,888.10
e) Oak Wood Architrave 1st Class Per Sft. 33.10 147.30 P.Sqm 356.25 1,585.05
58 Providing and fixing Vin board cabinet 3/4" thick with
drawers 3"deep in 'Kitchen including termite proofing and
polishing with synthetic enamel as specified, with handles
hinges,screws etc., complete in all respects.
i) 1-1/2' deep,without back Per Sft 375.90 1,730.25 P.Sqm 4,044.60 18,617.40
ii) 1-1/2' deep,with back Per Sft 375.90 1,880.25 P.Sqm 4,044.60 20,231.40
iii) 2' deep,without back Per Sft 375.90 1,876.50 P.Sqm 4,044.60 20,191.05
iv) 2' deep,with back Per Sft 375.90 2,026.50 P.Sqm 4,044.60 21,805.05

59 P/F 1½" (40mm) thick wooden dolly Frame chowkat comprising of


1-1/2'x2" (40 mmx50 mm) vertical and (40 mmx50 mm) horizontal
bracings @ 12" c/c of yellowpine wood full width of Jamb, filling of
spaces with (1:3:6) PCC i/c the cost of 3/8 " thick specified wooden
cladding i/c the cost of holdfast complete in all respect as approved and
directed by Engineer Incharge. ( Surface area of chowkat will be made
basis for payment)
(i) Deodar Wood Cladding Per Sft 170.75 1,319.40 P.Sqm 1,837.40 14,196.55
(ii) Ash Wood Claddding Per Sft 170.75 1,328.15 P.Sqm 1,837.40 14,291.15
(iii) Oak Wood Claddding Per Sft 170.75 1,221.00 P.Sqm 1,837.40 13,138.00
(iv) Yellowpine Wood Cladding Per Sft 170.75 1,042.50 P.Sqm 1,837.40 11,217.15

chapter-12(Wood Work) Page 83


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

60 P/F 3/4" dia heavy duty sliding bolt of specified material i/c the cost of
hardware complete in all respect as approved and directed by the Engineer
Incharge.
a) I ron
(i) 10" (250 mm) long Each 216.15 648.15 Each 216.15 648.15
ii) 12" (300 mm) long Each 216.15 684.15 Each 216.15 684.15
b) Brass
i) 10" (250 mm) long Each 216.15 1,041.15 Each 216.15 1,041.15
(ii) 12" (300 mm) long Each 216.15 1,206.15 Each 216.15 1,206.15
(iii) 18" (450 mm) long Each 216.15 1,776.15 Each 216.15 1,776.15
61 Providing and fixing almirah shutter comprising of 3/4" thick both side Per Sft 132.00 683.70 P.Sqm 1,420.30 7,356.45 26.1 to
Laminated/Glossy MDF (Karachi) sheet with 1"x3/4"deodar wood golla 26.3 & 26.7
all around the leaf fixed on (3"x1") Kail wood frame i/c the cost of 1/2"
full brass hinges, C.P.handles, catchers, screws, and rawal plugs,
polishing/ paint ing 3 coat to gola & frame i/c the cost of locking
arrangement complete in all respect as approved and directed by Engineer
Incharge.
62 Providing and fixing 24" Deep Box type Wardrobe consisting of 3/4" thick Per Sft 293.05 1,314.30 P.Sqm 3,153.10 14,141.95 26.1 to
UV coated MDF board(Medium density Fiber board) Sheet both side 26.3 & 26.7
glazed shutters and box comprising of 3/4" thick laminated MDF sheet i/c
the cost of 1mm thick PVC tape duly hot pressed on all edges of the
shutters / panels / drawers etc., with machine i/c the cost of self closing
blum type hinges, handles, screws, Glue and rawal plugs, Drawers &
locking arrangement complete in all respect as approved and directed by
Engineer Incharge
63 Providing and fixing 1-1/2" thick G.I sheet forged door comprising of G.I Per Sft 552.85 2,315.30 P.Sqm 5,948.90 24,912.80
pressed double skin pannelled sheet of 22 SWG in specified width of rails,
Styles and panels pressed on both sides of fillet (Honey Comb paper), dully
fixed in chowkat with Archtrative on one side, with heavy duty 4 No. steel
hinges i/c M.S Tower bolt 9" long, M.S Sliding bolt 12" long, Rowel bolt
for Hold Fasts, duly powder coated paint and punching of required holes as
approved and directed by the Engineer Incharge .

64 P/F heavy duty self closing blum type hinge having required degree of
opening i/c the cost of hardware complete in all respect as approved and
directed by the Engineer Incharge.
(i) CP coated Iron Each 216.15 492.15 Each 216.15 492.15
(ii) Stainless steel Each 216.15 762.15 Each 216.15 762.15
65 Providing and fixing auotomatic hydraulic operated door closer imported Each 432.30 4,992.30 Each 432.30 4,992.30
heavy duty complete in all respect as approved and directed by the
Engineer Incharge.
66 Providing and fixing heavy duty 3 mm thick SS Plate, die-cast metal Each 432.30 9,072.30 Each 432.30 9,072.30
auotomatic hydraulic operated door stopper (Concealed floor hinge )
embeded in floor i/c the cost of Top pivot hinge,hardware, cutting of floor
and making it good complete in all respect as approved and directed by the
Engineer Incharge.

chapter-12(Wood Work) Page 84


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

67 Providing and fixing Imported Mortise Lever Handle Lock with back plate Each 1,691.25 4,409.25 Each 1,691.25 4,409.25
(Machine, Cylinders, Lever Handles (Pair) and backplate (Pair)) of
approved quality, design & finish, including the cost of all accessories to
complete the job as shown on drawing and as per specification, complete
in all respect, as approved and directed by the Engineer Incharge.

chapter-12(Wood Work) Page 85


13. PAINTING AND VARNISHING
1 The rates include charges for scaffolding and other arrangements.
2 The rates for all finished works include the removal of surplus debris, unused material and by products
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
1 a) Cleaning painted wood work with oil and water. 100 Sft. 376.20 497.10 P. Sqm 40.50 53.50
b) Oiling woodwork with boiled linseed oil. 100 Sft. 250.80 397.65 P. Sqm 27.00 42.80 27.7
2 Brushing and scraping blisters of old paints from 100 Sft. 752.40 -- P. Sqm 80.95 - 27.3
woodwork.
3 Scraping, brushing and removing old paint from metal 100 Sft. 3,009.60 -- P. Sqm 323.85 - 27.9
surface.
4 Painting old surfaces:- 27.1
27.3 &
a) Painting corrugated surfaces, patent roofing, etc. with 27.9
oil paint.
i) first coat 100 Sft. 951.05 1,516.20 P. Sqm 102.35 163.15
ii) each subsequent coat 100 Sft. 720.50 1,010.50 P. Sqm 77.55 108.75
b) Painting sashes, fanlights, glazed or gauzed doors
and windows:-
i) first coat 100 Sft. 576.40 881.20 P. Sqm 62.00 94.80
ii) each subsequent coat 100 Sft. 489.95 739.75 P. Sqm 52.70 79.60
c) Painting doors and windows, any type:
i) first coat 100 Sft. 951.05 1,531.05 P. Sqm 102.35 164.75
ii) each subsequent coat 100 Sft. 720.50 1,162.90 P. Sqm 77.55 125.15
d) Painting guard bars, gates of iron bars, gratings,
railing (including standards, braces etc.) and similar
open work:-
i) first coat 100 Sft. 576.40 881.20 P. Sqm 62.00 94.80
ii) each subsequent coat 100 Sft. 489.95 739.75 P. Sqm 52.70 79.60
e) Painting fillets, framings, skirtings, pipes, gutters and
similar linear work not exceeding 6" in girth:-
i) first coat 100 Rft. 489.95 794.75 P. Sqm 16.05 26.05
ii) each subsequent coat 100 Rft. 345.85 595.65 P. Sqm 11.35 19.55
f) Painting small detached articles, not exceeding one
square foot (Sq.m) of painted surface:-
i) first coat 100 Nos. 1,456.15 2,021.30 100 Nos. 1,456.15 2,021.30
ii) each subsequent coat 100 Nos. 1,315.30 1,620.10 100 Nos. 1,315.30 1,620.10
g) Painting small detached articles, exceeding one
square foot (Sq.m) but not exceeding three square
feet (Sq.m) of painted surface:-
i) first coat 100 Nos 3,328.30 5,008.90 100 Nos 3,328.30 5,008.90
ii) each subsequent coat 100 Nos 1,932.85 2,773.15 100 Nos 1,932.85 2,773.15

chapter-13(Painting & Var) Page 86


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
5 Painting new surface:- 27.1
27.2 &
a) Preparing surface and painting corrugated surface, 27.9
patent roofing, etc.
i) priming coat. 100 Sft. 1,446.70 1,901.20 P. Sqm 155.65 204.55
ii) each subsequent coat of paint. 100 Sft. 507.30 1,210.05 P. Sqm 54.60 130.20
b) Preparing surface and painting sashes, fan light,
glazed or gauzed doors and windows etc. any type
(including edges):-
i) priming coat. 100 Sft. 608.80 1,120.00 P. Sqm 65.50 120.50
ii) each subsequent coat of paint. 100 Sft. 415.00 815.05 P. Sqm 44.65 87.70
c) Preparing surface and painting of doors and windows
any type (including edges):-
i) priming coat. 100 Sft. 1,446.70 1,886.35 P. Sqm 155.65 202.95
ii) each subsequent coat of paint. 100 Sft. 507.35 1,210.05 P. Sqm 54.60 130.20
d) Preparing surface and painting guard bars, gates of
iron bars, gratings, railing (including standards,
braces, etc.) and in similar open work:-
i) priming coat. 100 Sft. 930.25 1,207.75 P. Sqm 100.10 129.95
ii) each subsequent coat of paint. 100 Sft. 415.00 815.05 P. Sqm 44.65 87.70
e) Preparing surface and painting of fillets, framing,
skirtings, pipes, gutters, and similar linear work not
exceeding 6" (150 mm) girth:-
i) priming coat. 100 Rft. 734.90 948.65 Per Metre 24.10 31.10
ii) each subsequent coat of paint. 100 Rft. 276.65 609.00 Per Metre 9.10 20.00
f) Preparing surface and painting of small detached
articles, not exceeding one sq. ft. (Sq.m) of painted
surface:-
i) priming coat. 100 Nos. 2,161.50 3,910.90 100 Nos. 2,161.50 3,910.90
ii) each subsequent coat of paint. 100 Nos. 1,065.00 2,455.65 100 Nos. 1,065.00 2,455.65
g) Preparing surface and painting of small detached
articles, exceeding one Sft. but not exceeding 3 Sft.
(Sq.m) of painted surface:-
i) priming coat. 100 Nos. 6,154.50 7,883.35 100 Nos. 6,154.50 7,883.35
ii) each subsequent coat of paint. 100 Nos. 1,848.00 4,339.25 100 Nos. 1,848.00 4,339.25
h) Extra for knotting and stopping to 100 Sft. 97.70 147.20 P. Sqm 10.50 15.85
priming coat on new surface of wood.
6 Applying Khanki Mixture hot to barrage 27.10
gates:-
i) first coat 100 Sft. 720.50 1,345.40 P. Sqm 77.55 144.75
ii) second coat 100 Sft. 574.00 978.35 P. Sqm 61.75 105.25

chapter-13(Painting & Var) Page 87


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
7 French polishing complete:- 27.6
a) on new work 100 Sft. 7,354.30 7,602.00 P. Sqm 791.30 817.95
b) on old work 100 Sft. 3,865.70 3,999.65 P. Sqm 415.95 430.35
8 Varnishing wood work, including cleaning and preparing
surface.
a) first coat 100 Sft. 576.40 966.05 P. Sqm 62.00 103.95
b) second coat 100 Sft. 216.15 512.05 P. Sqm 23.25 55.10
c) third coat 100 Sft. 216.15 449.40 P. Sqm 23.25 48.35
9 Bitumen coating to plastered or cement concrete surface:-
i) 20 lbs. per 100 Sft. (9.07 Kg per Sq.m) 100 Sft. 627.00 2,696.05 P. Sqm 67.45 290.10
ii) 14 lbs. per 100 Sft. (6.35 Kg per Sq.m) 100 Sft. 601.90 1,709.75 P. Sqm 64.75 183.95
iii) 10 lbs. per 100 Sft. (4.54 Kg per Sq.m) 100 Sft. 496.60 1,604.45 P. Sqm 53.45 172.65
10 Writing letters or figures, per letter, per inch (25 mm) Per No. 28.80 30.90 Per No. 28.80 30.90 27.1
height.
11 Writing letters or figures at any surface with reflective paint Per Letter 28.80 29.75 Per Letter 28.80 29.75 27.1
of approved quality and colour per letter per inch height. per inch per 25 mm
height height

12 Writing letters of figures on any surface with reflective tape ditto 33.85 36.00 ditto 33.85 36.00 ditto
of approved quality and colour per letter per inch (25 mm)
height.
13 Coaltar painting: 27.8
to
a) first coat, laid hot 100 Sft. 644.70 2,175.40 P. Sqm 69.35 234.05 27.11
b) second coat, laid hot 100 Sft. 390.70 1,424.05 P. Sqm 42.05 153.25
14 Solignum painting:- 27.8
a) one coat, applied hot 100 Sft. 537.25 638.90 P. Sqm 57.80 68.75
b) two coats, applied hot 100 Sft. 814.00 975.95 P. Sqm 87.60 105.00
15 Creosote painting:- ditto
a) one coat, applied hot 100 Sft. 644.70 904.75 P. Sqm 69.35 97.35
b) two coats, applied hot 100 Sft. 976.80 1,408.05 P. Sqm 105.10 151.50
16 Burning off or rubbing down with pumice stone, old paint 100 Sft. 2,329.80 2,346.20 P. Sqm 250.70 252.45 27.3
from wood work.
17 Removing with caustic soda, old paint from wood work. 100 Sft. 752.40 775.60 P. Sqm 80.95 83.45 ditto
18 Painting distance marks for white ground and black Each 144.10 169.75 Each 144.10 169.75 27.1
lettering on both sides.
19 Painting two feet wide gauges, reading to 10th of a foot Per Rft. 288.20 338.55 per Metre 945.30 1,110.50 ditto
(metre).
20 Painting sounding rods and other gauges, reading to 10th Per Rft. 144.10 159.80 per Metre 472.65 524.15 27.1
of a foot (metre)
21 Painting leveling staves. Per Rft. 451.00 476.20 per Metre 1,479.30 1,561.90

chapter-13(Painting & Var) Page 88


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
22 a) Painting and lettering mile/Km stones, ditto
on both sides:
i) one coat Each 308.80 489.50 Each 308.80 489.50
ii) two coats Each 540.40 829.70 Each 540.40 829.70
b) Painting and lettering Furlong/½ Km 27.1
stones, on both sides:-
i) one coat Each 41.15 62.55 Each 41.15 62.55
ii) two coats Each 72.05 109.45 Each 72.05 109.45
c) Painting and lettering Sign posts:-
i) one coat Each 345.85 463.05 Each 345.85 463.05
ii) two coats Each 570.65 770.10 Each 570.65 770.10
23 Removing paint or varnish from wall. 100 Sft. 1,504.80 - sq.m 161.90 - 27.12
24 Scraping from hydraulic gates:- 27.1
a) Khanki paint 100 Sft. 3,009.60 - P. Sqm 323.85 -
b) Aluminium paint 100 Sft. 3,009.60 - P. Sqm 323.85 -
25 Painting letters with shade. per letter 46.10 46.10 per letter 46.10 46.10 27.1
per inch per 25 mm
height height
26 Scraping rust from old rail or girders. 100 Sft. 2,257.20 2,437.20 P. Sqm 242.90 262.25 27.9
27.10
27 Chiselling old paint from brick work. 100 Sft. 3,009.60 3,093.60 P. Sqm 323.85 332.85 27.12

28 Cleaning glasses with chalk and spirit, etc. 100 Sft. 2,508.00 2,570.60 P. Sqm 269.85 276.60
29 Cleaning and oiling rafter or rolled steel 100 Sft. 752.40 843.05 P. Sqm 80.95 90.70 27.9
beams.
30 Cleaning and painting punkha poles, including fixing Each 610.50 636.75 Each 610.50 636.75 27.3
hooks.
31 Preparing surface and painting with emulsion paint:- 27.12

a) first coat 100 Sft. 735.00 1,707.65 P. Sqm 79.10 183.75


b) 2nd and each subsequent coat 100 Sft. 563.65 1,321.85 P. Sqm 60.65 142.25
32 Preparing surface and painting with water proof coloured 27.12
cement finish, like duracem, buxcem or other finishes with
similar specifications, on walls, etc.
a) new surface:
i) 1st coat 100 Sft. 735.00 1,151.65 P. Sqm 79.10 123.90
ii) 2nd and subsequent coat 100 Sft. 563.65 926.00 P. Sqm 60.65 99.65
b) old surface:
i) 1st coat 100 Sft. 735.00 906.75 P. Sqm 79.10 97.55
ii) 2nd and subsequent coat 100 Sft. 563.65 732.85 P. Sqm 60.65 78.85

chapter-13(Painting & Var) Page 89


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
33 Providing and applying weather shield paint of approved
quality on external surface of building including preparation of
surface, application of primer complete in all respect:
a) new surface:
i) 1st coat 100 Sft. 2,481.60 4,752.60 P. Sqm 267.00 511.40
ii) 2nd coat 100 Sft. 1,362.90 2,669.40 P. Sqm 146.65 287.25
b) old surface: 100 Sft. 1,362.90 2,669.40 P. Sqm 146.65 287.25
34 Painting Traffic Lane 5" (125 mm) wide, with road marking Per Rft. 4.30 7.85 Per Metre 14.20 25.70
enamel.
35 Painting Traffic Lane 5" (125 mm) wide with reflective Per Rft. 5.75 24.40 Per Metre 18.85 80.05 AASHTO Rates shall be reduced by Rs.4.05
clorinated rubber (CR) paint including glass beads comlpete M248-91 P.Rft or Rs.13.20 P.Mtr.
in all respect. (2000) If glass beads are not used.
36 Painting Traffic Lane Marking of specified width (1.5mm thick), with *1205-1 Payment will be made as per actual
Thermoplastic (TP) Paint including Glass Beads, complete in all respect, as to measurement.
approved and directed by Engineer incharge. 1205-8
i) 5" wide Per Rft. 8.00 49.20 Per Metre 26.20 161.35
ii) 6" wide Per Rft 8.00 56.80 Per Metre 26.20 186.35
37 Repainting of ceiling fan (all sizes and types), including Per Job 174.45 286.65 Job 174.45 286.65
painting of blades, canopy, suspension rod and regulator,
with suitable enamel paint.
38 Repainting of iron poles with cross arms, with bitumen or Per Job 407.00 794.35 Job 407.00 794.35
other approved paint.
39 Repainting of pipes and specials of G.I., M.S. or conduit,
etc., fixed for on surface electric wiring, with approved
paint:
i) upto 40 mm (1½") dia Per Rft. 3.70 12.20 Per Metre 12.20 25.10
ii) above 40 mm (1½") to 50 mm (2") dia ditto 7.45 14.00 Per Metre 24.40 45.95
iii) above 50 mm (2") to 100 mm (4") dia ditto 12.40 22.25 Per Metre 40.70 73.00
40 Repainting main switches and branch distribution boards Per Job 80.60 241.20 Job 80.60 241.20
of all sizes and types, with approved paint (complete set).

41 Extra labour for painting, varnishing, etc. from 20' (6.10 m) 100 Sft. 240.75 - P. Sqm 25.90 - The height will be taken from the
height and above, for every additional 10' (3.05 m) height, per coat floor, roof or ground underneath, as
or part thereof, requiring scaffolding. the case may be on the side
towards which the work is to be
done.
42 Lettering and printing of signage / direction boards / road delineators of
any colour by machine i/c cost of Digital Lettering, Lamination & pasting
etc complete in all respect.
a) High Intensity Prismatic (HIP) Tape P.Sft 180.15 1,470.15 P. Sqm 1,938.15 15,818.55
b) Diamond Grade Tape P.Sft 180.15 1,686.15 P. Sqm 1,938.15 18,142.70

chapter-13(Painting & Var) Page 90


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
43 Providing and laying Rumble Strips with Thermoplastic Paint on pre-laid P.Rft 22.75 136.70 Per Metre 74.55 448.40
asphalt roads comprising of 8" wide yellow strip comprising of 03 Nos
humps and 6" wide chequered strip in white colour with machine of
specified thicknesses and pattern etc complete in all respect.
44 Preparing surface and Lacquar polish to reveal wooden grains by 27.6
application of multiple coats of wood sealer , sand papering with different
no of sandpapers and Lacquar to make glossy surface finish i/c the cost of
cotton, thinner, wood sealer complete in all respects as approved and
directed by the Engineer Incharge.
(i) Matt Finish Per Sft 176.45 252.60 P. Sqm 1,898.60 2,717.80
(ii) Glossy Finish Per Sft 181.45 285.10 P. Sqm 1,952.20 3,067.90
45 Preparing surface and painting with Matt/Glossy high chemical
resistant/hard wearing Polyurethane paint (Epoxy Paint) by sprayer/Brush
i/c the cost of Primer coat , all material and labour complete in all respects
as approved and directed by the Engineer Incharge.

(i) Priming Coat Per Sft 14.45 35.45 P. Sqm 155.65 381.55
(ii) Each and subsequent Coat Per Sft 7.60 25.60 P. Sqm 81.90 275.70

46 Providing and applying wall putty of 2mm thickness over plastered surface
(new surface) to prepare the surface even and smooth complete in all 100 Sft 345.85 544.75 P. Sqm 37.20 58.60
respect.

chapter-13(Painting & Var) Page 91


14. LINING OF CANALS
1 Rates for all finished works include the removal of surplus debris, unused material and byproducts.
2 The rates also include curing for specified period wherever necessary.
3 Nominal dimension of tile or brick shall be taken for the purpose of measurement and payment.
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
1 Formation, dressing and preparing sub-grade:- 28.1 to 28.3

a) in bed 100Sft. 1,664.00 - P.Sqm 179.05 -


b) on slope 100Sft. 2,270.40 - P.Sqm 244.30 -
2 Stabilized layer of cement, sand ratio 1:30, 2" (50 mm) 100Sft. 3,999.60 5,442.00 P.Sqm 430.35 585.55 ditto
thick on slope.
3 Cement plaster ½" (13 mm) thick ratio 1:10. ditto
a) in bed 100Sft. 2,915.10 3,616.15 P.Sqm 313.65 389.10
b) on slope 100Sft. 3,623.40 4,324.45 P.Sqm 389.90 465.30
4 Cement plaster 3/8" (10 mm) thick ratio 1:3. ditto
a) in bed 100Sft. 2,915.10 4,144.50 P.Sqm 313.65 445.95
b) on slope 100Sft. 3,623.40 4,852.80 P.Sqm 389.90 522.15
5 Cement plaster 1½" (40 mm) thick ratio 1:6. ditto
a) in bed 100Sft. 3,623.40 6,576.50 P.Sqm 389.90 707.65
b) on slope 100Sft. 4,488.00 7,441.10 P.Sqm 482.90 800.65
6 Tile lining 12"x6"x2" (300x 150x50 mm) in 1:6 cement, 28.2 to 28.3 The rates are only for laying tiles
sand mortar:- over 1/8" (3 mm) thick layer of 1:6
mortar. Items 1 to 5 above are
a) in bed 100Cft. 16,945.50 46,493.95 P.Cum 5,985.15 16,421.65 payable separately.
b) on slope 100Cft. 19,437.00 48,985.45 P.Cum 6,865.15 17,301.65
7 Tile lining 12"x6"x2" (300x150x50 mm) in 28.2 to 28.3 The rates are only for laying tiles
1:3 cement, sand mortar:- over 1/8" (3 mm) thick layer of 1:3
mortar. Items 1 to 5 above are
a) in bed 100Cft. 16,945.50 50,560.50 P.Cum 5,985.15 17,857.95 payable separately.
b) on slope 100Cft. 19,437.00 53,052.00 P.Cum 6,865.15 18,737.95
8 Brick lining 9"x4½"x3" (225x113x75 mm) in 1:6 cement, 28.2 The rates are only for laying bricks
sand mortar:- over 1/8" (3 mm) thick layer of 1:6
mortar. Items 1 to 5 above are
a) in bed 100Cft. 16,945.50 46,133.95 P.Cum 5,985.15 16,294.50 payable separately.
b) on slope 100Cft. 19,437.00 48,625.45 P.Cum 6,865.15 17,174.50
9 Brick lining 9"x4½"x3" (225x113x75 mm), in 1:3 cement, ditto The rates are only for laying
sand mortar:- bricks over 1/8" (3 mm) thick
layer of 1:3 mortar. Items 1 to
a) in bed 100Cft. 16,945.50 50,200.50 P.Cum 5,985.15 17,730.80 5 above are payable
b) on slope 100Cft. 19,437.00 52,692.00 P.Cum 6,865.15 18,610.80 separately.
10 Cement concrete lining, using washed screened and 20.1, 28.1
graded stone aggregate:- & 28.3

chapter-14(Lining of canal) Page 92


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
a) in bed:-

i) ratio 1:2:4 100Cft. 14,876.40 49,143.60 P.Cum 5,254.35 17,357.50


ii) ratio 1:3:6 100Cft. 14,876.40 41,888.40 P.Cum 5,254.35 14,795.00
iii) ratio 1:4:8 100Cft. 14,876.40 36,591.60 P.Cum 5,254.35 12,924.15

b) on slope:-

i) ratio 1:2:4 100Cft. 17,176.50 51,443.70 P.Cum 6,066.75 18,169.90


ii) ratio 1:3:6 100Cft. 17,176.50 44,188.50 P.Cum 6,066.75 15,607.40
iii) ratio 1:4:8 100Cft. 17,176.50 38,891.70 P.Cum 6,066.75 13,736.55

chapter-14(Lining of canal) Page 93


15. SHEET PILING
Rates for all finished works include the removal of surplus debris, unused material and by products.
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
1 Cutting Ransome and Larson piles. Per cut 488.40 - Per cut 488.40 - 29.1 - 29.3

2 Cutting universal piles. Per cut 722.85 - Per cut 722.85 - 29.1 - 29.3
3 Driving steel piles, 25' to 30'. (7.5 to 9.0 m) 100Sft. 11,312.40 - P. Sqm 1,217.20 - 29.1 - 29.3 1) The rate includes laying and
removing of track and also carriage
of piles to machine, average
distance of 3 chains (90 metre).
2) The rates are for the tackle
gangs only supplied by the
contractor, Mechanical staff
on-machines will be supplied by
Government.
3) T-piles and adjustable junction
piles will be counted as two piles.

4 Driving steel piles,more than 15' (4.6 m) and less than 25' 100Sft. 10,824.00 - P. Sqm 1,164.65 - ditto ditto
(7.5 m).
5 Driving steel piles, 15' (4.5 m) and under. 100Sft. 7,893.60 - P. Sqm 849.35 - ditto ditto
6 Dolleying piles. Each 691.70 - Each 691.70 - ditto Upto 5' (1.5 m) dolleying.
7 Drilling holes in piles by hand. Each 67.15 - Each 67.15 - ditto
8 Raising and lowering machine. Per Rft 10,648.00 - Per Metre 34,925.45 - ditto
o.
9 Turning Machine, 90 Per Job 15,338.40 - Per Job 15,338.40 - 29.1 to
29.3
10 Turning Machine, 135o . Per Job 19,245.60 - Per Job 19,245.60 - ditto

11 Turning Machine, 180o . Per Job 26,162.40 - Per Job 26,162.40 - 29.1 to
29.3
12 Travelling machine (light). Per 30,861.60 - 30 M. 30,861.60 - ditto
Chain
13 Loading and unloading piles. Ton 556.80 - Tonne 548.00 - ditto To be done by hand carts or
ramps, including cost of ropes.
14 Dismantling piling machine. Each 65,637.00 - Each 65,637.00 - ditto
15 Erecting piling machine. Each 75,735.00 - Each 75,735.00 - ditto
16 Carriage of piling machine under different conditions. per 12,480.60 - 30 M 12,480.60 - ditto
chain

chapter-15(Sheet piling) Page 94


16. PROTECTION & DIVERSION WORKS
1 Rates for all finished works include the removal of surplus debris, unused material and byproducts.
2 The composite rates of the items in which stone, boulders, shingle spawl are used do not contain the carriage
of the these stone materials, which will be paid separately by road, and/or rail, whichever means of transport is
adopted. The supply and carriage to site of work of all other material required in the item, is included in the composite rates.
3 The carriage of stone or spawl will be paid on the basis of actual stack measurement (without any reduction factor) of the stone, boulders, shingle or spawl carried.
4 Where stone, boulder or spawl is issued from stock and contractor is paid for its carriage and/ or labour only; or where such stone product is supplied,
carried or handled by the contractor in which no laying is required, the actual stack measurement (without any reduction factor) shall from the basis of payment of supply or
The quantity of finished and completed item of work shall form the basis of laying.
5 In case of the items in which the rates include carriage of stakes, bushing, Pilchi, sarkanda or farash, etc. within one mile (1.6 Km.)
i) The cost of the carriage within one mile (one Km) shall not be deducted from the carriage charges to follow thereafter from the point of supply.
ii) If the site of work happens to be within one mile (one Km.) of the source of supply, the materials will be collected and measured at site of work and no extra carriage would be admissible in such cases.
iii) where the site of the work is situated at more than one mile (one Km.) distance from the source of supply, the point of supply will be fixed carefully by the Engineer-in-charge
in such a way that the carriage charges would be arrived at, most economically. Extra carriage will be admissible from the place of supply of the
material which will be considered its starting point. The demarcation of the place of supply will be pre-determined before calling the tenders.

MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
1 Cutting pilchi frash or sarkanda inlcuidng carriage within 100Cft. 2,859.10 P.Cum 1,009.70
one mile.
2 Weaving matresses. 100Cft. 5,417.30 P.Cum 1,913.10
3 a) Supplying and filling jute bags 1.25 (o.o35 cum) Cft., Per Baq 84.65 137.50 Per Baq 84.65 137.50 The rate does not include supply of
capacity, with sand or earth, sewing and stacking, in sand or earth for filling bags, which
dry. will be paid extra.
b) Supply and filling jute bags 1.25 (0.35 ccum) Cft. Per Baq 131.65 184.55 Per Baq 131.65 184.55 -ditto-
capacity, with sand or earth, sewing and laying in
position, under water.
4 a) Supplying and filling jute bags 4 to 5 cft Per Baq 202.55 301.75 Per Baq 202.55 301.75 The rate does not include supply of
(0.11 to 0.14 cum) capacity, with sand or earth, sand or earth for filling bags, which
sewing and stacking, in dry. will be paid extra.
b) Supply and filling new jute bags 4 to 5 cft (0.11 to Per Baq 289.40 388.60 Per Baq 289.40 388.60 -ditto-
0.14 cu.m) capacity, with sand or earth, sewing and
laying in position, under water.
5 Carriage of jute bags 1.25 Cft. (0.035 cu m) capacity, filled
with sand or earth:-
a) 1st chain (30 m) 100 Nos 752.40 100 Nos 752.40

b) 2nd to 4th chain (30 m to 120 m) Per chain 270.85 Per 30 m 270.85
Per 100 Nos/ Per 100 Nos/

c) 5th and subsequent chains ditto 105.35 ditto 105.35


(150 m and subsequent every 30 m)

chapter-16(Protec & Div) Page 95


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
6 Carriage of new jute bags 4 to 5 Cft.(0.11 to 0.14 cu.m)
capacity, filled with sand or earth:-

a) 1st chain (Ist 30 metre) 100 Nos 3,009.60 100 Nos 3,009.60
b) 2nd to 4th chain (60 m to 120 m) per chain 1,053.35 Per 30 m 1,053.35
per 100Nos per %Nos
c) 5th and subsequent chains (150 m and ditto 406.30 ditto 406.30
subsequent every 30 m)
7 Rolling matresses to river edge and floating,
after unroling:-
a) area of matress upto 2,000 Sft. 100Sft. 1,692.90 P.Sqm 182.15
( 186 sq.m)
b) area of matress 2,000 to 2,500 Sft. 100Sft. 2,821.50 P.Sqm 303.60
(186 sq.m to 232 sq.m)
c) area of matress over 2,500 Sft. ditto 3,291.75 P.Sqm 354.20
(232 sq.m)
8 Sewing empty cement bags in sheets. 100 Nos 2,633.40 2,731.95 100 Nos 2,633.40 2,731.95
9 Making compact round pilchi, frash or sarkanda round 100Cft. 3,667.95 4,003.35 P.Cum 1,295.50 1,414.00 Measured in the shape of compact
bundles of specified size for the work. round bundles and of size specified
for the work, before filling at site.
10 Launching the above and placing in position. 100Cft. 1,805.75 P.Cum 637.70
11 Supply within 5 chains (150 m):-
a) Boulders 9" (225 mm) and above 100Cft. 5,447.40 P.Cum 1,923.75
b) Over size shingle 3" to 9"(75 to 225 mm) ditto 3,641.60 P.Cum 1,286.05
c) Mixed graded shingle ditto 4,318.80 P.Cum 1,525.20
12 Supplying Munj or Patha Trungers 6" (150 mm) mesh to hold Each 235.15 381.00 Each 235.15 381.00
3 Cft. (0.085 cu.m)
13 Providing and weaving G.I. wire netting for wire crates, with
G.I. wire of approved size (including siding and partition to
make crate):-
a) 6" (150 mm) mesh

i) 15 SWG wire 100Sft. 3,026.10 4,596.90 P.Sqm 325.60 494.65


ii) 10 SWG wire ditto 3,242.25 8,342.25 P.Sqm 348.85 897.65
iii) 8 SWG wire ditto 3,242.25 11,239.05 P.Sqm 348.85 1,209.30
b) 4" (100 mm) mesh
i) 15 SWG wire 100Sft. 3,890.70 6,057.55 P.Sqm 418.65 651.80
ii) 10 SWG wire ditto 4,323.00 11,957.70 P.Sqm 465.15 1,286.65
iii) 8 SWG wire ditto 4,323.00 16,292.70 P.Sqm 465.15 1,753.10
14 Providing and laying shingle on top of bund, including 100Cft. 1,881.00 3,531.00 P.Cum 664.30 1,247.00
handling of materials within three chains.
15 Supply and dumping at site, without boat, including
handling of materials within three chains (90 m)

chapter-16(Protec & Div) Page 96


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
a) stone or boulder 100Cft. 3,291.75 4,611.75 P.Cum 1,162.50 1,628.65 The rate includes supply of brick
b) shingle or spawl ditto 3,291.75 4,941.75 P.Cum 1,162.50 1,745.20 bats to site of work.
c) brick bats ditto 2,539.35 10,261.35 P.Cum 896.90 3,624.30
16 Supply and dumping by boat, including loading into boat The rate includes supply of brick
within three chains (90 m) lead, and hire charges of boat and bats to site of work.
boatman.
a) stone or boulder 100Cft. 5,990.15 7,310.15 P.Cum 2,115.75 2,581.95
b) shingle or spawl ditto 5,990.15 7,640.15 P.Cum 2,115.75 2,698.50
c) brick bats ditto 5,237.75 12,959.75 P.Cum 1,850.00 4,577.40
17 Providing and filling brick bats in crates 100Cft. 4,887.30 12,609.30 P.Cum 1,726.20 4,453.60 The rate includes supply of brick
(excluding cost of crates). bats to site of work.
18 Supplying and filling bricks in crates and hand packing 100Cft. 5,827.80 31,027.80 P.Cum 2,058.40 10,959.00 The rate includes supply of bricks
(excluding cost of crates). to site of work.
19 Supply and filling in wire crates, including sewing crates
(excluding cost of crates):-
i) stone or boulder 100Cft. 6,580.20 7,900.20 P.Cum 2,324.15 2,790.35
ii) shingle or spawl ditto 6,580.20 8,230.20 P.Cum 2,324.15 2,906.90
20 Extra for anchoring boat, for dumping by boats or tipping 100Cft. 662.10 - P.Cum 233.85 -
crates.
21 Extra for tipping crates (in addition to anchoring boats). 100Cft. 3,310.55 - P.Cum 1,169.30 -
22 Pilchi reventment, including carriage upto one mile 100Sft. 1,881.00 2,821.00 P.Sqm 202.40 303.55 30.1
(1.6 km.)
23 Surface protection with pilchi matresses, carriage upto 100Sft. 4,702.50 4,796.50 P.Sqm 506.00 516.10 ditto
one mile (1.6 Km).
24 Pilchi, sarkanda or frash pitching on slopes, including The cost of placing earth between
supply of pilchi, sarkanda or frash within one mile, (1.6 km) 100Sft. 12,440.30 15,085.40 P.Sqm 1,338.55 1,623.20 rolls shall be paid separately, as
also supply and driving of pegs 1½' (460 mm) long earthwork.
sharpened at one end and, tying with wire or Munj Ban
(excluding cost of placing earth between rolls).

25 Constructing Groynes upto 5' (1.5 m) height, with single 100Sft. 3,956.70 4,253.45 P.Sqm 425.75 457.65 Measurement to be made of the
row of wooden vertical stakes 7" to 12" (175 to 300 mm) area of elevation on one face only.
dia, 1' (300 mm) apart, average lead one mile (1.6 km.)
26 Construction Groynes upto 10' (3.0 m) height, with double 100Sft. 6,692.40 7,046.05 P.Sqm 720.10 758.15
row of wooden vertical stakes 7" to 12" (175 to 300 mm)
dia, 2' (600 mm) apart, average lead one mile (1.6 Km).
27 Providing and laying stone pitching/filling, dry hand 100Cft. 4,323.00 6,915.00 P.Cum 1,526.90 2,442.40
packed, as filling behind retaining walls or in pitching and
aprons.
28 Providing and laying stone pitching with hammer dressed 100Cft. 11,137.50 13,441.50 P.Cum 3,933.75 4,747.55
stones on surface, laid in courses.
29 Providing and laying stone pitching, for top layer only:-
a) one slope 100Cft. 9,306.00 11,610.00 P.Cum 3,286.90 4,100.65
b) on level ditto 8,365.50 10,669.50 P.Cum 2,954.70 3,768.45

chapter-16(Protec & Div) Page 97


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
30 Providing and laying stone or spawl filling:-
a) on level 100Cft. 2,491.50 3,991.50 P.Cum 880.00 1,409.80
b) on slope ditto 3,053.15 4,553.15 P.Cum 1,078.40 1,608.20
31 Providing and laying stone pitching, hand packed, with
surface levelled off to the correct section and voids filled in
1:8 cement, sand mortar, in floors of bridges along banks
and in appons etc.
i) top layer on slope 100Cft. 12,291.20 19,920.30 P.Cum 4,341.25 7,035.85
ii) top layer on level ditto 11,350.70 18,979.80 P.Cum 4,009.05 6,703.65
iii) stone pitching/filling on slope or on level ditto 6,582.20 14,499.30 P.Cum 2,324.85 5,121.15
(other than top layer).
32 Grouting stone pitching or apron, etc. in:-
a) cement, sand mortar 1:3 100Sft. 4,220.05 14,788.10 P.Sqm 454.10 1,591.20
b) cement, sand mortar 1:8 ditto 3,580.50 8,905.60 P.Sqm 385.25 958.25
33 Sand grouting in stone apron, with high 100Sft. 1,428.90 3,168.90 P.Sqm 153.75 340.95
pressure hose.
34 Grouting stone filling or pitching, with bajri. 100Cft. 2,351.25 3,719.25 P.Cum 830.45 1,313.65
35 Removing stone and repitching hand packed, on slopes or 100Cft. 8,723.90 - P.Cum 3,081.25 -
level after making good damaged slope/portion.
36 Collecting and stacking boulders from nullah beds or loose 100Cft. 3,009.60 - P.Cum 1,063.00 -
shale, or from any other site, within 3 chains (90 m) lead.
37 Levelling and dressing stone filling under blocks and 100Cft. 2,491.50 3,859.50 P.Cum 880.00 1,363.20
grouting with shingle.
38 Grouting jharies between blocks with bajri. 100Cft. 2,491.50 3,403.50 P.Cum 880.00 1,202.10
39 Breaking stone into spawls and stacking 100Cft. 2,257.20 - P.Cum 797.25 -
Canal and Roads
40 Fixing floating spurs, with material from canal plantation
within one mile (1.6 Km) lead:-
a) upto 2.0' (600 mm) F.S. depth Each 80.25 - Each 80.25 -
b) above 2.0' to 3.0' (600 to 900 mm) F.S. depth ditto 90.25 - ditto 90.25 -
c) above 3.0' to 4.0' F.S. (900 mm to 1200mm) depth Each 120.35 - ditto 120.35 -
d) above 4.0' (1200 mm) F.S. depth ditto 300.85 - ditto 300.85 -
41 Staking and bushing from canal plantation, royalty to be
paid to Forest Department or cost to private owner, if and
when required:-
a) i) Cutting and supply unsharpened pegs 3.5' (1.07 100 Nos 3,762.00 3,823.25 100 Nos 3,762.00 3,823.25
m) long, 3" to 6" (75 to 150 mm) dia, within one mile
(1.6 Km) lead.
ii) Sharpening one end of 3.5' (1.07 m) long pegs, 3" 100 Nos 1,729.20 - 100 Nos 1,729.20 -
to 6" (75 to 150 mm) dia.

chapter-16(Protec & Div) Page 98


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
iii) Driving pegs 3.5' (1.07 m) long, 3" to 6" (75 to 150 100 Nos 2,735.05 - 100 Nos 2,735.05 -
mm) dia (driven 1.0' (300 mm) below the available bed
or ground (average).
iv) Tying pegs with Munj, Patha ban (one line, Per Chain 188.10 289.50 Per 30 188.10 289.50
incuding tying around the pegs). of One Metre
Row of one
row
v) Cutting and supplying brush wood from canal ditto 2,682.70 3,011.70 ditto 2,682.70 3,011.70
plantation or private owners, lead within one mile
(1.6 Km) and wattling between stakes and intertwining
(thickness of wattled brushwood 1.0' (300 mm)
average).
b) i) Cutting and supplying unsharpened pegs 4.0' 100 Nos 96.40 166.10 100 Nos 96.40 166.10
(1.20 m) long, 3" to 6" (75 to 150 mm) dia, from canal
plantation, lead within one mile (1.6 Km).
ii) Sharpening one end of 4' (1.20 M) long pegs, 3" 100 Nos 1,729.20 - 100 Nos 1,729.20 -
to 6" (75 to 150 mm) dia.
iii) Driving pegs 4' (1.20 m) long, 3" to 6" (75 to 150 100 Nos 3,052.10 - 100 Nos 3,052.10 -
mm) dia (driven 1.0' (300 mm) below the available bed
or ground (average).
iv) Tying pegs with Munj, Patha ban (one line, Per 188.10 Per 188.10
incuding tying around the pegs). Chain of 30 M of
one row one row
v) Cutting and supplying brush wood from canal ditto 7,144.50 ditto 7,144.50
plantation or private source, lead within one mile
(1.6 Km). and wattling between stakes and intertwining
(thickness of wattled brushwood 1.0' (300 mm)
average).
c) i) Cutting and supplying unsharpened pegs 5.0' (1.5 100 Nos 120.55 207.75 100 Nos 120.55 207.75
m) long, 3" to 6" (75 to 150 mm) dia, from canal
plantation, lead within one mile (1.6 Km).
ii) Sharpening one end of 5' (1.5 m) long pegs, 3" to 100 Nos 1,826.90 - 100 Nos 1,826.90 -
6" (75 to 150 mm) dia.
iii) Driving pegs 5' (1.5 m) long, 3" to 6" (75 to 150 100 Nos 3,458.40 - 100 Nos 3,458.40 -
mm) dia (driven 1.5' (450 mm) below the available bed
or ground (average).
iv) Tying pegs with Munj, Patha ban (one line, Per 188.10 289.50 Per 188.10 289.50
incuding tying around the pegs). Chain of 30 M
one row of one
row
v) Cutting and supplying brush wood from canal Per chain 3,663.00 4,123.25 Per 30 M 3,663.00 4,123.25
plantation or private source, lead within one mile of one row of one row
(1.6 Km) and wattling between stakes and intertwining
(thickness of wattled brushwood 1.0' (300 mm)
average).
chapter-16(Protec & Div) Page 99
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

d) i) Cutting and supplying unsharpened 100 Nos 7,524.00 7,628.65 100 Nos 7,524.00 7,628.65
pegs 6.0' (1.8 m) long, 3" to 6" (75 to
150 mm) dia, from canal plantation, lead
within one mile (1.6 Km).
ii) Sharpening one end of 6' (1.8 m) long pegs, 3" to 100 Nos 2,172.70 - 100 Nos 2,172.70 -
6" (75 to 150 mm) dia.
iii) Driving pegs 6' (1.8 m) long, 3" to 6" (75 to 150 100 Nos 4,150.10 - 100 Nos 4,150.10 -
mm) dia (driven 1.75' (530 mm) below the available
bed or ground (average).
iv) Tying pegs with Munj, Patha ban (one line, Per Per Chain
incuding tying around the pegs). Chain of 188.10 289.50 of one row 188.10 289.50
one row
v) Cutting and supplying brush wood from canal ditto 8,085.00 8,643.95 ditto 8,085.00 8,643.95
plantation or private source, lead within one mile
(1.6 Km) and wattling between stakes and intertwining
(thickness of wattled brushwood 1.0' (300 mm) average).

e) i) Cutting and supplying unsharpened pegs 6'-1" to 100 Nos 5,643.00 5,860.00 100 Nos 5,643.00 5,860.00
8.0' long (1.85 to 2.45 m), 4" to 8" (100 to 200 mm)
dia, from canal plantation, lead within one mile
(1.6 Km).
ii) Sharpening one end of 6'-1" to 8.0' (1.85 to 2.45m) 100 Nos 2,766.70 - 100 Nos 2,766.70 -
long pegs, 4" to 8" (100 to 200 mm) dia.

iii) Driving pegs 6'-1" to 8.0' (1.85 to 2.45 m) long, 3" 100 Nos 4,571.15 - 100 Nos 4,571.15 -
to 6" (75 to 150 mm) dia driven 2' (600 mm) below
the available bed or ground (average).
iv) Tying pegs with Munj, Patha ban (one line, Per chain 188.10 244.25 Per 30 M 188.10 244.25
incuding tying around the pegs). of one row of one row
v) Cutting and supplying brush wood from canal Per 9,306.00 9,963.55 Per 30 M 9,306.00 9,963.55
plantation or private source, lead within one mile Chain of of one row
(1.6 Km) and wattling between stakes and intertwining one row
(thickness of wattled brushwood 1.0' (300 mm)
average).
42 Staking with Bamboo from market and bushing from canal
plantation or private source (royalty of brushwood to be
paid to Forest Department or cost to private owner, if and
when required):-
a) i) Supplying Bamboos 8'-1" to 10.0' (2.46 to 3.05 m) 100 Nos 97,200.00 100 Nos 97,200.00
long, 2½" to 5" (63 m to 125 mm) dia.
ii) Sharpening one end of 8'-1" to 10.0' (2.46 to 30.5 100 Nos 2,420.90 - 100 Nos 2,420.90 -
m) long Bomboos, 2½" to 5" (63 to 125 mm) dia.
iii) Driving Bamboos 8'-1" to 10.0' (2.46 to 3.05 m) 100 Nos 5,014.70 - 100 Nos 5,014.70 -
long 2½" to 5" (63 to 125 mm) dia, driven 2.5' (750
mm) below the available bed or ground (average).

chapter-16(Protec & Div) Page 100


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per Per 30 M
Munj, Patha Ban, two lines, including tying around Chain of 282.15 441.25 of one 282.15 441.25
the Bamboos. one row Row
v) Cutting and supplying brushwood from canal ditto 11,467.50 12,321.50 ditto 11,467.50 12,321.50
plantation or private source, lead within one mile
(1.6 Km), and wattling between stakes and
intertwining (thickness of wattled brushwood 1.0'
(300 mm) average).
b) i) Supplying Bamboos 10'-1" to 12.0' (3.07 to 3.66 100 Nos - 104,400.00 100 Nos - 104,400.00
m) long, 2½" to 5" (63 to 125 mm) dia.
ii) Sharpening one end of 10'-1" to 12.0' 100 Nos 2,766.70 - 100 Nos 2,766.70 -
(3.07 to 3.66 m) long Bamboos, 2½" to
5" (63 to 125 mm) dia.
iii) Driving Bamboos 10'-1" to 12.0' (3.07 to 3.66 m) 100 Nos 5,435.75 - 100 Nos 5,435.75 -
long 2½" to 5" (63 to 125 mm) dia, driven 2.75'
(840 mm) below the available bed or ground (average).
iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per chain Per 30 M
S.W.G. No. 10 wire, two lines, including tying around of one 940.50 3,505.35 of one Row 940.50 3,505.35
the Bamboos and third tie around the top end only. row
v) Cutting and supplying brushwood from canal ditto 13,959.00 15,044.00 ditto 13,959.00 15,044.00
plantation or private source, lead within one mile
(1.6 Km) and wattling between stakes and intertwining
(thickness of wattled brushwood 1.0' ( 300 mm)
average).
c) i) Supplying Bamboos 12'-1" to 14.0' (3.68 to 4.27 100 Nos - 116,400.00 100 Nos - 116,400.00
m) long, 2½" to 5" (63 to 125 mm) dia.
ii) Sharpening one end of 12'-1" to 14.0' (3.68 to 4.27 100 Nos 3,112.55 - 100 Nos 3,112.55 -
m) long Bamboos, 2½" to 5" (63 to 125 mm) dia.
iii) Driving Bamboos 12'-1" to 14.0' (3.68 to 4.27 m) 100 Nos 6,225.10 - 100 Nos 6,225.10 -
long 2½" to 5" dia, driven 3.5' (1.07 mm) below the
available bed or ground (average).
iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per chain Per 30 M
S.W.G. No. 10 wire, two lines, including tying around of one row 940.50 3,505.35 of one row 940.50 3,505.35
the Bamboos and third tie around the top end only.
v) Cutting and supplying brushwood from canal ditto 16,450.50 17,700.00 ditto 16,450.50 17,700.00
plantation or private source, lead within one mile
(1.6 Km) and wattling between stakes and intertwining
(thickness of wattled brushwood 1.0' (300 mm)
average).
d) i) Supplying Bamboos 14'-1" to 16.0' (4.30 to 4.90 m) 100 Nos - 140,400.00 100 Nos - 140,400.00
long, 2½" to 5" (63 to 125 mm) dia.
ii) Sharpening one end of 14'-1" to 16.0' (4.30 to 100 Nos 3,458.40 - 100 Nos 3,458.40 -
4.90 m) long Bamboos, 2½" to 5" (63 to 125 mm) dia.

chapter-16(Protec & Div) Page 101


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
iii) Driving Bamboos 14'-1" to 16.0' long (4.30 to 4.90m) 100 Nos 6,916.80 - 100 Nos 6,916.80 -
2½" to 5" (63 to 125 mm) dia, driven 4' (1.20 m)
below the available bed or ground (average).
iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per Chain Per 30 M
S.W.G. No. 10 wire, two lines, including tying around of one 940.50 3,505.35 of one 940.50 3,505.35
the Bamboos and third tie around the top end only. Row Row
v) Cutting and supplying brushwood from canal ditto 18,988.20 20,434.85 ditto 18,988.20 20,434.85
plantation or private source, lead within one mile
(1.6 Km) and wattling between stakes and intertwining
(thickness of wattled brushwood 1.0' (300 mm)
average).
e) i) Supplying Bamboos 16'-1" to 20' (4.9 to 6.10 m) 100 Nos - 176,400.00 100 Nos - 176,400.00
long, 2½" to 5" (63 to 125 mm) dia.
ii) Sharpening one end of 16'-1" to 20' (4.9 to 100 Nos 4,150.10 - 100 Nos 4,150.10 -
6.10 m) long Bamboos, 2½" to 5" (63 to 125 mm) dia.
iii) Driving Bamboos 16'-1" to 20' long (4.9 to 6.10 m) 100 Nos 8,300.15 - 100 Nos 8,300.15 -
2½" to 5" (63 to 125 mm) dia, driven 4' (1.20 m)
below the available bed or ground (average).
iv) Tying Bamboos 2½" to 5" (63 to 125 mm) dia with Per Chain Per 30 M
S.W.G. No. 10 wire, two lines, including tying around of one 940.50 3,505.35 of one 940.50 3,505.35
the Bamboos and third tie around the top end only. row row
v) Cutting and supplying brushwood from canal ditto 23,875.50 25,716.50 ditto 23,875.50 25,716.50
plantation or private source, lead within one mile
(1.6 Km) and wattling between stakes and intertwining
(thickness of wattled brushwood 1.0' (300 mm)
average).
43 Cutting and supplying brushwood from canal plantation or 100Cft. 940.50 1,071.75 P.Cum 332.20 378.55 Royalty to be paid to the Forest
from any other source, within one mile (1.6 Km). Department or cost to the private
owner, if and when required.
44 Filling brush wood only, thoroughly packed. 100Cft. 752.40 - P.Cum 265.75 - Measured in compacted and
packed shape before filling.
45 Covering road 10' to 12' (3.00 to 3.65 m) wide, with 3" Per 1,805.75 - Per 1,805.75 -
(75 mm) sarkanda or jungle upto one chain lead (30 m). Chain 30 M
46 a) Gachi pitching 1' (300 mm) thick. 100Sft. 9,781.20 - P. Sqm 1,052.45 -
b) Gachi pitching done with silt clearance 100Sft. 8,276.40 - P. Sqm 890.55 -
and berm dressing.
47 Providing, mixing and placing cement sand & Bituminious joint sealent P.Rft - 18.25 P.Meter - 59.90
Ratio 1:2:3, 1/2" wide- 1" deep (10' C/C) in construction control joints.

chapter-16(Protec & Div) Page 102


17. OUTLETS
Rates for all finished works include the removal of surplus debris, unused material and byproducts.

MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
1 Earthwork for outlets, excavation refilling, ramming and 17.1 Includes consolidation of earth after
puddling:- to refilling.
17.5
a) channels, discharge upto 50 cusecs. Job 3,135.00 - Job 3,135.00 -

b) channels, discharge from 51 to 100 cusecs. Job 4,138.20 - Job 4,138.20 -

c) channels, discharge from 101 to 200 cusecs. Job 6,270.00 - Job 6,270.00 -

d) channels, discharge from 201 to 350 cusecs. Job 8,464.50 - Job 8,464.50 -

e) channels, discharge over 350 cusecs. Job 12,540.00 - Job 12,540.00 -

2 Dismantling outlets:- 18.1 These rates are for total


dismantlement and removal
a) old types, such as K.G.O's orifices, etc. Each 3,135.00 - Each 3,135.00 - of material. The rates do not
include earth work for which
b) A.P.M. or O.F., "H" upto 2.0 ft. (600 mm) Each 4,702.50 - Each 4,702.50 - rates are given in item 1,
above.
c) A.P.M. or O.F., "H" from 2.1 ft. to 3.0'. Each 6,270.00 - Each 6,270.00 -
(630 mm to 900 mm)
d) A.P.M. or O.F., "H" above 3.0'. Each 7,837.50 - Each 7,837.50 -
(900 mm)
e) Tail cluster bifurcation Each 4,702.50 - Each 4,702.50 -

f) Tail cluster trifurcation Each 6,270.00 - Each 6,270.00 -

g) Tail cluster quardification Each 7,837.50 - Each 7,837.50 -

3 Making temporary A.P.M. bricks block and fixing at site. Each 1,426.60 2,205.40 Each 1,426.60 2,205.40 21.1 & 21.2

4 Dismantling walls, taking out temporary Job 2,970.00 - Job 2,970.00 - 18.1, 21.1
A.P.M. brick block, fixing iron block and & 21.2
rebuilding dismantled walls.
5 Dismantling walls and fitting iron block of O.F. outlet. Each 2,970.00 - Each 2,970.00 - 18.1, 21.1
& 21.2
6 Constructing, watching and removing bund for outlet built 17.1
in running water:- to
17.2
a) upto 3.0' (0.300 m) depth Each 7,524.00 - Each 7,524.00 -
b) above 3.0' (0.300 m) depth Each 10,157.40 - Each 10,157.40 -

chapter-17(Outlet) Page 103


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

7 Adjusting "B" of tail cluster by dismantling and rebuilding Each 1,591.70 2,654.90 Each 1,591.70 2,654.90 18.1, 21.1
throat walls. & 21.2
8 Adjusting "Y" of an A.P.M. outlet, including dismantling Each 3,102.00 4,827.60 Each 3,102.00 4,827.60 ditto
and rebuilding.
9 Extra labour in fixing A.P.M. and O.F. outlet blocks, 21.1 & 21.2 Rates to be Rs. 4.00 less in case
including dressing of bricks:- of O.F. outlets, where there is no
O.F. iron block.
a) for channel depth of 5.0'. (1.5 m) Each 3,458.40 3,819.60 Each 3,458.40 3,819.60
b) for channel depth of 4.0'. (1.2 m) Each 2,593.80 2,955.00 Each 2,593.80 2,955.00
c) for channel depth of 3.0'. (900 mm) Each 2,075.05 2,436.25 Each 2,075.05 2,436.25
d) for channel depth of 2.0'. (600 mm) Each 1,729.20 2,008.80 Each 1,729.20 2,008.80
e) for channel depth of less than 2.0'. (600 mm) Each 1,383.35 1,581.35 Each 1,383.35 1,581.35

10 Repairing damaged reducing collar of Hume pipe outlets. Each 1,426.60 1,915.00 Each 1,426.60 1,915.00
11 Laying iron pipes for outlets. Per Lft. 69.15 - Metre 226.95 - 21.1, 21.2
& 17.1 to
17.5
12 Water allowance for constructing outlets or culverts, when Each 1,529.90 Each 1,529.90 At the discretion of the
canal water is not flowing. to to Engineer-in-charge depending upon
3,135.00 3,135.00 the distance and source of supply.
13 Hoisting and placing R.C. slab or stone in position on Each 1,140.70 - Each 1,140.70 -
outlets or W.C. culverts.
14 Fixing pipe outlet, including back filling of earth and 17.1 to 17.5
puddling:- & 21.1 to
21.2
a) portion under bank. P. Rft. 291.50 315.60 Per Metre 956.35 1,035.35
b) portion under road, beyond bank. P. Rft. 126.60 150.70 Per Metre 415.40 494.40
15 Removing pipe outlet, refilling earth and puddling. 17.1
to
a) portion under bank. P. Rft. 250.80 - Per Metre 822.85 - 17.5
b) portion under road, beyond bank. P. Rft. 94.05 - Per Metre 308.55 -

16 Changing pipe outlets by removing one pipe and replacing


it at the same site with another pipe complete with earth
and puddling.
a) portion under bank. P. Rft. 346.05 370.15 Per Metre 1,135.35 1,214.35
b) portion under road, beyond bank. P. Rft. 173.05 197.10 Per Metre 567.70 646.70

chapter-17(Outlet) Page 104


18. ROAD & ROAD STRUCTURE
1 Specification No. correspond to Book of "Standard Specification for Road and Bridge Construction 2022".
2 Rates for all finished works include the removal of surplus debris, unused material and byproducts.
3 The rates include the provision and maintenance of field test laboratory, pay of laboratory staff, cost of material for testing, etc.
4 Subsequent carriage of crushed stone aggregate and bajri will be paid according to the following:
a) The carriage for the whole distance to the site of work shall be calculated on the basis of the rates of the actual means of transport used in carriage, i.e. road and / or rail, as the case may be.
b) It shall be payable from the nearest approved quarry to site of work.
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
Sub-base & base construction
1 Providing and laying sub-base course of brick on edge 100Cft. 9,418.00 33,703.60 P.Cum 3,326.45 11,904.10 5-5 The nominal thickness of bricks
4½" (113 mm) thick, including compaction to required shall be taken for the purpose of
camber and grade. measurement and payment.
2 Providing and laying sub-base course of brick aggregate, 100Cft. 7,719.75 11,043.75 P.Cum 2,726.60 3,900.65 5-2 To be used only when brick
including compaction of sub-base course material to aggregate is cheaper than stone
required depth, camber, grade & density. aggregate.

3 a) Providing and laying sub-base course of stone product 5-2


of approved quality and grade, including placing, mixing,
spreading and compaction of sub-base material to
required depth, camber, grade to achieve 100%
maximum modified AASHO dry density, including
carriage of all material to site of work except gravel and.
aggregate.
i) Pit run or bed run gravel. 100Cft. 7,719.75 9,087.75 P.Cum 2,726.60 3,209.80
ii) Crushed stone aggregate. 100Cft. 7,719.75 10,167.75 P.Cum 2,726.60 3,591.25
(b) Subsequent carriage of gravel and crushed stone 100Cft. of 1) The carriage of the whole distance
aggregate consoli- to the site of work shall be
dated calculated on the basis of the rates
sub-base of the actual means of transport
used in carriage, i.e. road and/or rail,
as the case may be.

2) It shall be payable from the


nearest approved quarry.
3) The quantity of pit run
or bed run gravel and crushed stone
aggregate for payment of carriage shall
be taken as per actual loose volume but
not more than 120 Cft.
4 a) Providing and laying base course of crushed stone 100Cft. 8,940.75 13,564.50 P.Cum 3,157.85 4,790.95 5-7
aggregate of approved quality and grade, and supply and
spreading of stone screening, including placing, mixing,
spreading and compaction of base course material to
required depth, camber and grade to achieve 100%
maximum modified AASHO dry density, including

chapter-18(R & Road Struc) Page 105


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
carriage of all materials to site of work except gravel and.
aggregate.

b) Subsequent carriage of crushed stone aggregate. 100Cft. of 1) The carriage for the whole
console- distance to the site of work shall be
dated calculated on the basis of the rates
base of the actual means of transport
used in carriage, i.e. road and/or
rail, as the case may be.

2) It shall be payable from the


nearest approved quarry.
3) The quantity of crushed stone
aggregate for payment of carriage shall
be taken as per actual loose volume but
not more than 122 Cft.
5 Providing and laying road edging of 3" (75 mm) wide and Per Rft. 24.40 72.80 Per Metre 80.10 238.85 5-10
9" (225 mm) deep brick on end, complete in all respects.

Bituminous Work & Resurfacing.


6 Providing and laying bituminous priming coat, using 10 100Sft. 376.20 2,193.45 P.Sqm 40.50 236.00 6-1
lbs. kerosene oil and 10 lbs. binder per 100 Sft. or 0.5 Kg
kerosene and 0.5 Kg binder per square metre.
7 Providing and laying bituminous tack coat, using 10 lbs. of 100Sft. 376.20 1,205.60 P.Sqm 40.50 129.70 6-2
bitumen per 100 Sft (0.49 Kg of bitumen per sq.m.)
8 a) Providing surface treatment to roads, including supply 6-3
of bitumen and bajri/crushed stone aggregate of
approved quality, including cleaning of road surface,
heating and spraying bitumen, spreading bajri and rolling
with road roller (including its operation cost, fuel and
hire charges, etc.) etc. complete including carriage of all
materials to site of work except bajjri/crushed stone
aggregate.
1) 1st coat:-
i) 40 lbs. bitumen, and 5.5 Cft. bajri of nominal size 1" (25 100Sft. 297.05 4,983.65 P.Sqm 31.95 536.25
mm) per 100 sq. feet or 1.96 Kg bitumen and 0.017
cu.metre bajri per square metre..
ii) 35 lbs. bitumen, and 4.0 Cft. bajri of nominal size ¾" 100Sft. 297.05 4,370.70 P.Sqm 31.95 470.30
(20 mm) per %Sft. or 1.72 Kg bitumen and 0.013 cu.metre
bajri per sq.metre.
2) 2nd coat:-
i) 25 lbs. bitumen, and 2.75 Cft. bajri of nominal size ½" 100Sft. 228.50 3,134.55 P.Sqm 24.60 337.30
(13 mm) per %sft or 1.23 Kg bitumen and 0.008 cu. metre bajri per
sq.metre.

chapter-18(R & Road Struc) Page 106


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
ii) 18 lbs. bitumen, and 2.0 Cft. bajri of nominal size 3/8" 100Sft. 228.50 2,321.75 P.Sqm 24.60 249.80
(10 mm) per %Sft. or 0.89 Kg bitumen and 0.006 cu.metre
bajri per sq. metre.
3) 3rd coat:-
14 lbs. bitumen, and 1.5 Cft. bajri of nominal size ¼" (6 100Sft. 156.35 1,781.55 P.Sqm 16.80 191.70
mm) per %sft or 0.69 Kg bitumen and 0.005 cubic metre
bajjri per sq.metre.
b) Subsequent carriage of crushed stone aggregate/bajri, 100Cft. P.Cum 1) The carriage for the whole
distance to the site of work shall be
calculated on the basis of the rates
of the actual means of transport
used in carriage, i.e. road and/or rail,
as the case may be.
2) It shall be payable from the
nearest approved quarry.
9 a) Resurfacing of road, including supply of bitumen and 6-3
bajri/crushed stone aggregate of approved quality,
including cleaning of road surface, heating and spraying
of bitumen, and spreading bajri/crushed stone
aggregate and rolling with road roller (including its
operation cost, fuel and hire charges, etc.) complete,
including carriage of all materials to site of work.

i) 22 lbs. bitumen, and 2.5 Cft. bajri of nominal size ½" 100Sft. 198.00 2,757.75 P.Sqm 21.30 296.75
(13 mm) per %Sft. or 1.07 Kg bitumen and bajjri 0.007 cu.m
per sq.m.
ii) 20 lbs. bitumen, and 2.0 Cft. bajri of nominal size 3/8" 100Sft. 198.00 2,512.80 P.Sqm 21.30 270.40
(10 mm) per % Sft. or 0.79 Kg bitumen and 0.006
cu.metre bajri per sq.metre.
b) Subsequent carriage of crushed stone aggregate/bajri. 100Cft. P.Cum Same remarks as against
item 8(b) above.

10 a) Providing and laying plant premixed bituminous carpet, per inch per 25mm 6-6
including compaction and finishing to required camber, grade thickness thickness
and density. per 100Sft. per Sq.m
i) 3% Bitumen -do- 2,392.80 6,009.15 -do- 257.55 646.80
ii) 3.5% Bitumen -do- 2,392.80 6,512.45 -do- 257.55 701.00
iii) 4% Bitumen -do- 2,392.80 7,015.75 -do- 257.55 755.15
iv) 4.5% Bitumen -do- 2,392.80 7,519.05 -do- 257.55 809.35
v) 5% Bitumen -do- 2,392.80 8,022.05 -do- 257.55 863.50
vi) 5.5% Bitumen -do- 2,392.80 8,525.70 -do- 257.55 917.70
vii) 6% Bitumen -do- 2,392.80 9,029.00 -do- 257.55 971.85
b) Subsequent carriage of crushed stone aggregate/bajri. 100Cft. cu.m Same remarks as against item 8(b)
above.

chapter-18(R & Road Struc) Page 107


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
11 Scarifying old road surface including removal of debris within 100Sft. 627.00 - P.Sqm 67.45 -
1 chain (30 m).
12 Cold milling of asphalt layer/concrete surface of specified thickness, 6-11
loading of debris onto haul trucks via conveyor system and disposal at
appropriate place i/c the charges of self propelled milling machine of
specified size, dumper, pump, water lorry, compressor and Tungsten
Carbide Bits etc complete in all respect as approved by Engineer Incharge.

i) 0 ~ 1" thick Per Sft 12.45 17.40 P.Sqm 133.95 187.00


ii) 0 ~ 2" thick Per Sft 15.40 25.25 P.Sqm 165.50 271.60
iii) 0 ~ 3" thick Per Sft 18.35 33.15 P.Sqm 197.00 356.25
iv) 0 ~ 4" thick Per Sft 21.25 40.95 P.Sqm 228.45 440.75
I ncidental Construction
13 Providing R.C.C. railing on bridges, as per standard drawing. Per Rft. 350.45 2,713.75 Metre 1,149.70 8,903.30 9-14 The rate includes cost of steel, its
fabrication, laying in position and
fastening, including cost of binding
wire and removal of rust from the
bars, etc.
14 Providing and fixing G.I. pipe railing, as per Per Rft. of 278.90 2,430.60 Per Metre 915.05 7,974.35 9-14
standard drawing. 3 rows of
Pipes
15 Providing and fixing steel bearings of standard quality and Each Set - 3,840.00 Each set - 3,840.00 8-12
type at site of work. of one of one
end end
16 Providing and fixing rubber bearing pad at site Per - 50.40 P.Cum - 3.10 8-12
of work. Cu. Inch
17 Providing and laying expansion joint of neoprine strip 4"x¼" Per Rft. 244.20 505.30 Per Metre 801.20 1,657.90 8-13
(100 mmx 6 mm) and plastic bitumen.
18 Providing and fixing rain water outlet of A.C. pipe. Each 122.10 478.55 Each 122.10 478.55

19 Providing and erection at site of work:- The rate is for complete item of
work according to Standard design
i) R.C.C. mile/Km. stone Each 6,466.60 13,773.90 Each 6,466.60 13,773.90 including cement concrete
ii) R.C.C. furlong/½ Km. stone Each 308.20 1,020.85 Each 308.20 1,020.85 foundation block and painting
iii) R.C.C. boundary pillar. Each 488.45 1,344.90 Each 488.45 1,344.90 letters etc.
iv) Sign post of M.S. plate 1/8" thick (3 mm)
a) Mandatory. Each 2,120.55 14,501.05 Each 2,120.55 14,501.05
b) Warning/Direction/Informatory. Each 2,051.40 13,589.20 Each 2,051.40 13,589.20
20 Providing and laying dry brick pavement/soling in streets or 100Cft. 8,472.75 32,758.35 P.Cum 2,992.60 11,570.25 5-5 The nominal thickness of bricks
roads, etc. sand grounted, laid in proper camber, including ( 9" x 4-3/8"x 2-11/16") shall be taken
preparation, watering, compaction of bed to proper camber, for the purpose of measurement
and sand cushion. and payment.

chapter-18(R & Road Struc) Page 108


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
21 Providing and fixing metalic expansion Joints of 3/4" thick Aluminium
Alloy strip of specified width duly bolted with check nuts @ 9" c/c with
the MS lugs for specified movements as mentioned by the designer i/c the
cost of polystrene joint fill but excluding the cost of Lugs complete in all
respect as approved and directed by the Engineer Incharge.

a) Flat plate Type


i) 25 mm to 50 mm Per Rft 435.35 10,803.35 Per Metre 1,428.00 35,435.05
ii) 40 mm to 80 mm Per Rft 435.35 12,675.35 Per Metre 1,428.00 41,575.20
iii) 50 mm to 100 mm Per Rft 435.35 14,115.35 Per Metre 1,428.00 46,298.40
b) Saw-tooth Type
i) 25 mm to 50 mm Per Rft 435.35 13,214.15 Per Metre 1,428.00 43,342.45
ii) 40 mm to 80 mm Per Rft 435.35 14,976.95 Per Metre 1,428.00 49,124.45
iii) 50 mm to 100 mm Per Rft 435.35 17,032.55 Per Metre 1,428.00 55,866.80
c) Finger /Comb Plate Type
i) 25 mm to 50 mm Per Rft 435.35 14,946.95 Per Metre 1,428.00 49,026.05
ii) 40 mm to 80 mm Per Rft 435.35 16,592.15 Per Metre 1,428.00 54,422.30
iii) 50 mm to 100 mm Per Rft 435.35 18,501.35 Per Metre 1,428.00 60,684.50
22 Providing and laying Elastomeric Neoprene Bearing Pads of specified 8-12
grade,Specific gravity, hardness, elongation, min tensile strength of 2250
psi, and compressive strength of 2000 psi conforming to ASTM D2240
standard test method for rubber as approved and directed by the Engineer
Incharge.
I- Grade 50
(a) Plain
(i) Without Anchrage Cu. Inch - 62.40 P.Cum - 3.80
(ii) With Anchrage Cu. Inch - 64.80 P.Cum - 3.95
(b) Laminated
(i) Without Anchrage Cu. Inch - 63.60 P.Cum - 3.90
(ii) With Anchrage Cu. Inch - 66.00 P.Cum - 4.05
II- Grade 60
(a) Plain
(i) Without Anchrage Cu. Inch - 64.80 P.Cum - 3.95
(ii) With Anchrage Cu. Inch - 70.80 P.Cum - 4.30
(b) Laminated
(i) Without Anchrage Cu. Inch - 66.00 P.Cum - 4.05
(ii) With Anchrage Cu. Inch - 72.00 P.Cum - 4.40
III- Grade 70
(a) Plain
(i) Without Anchrage Cu. Inch - 69.60 P.Cum - 4.25
(ii) With Anchrage Cu. Inch - 72.00 P.Cum - 4.40
(b) Laminated
(i) Without Anchrage Cu. Inch - 70.80 P.Cum - 4.30
(ii) With Anchrage Cu. Inch - 74.40 P.Cum - 4.55
23 Providing and fixing M.S Grating comprising of Angle Iron frame size P.Sft 488.10 2,054.00 P.Sqm 5,251.90 22,101.15
1.50" x 1.50" x 3/16" and 1/2" square bars duly welded @ 4" c/c,
including painting charges etc complete in all respect.

chapter-18(R & Road Struc) Page 109


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

24 Providing and laying good quality / local sand cushion from approved P.Cft 0.70 38.90 P.Cum 24.90 1,374.75
source (compacted in layers not exceeding 6" thickness) by mechanized
means including the cost of front end loader, viberatory roller and all lead
and lifts,dressing,watering complete in all respect as approved and
directed by the Engineer Incharge.
ROAD SAFETY
25 Providing, fabrication and fixing pole mounted Direction Board / road
If 3 mm thick Aluminium sheet is
delineator of any shape and size, with specified Sheet and thickness,
9-16 used,increase composite rate by Rs 630
supported with G.I Channel, (excluding the cost of vertical post and
Psft.
painting) etc complete in all respect.
(A) G.I Sheet 14 SWG
i) CI RCULAR/TRI ANGULAR
a) 3-4 ft size P.Sft 129.10 1,100.55 P. Sqm 1,389.55 11,846.20
ii) RECTANGULAR SHAPE
(a) 12 -48 sft P.Sft 162.10 1,001.80 P. Sqm 1,745.00 10,783.50
(b) 54 -120 sft P.Sft 97.40 901.80 P. Sqm 1,048.40 9,706.75
26 Providing and fixing pole mounted reflecting mirror (Convex type) of 36
inch diameter of specified material, excluding the cost of vertical post,
which will be paid extra etc complete in all respect.
(a) Acrylic made Each 94.05 24,574.05 Each 94.05 24,574.05
(b) Stainless Steel Each 94.05 20,974.05 Each 94.05 20,974.05
27 Providing, fabrication and fixing Vertical Post comprising of medium 9-16
quality G.I Pipe of specified diameter, including the cost of clamping
arrangements, top cover, hold fasts, PCC 1:2:4 footing of specified depth
and excavation etc complete in all respect, as approved and directed by the
engineer incharge.
(a) 2 inch diameter (footing 1.5'x1.5'x4') P.Rft 143.50 1,369.90 Per Metre 470.75 4,493.20
(b) 3 inch diameter (footing 1.5'x1.5'x5') P.Rft 170.40 1,974.80 Per Metre 558.85 6,477.30
(c) 4 inch diameter (footing 1.5'x1.5'x6') P.Rft 197.25 2,610.20 Per Metre 647.00 8,561.50
(d) 5 inch diameter (footing 1.5'x1.5'x6') P.Rft 197.25 3,348.05 Per Metre 647.00 10,981.55
(e ) 6 inch diameter (footing 2.0'x2.0'x6') P.Rft 322.65 4,143.55 Per Metre 1,058.35 13,590.90
(f) 8 inch diameter (footing 2.5'x2.5'x6') P.Rft 479.25 6,975.25 Per Metre 1,571.85 22,878.80
28 Providing & fixing Cat Eyes of size 4" x 4" x 3/4" duly casted with if L-Key steel bolt is used, increase
specified material having plastic strip containing mini retro-reflective glass Composite rate by Rs 25/- each
beads of color white/red/yellow having specifid reflections , quality &
shape i/c the cost of self built in 12 mm diax120 mm long steel zinc plated
nail,fixing to road with epoxy/ hammering with separate nail complete.

a) Acrylic material
(1) Dual-Directional
(i) 19x2=38 Glass beads a side Each 37.60 502.00 Each 37.60 502.00
(ii) 31x2=62 Glass beads a side Each 37.60 588.40 Each 37.60 588.40
(iii) Micro Cube Corner Spark glow reflectors Each 37.60 566.80 Each 37.60 566.80
(2) Uni-Directional
(i) 31 Glass beads a side Each 37.60 434.80 Each 37.60 434.80

chapter-18(R & Road Struc) Page 110


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
(ii) 43 Glass beads a side Each 37.60 511.60 Each 37.60 511.60
b) Aluminium Alloy
(1) Dual-Directional
(i) 31x2=42 Glass beads a side Each 37.60 706.00 Each 37.60 706.00
(ii) 43x2=86 Glass beads a side Each 37.60 900.40 Each 37.60 900.40
(iii) Micro Cube Corner Spark glow reflectors Each 37.60 940.00 Each 37.60 940.00
(2) Uni-Directional
(i) 31 Glass beads a side Each 37.60 667.60 Each 37.60 667.60
(ii) 43 Glass beads a side Each 37.60 706.00 Each 37.60 706.00
29 Providing & fixing Road Studs of aluminium alloy (raised profile) of
specified size with Diamond grade reflectors on both sides etc complete.

a) Uni-Directional
(i) 8" x 4" x 2" Each 37.60 1,056.40 Each 37.60 1,056.40
(ii) 6" x 4" x 1.75" Each 37.60 862.00 Each 37.60 862.00
b) Dual-Directional
(i) 8" x 4" x 2" Each 37.60 1,205.20 Each 37.60 1,205.20
(ii) 6" x 4" x 1.75" Each 37.60 1,018.00 Each 37.60 1,018.00
30 Providing and Fixing L-type Barrier delineator of specified material of
Size 150 x 100mm i/c the cost of hardware, reflective tape etc complete in
all respect.
(a) Acrylic made Each 94.05 667.65 Each 94.05 667.65
(b) Alluminium (3mm thick) Each 94.05 822.45 Each 94.05 822.45
31 Providing and fixing 3" dia G.I Pipe Delineator 3' long with HIP reflective Each 143.30 6,734.95 Each 143.30 6,734.95
tape (Red & White), duly embedded in P.C.C (1:2:4) etc complete in all
respect.
32 Providing of Portable Cautionary Plastic Barriers 6.50' Long & 2.50' high Each - 18,288.00 Each - 18,288.00
of approved shape & design etc complete in all respect.

33 Providing of Cautionary Portable Traffic safety Cones made of Plastic


polymer of approved shape, colour, size & design having wide
squar/hexagonal base provided with reflective sleeve having arrangement
for plastic chain etc complete in all respect.
a) 18" high, Bottom dia 13" & Top dia 2-1/2" Each - 777.60 Each - 777.60
b) 28" high, Bottom dia 13-3/4" & Top dia 2-1/2" Each - 933.60 Each - 933.60
c) 36" high, Bottom dia 15" & Top dia 2-1/2" Each - 1,244.40 Each - 1,244.40
34 Providing and fixing PLASTIC BODY Reflective cautionary flexible
spring post of specified height with reflective strips at the top for fixing to
road with bolts etc complete in all respect.
i) 300 mm high Each 94.05 871.65 Each 94.05 871.65
ii) 600 mm high Each 94.05 910.05 Each 94.05 910.05
iii) 700 mm high Each 94.05 1,027.65 Each 94.05 1,027.65
iv) 750 mm high Each 94.05 1,182.45 Each 94.05 1,182.45

chapter-18(R & Road Struc) Page 111


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
35 Providing & Fixing W-Beam Guard Rail made of 1/8" thick galvanized
sheet, fixed on vertical posts of galvanized channel of (13.40 Kg P.Meter)
@ 6.25 ft c/c duly embeded in P.C.C (1:2:4) of specified depth i/c the cost
of hardwares, Reflectors,boxing glove end, fish tail end and double face
reflectors etc complete in all respect.
i) Single Face P.Rft 1,499.05 5,421.10 Per Metre 4,916.85 17,781.15
ii) Double Face P.Rft 1,930.30 7,048.30 Per Metre 6,331.45 23,118.50

36 Providing and fixing Uni/Dual/Tri directional reflective extreme end road Each 94.05 1,260.45 Each 94.05 1,260.45
berm Vertical indicator made of plastic body of size 100x75x110 mm
having ultra -violet resistant colors (white/yellow/red) with high intensity
reflectors provided with additional 31 mini-glass reflectors to a side
imbeded in plastic strip base duly fixed with a steel rectangular tube i/c the
cost of hardware as approved and dirrected by the Engineer Incharge.

37 Providing and fixing Uni/Dual directional reflective extreme end road Each 94.05 715.65 Each 94.05 715.65
berm indicator made of plastic body of size 80x50x16 mm having ultra -
violet resistant colors (white/yellow/red) with high intensity reflectors duly
fixed on road egde Kerb with a hardened steel nail as approved and
dirrected by the Engineer Incharge.

ROAD FURNITURE
38 Providing and fixing Cantilever Gantry of specified portal made of 3 mm i) For GI sheet fascia on both sides,
thick GI sheet (Z-275) of size 4000x2400x3mm supported with a frame increase labor rate by Rs 3.25 Psft or
of MS angle iron frame of size 40x40x5mm all around the sheet with 3 no 35.00 Sq.Mtr and composite rate by Rs
vertical and one no horizontal braces of MS tees of size 40x40x5 mm duly 156.00 Psft or 1680.00 P.Sq.Mtr. ii)
supported on a truss of 2 no chords of MS pipes 273x7 mmx9.27 mtr and Area of Portal will be taken for
3 no struts of MS pipe of size 143x4.5mmx3.098 mtr duly bolted with a payment.
9-16
post of MS pipe of size 7500x457.5x 12.7 mm thick duly welded with iii) If 3 mm thick Aluminium sheet is
Base plate of 850x850x36 mm with MS stiffners of 18 mm thick MS sheet used,increase composite rate by Rs
and fixed with anchor bolts in prelaid RCC footing i/c the cost of 627/- Psft or Rs 6747/- Per Sq.Mtr.
polyurethene Paint to MS skeleton but excluding the cost of iv) For Digital Display Reduce rate by
lettering/printing as approved and directed by the Engineer Incharge. Rs 465/-Psft and Rs 5000/-
P.Sq.Mtr.
i) Single Leaf P.Sft 176.50 10,922.80 P.Sqm 1,899.20 117,529.05
ii) Double Leaf P.Sft 108.85 7,986.70 P.Sqm 1,171.35 85,937.10
39 Providing and fixing full width/ Portal Gantry comprising of 3 mm thick i) For GI sheet fascia on both sides,
GI sheet (Z-275) fixed over double front and back truss made with Top & increase labor rate by Rs 3.25 Psft or
bottom chords of MS angle iron L-100x100x10 mm, webs and struts of L- 35.00 Sq.Mtr and composite rate by Rs
65x65x8 mm welded with top and bottom truss of webs and struts of 156.00 Psft or 1680.00 P.Sq.Mtr. ii)
65x65x8 mm duly supported on specified vertical posts of double columns Area of Portal will be taken for
9-16
of MS pipe of size 7500x219x8 mm thick duly welded with Base plate of payment.
600x400x50 mm with MS stiffners of 350x150x15 mm thick MS sheet for iii) If 3 mm thick Aluminium sheet is
each column fixed in prelaid RCC footing i/c the cost of polyurethene used,increase composite rate by Rs
Paint to MS skeleton but excluding the cost of lettering/printing as 627/- Psft or Rs 6747/- Per Sq.Mtr.
approved and directed by the Engineer Incharge.

chapter-18(R & Road Struc) Page 112


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
a) Two Supports
i. Two Lane P.Sft 62.75 5,002.30 P.Sqm 675.30 53,824.55
ii. Three Lane P.Sft 52.20 4,479.25 P.Sqm 561.55 48,196.90
b) Three Supports
i. Three Lane each P.Sft 37.65 4,203.70 P.Sqm 404.90 45,232.05
40 Providing and fixing full width/ Portal Gantry comprising of 3 mm thick i) For GI sheet fascia on both sides,
GI sheet (Z-275) fixed over MS double front and back truss made with increase labor rate by Rs 3.25 Psft or
Top & bottom chords of L-100x100x10 mm, webs and struts of L- 35.00 Sq.Mtr and composite rate by Rs
65x65x8 mm welded with top and bottom truss of webs and struts of 156.00 Psft or 1680.00 P.Sq.Mtr. ii)
65x65x8 mm duly supported on specified vertical posts of double columns Area of Portal will be taken for
9-16
MS pipe of size 7500x457x12.5 mm thick duly welded with Base plate of payment.
600x400x50 mm with MS stiffners of 350x150x15 mm thick MS sheet for iii) If 3 mm thick Aluminium sheet is
each column fixed in prelaid RCC footing i/c the cost of polyurethene used,increase composite rate by Rs
Paint to MS skeleton but excluding the cost of lettering/printing as 627/- Psft or Rs 6747/- Per Sq.Mtr.
approved and directed by the Engineer Incharge.
a) Two Supports
i. Four Lane P.Sft 48.00 3,979.50 P.Sqm 516.45 42,819.65
ii. Five Lane P.Sft 45.00 3,650.70 P.Sqm 484.30 39,281.35
b) Three Supports
i) Four Lane Each P.Sft 33.60 3,748.65 P.Sqm 361.35 40,335.25

chapter-18(R & Road Struc) Page 113


19. PLUMBING, SANITARY INSTALLATION & GAS FITTINGS
1 Rates for all finished works include the removal of surplus debris, unused material & by products.
2 The material used shall conform to Schedule of Rates, Vol. I, Part I, (Specifications for Materials of
Construction, 1964, and the work will be executed according to Buildings & Roads Department Specifications,
Vol II, 1966 (Public Health Works).
3 The rates include cutting and making good of the surface of walls, roof, floor, etc. where necessary.

MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

1 Providing and fitting glazed earthen ware water closet


European type, excluding seat and cover:-
i) white Each 1,221.00 16,762.45 Each 1,221.00 16,762.45
iii) coloured Each 1,221.00 20,362.45 Each 1,221.00 20,362.45

2 Providing and fixing, double seat and cover only.


i) bakelite Each 12.70 1,992.70 Each 12.70 1,992.70
ii) plastic Each 12.70 912.70 Each 12.70 912.70
3 Providing and fitting one piece Europeon Coupled set of Water Closet (WC) Each 2,161.50 58,465.50 Each 2,161.50 58,465.50
and flushing Cistern of PORTA brand (full size) or approved equivalent
manufacturer i/c the cost of CP/rubber connection, thimble, normal seat
cover and rawal bolts complete in all respects as approved and directed by
the Engineer Incharge.
4 Providing and fitting glazed earthen ware water closet,
squatter type (Orisa pattern), combined with foot rest.
i) white Each 845.65 4,121.85 Each 845.65 4,121.85
ii) coloured Each 845.65 4,721.85 Each 845.65 4,721.85
5 Providing and fitting white glazed earthen ware water closet, Each 845.65 9,689.65 Each 845.65 9,689.65
squartter type, with separate foot rest.

6 Providing and fitting water closet, squatter type of terrazzo Each 845.65 1,811.85 Each 845.65 1,811.85
concrete.
7 Providing and fitting glazed earthen ware wash hand basin /vanity
56x40 cm (22"x16") including bracket set, waste pipe and
waste coupling, etc.
i) white, with pedestal Each 1,080.75 11,280.75 Each 1,080.75 11,280.75
ii) coloured, with pedestal Each 1,080.75 10,680.75 Each 1,080.75 10,680.75
iii) white, without pedestal Each 963.20 11,763.20 Each 963.20 11,763.20
iv) coloured, without pedestal Each 963.20 9,963.20 Each 963.20 9,963.20
v) Under Counter Vanity Basin Each 1,080.75 11,880.75 Each 1,080.75 11,880.75
8 Providing and fixing stainless steel sink with drain board, size Each 963.20 15,226.25 Each 963.20 15,226.25
120x60 cm (48"x24") including bracket set, waste pipe and
waste coupling.

chapter-19(PSI & GF) Page 114


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

9 Providing and fitting terrazzo concrete sink 60x45 cm (24"x18") Each 963.20 4,142.30 Each 963.20 4,142.30
with drain board of mosaic, including bracket set, waste pipe
and waste coupling.
10 Providing and fixing glazed earthen ware sink, including
bracket set, waste pipe and waste coupling:-
i) 60x45 cm (24"x18") Each 963.20 6,004.70 Each 963.20 6,004.70
ii) 37.5x45 cm (15"x18") Each 963.20 5,764.70 Each 963.20 5,764.70
11 Providing and fixing glazed earthen ware flat back urinal. Each 610.50 2,686.50 Each 610.50 2,686.50
12 Providing and fitting glazed earthen ware low down flushing
cistern 13.63 litres (3 gallons) capacity, including bracket
set, copper connection, etc.
i) white Each 963.20 8,086.45 Each 963.20 8,086.45
ii) coloured Each 963.20 8,506.45 Each 963.20 8,506.45
13 Providing and fitting plastic made low down flushing cistern
13.63 litre (3 gallons) capacity, including bracket set, copper
connection, etc. complete.
i) white Each 963.20 5,606.45 Each 963.20 5,606.45 If rubber connection is used, the
ii) coloured Each 963.20 5,806.45 Each 963.20 5,806.45 composite rate will be reduced by
Rs. 14.50
14 Providing and fixing white enameled cast iron low down flushing Each 963.20 4,809.40 Each 963.20 4,809.40
cistern 13.63 litres (3 gallons) capacity, including bracket
set, copper connection, etc.
15 Providing and fixing cast iron high level flushing cistern
including cost of bracket set, copper connection, etc.
i) 13.63 litres (3 gallons) capacity Each 1,024.25 10,846.45 Each 1,024.25 10,846.45
ii) 4.55 litres (1 gallon) capacity Each 1,024.25 4,420.45 Each 1,024.25 4,420.45
16 Providing and fixing, chromium plated soap dish. Each 61.05 937.75 Each 61.05 937.75
17 Providing and fitting, glazed earthen ware soap dish.
i) white Each 61.05 635.55 Each 61.05 635.55
ii) coloured Each 61.05 712.65 Each 61.05 712.65
18 Providing and fixing, chromium plated toilet paper holder. Each 81.40 1,201.40 Each 81.40 1,201.40
19 Providing and fixing, chromium plated towel rail:-
i) 60 cm (24") long, and 2 cm (¾") dia. Each 81.40 1,254.75 Each 81.40 1,254.75
ii) 50 cm (20") long, and 1.5 cm (½") dia. Each 81.40 1,111.25 Each 81.40 1,111.25
20 Providing and fixing looking glass 55x40 cm (22"x16") size, Each 152.65 1,461.85 Each 152.65 1,461.85
and minimum 5 mm thick, first quality.
21 Providing and fixing glass shelf 60x13 cm (24"x5"), with
5mm thick glass:-
i) with chromium plated brackets and railing. Each 190.80 1,657.10 Each 190.80 1,657.10

chapter-19(PSI & GF) Page 115


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

ii) glass shelf only, without chromium plated brackets Each 122.10 808.50 Each 122.10 808.50
and railing.
22 Providing and fitting glazed earthen ware shelf 60x13 cm
(24"x5"), with chromium plated bracket and railing:-
i) white Each 190.80 2,394.40 Each 190.80 2,394.40
ii) coloured Each 190.80 2,634.40 Each 190.80 2,634.40
23 Providing and fixing Bathroom Accessories (7-piece set) Master brand -
One Cosmetic Shelf, One Towel rod with bracket, One soap dish, One
double hook, One towel ring, brush holder, toilet paper holder & looking
glass i/c the cost of hardwares etc complete in all respect as approved and
directed by the Engineer incharge.
i) Plastic soap dish Each 150.00 1,380.00 Each 150.00 1,380.00
ii) Plastic toilet paper holder Each 150.00 1,035.00 Each 150.00 1,035.00
iii) Plastic tower rail Each 150.00 1,610.00 Each 150.00 1,610.00
iv) Plastic shelf 60x13 cm (24:x5") with bracket and railing Each 150.00 1,035.00 Each 150.00 1,035.00
v) Plastic Brush holder Each 150.00 1,035.00 Each 150.00 1,035.00
vi) Looking glass with plastic frame Each 150.00 1,955.00 Each 150.00 1,955.00
vii) Towel ring Each 150.00 690.00 Each 150.00 690.00
24 Providing and fixing chromium plated pillar-cock, heavy:-
i) 2 cm (¾") Each 81.40 3,513.40 Each 81.40 3,513.40
ii) 1.5 cm (½") Each 81.40 3,201.40 Each 81.40 3,201.40
25 Providing and fixing chromium plated stop cock, heavy:-
i) 2 cm (¾") Each 81.40 2,001.40 Each 81.40 2,001.40
ii) 1.5 cm (½") Each 81.40 1,641.40 Each 81.40 1,641.40
26 Providing and fixing underground stop cock 13 mm (½"), Each 117.45 1,888.55 Each 117.45 1,888.55
with chromium plated cover.

27 Providing and fixing chromium plated bib cock:-


i) 2 cm (¾") Each 81.40 1,881.40 Each 81.40 1,881.40
ii) 1.5 cm (½") Each 81.40 1,641.40 Each 81.40 1,641.40
28 Providing and fixing chromium plated tee stop cock Each 81.40 2,001.40 Each 81.40 2,001.40
15mm (½").
29 Providing and fixing chromium plated shower rose:-

i) 1.5x10 cm (½"x4") Each 81.40 1,341.40 Each 81.40 1,341.40


ii) 2x15 cm (¾"x6") Each 81.40 2,721.40 Each 81.40 2,721.40
30 Providing and fixing, chromium plated mixing valve, for wash Each 101.75 3,845.75 Each 101.75 3,845.75
hand basin, sink or shower.
31 Providing and fixing gun metal peet/gate valve (screwed):- For brass peet/gate valve (screwed),
the composite rates of items (i) to (v)
i) 30 mm (1¼") dia Each 122.10 8,492.10 Each 122.10 8,492.10 will be reduced by Rs. 68, 79, 97, 109
ii) 40 mm(1½") dia Each 122.10 9,842.10 Each 122.10 9,842.10 and 122 respectively.
iii) 50 mm(2") dia Each 122.10 15,692.10 Each 122.10 15,692.10
chapter-19(PSI & GF) Page 116
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

iv) 65 mm(2½") dia Each 122.10 27,122.10 Each 122.10 27,122.10


v) 80 mm(3") dia Each 122.10 38,402.10 Each 122.10 38,402.10
32 Providing and fitting, chromium plated or brass oxidised,
swan neck cock 15 mm (½") dia.
i) single way Each 81.40 861.40 Each 81.40 861.40
ii) two way Each 122.10 1,682.10 Each 122.10 1,682.10
iii) three way Each 162.80 2,010.80 Each 162.80 2,010.80
33 Providing and fixing, union brass cock.
i) 13 mm (½") dia Each 81.40 789.40 Each 81.40 789.40
ii) 20 mm (¾") dia Each 81.40 921.40 Each 81.40 921.40
34 Providing and fixing, floor trap of cast iron, including concrete
chamber all round, and C.I. grating:-
i) 10x5 cm (4"x2") Each 244.20 994.00 Each 244.20 994.00
ii) 10x7.5 cm (4"x3") Each 244.20 1,198.00 Each 244.20 1,198.00
35 Providing and fitting "P" trap:-
i) 10 cm (4") of cast iron. Each 203.50 1,326.70 Each 203.50 1,326.70
ii) 10 cm (4") glazed. Each 203.50 468.70 Each 203.50 468.70
36 Providing and fitting 10 cm (4") gully trap, including cement Each 305.25 1,651.20 Each 305.25 1,651.20
concrete, cost of PVC grating 15x15 cm (6"x6") and
masonry chamber 30x30 cm (12"x12").
37 Providing and fitting, cast iron soil pipe with:-
a) lead caulked, yarn joint:-
i) 10 cm (4") i/d Per foot 94.55 458.50 Metre 310.20 1,503.90
ii) 5 cm (2") i/d Per foot 37.85 217.60 Metre 124.10 713.70
b) cement caulked joint:-
i) 10 cm (4") i/d Per foot 22.20 261.15 Metre 72.80 856.50
ii) 5 cm (2") i/d Per foot 8.90 169.50 Metre 29.10 555.95
38 Providing and fitting, A.C. soil pipe with cement caulked
joint, including all specials:-
i) 60 (2¼)" mm i/d Per foot 17.75 125.20 Metre 58.25 410.70
ii) 80 (3") mm i/d Per foot 19.75 187.55 Metre 64.70 615.20
iii) 100 (4") mm i/d Per foot 22.20 229.90 Metre 72.80 754.00
iv) 150 (6") mm i/d Per foot 29.60 331.65 Metre 97.10 1,087.80
39 Providing and fitting cast iron specials, such as tee bend, In case of plug type, the composite
collar, cross, etc. plain type:- rate shall be increased by Rs.3 per kg.
i) lead caulked joint Kg 78.30 540.90 Kg 78.30 540.90
ii) cement caulked joint Kg 48.05 411.30 Kg 48.05 411.30
40 Supply and fitting of cast iron manhole cover square / circular
with frame, etc. complete.
i) 30 cm (12") Each 122.10 2,282.10 Each 122.10 2,282.10

chapter-19(PSI & GF) Page 117


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

ii) 45 cm (18") Each 122.10 3,242.10 Each 122.10 3,242.10


iii) 60 cm (24") Each 194.15 5,594.15 Each 194.15 5,594.15
41 Providing and fitting R.C.C. pipe 10 cm (4") dia, including Per foot 47.30 215.30 Metre 155.10 706.15
laying and jointing in trenches.
42 Providing and fitting chromium plated or oxidised, gas cock
6'mm (¼"):-
i) single way Each 81.40 717.40 Each 81.40 717.40
ii) two way Each 122.10 902.10 Each 122.10 902.10
iii) three way Each 162.80 1,230.80 Each 162.80 1,230.80
43 Providing and fitting nipple or bush, 6 mm to Each 61.05 143.85 Each 61.05 143.85
10 mm (¼" to 3/8") i/d.
44 Providing and fixing, brass gas cock:-
a) 15 mm (½") dia Each 12.70 708.70 Each 12.70 708.70
b) 20 mm (¾") dia Each 462.50 972.70 Each 462.50 972.70
45 Providing and fixing brass stop cock/bib cock:-
a) 15 mm (½") dia Each 20.35 992.35 Each 20.35 992.35
b) 20 mm (¾") dia Each 20.35 1,280.35 Each 20.35 1,280.35
46 Hoisting and placing in position, precast R.C. latrine seats. Each 1,221.00 - Each 1,221.00 -
47 Providing, fixing, testing and commissioning of µ-PVC (Unplasticized
Polyvinyl Chloride ) Nikasi/ SWV pipe, Dadex / Popular / Beta or approved
equivalent manufacturer, plain / Bell Ended / Z - Joints conforming to BS
4514 / BS 5255 - EN 1329 including the cost of specials and Solvents
complete in all respects, as per drawings & specifications and / or as
approved and directed by the Engineer Incharge.
(i) 32mm Per Rft 10.80 93.10 Meter 35.45 305.35
(ii) 40mm Per Rft 10.80 106.35 Meter 35.45 348.75
(iii) 50mm Per Rft 10.80 115.05 Meter 35.45 377.40
(iv) 82mm Per Rft 10.80 175.05 Meter 35.45 574.10
(v) 110 mm Per Rft 10.80 274.20 Meter 35.45 899.35
(vi) 160 mm Per Rft 10.80 528.00 Meter 35.45 1,731.90
(vii) 200 mm Per Rft 10.80 564.60 Meter 35.45 1,851.85
48 Providing, fixing, testing and commissioning of µ-PVC (Unplasticized
Polyvinyl Chloride ) sewerage pipe make of Dadex /Popular/Beta or
approved equivalent manufacturer, plain /socket ended conforming to code
EN-1401 of specified SDR (Standard Dimension Ratio) including the cost
of specials and Solvents complete in all respect as approved and directed by
the Engineer Incharge.
Type (SDR 34/SN-8)
i) 6" dia 150mm Per Rft 10.80 1,465.45 Meter 35.45 4,806.65
ii) 8" dia 200 mm Per Rft 12.95 2,188.65 Meter 42.55 7,178.80
iii) 10"dia 250 mm Per Rft 15.15 3,382.10 Meter 49.65 11,093.35
iv) 12" dia 300 mm Per Rft 17.30 5,328.00 Meter 56.70 17,475.80
chapter-19(PSI & GF) Page 118
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

v) 14" dia 350 mm Per Rft 19.45 6,935.25 Meter 63.80 22,747.65
vi) 16" dia 400 mm Per Rft 21.60 8,799.60 Meter 70.90 28,862.75
49 Providing, fixing, testing and commissioning of µ-PVC (Unplasticized
polyvinyl Chloride ) Nikasi/ waste pipe Fittings make of Dadex
/Popular/Beta or approved equivalent manufacturer, conforming to BS
4514 / BS 5255 including the cost of Solvents complete in all respect as
approved and directed by the Engineer Incharge.
a) P-Trap
(i) 4" dia Each 122.10 1,358.10 Each 122.10 1,358.10
(ii) 3" dia Each 122.10 1,020.90 Each 122.10 1,020.90
b) M ulti-Trap
(i) 4" dia Each 122.10 1,305.30 Each 122.10 1,305.30
(ii) 3" dia Each 122.10 945.30 Each 122.10 945.30
c) Vent Cowel
(i) 4" dia Each 122.10 346.50 Each 122.10 346.50
(ii) 3" dia Each 122.10 294.90 Each 122.10 294.90
(iii) 2" dia Each 122.10 256.50 Each 122.10 256.50
d) Clean Out
(i) 4" dia Each 122.10 758.10 Each 122.10 758.10
(ii) 3" dia Each 122.10 609.30 Each 122.10 609.30
50 Providing, laying, testing and commissioning underground Yellow Medium
Density Polyethelene (MDPE) gas pipe tubing of required IPS (Iron Pipe
Size) in the trenches , made of Dadex/ Popular / Beta or approved
equivalent manufacturer, for Gas supply i/c the cost of solvent and specials
complete as approved and directed by the Engineer Incharge.

SDR-11
(i) 3/4" Per Rft 10.80 100.35 Meter 35.45 329.15
(ii) 1" Per Rft 10.80 145.30 Meter 35.45 476.55
(iii) 1-1/4" Per Rft 10.80 227.45 Meter 35.45 746.10
(iv) 1-1/2" Per Rft 10.80 267.65 Meter 35.45 877.85
(v) 2" Per Rft 10.80 398.60 Meter 35.45 1,307.45
51 Providing and hoisting vertical/ horizontal type storage tank of required Per Gallon 8.65 117.45 Per Ltr. 2.30 31.05
capacity made of rotationally molded from (HDPE), double ply polyethelene
of approved manufacturer i/c cost of making connection for inlet/outlet pipe,
float valve i/c all cost of specials & labour complete in all respect as
approved and directed by the Engineer Incharge.
52 Providing and fixing CP bath Room Set made of Sonex/Master/Faisal or
approved equvilent manufacturer, comprising of 3-No Tee stop cocks,
lever type Basin Mixer, double Bib Cock, open wall shower, Muslim
shower,waste coupling and bottle trap etc. complete in all respect as
approved and directed by the Engineer incharge.
(i) 3 No Tee Stop Cock (set) Each 432.30 2,232.30 Each 432.30 2,232.30
(ii) Lever Type Basin Mixer Each 432.30 6,672.30 Each 432.30 6,672.30
(iii) Double Bib Cock Each 432.30 1,872.30 Each 432.30 1,872.30
(iv) Open Type Wall Shower Each 432.30 18,672.30 Each 432.30 18,672.30
chapter-19(PSI & GF) Page 119
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

(v) Muslim shower Each 432.30 2,352.30 Each 432.30 2,352.30


(vi) Waste Coupling Each 432.30 732.30 Each 432.30 732.30
(vii) Bottle Trap Each 432.30 1,452.30 Each 432.30 1,452.30
53 Providing/fixing Gas water heater (Geyser) of specified capacity,comprising
of water tank made of 14 SWG steel sheet and cover with 20 SWG MS
sheet, best quality make of Corona/Ambassador / Super Asia/Canon or
approved equivalent manufacturer i/c the cost of non return valve,imported
thermostate,G.I. accessories, safety valve and making connection with
existing water supply pipe line complete in all respects as approved and
directed by the Engineer Incharge.
(i) 35 Gallons Each 3,102.00 61,291.75 Each 3,102.00 61,291.75
(ii) 50 Gallons Each 3,102.00 73,291.75 Each 3,102.00 73,291.75
(iii) 55 Gallons Each 3,102.00 85,291.75 Each 3,102.00 85,291.75
54 Supply & Fixing gas room heater of required plates of approved quality
made by Crona /Ambessedor/Canon or approved equivalent manufacturer
i/c cost of fittings & pipe etc. complete in all respect as directed and
approved by the Engineer Incharge.
(i) Single plate Each 1,080.75 5,814.75 Each 1,080.75 5,814.75
(i) Double plate Each 1,080.75 11,652.75 Each 1,080.75 11,652.75
55 Providing/fixing Electric water heater (Geyser) comprising of tank of 14
SWG, GI sheet and external cover of 22 SWG MS sheet, insulated with 4"
thick high density glass wool, imported thermostat i/c electric rod, safety
valve (Ambassador / Canon) or approved equivalent manufacturer i/c cost
of accessories & making connection complete in all respect as approved and
directed by Engineer Incharge.
(i) 15 Gal capacity Each 2,161.50 32,521.50 Each 2,161.50 32,521.50
(ii) 20 Gal capacity Each 2,161.50 34,441.50 Each 2,161.50 34,441.50
Replacement items
1 Providing and fixing, chromium plated waste coupling:-
i) 3 cm (1¼") Each 122.10 512.10 Each 122.10 512.10
ii) 4 cm (1½") Each 122.10 572.10 Each 122.10 572.10
2 Providing and fixing rubber plug with chain:-
i) 3 cm (1¼") Each 4.90 214.90 Each 4.90 214.90
ii) 4 cm (1½") Each 4.90 226.90 Each 4.90 226.90
3 Providing and fixing, waste pipe of PVC:-
i) 3 cm (1¼") Each 61.05 361.05 Each 61.05 361.05
ii) 4 cm (1½") Each 61.05 361.05 Each 61.05 361.05
4 Providing and fixing, flushing bend.
i) 3 cm (1¼") PVC Each 54.25 366.25 Each 54.25 366.25
ii) 4 cm (1½") PVC Each 54.25 390.25 Each 54.25 390.25
iii) 3 cm (1¼") CP Each 54.25 1,494.25 Each 54.25 1,494.25
iv) 4 cm (1½") CP Each 54.25 1,854.25 Each 54.25 1,854.25

chapter-19(PSI & GF) Page 120


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

5 Providing and fixing chromium plated bottle trap with waste


pipe, etc. complete:-
i) 3 cm (1¼") Each 122.10 1,682.10 Each 122.10 1,682.10
ii) 4 cm (1½") Each 122.10 1,802.10 Each 122.10 1,802.10
6 Providing and fixing, angle iron brackets for:-
i) wash hand basin and cistern Each 122.10 1,490.10 Each 122.10 1,490.10
ii) sinks Each 122.10 1,490.10 Each 122.10 1,490.10
7 Providing and fixing 1.5 cm (½") dia connection, including
check nuts, etc.:-
i) plastic rubber connection Each 48.85 384.85 Each 48.85 384.85
ii) copper connection Each 48.85 708.85 Each 48.85 708.85
8 Providing and fixing brass ball float valve:-
i) 1.5 cm (½") dia Each 101.75 797.75 Each 101.75 797.75
ii) 32.0 cm (¾") dia Each 101.75 1,061.75 Each 101.75 1,061.75
iii) 2.5 cm (1") dia Each 101.75 1,481.75 Each 101.75 1,481.75
iv) 3 cm (1¼") dia Each 101.75 1,601.75 Each 101.75 1,601.75
v) '4.0 cm (1½") dia Each 101.75 1,841.75 Each 101.75 1,841.75
vi) 5 cm (2") dia Each 101.75 2,021.75 Each 101.75 2,021.75
9 Supply and fixing of Soap Dispensor including all other cost of required
fittings & required accessories complete in all respect as approved &
directed by the Engineer incharge.
i) uPVC Each 270.20 2,857.70 Each 270.20 2,857.70
ii) Stainless steel Each 270.20 4,207.70 Each 270.20 4,207.70
10 Providing/fixing U-shape 1-1/4" dia Stainless Steel Grab bar of 14 SWG
thickness and specified length for safety grip i/c the cost of Stainless Steel
brackets,rawal plugs and hardware as approved and directed by Engineer
Incharge.
i) 15" long Each 216.15 3,024.15 Each 216.15 3,024.15
i) 18" long Each 216.15 3,744.15 Each 216.15 3,744.15
11 Providing and fixing of wall hung Box Type Toilet Tissue Holder for
Vanities from approved manufacturers i/c cost of required fittings &
required accessories as approved and directed by Engineer Incharge.
i) uPVC Each 175.00 1,063.75 Each 175.00 1,063.75
ii) Stainless steel Each 175.00 1,581.25 Each 175.00 1,581.25
12 Providing and Fixing of SS 304 Floor Drain, complete in all respect as
approved and directed by Engineer Incharge.
i) 4" dia Each 276.55 1,401.55 Each 276.55 1,401.55
ii) 6" dia Each 304.20 1,429.20 Each 304.20 1,429.20
13 Providing and Fixing of SS 304 Roof / scupper Drain, complete in all
respect as approved and directed by Engineer Incharge.
i) 4" dia Each 304.20 1,429.20 Each 304.20 1,429.20
ii) 6" dia Each 380.25 1,505.25 Each 380.25 1,505.25

chapter-19(PSI & GF) Page 121


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

14 Providing and fixing of Hose Bibs with gate valve, i/c cost of required
fittings & accessories as approved and directed by Engineer Incharge.
i) 1/2" dia Each 224.55 1,912.05 Each 224.55 1,912.05
ii) 3/4" dia Each 262.00 2,287.00 Each 262.00 2,287.00

chapter-19(PSI & GF) Page 122


20. SURFACE DRAINAGE
1. Specification No. correspond to Book of Specification (B & R Department ) Vol. II, 1966 (public Health Works).
2. Rates for all finished works include the removal of surplus debris, unused material and by products.
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
1 Tega formed of pacca bricks on end, laid in and over 17.1
cement sand mortar projecting to a height of not more
than 6" (150 mm) top of drain along the property side
where required, laid to lines, grades, slopes and shape
according to the Engineer's drawing:-
a) 3" thick (75 mm)
i) ratio 1:3 100Rft 3,196.50 9,242.60 Per Metre 104.85 303.15
ii) ratio 1:5 100Rft 3,196.50 8,748.20 Per Metre 104.85 286.95
B) 4½" thick (113 mm)
i) ratio 1:3 100Rft 4,792.65 13,461.80 Per Metre 157.20 441.55
ii) ratio 1:5 100Rft 4,792.65 12,712.20 Per Metre 157.20 416.95
2 Pacca flat brick 3" (75 mm ) thick, laid in reimbursement, 17.1
in cement, sand mortar, on sides of drains and in other
works where required. All joints to be completely filled
and struck flush:-
a) ratio 1:3 100Rft 4,716.10 13,239.00 P.Sqm. 507.45 1,424.50
b) ratio 1:5 100Rft 4,716.10 12,445.60 P.Sqm. 507.45 1,339.15
c) ratio 1:6 100Rft 4,716.10 12,222.35 P.Sqm. 507.45 1,315.10
3 Pacca brick on edge, laid in reimbursement, in cement, 17.1
sand mortar, on sides of drains and on other works where
required. All joints to be completely filled and struck
flush:-
a) ratio 1:3 100Sft. 6,705.60 19,576.75 P.Sqm. 721.50 2,106.45
b) ratio 1:5 100Rft 6,705.60 18,304.20 P.Sqm. 721.50 1,969.55
c) ratio 1:6 100Rft 6,705.60 17,987.55 P.Sqm. 721.50 1,935.45
4 Pacca flat brick, Herring bond pitching in cement, sand 17.2
mortar, laid to lines, grades, shapes and slopes as per
Engineer's drawing:-

a) ratio 1:3 100Sft. 4,488.00 13,010.90 P.Sqm. 482.90 1,399.95


b) ratio 1:5 100Rft 4,488.00 12,217.50 P.Sqm. 482.90 1,314.60
c) ratio 1:6 100Rft 4,488.00 11,994.25 P.Sqm. 482.90 1,290.60

chapter-20(Surface Drainage) Page 123


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

5 Pacca brick on edge, Herring bond pitching in cement, 17.2


sand mortar, laid to lines, grades, shapes and slopes as
per Engineer's drawing:-

a) ratio 1:3 100Sft. 6,932.65 19,803.80 P.Sqm. 745.95 2,130.90


b) ratio 1:5 100Rft 6,932.65 18,531.25 P.Sqm. 745.95 1,993.95
c) ratio 1:6 100Rft 6,932.65 18,214.60 P.Sqm. 745.95 1,959.90
6 Constructing Punjab Standard Drains. of cement concrete
1:2 ½ :5, with cement concrete bedding ratio 1:6:12, 17.1
complete, laid to lines, grades, slopes and shapes,
rendering exposed surface of concrete with 1:1 cement,
sand mortar, ¼" (6 mm) thick, as per Engineer's drawing
(excluding excavation):-
a) Type I Per Rft 107.40 247.25 Per Metre 352.30 810.90
b) Type II Per Rft 214.85 476.45 Per Metre 704.65 1,562.75
c) Type III Per Rft 280.15 621.60 Per Metre 918.85 2,038.80
d) Type IV Per Rft 333.85 742.80 Per Metre 1,095.05 2,436.45
e) Type V Per Rft 440.75 1,011.85 Per Metre 1,445.65 3,318.85
f) Type VI Per Rft 506.95 1,162.25 Per Metre 1,662.80 3,812.25
g) Type VII Per Rft 561.90 1,284.15 Per Metre 1,843.00 4,212.05
h) Type VIII Per Rft 627.55 1,447.60 Per Metre 2,058.40 4,748.10
i) Type IX Per Rft 840.00 2,022.40 Per Metre 2,755.20 6,633.50
j) Type X Per Rft 922.65 2,218.10 Per Metre 3,026.20 7,275.30
k) Type XI Per Rft 1,031.05 2,467.00 Per Metre 3,381.85 8,091.75
l) Type XII Per Rft 1,099.15 2,622.00 Per Metre 3,605.20 8,600.20
7 Laying R.C.C hume pipes in position, including jointing:-
a) 6" to 12" (150 mm to 300 mm ) dia Per Rft 199.30 208.30 Per Metre 653.75 683.25
b) 12" to 24" (300 mm to 600 mm) dia Per Rft 312.20 330.15 Per Metre 1,023.95 1,082.95
c) 24" to 36" (600 mm to 900 mm) dia Per Rft 398.65 425.75 Per Metre 1,307.55 1,396.40

chapter-20(Surface Drainage) Page 124


21. SEWERAGE
1 Specification No. correspond to Book of Specification of B& R Department Vol. II, 1966 (Public Health Works).
2 Rate for all finished works include the removal of surplus debris, unused material and byproducts.
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
1 Providing and laying R.C.C. pipe, moulded with cement Chapter - 8
concrete 1:1½:3, with spigot socket or collar joint, etc.
including cost of reinforcement, conforming to B.S. 5911:
Part I: 1981, Class "L" including carriage of pipe from
factory to site of work, lowering in trenches to correct
alignment and grade, jointing, cutting pipes where
necessary, finishing and testing, etc., complete.
i) 100 mm (4") i/d Per Rft. 55.95 196.70 Per Metre 183.50 645.20
ii) 150 mm (6") i/d Per Rft. 67.85 288.45 Per Metre 222.55 946.10
iii) 225 mm (9:) i/d Per Rft. 129.30 597.00 Per Metre 424.10 1,958.15
2 Providing and laying non-reinforced concrete pipe, ditto
moulded with cement concrete 1:1½:3, conforming to
ASTM Specification C-14-73, Class 2, including carriage
of pipe from factory to site of work, lowering in trenches to
correct alignment and grade, jointing, cutting pipe where
necessary, finishing and testing, etc. complete.
i) 100 mm (4") i/d Per Rft. 40.95 112.75 Per Metre 134.30 369.80
ii) 150 mm (6") i/d Per Rft. 49.40 148.20 Per Metre 162.05 486.10
iii) 200 mm (8") i/d Per Rft. 78.90 203.40 Per Metre 258.80 667.15
iv) 225 mm (9:) i/d wall thickness 1 inch (25 mm) Per Rft. 83.80 235.80 Per Metre 274.85 773.40
v) 250 mm (10") i/d Per Rft. 84.90 259.30 Per Metre 278.45 850.50
3 Providing and laying R.C.C. pipe sewers, moulded with ditto
cement concrete 4000 psi conforming to ASTM
Specification C-76-20, Class II. Wall B, including carriage
of pipe from factory to site of work, lowering in trenches to
correct alignment and grade, jointing with rubber ring,
cutting pipes where necessary, testing, etc., complete.
i) 310 mm (12") i/d Per Rft. 125.65 899.65 Per Metre 412.15 2,950.85
ii) 380 mm (15") i/d Per Rft. 157.15 1,201.15 Per Metre 515.45 3,939.75
iii) 460 mm (18") i/d Per Rft. 188.55 1,563.75 Per Metre 618.45 5,129.10
iv) 530 mm (21":) i/d Per Rft. 235.30 1,856.00 Per Metre 771.80 6,087.70
v) 610 mm (24") i/d Per Rft. 268.95 2,153.55 Per Metre 882.15 7,063.65
vi) 690 mm (27") i/d Per Rft. 400.80 3,198.00 Per Metre 1,314.60 10,489.45
vii) 760 mm (30") i/d Per Rft. 479.95 4,097.95 Per Metre 1,574.25 13,441.30
viii) 840 mm (33") i/d Per Rft. 597.70 4,565.25 Per Metre 1,960.45 14,974.00
ix) 910 mm (36") i/d Per Rft. 738.20 5,128.75 Per Metre 2,421.30 16,822.30
x) 1070 mm (42") i/d Per Rft. 957.15 5,961.15 Per Metre 3,139.45 19,552.55
xi) 1220 mm (48") i/d Per Rft. 1,815.10 7,420.30 Per Metre 5,953.55 24,338.60
xii) 1370 mm (54") i/d Per Rft. 2,534.10 9,487.15 Per Metre 8,311.85 31,117.85
xiii) 1520 mm (60") i/d Per Rft. 3,178.50 13,511.20 Per Metre 10,425.50 44,316.75
xiv) 1680 mm (66") i/d Per Rft. 5,047.80 17,352.60 Per Metre 16,556.80 56,916.55
xv) 1830 mm (72") i/d Per Rft. 6,295.00 19,910.90 Per Metre 20,647.60 65,307.75

chapter-21(Sewerage) Page 125


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
4 Providing and laying R.C.C. pipe sewers, moulded with Chapter-8
cement concrete 4000 psi conforming to ASTM Specification
C-76-20, Class III, Wall B, including carriage of pipes from
factory to site of work, lowering in trenches to correct
alignment and grade, jointing with rubber ring, cutting pipes
where necessary, testing, etc. complete:-
i) 310 mm (12") i/d Per Rft. 125.65 911.85 Per Metre 412.05 2,990.85
ii) 380 mm (15") i/d Per Rft. 157.15 1,231.75 Per Metre 515.45 4,040.15
iii) 460 mm (18") i/d Per Rft. 188.55 1,637.20 Per Metre 618.50 5,370.00
iv) 530 mm (21":) i/d Per Rft. 235.30 1,941.70 Per Metre 771.75 6,368.80
v) 610 mm (24") i/d Per Rft. 268.95 2,074.00 Per Metre 882.20 6,802.70
vi) 690 mm (27") i/d Per Rft. 400.80 3,516.25 Per Metre 1,314.65 11,533.30
vii) 760 mm (30") i/d Per Rft. 479.95 4,771.15 Per Metre 1,574.25 15,649.35
viii) 840 mm (33") i/d Per Rft. 597.70 5,245.80 Per Metre 1,960.50 17,206.20
ix) 910 mm (36") i/d Per Rft. 738.20 5,997.80 Per Metre 2,421.25 19,672.80
x) 1070 mm (42") i/d Per Rft. 957.15 7,001.55 Per Metre 3,139.45 22,965.10
xi) 1220 mm (48") i/d Per Rft. 1,842.55 8,781.95 Per Metre 6,043.65 28,804.80
xii) 1370 mm (54") i/d Per Rft. 2,572.55 12,426.45 Per Metre 8,437.95 40,758.75
xiii) 1520 mm (60") i/d Per Rft. 3,226.60 14,575.25 Per Metre 10,583.25 47,806.80
xiv) 1680 mm (66") i/d Per Rft. 5,124.75 20,367.15 Per Metre 16,809.10 66,804.25
xv) 1830 mm (72") i/d Per Rft. 6,391.20 24,988.80 Per Metre 20,963.10 81,963.25
5 Providing and laying R.C.C. pipe sewers, moulded with Chapter - 8
cement concrete conforming to ASTM
Specification C-76-20, Class IV, Wall B, including carriage
of pipes from factory to site of work, lowering in trenches
to correct alignment and grade, jointing with rubber ring,
cutting pipes where necessary, testing, etc. complete:-
a) 4000 psi
i) 310 mm (12") i/d Per Rft. 125.65 930.25 Per Metre 412.05 3,051.15
ii) 380 mm (15") i/d Per Rft. 157.15 1,262.35 Per Metre 515.45 4,140.55
iii) 460 mm (18") i/d Per Rft. 188.55 1,655.55 Per Metre 618.50 5,430.25
iv) 530 mm (21":) i/d Per Rft. 235.30 2,015.15 Per Metre 771.75 6,609.65
v) 610 mm (24") i/d Per Rft. 268.95 3,138.90 Per Metre 882.20 10,295.55
vi) 690 mm (27") i/d Per Rft. 400.80 3,871.20 Per Metre 1,314.65 12,697.60
vii) 760 mm (30") i/d Per Rft. 479.95 5,432.10 Per Metre 1,574.25 17,817.30
viii) 840 mm (33") i/d Per Rft. 597.70 6,009.60 Per Metre 1,960.50 19,711.50
ix) 910 mm (36") i/d Per Rft. 738.20 7,589.00 Per Metre 2,421.25 24,891.90
x) 1070 mm (42") i/d Per Rft. 957.15 9,780.05 Per Metre 3,139.45 32,078.50
xi) 1220 mm (48") i/d Per Rft. 1,842.55 12,098.95 Per Metre 6,043.65 39,684.65
xii) 1370 mm (54") i/d Per Rft. 2,572.55 14,592.95 Per Metre 8,437.95 47,864.90
b) 5000 psi
xiii) 1520 mm (60") i/d Per Rft. 3,226.60 18,051.40 Per Metre 10,583.25 59,208.55
xiv) 1680 mm (66") i/d Per Rft. 5,124.75 27,711.15 Per Metre 16,809.10 90,892.50
xv) 1830 mm (72") i/d Per Rft. 6,391.20 32,271.60 Per Metre 20,963.10 105,850.80

chapter-21(Sewerage) Page 126


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
6 Lowering of sub-soil water table, by installation of tubewells 1) This rate shall be payable, in
along sewer line and pumping out water, for excavation in addition to the item of excavation
open cutting below sub-soil water level, concreting, curing, below SSWL for sewers and
laying and jointing pipes, filling haunches, etc. till the manholes under Chapter,
completion of sewer line, including disposal of pumped out EARTHWORK
water:- 2) The grant of these rates shall be
Rft of Metre of subject to Superintending Engineer's
1) 0-1 ft. (0 to 310 mm) below SSWL laid sewer - 721.30 laid sewer - 2,365.80 approval.
2) 0-2 ft. (0 to 610 mm) below SSWL ditto - 1,307.60 ditto - 4,288.90
3) 0-3 ft. (0 to 910 mm) below SSWL ditto - 2,300.90 ditto - 7,547.00 3) The rate includes cost of
4) 0-4 ft. (0 to 1220 mm) below SSWL ditto - 3,368.10 ditto - 11,047.40 providing pumps, POL and all
5) 0-5 ft. (0 to 1520 mm) below SSWL ditto - 4,783.00 ditto - 15,688.30 operation charges at the site
6) 0-6 ft. (0 to 1830 mm) below SSWL ditto - 5,910.10 ditto - 19,385.10 of work, etc.
7) 0-7 ft. (0 to 2170 mm) below SSWL ditto - 7,076.25 ditto - 23,210.00
8) 0-8 ft. (0 to 2480 mm) below SSWL ditto - 8,123.00 ditto - 26,643.40
9) 0-9 ft. (0 to 2790 mm) below SSWL ditto - 8,703.05 ditto - 28,545.95
10) 0-10 ft. (0 to 3100 mm) below SSWL ditto - 10,070.10 ditto - 33,029.95
11) 0-11 ft. (0 to 3410 mm) below SSWL ditto - 11,238.20 ditto - 36,861.35
12) 0-12 ft. (0 to 3720 mm) below SSWL ditto - 12,489.65 ditto - 40,966.10
7 Constructing gully grating chamber, 12"x12", ( 300x300 16.2 Pipe connection to be paid
mm) complete in all respects: separately.
a) with C.I. gully trap, weighing 81 lbs. (36.75 Kg.) frame Each 2,072.00 16,981.60 Each 2,072.00 16,981.60
hinged safety type.
b) concrete Gully trap. Each 2,072.00 6,848.60 Each 2,072.00 6,848.60
8 Constructing standard gully grating chamber, 3'x2½' Each 6,406.00 21,450.20 Each 6,406.00 21,450.20 ditto Pipe connection to be paid
(900x750 mm), with chinaware trap as per PHED Drawing separately.
STD/PD No. 3 of 1977, complete in all respects.
9 Extra for making and finishing benching floor work in 100Sft. 2,842.60 4,197.20 P. Sqm 305.85 451.60 14.4
manhole chamber, with 1/8" (3 mm) thick cement finish.
10 Restoration of brick pavement on edge, over laid service 100Sft. 4,091.65 7,612.85 P. Sqm 440.25 819.15 13.1
line, with 2" (50 mm) sand cushion under soling.
11 Restoration of flat brick pavement sand grouted, over 2" 100Sft. 2,483.25 5,030.00 P. Sqm 267.20 541.25 13.1
(50 mm) thick dry sand cushion, under soling on laid
service line.
12 Restoration of metalled road, on laid service line, including 13.1
compaction:-
a) Carpetted road, with 2" (50 mm) carpet and 10" (250 100Sft. 6,908.50 17,537.25 P. Sqm 743.35 1,887.00
mm) depth of stone metal for sub-base and base.
b) Carpeted road, with 1½" (38 mm) carpet and 6" (150 100Sft. 4,878.35 12,796.25 P. Sqm 524.90 1,376.90
mm) depth of stone metal, for sub-base and base.
c) Black Topped Road with two coats of surfacing & 10" 100Sft. 2,670.10 8,742.60 P. Sqm 287.30 940.70
(250 mm) depth of stone metal, for sub base & base.
13 Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle 14.7
iron step, in manhole chambers, including carriage and Each 195.80 718.55 Each 195.80 718.55
setting the same in work to correct lines and levels.

chapter-21(Sewerage) Page 127


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
14 Fixing manhole frame and cover in R.C.C. slab including Per 564.95 - Per 564.95 - ditto
carriage to site. set set
15 Providing and fixing 3" (75 mm) thick R.C.C. manhole Per 331.75 21,164.85 Per 331.75 21,164.85 ditto
cover, 22" (550 mm) dia, with tee shaped C.I. frame of 20" set set
(500 mm) clear i/d (frame weighing 37.324 Kg. or one
maund) as per Standard Drawing STD/PD No. 5, of 1977,
complete in all respects.
16 Providing and fixing 6" thick R.C.C. manhole Per 837.75 25,255.90 Per 837.75 25,255.90
cover with tee shaped C.I. frame of 22" I/d (frame set set
weighing 37.324 Kg. or one maund as per Standard
Drawing STD/PD No. 6, of 1977, complete in all respect.
17 Providing and fixing, 6" (150 mm) thick R.C.C. manhole Per 739.40 8,009.20 Per 739.40 8,009.20 ditto
cover for 22" as per standard drawing STD/PD No. 6 of set set
1977, complete in all respects.

18 Providing and fixing, 6" (150 mm) thick R.C.C. manhole Per 572.75 12,822.60 Per 572.75 12,822.60 ditto
cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" set set
(550 mm) i/d as per standard drawing STD/PD No. 7 of
1977, complete in all respects.
19 Desilting of disposal work collecting tank, including 100Cft. 2,149.70 2,204.00 P.Cum 759.30 778.45 16.2
removal of sludge within 3 chains (90 metre).
20 Desilting of Manholes including rehandling of sludge within three chains
100Cft. 1,335.00 3,238.40 P.Cum 471.75 1,144.30
and removal from site to Dumping Site. Complete in all respect.
21 Providing and installing, C.I. ventilating shaft painted with 14.6
bituminous paint with foundation bolts, as per PHED
Standard Drawing STD/PD No. 4 of 1977, complete in all
respects (except concrete foundation block):-
a) 6" (150 mm) i/d shaft
i) 18 ft. (5.5 metre) long Per Cwt 622.90 24,145.00 100 Kg 1,226.15 47,529.55
ii) 24 ft. (7.30 metre) long Per Cwt 692.10 24,228.70 100 Kg 1,362.35 47,694.25
iii) 30 ft. (9.15 metre) long Per Cwt 747.45 24,266.25 100 Kg 1,471.35 47,768.25
iv) 36 ft. (11 metre) long Per Cwt 782.10 24,306.00 100 Kg 1,539.55 47,846.40
b) 9" (225 mm) i/d shaft
i) 18 ft. (5.5 metre) long Per Cwt 549.10 24,061.40 100 Kg 1,080.95 47,365.00
ii) 24 ft. (7.30 metre) long Per Cwt 591.70 24,101.00 100 Kg 1,164.80 47,442.90
iii) 30 ft. (9.15 metre) long Per Cwt 633.60 24,141.15 100 Kg 1,247.25 47,521.95
iv) 36 ft. (11 metre) long Per Cwt 762.65 24,268.85 100 Kg 1,501.30 47,773.30
c) 12" (300 mm) i/d shaft
i) 18 ft. (5.5 metre) long Per Cwt 485.85 23,997.30 100 Kg 956.35 47,238.75
ii) 24 ft. (7.30 metre) long Per Cwt 624.65 24,127.95 100 Kg 1,229.60 47,495.90
iii) 30 ft. (9.15 metre) long Per Cwt 728.75 24,230.90 100 Kg 1,434.55 47,698.65

chapter-21(Sewerage) Page 128


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
22 Silt clearing 10' (3.00 m) dia wells, and
removal of slush outside the compound:-
a) upto 10' (3.00 m) depth of slush Per well 17,671.50 - Per well 17,671.50 -
b) beyond 10' (3.00 m) depth of slush Per well 34,782.00 - Per well 34,782.00 -
23 Providing and laying crushed stone aggregate of 1/4" to 1-1/2" guage 100Cft. 3,762.00 8,550.00 P.Cum 1,328.75 3,019.85
under and around the sewer pipe, including leveling, manual compaction,
complete in all respects.
24 Providing and laying sand under and around the sewer pipe, including 100Cft. 1,881.00 5,361.00 P.Cum 664.35 1,893.50
leveling, manual compaction, complete in all respect.
25 Supply of Bamboos for removal of sewer blockage 4" dia from Bottom 04 pieces - 1,953.60 01 piece - 488.40
and 2" to 2.5" dia from Top, 22' long i/c cutting charges into four pieces, 22 feet 22 feet
including carriage charges. long long
26 Desilting including disposal of sludge upto one Chain (30 Meters).
a) Open Drain 100Cft. 640.45 2,472.85 P.Cum 226.25 873.80
b) Covered Drain 100Cft. 919.10 2,820.40 P.Cum 324.65 996.60

chapter-21(Sewerage) Page 129


22. SINKING OF WELLS
1 Rates for all finished works include the removal of surplus debris, unused material and byproducts.
2 Well curbs to be laid at spring level or as deep as possible.
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
1 Excavation of well in dry upto 20'(6 metre) below ground
level, and disposal of soil within one chain (30 metre)
a) in ordinary soil or sand :-
i) from 0' to 5' (o to 1.5 m) depth 1000 Cft. 11,180.65 - P. Cum 394.90 -
ii) from 5.1' to 10' (1.5 to 3.0 metre) depth 1000 Cft. 11,677.25 - P. Cum 412.45 -
iii) from 10.1' to 15' (3.0 to 4.5 metre) depth 1000 Cft. 13,136.90 - P. Cum 464.00 -
iv) from 15.1' to 20' (4.5 metre to 6.0 metre) depth 1000 Cft. 15,078.10 - P. Cum 532.55 -
b) in hard soil
i) from 0' to 5'(0 to 1.5 metre) depth 1000 Cft. 13,618.45 - P. Cum 481.00 -
ii) from 5.1' to 10'(1.5 to 3.0 metre) depth 1000 Cft. 14,235.40 - P. Cum 502.80 -
iii) from 10.1' to 15'(3.0 to 4.5 metre) depth 1000 Cft. 15,559.65 - P. Cum 549.55 -
iv) from 15.1' to 20'(4.5 to 6.0 metre) depth 1000 Cft. 17,500.80 - P. Cum 618.15 -
c) in hard strata, such as shingle, gravel, etc.
i) from 0' to 5'(0 to 1.5 metre) depth 1000 Cft. 29,373.70 - P. Cum 1,037.50 -
ii) from 5.1' to 10'(1.5 to 3.0 metre) depth 1000 Cft. 30,427.05 - P. Cum 1,074.70 -
iii) from 10.1' to 15'(3.0 to 4.5 metre) depth 1000 Cft. 31,721.20 - P. Cum 1,120.40 -
iv) from 15.1' to 20'(4.5 to 6.0 metre ) depth 1000 Cft. 34,053.60 - P. Cum 1,202.75 -
2 Dry sinking of well, including loading, and removing
excavated material within one chain (30 m):-
a) in ordinary soil :-
i) from 10' to 15'(3.0 to 4.5 m) depth 1000 Cft. 60,192.00 - P. Cum 2,126.00 -
ii) from 15.1' to 20'(4.5 to 6.0 m) depth 1000 Cft. 75,240.00 - P. Cum 2,657.50 -
iii) from 20.1' to 25'(6.0 to 7.5 m) depth 1000 Cft. 90,288.00 - P. Cum 3,188.95 -
iv) from 25.1' to 30'(7.5 to 9.0 m) depth 1000 Cft. 105,336.00 - P. Cum 3,720.45 -
v) from 30.1' to 35'(9.0 to 10.5 m) depth 1000 Cft. 120,384.00 - P. Cum 4,251.95 -
vi) from 35.1' to 40'(10.5 to 12.0 m) depth 1000 Cft. 135,432.00 - P. Cum 4,783.45 -
vii) from 40.1'to 45'(12.0 to 13.5 m) depth 1000 Cft. 150,480.00 - P. Cum 5,314.95 -
viii) from 45'(13.5 Sm) to any depth 1000 Cft. 165,528.00 - P. Cum 5,846.45 -
b) in hard soil :-
i) from 10' to 15'(3.0 to 4.5 m) depth 1000 Cft. 82,764.00 - P. Cum 2,923.25 -
ii) from 15.1' to 20'(4.5 to 6.0 m) depth 1000 Cft. 97,812.00 - P. Cum 3,454.70 -
iii) from 20.1' to 25'(6.0 to 7.5 m) depth 1000 Cft. 112,860.00 - P. Cum 3,986.20 -
iv) from 25.1' to 30'(7.5 to 9.0 m) depth 1000 Cft. 127,908.00 - P. Cum 4,517.70 -
v) from 30.1' to 35'(9.0 to 10.5 m) depth 1000 Cft. 142,956.00 - P. Cum 5,049.20 -
vi) from 35.1' to 40'(10.5 to 12.0 m) depth 1000 Cft. 158,004.00 - P. Cum 5,580.70 -
vii) from 40.1' to 45'(12.0 to 13.5 m) depth 1000 Cft. 173,052.00 - P. Cum 6,112.20 -
viii) from 45'(13.5 m) to any depth 1000 Cft. 188,100.00 - P. Cum 6,643.70 -

chapter-22(Sinking of Wells) Page 130


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
c) in hard strata, such as shingle, gravel, etc.
i) from 10' to 15'(3.0 to 4.5 m) depth 1000 Cft. 112,860.00 - P. Cum 3,986.20 -
ii) from 15.1' to 20'(4.5 to 6.0 m) depth 1000 Cft. 127,908.00 - P. Cum 4,517.70 -
iii) from 20.1' to 25'(6.0 to 7.5 m) depth 1000 Cft. 142,956.00 - P. Cum 5,049.20 -
iv) from 25.1' to 30'(7.5 to 9.0 m) depth 1000 Cft. 144,837.00 - P. Cum 5,115.65 -
v) from 30.1' to 35'(9.0 to 10.5 m) depth 1000 Cft. 173,052.00 - P. Cum 6,112.20 -
vi) from 35.1' to 40'(10.5 to 12.0 m) depth 1000 Cft. 188,100.00 - P. Cum 6,643.70 -
vii)from 40.1' to 45'(12.0 to 13.5 m) depth 1000 Cft. 203,148.00 - P. Cum 7,175.20 -
viii) from 45'-1" (13.5 m) to any depth 1000 Cft. 218,196.00 - P. Cum 7,706.70 -
3 Wet sinking of well in ordinary soil (value of C upto 5), for *841-1 The outer dimensions of the curb
depths below spring level, including charges of machinery, to shall form basis of payment.
shoring, kentledge and removal of excavated spoil within 841-9
one chain (30 m):-
i) i) from o' to 10'(0 to 3.0 m) depth 1000 Cft. 95,117.65 - P. Cum 3,359.55 -
ii) ii) above 10' to 20'(3.0 to 6.0 m) depth 1000 Cft. 202,125.00 - P. Cum 7,139.05 -
iii) iii) above 20' to 30'(6.0 to 9.0 m) depth 1000 Cft. 248,769.25 - P. Cum 8,786.55 -
iv) iv) above 30' to 40'(9.0 to 12.0 m) depth 1000 Cft. 323,400.00 - P. Cum 11,422.50 -
v) v) above 40' to 50'(12.0 to 15.0 m) depth 1000 Cft. 359,333.35 - P. Cum 12,691.65 -
vi) vi) above 50' to 60'(15.0 to 18.0 m) depth 1000 Cft. 404,250.00 - P. Cum 14,278.10 -
vii) vii) above 60' to 70'(18.0 to 21.0 m) depth 1000 Cft. 414,615.40 - P. Cum 14,644.20 -
viii) viii) above 70' to 80'(21.0 to 24.0 m) depth 1000 Cft. 425,526.30 - P. Cum 15,029.60 -
ix) ix) above 80'(24.0 m) to any depth 1000 Cft. 462,000.00 - P. Cum 16,317.85 -

4 Wet sinking of well in cohesive soil (value of Cmore than *841-1 The outer dimensions of the curb
5), for depths below spring level, including charges of to shall form basis of payment.
machinery shoring, kentledge and removal of excavated 841-9
spoil within one chain (30 m):-
i) from o' to 10'(0 to 3.0 m) depth 1000 Cft. - 132,165.05 P. Cum - 4,668.05
ii) above 10' to 20'(3.0 to 6.0 m) depth 1000 Cft. - 165,206.30 P. Cum - 5,835.10
iii) above 20' to 30'(6.0 to 9.0 m) depth 1000 Cft. - 198,247.60 P. Cum - 7,002.10
iv) above 30' to 40'(9.0 to 12.0 m) depth 1000 Cft. - 264,330.10 P. Cum - 9,336.15
v) above 40' to 50'(12.0 to 15.0 m) depth 1000 Cft. - 304,996.30 P. Cum - 10,772.45
vi) above 50' to 60'(15.0 to 18.0 m) depth 1000 Cft. - 330,412.65 P. Cum - 11,670.20
vii) above 60' to 70'(18.0 to 21.0 m) depth 1000 Cft. - 360,450.15 P. Cum - 12,731.10
viii) above 70' to 80'(21.0 to 24.0 m) depth 1000 Cft. - 374,052.05 P. Cum - 13,211.50
ix) above 80'(24.0 m) to any depth 1000 Cft. - 396,495.15 P. Cum - 14,004.20
5 Wet sinking of well in shingle, or gravel, etc, for depths *841-1 The outer dimensions of the curb
below spring level, including charges of machinery, to shall form basis of payment.
shoring, kentledge and removal of excavated spoil within 841-9
one chain (30 m) :-
i) from o' to 10'(0 to 3.0 m) depth 1000 Cft. - 180,225.10 P. Cum - 6,365.55
ii) above 10' to 20'(3.0 to 6.0 m) depth 1000 Cft. - 220,275.10 P. Cum - 7,780.10
iii) above 20' to 30'(6.0 to 9.0 m) depth 1000 Cft. - 264,330.10 P. Cum - 9,336.15
iv) above 30' to 40'(9.0 to 12.0 m) depth 1000 Cft. - 360,450.15 P. Cum - 12,731.10
v) above 40' to 50'(12.0 to 15.0 m) depth 1000 Cft. - 396,495.15 P. Cum - 14,004.20
chapter-22(Sinking of Wells) Page 131
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
vi) above 50' to 60'(15.0 to 18.0 m) depth 1000 Cft. - 440,550.20 P. Cum - 15,560.25
vii) above 60' to 70'(18.0 to 21.0 m) depth 1000 Cft. - 461,040.90 P. Cum - 16,283.95
viii) above 70' to 80'(21.0 to 24.0 m) depth 1000 Cft. - 472,018.05 P. Cum - 16,671.70
ix) above 80'(24.0 m) to any depth 1000 Cft. - 521,704.15 P. Cum - 18,426.60
6 Making and fixing in position, kiker wood well curb/ left over Per Cft. 2,754.65 8,204.15 P. Cum 97,294.65 289,770.80
shuttering.
7 Laying well curb in position only. Each 976.80 - Each 976.80 -
8 Providing, making and laying R.C.C. well curb in position, *841-1 1) If concrete mixer is supplied by
using coarse sand, including all kinds of form, moulds, to Government, all charges including
curing, shuttering, rendering and finishing the exposed 841-9 depreciation will be recovered from
surface, (including screening and washing of aggregate :- the contractor.
2) The rate does not include cost of
a) Ratio 1:1½:3 Per Cft. 378.85 901.45 P. Cum 13,380.65 31,840.00 steel reinforcement and its labour for
b) ratio 1:2:4 Per Cft. 378.85 825.50 P. Cum 13,380.65 29,156.25 bending, which is payable, separately.
9 Providing and fixing structural steel for cutting 100Kg 2,161.50 35,821.50 100Kg 2,161.50 35,821.50 841-1 to
edge. 841-9
10 Making and removing false masonry on well. 100Cft. 18,690.10 43,538.60 P. Cum 6,601.35 15,377.85 21.1 to The rate includes dismantling of false
21.5 & 18.1 masonry, scraping bricks obtained
from dismantling and credit of
byproducts.

* Specification No. correspond to Book of "Standard Specification for Road and Bridge Construction, 1971".

chapter-22(Sinking of Wells) Page 132


23. TUBEWELL AND WATER SUPPLY
1 Specification No. correspond to Book of "Specification for B&R Department, 1966, Vol. II (Public Health Works)".
2 Rates for all finished works include the removal of surplus debris, unused material and byproducts.
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
1 Boring for tubewell in all types of soil except shingle and Chap. 2
rock, from ground level to 100 ft. (30 m) depth, including
sinking and withdrawing of casing pipe, complete:-
a) 3" (75 mm) i/d Per Rft. 347.10 Per Metre 1,138.45
b) 4" (100 mm) i/d of bore 466.40 of bore 1,529.85
c) 5" (125 mm) i/d ditto 855.25 ditto 2,805.20
d) 6" (150 mm) i/d ditto 1,301.00 ditto 4,267.20
e) 8" (200 mm) i/d ditto 1,708.05 ditto 5,602.45
f) 10" (250 mm) i/d ditto 2,154.20 ditto 7,065.75
g) 12" (300 mm) i/d ditto 2,316.40 ditto 7,597.80
h) 15" (375 mm) i/d ditto 3,523.95 ditto 11,558.55
i) 18" (450 mm) i/d ditto 3,739.50 ditto 12,265.55
2 Boring for tubewell in all types of soil except shingle, ditto
gravel & rock, from a depth of 100.1 ft. to 200 ft.
(30 to 60 m) below ground level, including sinking and
withdrawing of casing pipe, complete:-
a) 5" (125 mm) i/d Rft of bore 1,436.50 Per Metre 4,711.80
b) 6" (150 mm) i/d ditto 2,018.75 of bore 6,621.55
c) 8" (200 mm) i/d ditto 2,317.15 ditto 7,600.25
d) 10" (250 mm) i/d ditto 2,632.70 ditto 8,635.20
e) 12" (300 mm) i/d ditto 2,809.30 ditto 9,214.50
f) 15" (375 mm) i/d ditto 4,137.25 ditto 13,570.15
g) 18" (450 mm) i/d ditto 4,352.80 ditto 14,277.15
3 Boring for tubewell in all types of soil except shingle, ditto
gravel & rock, from a depth of 200.1 ft. to 300 ft. (60
to 90 m) below ground level, including sinking and
withdrawing of casing pipe, complete:-
a) 5" (125 mm) i/d Rft of bore 2,004.35 Per Metre 6,574.30
b) 6" (150 mm) i/d ditto 2,584.20 of bore 8,476.20
c) 8" (200 mm) i/d ditto 2,925.05 ditto 9,594.10
d) 10" (250 mm) i/d ditto 3,279.40 ditto 10,756.40
e) 12" (300 mm) i/d ditto 3,452.40 ditto 11,323.90
f) 15" (375 mm) i/d ditto 4,548.20 ditto 14,918.05
g) 18" (450 mm) i/d ditto 4,763.75 ditto 15,625.05
4 Boring for tubewell in all types of soil except shingle, Chap. 2
gravel & rock, from a depth of 300.1 ft. to 400 ft.
(90 to 120 m) below ground level, including sinking and
withdrawing of casing pipe, complete:-
a) 8" (200 mm) i/d Rft of bore 3,536.55 Per Metre 11,599.80
b) 10" (250 mm) i/d ditto 3,928.50 of bore 12,885.50
c) 12" (300 mm) i/d ditto 4,103.90 ditto 13,460.85
d) 15" (375 mm) i/d ditto 5,566.15 ditto 18,257.05
e) 18" (450 mm) i/d ditto 5,585.35 ditto 18,320.00

chapter-23(Tubewell) Page 133


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
5 Direct Rotary/Reverse Rotary drilling of bore for tubewells, ditto
in all types of soil except shingle, gravel and rock:-
a) from ground level to 250 ft. (75 m) below ground level:-

i) 15" to 18" (375 to 450 mm) i/d Rft of bore 895.10 Per Metre 2,935.85 Upto 2 cusec discharge
ii) 20" to 26" (500 to 650 mm) i/d ditto 1,287.30 of bore 4,222.25 Above 2 cusec discharge
b) exceeding 250 ft. (75 m) depth below ground level:-

i) 15" to 18" (375 to 450 mm) i/d Rft of bore 895.10 Per Metre 2,935.85 Upto 2 cusec discharge
ii) 20" to 26" (500 to 650 mm) i/d ditto 1,287.30 of bore 4,222.25 Above 2 cusec discharge
6 Boring for tubewell in shingle, gravel and rock, including ditto Location and depth of shingle,
sinking and withdrawing of casing pipe:- gravel or rock is to be determined
from the bore log.
a) from ground level to 200 ft. (60 m) below ground level:-

i) 12" to 18" (300 to 450 mm) i/d Rft of bore 2,018.70 Per Metre 6,621.30 Upto 2 cusec discharge
ii) 20" to 26" (500 to 650 mm) i/d ditto 2,730.20 of bore 8,955.00 Above 2 cusec discharge
b) exceeding 200 ft. (60 m) depth below
ground level:-
i) 12" to 18" (300 to 450 mm) i/d ditto 2,018.70 ditto 6,621.30 Upto 2 cusec discharge
ii) 20" to 26" (500 to 650 mm) i/d ditto 2,730.20 ditto 8,955.00 Above 2 cusec discharge
7 Providing strong substantially built box of deodar wood Job for 7,211.95 52,144.75 Job for 7,211.95 52,144.75 ditto
4'x2½'x9" (1200x750x225 mm), with compartments, lock compl- compl-
and locking arrangement, for preserving samples of strata ete bore ete bore
from bore hole.
8 Furnishing sample of water from bore hole. Per Set 124.75 232.75 Per Set 124.75 232.75 Chap. 2
of 2 of 2
bottles bottles
9 Providing and installing, brass strainer in tubewell bore ditto Cost/labour of jointing both ends is
hole, including sockets, special sockets, studs, etc. included in the rate.
complete:-
a) 2" i/d, 5/32" (50 mm i/d 4 mm) thick Per Rft. 79.85 2,368.25 Per Metre 261.90 7,767.85
b) 3" i/d, 5/32" (75 mm i/d 4 mm) thick Per Rft. 79.85 4,278.65 Per Metre 261.90 14,033.95
c) 4" i/d, 3/16" (100 mm i/d 5 mm) thick Per Rft. 104.85 5,513.25 Per Metre 343.95 18,083.50
d) 5" i/d, 3/16" (125 mm i/d 5 mm) thick Per Rft. 119.50 7,029.10 Per Metre 392.00 23,055.50
e) 6" i/d, 3/16" (150 mm i/d 5 mm) thick Per Rft. 131.10 7,919.10 Per Metre 429.95 25,974.55
f) 7" i/d, 3/16" (175 mm i/d 5 mm) thick Per Rft. 154.90 9,516.10 Per Metre 508.05 31,212.80
g) 8" i/d, 3/16" (200 mm i/d 5 mm) thick Per Rft. 190.60 11,279.80 Per Metre 625.20 36,997.80
h) 9" i/d, 3/16" (225 mm i/d 5 mm) thick Per Rft. 190.60 11,733.40 Per Metre 625.20 38,485.60
i) 10" i/d, 3/16" (250 mm i/d 5 mm) thick Per Rft. 216.15 12,939.75 Per Metre 708.90 42,442.30
j) 10" i/d, ¼" (250 mm i/d 6 mm) thick Per Rft. 216.15 14,463.75 Per Metre 708.90 47,441.05
k) 12" i/d, ¼" (300 mm i/d 6 mm) thick Per Rft. 217.35 18,798.15 Per Metre 712.85 61,657.85
l) 14" i/d, ¼" (355 mm i/d 6 mm) thick Per Rft. 251.35 23,158.15 Per Metre 824.45 75,958.75
m) 16" i/d, ¼" (405 mm i/d 6 mm) thick Per Rft. 251.35 23,291.35 Per Metre 824.45 76,395.65
n) 18" i/d, ¼" (450 mm i/d 6 mm) thick Per Rft. 251.35 26,340.55 Per Metre 824.45 86,397.00
o) 20" i/d, ¼" (500 mm i/d 6 mm) thick Per Rft. 299.00 29,063.00 Per Metre 980.65 95,326.55
p) 22" i/d, ¼" (550 mm i/d 6 mm) thick Per Rft. 300.20 33,348.20 Per Metre 984.60 109,382.05

chapter-23(Tubewell) Page 134


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
10 Providing and installing M.S. Bail plug in tubewell bore In the case of increase or decrease
hole: in the length of Bail plug, the rates
will be increased or decreased as
a) 2" i/d, 1.5 ft. (50 mm i/d 450 mm) long. Each 375.80 1,428.05 Each 375.80 1,428.05 per rates given in serial No. 14 of
b) 3" i/d, 1.5 ft. (75 mm i/d 450 mm) long. Each 375.80 1,825.70 Each 375.80 1,825.70 this chapter for the respective
c) 4" i/d, 2 ft. (100 mm i/d 600 mm) long. Each 627.25 3,195.85 Each 627.25 3,195.85 diameter.
d) 5" i/d, 2 ft. (125 mm i/d 600 mm) long. Each 627.25 3,939.50 Each 627.25 3,939.50
e) 6" i/d, 2 ft. (150 mm i/d 600 mm) long. Each 848.65 4,992.25 Each 848.65 4,992.25
f) 7" i/d, 2 ft. (175 mm i/d 600 mm) long. Each 848.65 5,731.30 Each 848.65 5,731.30
g) 8" i/d, 2 ft. (200 mm i/d 600 mm) long Each 1,043.65 6,408.80 Each 1,043.65 6,408.80
h) 9" i/d, 2 ft. (225 mm i/d 600 mm) long Each 1,043.65 6,945.85 Each 1,043.65 6,945.85
i) 10" i/d, 2 ft. (250 mm i/d 600 mm) long Each 1,043.65 8,588.40 Each 1,043.65 8,588.40
j) 12" i/d, 2 ft. (300 mm i/d 600 mm) long Each 1,252.65 10,309.90 Each 1,252.65 10,309.90
k) 14" i/d, 2 ft. (355 mm i/d 600 mm) long Each 1,252.65 12,426.45 Each 1,252.65 12,426.45
l) 16" i/d, 2 ft. (405 mm i/d 600 mm) long Each 1,252.65 12,659.25 Each 1,252.65 12,659.25
m) 18" i/d, 2 ft. (450 mm i/d 600 mm) long Each 1,508.80 14,708.05 Each 1,508.80 14,708.05
n) 20" i/d, 2 ft. (500 mm i/d 600 mm) long Each 1,639.80 16,029.25 Each 1,639.80 16,029.25
o) 22" i/d, 2 ft. (550 mm i/d 600 mm) long Each 1,639.80 17,708.80 Each 1,639.80 17,708.80
11 Providing and installing, P.V.C. strainer B.S.S. Class 'B', Chap. 2
in tubewell bore hole, including sockets and solvents, etc.
complete:-
a) 3" i/d (75 mm) Per Rft. 64.75 224.35 Per Metre 212.40 735.85
b) 4" i/d (100 mm) Per Rft. 75.15 325.95 Per Metre 246.45 1,069.10
c) 5" i/d (125 mm) Per Rft. 79.80 417.00 Per Metre 261.75 1,367.75
d) 6" i/d (150 mm) Per Rft. 94.70 535.10 Per Metre 310.65 1,755.15
e) 8" i/d (200 mm) Per Rft. 125.20 1,214.80 Per Metre 410.70 3,984.60
f) 10" i/d (250 mm) Per Rft. 128.35 1,682.35 Per Metre 420.90 5,518.05
g) 12" i/d (300 mm) Per Rft. 128.35 2,374.75 Per Metre 420.90 7,789.10

12 Providing and installing P.V.C. strainer B.S.S. Class `D' ,


in tubewell bore hole, including sockets and solvent, etc.
complete:-
a) 1¼" i/d (30 mm) Per Rft. 44.80 109.60 Per Metre 146.90 359.45
b) 1½" i/d (40 mm) Per Rft. 45.90 116.70 Per Metre 150.55 382.75
c) 2" i/d (50 mm) Per Rft. 47.55 163.95 Per Metre 155.95 537.75
d) 3" i/d (75 mm) Per Rft. 66.00 310.80 Per Metre 216.45 1,019.40
e) 4" i/d (100 mm) Per Rft. 74.90 491.30 Per Metre 245.75 1,611.55
f) 5" i/d (125 mm) Per Rft. 81.00 693.00 Per Metre 265.60 2,273.00
g) 6" i/d (150 mm) Per Rft. 144.55 998.95 Per Metre 474.05 3,276.50
13 Providing and installing Fiberglass Reinforced Polypropelene (FRP)
strainer of specifid wall thickness having slot size of 0.9 mm to 1.10 mm in
Tubewell borehole i/c the cost of male/female coupling with Nylone
Strip,studs complete in all respect as approved and directed by the Engineer
Incharge.
i) 2" inch dia (5 mm thickness) Per Rft 207.40 1,059.40 Per Metre 680.35 3,474.90
ii) 3" inch dia (5 mm thickness) Per Rft 207.40 1,269.40 Per Metre 680.35 4,163.70
iii) 4" inch dia (5 mm thickness) Per Rft 207.40 1,557.40 Per Metre 680.35 5,108.35
iv) 6" inch dia (5 mm thickness) Per Rft 207.40 2,146.60 Per Metre 680.35 7,040.90
v) 8" inch dia (5 mm thickness) Per Rft 207.40 2,405.80 Per Metre 680.35 7,891.10
chapter-23(Tubewell) Page 135
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
vi) 10" inch dia (6.35 mm thickness) Per Rft 207.40 3,627.40 Per Metre 680.35 11,897.95
vii) 12" inch dia (6.35 mm thickness) Per Rft 207.40 4,197.40 Per Metre 680.35 13,767.55
viii) 14" inch dia (6.35 mm thickness) Per Rft 219.90 4,847.10 Per Metre 721.30 15,898.50
xi) 16" inch dia (6.35 mm thickness) Per Rft 219.90 5,624.70 Per Metre 721.30 18,449.05
x) 18" inch dia (6.35 mm thickness) Per Rft 236.55 6,486.15 Per Metre 775.90 21,274.60
14 Providing and installing Fiber glass Reinforced Polypropelene (FRP) bail
plug of specified wall thickness having slot size of 0.9 mm to 1.10 mm in
Tubewell bore hole i/c the cost of male / female coupling with Nylone Strip,
studs complete in all respect as approved and directed by the Engineer
Incharge.
i) 2"dia (5mm thickness) Per Rft 108.10 985.65 Per Metre 354.55 3,232.90
ii) 3"dia (5mm thickness) Per Rft 108.10 1,310.05 Per Metre 354.55 4,296.90
iii) 4"dia (5mm thickness) Per Rft 108.10 1,606.70 Per Metre 354.55 5,269.90
iv) 6"dia (5mm thickness) Per Rft 108.10 2,213.55 Per Metre 354.55 7,260.45
v) 8"dia (5mm thickness) Per Rft 108.10 2,480.55 Per Metre 354.55 8,136.15
vi) 10"dia (6.35mm thickness) Per Rft 108.10 3,738.80 Per Metre 354.55 12,263.20
vii) 12"dia (6.35mm thickness) Per Rft 108.10 4,325.90 Per Metre 354.55 14,188.85
viii) 14"dia (6.35mm thickness) Per Rft 108.10 4,982.20 Per Metre 354.55 16,341.60
xi) 16"dia (6.35mm thickness) Per Rft 108.10 5,783.10 Per Metre 354.55 18,968.65
x) 18"dia (6.35mm thickness) Per Rft 108.10 6,653.25 Per Metre 354.55 21,822.70
15 Providing and installing P.V.C. Bail/End plug, in tubewell
bore hole:-
a) B.S.S. Class `B'
i) 3" i/d (75 mm) Each 35.50 112.30 Each 35.50 112.30
ii) 4" i/d (100 mm) Each 39.75 144.15 Each 39.75 144.15
iii) 5" i/d (125 mm) Each 43.30 208.90 Each 43.30 208.90
iv) 6" i/d (150 mm) Each 53.15 297.95 Each 53.15 297.95
v) 8" i/d (200 mm) Each 63.55 575.95 Each 63.55 575.95
vi) 10" i/d (250 mm) Each 67.15 777.55 Each 67.15 777.55
vii) 12" i/d (300 mm) Each 75.65 1,036.85 Each 75.65 1,036.85
viii) 14" i/d (350 mm) Each 75.65 1,072.85 Each 75.65 1,072.85
b) B.S.S. Class `D'
i) 1¼" i/d (30 mm) Each 24.60 70.20 Each 24.60 70.20
ii) 1½" i/d (40 mm) Each 25.90 102.70 Each 25.90 102.70
iii) 2" i/d (50 mm) Each 26.80 125.20 Each 26.80 125.20
iv) 3" i/d (75 mm) Each 35.50 163.90 Each 35.50 163.90
v) 4" i/d (100 mm) Each 39.85 193.45 Each 39.85 193.45
vi) 5" i/d (125 mm) Each 43.35 276.15 Each 43.35 276.15
vii) 6" i/d (150 mm) Each 54.45 360.45 Each 54.45 360.45
16 Providing and installing M.S. blind pipe socketed/welded Chap.
joint, M.S. reducer (where necessary), in tubewell bore 2
hole, including jointing/welding with strainer, etc.
complete:-
a) 2" i/d, 1/8" (50 mm i/d 3 mm) thick Per Rft. 231.05 755.45 Per Metre 757.85 2,477.90
b) 3" i/d, 1/8" (75 mm i/d 3 mm) thick Per Rft. 231.05 1,015.15 Per Metre 757.85 3,329.65
c) 4" i/d, 1/8" (100 mm i/d 3 mm) thick Per Rft. 289.05 1,306.75 Per Metre 948.10 4,286.20
d) 5" i/d, 3/16" (125 mm i/d 5 mm) thick Per Rft. 289.05 2,365.05 Per Metre 948.10 7,757.35
e) 6" i/d, 3/16" (150 mm i/d 5 mm) thick Per Rft. 412.45 2,786.05 Per Metre 1,352.85 9,138.25

chapter-23(Tubewell) Page 136


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
f) 7" i/d, 3/16" (175 mm i/d 5 mm) thick Per Rft. 412.45 3,182.05 Per Metre 1,352.85 10,437.10
g) 8" i/d, 3/16" (200 mm i/d 5 mm) thick Per Rft. 481.25 3,674.45 Per Metre 1,578.50 12,052.20
h) 9" i/d, 3/16" (225 mm i/d 5 mm) thick Per Rft. 481.25 4,072.85 Per Metre 1,578.50 13,358.95
i) 10" i/d, ¼" (250 mm i/d 6 mm) thick Per Rft. 481.25 5,349.80 Per Metre 1,578.50 17,547.35
j) 12" i/d, ¼" (300 mm i/d 6 mm) thick Per Rft. 577.60 6,420.45 Per Metre 1,894.55 21,059.05
k) 14" i/d, ¼" (355 mm i/d 6 mm) thick Per Rft. 577.60 7,673.20 Per Metre 1,894.55 25,168.10
l) 16" i/d, ¼" (405 mm i/d 6 mm) thick Per Rft. 577.60 8,567.20 Per Metre 1,894.55 28,100.40
m) 18" i/d, ¼" (450 mm i/d 6 mm) thick Per Rft. 705.70 9,573.05 Per Metre 2,314.70 31,399.65
n) 20" i/d, ¼" (500 mm i/d 6 mm) thick Per Rft. 761.45 10,613.25 Per Metre 2,497.55 34,811.55
o) 22" i/d, ¼" (550 mm i/d 6 mm) thick Per Rft. 761.45 11,600.65 Per Metre 2,497.55 38,050.05
17 Providing and installing P.V.C. blind pipe, B.S.S. Class ditto
`B', in tubewell bore hole, including sockets and solvents
and jointing with strainer, etc. complete.
a) 3" i/d (75 mm) Per Rft. 85.45 412.25 Per Metre 280.35 1,352.10
b) 4" i/d (100 mm) Per Rft. 98.05 589.45 Per Metre 321.60 1,933.40
c) 5" i/d (125 mm) Per Rft. 102.75 789.85 Per Metre 337.05 2,590.80
d) 6" i/d (150 mm) Per Rft. 123.60 1,069.85 Per Metre 403.90 3,509.05
e) 8" i/d (200 mm) Per Rft. 161.20 1,623.65 Per Metre 528.80 5,325.60
f) 10" i/d (250 mm) Per Rft. 168.55 2,482.75 Per Metre 552.80 8,143.35
g) 12" i/d (300 mm) Per Rft. 200.80 3,439.85 Per Metre 658.60 11,282.65
h) 14" i/d (350 mm) Per Rft. 190.00 4,081.70 Per Metre 623.20 13,388.05
18 Providing and installing P.V.C. blind pipe, B.S.S. Class
`D', in tubewell bore hole, including sockets and solvents
and jointing with strainer, etc. complete.
a) 1¼" i/d (30 mm) Per Rft. 53.35 170.95 Per Metre 175.00 560.75
b) 1½" i/d (40 mm) Per Rft. 54.40 202.25 Per Metre 178.45 663.35
c) 2" i/d (50 mm) Per Rft. 58.90 290.75 Per Metre 193.20 953.60
d) 3" i/d (75 mm) Per Rft. 74.45 581.80 Per Metre 244.20 1,908.35
e) 4" i/d (100 mm) Per Rft. 98.05 948.95 Per Metre 321.60 3,112.65
f) 5" i/d (125 mm) Per Rft. 103.95 1,358.90 Per Metre 340.95 4,457.25
g) 6" i/d (150 mm) Per Rft. 124.35 1,963.10 Per Metre 407.85 6,439.00
19 Testing and developing of tubewell of size 6" (150 mm)
i/d and above continuously.

i) upto 1.5 cs. discharge Per 2,881.10 Per 2,881.10


Hour Hour
ii) above 1.5 cs. discharge ditto 3,477.95 ditto 3,477.95
20 Shrouding with graded pea gravel 3/8" to 1/8" (10 to 3 Per Cft. 99.40 181.30 P. Cum 3,510.80 6,403.50 The rate includes wastage, etc.
mm), around tubewell in bore hole.
21 Providing, laying, cutting, jointing, testing and disinfecting cast iron Chap.
pipe line (BS-2035) in trenches, with spigot and socket caulked lead 2
joints, including cost of materials, such as lead, yarn, etc.
complete in all respects:-
a) 3" (75 mm) i/d Per Rft. 1,675.50 Per Metre 5,495.65
b) 4" (100 mm) i/d Per Rft. 2,168.55 Per Metre 7,112.80
c) 5" (125 mm) i/d Per Rft. 2,628.00 Per Metre 8,619.90
d) 6" (150 mm) i/d Per Rft. 3,140.85 Per Metre 10,301.95

chapter-23(Tubewell) Page 137


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
e) 8" (200 mm) i/d Per Rft. 3,567.80 Per Metre 11,702.35
f) 10" (250 mm) i/d Per Rft. 5,045.20 Per Metre 16,548.25
g) 12" (300 mm) i/d Per Rft. 6,855.40 Per Metre 22,485.65
h) 15" (375 mm) i/d Per Rft. 9,530.00 Per Metre 31,258.35
i) 18" (450 mm) i/d Per Rft. 14,807.15 Per Metre 48,567.35
22 Providing, laying, cutting, jointing, testing and disinfecting cast iron ditto
pipe line (BS-2035) in trenches, with flanged and flanged joints,
complete in all respects:-
a) 3" (75 mm) i/d Per Rft. 1,585.10 Per Metre 5,199.05
b) 4" (100 mm) i/d Per Rft. 2,047.15 Per Metre 6,714.60
c) 5" (125 mm) i/d Per Rft. 2,485.90 Per Metre 8,153.75
d) 6" (150 mm) i/d Per Rft. 2,965.15 Per Metre 9,725.70
e) 8" (200 mm) i/d Per Rft. 3,352.45 Per Metre 10,996.10
f) 10" (250 mm) i/d Per Rft. 4,701.25 Per Metre 15,420.05
g) 12" (300 mm) i/d Per Rft. 6,452.85 Per Metre 21,165.30
h) 15" (375 mm) i/d Per Rft. 9,038.70 Per Metre 29,646.80
i) 18" (450 mm) i/d Per Rft. 14,144.45 Per Metre 46,393.75
23 Providing, laying, cutting, jointing, testing and disinfecting cast iron Chap. 2
pipe line (BS-2035) in trenches with Tyton joints, complete in all
respects:-
a) 3" (75 mm) i/d Per Rft. 1,548.00 Per Metre 5,077.35
b) 4" (100 mm) i/d Per Rft. 2,006.55 Per Metre 6,581.45
c) 5" (125 mm) i/d Per Rft. 2,426.05 Per Metre 7,957.35
d) 6" (150 mm) i/d Per Rft. 2,900.05 Per Metre 9,512.15
e) 8" (200 mm) i/d Per Rft. 3,286.15 Per Metre 10,778.60
f) 10" (250 mm) i/d Per Rft. 4,601.25 Per Metre 15,092.10
g) 12" (300 mm) i/d Per Rft. 6,333.95 Per Metre 20,775.30
h) 15" (375 mm) i/d Per Rft. 8,874.40 Per Metre 29,108.00
i) 18" (450 mm) i/d Per Rft. 13,918.70 Per Metre 45,653.30
24 Providing, laying, cutting, jointing, testing and disinfecting Chap. Cost of sockets, tees, elbows,
G.I. pipeline in trenches, with socket joints, using G.I. 2 bends, valves, crosses, unions and
pipes of B.S.S. 1387-1967 complete in all respects, with plugs, etc. is included in the rates.
specials and valves.
1) Light Quality
a) ½" i/d (15 mm) 2mm thick Per Rft. 20.50 192.55 Per Metre 67.25 631.55
b) ¾" i/d (20 mm) 2.35mm thick Per Rft. 22.85 271.70 Per Metre 74.85 891.15
c) 1" i/d (25 mm) 2.65mm thick Per Rft. 26.20 381.45 Per Metre 85.85 1,251.10
d) 1¼" i/d (32 mm) 2.65mm thick Per Rft. 26.30 485.80 Per Metre 86.20 1,593.35
e) 1½" i/d (40 mm) 2.9mm thick Per Rft. 26.40 602.70 Per Metre 86.60 1,976.85
f) 2" i/d (50 mm) 2.9mm thick Per Rft. 28.85 758.35 Per Metre 94.60 2,487.45
g) 2"½ i/d (65 mm) 3.25mm thick Per Rft. 29.45 1,055.70 Per Metre 96.55 3,462.65
h) 3" i/d (75 mm) 3.25mm thick Per Rft. 33.55 1,240.65 Per Metre 110.10 4,069.35
i) 4" i/d (100 mm) 3.65mm thick Per Rft. 36.35 1,788.30 Per Metre 119.20 5,865.60
2) M edium Quality i.  Cost of sockets, tees, elbow,
bends, valves, crosses, unions and
a) ½" i/d (15 mm) 2.65mm thick Per Rft. 20.50 234.75 Per Metre 67.25 770.00 plugs etc is included in the rates
b) ¾" i/d (20 mm) 2.65mm thick Per Rft. 22.85 300.90 Per Metre 74.85 986.95 except for internal G.I piping (1"dia,
c) 1" i/d (25 mm) 3.25mm thick Per Rft. 26.20 452.55 Per Metre 85.85 1,484.40 3/4"dia & 1/2"dia) for Bath rooms/
chapter-23(Tubewell) Page 138
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
d) 1¼" i/d (32 mm) 3.25mm thick Per Rft. 26.30 576.35 Per Metre 86.20 1,890.35 Lavoratary.
e) 1½" i/d (40 mm) 3.25mm thick Per Rft. 26.60 659.90 Per Metre 87.25 2,164.50
f) 2" i/d (50 mm) 3.65mm thick Per Rft. 28.85 919.50 Per Metre 94.60 3,016.00 ii.  For internal G.I piping (1"dia, 3/4"dia &
g) 2"½ i/d (65 mm) 3.65mm thick Per Rft. 29.45 1,168.55 Per Metre 96.55 3,832.80 Bath room(s)/ Lavoratary of rate
h) 3" i/d (75 mm) 4.05mm thick Per Rft. 33.55 1,504.85 Per Metre 110.10 4,935.85 (composite) shall be reduced by 8%
i) 4" i/d (100 mm) 4.5mm thick Per Rft. 36.35 2,111.00 Per Metre 119.20 6,924.15 and specials mentioned above may
j) 5" i/d (150 mm) 4.85mm thick Per Rft. 41.80 2,905.65 Per Metre 137.10 9,530.60 be paid at the rates placed on
k) 6" i/d (200 mm) 4.85mm thick Per Rft. 42.35 3,313.00 Per Metre 138.90 10,866.70 website as per actual quantity used.
3) Heavy Quality

a) ½" i/d (15 mm) 3.25mm thick Per Rft. 20.50 280.85 Per Metre 67.35 921.25
b) ¾" i/d (20 mm) 3.25mm thick Per Rft. 22.85 357.75 Per Metre 74.85 1,173.45
c) 1" i/d (25 mm) 4.05mm thick Per Rft. 26.20 550.95 Per Metre 85.85 1,807.10
d) 1¼" i/d (32 mm) 4.05mm thick Per Rft. 26.30 708.35 Per Metre 86.20 2,323.40
e) 1½" i/d (40 mm) 4.05mm thick Per Rft. 26.60 814.45 Per Metre 87.25 2,671.35
f) 2" i/d (50 mm) 4.5mm thick Per Rft. 28.85 1,115.00 Per Metre 94.60 3,657.20
g) 2"½ i/d (65 mm) 4.5mm thick Per Rft. 29.45 1,423.40 Per Metre 96.55 4,668.75
h) 3" i/d (75 mm) 4.85mm thick Per Rft. 33.55 1,854.65 Per Metre 110.10 6,083.35
i) 4" i/d (100 mm) 5.4mm thick Per Rft. 36.35 2,582.90 Per Metre 119.20 8,471.90
j) 5" i/d (125 mm) 5.4mm thick Per Rft. 41.80 3,182.30 Per Metre 137.10 10,437.95
k) 6" i/d (150 mm) 5.4mm thick Per Rft. 42.35 3,835.05 Per Metre 138.90 12,579.05
25 Providing, laying, cutting, jointing, testing and disinfecting
Asbestos Cement / Fibre Cement pipe line in trenches, with PS 428 & Providing and installing specials
comet joint and rubber ring, complete in all respects:- ISO 160 and valves is not included in the
rate, which is payable separately.
1) B Class Working Pressure
a) 3" i/d (75 mm) Per Rft. 38.60 275.10 Per Metre 126.65 902.30
b) 4" i/d (100 mm) Per Rft. 41.00 353.40 Per Metre 134.40 1,159.20
c) 6" i/d (150 mm) Per Rft. 56.40 556.25 Per Metre 185.00 1,824.55
d) 8" i/d (200 mm) Per Rft. 77.80 921.95 Per Metre 255.25 3,024.00
e) 10" i/d (250 mm) Per Rft. 101.50 1,253.10 Per Metre 332.85 4,110.25
f) 12" i/d (300 mm) Per Rft. 129.25 1,653.30 Per Metre 423.90 5,422.80
g) 14" i/d (350 mm) Per Rft. 149.70 2,359.65 Per Metre 491.10 7,739.70
h) 16" i/d (400 mm) Per Rft. 169.20 2,983.00 Per Metre 554.90 9,784.20
i) 18" i/d (450 mm) Per Rft. 199.65 3,711.80 Per Metre 654.85 12,174.75
j) 20" i/d (500 mm) Per Rft. 234.90 4,559.95 Per Metre 770.45 14,956.70
k) 24" i/d (600 mm) Per Rft. 281.55 6,265.45 Per Metre 923.45 20,550.75
l) 28" i/d (700 mm) Per Rft. 298.45 9,959.60 Per Metre 978.90 32,667.50
m) 32" i/d (800 mm) Per Rft. 323.30 11,385.05 Per Metre 1,060.35 37,342.90
n) 40" i/d 1000 mm) Per Rft. 354.80 17,491.60 Per Metre 1,163.75 57,372.50
2) C Class Working Pressure PS 428 &
a) 3" i/d (75 mm) Per Rft. 38.60 275.10 Per Metre 126.65 902.30 ISO 160
b) 4" i/d (100 mm) Per Rft. 41.00 385.25 Per Metre 134.40 1,263.55
c) 6" i/d (150 mm) Per Rft. 56.40 657.85 Per Metre 185.00 2,157.75
d) 8" i/d (200 mm) Per Rft. 77.80 1,033.35 Per Metre 255.25 3,389.35
e) 10" i/d (250 mm) Per Rft. 101.50 1,437.95 Per Metre 332.85 4,716.45
f) 12" i/d (300 mm) Per Rft. 129.25 1,994.80 Per Metre 423.90 6,542.90
g) 14" i/d (350 mm) Per Rft. 149.70 3,395.15 Per Metre 491.10 11,136.15
h) 16" i/d (400 mm) Per Rft. 169.20 4,325.70 Per Metre 554.90 14,188.35
i) 18" i/d (450 mm) Per Rft. 199.65 5,301.80 Per Metre 654.85 17,389.85

chapter-23(Tubewell) Page 139


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
j) 20" i/d (500 mm) Per Rft. 234.90 6,309.05 Per Metre 770.45 20,693.70
k) 24" i/d (600 mm) Per Rft. 285.50 8,856.95 Per Metre 936.40 29,050.80
3) D Class Working Pressure PS 428 &
a) 3" i/d (75 mm) Per Rft. 38.60 275.10 Per Metre 126.65 902.30 ISO 160
b) 4" i/d (100 mm) Per Rft. 41.00 385.25 Per Metre 134.40 1,263.55
c) 6" i/d (150 mm) Per Rft. 56.40 657.85 Per Metre 185.00 2,157.75
d) 8" i/d (200 mm) Per Rft. 77.80 1,033.35 Per Metre 255.25 3,389.35
e) 10" i/d (250 mm) Per Rft. 101.50 1,437.95 Per Metre 332.85 4,716.45
f) 12" i/d (300 mm) Per Rft. 129.25 1,994.80 Per Metre 423.90 6,542.90
g) 14" i/d (350 mm) Per Rft. 149.70 3,395.15 Per Metre 491.10 11,136.15
h) 16" i/d (400 mm) Per Rft. 169.20 4,325.70 Per Metre 554.90 14,188.35
i) 18" i/d (450 mm) Per Rft. 199.65 5,301.80 Per Metre 654.85 17,389.85
j) 20" i/d (500 mm) Per Rft. 234.90 6,309.05 Per Metre 770.45 20,693.70
26 Providing, laying, cutting, jointing, testing and disinfecting PS 3051 Providing and installing specials
PVC/ uPVC pipe line with `B' Class working pressure BS 3505 and valves is not included in the
pipe, in trenches, complete in all respects:- rate, which is payable separately.
a) 3" i/d (75 mm) Per Rft. 10.75 344.05 Per Metre 35.30 1,128.55
b) 4" i/d (100 mm) Per Rft. 14.00 515.20 Per Metre 45.90 1,689.90
c) 5" i/d (125 mm) Per Rft. 16.95 717.85 Per Metre 55.65 2,354.50
d) 6" i/d (150 mm) Per Rft. 17.45 983.05 Per Metre 57.20 3,224.45
e) 8" i/d (200 mm) Per Rft. 24.80 1,516.50 Per Metre 81.35 4,974.10
f) 10" i/d (250 mm) Per Rft. 33.65 2,394.10 Per Metre 110.30 7,852.70
h) 12" i/d (300 mm) Per Rft. 41.85 3,345.65 Per Metre 137.20 10,973.70
g) 14" i/d (350 mm) Per Rft. 54.75 4,024.30 Per Metre 179.65 13,199.75
27 Providing, laying, cutting, jointing, testing and disinfecting Chap Providing and installing specials
pipe line in trenches with PVC/ uPVC pipes of B.S.S. with `D' 2 and valves is not included in the
Class working pressure complete in all respects:- rate, which is payable separately.
a) 2" i/d (50 mm) Per Rft. 9.40 245.90 Per Metre 30.90 806.55
b) 3" i/d (75 mm) Per Rft. 11.55 529.05 Per Metre 37.90 1,735.30
c) 4" i/d (100 mm) Per Rft. 14.85 882.80 Per Metre 48.75 2,895.60
d) 5" i/d (125 mm) Per Rft. 18.15 1,298.25 Per Metre 59.60 4,258.20
e) 6" i/d (150 mm) Per Rft. 18.85 1,894.40 Per Metre 61.80 6,213.55
28 Providing and fixing cast iron special of B.S.S. Class `B' 9.1 i) Labour rates include the cost of
(such as bend, tee cross collar, reducer, tail piece, jointing material & labour.
flanged spigot, cap, flanged socket, taper, angle branch,
plug etc.) for cast iron pipe line , complete:- ii) The internal dia of the pipe, from
which the branch is taken out will
a) C.I.S.S. Specials, with spigot. and be considered the internal dia for
socket joint:- the purpose of payments of
i) 3" to 6" (75 to 150 mm) i/d Per Kg. 39.20 483.20 Per Kg 39.20 483.20 specials.
ii) 8" to 12" (200 to 300 mm) i/d Per Kg. 34.55 478.55 Per Kg 34.55 478.55
iii) 15" to 18" (375 to 450 mm) i/d Per Kg. 31.40 475.40 Per Kg 31.40 475.40
b) C.I. flanged specials, with flanged and
flanged joints:-
i) 3" to 6" (75 to 150 mm) i/d Per Kg 30.00 474.00 Per Kg 30.00 474.00
ii) 8" to 12" (200 to 300 mm) i/d Per Kg 22.95 466.95 Per Kg 22.95 466.95
iii) 15" to 18" (375 to 450 mm) i/d Per Kg 23.55 467.55 Per Kg 23.55 467.55

chapter-23(Tubewell) Page 140


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
c) C.I. Specials, with tyton joints:-
i) 3" to 6" (75 to 150 mm) i/d Per Kg 28.25 472.25 Per Kg 28.25 472.25
ii) 8" to 12" (200 to 300 mm) i/d Per Kg 23.40 467.40 Per Kg 23.40 467.40
iii) 15" to 18" (375 to 450 mm) i/d Per Kg 20.05 464.05 Per Kg 20.05 464.05
29 Providing and fixing cast iron specials of B.S.S. Class 'B' 9.1 1) Labour rates include the cost of
(such as bend, tee, cross collar, reducer, tail piece, jointing material and labour.
flanged socket, flanged spigot, cap, taper, angle branch,
plug, etc) for Asbestos cement pipe line, with comet joint 2) The internal dia of the pipe, from
and rubber ring, complete. which the branch is taken out, will
i) 3" to 6" (75 to 150 mm) i/d Per Kg 23.20 467.20 Per Kg 23.20 467.20 be considered the internal dia for
ii) 8" to 18" (200 to 450 mm) i/d Per Kg 18.85 462.85 Per Kg 18.85 462.85 the purpose of payment.
iii) 20" to 24" (500 to 600 mm) i/d Per Kg 16.25 475.85 Per Kg 16.25 475.85
30 Providing and fixing sluice valve of B.S.S. quality and 9.1 Labour rates include cost of jointing
weight, Class `B', for cast iron pipe line, and Asbestos material and labour.
cement pipe line (including cost of jointing material):-
a) 3" i/d (75 mm) Each 2,490.85 19,137.25 Each 2,490.85 19,137.25
b) 4" i/d (100 mm) Each 2,710.60 22,906.60 Each 2,710.60 22,906.60
c) 5" i/d (125 mm) Each 4,879.10 29,359.10 Each 4,879.10 29,359.10
d) 6" i/d (150 mm) Each 5,201.45 38,861.45 Each 5,201.45 38,861.45
e) 8" i/d (200 mm) Each 6,073.25 64,825.25 Each 6,073.25 64,825.25
f) 10" i/d (250 mm) Each 9,857.25 83,297.25 Each 9,857.25 83,297.25
g) 12" i/d (300 mm) Each 11,076.90 102,876.90 Each 11,076.90 102,876.90
h) 16" i/d (400 mm) Each 14,691.60 155,451.60 Each 14,691.60 155,451.60
i) 18" i/d (450 mm) Each 16,909.20 243,349.20 Each 16,909.20 243,349.20
31 Providing and fixing, sluice valve of B.S.S. quality and Labour rates include cost of jointing
weight, for Asbestos cement pipe line, with comet joint 9.1 material and labour.
and rubber ring, complete (including cost of jointing
materials):-
a) 3" i/d (75 mm) Each 1,125.60 11,652.00 Each 1,125.60 11,652.00
b) 4" i/d (100 mm) Each 1,356.65 13,351.85 Each 1,356.65 13,351.85
c) 6" i/d (150 mm) Each 1,625.85 21,209.85 Each 1,625.85 21,209.85
d) 8" i/d (200 mm) Each 2,520.00 38,750.40 Each 2,520.00 38,750.40
e) 10" i/d (250 mm) Each 3,232.25 51,580.25 Each 3,232.25 51,580.25
f) 12" i/d (300 mm) Each 3,946.00 63,677.20 Each 3,946.00 63,677.20
g) 16" i/d (400 mm) Each 4,571.70 121,586.10 Each 4,571.70 121,586.10
h) 18" i/d (450 mm) Each 5,488.35 200,104.35 Each 5,488.35 200,104.35

32 Supply, installation, testing, and commissioning of Garden/fire Hydrants Each 4,323.00 68,766.60 Each 4,323.00 68,766.60 Labour rate includes cost of jointing
made by Haseen Habib / Teepu Engineering or approved equvilent material.
manufacturer, according to B.S.S. 750 standard double delivery type having
4" dia barrel with 2 Nos. 2-1/2" valve including the cost of jointing material
with all fittings and accessories complete in all respect as approved by the
Engineer Incharge.
33 Providing and fixing, air valve 2½ (65mm) dia of B.S.S. 9.1
quality and weight (complete with jointing material).
a) single Each 319.80 6,439.80 Each 319.80 6,439.80
b) double Each 319.80 14,395.80 Each 319.80 14,395.80

chapter-23(Tubewell) Page 141


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
34 Providing and fitting C.I. flanges on pipes, including
turning, threading, facing and fitting, etc. complete in all 9.1
respects:-
a) 3" to 6" (75 to 150 mm) i/d Per Kg 103.05 249.35 Per Kg 103.05 249.35
b) 8" to 12" (200 to 300 mm) i/d Per Kg 65.20 211.55 Per Kg 65.20 211.55
c) 15" to 18" (375 to 450 mm) i/d Per Kg 55.00 201.30 Per Kg 55.00 201.30
35 Cutting C.I. pipe, and welding spigot or socket, flanged or
tyton end, after finishing ends of pipes:
Per Inch Per cm i/d
a) 3" to 6" (75 to 150 mm) i/d i/d of pipe 162.70 of pipe 65.10
b) 8" to 12" (200 to 300 mm) i/d ditto 206.95 ditto 82.80
c) 15" to 18" (375 to 450 mm) i/d ditto 189.35 ditto 75.75
36 Providing, laying, cutting, jointing, testing and disinfecting Cost of sockets, tees, elbows,
G.I. pipe line in trenches, with flanged joints, using G.I. bends, valves, crosses, unions and
pipe of B.S.S. 1387-1967 complete in all respects, plugs, etc. is included in the rates.
including specials and valves:-
i) Heavy Quality
a) 1½" i/d (40 mm) Per Rft. 44.80 832.65 Per Metre 147.00 2,731.10
b) 2" i/d (50 mm) Per Rft. 44.80 1,131.00 Per Metre 147.00 3,709.60
c) 2½" i/d (65 mm) Per Rft. 46.10 1,440.05 Per Metre 151.15 4,723.35
d) 3" i/d (75 mm) Per Rft. 51.10 1,872.25 Per Metre 167.65 6,140.90
e) 4" i/d (100 mm) Per Rft. 65.75 2,612.30 Per Metre 215.60 8,568.35
f) 6" i/d (150 mm) Per Rft. 73.00 3,213.45 Per Metre 239.35 10,540.20
g) 8" i/d (200 mm) Per Rft. 73.00 3,865.75 Per Metre 239.50 12,679.60
ii) M edium Quality
a) 1½" i/d (40 mm) Per Rft. 40.95 747.10 Per Metre 134.35 2,450.55
b) 2" i/d (50 mm) Per Rft. 40.95 1,034.10 Per Metre 134.35 3,391.85
c) 2½" i/d (65 mm) Per Rft. 42.25 1,312.35 Per Metre 138.50 4,304.55
d) 3" i/d (75 mm) Per Rft. 42.45 1,682.95 Per Metre 139.20 5,520.10
e) 4" i/d (100 mm) Per Rft. 51.25 2,364.60 Per Metre 168.10 7,755.95
f) 6" i/d (150 mm) Per Rft. 59.95 3,253.30 Per Metre 196.65 10,670.80
g) 8" i/d (200 mm) Per Rft. 59.95 3,706.90 Per Metre 196.70 12,158.65
37 Providing and installing P.V.C. bends, of B.S.S.
i) Class `B' working pressure:-
a) 3" i/d (75 mm) Each 248.50 523.90 Each 248.50 523.90
b) 4" i/d (100 mm) Each 277.05 852.35 Each 277.05 852.35
c) 5" i/d (125 mm) Each 346.35 1,570.35 Each 346.35 1,570.35
d) 6" i/d (150 mm) Each 355.50 2,007.90 Each 355.50 2,007.90
ii) Class `D' working pressure:-
a) 1¼" i/d (30 mm) Each 173.50 240.80 Each 173.50 240.80
b) 1½" i/d (40 mm) Each 183.15 262.70 Each 183.15 262.70
c) 2" i/d (50 mm) Each 194.15 353.25 Each 194.15 353.25
d) 3" i/d (75 mm) Each 248.50 689.15 Each 248.50 689.15
e) 4" i/d (100 mm) Each 277.05 1,256.25 Each 277.05 1,256.25
f) 5" i/d (125 mm) Each 346.35 2,427.15 Each 346.35 2,427.15
g) 6" i/d (150 mm) Each 355.50 3,415.50 Each 355.50 3,415.50

chapter-23(Tubewell) Page 142


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
38 Providing and installing P.V.C. tees, of B.S.S.
i) Class `B' working pressure:-
a) 3" i/d (80 mm) Each 372.75 1,290.75 Each 372.75 1,290.75
b) 4" i/d (100 mm) Each 419.85 2,378.25 Each 419.85 2,378.25
c) 5" i/d (125 mm) Each 513.25 4,430.05 Each 513.25 4,430.05
d) 6" i/d (150 mm) Each 533.25 4,572.45 Each 533.25 4,572.45
ii) Class `D' working pressure:-
a) 1¼" i/d (30 mm) Each 263.70 569.70 Each 263.70 569.70
b) 1½" i/d (40 mm) Each 275.40 605.90 Each 275.40 605.90
c) 2" i/d (50 mm) Each 290.25 706.40 Each 290.25 706.40
d) 3" i/d (75 mm) Each 372.75 1,290.75 Each 372.75 1,290.75
e) 4" i/d (100 mm) Each 419.85 2,378.25 Each 419.85 2,378.25
f) 5" i/d (125 mm) Each 513.25 4,430.05 Each 513.25 4,430.05
g) 6" i/d (150 mm) Each 533.25 4,633.65 Each 533.25 4,633.65
39 Providing and installing P.V.C. sockets, B.S.S.
i) Class `B' working pressure:-
a) 3" i/d (75 mm) Each 165.05 348.65 Each 165.05 348.65
b) 4" i/d (100 mm) Each 193.60 524.10 Each 193.60 524.10
c) 5" i/d (125 mm) Each 242.00 670.40 Each 242.00 670.40
d) 6" i/d (150 mm) Each 251.20 832.60 Each 251.20 832.60
e) 8" i/d (200 mm) Each 359.40 1,705.80 Each 359.40 1,705.80
f) 10" i/d (250 mm) Each 414.50 4,086.50 Each 414.50 4,086.50
g) 12" i/d (300 mm) Each 481.65 7,458.45 Each 481.65 7,458.45
h) 14" i/d (350 mm) Each 534.10 9,714.10 Each 534.10 9,714.10
ii) Class `D' working pressure:-
a) 1¼" i/d (30 mm) Each 103.95 146.80 Each 103.95 146.80
b) 1½" i/d (40 mm) Each 113.60 178.45 Each 113.60 178.45
c) 2" i/d (50 mm) Each 124.60 226.20 Each 124.60 226.20
d) 3" i/d (75 mm) Each 165.05 495.55 Each 165.05 495.55
e) 4" i/d (100 mm) Each 193.60 768.90 Each 193.60 768.90
f) 5" i/d (125 mm) Each 242.00 1,331.35 Each 242.00 1,331.35
g) 6" i/d (150 mm) Each 251.20 2,087.20 Each 251.20 2,087.20
40 Providing and installing P.V.C. Tapered core, B.S.S.
i) Class `B' working pressure:-
a) 3" i/d (75 mm) Each 248.50 340.30 Each 248.50 340.30
b) 4" i/d (100 mm) Each 277.05 393.35 Each 277.05 393.35
c) 5" i/d (125 mm) Each 346.35 481.00 Each 346.35 481.00
d) 6" i/d (150 mm) Each 355.50 526.85 Each 355.50 526.85
e) 8" i/d (200 mm) Each 498.50 786.15 Each 498.50 786.15
f) 10" i/d (250 mm) Each 553.55 920.75 Each 553.55 920.75
g) 12" i/d (300 mm) Each 648.55 1,076.95 Each 648.55 1,076.95
h) 14" i/d (350 mm) Each 701.00 1,251.80 Each 701.00 1,251.80
ii) Class `D' working pressure:-
a) 1¼" i/d (30 mm) Each 173.50 216.35 Each 173.50 216.35
b) 1½" i/d (40 mm) Each 183.15 244.35 Each 183.15 244.35
c) 2" i/d (50 mm) Each 194.15 273.70 Each 194.15 273.70

chapter-23(Tubewell) Page 143


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
41 Making connection for new watersupply lines with the The rate includes the component of
running main, including excavation of trench and refilling, bailing out water from the trench
complete, but excluding cost of pipe and specials, etc. and cutting of existing pipe line.
Diameter of running main:
Per Per
i) upto 6" i/d (150 mm) Connection 4,372.50 Connection 4,372.50
ii) upto 8" i/d (200 mm) ditto 5,501.10 ditto 5,501.10
iii) upto 10" i/d (250 mm) ction 7,804.50 ction 7,804.50
iv) upto 12" i/d (300 mm) ditto 10,626.00 ditto 10,626.00
v) upto 16" i/d (400 mm) ditto 13,070.50 ditto 13,070.50
vi) upto 20" i/d (500 mm) ditto 16,879.50 ditto 16,879.50
vii) upto 24" i/d (600 mm) ditto 20,311.50 ditto 20,311.50
42 Providing, laying, cutting, jointing, testing and disinfecting High Density
Polyethylene Pipe (HDPE-100) working presure pipe, Beta/ Dadex/
Popular/ IIL or approved equivalent manufacturer, including the cost of
specials, in trenches, as approved & directed by the engineer incharge,
complete in all respects.
a) PN-6 (SDR-26)
1 90 mm Per Rft 9.75 247.80 Per Metre 26.60 813.00
2 110 mm Per Rft 11.65 361.30 Per Metre 31.80 1,185.35
3 125 mm Per Rft 14.35 464.70 Per Metre 39.20 1,524.70
4 160 mm Per Rft 15.90 762.60 Per Metre 43.50 2,502.10
5 180 mm Per Rft 18.45 948.30 Per Metre 50.40 3,111.35
6 200 mm Per Rft 20.70 1,174.20 Per Metre 56.60 3,852.50
7 225 mm Per Rft 24.85 1,478.40 Per Metre 67.95 4,850.65
8 250 mm Per Rft 31.10 1,832.50 Per Metre 85.00 6,012.35
9 315 mm Per Rft 53.45 2,913.35 Per Metre 146.05 9,558.65
10 355 mm Per Rft 58.30 3,675.45 Per Metre 159.40 12,059.10
11 400 mm Per Rft 64.85 4,655.45 Per Metre 177.25 15,274.55
12 450 mm Per Rft 68.50 5,886.70 Per Metre 187.35 19,314.20
13 500 mm Per Rft 75.35 7,264.35 Per Metre 206.00 23,834.30
14 560 mm Per Rft 90.65 9,129.55 Per Metre 247.80 29,954.15
15 630 mm Per Rft 94.90 11,527.65 Per Metre 259.55 37,822.30
16 710 mm Per Rft 117.85 14,708.45 Per Metre 322.25 48,258.45
17 800 mm Per Rft 122.90 18,566.85 Per Metre 336.10 60,917.85
18 900 mm Per Rft 180.25 23,704.70 Per Metre 492.85 77,775.05
19 1000 mm Per Rft 187.85 29,051.00 Per Metre 513.55 95,316.40
b) PN-8 (SDR-21)
1 25 mm Per Rft 6.25 36.85 Per Metre 17.15 120.85
2 32 mm Per Rft 7.20 51.00 Per Metre 19.65 167.30
3 40 mm Per Rft 7.70 67.00 Per Metre 21.05 219.90
4 50 mm Per Rft 7.95 98.20 Per Metre 21.70 322.15
5 63 mm Per Rft 8.50 148.95 Per Metre 23.20 488.75
6 75 mm Per Rft 9.15 210.65 Per Metre 25.00 691.15
7 90 mm Per Rft 10.45 299.75 Per Metre 28.55 983.40
8 110 mm Per Rft 14.00 449.65 Per Metre 38.25 1,475.25
9 125 mm Per Rft 15.20 572.05 Per Metre 41.60 1,876.90
10 160 mm Per Rft 16.60 932.60 Per Metre 45.40 3,059.90
11 180 mm Per Rft 21.20 1,172.25 Per Metre 58.00 3,846.10

chapter-23(Tubewell) Page 144


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
12 200 mm Per Rft 23.30 1,450.15 Per Metre 63.65 4,757.90
13 225 mm Per Rft 26.05 1,830.65 Per Metre 71.15 6,006.30
14 250 mm Per Rft 33.80 2,241.90 Per Metre 92.45 7,355.65
15 315 mm Per Rft 55.65 3,554.85 Per Metre 152.10 11,663.40
16 355 mm Per Rft 60.40 4,505.15 Per Metre 165.10 14,781.40
17 400 mm Per Rft 66.65 5,736.65 Per Metre 182.25 18,821.90
18 450 mm Per Rft 72.80 7,252.60 Per Metre 199.05 23,795.75
19 500 mm Per Rft 79.65 8,949.90 Per Metre 217.75 29,364.65
20 560 mm Per Rft 94.90 11,224.65 Per Metre 259.55 36,828.05
21 630 mm Per Rft 100.00 14,139.30 Per Metre 273.40 46,391.00
22 710 mm Per Rft 122.90 18,062.15 Per Metre 336.10 59,261.95
23 800 mm Per Rft 129.00 22,832.05 Per Metre 352.70 74,911.95
24 900 mm Per Rft 186.35 29,017.35 Per Metre 509.45 95,205.90
25 1000 mm Per Rft 195.40 35,793.80 Per Metre 534.30 117,439.45
c) PN-10 (SDR-17)
1 25 mm Per Rft 7.00 40.25 Per Metre 19.15 132.05
2 32 mm Per Rft 7.70 54.25 Per Metre 21.05 178.05
3 40 mm Per Rft 8.35 73.25 Per Metre 22.80 240.30
4 50 mm Per Rft 8.65 109.15 Per Metre 23.60 358.10
5 63 mm Per Rft 9.35 169.15 Per Metre 25.50 554.95
6 75 mm Per Rft 10.20 237.20 Per Metre 27.85 778.20
7 90 mm Per Rft 11.95 338.95 Per Metre 32.65 1,112.15
8 110 mm Per Rft 15.15 502.80 Per Metre 41.45 1,649.65
9 125 mm Per Rft 16.15 638.45 Per Metre 44.20 2,094.70
10 160 mm Per Rft 18.35 1,038.80 Per Metre 50.15 3,408.35
11 180 mm Per Rft 22.00 1,313.35 Per Metre 60.15 4,309.15
12 200 mm Per Rft 26.40 1,619.20 Per Metre 72.15 5,312.60
13 225 mm Per Rft 28.45 2,050.80 Per Metre 77.80 6,728.60
14 250 mm Per Rft 35.40 2,513.85 Per Metre 96.80 8,247.95
15 315 mm Per Rft 58.80 3,998.10 Per Metre 160.80 13,117.85
16 355 mm Per Rft 64.05 5,079.85 Per Metre 175.15 16,667.00
17 400 mm Per Rft 70.95 6,411.70 Per Metre 194.00 21,036.85
18 450 mm Per Rft 77.85 8,120.90 Per Metre 212.90 26,644.75
19 500 mm Per Rft 90.80 10,040.85 Per Metre 248.20 32,944.10
20 560 mm Per Rft 106.05 12,598.50 Per Metre 290.00 41,335.60
21 630 mm Per Rft 113.50 15,915.25 Per Metre 310.30 52,217.90
22 710 mm Per Rft 136.45 20,255.90 Per Metre 373.00 66,459.55
23 800 mm Per Rft 145.70 25,621.50 Per Metre 398.40 84,064.15
24 900 mm Per Rft 215.00 32,544.85 Per Metre 587.80 106,779.75
25 1000 mm Per Rft 233.40 40,168.80 Per Metre 638.15 131,793.80
d) PN-12.5 (SDR-13.6)
1 25 mm Per Rft 7.30 42.80 Per Metre 19.90 140.45
2 32 mm Per Rft 8.20 63.75 Per Metre 22.40 209.20
3 40 mm Per Rft 8.50 95.90 Per Metre 23.20 314.75
4 50 mm Per Rft 8.80 142.35 Per Metre 24.05 467.10
5 63 mm Per Rft 9.75 223.05 Per Metre 26.60 731.80
6 75 mm Per Rft 10.45 313.10 Per Metre 28.55 1,027.30
7 90 mm Per Rft 12.30 446.20 Per Metre 33.65 1,464.00
8 110 mm Per Rft 16.10 663.85 Per Metre 44.00 2,178.15
9 125 mm Per Rft 17.25 851.70 Per Metre 47.20 2,794.40

chapter-23(Tubewell) Page 145


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
10 160 mm Per Rft 19.05 1,378.20 Per Metre 52.05 4,521.95
11 180 mm Per Rft 22.85 1,753.75 Per Metre 62.45 5,754.00
12 200 mm Per Rft 27.65 2,150.20 Per Metre 75.65 7,054.85
13 225 mm Per Rft 29.90 2,726.15 Per Metre 81.70 8,944.45
14 250 mm Per Rft 37.25 3,357.80 Per Metre 101.80 11,016.90
15 315 mm Per Rft 62.50 5,319.20 Per Metre 170.85 17,452.30
16 355 mm Per Rft 68.35 6,735.00 Per Metre 186.85 22,097.60
17 400 mm Per Rft 76.00 8,532.70 Per Metre 207.85 27,995.80
18 450 mm Per Rft 83.95 10,805.10 Per Metre 229.55 35,451.55
19 500 mm Per Rft 98.20 13,338.40 Per Metre 268.50 43,763.35
20 560 mm Per Rft 113.50 16,743.25 Per Metre 310.30 54,934.65
21 630 mm Per Rft 122.80 21,135.95 Per Metre 335.70 69,347.10
22 710 mm Per Rft 145.70 26,920.50 Per Metre 398.40 88,326.10
23 800 mm Per Rft 173.60 34,128.65 Per Metre 474.60 111,976.15
24 900 mm Per Rft 230.90 43,321.20 Per Metre 631.35 142,136.85
25 1000 mm Per Rft 256.20 52,713.65 Per Metre 700.50 172,953.40
e) PN-16 (SDR-11)
1 25 mm Per Rft 7.30 48.10 Per Metre 19.90 157.85
2 32 mm Per Rft 8.50 75.65 Per Metre 23.20 248.30
3 40 mm Per Rft 9.80 114.05 Per Metre 26.75 374.20
4 50 mm Per Rft 11.00 173.15 Per Metre 30.05 568.15
5 63 mm Per Rft 12.20 269.20 Per Metre 33.35 883.35
6 75 mm Per Rft 13.40 372.80 Per Metre 36.65 1,223.20
7 90 mm Per Rft 14.60 536.05 Per Metre 39.95 1,758.80
8 110 mm Per Rft 16.65 792.00 Per Metre 45.45 2,598.60
9 125 mm Per Rft 17.90 1,024.00 Per Metre 48.90 3,359.80
10 160 mm Per Rft 19.80 1,667.40 Per Metre 54.10 5,470.75
11 180 mm Per Rft 23.75 2,106.45 Per Metre 65.00 6,911.25
12 200 mm Per Rft 29.10 2,597.80 Per Metre 79.55 8,523.40
13 225 mm Per Rft 31.50 3,284.60 Per Metre 86.15 10,776.75
14 250 mm Per Rft 39.30 4,040.05 Per Metre 107.45 13,255.40
15 315 mm Per Rft 66.80 6,411.80 Per Metre 182.60 21,037.20
16 355 mm Per Rft 73.40 8,129.90 Per Metre 200.70 26,674.15
17 400 mm Per Rft 82.10 10,312.85 Per Metre 224.45 33,836.40
18 450 mm Per Rft 91.40 13,055.90 Per Metre 249.85 42,836.35
19 500 mm Per Rft 107.50 16,115.80 Per Metre 293.90 52,876.00
20 560 mm Per Rft 122.80 20,206.55 Per Metre 335.70 66,297.65
21 630 mm Per Rft 134.70 25,560.80 Per Metre 368.35 83,865.00
22 710 mm Per Rft 157.65 32,546.65 Per Metre 431.05 106,785.50
f) PN-20 (SDR-9)
i) 90 mm Per Rft 16.60 645.05 Per Metre 45.40 2,116.50
ii) 110 mm Per Rft 17.70 951.15 Per Metre 48.45 3,120.70
iii) 125 mm Per Rft 18.40 1,225.70 Per Metre 50.30 4,021.55
iv) 160 mm Per Rft 19.90 1,989.05 Per Metre 54.45 6,526.05
v) 180 mm Per Rft 25.95 2,516.80 Per Metre 70.95 8,257.55
vi) 200 mm Per Rft 30.75 3,111.15 Per Metre 84.00 10,207.70
vii) 225 mm Per Rft 33.35 3,934.20 Per Metre 91.25 12,908.15
viii) 250 mm Per Rft 44.50 4,838.10 Per Metre 121.65 15,873.75
ix) 315 mm Per Rft 77.90 7,696.20 Per Metre 213.05 25,251.15
x) 355 mm Per Rft 86.90 9,764.55 Per Metre 237.65 32,037.45

chapter-23(Tubewell) Page 146


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
xi) 400 mm Per Rft 89.50 12,369.60 Per Metre 244.75 40,584.60
xii) 450 mm Per Rft 100.65 15,658.50 Per Metre 275.25 51,375.50
xiii) 500 mm Per Rft 119.45 19,301.45 Per Metre 326.55 63,328.00
xiv) 560 mm Per Rft 134.70 24,230.85 Per Metre 368.35 79,501.45
xv) 630 mm Per Rft 150.65 40,474.45 Per Metre 411.90 132,796.60
xvi) 710 mm Per Rft 173.60 51,112.80 Per Metre 474.60 167,701.10
43 Providing & mixing bentonite clay / powder have swelling factor of 1200% Per 5.55 12.20 Per Kg. 33.85 74.60
for lining /seal and plug earthen bore holes / ponds in the specified ratio Pound
conforming to IS:6186 for stabilization of soil as specified by the designer
etc complete in all respect.
44 P/F Ejector Pump of specified Suction and Delivery heads,coupled with
Single Phase Seimen Electric Motor of required rating for water supply i/c
the cost of connection charges, necessary wire, PVC pipes etc complete in
all respect as approved and directed by the Engineer Incharge.

i) G-II (1-1/4"x3/4") with 1 HP Electric Motor, 21-Mtr Suction and 21 Each 2,161.50 16,865.10 Each 2,161.50 16,865.10
M delivery head
ii) G-IV (2-1/2"x2") with 2.5 HP Electric Motor, 38-Mtr Suction and 38 Each 2,161.50 22,865.10 Each 2,161.50 22,865.10
M delivery head
45 Providing and fixing CP heavy duty brass Ball valve with CP handle of
specified diameter made of Faisal/Sonex / Master best quality or
equivalent complete in all respect as approved and directed by the Engineer
Incharge.
i) 1/2" dia Each 488.40 1,184.40 Each 488.40 1,184.40
ii) 3/4" dia Each 488.40 1,448.40 Each 488.40 1,448.40
iii) 1" dia Each 488.40 1,868.40 Each 488.40 1,868.40
iv) 1-1/4" dia Each 488.40 1,988.40 Each 488.40 1,988.40
v) 1-1/2" dia Each 488.40 2,228.40 Each 488.40 2,228.40
vi) 2" dia Each 488.40 2,408.40 Each 488.40 2,408.40
vii) 2-1/2" dia Each 488.40 2,768.40 Each 488.40 2,768.40
46 Providing, laying, testing and commissioning of POLYPROPYLENE
RANDOM COPOLYMER (PPRC) water supply pipe (Dadex /Popular/
Beta or approved equivalent manufacturer, with specified pressure rating
PN (PRESSURE NOMINAL)and conforming to DIN 8077-8078 code i/c
cost of solvent, specials,making jharries complete in all respect as approved
and directed by Engineer Incharge.(Internal/External Diameters mentioned).

a) PN-16 pipe
(i) 20 mm Per Rft 9.65 62.30 Per Metre 31.65 204.30
(ii) 25 mm Per Rft 9.65 86.40 Per Metre 31.65 283.45
(iii) 32 mm Per Rft 11.20 131.55 Per Metre 36.65 431.50
(iv) 40 mm Per Rft 11.25 195.30 Per Metre 36.85 640.65
(v) 50 mm Per Rft 11.30 307.15 Per Metre 37.00 1,007.40
(vi) 63 mm Per Rft 12.25 475.75 Per Metre 40.20 1,560.50
(vii) 75 mm Per Rft 12.45 759.15 Per Metre 40.85 2,490.00
(viii) 90 mm Per Rft 14.05 1,133.35 Per Metre 46.10 3,717.45
(ix) 110 mm Per Rft 15.50 1,682.60 Per Metre 50.85 5,518.90

chapter-23(Tubewell) Page 147


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
b) PN-20 pipe
(i) 20 mm Per Rft 9.65 74.65 Per Metre 31.65 244.90
(ii) 25 mm Per Rft 9.65 100.35 Per Metre 31.65 329.20
(iii) 32 mm Per Rft 11.20 160.50 Per Metre 36.65 526.50
(iv) 40 mm Per Rft 11.25 245.90 Per Metre 36.85 806.55
(v) 50 mm Per Rft 11.30 354.10 Per Metre 37.00 1,161.45
(vi) 63 mm Per Rft 12.25 554.65 Per Metre 40.20 1,819.30
(vii) 75 mm Per Rft 12.45 846.00 Per Metre 40.85 2,774.80
(viii) 90 mm Per Rft 14.05 1,219.75 Per Metre 46.10 4,000.70
(ix) 110 mm Per Rft 15.50 1,944.55 Per Metre 50.85 6,378.10
c) PN-25 pipe
(i) 20 mm Per Rft 9.65 99.10 Per Metre 31.65 325.00
(ii) 25 mm Per Rft 9.65 134.20 Per Metre 31.65 440.10
(iii) 32 mm Per Rft 11.20 212.75 Per Metre 36.65 697.75
(iv) 40 mm Per Rft 11.25 326.60 Per Metre 36.85 1,071.25
(v) 50 mm Per Rft 11.30 461.35 Per Metre 37.00 1,513.15
(vi) 63 mm Per Rft 12.25 722.55 Per Metre 40.20 2,369.95
47 Providing, laying, testing and commissioning µ-PVC (Un plasticized
Polyvinyl Chloride) Pressure pipe of nominal diameter, conforming to PS-
3051/BS-3505, Dadex/Popular / Beta or approved equivalent manufacturer,
i/c the cost of solvent and specials complete as approved and directed by the
Engineer Incharge.
a) Class-D
(i) 1/2" Per Rft 10.25 84.70 Per Metre 33.55 277.85
(ii) 3/4" Per Rft 10.25 86.50 Per Metre 33.55 283.70
(iii) 1" Per Rft 10.25 122.75 Per Metre 33.55 402.60
(iv) 1-1/4" Per Rft 10.25 161.95 Per Metre 33.55 531.20
(v) 1-1/2" Per Rft 10.25 183.85 Per Metre 33.55 603.05
(vi) 2" Per Rft 10.25 251.90 Per Metre 33.55 826.25
(vii) 3" Per Rft 10.25 502.65 Per Metre 33.55 1,648.75
(viii) 4" Per Rft 10.25 709.60 Per Metre 33.55 2,327.45
(ix) 6" Per Rft 10.25 1,241.25 Per Metre 33.55 4,071.35
(x) 8" Per Rft 10.25 1,859.45 Per Metre 33.55 6,098.95
(xi) 10" Per Rft 10.25 2,705.15 Per Metre 33.55 8,872.80
(xii) 12" Per Rft 10.25 3,564.35 Per Metre 33.55 11,691.00
b) Class-E
(i) 1/2" Per Rft 10.25 98.10 Per Metre 33.55 321.85
(ii) 3/4" Per Rft 10.25 107.25 Per Metre 33.55 351.80
(iii) 1" Per Rft 10.25 152.70 Per Metre 33.55 500.95
(iv)1-1/4" Per Rft 10.25 205.80 Per Metre 33.55 674.95
(v) 1-1/2" Per Rft 10.25 227.70 Per Metre 33.55 746.80
(vi) 2" Per Rft 10.25 337.75 Per Metre 33.55 1,107.80
(vii) 3" Per Rft 10.25 675.00 Per Metre 33.55 2,214.00
(viii) 4" Per Rft 10.25 956.40 Per Metre 33.55 3,137.00
(ix) 6" Per Rft 10.25 1,801.75 Per Metre 33.55 5,909.80
(x) 8" Per Rft 10.25 2,813.20 Per Metre 33.55 9,227.35
(xi) 10" Per Rft 10.25 4,280.55 Per Metre 33.55 14,040.15
(xii) 12" Per Rft 10.25 5,875.55 Per Metre 33.55 19,271.80

chapter-23(Tubewell) Page 148


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
48 Providing, laying, testing and commissioning of Grade-B,MS Seamless
Schedule pipe of nominal diameter, conforming to ASTM-A106, Lontrin/
Hufaz / Pecific baolai or approved equivalent manufacturer, duly welded
i/c the cost of specials complete as approved and directed by the Engineer
Incharge.
Schedule 40
i) 1/2" Per Rft 20.45 310.65 Per Metre 67.15 1,018.95
ii) 3/4" Per Rft 20.45 376.15 Per Metre 67.15 1,233.85
iii) 1" Per Rft 20.45 553.40 Per Metre 67.15 1,815.20
iv) 1-1/4" Per Rft 20.45 710.00 Per Metre 67.15 2,328.85
v) 1-1/2" Per Rft 30.70 833.15 Per Metre 100.70 2,732.75
vi) 2" Per Rft 30.70 1,086.90 Per Metre 100.70 3,565.00
vii) 2-1/2" Per Rft 30.70 1,760.65 Per Metre 100.70 5,774.95
viii) 3" Per Rft 30.70 2,235.35 Per Metre 100.70 7,331.85
ix) 4" Per Rft 40.95 3,044.35 Per Metre 134.30 9,985.55
x) 5" Per Rft 40.95 3,956.10 Per Metre 134.30 12,975.95
xi) 6" Per Rft 40.95 5,131.25 Per Metre 134.30 16,830.45
xii) 8" Per Rft 51.15 7,525.75 Per Metre 167.85 24,684.55
xiii) 10" Per Rft 51.15 10,827.85 Per Metre 167.85 35,515.35
xiv) 12" Per Rft 51.15 15,012.50 Per Metre 167.85 49,241.05
xv) 14" Per Rft 61.40 17,181.25 Per Metre 201.40 56,354.45
xvi) 16" Per Rft 61.40 21,271.20 Per Metre 201.40 69,769.55
xvii) 18" Per Rft 61.40 26,429.50 Per Metre 201.40 86,688.70
xviii) 20" Per Rft 81.90 30,519.30 Per Metre 268.55 100,103.25
xix) 24" Per Rft 81.90 42,042.55 Per Metre 268.55 137,899.65
xx) 30" Per Rft 81.90 52,531.55 Per Metre 268.55 172,303.40
49 Providing and fixing heavy duty Strainer valve of specified diameter and
material for pressure rating PN-16 made of Crane (USA), Hatersly (UK),
Scon (Pakistan) or approved equivalent manufacturer i/c the cost of all
accessories flanges,nut/bolt and gaskit where required complete in all
respect as approved and directed by the Engineer Incharge.
(a) Brass Threaded Valves
(i) 1/2" dia Each 488.40 2,324.40 Each 488.40 2,324.40
(ii) 3/4" dia Each 488.40 3,117.60 Each 488.40 3,117.60
(iii) 1" dia Each 488.40 4,386.00 Each 488.40 4,386.00
(iv) 1-1/4" dia Each 488.40 7,117.20 Each 488.40 7,117.20
(v) 1-1/2" dia Each 732.60 8,614.20 Each 732.60 8,614.20
(vi) 2" dia Each 732.60 12,678.60 Each 732.60 12,678.60
(b) Flange Ended Ductile I ron Valve
(vii) 2-1/2" dia Each 2,442.00 22,434.00 Each 2,442.00 22,434.00
(viii) 3" dia Each 2,442.00 27,680.00 Each 2,442.00 27,680.00
(ix) 4" dia Each 2,442.00 36,785.30 Each 2,442.00 36,785.30
(x) 5" dia Each 2,442.00 49,450.80 Each 2,442.00 49,450.80
(xi) 6" dia Each 2,442.00 75,696.45 Each 2,442.00 75,696.45
(xii) 8" dia Each 2,442.00 96,469.65 Each 2,442.00 96,469.65
(xiii) 10" dia Each 2,442.00 158,667.25 Each 2,442.00 158,667.25
(xiv) 12" dia Each 2,442.00 220,866.10 Each 2,442.00 220,866.10
(xv) 14" dia Each 2,442.00 346,050.85 Each 2,442.00 346,050.85

chapter-23(Tubewell) Page 149


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
50 Providing and fixing heavy duty Globe valve of specified diameter and
material for pressure rating PN-16 made of Crane (USA), Hatersly (UK),
Scon (Pakistan) or approved equivalent manufacturer, i/c the cost of all
accessories flanges,nut/bolt and gaskit where required complete in all
respect as approved and directed by the Engineer Incharge.
(a) Brass Threaded Valves
(i) 1/2" dia Each 488.40 3,368.40 Each 488.40 3,368.40
(ii) 3/4" dia Each 488.40 4,448.40 Each 488.40 4,448.40
(iii) 1" dia Each 488.40 6,428.40 Each 488.40 6,428.40
(iv) 1-1/4" dia Each 488.40 8,768.40 Each 488.40 8,768.40
(v) 1-1/2" dia Each 732.60 12,972.60 Each 732.60 12,972.60
(vi) 2" dia Each 732.60 19,452.60 Each 732.60 19,452.60
(b) Flange Ended Ductile I ron Valve
(vii) 2-1/2" dia Each 732.60 33,516.60 Each 732.60 33,516.60
(viii) 3" dia Each 976.80 45,460.80 Each 976.80 45,460.80
(ix) 4" dia Each 976.80 56,260.80 Each 976.80 56,260.80
(x) 5" dia Each 976.80 75,160.80 Each 976.80 75,160.80
(xi) 6" dia Each 976.80 102,400.80 Each 976.80 102,400.80
(xii) 8" dia Each 1,221.00 162,945.00 Each 1,221.00 162,945.00
(xiii) 10" dia Each 1,221.00 240,345.00 Each 1,221.00 240,345.00
(xiv) 12" dia Each 1,221.00 297,645.00 Each 1,221.00 297,645.00
(xv) 14" dia Each 1,221.00 502,845.00 Each 1,221.00 502,845.00
(xvi)16" dia Each 1,221.00 640,845.00 Each 1,221.00 640,845.00
(xvii) 18" dia Each 1,221.00 789,645.00 Each 1,221.00 789,645.00
(xviii) 20" dia Each 1,221.00 993,645.00 Each 1,221.00 993,645.00
(xix) 24" dia Each 1,221.00 1,569,645.00 Each 1,221.00 1,569,645.00
(xx) 30" dia Each 1,221.00 2,217,645.00 Each 1,221.00 2,217,645.00
51 Providing and fixing heavy duty Gate valve of specified diameter and
material for pressure rating PN-16 mde of Crane (USA), Hatersly (UK),
Scon (Pakistan) or approved equivalent manufacturer, i/c the cost of all
accessories flanges,nut/bolt and gaskit where required complete in all
respect as approved and directed by the Engineer Incharge.
(a) Brass Threaded Valves
(i) 1/2" dia Each 488.40 3,548.40 Each 488.40 3,548.40
(ii) 3/4" dia Each 488.40 4,628.40 Each 488.40 4,628.40
(iii) 1" dia Each 488.40 6,608.40 Each 488.40 6,608.40
(iv) 1-1/4" dia Each 488.40 9,308.40 Each 488.40 9,308.40
(v) 1-1/2" dia Each 732.60 12,972.60 Each 732.60 12,972.60
(vi) 2" dia Each 732.60 20,412.60 Each 732.60 20,412.60
(b) Flange Ended Ductile I ron Valve
(vii) 2-1/2" dia Each 732.60 37,116.60 Each 732.60 37,116.60
(viii) 3" dia Each 976.80 43,660.80 Each 976.80 43,660.80
(ix) 4" dia Each 976.80 57,160.80 Each 976.80 57,160.80
(x) 5" dia Each 976.80 80,560.80 Each 976.80 80,560.80
(xi) 6" dia Each 976.80 100,600.80 Each 976.80 100,600.80
(xii) 8" dia Each 1,221.00 123,241.00 Each 1,221.00 123,241.00
(xiii) 10" dia Each 1,221.00 177,241.00 Each 1,221.00 177,241.00
(xiv) 12" dia Each 1,221.00 216,991.00 Each 1,221.00 216,991.00
(xv) 14" dia Each 1,221.00 351,241.00 Each 1,221.00 351,241.00
(xvi)16" dia Each 1,221.00 445,741.00 Each 1,221.00 445,741.00

chapter-23(Tubewell) Page 150


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
(xvii) 18" dia Each 1,221.00 583,741.00 Each 1,221.00 583,741.00
(xviii) 20" dia Each 1,221.00 688,241.00 Each 1,221.00 688,241.00
(xix) 24" dia Each 1,221.00 1,053,241.00 Each 1,221.00 1,053,241.00
(xx) 30" dia Each 1,221.00 1,660,741.00 Each 1,221.00 1,660,741.00
52 Providing and fixing heavy duty Balancing valve of specified diameter and
material for pressure rating PN-16 made of Crane (USA), Hatersly (UK),
Scon (Pakistan) or approved equivalent manufacturer i/c the cost of all
accessories flanges,nut/bolt and gaskit where required complete in all
respect as approved and directed by the Engineer Incharge.
(a) Brass Threaded Valves
(i) 1/2" dia Each 488.40 11,288.40 Each 488.40 11,288.40
(ii) 3/4" dia Each 488.40 12,548.40 Each 488.40 12,548.40
(iii) 1" dia Each 488.40 16,868.40 Each 488.40 16,868.40
(iv) 1-1/4" dia Each 488.40 20,648.40 Each 488.40 20,648.40
(v) 1-1/2" dia Each 732.60 27,372.60 Each 732.60 27,372.60
(vi) 2" dia Each 732.60 36,912.60 Each 732.60 36,912.60
(b) Flange Ended Ductile I ron Valve
(i) 2-1/2" dia Each 732.60 38,550.60 Each 732.60 38,550.60
(ii) 3" dia Each 732.60 45,994.80 Each 732.60 45,994.80
(iii) 4" dia Each 976.80 63,994.80 Each 976.80 63,994.80
(iv) 5" dia Each 976.80 85,594.80 Each 976.80 85,594.80
(v) 6" dia Each 976.80 93,039.00 Each 976.80 93,039.00
(vi) 8" dia Each 1,221.00 237,135.00 Each 1,221.00 237,135.00
(vii) 10" dia Each 1,221.00 327,135.00 Each 1,221.00 327,135.00
(viii) 12" dia Each 1,221.00 492,735.00 Each 1,221.00 492,735.00
53 Providing and fixing heavy duty Check valve of specified diameter and
material for pressure rating PN-16 made of Crane (USA), Hatersly (UK),
Scon (Pakistan) or approved equivalent manufacturer i/c the cost of all
accessories flanges,nut/bolt and gaskit where required complete in all
respect as approved and directed by the Engineer Incharge.
(a) Brass Threaded Valves
(i) 1/2" dia Each 488.40 4,388.40 Each 488.40 4,388.40
(ii) 3/4" dia Each 488.40 6,188.40 Each 488.40 6,188.40
(iii) 1" dia Each 488.40 8,888.40 Each 488.40 8,888.40
(iv) 1-1/4" dia Each 488.40 10,748.40 Each 488.40 10,748.40
(v) 1-1/2" dia Each 732.60 14,412.60 Each 732.60 14,412.60
(vi) 2" dia Each 732.60 19,692.60 Each 732.60 19,692.60
(b) Flange Ended Ductile I ron Valve
(vii) 2-1/2" dia Each 732.60 27,024.60 Each 732.60 27,024.60
(viii) 3" dia Each 976.80 28,948.80 Each 976.80 28,948.80
(ix) 4" dia Each 976.80 46,828.80 Each 976.80 46,828.80
(x) 5" dia Each 976.80 55,828.80 Each 976.80 55,828.80
(xi) 6" dia Each 1,221.00 71,673.00 Each 1,221.00 71,673.00
(xii) 8" dia Each 1,221.00 117,393.00 Each 1,221.00 117,393.00
(xiii) 10" dia Each 1,221.00 189,393.00 Each 1,221.00 189,393.00
(xiv) 12" dia Each 1,221.00 248,193.00 Each 1,221.00 248,193.00

chapter-23(Tubewell) Page 151


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
54 Supply & installation of heavy duty Brass PN-16 air Vents of specified
size provided at the highest points (Pipe Risers) to expel air as approved and
directed by the Engineer Incharge
(a) Automatic
(i) 1/2" Each 244.20 2,404.20 Each 244.20 2,404.20
(ii) 3/4" Each 244.20 2,584.20 Each 244.20 2,584.20
(iii) 1" Each 244.20 3,304.20 Each 244.20 3,304.20
(b) M anual
(i) 1/2" Each 244.20 2,164.20 Each 244.20 2,164.20
(ii) 3/4" Each 244.20 2,344.20 Each 244.20 2,344.20
(iii) 1" Each 244.20 3,064.20 Each 244.20 3,064.20
55 Providing and fixing heavy duty Pressure Relief Valve of specified
diameter and material for pressure rating PN-16 made of Crane (USA),
Hatersly (UK), Scon (Pakistan) or approved equivalent manufacturer,
integral device with a pressure setting, a restrictor and a sensor all in the one
body, i/c the cost of all accessories flanges,nut/bolt and gaskit where
required complete in all respect as approved and directed by the Engineer
Incharge.
i) 3/4" dia Each 488.40 22,928.40 Each 488.40 22,928.40
ii) 1" dia Each 488.40 31,088.40 Each 488.40 31,088.40
iii) 1-1/2" dia Each 488.40 49,988.40 Each 488.40 49,988.40
iv) 2" dia Each 488.40 58,988.40 Each 488.40 58,988.40
v) 2-1/2" dia Each 732.60 71,232.60 Each 732.60 71,232.60
56 Supply and Installation of Gas & Liquid Copper Piping of specified size
and thickness including the cost of Fittings, Welding Complete
clamps/hangers/supports,testing charges and all other related material for
installation purpose complete in all respect as approved and directed by the
Engineer Incharge
i) 1/4" Per Rft 20.45 255.45 Per Metre 67.15 837.90
ii) 3/8" Per Rft 20.45 385.75 Per Metre 67.15 1,265.25
iii) 1/2" Per Rft 20.45 600.80 Per Metre 67.15 1,970.65
iv) 5/8" Per Rft 20.45 804.80 Per Metre 67.15 2,639.75
v) 3/4" Per Rft 30.70 1,023.75 Per Metre 100.70 3,357.95
vi) 7/8" Per Rft 30.70 1,294.95 Per Metre 100.70 4,247.50
vii) 1" Per Rft 30.70 1,511.60 Per Metre 100.70 4,958.05
viii) 1-1/8" Per Rft 30.70 1,756.70 Per Metre 100.70 5,762.00
ix) 1-1/4" Per Rft 40.95 2,019.15 Per Metre 134.30 6,622.85
x) 1-3/8" Per Rft 40.95 2,241.80 Per Metre 134.30 7,353.05
xi) 1-1/2" Per Rft 40.95 2,802.70 Per Metre 134.30 9,192.85
xii) 1-3/4" Per Rft 51.15 3,302.95 Per Metre 167.85 10,833.60
xiii) 2" Per Rft 51.15 3,719.25 Per Metre 167.85 12,199.15
xiv) 2-1/2" Per Rft 51.15 4,163.85 Per Metre 167.85 13,657.45
xv) 3" Per Rft 61.40 5,478.90 Per Metre 201.40 17,970.75

chapter-23(Tubewell) Page 152


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

FIRE FIGHTING WORKS


57 Supply , installation and commissioning of Concealed/Open type wall If floor mounted Rack is used, increase
mounted fire Hose Rack of specified size made of 18 SWG MS sheet , composite rate by 5%.
single/double Cabin having demountable single/double doors of steel/glazed
with 4 mm thick glass,with warning sign on it,duly painted with 70 micron
electrostated powder coated Red color, housing at least 100 ft length of pipe
i/c the cost of specified valve , complete in all respects as approved and
directed by Engineer Incharge ( The accessories will be paid separately).
23.6
I ndoor/Outdoor Type
i) 8"-10"deep P.Cft 832.25 3,376.50 P.Cum 29,361.60 119,122.75
ii) 12" deep P.Cft 540.85 2,464.85 P.Cum 19,080.50 86,960.55
58 Supply , installation and commissioning of Concealed/open type fire Hose If floor mounted Cabinet is used, increase
reel cabinet of specified size made of 18 SWG MS sheet , single/double composite rate by 5%.
Cabin having demountable single/double doors of steel/glazed with 4 mm
thick glass with warning sign on it,duly painted with 70 micron
electrostated powder coated Red color, housing at least 100 ft length of pipe
i/c the cost of specified valve , complete in all respects. as approved and
directed by Engineer Incharge ( The accessories will be paid separately).

I ndoor/Outdoor Type
i) 8-10" deep P.Cft 832.25 3,541.45 P.Cum 29,361.60 124,941.65
ii) 12" deep P.Cft 540.85 2,573.75 P.Cum 19,080.50 90,802.25
59 Supply , installation and commissioning of fire Hose reel Cabinet
accessories of specified size and make, complete in all respects. as approved
and directed by Engineer Incharge.
A) Rubber covered hose pipe
(i) 1" dia Per Rft 103.15 1,184.50 Per Metre 338.35 3,885.10
B) Jacket of Polyurethane/100% Polyester filmant yarn Twin wave ,full
Synthetic rubber compound with brass connectors UL listed.
(i) 1-1/2" dia
(a) Burst pressure 500 psi Per Rft 103.15 1,058.85 Per Metre 338.35 3,473.00
(b) Burst pressure 750 psi Per Rft 103.15 1,154.85 Per Metre 338.35 3,787.90
(ii) 2-1/2" dia Hose
Burst pressure 650 psi Per Rft 103.15 1,348.40 Per Metre 338.35 4,422.75
C) PVC lining Canvas Fire Hose with brass connectors UL listed.
Burst pressure 650 psi Per Rft 2.60 9.90 Per Metre 8.55 32.50
D) Fire hose Spray Nozzle with jet
(a) 1" dia Polycarbonate Nozzle(75gpm) Each 1,031.65 3,813.25 Each 1,031.65 3,813.25
(b)1-1/2" dia Gunmetal/Chrome Nozzle Each 1,031.65 5,745.25 Each 1,031.65 5,745.25
('c) 2-1/2" dia Gunmetal/Chrome Nozzle
(i) Fog spray Tripple Purpose Each 1,031.65 7,986.85 Each 1,031.65 7,986.85
(ii) Jet Nozzel Each 1,031.65 7,214.05 Each 1,031.65 7,214.05

chapter-23(Tubewell) Page 153


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
60 Supplying, fixing and testing ductile iron pipe with flange including the
cost of specials, (teepu pipe / alpine steel or approved equivalent
manufacturer, complying Class K-12, ISO - 2531 & BS - 4772, & jointing
material with all fittings and accessories complete in all respect as approved
by the Engineer Incharge
i) 3" dia (75 mm) Per Rft 37.15 4,166.65 Per Metre 121.85 13,666.65
ii) 4" dia (100 mm) Per Rft 47.95 5,209.15 Per Metre 157.30 17,086.10
iii) 6" dia (150 mm) Per Rft 58.75 7,801.15 Per Metre 192.70 25,587.85
iv) 8" dia (200mm) Per Rft 69.55 11,424.75 Per Metre 228.10 37,473.20
v) 10" dia (250 mm) Per Rft 80.35 15,564.85 Per Metre 263.55 51,052.70
vi) 12" dia (300 mm) Per Rft 91.15 19,188.45 Per Metre 298.95 62,938.05
61 Providing and fixing Chain Pulley Block of 5 ton capacity with 5 meter Each 1,881.00 52,881.00 Each 1,881.00 52,881.00
length of chain, as per required specifications complete in all respect and as
approved by the Engineer Incharge.
62 Two Coats of Bitumen Grade 80/100 (40 Lbs/100Sft)(NRL/PARCO) and 100 Sft 4,232.25 9,818.75 P.Sqm 455.40 1,056.50
Wrapping of Polythene (500 gauge) on M.S. Pipe

chapter-23(Tubewell) Page 154


24. ELECTRIC INSTALLATION
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

1 Supply and erection of G.I. pipes for wiring purposes, including


pull boxes, inspection boxes, bends, tees, etc. complete with
all specials.
a) on surface, including clamps, etc. 38.4
i) 15 mm i/d Per Rft. 59.55 264.20 Per Metre 195.35 866.60
ii) 20 mm i/d Per Rft. 59.55 273.10 Per Metre 195.35 895.80
iii) 25 mm i/d Per Rft. 59.55 360.50 Per Metre 195.35 1,182.45
iv) 32 mm i/d Per Rft. 74.45 460.35 Per Metre 244.20 1,509.90
v) 40 mm i/d Per Rft. 74.45 564.20 Per Metre 244.20 1,850.60
vi) 50 mm i/d Per Rft. 88.65 709.55 Per Metre 290.70 2,327.25
vii) 80 mm i/d Per Rft. 112.80 1,126.45 Per Metre 370.00 3,694.75
b) recessed in walls, including hooks, cutting jharries and
repairing surface: 38.3

i) 15 mm i/d Per Rft. 89.35 236.90 Per Metre 293.05 777.10


ii) 20 mm i/d Per Rft. 89.35 295.35 Per Metre 293.05 968.80
iii) 25 mm i/d Per Rft. 93.05 388.40 Per Metre 305.25 1,274.00
iv) 32 mm i/d Per Rft. 93.05 473.25 Per Metre 305.25 1,552.35
v) 40 mm i/d Per Rft. 101.50 585.00 Per Metre 333.00 1,918.75
vi) 50 mm i/d Per Rft. 139.60 755.20 Per Metre 457.90 2,477.00
vii) 80 mm i/d Per Rft. 223.35 1,233.50 Per Metre 732.60 4,045.90
2 Supply and erection of M.S. conduit pipes for wiring, including 38.4 & 38.6
pull boxes, inspection boxes, bends, tees, etc. complete with
all specials.
a) on surface, including clamps, etc.
i) 16 mm i/d Per Rft. 41.35 92.10 Per Metre 135.65 302.05
ii) 20 mm i/d Per Rft. 41.35 99.20 Per Metre 135.65 325.40
iii) 25 mm i/d Per Rft. 41.35 117.30 Per Metre 135.65 384.80
iv) 32 mm i/d Per Rft. 41.35 124.85 Per Metre 135.65 409.55
v) 40 mm i/d Per Rft. 46.55 153.50 Per Metre 152.65 503.50
vi) 50 mm i/d Per Rft. 57.25 188.50 Per Metre 187.85 618.25
b) recessed in walls, including cutting jharries, cost of 38.3 &
hooks and repairing surface etc. 38.7
i) 16 mm i/d Per Rft. 79.75 123.85 Per Metre 261.65 406.30
ii) 20 mm i/d Per Rft. 79.75 129.40 Per Metre 261.65 424.45
iii) 25 mm i/d Per Rft. 89.35 154.20 Per Metre 293.05 505.75
iv) 32 mm i/d Per Rft. 93.05 165.75 Per Metre 305.25 543.60
v) 40 mm i/d Per Rft. 97.10 191.20 Per Metre 318.50 627.10
vi) 50 mm i/d Per Rft. 101.50 219.85 Per Metre 333.00 721.05

chapter-24(Electric Installation) Page 155


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
3 Supply and erection of PVC pipe for wiring recessed in walls, 38.3 &
including inspection boxes, pull boxes, hooks, cutting jharries, 38.5
and repairing surface, etc., complete with all specials.
i) 12 mm i/d Per Rft. 72.05 102.10 Per Metre 236.30 334.80
ii) 20 mm i/d Per Rft. 74.45 114.30 Per Metre 244.20 374.90
iii) 25 mm i/d Per Rft. 82.70 135.85 Per Metre 271.35 445.60
iv) 32 mm i/d Per Rft. 89.35 159.60 Per Metre 293.05 523.50
v) 40 mm i/d Per Rft. 93.05 189.20 Per Metre 305.25 620.60
vi) 50 mm i/d Per Rft. 97.10 234.20 Per Metre 318.50 768.15
4 Supply and erection of PVC pipe for wiring on surface
including clamps inspection boxes, pull boxes, bends, tees,
repairing surface, etc., complete with all specials:-
i) 12 mm i/d Per Rft. 18.60 59.65 Per Metre 61.05 195.70
ii) 20 mm i/d Per Rft. 18.60 69.30 Per Metre 61.05 227.30
iii) 25 mm i/d Per Rft. 18.60 86.95 Per Metre 61.05 285.25
iv) 32 mm i/d Per Rft. 21.25 108.75 Per Metre 69.75 356.75
v) 40 mm i/d Per Rft. 21.25 138.60 Per Metre 69.75 454.55
vi) 50 mm i/d Per Rft. 25.65 195.20 Per Metre 84.20 640.25
5 Supply and erection of G.I. flexible pipe for wiring, including 38.4
welding of sockets, nipples and check nuts, etc. complete:-
i) 12 mm i/d Per Rft. 48.70 173.65 Per Metre 159.80 569.55
ii) 20 mm i/d Per Rft. 51.95 208.35 Per Metre 170.45 683.40
iii) 25 mm i/d Per Rft. 53.75 278.95 Per Metre 176.35 914.90
iv) 32 mm i/d Per Rft. 64.95 324.50 Per Metre 213.10 1,064.40
v) 40 mm i/d Per Rft. 70.85 378.35 Per Metre 232.45 1,241.00
vi) 50 mm i/d Per Rft. 77.95 448.00 Per Metre 255.70 1,469.45
vii) 80 mm i/d Per Rft. 103.95 661.55 Per Metre 340.90 2,169.95
6 Supply and erection PVC pipe for recessed wiring (main and 38.2 &
sub-main) purpose, including bends, specials, etc. in floor, 38.3
wall or trenches:-
i) 50 mm i/d Per Rft. 97.10 237.60 Per Metre 318.50 779.30
ii) 80 mm i/d Per Rft. 111.70 306.90 Per Metre 366.30 1,006.60
iii) 100 mm i/d Per Rft. 111.70 381.80 Per Metre 366.30 1,252.30

7 Supply and erection of PVC pipe for surface wiring (main and
sub-main) including clamps, inspection boxes, pull boxes
bends etc., complete with all specials:-
i) 50 mm i/d Per Rft. 25.65 170.50 Per Metre 84.20 559.30
ii) 80 mm i/d Per Rft. 37.25 267.95 Per Metre 122.10 878.95
iii) 100 mm i/d Per Rft. 42.55 381.55 Per Metre 139.55 1,251.50
8 Supply and erection of wooden strip batten for wiring Per Rft. 7.45 13.15 Per Metre 24.40 43.05 38.8 Additional width required to
purposes, including clips, insulation cleats, etc. accommodate wires will be provided
by erection of additional strips.
9 Supply and erection of Sahl wood casing and capping for Per Rft. 7.45 31.80 Per Metre 24.40 104.30 38.8
wiring purposes, including insulation cleats, screws, etc.
complete.
chapter-24(Electric Installation) Page 156
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
10 Supply and erection of single core PVC insulated copper 38.1
conductor cables, in prelaid PVC pipe/M.S. conduit/G.I
pipe/wooden strip batten/wooden casing an capping/G.I.
wire/trenches (rate for cables only):-
a) 250/440 volts, PVC insulated:
i) 3/0.74 mm (3/0.029") Per Rft. 13.20 35.90 Per Metre 43.25 117.75
ii) 3/0.91 mm (3/0.036") Per Rft. 13.20 36.30 Per Metre 43.25 119.05
iii) 7/0.74 mm (7/0.029") Per Rft. 13.20 56.50 Per Metre 43.25 185.35
iv) 7/0.91 mm (7/0.036") Per Rft. 14.65 74.95 Per Metre 48.05 245.80
v) 7/1.12 mm (7/0.044") Per Rft. 16.50 110.30 Per Metre 54.05 361.80
vi) 7/1.63 mm (7/0.064") Per Rft. 20.30 269.00 Per Metre 66.50 882.25
vii) 19/1.32 mm (19/0.052") Per Rft. 45.85 368.65 Per Metre 150.40 1,209.15
viii) 19/1.63 mm (19/0.064") Per Rft. 53.50 482.65 Per Metre 175.45 1,583.05
b) 250/440 volts, PVC insulated cotton braided and
compounded cables:-
i) 3/0.74 mm (3/0.029") Per Rft. 14.65 36.50 Per Metre 48.05 119.70
ii) 3/0.91 mm (3/0.036") Per Rft. 14.65 42.90 Per Metre 48.05 140.75
iii) 7/0.74 mm (7/0.029") Per Rft. 14.65 61.75 Per Metre 48.05 202.55
iv) 7/0.91 mm (7/0.036") Per Rft. 15.50 75.80 Per Metre 50.85 248.60
v) 7/1.12 mm (7/0.044") Per Rft. 17.35 105.90 Per Metre 56.90 347.35
vi) 7/1.63 mm (7/0.064") Per Rft. 19.95 268.70 Per Metre 65.50 881.25
c) 450/750 volts, PVC insulated:
i) 1 mm sq (1/0.039") Per Rft 16.55 33.10 Per Metre 54.25 108.50
ii) 1.5 mm sq (3/0.029") Per Rft 16.55 43.15 Per Metre 54.25 141.55
iii) 2.5 mm sq (7/0.029") Per Rft 16.55 60.50 Per Metre 54.25 198.40
iv) 4 mm sq (7/0.036") Per Rft 17.50 80.40 Per Metre 57.45 263.75
v) 6 mm sq (7/0.044") Per Rft 19.60 111.50 Per Metre 64.25 365.80
vi) 10 mm sq (7/0.052") Per Rft 22.55 176.20 Per Metre 74.00 577.90
vii) 16 mm sq (7/0.064") Per Rft 22.55 266.10 Per Metre 74.00 872.80
viii) 25 mm sq (19/0.052") Per Rft 24.80 351.40 Per Metre 81.40 1,152.65
ix) 35 mm sq (19/0.064") Per Rft 24.80 475.20 Per Metre 81.40 1,558.65
x) 50 mm sq (19/0.072") Per Rft 23.95 632.45 Per Metre 78.60 2,074.45
xi) 70 mm sq (19/0.083") Per Rft 23.95 899.65 Per Metre 78.60 2,950.90
xii) 95 mm sq (37/0.072") Per Rft 23.95 1,238.10 Per Metre 78.60 4,061.05
xiii) 120 mm sq (37/0.083") Per Rft 25.35 1,555.40 Per Metre 83.15 5,101.80
xiv) 150 mm Sq (37/0.093") Per Rft 25.35 1,905.15 Per Metre 83.15 6,248.85
xv) 185 mm sq (37/0.103") Per Rft 25.35 2,382.45 Per Metre 83.15 7,814.40
xvi) 240 mm sq (37/0.114") Per Rft 26.35 3,122.75 Per Metre 86.45 10,242.55
11 Supply and erection of single core PVC insulated, PVC
sheathed copper conductor, 250/440 volts grade cable
(BSS-2004), in prelaid PVC pipes/M.S. conduit/G.I.
pipe/wooden strip batten/wooden casing and
capping/trenches, etc. (rate for cable only):-
i) 3/0.74 mm (3/0.029") Per Rft. 13.20 36.55 Per Metre 43.25 119.85
ii) 3/0.91 mm (3/0.036") Per Rft. 13.20 36.55 Per Metre 43.25 119.85
iii) 7/0.74 mm (7/0.029") Per Rft. 13.20 52.75 Per Metre 43.25 173.00
iv) 7/0.91 mm (7/0.036") Per Rft. 14.65 73.05 Per Metre 48.05 239.60

chapter-24(Electric Installation) Page 157


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
v) 7/1.12 mm (7/0.044") Per Rft. 16.50 101.65 Per Metre 54.05 333.35
vi) 7/1.63 mm (7/0.064") Per Rft. 20.30 240.70 Per Metre 66.50 789.55
12 Supply and erection of single core PVC insulated, PVC
sheathed copper conductor, 600/1000 volts grade cable, in 38.1 to
prelaid G.I. pipe/M.S. conduits/PVC pipe/G.I. wire/trenches, 38.7
etc (rate for cable only):-
i) 4 .00 mm sq (7/0.036") Per Rft. 16.50 73.35 Per Metre 54.05 240.50
ii) 6 mm sq (7/0.044") Per Rft. 16.50 99.15 Per Metre 54.05 325.15
iii) 10.00 mm sq (7/0.052") Per Rft. 16.50 154.35 Per Metre 54.05 506.35
iv) 16 mm sq (7/0.064") Per Rft. 17.55 232.90 Per Metre 57.65 763.85
v) 25 mm sq (19/0.052") Per Rft. 17.55 357.05 Per Metre 57.65 1,171.20
vi) 35 mm sq (19/0.064") Per Rft. 20.30 495.65 Per Metre 66.50 1,625.75
vii) 50 mm sq (19/0.072") Per Rft. 20.30 699.30 Per Metre 66.50 2,293.65
viii) 70 mm sq (19/0.083") Per Rft. 20.30 916.20 Per Metre 66.50 3,005.15
ix) 95 mm sq (37/0.072") Per Rft. 20.30 1,259.35 Per Metre 66.50 4,130.60
x) 120 mm sq (37/0.083") Per Rft. 23.95 1,581.95 Per Metre 78.60 5,188.80
xi) 150 mm Sq (37/0.093") Per Rft. 23.95 1,937.20 Per Metre 78.60 6,353.95
xii) 185 mm sq (37/0.103") Per Rft. 23.95 2,420.65 Per Metre 78.60 7,939.65
xiii) 240 mm sq (37/0.114") Per Rft. 26.35 3,170.55 Per Metre 86.45 10,399.45
xiv) 300 mm sq (61/0.099") Per Rft. 26.35 3,966.50 Per Metre 86.45 13,010.15
xv) 400 mm sq (61/0.114") Per Rft. 26.35 5,056.35 Per Metre 86.45 16,584.90
xvi) 500 mm sq (91/0.103") Per Rft. 32.95 6,365.70 Per Metre 108.10 20,879.55
xvii) 630 mm sq (127/0.093") Per Rft. 32.95 8,189.85 Per Metre 108.10 26,862.65
13 Supply and erection of PVC insulated, PVC sheathed copper conductor ditto
cables for service connection, in prelaid pipe/G.I. wire/trenches, etc.
(rate for cable only):-
a) Two core, 250/440 volts.
i) 3/0.74 mm (3/0.029") Per Rft. 14.65 80.60 Per Metre 48.05 264.35
ii) 3/0.91 mm (3/0.036") Per Rft. 14.65 84.75 Per Metre 48.05 277.95
iii) 7/0.74 mm (7/0.029") Per Rft. 14.65 120.15 Per Metre 48.05 394.10
iv) 7/0.91 mm (7/0.036") Per Rft. 15.50 172.90 Per Metre 50.85 567.15
v) 7/1.12 mm (7/0.044") Per Rft. 17.35 237.90 Per Metre 56.90 780.30
vi) 7/1.63 mm (7/0.064") Per Rft. 19.95 532.00 Per Metre 65.50 1,744.95
b) Three core, 600/1000 volt cable:-

i) 3/0.74 mm (3/0.029") Per Rft. 15.50 101.05 Per Metre 50.85 331.45
ii) 3/0.91 mm (3/0.036") Per Rft. 15.50 104.80 Per Metre 50.85 343.80
iii) 7/0.74 mm (7/0.029") Per Rft. 15.50 139.85 Per Metre 50.85 458.75
iv) 7/0.91 mm (7/0.036") Per Rft. 17.35 209.55 Per Metre 56.90 687.25
v) 7/1.12 mm (7/0.044") Per Rft. 18.30 300.05 Per Metre 60.05 984.15
vi) 7/1.63 mm (7/0.064") Per Rft. 20.90 704.55 Per Metre 68.60 2,311.00
c) Four core, 600/1000 volt non armoured cable:-
i) 1.5 mm (3/0.029") Per Rft. 16.50 125.40 Per Metre 54.05 411.25
ii) 1.5 mm (3/0.036") Per Rft. 16.50 125.40 Per Metre 54.05 411.25
iii) 2.5 mm (7/0.029") Per Rft. 17.35 177.80 Per Metre 56.90 583.20
iv) 4 mm (7/0.036") Per Rft. 17.35 267.35 Per Metre 56.90 876.95

chapter-24(Electric Installation) Page 158


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
v) 6 mm (7/0.044") Per Rft. 18.30 379.90 Per Metre 60.05 1,246.10
vi) 10 mm (7/0.052") Per Rft. 20.90 590.70 Per Metre 68.60 1,937.55
vii) 16 mm (7/0.064") Per Rft. 20.90 924.35 Per Metre 68.60 3,031.90
viii) 25 mm (19/0.052") Per Rft. 29.30 1,423.85 Per Metre 96.05 4,670.15
ix) 35 mm sq (19/0.064") Per Rft. 29.30 1,889.20 Per Metre 96.05 6,196.55
x) 50 mm sq (19/0.072") Per Rft. 29.30 2,542.05 Per Metre 96.05 8,337.90
xi) 70 mm sq (19/0.083") Per Rft. 37.65 3,642.05 Per Metre 123.50 11,946.00
xii) 95 mm sq (37/0.072") Per Rft. 37.65 5,028.00 Per Metre 123.50 16,491.90
xiii) 120 mm sq (37/0.083") Per Rft. 43.95 6,323.20 Per Metre 144.10 20,740.15
xiv) 150 mm sq (37/0.093") Per Rft. 43.95 7,758.65 Per Metre 144.10 25,448.45
xv) 185 mm sq (37/0.103") Per Rft. 52.70 9,715.20 Per Metre 172.90 31,865.85
xvi) 240 mm sq (37/0.114") Per Rft. 52.70 12,731.45 Per Metre 172.90 41,759.20
xvii) 300 mm sq (61/0.099") Per Rft. 52.70 15,950.95 Per Metre 172.90 52,319.15
xviii) 400 mm sq (61/0.114") Per Rft. 52.70 20,356.35 Per Metre 172.90 66,768.85
d) Four Core, 600/1000 volt armoured cable:- Cost of trenches where necessary
is included in the rates.
i) 4 mm sq (7/0.036) Per Rft. 17.35 340.00 Per Metre 56.90 1,115.15
ii) 6 mm sq (7/0.044) Per Rft. 18.30 458.35 Per Metre 60.05 1,503.40
iii) 10 mm sq (7/0.052) Per Rft. 20.90 713.40 Per Metre 68.60 2,340.00
iv) 16 mm sq (7/0.064) Per Rft. 29.30 1,099.85 Per Metre 96.05 3,607.50
v) 25 mm sq (19/0.052) Per Rft. 29.30 1,592.50 Per Metre 96.05 5,223.40
vi) 35 mm sq (19/0.064) Per Rft. 31.40 2,128.60 Per Metre 102.95 6,981.80
vii) 50 mm sq (19/0.072) Per Rft. 32.95 2,872.80 Per Metre 108.10 9,422.70
viii) 70 mm sq (19/0.083) Per Rft. 35.60 4,036.00 Per Metre 116.85 13,238.10
ix) 95 mm sq (37/0.072) Per Rft. 36.60 5,494.25 Per Metre 120.10 18,021.10
x) 120 mm sq (37/0.083) Per Rft. 37.65 6,946.90 Per Metre 123.50 22,785.85
xi) 150 mm (37/0.093) Per Rft. 43.95 8,474.25 Per Metre 144.10 27,795.50
xii) 185 mm sq (37/0.103) Per Rft. 52.70 10,550.00 Per Metre 172.90 34,604.05
xiii) 240 mm sq (37/0.114) Per Rft. 65.90 13,732.25 Per Metre 216.15 45,041.85
xiv) 300 mm sq (61/0.099) Per Rft. 65.90 17,100.75 Per Metre 216.15 56,090.40
xv) 400 mm sq (61/0.114) Per Rft. 73.20 21,896.00 Per Metre 240.15 71,818.85
14 Supply and erection of XLPE insulated, PVC sheathed copper conductor,
600/1000 volts grade cable, in prelaid G.I. pipe/M.S. conduits/PVC pipe/G.I.
wire/trenches, etc (rate for cable only):-
a) Single core non-armoured
i) 35 mm sq (19/0.064") Per Rft. 44.05 491.45 Per Metre 144.40 1,612.05
ii) 50 mm sq (19/0.072") Per Rft. 44.05 646.50 Per Metre 144.40 2,120.50
iii) 70 mm sq (19/0.083") Per Rft. 44.05 909.15 Per Metre 144.40 2,982.05
iv) 95 mm sq (37/0.072") Per Rft. 48.05 1,243.15 Per Metre 157.55 4,077.60
v) 120 mm sq (37/0.083") Per Rft. 48.05 1,553.60 Per Metre 157.55 5,095.80
vi) 150 mm Sq (37/0.093") Per Rft. 48.05 1,897.70 Per Metre 157.55 6,224.45
vii) 185 mm sq (37/0.103") Per Rft. 48.05 2,364.30 Per Metre 157.55 7,755.00
viii) 240 mm sq (37/0.114") Per Rft. 53.25 3,091.80 Per Metre 174.70 10,141.10
ix) 300 mm sq (61/0.099") Per Rft. 53.25 3,816.80 Per Metre 174.70 12,519.05
x) 400 mm sq (61/0.114") Per Rft. 53.25 4,916.00 Per Metre 174.70 16,124.55
xi) 500 mm sq (91/0.103") Per Rft. 53.25 6,178.50 Per Metre 174.70 20,265.45
xii) 630 mm sq (127/0.093") Per Rft. 53.25 7,957.70 Per Metre 174.70 26,101.20

chapter-24(Electric Installation) Page 159


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
b) Four core non-armoured
i) 25 mm sq (19/0.052") Per Rft. 48.05 1,366.50 Per Metre 157.55 4,482.05
ii) 35 mm sq (19/0.064") Per Rft. 48.05 1,858.95 Per Metre 157.55 6,097.35
iii) 50 mm sq (19/0.072") Per Rft. 48.05 2,490.10 Per Metre 157.55 8,167.55
iv) 70 mm sq (19/0.083") Per Rft. 60.05 3,576.95 Per Metre 196.95 11,732.40
v) 95 mm sq (37/0.072") Per Rft. 60.05 4,918.10 Per Metre 196.95 16,131.40
vi) 120 mm sq (37/0.083") Per Rft. 60.05 6,185.25 Per Metre 196.95 20,287.70
vii) 150 mm sq (37/0.093") Per Rft. 60.05 8,688.15 Per Metre 196.95 28,497.20
viii) 185 mm sq (37/0.103") Per Rft. 72.05 7,599.10 Per Metre 236.30 24,925.10
ix) 240 mm sq (37/0.114") Per Rft. 72.05 12,453.65 Per Metre 236.30 40,847.95
x) 300 mm sq (61/0.099") Per Rft. 72.05 15,588.50 Per Metre 236.30 51,130.25
xi) 400 mm sq (61/0.114") Per Rft. 72.05 19,896.95 Per Metre 236.30 65,261.95
c) Four core armoured
i) 25 mm sq (19/0.052") Per Rft. 65.50 1,526.45 Per Metre 214.85 5,006.75
ii) 35 mm sq (19/0.064") Per Rft. 65.50 2,037.30 Per Metre 214.85 6,682.35
iii) 50 mm sq (19/0.072") Per Rft. 65.50 2,686.75 Per Metre 214.85 8,812.50
iv) 70 mm sq (19/0.083") Per Rft. 65.25 3,832.70 Per Metre 214.10 12,571.30
v) 95 mm sq (37/0.072") Per Rft. 65.25 5,205.55 Per Metre 214.10 17,074.30
vi) 120 mm sq (37/0.083") Per Rft. 65.25 6,573.35 Per Metre 214.10 21,560.60
vii) 150 mm sq (37/0.093") Per Rft. 65.25 8,019.80 Per Metre 214.10 26,304.95
viii) 185 mm sq (37/0.103") Per Rft. 77.30 9,996.20 Per Metre 253.45 32,787.45
ix) 240 mm sq (37/0.114") Per Rft. 77.30 14,206.00 Per Metre 253.45 46,595.65
x) 300 mm sq (61/0.099") Per Rft. 77.30 16,202.05 Per Metre 253.45 53,142.70
xi) 400 mm sq (61/0.114") Per Rft. 77.30 20,726.95 Per Metre 253.45 67,984.45
15 Supply, installation, testing, commissioning and termination of 8.7 / 15kV,
AL/XLPE/UA/PVC three Core (MV cables) of Pakistan cables / Newage or
approved equivalent along with cable glands, in already installed cable trench /
cable ladder / cable tray / duct bank.
a) Non-Armoured Cable
i) 50 mm sq Per Rft 43.25 1,299.20 P.Meter 141.80 4,261.35
ii) 70 mm sq Per Rft 43.25 1,505.20 P.Meter 141.80 4,937.00
iii) 95 mm sq Per Rft 43.25 1,765.60 P.Meter 141.80 5,791.15
iv) 120 mm sq Per Rft 43.25 1,985.20 P.Meter 141.80 6,511.40
v) 150 mm sq Per Rft 43.25 2,236.15 P.Meter 141.80 7,334.60
vi) 185 mm sq Per Rft 43.25 2,541.90 P.Meter 141.80 8,337.50
vii) 240 mm sq Per Rft 43.25 2,716.15 P.Meter 141.80 8,909.00
viii) 300 mm sq Per Rft 43.25 3,466.40 P.Meter 141.80 11,369.85
b) Armoured Cable
i) 50 mm sq Per Rft 43.25 2,061.15 P.Meter 141.80 6,760.60
ii) 70 mm sq Per Rft 43.25 2,317.80 P.Meter 141.80 7,602.35
iii) 95 mm sq Per Rft 43.25 2,647.75 P.Meter 141.80 8,684.60
iv) 120 mm sq Per Rft 43.25 3,111.15 P.Meter 141.80 10,204.50
v) 150 mm sq Per Rft 43.25 3,643.70 P.Meter 141.80 11,951.25
vi) 185 mm sq Per Rft 43.25 3,807.35 P.Meter 141.80 12,488.05
vii) 240 mm sq Per Rft 43.25 4,341.75 P.Meter 141.80 14,241.00
viii) 300 mm sq Per Rft 43.25 4,928.00 P.Meter 141.80 16,163.80

chapter-24(Electric Installation) Page 160


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
16 Supply laying,testing and commissioning of Single Core XLPE (Cross linked
polyethelene) insulated stranded Aluminium Conductor cable of 8.7/15 KV
grade made of Pakistan Cable/Newage with Semiconducting tape screened,
Copper tape screen, PVC filler binder, Extruded PVC sheath in
trenches/prelaid pipes as per Wapda specifications i/c the cost of ties and
cable identification tags (rate for cables only):-
a) Non-Armoured Cable
i) 50mm sq. Per Rft 48.05 504.15 P.Meter 157.55 1,653.60
ii) 70mm sq. Per Rft 48.05 557.75 P.Meter 157.55 1,829.35
iii) 95mm sq. Per Rft 48.05 635.90 P.Meter 157.55 2,085.70
iv) 120mm sq. Per Rft 48.05 712.95 P.Meter 157.55 2,338.45
v) 150mm sq. Per Rft 48.05 775.70 P.Meter 157.55 2,544.30
vi) 185mm sq. Per Rft 48.05 896.80 P.Meter 157.55 2,941.50
vii) 240mm sq. Per Rft 48.05 1,024.85 P.Meter 157.55 3,361.55
viii) 300mm sq. Per Rft 48.05 1,138.60 P.Meter 157.55 3,734.65
ix) 400mm sq. Per Rft 48.05 1,326.85 P.Meter 157.55 4,352.10
x) 500mm sq Per Rft 48.05 1,591.05 P.Meter 157.55 5,218.70
xi) 630mm sq Per Rft 48.05 1,921.30 P.Meter 157.55 6,301.95
b) Armoured Cable
i) 50mm sq. Per Rft 48.05 656.05 P.Meter 157.55 2,151.90
ii) 70mm sq. Per Rft 48.05 780.85 P.Meter 157.55 2,561.15
iii) 95mm sq. Per Rft 48.05 878.80 P.Meter 157.55 2,882.50
iv) 120mm sq. Per Rft 48.05 963.60 P.Meter 157.55 3,160.55
v) 150mm sq. Per Rft 48.05 1,057.90 P.Meter 157.55 3,469.85
vi) 185mm sq. Per Rft 48.05 1,170.90 P.Meter 157.55 3,840.55
vii) 240mm sq. Per Rft 48.05 1,339.35 P.Meter 157.55 4,393.00
viii) 300mm sq. Per Rft 48.05 1,599.15 P.Meter 157.55 5,245.15
ix) 400mm sq. Per Rft 48.05 1,830.30 P.Meter 157.55 6,003.45
x) 500mm sq Per Rft 48.05 2,024.05 P.Meter 157.55 6,638.94
xi) 630mm sq Per Rft 48.05 2,385.50 P.Meter 157.55 7,824.48
17 Supply and erection of M.S. sheet box of 16 SWG, 10 cm (4") 38.1
deep, with 4.75 mm thick (3/16") bakelite sheet top, for to
recessed wiring, including making holes for regulators, 38.7
switches, plugs, etc.
i) 10 x 10 cm (4"x4") Each 244.20 389.25 Each 244.20 389.25
ii) 17.5 x 10 cm (7"x4") Each 305.25 531.40 Each 305.25 531.40
iii) 22.5 x 10 cm (9"x4") Each 407.00 680.25 Each 407.00 680.25
iv) 20 x 25 cm (8"x10") Each 488.40 981.25 Each 488.40 981.25
v) 25 x 30 cm (10"x12") Each 610.50 1,299.90 Each 610.50 1,299.90
vi) 30 x 35 cm (12"x14") Each 814.00 1,696.15 Each 814.00 1,696.15
18 Supply and erection of round block of Sahl wood, 10x4 cm Each 69.75 113.70 Each 69.75 113.70 38.1
(4"x1½") thick.
19 Supply and erection of teak wood board, 4.5 cm (1¾") thick. 38.1
i) 17.5 x 10 cm (7"x4") Each 97.70 204.10 Each 97.70 204.10
ii) 22.5 x 10 cm (9"x4") Each 97.70 219.70 Each 97.70 219.70
iii) 20 x 25 cm (8"x10") Each 108.55 244.95 Each 108.55 244.95
iv) 25 x 30 cm (10"x12") Each 122.10 341.70 Each 122.10 341.70

chapter-24(Electric Installation) Page 161


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
v) 30 x 35 cm (12"x14") Each 139.55 444.35 Each 139.55 444.35
20 Supply and erection of Sahl wood board, 4.5 cm (1¾") thick.
i) 17.5 x 10 cm (7"x4") Each 97.70 176.90 Each 97.70 176.90
ii) 22.5 x 10 cm (9"x4") Each 97.70 208.10 Each 97.70 208.10
iii) 20 x 25 cm (8"x10") Each 108.55 230.55 Each 108.55 230.55
iv) 25 x 30 cm (10"x12") Each 122.10 265.70 Each 122.10 265.70
v) 30 x 35 cm (12"x14") Each 139.55 326.75 Each 139.55 326.75
21 Supply and erection of iron/aluminum clad, 500 volts main 38.1 When the base frame is already
switches with kitkat fuses, on angle iron board with 3 mm installed, the labour and composite
(1/8") thick M.S. sheet covering, including bonding to earth rates will be reduced as follows:- For
with necessary flexible pipe and thimbles, etc. 15 to 35 Amps. by Rs. 21.20 and Rs.
145.50. For 60 to 65 Amps. by Rs.
a) double pole: 38.80 and Rs. 252.60. For 100 Amps.
by Rs. 38.80 and Rs. 350.80.
i) 15/20 Amp. Each 1,628.00 4,099.80 Each 1,628.00 4,099.80
ii) 30/35 Amp. Each 1,628.00 4,618.20 Each 1,628.00 4,618.20
iii) 60/65 Amp. Each 2,442.00 6,155.20 Each 2,442.00 6,155.20
iv) 100 Amp. Each 2,442.00 6,901.60 Each 2,442.00 6,901.60
b) triple pole:
i) 15/20 Amp. Each 1,628.00 4,798.20 Each 1,628.00 4,798.20
ii) 30/35 Amp. Each 1,628.00 5,484.60 Each 1,628.00 5,484.60
c) triple pole with neutral link:
i) 30/35 Amp. Each 1,628.00 5,844.60 Each 1,628.00 5,844.60
ii) 60/65 Amp. Each 2,442.00 7,466.35 Each 2,442.00 7,466.35
iii) 100 Amp. Each 3,199.00 8,967.95 Each 3,199.00 8,967.95
22 Supply and erection of iron/aluminum clad, 500 volts main When the base frame is already
switches with triple pole and neutral link and HRC fuses, on 38.1 installed, the labour & composite
angle iron board with 3 mm (1/8") thick M.S. sheet covering, rates will be reduced as follows:-
including bonding to earth with necessary flexible pipe and
thimbles. i) For 60/65 Amp. by Rs. 21.20 and
Rs. 145.50.
i) 60/65 Amp Each 2,442.00 7,153.80 Each 2,442.00 7,153.80 ii) For 100 to 300 Amp. by Rs. 21.20
ii) 100 Amp Each 3,199.00 10,278.45 Each 3,199.00 10,278.45 and Rs. 350.80
iii) 150 Amp Each 3,199.00 12,672.40 Each 3,199.00 12,672.40 iii) For 400 to 500 Amp. by Rs. 42.20
iv) 200 Amp Each 7,326.00 21,323.40 Each 7,326.00 21,323.40 and Rs. 526.20
v) 300 Amp Each 7,326.00 23,795.40 Each 7,326.00 23,795.40
vi) 400 Amp Each 10,378.50 30,867.30 Each 10,378.50 30,867.30
vii) 500 Amp Each 10,989.00 41,690.75 Each 10,989.00 41,690.75
23 Supply and erection of iron/aluminum clad, branch ditto When the base frame is already
distribution board, 250 volt, on angle iron frame of suitable installed the labour and composite
size with 3 mm (1/8") M.S. sheet covering: rates will be reduced by Rs. 19.50 &
Rs. 152.20 respectively.
i) 2 way, 15 Amp per way Each 814.00 1,810.00 Each 814.00 1,810.00
ii) 3 way, 15 Amp per way Each 814.00 1,884.40 Each 814.00 1,884.40
iii) 4 way, 15 Amp per way Each 814.00 1,884.40 Each 814.00 1,884.40
iv) 5 way, 15 Amp per way Each 814.00 2,098.00 Each 814.00 2,098.00

chapter-24(Electric Installation) Page 162


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
v) 6 way, 15 Amp per way Each 814.00 2,207.20 Each 814.00 2,207.20
vi) 7 way, 15 Amp per way Each 814.00 2,281.60 Each 814.00 2,281.60
vii) 8 way, 15 Amp per way Each 814.00 2,404.00 Each 814.00 2,404.00
viii) 9 way, 15 Amp per way Each 814.00 2,465.20 Each 814.00 2,465.20
ix) 10 way, 15 Amp per way Each 814.00 2,526.40 Each 814.00 2,526.40
x) 11 way, 15 Amp per way Each 814.00 2,587.60 Each 814.00 2,587.60
xi) 12 way, 15 Amp per way Each 814.00 2,771.20 Each 814.00 2,771.20
xii) 2 way, 30 Amp per way Each 1,221.00 2,137.80 Each 1,221.00 2,137.80
xiii) 3 way, 30 Amp per way Each 1,221.00 2,199.00 Each 1,221.00 2,199.00
xiv) 4 way, 30 Amp per way Each 1,221.00 2,223.00 Each 1,221.00 2,223.00
xv) 5 way, 30 Amp per way Each 1,221.00 2,333.40 Each 1,221.00 2,333.40
xvi) 6 way, 30 Amp per way Each 1,221.00 2,467.80 Each 1,221.00 2,467.80
xvii) 7 way, 30 Amp per way Each 1,221.00 2,542.20 Each 1,221.00 2,542.20
xviii) 8 way, 30 Amp per way Each 1,221.00 2,627.40 Each 1,221.00 2,627.40
xix) 9 way, 30 Amp per way Each 1,221.00 2,688.60 Each 1,221.00 2,688.60
xx) 10 way, 30 Amp per way Each 1,221.00 2,749.80 Each 1,221.00 2,749.80
24 Supply and erection of bus bars, for 500 volts 3 phase A.C. When the base frame is already
supply with four copper bars, including glazed porcelain 38.1 installed the labour and composite
bridges, on angle iron board, fixed with rag bolts and M.S. rates will be reduced by Rs. 21.20 and
sheet box 1.5 mm thick, etc. complete:- Rs. 145.50 respectively.
i) 60 Amp. with 4 copper bars Each 2,772.00 6,975.50 Each 2,772.00 6,975.50
size 1½"x1/8" (40 x 3 mm)
ii) 100 Amp. with 4 copper bars Each 3,007.15 7,210.60 Each 3,007.15 7,210.60
size 1½"x1/8" (40 x 3 mm)
iii) 200 Amp with 4 copper bars Each 3,382.50 7,826.00 Each 3,382.50 7,826.00
size 2"x1/8" (50x 3 mm)
iv) 300 Amp with 4 copper bars Each 3,663.00 8,106.50 Each 3,663.00 8,106.50
size 2"x3/16" (50x 5 mm)
v) 500 Amp with 4 copper Each 3,382.50 9,062.35 Each 3,382.50 9,062.35
size 2"x1/4" (50x 6 mm)
25 i) Supply and erection of plain pendent lamp holder, Each 50.90 426.50 Each 50.90 426.50 38.1
complete with bakelite lamp holder and flexible twin wire
23/0.0076" upto 2 metre length (without bulb and shade).
ii) Extra for additional length of flexible wire, beyond Per Rft. -- 2.15 Per Metre -- 7.00
2 metres.
26 Supply and erection of counter weight pedent with porcelain Each 101.75 798.95 Each 101.75 798.95 38.1
counter weight, and fitting on bakelite lamp holder, with
flexible twin wire 23/0.0076" complete (without bulb and
shade).
27 Supply and erection of stiff pedent with brass/metal pipe 6.3 Each 144.10 1,310.10 Each 144.10 1,310.10 ditto
cm (2.5") long, and 15 mm (½") dia brass oxidised or painted,
along with brass lamp holder with VIR/PVC cable 3/0.74 mm
(3/0.029").
28 Supply and erection of 22.5 cm (9") long swan neck plain Each 149.05 399.25 Each 149.05 399.25 ditto
brass/steel brass oxidised bracket lamp holder, complete.

chapter-24(Electric Installation) Page 163


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
29 Supply and erection of wall type/pole type bracket, with double Each 205.85 1,334.20 Each 205.85 1,334.20 ditto
cover water tight reflector, flexible wire and brass bolder.
30 Supply and erection of bakelite button holder shade, large Each 33.85 179.40 Each 33.85 179.40 ditto
size.
31 Supply and erection of call bell 220/250 volts, fixed on teak Each 144.10 725.85 Each 144.10 725.85 38.1
wood board 17.5x10 cm (7"x4").
32 Supply and erection of bell push or bed switch, with 5 metres Each 30.55 910.15 Each 30.55 910.15 38.1
twin flexible wire 23/0.0076".
33 Supply and erection of ceiling rose, bakelite. Each 50.90 97.70 Each 50.90 97.70 ditto
34 Supply and erection of switches 5 Amp.
i) open type Each 48.85 104.05 Each 48.85 104.05 ditto
ii) piano type Each 48.85 104.05 Each 48.85 104.05
iii) ring type, recessed Each 48.85 96.85 Each 48.85 96.85
iv) plate type, recessed Each 48.85 140.05 Each 48.85 140.05
v) double control, open type Each 66.20 159.80 Each 66.20 159.80
vi) double control, ring type recessed Each 66.20 147.80 Each 66.20 147.80
vii) double control, piano type Each 66.20 147.80 Each 66.20 147.80
35 Supply and erection of switches 10/15 Amp. ditto
i) open type Each 48.85 106.45 Each 48.85 106.45
ii) recessed type Each 48.85 124.45 Each 48.85 124.45
36 Supply and erection of wall socket with 3 pin 5 Amp, shoe. Each 48.85 206.05 Each 48.85 206.05 ditto
37 Supply and erection of 3 pin. 5 Amp wall socket. Each 48.85 125.65 Each 48.85 125.65 ditto
38 Supply and erection of 3 pin, 10/15 Amp. wall socket. ditto
i) open type Each 48.85 122.05 Each 48.85 122.05
ii) recessed type Each 48.85 188.05 Each 48.85 188.05
39 Supply and erection of 3 pin switch and plug combined, ditto
recessed type.
i) 5 Amp Each 48.85 162.85 Each 48.85 162.85
ii) 10/15 Amp Each 48.85 214.45 Each 48.85 214.45

40 Supply and erection of 3 pin 10/15 Amp. wall socket with shoe, Each 48.85 321.25 Each 48.85 321.25 ditto
open type.
41 Supply and erection of cut out, bakelite. ditto
i) open type Each 27.15 94.35 Each 27.15 94.35
ii) recessed type Each 27.15 102.75 Each 27.15 102.75
42 Supply and erection of button holder. 38.1
i) bakelite large size Each 30.55 79.75 Each 30.55 79.75
ii) brass Each 30.55 89.35 Each 30.55 89.35
43 Supply and erection of brass bracket with holder. Each 40.70 185.90 Each 40.70 185.90 ditto
44 Supply and erection of bell push open/recessed type Each 27.15 76.35 Each 27.15 76.35 ditto
(without flexible wire).

chapter-24(Electric Installation) Page 164


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
45 Supply and erection of kitkat, 500 volt: ditto
i) 15/20 Amp Each 48.55 167.75 Each 48.55 167.75
ii) 30/35 Amp Each 52.95 194.95 Each 52.95 194.95
iii) 60/65 Amp Each 80.90 247.70 Each 80.90 247.70
iv) 100 Amp Each 91.00 326.20 Each 91.00 326.20
v) 200 Amp Each 104.00 492.80 Each 104.00 492.80
vi) 300 Amp Each 104.00 683.60 Each 104.00 683.60
vii) 400 Amp Each 135.30 906.90 Each 135.30 906.90
viii) 500 Amp Each 135.30 1,197.30 Each 135.30 1,197.30
46 Supply and erection of tube light, including rod, choke, starter 38.1
with frame, flexible wire, including connection from ceiling
rose, etc., complete.
i) double rod (80 watts) with two chokes and 2 starters. Per set 845.65 3,586.45 Per set 845.65 3,586.45
ii) single rod (40 watts) with one choke and one starter. Per set 676.50 2,008.50 Per set 676.50 2,008.50
iii) round tube, 32 watt, with one choke and one starter, Each 676.50 1,764.90 Each 676.50 1,764.90
without cover.
iv) round tube, 32 watt with one chock and one starter, with Each 563.75 1,881.35 Each 563.75 1,881.35
cover.
47 Providing and fixing M.S. iron box for housing main switches, ditto
made of 1.5 mm (1/16") thick M.S. sheet, with locking
arrangement, including painting:-
i) 60x35x15 cm (24"x14"x6") Each 1,767.55 8,622.75 Each 1,767.55 8,622.75
ii) 95x40x20 cm (38"x16"x8") Each 2,560.25 10,933.10 Each 2,560.25 10,933.10
iii) 105x52.5x22.5 cm (42"x21"x9") Each 3,895.30 15,213.45 Each 3,895.30 15,213.45
iv) 135x70x27.5 cm (54"x28"x11") Each 4,298.25 22,364.50 Each 4,298.25 22,364.50
48 Supply and erection of girder clamp hook, 16 mm (5/8") with Each 112.75 327.55 Each 112.75 327.55 38.1
M.S. plate 25x6 mm (1"x¼"), with bolts and nuts for hanging &
ceiling fans. 38.10
49 Supply and erection of girder strut, of M.S. tee section Each 144.10 3,069.00 Each 144.10 3,069.00 ditto
40x40x6 mm (1½"1½"x ¼"), complete with clamp, bolts and
nuts, etc., including fixing with cement concrete 1:3:6.
50 Supply and erection of roof suspension hook, 16 mm (5/8") Each 154.40 3,671.10 Each 154.40 3,671.10 38.1
dia rod with 75x40x3 mm (3"x1½"x1/8") M.S. steel channel,
with clamp, bolts and nuts, etc., including fixing with cement
concrete 1:3:6.
51 Supply and erection of roof suspension hook of M.S plate Each 205.85 1,188.55 Each 205.85 1,188.55
75x40x12.7mm (3"x1½"x½") with 16 mm (5/8") hook complete
with bolts, nuts and fixing with cement concrete 1:3:6
52 Supply and erection of 3/8" (10 mm) dia M.S. bar fan hook, Each 62.60 97.40 Each 62.60 97.40 ditto
placed at the time of casting of slab.
53 Erection of circular L.T. pole in cement concrete 1:3:6 one Each 1,700.15 5,952.20 Each 1,700.15 5,952.20 38.12
metre below ground level (excluding the cost of pole),
including cement concrete collar (1:2:4) excavation of
foundation, and finishing surface.

chapter-24(Electric Installation) Page 165


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
54 Supply and erection of bracket of M.S. channel 75x40x6 mm
(3"x1½"x¼") section:-
i) 0.60 metre (2') long for 2 lines. Each 436.05 1,391.60 Each 436.05 1,391.60
ii) 1.200 metre (4') long for 4 lines. Each 508.75 3,105.05 Each 508.75 3,105.05
55 Supply and erection of anchor rod Henley type for pole, Per Rft. 27.00 56.45 Per Metre 88.65 185.20 38.14
including necessary clamps and 7/12" stay wire, straining
screws, etc., erected in cement concrete 1:3:6 and collar of
cement concrete.
56 Supply and erection of stay for house service pipe, erected Per Rft. 42.55 86.95 Per Metre 139.55 285.20 ditto
with straining screws and 7/14" stay wire, complete.
57 Supply and erection of house service pipe Henley (G.I. pipe Per Rft. 186.15 873.40 Per Metre 610.50 2,864.70
water quality) or pole type, 50 mm (2") dia, erected to instal
insulated overhead line,include shackle insulator for holding
insulated wire and straining devices for bearer wire and other
accessories etc., complete.
58 Supply and erection of house service pipe 50 mm (2") dia G.I. Per Rft. 157.60 840.90 Per Metre 517.00 2,758.20
pipe Henley or pole type for bare copper wire overhead line,
including shackle insulator, straining devices and other
accessories etc.
59 Supply and erection of lightning arrestor horn type, complete. Each 864.60 4,464.60 Each 864.60 4,464.60
60 Supply and erection of shackle insulator, medium size. Each 115.10 497.90 Each 115.10 497.90 38.12
61
61 Supply and erection of pin insulator, green medium size. Each 115.10 211.10 Each 115.10 211.10 ditto
62 Supply and erection of bare copper conductor wire No. 2 to Per Kg 59.80 2,832.20 Per Kg 59.80 2,832.20 38.1
No. 10 SWG, including binding wire No. 16 SWG.
63 Supply and erection of G.I. wire of all sizes, including binding Per Kg 59.80 425.00 Per Kg 59.80 425.00 ditto
wire No. 16 SWG for support of rubber wire or earthing wire,
pole to pole etc.
64 Wiring overhead line in Two single core, PVC/weather proof 38.12
cable, on G.I. wire No. 8 SWG bearer wire and in house
service pipe, including connection through joint box.
i) 3/0.74 mm (3/0.029") Per Rft. 14.65 43.75 Per Metre 48.05 143.45
ii) 7/0.74 mm (7/0.029") Per Rft. 14.65 59.35 Per Metre 48.05 194.60
iii) 7/0.91 mm (7/0.036") Per Rft. 14.65 79.10 Per Metre 48.05 259.45
iv) 7/1.12 mm (7/0.044") Per Rft. 14.65 104.15 Per Metre 48.05 341.60
65 Supply and erection of all aluminum stranded hard drawn bare Per Rft. 28.65 100.00 Per Metre 93.90 327.90 38.1
conductor, of size 7/3.099 mm (7/0.122").
66 Supply and erection of street light pole bracket 30 mm (1¼") Each 720.50 3,389.50 Each 720.50 3,389.50
G.I. pipe 2 metre long, complete with 2 No. pole clamp.
67 Supply and erection of pole mounted street light, holders,
shade and glass, etc., for fitting 125/250 watts mercury vapour
lamp (excluding cost of lamps):
i) G.E.C. design Each 1,441.00 6,050.20 Each 1,441.00 6,050.20
ii) Philips design Each 1,441.00 6,971.80 Each 1,441.00 6,971.80

chapter-24(Electric Installation) Page 166


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
68 Supply and fitting of mercury vapour lamp, complete with
choke set.
i) 125 watt lamp Each 563.75 2,476.55 Each 563.75 2,476.55
ii) 250 watt lamp Each 676.50 4,126.50 Each 676.50 4,126.50
69 Manufacture and erection of angle iron lattice steel structure Each 24,360.45 75,314.15 Each 24,360.45 75,314.15 38.13 The composite rate will be reduced
pole (36.0') 10,923 mm long 9348 mm (30.5') above ground or increased by Rs. 36.50 for each
level) 355 mm (14") square at base and 204 mm (8") square at (100 mm) of reduction or addition in
top for electric distribution line, using 1¼"x1¼"x3/16" (30x30x5 the height of the pole above ground
mm) angle iron legs and ¾"x¾"1/8" (20x20x3 mm) angle iron level.
bracing 420 mm (17") long fixed between legs on all the four
sides in diagonal position, and 1¾"x1¾"x3/16"(45x45x5 mm)
angle iron on top and 4 bands of M.S. flat iron 2"x¼" (50x6 mm)
305 mm (12") centre to centre, as per standard drawing
including silver painting of pole 3 coats, excavation and refilling
of foundation cement concrete 1:2:4. 6'-0"x1'-8"x1'-8"
(1807x500x500 mm) for foundation, etc, complete in all
respects.
70 Manufacture and erection of galvanized angle iron lattice steel Each 23,354.10 115,962.05 Each 23,354.10 115,962.05 38.13 The composite rate will be reduced
structure pole 37 ft. (11.25 m) long 30 ft. (9 m) above ground or increased by Rs. 237.00 for each
level), 34" square (850 mm) at base, 13.75" (35 mm) square at foot (300 mm) of reduction or
top, for electric distribution line, using 2"x2"x5/32" addition in the height of the pole
(50x50x4mm) high tensile steel angle iron legs, and 1-3/8"x above ground level.
1-3/8"x1/8" (35x35x3 mm) M.S. angle iron bracings fixed
between legs on all the four sides in diagonal position as per
standard drawing including silver painting of pole, excavation
and refilling of foundation, one ft. (300 mm) thick cement
concrete 1:3:6 foundation of outer size 8'x3½'x3½'
(2400x1050x1050 mm), etc. complete in all respects.
71 Supplying, installation testing and commissioning of Octagonal shape electric
street light pole, made of hot dipped 4.5 mm thick (7 SWG) galvanized steel,
tappered from 225 mm at bottom to 100 mm at top, with 1500 mm x 60 mm x
4mm thick dia. arm for luminaire installation, duly G.I.welded with
470x470x20 mm base plate with the help of 4 no triangular stiffeners
100x350x20 mm of GI sheet, with built in junction box with shutter, i/c the
cost of nuts & J-rag bolts, duly fixed in prelaid concrete foundation,
foundation will be paid additionally as approved and directed by the Engineer
In charge.
a) Single Arm
(i) 8 mtr height Each 5,544.00 134,418.75 Each 5,544.00 134,418.75
(ii) 10 mtr height Each 5,544.00 156,065.65 Each 5,544.00 156,065.65
(iii) 12 mtr height Each 5,544.00 177,712.50 Each 5,544.00 177,712.50
(iv) 15 mtr height Each 5,544.00 210,182.80 Each 5,544.00 210,182.80
b) Double Arm
(i) 8 mtr height Each 5,544.00 139,459.00 Each 5,544.00 139,459.00
(ii) 10 mtr height Each 5,544.00 161,105.90 Each 5,544.00 161,105.90
(iii) 12 mtr height Each 5,544.00 182,752.75 Each 5,544.00 182,752.75
(iv) 15 mtr height Each 5,544.00 215,223.05 Each 5,544.00 215,223.05

chapter-24(Electric Installation) Page 167


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
72 Supplying, installation and commissioning of LED Cobra-head Luminaries of
specified wattage and lumens conforming to IP 66 & IK 08 or above
Philips/Osram/Thorn or NEECA approved equivalent manufacturer with
corrosion resistant die casted Aluminum housing, silicon gasket in special
groove, UV stable & scratch resistant synthetic materials, thermally hardened
glass complete with LED Chip (Philips Lumiled/Cree/Nichia/Osram make or
equivalent approved manufacturer), programmable LED driver
(Harvard/TCI/Lumotech/Philips/VOSSLOH Schwabe/Lightech make or
approved equivalent manufacturer), minimum 10kV surge protection rating
device i/c the cost of all accessories/components required for proper operation,
fully flexible for future upgradation and easy replacements for maintenance
purposes, bucket elevator charges as approved and directed by the Engineer
Incharge.

a) 140 Lm/Watt
(i) 30 Watt with 4200 lumens Each 488.40 56,251.90 Each 488.40 56,251.90
(ii) 50 Watt with 7000 Lumens Each 488.40 76,051.90 Each 488.40 76,051.90
(iii) 60 Watt with 8400 lumens Each 488.40 77,345.65 Each 488.40 77,345.65
(iv) 90 Watt with 12600 Lumens Each 488.40 81,339.40 Each 488.40 81,339.40
(v) 120 Watt with 16800 Lumens Each 488.40 85,614.40 Each 488.40 85,614.40
(vi) 140 Watt with 19600 lumens Each 488.40 92,439.40 Each 488.40 92,439.40
(vii) 150 Watt with 21000 lumens Each 488.40 95,439.40 Each 488.40 95,439.40
(viii) 180 Watt with 25200 Lumens Each 488.40 97,479.40 Each 488.40 97,479.40
(ix) 250 Watt with 35000 Lumens Each 488.40 100,839.40 Each 488.40 100,839.40
b) 130 Lm/Watt
(i) 30 Watt with 3900 lumens Each 488.40 55,059.40 Each 488.40 55,059.40
(ii) 50 Watt with 6500 Lumens Each 488.40 71,619.40 Each 488.40 71,619.40
(iii) 60 Watt with 7800 lumens Each 488.40 79,071.40 Each 488.40 79,071.40
(iv) 90 Watt with 11700 Lumens Each 488.40 82,383.40 Each 488.40 82,383.40
(v) 120 Watt with 15600 Lumens Each 488.40 86,192.20 Each 488.40 86,192.20
(vi) 140 Watt with 18200 lumens Each 488.40 88,179.40 Each 488.40 88,179.40
(vii) 150 Watt with 19500 lumens Each 488.40 91,988.20 Each 488.40 91,988.20
(viii) 180 Watt with 23400 Lumens Each 488.40 94,803.40 Each 488.40 94,803.40
(ix) 250 Watt with 32500 Lumens Each 488.40 98,115.40 Each 488.40 98,115.40
c) 120 Lm/Watt
(i) 30 Watt with 3600 lumens Each 488.40 51,747.40 Each 488.40 51,747.40
(ii) 40 Watt with 4800 Lumens Each 488.40 57,543.40 Each 488.40 57,543.40
(iii) 50 Watt with 6000 lumens Each 488.40 61,683.40 Each 488.40 61,683.40
(iv) 60 Watt with 7200 Lumens Each 488.40 67,479.40 Each 488.40 67,479.40
(v) 90 Watt with 10800 Lumens Each 488.40 72,447.40 Each 488.40 72,447.40
(vi) 120 Watt with 14400 Lumens Each 488.40 77,415.40 Each 488.40 77,415.40
(vii) 140 Watt with 16800 lumens Each 488.40 82,383.40 Each 488.40 82,383.40
(viii) 150 Watt with 18000 lumens Each 488.40 85,695.40 Each 488.40 85,695.40
(ix) 180 Watt with 21600 Lumens Each 488.40 92,319.40 Each 488.40 92,319.40
(x) 250 Watt with 30000 Lumens Each 488.40 95,631.40 Each 488.40 95,631.40
73 Earthing of iron clad/aluminum switches, etc. with G.I. wire No. Job 3,102.00 13,184.85 Job 3,102.00 13,184.85
8 SWG in G.I. pipe 15 mm (½") dia, recessed or on surface of
wall and floor, complete with 1.5 metre long G.I. pipe, 50 mm
(2") dia with reducing socket 4 to 5 metre below ground level,

chapter-24(Electric Installation) Page 168


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
and 2 metre away from building plinth.
74 Earthing of Metallic cases, etc. with G.I. wire No. 8 SWG, in 38.11
15 mm (½") dia G.I. pipe, best quality:-
i) on surface, including clamps, etc. Per Rft. 32.95 188.15 Per Metre 108.10 617.15
ii) recessed in wall, including hooks, Per Rft. 75.65 231.90 Per Metre 248.15 760.60
jharries and making good surface.
75 Bonding to earth with wire on surface, including cost of wire, ditto
clamps, thimbles, etc.
a) G.I . wire:
i) 8 SWG Per Rft. 14.90 32.55 Per Metre 48.85 106.70
ii) 16 SWG Per Rft. 14.90 19.20 Per Metre 48.85 62.90

b) Copper wire:
i) 16 SWG Per Rft. 14.90 34.15 Per Metre 48.85 112.00
ii) 20 SWG Per Rft. 14.90 21.85 Per Metre 48.85 71.65
76 Erection only, of lightning conductor of copper tape, including Per Rft. 52.70 65.40 Per Metre 172.90 214.45 38.11 Rate includes all materials required
supply of copper staple and copper nails and cement, sand in erection (excluding copper tape
mortar. lightning conductor).
77 Supply and erection of 600 x 600 x 3 mm (2'x2'x1/8") copper Each 2,068.00 20,990.60 Each 2,068.00 20,990.60 ditto
plate, including revitting to copper tape and placing in mixture
of salt and charcoal, etc.
78 Supply and erection of copper tape, including copper staple
copper nails, cement, sand, etc.
i) tape 40x3 mm (1½"x1/8") Per Rft. 75.65 521.80 Per Metre 248.15 1,711.55
ii) tape 50x3 mm (2"x1/8") Per Rft. 75.65 613.80 Per Metre 248.15 2,013.20
79 Supply and erection of 25 mm (1") dia and one metre long Job 1,441.00 5,931.65 Job 1,441.00 5,931.65
lightning conductor copper rod with 5 spikes on ball and base,
etc. complete.
80 Supply and erection of electric energy meter, including meter 38.1
testing fee, etc.
a) Single phase:
i) 1x10 Amp, 250 volts Each 610.50 5,816.80 Each 610.50 5,816.80
ii) 1x30 Amp, 250 volts Each 610.50 5,936.80 Each 610.50 5,936.80
b) Three phase, 4 wires:
i) 3x15 Amp, 400 volts Each 1,221.00 20,934.35 Each 1,221.00 20,934.35
ii) 3x50 Amp, 400 volts Each 1,691.25 22,045.30 Each 1,691.25 22,045.30
iii) 3x80 Amp, 400 volts Each 1,691.25 22,246.90 Each 1,691.25 22,246.90
81 Rewinding of A.C. ceiling fan, capacitor type, including cost of The credit of out turn of dismantled
wire, leatheride paper cotton tape, soldering, etc. material has been accounted for in
the rate.
i) 1200 mm (48") sweep, 275-300 RPM. Each 998.25 2,326.10 Each 998.25 2,326.10
ii) 1400 mm (56") sweep, 250-275 RPM. Each 1,075.80 2,809.25 Each 1,075.80 2,809.25

chapter-24(Electric Installation) Page 169


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
82 Rewinding of A.C. exhaust fan, including cost of wire, The credit of out turn of dismantled
leatheride paper, cotton tape, soldering, etc. material has been accounted for in
the rate.
i) 375 mm (15") sweep, and 1300-1500 RPM Each 814.00 1,815.45 Each 814.00 1,815.45
ii) 450 mm (18") sweep, and 1300-1500 RPM Each 976.80 2,171.45 Each 976.80 2,171.45
83 Rewinding of pedestal fan 600 mm (24") sweep, and 900-950 Each 976.80 2,254.25 Each 976.80 2,254.25 The credit of out turn of dismantled
RPM, including wire, leatheride paper, cotton, tape, etc. material has been accounted for in
the rate.
84 Supply and fitting of regulator knob with shaft Each 152.65 306.25 Each 152.65 306.25 38.1
and plate of electric fan regulator.
85 Supply and fitting of capacitor 2.2 uF, for ceiling fans. Each 122.10 284.10 Each 122.10 284.10 ditto
86 Supply and fitting of ball bearing of size Each 152.65 386.65 Each 152.65 386.65 ditto
6201, 6202 or 6203 for ceiling fans.
87 Rewinding regulator of ceiling fan 48"/56" (1200/1400 mm) Each 305.25 556.70 Each 305.25 556.70 The credit out turn of dismantled
sweep, to control 3/4 speeds. material has been accounted for in
the rate.
88 Erection of ceiling fan alongwith regulator (all sizes), including Each 526.30 670.30 Each 526.30 670.30
carriage from local Railway Station/Store to site of work,
electric wire/cable for suspension rod and board connection,
and cutting, threading on the rod, where necessary.
89 Suppling,Installation and comissioning of MCB (Miniature Circuit Breaker)
of specified rating made of LEGRAND FRANCE/ GE U.S.A / SCHNEIDER
GERMANY /SIEMEN GERMAN/TERASAKI JAPAN/ ABB
SWITZERLAND or approved equivalent manufacturer in prelaid DBs and
Panels i/c the cost of screwes,necessary wire complete in all respect as
approved and directed by the Engineer Incharge.
a) Single Pole
(i) 1-4 Amp (6KA,10KA) Each 48.85 1,173.85 Each 48.85 1,173.85
(ii) 6-40 Amp (6 KA) Each 48.85 1,128.85 Each 48.85 1,128.85
(iii) 6-63 Amp (10 KA) Each 48.85 1,455.10 Each 48.85 1,455.10
b) Double Pole
(i) 1-4 Amp(6 KA,10 KA) Each 48.85 2,973.85 Each 48.85 2,973.85
(ii) 6-40 Amp (6 KA) Each 48.85 3,963.85 Each 48.85 3,963.85
(iii) 6-63 Amp (10 KA) Each 48.85 5,617.60 Each 48.85 5,617.60
c) Triple Pole
(i) 1-4 Amp(6 KA,10 KA) Each 73.25 6,992.00 Each 73.25 6,992.00
(ii) 6-40 Amp (6 KA) Each 73.25 5,979.50 Each 73.25 5,979.50
(iii) 6-63 Amp (10 KA) Each 73.25 8,510.75 Each 73.25 8,510.75
d) Four Pole
(i) 1-4 Amp (6KA,10KA) Each 73.25 10,326.50 Each 73.25 10,326.50
(ii) 6-40 Amp(6 KA) Each 73.25 8,848.25 Each 73.25 8,848.25
(iii) 6-63 Amp (10 KA) Each 73.25 12,448.25 Each 73.25 12,448.25

chapter-24(Electric Installation) Page 170


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
90 Supplying ,Installation and commissioning of MCCB (Moulded Case Circuit
Breaker) of specified rating made of LEGRAND FRANCE/ GE U.S.A /
SCHNEIDER GERMANY / TERASAKI JAPAN/SIEMEN/ABB
SWITZERLAND or approved equivalent manufacturer (with fixed Thermal-
Magnetic Trip ) in prelaid DBs and Panels i/c the cost of screws, necessary
wire complete in all respect as approved and directed by the Engineer
Incharge.
a) Triple Pole
(i) 15-63 Amp(7.5 KA) Each 73.25 12,223.25 Each 73.25 12,223.25
(ii) 15-100 Amp (10 KA,15KA) Each 73.25 13,798.25 Each 73.25 13,798.25
(iii) 15-100 Amp(18 KA) Each 73.25 14,473.25 Each 73.25 14,473.25
(iv) 125-250 Amp(18 KA) Each 73.25 27,117.15 Each 73.25 27,117.15
(v) 15-100 Amp(25 KA) Each 73.25 19,760.75 Each 73.25 19,760.75
(vi) 125-250 Amp(25KA) Each 73.25 34,948.25 Each 73.25 34,948.25
(vii) 15-100 Amp(36 KA) Each 73.25 20,323.25 Each 73.25 20,323.25
(viii) 125-150 Amp(36 KA) Each 73.25 26,510.75 Each 73.25 26,510.75
(ix) 200-250 Amp(36 KA) Each 73.25 47,323.25 Each 73.25 47,323.25
(x) 300-630 Amp(36 KA) Each 73.25 93,377.85 Each 73.25 93,377.85
(xi) 300-630 Amp(50 KA) Each 73.25 107,539.85 Each 73.25 107,539.85
b) Four Pole
(i) 15-100 Amp(18KA) Each 85.45 33,835.45 Each 85.45 33,835.45
(ii) 125-250 Amp(18 KA) Each 85.45 42,835.45 Each 85.45 42,835.45
(iii) 15-100 Amp(25 KA) Each 85.45 33,835.45 Each 85.45 33,835.45
(iv) 125-250 Amp(25 KA) Each 85.45 73,385.95 Each 85.45 73,385.95
(v) 15-200 Amp(36 KA) Each 85.45 36,085.45 Each 85.45 36,085.45
(vi) 225-630 Amp(36 KA) Each 85.45 115,883.95 Each 85.45 115,883.95
(vii) 300-630 Amp(50 KA) Each 85.45 189,028.10 Each 85.45 189,028.10
91 Supplying,Installation and commissioning of MCCB (Moulded Case Circuit
Breaker) of specified rating made of LEGRAND FRANCE/ GE U.S.A /
SCHNEIDER GERMANY / TERASAKI JAPAN/ABB SWITZERL or
approved equivalent manufacturer (with adjustable Thermal-Magnetic Trip )
in prelaid DBs and Panels i/c the cost of screws, necessary wire complete in all
respect as approved and directed by the Engineer Incharge.

a) Triple Pole With Adjustable Thermal-M agnetic Trip /Electronic


Trip (60-100%)
(i) 25-100 Amp(25 KA) Each 61.05 19,861.05 Each 61.05 19,861.05
(ii) 125-400 Amp(25 KA) Each 61.05 56,461.35 Each 61.05 56,461.35
(iii) 32-100 Amp(36 KA) Each 61.05 24,361.05 Each 61.05 24,361.05
(iv) 125-160 Amp(36 KA) Each 61.05 36,961.05 Each 61.05 36,961.05
(v) 200-250 Amp(36 KA) Each 61.05 49,561.05 Each 61.05 49,561.05
(vi) 300-1000 Amp(36 KA) Each 61.05 151,936.05 Each 61.05 151,936.05
(vii) 16-100 Amp(50 KA) Each 61.05 40,561.05 Each 61.05 40,561.05
(viii) 125-160 Amp(50 KA) Each 61.05 61,936.05 Each 61.05 61,936.05
(ix) 200-400 Amp(50 KA) Each 61.05 99,030.90 Each 61.05 99,030.90
(x) 630-1600 Amp(50 KA) Each 61.05 348,671.55 Each 61.05 348,671.55
(xi) 16-80 Amp(70 KA) Each 61.05 45,061.05 Each 61.05 45,061.05
(xii) 100-160 Amp(70 KA) Each 61.05 67,561.05 Each 61.05 67,561.05
(xiii) 250-630 Amp(70 KA) Each 61.05 191,311.05 Each 61.05 191,311.05

chapter-24(Electric Installation) Page 171


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
(xiv) 800-1250 Amp(70 KA) Each 61.05 405,061.05 Each 61.05 405,061.05
(xv) 1600-3200 Amp(70 KA) Each 61.05 506,311.05 Each 61.05 506,311.05
b) Four Pole With Adjustable Thermal-M agnetic Trip/Electronic
Trip (40-100%)
(i) 25-60 Amp(25 KA) Each 73.25 36,073.25 Each 73.25 36,073.25
(ii) 80-160 Amp(25 KA) Each 73.25 40,573.25 Each 73.25 40,573.25
(iii) 32-63 Amp(36 KA) Each 73.25 39,522.50 Each 73.25 39,522.50
(iv) 80-160 Amp(36 KA) Each 73.25 51,373.25 Each 73.25 51,373.25
(v) 200-630 Amp(36 KA) Each 73.25 167,923.25 Each 73.25 167,923.25
(vi) 800-1000 Amp(36KA) Each 73.25 450,073.25 Each 73.25 450,073.25
(vii) 60-250 Amp(50 KA) Each 73.25 121,355.00 Each 73.25 121,355.00
(viii) 400-630 Amp(50 KA) Each 73.25 230,698.25 Each 73.25 230,698.25
(ix) 800 Amp(50 KA) Each 73.25 393,823.25 Each 73.25 393,823.25
(x) 1000-1250 Amp(50KA) Each 73.25 478,198.25 Each 73.25 478,198.25
(xi) 1600 Amp(50 KA) Each 73.25 562,573.25 Each 73.25 562,573.25
(xii) 32-80 Amp(70 KA) Each 73.25 78,823.25 Each 73.25 78,823.25
(xiii) 100-250 Amp(70 KA) Each 73.25 95,698.25 Each 73.25 95,698.25
(xiv) 400-630 Amp(70 KA) Each 73.25 209,323.25 Each 73.25 209,323.25
(xv) 800 Amp(70 KA) Each 73.25 423,019.80 Each 73.25 423,019.80
(xvi) 1000-1600 Amp(70 KA) Each 73.25 556,948.25 Each 73.25 556,948.25
92 P/F ACB (Air Circuit Breaker) of specified rating made of LEGRAND
FRANCE/ GE U.S.A / SCHNEIDER GERMANY / TERASAKI
JAPAN/ABB SWITZERLAND or approved equivalent manufacturer in
prelaid Panels i/c the cost of screws,necessary wire complete in all respect as
approved and directed by the Engineer Incharge.
a) Triple Pole (65 KA)
(i) 800 Amp Each 73.25 666,073.25 Each 73.25 666,073.25
(ii) 1000-1250 Amp Each 73.25 627,572.15 Each 73.25 627,572.15
(iii) 1600 Amp Each 73.25 721,645.75 Each 73.25 721,645.75
(iv) 2000 Amp Each 73.25 837,073.25 Each 73.25 837,073.25
b) Tripple Pole (85-100 KA)
(i) 2500 Amp Each 73.25 1,112,619.25 Each 73.25 1,112,619.25
(ii) 3200 Amp Each 73.25 1,287,547.15 Each 73.25 1,287,547.15
(iii) 4000 Amp Each 73.25 1,320,769.80 Each 73.25 1,320,769.80
c) Four Pole (65-100 KA)
(i) 800 Amp Each 73.25 993,356.85 Each 73.25 993,356.85
(ii) 1000 Amp Each 73.25 1,018,990.00 Each 73.25 1,018,990.00
(iii) 1250 Amp Each 73.25 1,038,907.05 Each 73.25 1,038,907.05
(iv) 1600 Amp Each 73.25 1,051,948.25 Each 73.25 1,051,948.25
(v) 2000 Amp Each 73.25 1,170,073.25 Each 73.25 1,170,073.25
(vi) 2500 Amp Each 73.25 1,696,345.90 Each 73.25 1,696,345.90
(vii) 3200 Amp Each 73.25 1,878,823.25 Each 73.25 1,878,823.25
(viii) 4000 Amp Each 73.25 2,210,788.25 Each 73.25 2,210,788.25
(ix) 6300 Amp Each 73.25 2,281,421.40 Each 73.25 2,281,421.40

chapter-24(Electric Installation) Page 172


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
93 P/F wall mounted DB (Distribution Board) made with 16SWG Sheet
(Recessded/Surface mounted Type), Powder coated Paint, i/c the cost of Lock,
Indication lights,Thimble, Copper Comb, Wiring, Netural & Earth Bar, Door
Earthing, Digital Voltmeter,Digital Ammeter,Volt Selector Switch,Ammeter
selector switch,Current Transformers and Controles Complete in all respect as
approved and directed by the Engineer Incharge (Breakers will be Paid
Separately).
(a) 6" deep
(i) 20~60A P.Cft 2,255.00 24,685.85 `
(ii) 75~100A P.Cft 2,410.45 18,997.80
(b) 12" deep
(i) 125~150A P.Cft 856.15 7,246.70
(ii) 160~200A P.Cft 873.15 6,410.55
94 P/F floor mounted Electric Panel board of required depth and size, fabricarted
with 14SWG M.S sheet (Indoor/Outdoor Type),derusting, zinc Phosphated,
finish with electro static powder coating in approved colour i/c the cost of
Lock, Indication lights, Brass glands, Netural & Earth bar, Digital volt meter/
Amp meter, Slector switchs, Current Transformers, Controles, Channels,
Copper bus bars of specified capacity ,Door Earthing, complete in all respects
as approved and directed by the Engineer Incharge (Breakers will be Paid
Separately).
1. LT Switchboards
a) 2.50 Ft deep
(i)250~600A P.Cft 246.40 4,419.10
(ii)800~1200A P.Cft 246.40 5,400.45
b) 3.00 Ft deep
(i)1600~2000A P.Cft 246.40 7,917.00
(ii)2500~3200A P.Cft 257.70 11,878.90
2. HT Switchboards
a) 3.00 Ft deep
(i)630A P.Cft 188.65 5,462.30
95 P/F floor mounted ATS (Auto Transfer Switch) panel board , fabricarted with
14S WG M.S sheet (Indoor Type) duly painted with 100 microns powder
coated paint in approved colour , front access ,extendable,insulation class of
600 volts IP-44, incomimg & outgoing connections from bottom with flexible
copper cable suitable for 415 VAC, 3-phase 4 wire, 50 HZ TPN&E system
having rated service, short circuit breaking capacity at 400VAC conformimg
to IEC-947-2 to accomodate given no of circuit components, instruments &
accessories,assembled & wired with Electrolitic Copper bus bars at 50 deg
and cables duly cleaned down to bare shining metal phosphate, manual
change Over i/c the cost of Lock, Indication lights, Brass glands, Netural &
Earth bar, thimbles, Digital volt meter/ Amp meter, Selector switch, Current
transformers, Controles, Channels, Copper bus bars of specified capacity
,Relays, Door Earthing, complete in all respects as approved and directed by
the Engineer Incharge. (Breakers wil be paid additionally)

a) 1.00 Ft deep
(i) 15-40 KVA Each 12,309.00 963,097.10 Each 12,309.00 963,097.10
(ii) 50-100 KVA Each 13,530.00 975,358.10 Each 13,530.00 975,358.10

chapter-24(Electric Installation) Page 173


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
b) 2.00 Ft deep
(i)125-250 KVA Each 13,530.00 2,421,886.40 Each 13,530.00 2,421,886.40
c) 2.50 Ft deep
(i)300-500 KVA Each 15,972.00 4,342,643.85 Each 15,972.00 4,342,643.85
(ii)630-1000 KVA Each 15,972.00 6,467,273.50 Each 15,972.00 6,467,273.50
96 P/F PFI PLANT (Power Factor Improvement Plant) comprising of
components of required ratitngs, in MS box of 14 SWG i/c the cost of 3mm
thick Backlite sheet (Safety Sheet) Lock, thimbles, power capacitors,
Magnetic contactors, HRC fuses, Power factor controllers, Indication lights,
Copper comb, Wiring, Netural & Earth bar, Door earthing, brass glands, push
buttons, CTS, Controle MCB, Surge Suppressors, Auto/Manual Switches,
Exhaust Fan, Temp regulators as per WAPDA standards complete in all
respects as approved and directed by the Engineer Incharge.

i) 62.5KVAr Each 17,309.25 297,990.50 Each 17,309.25 297,990.50


ii) 100KVAr Each 17,309.25 368,739.50 Each 17,309.25 368,739.50
iii) 150KVAr Each 17,309.25 523,395.65 Each 17,309.25 523,395.65
iv) 250KVAr Each 17,309.25 803,250.20 Each 17,309.25 803,250.20
v) 300KVAr Each 19,640.25 1,158,627.35 Each 19,640.25 1,158,627.35
vi) 400KVAr Each 19,640.25 1,236,747.35 Each 19,640.25 1,236,747.35
vii) 500KVAr Each 21,703.50 1,689,485.00 Each 21,703.50 1,689,485.00
viii) 600KVAr Each 21,703.50 1,814,225.00 Each 21,703.50 1,814,225.00
ix) 800KVAr Each 21,703.50 2,075,045.00 Each 21,703.50 2,075,045.00
x) 1000KVAr Each 25,830.00 2,709,154.20 Each 25,830.00 2,709,154.20
xi) 1500KVAr Each 25,830.00 3,913,061.55 Each 25,830.00 3,913,061.55
xii) 2000KVAr Each 25,830.00 5,026,500.85 Each 25,830.00 5,026,500.85
97 Providing and fixing DB/Panel accessories of required rating and size i/c
copper screws of approved brand Complete in all respect as approved and
directed by the Engineer Incharge.
(i) Selector Switch Each 48.85 1,224.85 Each 48.85 1,224.85
(ii) Current Transformer Coil (Make: Metelx/Fico) Each 48.85 2,130.35 Each 48.85 2,130.35
(iii)Digital Voltmeter (0-600 Volt) Each 48.85 1,008.85 Each 48.85 1,008.85
(iv) Digital Ammeter (0-9999 Amp) Each 48.85 1,224.85 Each 48.85 1,224.85
(v) LED Phase Indicator Each 48.85 618.85 Each 48.85 618.85
(vi) Push Button ON/OFF (Make: Schneider/Himal/Eqv.) Each 48.85 627.20 Each 48.85 627.20
(vii) Auxiliary Contactor. (Make: Schneider/ Terasaki/ABB) Each 48.85 5,369.80 Each 48.85 5,369.80
(viii)Control MCB S/P 6A (Make: Schneider/ Terasaki/ABB) Each 48.85 1,371.85 Each 48.85 1,371.85
(ix) Surge Suppressors. Each 48.85 1,056.85 Each 48.85 1,056.85
(x) Auto/Manual Switch 3-Steps (Make: GGT/Camsco) Each 48.85 2,253.85 Each 48.85 2,253.85
(xi) Exhaust Fan with Louvers (Make: Imported/Plastim) Each 48.85 3,828.85 Each 48.85 3,828.85
(xii) Temperature Regulator 0~60C Each 48.85 2,130.35 Each 48.85 2,130.35
(xiii)Power Capacitors Each
(a) 12.5 KVAR Each 48.85 17,688.85 Each 48.85 17,688.85
(b) 25 KVAR Each 48.85 27,138.85 Each 48.85 27,138.85
(c) 50 KVAR Each 48.85 69,348.85 Each 48.85 69,348.85
(d) 100 KVAR Each 48.85 188,026.45 Each 48.85 188,026.45
(xiv) Power Capacitors with Harmonic Blocker Each
(a) for 12.5 KVAR Each 48.85 46,845.25 Each 48.85 46,845.25
(b) for 25 KVAR Each 48.85 51,603.25 Each 48.85 51,603.25

chapter-24(Electric Installation) Page 174


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
(c) for 50 KVAR Each 48.85 98,752.45 Each 48.85 98,752.45
(xv) Magnetic Contactor Each
(a) 25 A (AC 3) for 12.5 KVAR Each 48.85 12,396.85 Each 48.85 12,396.85
(b) 40 A (AC 3) for 25 KVAR Each 48.85 23,358.85 Each 48.85 23,358.85
(c) 80 A (AC 3) for 50 KVAR Each 48.85 46,038.85 Each 48.85 46,038.85
(d)185A (AC3) 4-Pole Each 48.85 171,408.85 Each 48.85 171,408.85
(e)630A (AC3) 4-Pole Each 48.85 757,906.10 Each 48.85 757,906.10
(f)1250A ACB 65 KA (AC 3) Adj. 4-Pole Each 48.85 1,116,630.60 Each 48.85 1,116,630.60
(g)2000A ACB 65 KA Adj.(AC 3) 4-Pole Each 48.85 1,150,097.45 Each 48.85 1,150,097.45
(xvi) HRC Fuses With Base
(a) 32 Amp Each 48.85 1,868.30 Each 48.85 1,868.30
(b) 63 Amp Each 48.85 1,875.85 Each 48.85 1,875.85
(c) 125 Amp Each 48.85 2,568.85 Each 48.85 2,568.85
(xvii) Power Factor Controller
(a) 6 Steps Each 48.85 58,008.85 Each 48.85 58,008.85
(b) 12 Steps Each 48.85 67,458.85 Each 48.85 67,458.85
98 Suplying,Installation,testing and commissioning of 415-Volt ,5 Pole
(TP+N+E) compact Copper Busway (Bus Tie Duct B.T.D) of specified
size/rating comprising of 10 mm thick sandwitch copper Bus bars,insulated
with non-flammable/flame resistant resin applied at 130 OC by Automatic
Electro-static application with Mayler Class-B, housed in Aluminium Housing
i/c the cost of hangers, accessories,enclosures IP55, IEC 61439-1, complete in
all respect,spaced to a minimum reducing reactance as approved & directed by
the Engineer Incharge.
(i) 400 Amp P.Rft 93.25 29,542.25 P.Mtr 305.85 96,898.55
(ii) 630 Amp P.Rft 93.25 38,156.05 P.Mtr 305.85 125,151.90
(iii) 800 Amp P.Rft 93.25 50,342.40 P.Mtr 305.85 165,123.05
(iv) 1000 Amp P.Rft 93.25 59,955.95 P.Mtr 305.85 196,655.45
(v) 1250 Amp P.Rft 93.25 66,428.60 P.Mtr 305.85 217,885.75
(vi) 1600 Amp P.Rft 93.25 82,550.65 P.Mtr 305.85 270,766.20
(vii) 2000 Amp P.Rft 93.25 101,444.25 P.Mtr 305.85 332,737.15
(viii) 2500 Amp P.Rft 116.55 114,315.35 P.Mtr 382.30 374,954.40
(ix) 3200 Amp P.Rft 116.55 138,180.15 P.Mtr 382.30 453,230.95
(x) 3600 Amp P.Rft 116.55 151,061.10 P.Mtr 382.30 495,480.35
(xi) 4000 Amp P.Rft 116.55 166,523.50 P.Mtr 382.30 546,197.15
(xii) 4250 Amp P.Rft 116.55 185,364.20 P.Mtr 382.30 607,994.60
(xiii) 5000 Amp P.Rft 139.85 209,339.70 P.Mtr 458.75 686,634.25
(xiv) 6300 Amp P.Rft 139.85 249,145.35 P.Mtr 458.75 817,196.75
99 Suplying,Installation,testing and commissioning of 415-Volt ,5 Pole
(TP+N+E) compact joint modules for Copper Busway (Bus Tie Duct B.T.D)
of specified size/rating comprising of 10 mm thick copper Bus bars,insulated
with non-flammable/flame resistant resin applied at 130 OC by Automatic
Electro-static application/with epoxy coated insulation with Mayler Class-B,
housed in Aluminium Housing i/c the cost of, accessories,enclosures IP55,
IEC 61439-1, complete in all respect,as approved & directed by the Engineer
Incharge.
a) Flange End
(i) 400-800 Amp Each 466.20 34,246.20 Each 466.20 34,246.20
(ii) 1000-1600 Amp Each 466.20 62,937.70 Each 466.20 62,937.70

chapter-24(Electric Installation) Page 175


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
(iii) 1600-2000 Amp Each 466.20 72,218.65 Each 466.20 72,218.65
(iv) 2500-3200 Amp Each 466.20 92,934.70 Each 466.20 92,934.70
(v) 4000 Amp Each 466.20 119,580.25 Each 466.20 119,580.25
(vi) 4250-6300 Amp Each 466.20 141,873.70 Each 466.20 141,873.70
b) Elbow 90 degree
(i) 400-800 Amp Each 466.20 40,167.70 Each 466.20 40,167.70
(ii) 1000-1600 Amp Each 466.20 60,791.40 Each 466.20 60,791.40
(iii) 1600-2000 Amp Each 466.20 77,651.75 Each 466.20 77,651.75
(iv) 2500-3200 Amp Each 466.20 103,432.70 Each 466.20 103,432.70
(v) 4000-6300 Amp Each 466.20 140,595.95 Each 466.20 140,595.95
c) Reducer/Tee jont
(i) 400-800 Amp Each 466.20 43,297.55 Each 466.20 43,297.55
(ii) 1000-1600 Amp Each 466.20 64,548.70 Each 466.20 64,548.70
(iii) 1600-2000 Amp Each 466.20 81,938.00 Each 466.20 81,938.00
(iv) 2500-3200 Amp Each 466.20 108,526.50 Each 466.20 108,526.50
(v) 4000-6300 Amp Each 466.20 148,748.20 Each 466.20 148,748.20
d) Flexible Connector
(i) 2500-3200 Amp Each 466.20 456,391.20 Each 466.20 456,391.20
(ii) 4000-4250 Amp Each 466.20 607,700.40 Each 466.20 607,700.40
(iii) 6300 Amp Each 466.20 769,097.90 Each 466.20 769,097.90
e) 4 pole TAP OFF Units i/c the cost of, circuit breakers
(i) 400 Amp (50 KA) Each 466.20 381,348.05 Each 466.20 381,348.05
(ii) 630-800 Amp (50 KA) Each 466.20 655,730.10 Each 466.20 655,730.10
(iii) 1000-1250 Amp (50 KA) Each 466.20 817,699.50 Each 466.20 817,699.50
(iv) 1600-2000 Amp (50 KA) Each 466.20 1,200,890.50 Each 466.20 1,200,890.50
(v) 2500-6300 Amp (50 KA) Each 466.20 1,620,833.60 Each 466.20 1,620,833.60
100 Providing and fixing 3" deep cable tray with straight flange fabricated with
perforated G.I. Sheet of specified guage,size and depth duly wall
supported/ceiling hung on painted brackets of MS angle iron of 1"x1"x1/8"
and MS patti of 1-1/2"x3/16" size @ 5 ft C/C, hangers i/c the cost of
hardwares as approved and directed by the Engineer Incharge.
a) 16SWG
(i) 4"x3" Per Rft 216.15 528.05 Per Meter 708.95 1,732.00
(ii) 6"x3" Per Rft 216.15 642.45 Per Meter 708.95 2,107.20
101 Providing and fixing 4" deep cable tray with straight flange fabricated with
perforated G.I. Sheet of specified guage,size and depth duly wall
supported/ceiling hung,supported on painted brackets of MS angle iron of 1-
1/2"x1-1/2"x3/16" and MS patti of 1-1/2"x3/16" size @ 5 ft C/C, hangers i/c
the cost of hardwares as approved and directed by the Engineer Incharge.

a)16SWG
(i) 4"x4" Per Rft 259.40 647.20 Per Meter 850.75 2,122.75
(ii) 9"x4" Per Rft 259.40 911.00 Per Meter 850.75 2,988.05
(iii) 10"x4" Per Rft 259.40 1,199.35 Per Meter 850.75 3,933.90

chapter-24(Electric Installation) Page 176


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
102 Providing and fixing cable tray with straight flange fabricated with perforated
G.I. Sheet of specified guage,size and depth duly supported on painted
brackets of MS angle iron of 1-1/2"x1-1/2"x3/16" and MS patti of 1-
1/2"x3/16" size @ 3 ft C/C, hangers i/c the cost of hardwares as approved and
directed by the Engineer Incharge.
a) 14 SWG
(i) 12"x4" Per Rft 259.40 1,484.05 Per Meter 850.75 4,867.65
(ii) 16"x4" Per Rft 259.40 1,734.40 Per Meter 850.75 5,688.75
(iii) 24"x4" Per Rft 259.40 2,104.75 Per Meter 850.75 6,903.60
103 Providing and fixing screwless cable tray cover fabricated with 18 SWG G.I.
Sheet of required size i/c the cost of hardware as approved and directed by the
Engineer Incharge.
i) 4" wide Per Rft 21.60 153.40 Per Meter 70.90 503.15
ii) 6" wide Per Rft 21.60 195.45 Per Meter 70.90 641.05
iii) 9" wide Per Rft 21.60 263.75 Per Meter 70.90 865.15
iv) 10" wide Per Rft 32.40 295.60 Per Meter 106.35 969.55
v) 12" wide Per Rft 32.40 348.15 Per Meter 106.35 1,141.95
vi) 16" wide Per Rft 32.40 427.00 Per Meter 106.35 1,400.55
vii) 24" wide Per Rft 43.25 613.90 Per Meter 141.80 2,013.55
104 Providing and fixing hot dipped Galvanized Cable Ladder fabricated with side
channels of specified size and guage duly fixed with rungs of 35x15 mm run
@ 10"C/C i/c the cost of coupler plates (1-1/4"x8") and hardwares as
approved and directed by the Engineer Incharge.
I -Side Channel (2"x1/2")
(a) 16SWG
(i) 4"x2" Per Rft 86.45 262.65 Per Meter 283.60 861.45
(ii) 6"x2" Per Rft 86.45 271.45 Per Meter 283.60 890.40
(iii) 8"x2" Per Rft 86.45 279.00 Per Meter 283.60 915.20
(iv) 12"x2" Per Rft 86.45 302.95 Per Meter 283.60 993.70
(v) 18"x2" Per Rft 86.45 347.80 Per Meter 283.60 1,140.85
(vi) 24"x2" Per Rft 86.45 362.20 Per Meter 283.60 1,187.95
(vii) 30"x2" Per Rft 86.45 401.25 Per Meter 283.60 1,316.10
(viii) 36"x2" Per Rft 86.45 434.00 Per Meter 283.60 1,423.55
(b) 14SWG
(i) 4"x2" Per Rft 86.45 295.25 Per Meter 283.60 968.45
(ii) 6"x2" Per Rft 86.45 302.80 Per Meter 283.60 993.25
(iii) 8"x2" Per Rft 86.45 369.60 Per Meter 283.60 1,212.30
(iv) 12"x2" Per Rft 86.45 383.45 Per Meter 283.60 1,257.75
(v) 18"x2" Per Rft 86.45 430.25 Per Meter 283.60 1,411.25
(vi) 24"x2" Per Rft 86.45 457.80 Per Meter 283.60 1,501.60
(vii) 30"x2" Per Rft 86.45 490.55 Per Meter 283.60 1,609.05
(viii) 36"x2" Per Rft 86.45 530.90 Per Meter 283.60 1,741.30
I I -Side Channel (3"x1/2")
(c) 16SWG
(i) 4"x3" Per Rft 86.45 302.80 Per Meter 283.60 993.25
(ii) 6"x3" Per Rft 86.45 319.20 Per Meter 283.60 1,047.00
(iii) 8"x3" Per Rft 86.45 329.30 Per Meter 283.60 1,080.05
(iv) 12"x3" Per Rft 86.45 343.15 Per Meter 283.60 1,125.50
(v) 18"x3" Per Rft 86.45 395.00 Per Meter 283.60 1,295.55

chapter-24(Electric Installation) Page 177


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
(vi) 24"x3" Per Rft 86.45 417.50 Per Meter 283.60 1,369.35
(vii) 30"x3" Per Rft 86.45 450.25 Per Meter 283.60 1,476.80
(viii) 36"x 3" Per Rft 86.45 481.75 Per Meter 283.60 1,580.10
(d) 14SWG
(i) 4"x3" Per Rft 86.45 353.20 Per Meter 283.60 1,158.55
(ii) 6"x3" Per Rft 86.45 369.60 Per Meter 283.60 1,212.30
(iii) 8"x3" Per Rft 86.45 377.15 Per Meter 283.60 1,237.10
(iv) 12"x3" Per Rft 86.45 401.10 Per Meter 283.60 1,315.60
(v) 18"x3" Per Rft 86.45 452.95 Per Meter 283.60 1,485.65
(vi) 24"x3" Per Rft 86.45 481.75 Per Meter 283.60 1,580.10
(vii) 30"x 3" Per Rft 86.45 530.90 Per Meter 283.60 1,741.30
(viii) 36"x 3" Per Rft 86.45 562.40 Per Meter 283.60 1,844.60
I I I -Side Channel (4"x1/2")
(e) 16SWG
(i) 4"x 4" Per Rft 86.45 678.90 Per Meter 283.60 2,226.75
(ii) 6"x 4" Per Rft 86.45 717.95 Per Meter 283.60 2,354.85
(iii) 8"x 4" Per Rft 86.45 755.75 Per Meter 283.60 2,478.85
(iv) 12"x 4" Per Rft 86.45 833.85 Per Meter 283.60 2,735.10
(v) 18"x 4" Per Rft 86.45 960.05 Per Meter 283.60 3,148.95
(vi) 24"x 4" Per Rft 86.45 1,064.45 Per Meter 283.60 3,491.40
(f) 14SWG
(i) 4"x4" Per Rft 86.45 792.95 Per Meter 283.60 2,600.90
(ii) 6"x4" Per Rft 86.45 816.25 Per Meter 283.60 2,677.25
(iii) 8"x4" Per Rft 86.45 840.15 Per Meter 283.60 2,755.75
(iv) 12"x4" Per Rft 86.45 886.80 Per Meter 283.60 2,908.65
(v) 18"x4" Per Rft 86.45 970.15 Per Meter 283.60 3,182.00
(vi) 24"x4" Per Rft 86.45 1,030.45 Per Meter 283.60 3,379.80
105 Providing and fixing Pakistan Energy Label NEECA approved Copper winded
Exaust Fan i/c the cost of necessary cable and hardware for connection from
ceiling rose complete as approved and directed by Engineer Incharge.

a) Plastic body
(i) 10" dia Each 108.10 5,028.10 Each 108.10 5,028.10
(ii) 12 " dia Each 108.10 5,508.10 Each 108.10 5,508.10
b) Steel body
(i) 12" sweep Each 108.10 5,508.10 Each 108.10 5,508.10
(ii) 18" sweep Each 108.10 6,108.10 Each 108.10 6,108.10
106 Providing and fixing Pakistan Energy Label NEECA approved Copper
winded wall bracket Fan i/c the cost of necessary cable and hardware for
connection as approved and directed by Engineer Incharge.
i) 18" Sweep dia Each 108.10 6,708.10 Each 108.10 6,708.10
ii) 24" Sweep dia Each 108.10 10,296.10 Each 108.10 10,296.10
107 Providing and fixing Pakistan Energy Label NEECA approved Copper winded
Ceiling Fan i/c the cost of necessary cable and hardware for connection as
approved and directed by Engineer Incharge.
i) 36" dia Each 259.40 8,659.40 Each 259.40 8,659.40
ii) 48" dia Each 259.40 8,899.40 Each 259.40 8,899.40
iii) 56" dia Each 259.40 9,259.40 Each 259.40 9,259.40

chapter-24(Electric Installation) Page 178


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
108 P/F PVC double layer Switch kit Face plate with specified switch holes i/c the
cost of switches / sockets / dimmer made of Hi-Life / Bush / Schenider or
approved equvilent manufacturer, screws complete as approved and directed
by the Engineer Incharge
a) One way Gange Switch (Small)
(i) 01 Gange Each 122.10 453.30 Each 122.10 453.30
(ii) 02 Gange Each 122.10 694.50 Each 122.10 694.50
(iii) 03 Gange Each 122.10 878.10 Each 122.10 878.10
(iv) Three pin Light Plug 10/13 Amp Each 122.10 744.55 Each 122.10 744.55
(v) Telephone / TV/Datacable socket Each 122.10 652.55 Each 122.10 652.55
(vi) Fan Dimmer Each 122.10 730.70 Each 122.10 730.70
(vii) Bell push Each 122.10 588.30 Each 122.10 588.30
(viii) Three Pin Power Plug 15-32 Amp Each 122.10 914.65 Each 122.10 914.65
b) One way Gange Switch (Large)
(i) 04 Gange Each 122.10 971.35 Each 122.10 971.35
(ii) 05 Gange Each 122.10 1,141.45 Each 122.10 1,141.45
(iii) 06 Gange Each 122.10 1,395.95 Each 122.10 1,395.95
c) Two way Gange Switch (Small)
(i) 01 Gange one way/ Two way Each 122.10 490.00 Each 122.10 490.00
(ii) 02 Gange Each 122.10 765.95 Each 122.10 765.95
(iii) 03 Gange Each 122.10 914.65 Each 122.10 914.65
(iv) 04 Gange Each 122.10 1,098.60 Each 122.10 1,098.60
109 P/F PVC concealed Switch kit Box i/c the cost of screws complete as
approved and directed by the Engineer Incharge
i) Small Each 122.10 182.60 Each 122.10 182.60
ii) Large Each 122.10 211.55 Each 122.10 211.55
110 Supply, insatllation, commissioning and testing of oil cooled type, Step down
Power Transformer pole mounted of specified rating,11/0.415 kV, i/c the cost
of lifting hooks, thermometers, LT & HT bushing 5-steps, tap changer,
imported double float buchholz relay, 2 earthing terminals, roller wheels,
connecting terminals for cables M.S box on transformer in order to cover
complete L.T side, all necessary materials required for connections on H.T &
L.T side, rated voltage 11000/415/240 V specified impedance as specified by
WAPDA/IEC system earth: Delta / Star, neutral solidly earthed, i/c Wapda
testing charges,complete in all respects made of PEL, Siemens, Transfopower,
Elmetec or as approved and directed by the Engineer Incharge.
a) 4% impedence without buchholz relay
(i) 10 KVA Each 9,869.05 276,705.05 Each 9,869.05 276,705.05
(ii) 15 KVA Each 9,869.05 397,455.05 Each 9,869.05 397,455.05
(iii) 25 KVA Each 9,869.05 625,431.05 Each 9,869.05 625,431.05
(iv) 50 KVA Each 9,869.05 864,010.05 Each 9,869.05 864,010.05
(v) 100 KVA Each 9,869.05 1,236,955.05 Each 9,869.05 1,236,955.05
(vi) 200 KVA Each 9,869.05 2,099,455.05 Each 9,869.05 2,099,455.05
(vii) 300 KVA Each 9,869.05 2,754,955.05 Each 9,869.05 2,754,955.05
(viii) 400 KVA Each 9,869.05 3,267,717.05 Each 9,869.05 3,267,717.05
(ix) 630 KVA Each 9,869.05 4,141,982.55 Each 9,869.05 4,141,982.55

chapter-24(Electric Installation) Page 179


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
b) 5% impedence with buchholz relay and LT box
(i) 750 KVA Each 9,869.05 4,974,455.05 Each 9,869.05 4,974,455.05
(ii) 1000 KVA Each 9,869.05 6,354,455.05 Each 9,869.05 6,354,455.05
(iii) 1250 KVA Each 9,869.05 7,504,455.05 Each 9,869.05 7,504,455.05
c) 6% impedence with buchholz relay and LT box
(i) 1500 KVA Each 9,869.05 8,466,955.05 Each 9,869.05 8,466,955.05
(ii) 2000 KVA Each 9,869.05 9,816,955.05 Each 9,869.05 9,816,955.05

DATA CABLI NG SYSTEM


111 Supply, Installation and commissioning of wiring with 4-pair data Cable, 23 38.1 to 38.7
AWG UL/EN listed cable * Conforming to following standards: TIA/EIA 568
/ ISO/IEC 11801, in prelaid conduit / cable tray from including all accessories,
Manufacturer/OEM Authorization, Make: Schneider / i-connect UK/3M
Corning USA/ D-Link/ Pollo Australian or equivalent approved manufacturer,
complete in all respect as approved and directed by Engineer Incharge.

a) UTP (Unshielded Twisted pair)


(i)CAT-6 (Min.1G @ 250MHz or higher) Per Rft 4.45 48.85 Per Meter 14.55 160.20
(ii)CAT-6A (Min.1G/ 10G @ 500MHz or higher) Per Rft 4.45 69.25 Per Meter 14.55 227.10
b) STP (Shielded Twisted pair)
(i)CAT-7 (Min.1G/ 10G @ 600MHz or higher ) Per Rft 4.45 87.25 Per Meter 14.55 286.15
c) FTP (Foiled Twisted pair)
(i)CAT-5e Per Rft 4.45 69.25 Per Meter 14.55 227.10
112 Supply, Installation and commissioning of wiring with Multimode OM3 Per Rft 11.10 68.70 Per Meter 36.40 225.35 38.1 to 38.7
Armored Fiber Optic Cable Central Loose Tube for 10 Giga Fiber Optic
Connection UL/EN listed cable or equivalent approved manufacturer, in
prelaid cable tray from Main Cabinet to Floor Level Cabinets, including all
accessories, Manufacturer/OEM Authorization, Make: Schneider / i-Connect
UK/3M Corning USA/ D-Link/ Pollo Australia or equivalent complete in all
respect as approved and directed by the Engineer Incharge.

113 Supply, Installation and commissioning of wiring with fiber optic cable with 38.1 to 38.7
Unitube, Light-Armoured Cable, Single-Mode, OS2, of specified Core, 9μm,
in pre laid conduit or cable tray etc. from Fiber switch to Fiber Switch in ODF
Panel, including all accessories, made of Schnider/i-Connect UK/Panduit
USA Pollo Australia or equivalent approved manufacturer and directed by the
Engineer Incharge.
i) 12 Core Per Rft 17.75 167.50 Per Meter 58.25 549.45
ii) 24 Core Per Rft 17.75 332.65 Per Meter 58.25 1,091.05
iii) 48 Core Per Rft 17.75 580.30 Per Meter 58.25 1,903.45
iv) 96 Core Per Rft 17.75 919.20 Per Meter 58.25 3,015.00
114 Supply, Installation and commissioning of Cat-6, UTP Machine Made Patch 38.1 to 38.7
Cord of Specified Length, Support 10 Giga, UL listed cable, with anti snag
boots, Gold Over Nickel Plated, Manufacturer/OEM Authorization,
confirming to manufacturer warranty, Made of Schneider / i-Connect UK
/Panduit USA/D-Link/3M, Corning ,Pollo Australian or equivalent Approved
and Directed by Engineer Incharge.
i) 1 meter Patch Cord Each 81.40 1,067.80 Each 81.40 1,067.80
ii) 3 Meter Patch Cord Each 81.40 1,303.00 Each 81.40 1,303.00

chapter-24(Electric Installation) Page 180


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
115 Supply, installation and connections of CAT-6A UTP (Unsheilded Twisted 38.1 to 38.7
Pair) , patch cord of specified length,Factory Fabricated and UL Listed with
anti Snag Boots- Gold over nickel plated made of Schneider, Pollo Australia or
equivalent approved manufacturer and directed by Engineer Incharge .

i) 1 meter Patch Cord Each 81.40 2,601.40 Each 81.40 2,601.40


ii) 3 Meter Patch Cord Each 81.40 2,961.40 Each 81.40 2,961.40
116 Supply, Installation and Connection of Specified Ports Layer-2 PoE (Power
Over Ethernet) data Network Switch specified ports x100 Mbps PoE,
Min.2x1Gbps SFP UPLINK ports, made of Cisco USA/NOVAS
Europe/Juniper USA / Huawei / H3C, Pollo Australia or equivalent approved
manufacturer and directed by the Engineer Incharge.
i) 8 port, Min. 120 Watt PoE power Each 1,628.00 48,500.00 Each 1,628.00 48,500.00
ii) 12 port, Min. 250 Watt PoE power Each 1,628.00 63,468.80 Each 1,628.00 63,468.80
iii) 16 port, Min. 300 Watt PoE power Each 1,628.00 84,243.20 Each 1,628.00 84,243.20
iv) 24 port, Min. 365 Watt PoE power Each 1,628.00 121,809.20 Each 1,628.00 121,809.20
v) 48 port, Min. 665 Watt PoE power Each 1,628.00 198,808.40 Each 1,628.00 198,808.40
117 Supply, Installation and Connection of Data switch ,10/100/1000 Mbps with
SFP UPLINK made of Cisco USA/NOVAS Europe/Juniper USA / Huawei
/H3C Pollo Australian or equivalent approved manufacturer and directed by
the Engineer Incharge.
i) 8 Ports,(PoE) Each 48.85 2,392.45 Each 48.85 2,392.45
ii) 12 Ports,(PoE) Each 48.85 2,619.20 Each 48.85 2,619.20
iii) 16 Ports( PoE ) Each 48.85 3,101.60 Each 48.85 3,101.60
iv) 24 Ports(PoE) Each 48.85 3,568.40 Each 48.85 3,568.40
v) 48 Ports(PoE) Each 48.85 4,839.20 Each 48.85 4,839.20
118 Supply, Installation and Connection of Single /Multimode SFP (Small form
Pluggable) Tranceiver Duplex Multimode of Specified Capacity. made of
Cisco USA/NOVAS Europe / Juniper USA / Huawei /H3C/ Pollo Australia or
equivalent approved manufacurer and directed by Engineer Incharge.
i) 10/100/1000 SFP (as per site specific port type requirements) Each 2,442.00 56,019.60 Each 2,442.00 56,019.60
ii) 10 Gigabit SFP (as per site specific port type requirements) Each 2,442.00 140,510.40 Each 2,442.00 140,510.40
119 Supply and installation of Cable Metal Organizer, 19" Rack mounted with Each 976.80 4,029.60 Each 976.80 4,029.60
high graded epoxy powder coating and slideable top- UL Listed. Made of
Schneider/i-Connect UK/3M Corning: Pollo Australia or equivalent approved
manufacturer and directed by the Engineer Incharge.
120 Supply, Installation and commissioning of 19" Rack Mounted of specified,
UTP Patch Panel with specified toolless support & Rear Cable Management,
UL listed, Loaded with UTP of specified Keystone Jack Toolless Support ,
Made of Schneider / Norden /3M Corning/D-Link, Pollo Australia or
equivalent approved manufacturer and Directed by Engineer Incharge.

i) CAT-6 (24 Port Patch Panel with Toolless Support 1-Gigabit) Each 122.10 32,285.00 Each 122.10 32,285.00
ii) CAT-6A (24 Port Patch Panel with Toolless Support 10-Gigabit) Each 122.10 36,231.70 Each 122.10 36,231.70

chapter-24(Electric Installation) Page 181


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
CCTV
121 Supply & Installation of NVR (Network Video Recorder) for Real Time View
of specified Channels, video and Audio channels,Supported protocoles:
ONVIF,RTSP etc, Internal HDDs mount support:2/4/8 or higher as per site
requirement,Monitor outputs,(HDMI,4K Ultra HD),VGA (Video Graphic
array), Support Raid 5/6, Embeded OS, Data Encryption, Min. 1 x RJ-45
1000Mbps Ports, with PC Video Monitoring Software, Web Server,
Embedded Server complete in all respect. made of AXIS Europe/NOVAS
Europe/Avigilon by Motrola USA /Huawei, Pollo Australia or equivalent
approved manufacturer and directed by the Engineer Incharge.

i) 8-Channel Each 610.50 99,264.90 Each 610.50 99,264.90


ii) 16-Channel Each 610.50 124,054.50 Each 610.50 124,054.50
iii) 32-Channel Each 610.50 140,016.90 Each 610.50 140,016.90
iv) 42-Channel Each 610.50 414,218.10 Each 610.50 414,218.10
v) 50-Channel Each 610.50 499,570.50 Each 610.50 499,570.50
vi) 64-Channel Each 610.50 515,620.50 Each 610.50 515,620.50
vii) 150-Channel Each 610.50 789,798.90 Each 610.50 789,798.90
122 Supply, Installation and Connection of Surveillance Grade Hard Drives
(HDD) of Specified Capacity for CCTV System Backup. made of Seagate /
WD, Pollo Australia or equivalent approved manufacturer and directed by
Engineer Incharge.
i) 4 TB Each 1,221.00 29,857.80 Each 1,221.00 29,857.80
ii) 8 TB Each 1,221.00 48,826.20 Each 1,221.00 48,826.20
iii) 10 TB Each 1,221.00 73,797.00 Each 1,221.00 73,797.00
iv) 14 TB Each 1,221.00 81,501.00 Each 1,221.00 81,501.00
123 Supply, Installation and Connection of L2 Access Switches 24xEthernet Each 2,331.00 387,891.00 Each 2,331.00 387,891.00
10/100/1000 base-T port, min 2x1Gigabit SFP ports with 2x1G single mode
SFP. POE/POE+. Switching capacity at least 200 Gbps full-duplex or higher
supporting bi-directional ACL, port based ACL,VLAN based ACL, automatic
Isolation of attack sources, DAI (Dyanamic ARP inspection), DHCP
Snooping, IP Source Gaurd, port based network acess control conforming
IEEE 802.1 x standard, Stackable or Cluster setup complete with Stack
Modules, Stack cables, necessary licenses etc made of
Cisco/HP/Planet/H3C/Huawei, Pollo Australia or equivalent approved
manufacturer and directed by Engineer Incharge.
124 Supply, Installation and Connection of Layer-3, Core Switches, of specified
speeds, supporting 10 Giga SFP+ (Small Form Pluggable +) Tranceiver,
Switching Capacity at least 500 Gbps or higher ,supporting bidirectional
ACL,port-based ACL., Stackable or Cluster setup complete with stacking
cable, Stack modules, necessary licenses made of Cisco/ HP /
Planet/Huawei/H3C Pollo Australia or equivalent approved manufacturer i/c
the cost of tags as approved and directed by Engineer Incharge.
a) 10/100/1000
(i) 12 port(SFP) Each 2,331.00 688,344.60 Each 2,331.00 688,344.60
(ii) 24 port (SFP) Each 2,331.00 1,195,288.20 Each 2,331.00 1,195,288.20
b) 24/100/1000
(i) 12 port(SFP) Each 2,331.00 801,064.20 Each 2,331.00 801,064.20
(ii) 24 port (SFP) Each 2,331.00 1,383,078.60 Each 2,331.00 1,383,078.60
chapter-24(Electric Installation) Page 182
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
125 Supply and installation of ODF (Optical Distribution frame) having specified
ports,mounting tray loaded, including Splicing, labeling, tagging, support for
OM3 multi mode fibre, duplex adopters, and simplex pig-tails. Make
Schneider, Pollo Australia or equivalent approved manufacturer and directed
by the Engineer Incharge .
i) 8 Port Each 116.55 30,728.55 Each 116.55 30,728.55
ii) 12 Port Each 116.55 73,734.15 Each 116.55 73,734.15
iii) 24 Port Each 116.55 119,184.15 Each 116.55 119,184.15
126 Supply, Installation and Connection of Fiber Optic SC-LC Patch Cords OS2 Per Rft 40.70 1,918.70 P.Mtr 133.50 6,293.35
or OM3 of Specified Length from PoE Switch to ODF Point, UL Listed,
Made of Schneider / Norden ,Pollo Australia or equivalent as approved and
directed by Engineer Incharge.

127 Supply, installation & connecting IP based Camera of specified resolution,


1/3" Progressive scan, fixed lens 2.8 mm AF, Max resolution 2592 x 1920
mm, Codec H-265, Camera with 25 fps, day night (ICR), ONVIF, IP-66, Max
IR distance 30 meter, WDR Smart Analytics, i/c the cost of mounting bracket,
mounting accessories/ materials. Make: - Honey Well / Bosch / Norden, Pollo
Australia or equivalent, as approved as directed by the Engineer Incharge.

a) 2 M ega Pixel
(i)Fixed Bullet Type Each 610.50 76,210.50 Each 610.50 76,210.50
(ii)Fixed Dome type Each 610.50 88,210.50 Each 610.50 88,210.50
b) 4 M ega Pixel
(i)Fixed Bullet Type Each 610.50 76,210.50 Each 610.50 76,210.50
(ii)Fixed Dome type Each 610.50 88,210.50 Each 610.50 88,210.50
c) 8 M ega Pixel
(i)Fixed Bullet Type Each 610.50 104,386.50 Each 610.50 104,386.50
(ii)Fixed Dome type Each 610.50 108,610.50 Each 610.50 108,610.50
128 Supply, installation & connecting IP based Camera of specified resolution,
lens,motorized,auto-iris and auto-focus function,f=2.8~12 mm,human/vehicle
object classification ,D/N function-IR cut filter,Video content analysis based
on Deep learning,micro SD card support,WDR with double scan sensor, Min,
illumination: 0.007 Ix(01xIR on),IR LED,range upto 50 m, i/c the cost of
mounting bracket,accessories,made of AXIS Europe/NOVAS
Europe/Avigilon by Motorla USA/Bosch Germany, Pollo Australia or
equivalent, as approved as directed by the Engineer Incharge.

a) 2 M ega Pixel
(i)Fixed Bullet Type Each 610.50 84,610.50 Each 610.50 84,610.50
(ii)Fixed Dome type Each 610.50 90,610.50 Each 610.50 90,610.50
b) 4 M ega Pixel
(i)Fixed Bullet Type Each 610.50 95,003.70 Each 610.50 95,003.70
(ii)Fixed Dome type Each 610.50 110,938.50 Each 610.50 110,938.50
c) 5 M ega Pixel
(i)Fixed Bullet Type Each 610.50 100,636.50 Each 610.50 100,636.50
(ii)Fixed Dome type Each 610.50 116,505.30 Each 610.50 116,505.30

chapter-24(Electric Installation) Page 183


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
129 Supply, installation & connecting IP based Camera of specified resolution,
lens,motorized,auto-iris and auto-focus function,f=3-12 mm, D/N function-IR
cut filter,Video content analysis based on Deep learning,micro SD card
support,WDR, Min, illumination: 0.007 Ix(01xIR on),IR LED,range upto 40
m, pivacy zone,motion detection,system reaction to alarm event i/c the cost of
mounting bracket,accessories,made of AXIS Europe/NOVAS
Europe/Avigilon by Motorla USA/Bosch Germany, Pollo Australia or
equivalent, as approved as directed by the Engineer Incharge.
a) 6 M ega Pixel
(i)Fixed Bullet Type Each 610.50 76,210.50 Each 610.50 76,210.50
(ii)Fixed Dome type Each 610.50 82,210.50 Each 610.50 82,210.50
b) 8 M ega Pixel
(i)Fixed Bullet Type Each 610.50 84,610.50 Each 610.50 84,610.50
(ii)Fixed Dome type Each 610.50 90,610.50 Each 610.50 90,610.50
c) 12 M ega Pixel
(i)Fixed Bullet Type Each 610.50 113,776.50 Each 610.50 113,776.50
(ii)Fixed Dome type Each 610.50 131,595.30 Each 610.50 131,595.30
130 Supply, installation & connecting IP based Camera of specified resolution,
LPR -Camera,Lens: motorized,auto-iris and auto-focus function,f=7~22
mm,human/vehicle no plate recognition,D/N function-IR cut filter,Video
content analysis based on Deep learning,micro SD card support,WDR with
double scan sensor, Min, illumination: 0.007 Ix(01xIR on), IR LED,range upto
50 m, Barrier controle i/c the cost of mounting bracket,accessories,made of
AXIS Europe/NOVAS Europe/Avigilon by Motorla USA/Bosch Germany,
Pollo Australia or equivalent, as approved as directed by the Engineer
Incharge.
a) 2 M ega Pixel
i) Fixed Bullet Type Each 610.50 110,938.50 Each 610.50 110,938.50
ii) Fixed Dome type Each 610.50 123,082.50 Each 610.50 123,082.50
131 Supply, installation & connecting outdoor PTZ (Pan-Tilt-Zoom),IP based
Camera of specified resolution, lens,motorized varfocal,AL & AF
function,specified optical zoom,D/N function-IR cut filter,Video content
analysis,micro SD card support, Min, illumination:face recognition, specified
IR LED range RANGE i/c the cost of mounting bracket,accessories,made of
AXIS Europe/NOVAS Europe/Avigilon by Motorla USA/Bosch Germany,
Pollo Australia or equivalent, as approved as directed by the Engineer
Incharge.
i) 2 MPxl optical zoom 20x,f=5.5-110 mm with min illumination from Each 610.50 480,881.70 Each 610.50 480,881.70
0.003x (01xIR ON),IR LED range upto 150 m.
ii) 3 MPxl,optical zoom 30x,f=4.5- 135 mm,with min illumination from Each 610.50 498,723.30 Each 610.50 498,723.30
01x(01x,IR ON),IR LED range upto 180 m
iii) 4.0 MPxl, Optical zoom 30x,Digital zoom 16x,,laser distance 200 Each 610.50 555,250.50 Each 610.50 555,250.50
meter, Main stream H-264+/265+, sub stream H.264/265, Third Stream
H.264/265, Max resolution 2560 x 1440 with 30 fps,IP-67.
132 Supply, installation and connections of POLE ADAPTER, Esprit system to Each 1,110.00 39,409.20 Each 1,110.00 39,409.20
convert any wall mount to pole mount. Made of PELCO( USA) /AXIS
(Sweden) , Pollo Australia or equivalent as approved and direcyed by the
Engineer Incharge.

chapter-24(Electric Installation) Page 184


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
133 Supply, installation and connections of HD Video Decoder that support digital Each 1,831.50 683,509.50 Each 1,831.50 683,509.50
video stream on network and allow for the decoding upto 16 simultaneous
streams with HDMI cable as required at site. made of PELCO ( USA) /AXIS
(Sweden) , Pollo Australia or equivalent as approved and directed by the
Engineer Incharge.
134 Supply , installation of wall mounted CCTV Cabinet comprising of Powder
Coated M.S frame, front glass & two side openings, 02 way fans for cooling,
top & bottom entry, handle lock with 6 way PDU (Power Distribution Unit)
with all necessary accessories/ materials, complete in all respects. Made of
Bosch/ HP / Dell , Pollo Australia or equivalent or as approved and directed by
Engineer Incharge.
i) 12U size (600x550x635 mm) Each 2,442.00 58,578.20 Each 2,442.00 58,578.20
ii) 15U size (600x550x770 mm) Each 2,442.00 60,149.85 Each 2,442.00 60,149.85
iii) 18U size (600x550x900 mm) Each 2,442.00 62,956.40 Each 2,442.00 62,956.40
135 Supply , installation of floor mounted Main CCTV Cabinet of specified size,
installed in Main IT / Server room/Security Room, made of Powder Coated
M.S frame, perforated front & rear doors, removable side panels, 04 way fans
for cooling, top/bottom entry, handle lock with 4 lockable wheels, cable
manager, with 6 way PDU (Power Distribution Unit) & 2 x 6 way PDU
(Power Distribution Unit) for 42U size with all necessary accessories/
materials, complete in all respects. made of Bosch/ HP / Dell , Pollo Australia
or equivalent or as approved and directed by Engineer Incharge.

i) 42U (800x800x2055mm) Each 3,094.90 200,889.70 Each 3,094.90 200,889.70


ii) 27U (600x600x1300mm) Each 3,094.90 105,718.45 Each 3,094.90 105,718.45
DATA NETWORK & WI FI SYSTEM
136 Supply, Installation and commissioning of Simple type, Dual Shutter Face
Plates having fully populated I/O:
Option 1:RJ-11 with RJ45/8P8C I/Os supporting either Cat6 or Cat6a cables
as required by project
Option 2: Two RJ45/8P8C I/Os supporting either Cat6 or Cat6a cables as
required by project.
i) Single I/O Each 44.40 1,783.20 Each 44.40 1,783.20
ii) Double I/O Each 44.40 2,794.80 Each 44.40 2,794.80
137 Supply, Installation and commissioning of Core Switches with interface :
10GBASE-R(SFP+)/1000 BASE-X(SFP) 4X40 BASE -SR4/LR4 (QSFP)
,Bandwidth: Tbps or higher with Quad-core processor or higher,MAC Table:
96K ,AC Power: 220V+-10%,cooling fans made of RUCKS USA/Cisco
USA/Juniper USA, Pollo Australia or equivalent as approved and directed by
Engineer's Incharge.
i) 24 Ports Each 44.40 133,947.60 Each 44.40 133,947.60
ii) 48 Ports Each 44.40 228,658.80 Each 44.40 228,658.80

chapter-24(Electric Installation) Page 185


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
138 Supply, Installation and commissioning of Access Switches Layer 3, with
specified 1000 Base-T (RJ-45) Ports (PoE/PoE+) with 4 x 10 G SFP+ with
license , Switching capacity 128 Gbps or higher,Packet forwarding capacity
:90 Mpps,RAM (DDR3):512 MB, DHCP snooping, ACL, power supply
Min.350 Watt AC, made of RUCKS USA/Cisco USA/Juniper USA / Huawei
/ H3C, Pollo Australia or equivalent as approved and directed by Engineer's
Incharge.
24 Ports Each 44.40 98,022.00 Each 44.40 98,022.00
139 Supply, Installation and commissioning of Armored Fiber Optic Cable of 38.1 to 38.7
specified core and mode, Fiber Optic Connection, UL listed , in prelaid/pipe,
cable tray , including all accessories, made of Norden / Schneider /
Panduit/Pollo Australia or equivalent Complete in all respect as approved and
directed by Engineer Incharge.
a) M ultimode OM 3
(i) 04 Core Per Rft 44.40 392.40 Per Meter 145.65 1,287.05
(ii) 06 Core Per Rft 44.40 592.80 Per Meter 145.65 1,944.40
(iii) 12 Core Per Rft 44.40 880.80 Per Meter 145.65 2,889.00
b) Singlemode OS2
(i) 04 Core Per Rft 44.40 354.00 Per Meter 145.65 1,161.10
(ii) 06 Core Per Rft 44.40 505.20 Per Meter 145.65 1,657.05
(iii) 12 Core Per Rft 44.40 693.60 Per Meter 145.65 2,275.00
140 Supply, Installation of OFDF (Optical Fiber Distribution Frame) having
specified mode ports Loaded with Splicing Tray, with splicing of Pigtails,
Fully loaded DUPLEX SC Couplers & Pigtail supplied with Patch Leads (LC-
SC) or as per site SFP based required cords, UL Listed, Made of Schneider /
Norden, Pollo Australia or equivalent or as approved and directed by the
Engineer Incharge.
a) M ultimode (M M ) Ports
(i) 06 Ports Each 1,665.00 37,151.40 Each 1,665.00 37,151.40
(ii) 12 Ports Each 1,665.00 68,609.40 Each 1,665.00 68,609.40
(iii) 24 Ports Each 1,665.00 136,588.20 Each 1,665.00 136,588.20
(iv) 48 Ports Each 1,665.00 273,016.20 Each 1,665.00 273,016.20
(v) 96 Ports Each 1,665.00 483,342.60 Each 1,665.00 483,342.60
b) Singlemode (SM ) Ports
(i) 06 Ports Each 1,665.00 31,519.80 Each 1,665.00 31,519.80
(ii) 12 Ports Each 1,665.00 55,462.20 Each 1,665.00 55,462.20
(iii) 24 Ports Each 1,665.00 107,505.00 Each 1,665.00 107,505.00
(iv) 48 Ports Each 1,665.00 236,403.00 Each 1,665.00 236,403.00
(v) 96 Ports Each 1,665.00 452,694.60 Each 1,665.00 452,694.60
141 Supply, installation and connections of 42U Racks 800 x1000 MM with Fans Each 22.20 221,615.40 Each 22.20 221,615.40
and:02 nos PDU-IMPORTED. Make Schneider as specified as approved and
directed by Engineer's Incharge .
142 Supply, Installation of WiFi access points(APs),conforming IEEE as approved
and directed by the Engineer Incharge.

chapter-24(Electric Installation) Page 186


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
i) Support upto 50 concurrent connections
(a) Data transfer rate Min. 802.11ac: 1200 Mbps Each 888.00 93,844.80 Each 888.00 93,844.80
(b) Support upto 50 concurrent connections
(c) 4X4 MIMO support (3SU,3MU)
(d) 2xEthernet 10/100/1000 Base-T (RJ-45)
(e) 1x100/1000 BASE -X (SFP) optionally
(f) N- Type (Female) for external antennas (Omni,sector rod,etc.)
(g) IEEEa/b/g/n/ac wave 2 standards, should work on 2.4 & 5.8 Ghz
band Simultaneously ans @ 2.4 Ghz support 500 Mbps ,
(h) VLAN 802.1Xauthentication ,NAT and DHCP client,LLDP,ACL
Ipv4 and lpv 6 support.
(i) Power supply: PoE + 48 V /54 V (IEEE 802.3 at -2009) 48 V DC.
(j) Operating Temperature from -10 to +45 C. managed by wireless
controller. Make: - Aruba / Cisco / Al-Catel.as approved and directed by
Engineer Incharge.Support Automatic RF channel selection, and dual
stack. Make: - Aruba / Cisco / Al-Catel.
ii) Support upto 500 concurrent connections
(a) Data transfer rate 802.11ac:1300 Mbps Each 888.00 799,935.60 Each 888.00 799,935.60
(b) Support upto 500 concurrent connections
(c) 3x3 MIMO support
(d) 2xEthernet 10/100/1000 Base-T (RJ-45)
(e) 1x100/1000 BASE -X (SFP) optionally
(f) N- Type (Female) for external antennas (Omni,sector rod,etc.)
(g) IEEE 802.11 a/b/g/n/ac standard support
(h) VLAN 802.1Xauthentication ,DHCP client,LLDP,ACL and lpv 6
support.
(i) Power supply: PoE + 48 V /54 V (IEEE 802.3 at -2009) 48 V DC.
(j) Operating Temperature from -10 to +45 C. managed by wireless
controller. Make: - Aruba / Cisco / Al-Catel.
143 Supply , installation of Wifi Access Controller installed in the Main Cabinet,
supportting specified Access Points, concurrent users, customizeable dash
board, DHCP(Dynamic Host Configeration Protocol),min 2x1 Giga Ethernet
ports,min 2X 10 Giga Ethernet/SFP+ ports,packet forwarding capacity>= 4
Gbps, authentication based on MAC,802.1X WEP, WPA-TKIP, WPA2-AES,
and ACL Layer-2, Layer-3 and Layer-4, compatible with Apple & Andriod
devices, Console Port. Make Aruba, Cisco, Al-Catel as approved and directed
by Engineer Incharge.

i) 15 Access Points Each 1,665.00 386,635.80 Each 1,665.00 386,635.80


ii) 25 Access Points Each 1,665.00 574,426.20 Each 1,665.00 574,426.20
iii) 50 Access Points Each 1,665.00 707,476.20 Each 1,665.00 707,476.20
iv) 100 Access Points Each 1,665.00 801,371.40 Each 1,665.00 801,371.40

chapter-24(Electric Installation) Page 187


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
ACCESS CONTROL SYSTEM
144 Supply, Installation and commissioining of wire free standalone network Each 3,930.00 104,200.80 Each 3,930.00 104,200.80
Based RFID (Radio Frequency Identification) Door Lock AELEMENT AE
model AE 901MBA3A8 with reader, wireless DNA. Mechanical Dead bolt,
1000 Audit trail, SVN Compatible, UL Listed with ANSI Mortise lock, (For
minimum 40mm door), 4 built in Switches (DND, Mechanical override, Inside
opening and Door Ajar), Handle "U" Model, Satin Stainless Steel. Make Salto
(USA)/ Fingertec (USA) / Pollo Australia or equivalent as specified complete
in all respects and approved by Engineer Incharge.
145 Supply, Installation and commissioining of RFID Based NODE with wireless Each 3,502.50 18,104.10 Each 3,502.50 18,104.10
DNA. control, read and transmit data to operate door locks to main server for
upto 15-20 meters. Make Salto (USA)/ Fingertec (USA)/ Pollo Australia or
equivalent as specified complete in all respects approved by Engineer
Incharge.
146 Supply, installation Testing and Connections of signal distribution Salto Each 888.00 62,132.40 Each 888.00 62,132.40
Model GATEWAY controller PoE (Power Over Ethernet), Wireless Gateway
connect via nodes, Wireless radio frequency based on IEEE 802.15.4 at 2,4
Ghz. AES 128 bits encryption, Software SALTO Spaonline SPAC-OPT-0021
Connection to the LAN Network 10 BASE-T/100 BASE-TX, Make Salto
(USA)/ Fingertec (USA) as specified complete in all respect as approved and
directed by Engineer Incharge.
147 Supply , installation of Push Buttons or manual access control system (Exit Each 555.00 1,822.20 Each 555.00 1,822.20
switch) with British standard size back box, including Emergency door release
break glass button complete in all respects. Make: Norden / Bosch / Honey
Well, Complete in all respect as approved and Directed by Engineer Incharge.

148 Supply , installation of Power Supply with stabilized voltage of 12 volt DC (+/- Each 555.00 10,883.40 Each 555.00 10,883.40
15%). The PSU supplies voltage U= 13.8 V DC with current efficiency I =4.5
A +0.5A battery charging for access control machines, in case of power
failure,instantaneous switching to battery operation complete in all respects.
Make: Norden / Bosch / Honey Well, Complete in all Respect as approved and
directed by Engineer Incharge.
149 Supply and energization of RFID ( Radio Frequency Identification) Proximity Each 888.00 1,563.60 Each 888.00 1,563.60
Cards , ISO credit card standard size and thickness,thin as specified made of
KADE Europe/Siemen Europe complete in all respect as approved and
directed by the Engineer Incharge.
150 Supply and energization of Proximity Cards reader with keypad for Each 666.00 1,099.20 Each 666.00 1,099.20
Unique(EM), ISO credit card standard size ,HID Prox(125 KHz) and Mifare
Classics (13.56 MHzs) card type.Read range from 2 to 10 cm made of KADE
Europe/Siemen Europe complete in all respect as approved and directed by the
Engineer Incharge.
151 Supply and energization of Administrator Proximity Card Unique Mifare Each 666.00 1,286.40 Each 666.00 1,286.40
HID,Prox,Reader type,operating frequency:125 kHz,13.56 MHz and USB
interface,made of KADE Europe/Siemen Europe complete in all respect as
approved and directed by the Engineer Incharge.

chapter-24(Electric Installation) Page 188


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
152 Supply, installation and connection of POE (Port of Ethernet) of specified
Port Switch or equivalent, rated 10/100/1000 Mbps unmanaged switch, & 4-U
Cabinet Racks equipped as per specifications, make of Schneider (UK)/ Cisco
(UK, Ireland) as specified complete in all respect as approved & directed by
Engineer Incharge.
i) 8-Port Gigabite Switch with 2xSFP Each 1,118.75 75,531.25 Each 1,118.75 75,531.25
ii) 24-Port Gigabite Switch with 14xSFP Each 1,118.75 238,128.65 Each 1,118.75 238,128.65
iii) 48-Port Gigabite Switch with 14xSFP Each 1,118.75 384,518.65 Each 1,118.75 384,518.65
153 Supply, installation of following RFID based Access Control Machines with
display i/c the cost of mounting accessories, complete in all respect. Make:
Norden / Bosch / Honey Well, complete in all respect as approved and directed
by Engineer Incharge.
i) Keypad Each 666.00 67,238.40 Each 666.00 67,238.40
ii) Keypad Finger/Thumb Each 666.00 118,693.20 Each 666.00 118,693.20
iii) Keypad Finger/Thumb,Retina Each 666.00 147,846.00 Each 666.00 147,846.00
154 Supply , installation and commissioning of Access Controller suitable for
standard controller with TCP/RS-485,commuinication ports, for specified
doors, complete in all respect. make: KADE Europe/Norden / Bosch / Honey
Well, complete in all respect as approved and directed by Engineer Incharge.

i) 2-doors Each 666.00 10,866.00 Each 666.00 10,866.00


ii) 4-doors Each 666.00 18,968.40 Each 666.00 18,968.40
iii) 8-doors Each 666.00 31,086.00 Each 666.00 31,086.00
PUBLI C ADDRESS SYSTEM
155 Supply, Installation & Commissioning of recessed/surface mounted Speakers
of specified capacity housed in metalic enclosure with builtin 70v/100v
transformer , aluminium grill, SPL (Sound Pressure Level) (1W / 1M)= 92dB
max 99dB, frequency response 130-13 Khz, EN-54 compliant, Including cost
of all accessories and matierlas, complete in all respect made of Ecler
Europe/Bosch/ Norden / Honey Well or equivalent as approved and directed
by the Engineer Incharge.
a) Ceiling mounted speaker
(i) 1.5-6 Watt Each 222.00 6,794.40 Each 222.00 6,794.40
(ii) 8-10 Watt Each 222.00 9,987.60 Each 222.00 9,987.60
(iii) 20 Watt Each 222.00 14,588.40 Each 222.00 14,588.40
(iv) 40 Watt Each 222.00 20,222.40 Each 222.00 20,222.40
b) Column Type Speaker
(i) 10-15 Watt Each 222.00 44,353.20 Each 222.00 44,353.20
(ii)20 Watt Each 222.00 53,274.00 Each 222.00 53,274.00
(iii) 40 Watt Each 222.00 66,381.60 Each 222.00 66,381.60
(iv) 60 Watt Each 222.00 85,386.00 Each 222.00 85,386.00
(v) 80 Watt Each 222.00 119,468.40 Each 222.00 119,468.40

chapter-24(Electric Installation) Page 189


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
156 Supply, Installation & Commissioning of surface mounted Line array speakers
of specified capacity housed in metalic enclosure with builtin 70v/100v
transformer , aluminium grill, SPL (Sound Pressure Level) (1W / 1M)= 92dB
max 99dB, frequency response 130-13 Khz, EN-54 compliant, with output
power adjustment for full,half and quarter power output,including cost of all
necessary accessories and matierlas, complete in all respect made of Bosch/
Norden / Honey Well or Equivalent as approved and Directed by Engineer
Incharge.
a) Frquency range 136-20000 sensitivity @ 4m,1W:79 db SPL @ 4m,94
dB
(i) 60 Watt Each 222.00 82,060.80 Each 222.00 82,060.80
b) Frquency range 140-20000 sensitivity @ 4m,1W: SPL @ 4m,105 dB
(i) 30 Watt Each 222.00 61,404.00 Each 222.00 61,404.00
c) Sound Projector frquency range 150-20000, sensitivity @ 4m,1W: SPL
@ 1m,1W:90 dB
(i) 20 Watt Each 222.00 63,132.00 Each 222.00 63,132.00
157 Supply, Installation and commissioning of Power / Mixer Amplifier of
specified wattage, Including cost of all necessary accessories / materials ,
complete in all respects made of Ecler Europe/Bosch/ Norden / Honey Well or
Equivalent or as approved and directed by Engineer Incharge.
i) 30 Watt Each 222.00 77,686.80 Each 222.00 77,686.80
ii) 60 Watt Each 222.00 143,413.20 Each 222.00 143,413.20
iii) 120 Watt Each 222.00 206,791.20 Each 222.00 206,791.20
iv) 160 Watt Each 222.00 248,575.20 Each 222.00 248,575.20
v) 240 Watt Each 222.00 267,823.20 Each 222.00 267,823.20
vi) 480 Watt Each 222.00 500,215.20 Each 222.00 500,215.20
158 Supply, Installation and commissioning of Power Amplifier of specified watts
and channels, Including cost of all necessary accessories / materials , complete
in all respects.made of Ecler Erope/ Bosch/ Norden / Honey Well or equivalent
as approved and directed by Engineer Incharge.
a) 2-Channel
(i) 2x60 Watt Each 1,665.00 137,344.20 Each 1,665.00 137,344.20
(ii) 2x120 Watt Each 1,665.00 180,535.80 Each 1,665.00 180,535.80
(iii)2x150 Watt Each 1,665.00 274,619.40 Each 1,665.00 274,619.40
(iv) 2x240 Watt Each 1,665.00 368,514.60 Each 1,665.00 368,514.60
b) 4-Channel
(i) 120 Watt Each 1,665.00 563,815.80 Each 1,665.00 563,815.80
(ii) 240 Watt Each 1,665.00 612,641.40 Each 1,665.00 612,641.40
c) 8-Channel
(i) 150 Watt Each 1,665.00 368,514.60 Each 1,665.00 368,514.60
(ii) 240 Watt Each 1,665.00 563,628.60 Each 1,665.00 563,628.60

chapter-24(Electric Installation) Page 190


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
159 Supplying ,Installation and comissioning of IP based Audio Matrix Paging
Controller in specified Channels, suport specified Music source input,
specified remote control panels, 02 paging consoles and 01 microphone input,
expandable to 32 Zones and support cascade 4 Amplifire units to make 8 x 32
matrix system. and capable of specified zone voice alarm system. made of
Ecler Europe/Norden, Bosch, Honeywell. Complete in all respect as approved
and directed by Engineer Incharge.
i) Digital zones 8x8 (8 input & 8 output channels) Each 1,110.00 574,341.60 Each 1,110.00 574,341.60
ii) Digital zones 16x16 (16 input & 16 output channels) Each 1,110.00 762,132.00 Each 1,110.00 762,132.00
160 Supply, Installation of Microphone of specified quality as per requirement
made of : Norden, Bosch, Honeywell. Complete in all respect. as approved
and directed by Engineer Incharge.
i) Cordless Microphone with Transmitter Each 1,110.00 161,390.40 Each 1,110.00 161,390.40
ii) Desktop Remote Paging Microphone Each 1,110.00 574,341.60 Each 1,110.00 574,341.60
iii) Handheld Microphone with Stand Each 1,110.00 49,044.00 Each 1,110.00 49,044.00
iv) Headset Condensor Microphone Each 1,110.00 67,822.80 Each 1,110.00 67,822.80
161 Supplying, Installation of musical source multiformat audio player, including Each 1,110.00 123,877.20 Each 1,110.00 123,877.20
cost of all necessary accessories / materials , complete in all respects. made of
Bosch/ Norden / Honey Well or equivalent, as approved and directed by
Engineer Incharge.
FI RE ALARM SYSTEM
162 Supply, Installation and commissioning of wiring for Signals RS 485,
Shielded Copper Cable , in prelaid conduit . Make 3M / Belden, or equivalent
as approved and directed by the Engineer Incharges. P.Rft 12.20 79.70 P.Meter 40.05 261.45

163 Supply, Installation and commissioning of wiring with specified Fire Resistant
Shielded Cable (Fire Rating for 2 hours) of required size from respective DB
to Fire Alarm FACP (Fire Alarm Controle Panel) in prelaid conduit/duct.
Make Pony / Belden/ Covican (Italy) or equilvent as approved and directed by
the Engineer Incharge.
i) 2C,1.5 mm sq Per Rft 12.20 130.35 Per Meter 40.05 427.50
ii) 3C,1.5 mm sq Per Rft 12.20 152.85 Per Meter 40.05 501.30
iii) 3C,2.5 mm sq Per Rft 12.20 203.45 Per Meter 40.05 667.35
iv) 3C,4.0 mm sq Per Rft 12.20 242.85 Per Meter 40.05 796.50
164 Supply, Installation and commissioining with Addressable Break Glass unit, Each 24.40 18,586.90 Each 24.40 18,586.90
(Manual Call Point) with key type EN-54 having a built in short circuit
isolator and microprocessor to ensure a response time of max. 1 second,having
an indication LED flash after pressing the button to acknowledge the
activation and a key operation facility for testing purposes. made of
Honeywell/ Bosch/ Eaton (UK) or as approved and directed by the Engineer
Incharge.

chapter-24(Electric Installation) Page 191


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
165 Supply, installation and commissioning of Addressable Type Indoor Loop
Powered electronic Sounder/Flasher/Bell EN-54 with minimum sound output
100dB at 1 meter with frequencies of variety of sounds as required and shall
be loop wired and loop signaled, built in short circuit isolator, configured via
software. made of Honeywell/ Bosch/ Eaton (UK), or equivalent as approved
and directed by the Engineer Incharge.
i) With Buzzer Each 610.50 19,150.50 Each 610.50 19,150.50
ii) With Flasher Each 610.50 25,923.00 Each 610.50 25,923.00
166 Supply, installation and commissioning of Addressable Optical Smoke
Detectors EN-54, incorporating an LED indication located in labyrinth with in
the housing of the detector. Sensing unit, adjustable via software between 0-90
seconds having built in short circuit isolators on both inputs. make Honeywell/
Bosch/ Eaton (UK), or equivalent inclulding the cost of all other accessories as
required, approved and directed by the Engineer Incharge.

i) Ionization, photoelectric, Each 24.40 9,586.90 Each 24.40 9,586.90


ii) Dual Detector Each 24.40 12,538.92 Each 24.40 12,538.92
167 Supply, installation and commisioning of Addressable Heat Detectors
incorporating an LED indication located in labyrinth with in the housing of the
detector. adjustable Sensing unit via software between 0-90 seconds. The
detector shall have built in short circuit isolators on both inputs. made of
Ademco/ Honeywell/ Bosch/ Eaton (UK) or equivalent as approved and
directed by the Engineer Incharge.
i) Fixed Heat Detector to Sense High Temperatures Each 24.40 7,556.30 Each 24.40 7,556.30
Rate of Rise (ROR) Heat Detector to sense sudden increase in Each 24.40 9,586.92 Each 24.40 9,586.92
ii) Temp.
168 Supply, installation and connections of Addressable Multi Detectors Each 24.40 11,032.55 Each 24.40 11,032.55
incorporating an LED indication located in labyrinth with in the housing of the
detector. Sensing unit, adjustable via software between 0-90 seconds and have
built in short circuit isolators on both inputs. inclulding cost of all other
accessories or equivalent as approved and directed by the Engineer Incharge.

169 Supply, installation and commissioning of wired/wireless Addressable Micro


processor based Fire Alarm Control Panel (FACP) capable of PC interface
with window conforming to EN-54, consisting of specified loop circuits
having 240 devices per loop, indicating circuits, built in power supply with
back up batteries, alarm and trouble indication, silence alarm and reset system,
general alarm and reset system, general alarm facility. Made of Eurotech Fire
UK, Notifire USA, Simplex USA. complete in all respect as approved and
directed by Engineer Incharge.
i) FACP 1-Loop Each 4,257.50 294,235.25 Each 4,257.50 294,235.25
ii) FACP 2-Loop Each 4,257.50 381,257.40 Each 4,257.50 381,257.40
iii) FACP 3-Loop Each 4,257.50 497,016.55 Each 4,257.50 497,016.55
iv) FACP 4-Loop Each 4,257.50 612,891.55 Each 4,257.50 612,891.55

chapter-24(Electric Installation) Page 192


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
170 Supply, installation and commissioning of digital Addressable wired/wireless
Repeater Fire Alarm Control Panel (RFACP) EN-54, shall be self powered
with built in 12V batteries for 48 Hrs backup with charging unit and
programmed by using Window based software for peripheral devices like
display unit, printers etc., including cost of all necessary accessories /
materials, make Honeywell/ Bosch/ Eaton (UK) or as approved and directed
by the Engineer Incharge.
i) Auto Dialer Device (Card) GSM based Each 2,238.50 155,483.75 Each 2,238.50 155,483.75
171 Supply, installation and commissioning of digital/ Modular Annunciater panel Each 79.25 20,936.75 Each 79.25 20,936.75
Centeralized Warning Panel (CWP), conforming to EN-54, multi-point,
flexible and reliable Light Box to monitor the status of input signals, Custom
made in any number of windows. Backlit illumination by removable LED
modules in different colours. Optional bi-color windows make of Honeywell/
Bosch/ Eaton (UK) or as approved and directed by the Engineer Incharge.

Grounding / Earthing System


172 Supply, Installation, Testing & Commissioning of complete grounding
system:
i) 4 mm² CU bare conductor Per Rft 20.20 72.05 Per Meter 66.30 236.25
ii) 6 mm² CU bare conductor Per Rft 20.20 97.30 Per Meter 66.30 319.20
iii) 10 mm² CU bare conductor Per Rft 20.20 149.95 Per Meter 66.30 491.85
iv) 16 mm² CU bare conductor Per Rft 20.20 227.45 Per Meter 66.30 746.10
v) 25 mm² CU bare conductor Per Rft 20.20 347.70 Per Meter 66.30 1,140.40
vi) 35 mm² CU bare conductor Per Rft 20.20 473.70 Per Meter 66.30 1,553.70
vii) 50 mm² CU bare conductor Per Rft 20.20 654.40 Per Meter 66.30 2,146.50
viii) 70 mm² CU bare conductor Per Rft 20.20 906.85 Per Meter 66.30 2,974.50
ix) 95 mm² CU bare conductor Per Rft 20.20 1,250.05 Per Meter 66.30 4,100.25
x) 120 mm² CU bare conductor Per Rft 20.20 1,573.00 Per Meter 66.30 5,159.35
xi) 150 mm² CU bare conductor Per Rft 20.20 1,927.80 Per Meter 66.30 6,323.20
xi) 185 mm² CU bare conductor Per Rft 20.20 2,347.10 Per Meter 66.30 7,698.55

chapter-24(Electric Installation) Page 193


25. IRON WORK
The Rates for all finished works include the removal of surplus debris, unused material and byproducts.

MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

RAI LWAY TRACK , ETC


1 Laying, linking and packing tramway line. 100Lft. 5,157.45 Metre 169.15
2 Dismantling tramway track. 100Lft. 1,692.45 Metre 55.50
3 Laying, linking of B.G. track, including packing, 100Lft. 13,475.00 Metre 442.00
straightening and leveling.
4 Linking points and crossings, complete with fastenings. Each 12,787.50 Each 12,787.50
5 Bending or strainghtening B.G. rail with Jim Each 1,428.90 Each 1,428.90
Crow. Point Point
6 Fixing street lamp posts. Each 1,598.85 Each 1,598.85
7 Binding ends of sleepers and timber of all sizes and kinds, 100 Nos 15,699.75 100 Nos 15,699.75
including spreading and restacking.
8 Opening stacks of sleepers and timber of all kinds and 100 Nos 1,918.40 100 Nos 1,918.40
sizes, including spreading for inspection and restacking
within one chain lead.
I RON WORK
9 Small iron work, such as gusset plates, knees, bends, Per Cwt 8,365.50 26,247.60 100 Kg 16,467.50 51,668.45
stirrups, straps, rings, etc. including cutting, drilling,
riveting, handling, assembling and fixing; but excluding
erection in position.
10 Fabrication of heavy steel work, with angle, tees, flat iron Per Cwt 2,943.60 19,961.25 100 Kg 5,794.50 39,293.80
round iron and sheet iron for making trusses, girders,
tanks, etc., including cutting, drilling, revitting, handling,
assembling and fixing, but excluding erection in position.
11 Erection and fitting in position iron trusses, staging of Per Cwt 960.65 100 Kg 1,891.10
water tanks, etc.
12 Fixing corrugated iron sheet, including revitting, etc. 100 Sft. 3,458.40 sq.m 372.10
13 Erecting corrugated iron sheet tanks, upto 20' Per Cwt 1,596.75 100 Kg 3,143.20
(6 m) height.
14 Erecting rolled steel beams or old rails, in roofs, etc., Per Cwt 949.85 100 Kg 1,869.80
erection and fixing in position.
15 Erecting rolled steel beams or rails, erection for posts etc. Per Cwt 463.95 100 Kg 913.25
(other than in roofs).

16 Making bolts and nuts of iron rods. Per Cwt 6,509.25 28,031.00 100 Kg 12,813.50 55,179.15
17 Cutting rails, rolled steel joists and beams, with hacksaw:-

chapter-25(Iron work) Page 194


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
a) upto 6" size (150 mm) Per Cut 648.45 Per Cut 648.45
b) above 6" size (150 mm) Per Cut 962.30 Per Cut 962.30
18 Cutting rails or rolled steel beams of size below 6" Per 308.80 Per Cwt 308.80
(150 mm), with jim. Cut Cut
19 Bending rolled steel beams or rails. Per 326.70 830.50 Per 326.70 830.50
Bend Bend
20 Drilling holes, in plates upto ½" (13 mm) thick, per inch Per 124.60 Per 124.60
dia, (25mm) or part thereof. Hole Hole
21 Extra for drilling holes in plates over ½" (13 mm) thick, per Per 67.80 Per 67.80
inch dia, (25 mm) or part thereof. Hole Hole
22 Rivetting 1/8" dia (3 mm). 100 Nos 1,581.25 100 Nos 1,581.25
23 Cutting out Rivets, all sizes. 100 Nos 5,445.00 100 Nos 5,445.00
24 Fitting and erection of gutters of sheet iron. Per Lft. 206.05 Metre 675.80
25 Cutting and fixing iron bars, for barred windows. Per bar 123.50 Per bar 123.50
26 Cutting G.I. sheets. Each 67.00 Each 67.00
Cut Cut
27 Notching web or foot of rail posts, for housing rail beams. Per 1,452.00 1,788.00 Per 1,452.00 1,788.00
Notch Notch
28 Hoop iron netted trellis work fixed with nails. Per Sft. 86.45 sq.m 930.30

29 Fixing zinc iron or G.I. sheet on table tops. Per Sft. 50.85 sq.m 547.25
30 Making and fixing steel grated doors, complete with Per Sft. 513.85 2,384.75 sq.m 5,529.10 25,660.00
locking arrangement, angle iron frame 2"x2"x3/8"
(50x50x10 mm) and ¾" (20 mm) square bars 4" (100 mm)
centre to centre.
31 Making and fixing steel grated door with 1/16" thick Per Sft. 535.65 2,913.95 sq.m 5,763.70 31,354.20
(1.5mm) sheeting, including angle iron frame 2"x2"x3/8"
(50x50x10 mm) and ¾" (20 mm) square bars 4" (100 mm)
centre to centre, with locking arrangement.
32 Making and fixing grating in opening, including fixing at Per Sft. 206.65 1,157.70 sq.m 2,223.70 12,456.80
site with flat iron 2"x3/8" (50x10 mm) and ¾" (19 mm)
square bars, at 4" (100 mm) centre to centre.
33 Providing and fixing stair railing (all types and designs) of Per Rft. 1,081.40 2,678.10 Metre 3,547.95 8,786.50 The composite rate shall be
hard wood, including bends and corners, screwed to reduced or increased by Rs. 31.90
5/8"x5/8" (16x16 mm) M.S. square bars 2.75 ft. (838 mm) for each foot of reduction or
high, at 5.5 inch (137 mm) inch centre to centre, fixed in addition in the height of the square
steps of stairs, M.S. flat 1"x1/8" (25x3 mm) welded to bars.
bars, painting/polishing 3 coats, etc. complete.
34 Providing/fixing stair railing consisting of M.S. Box section Per Rft. 568.35 1,179.25 Metre 1,864.70 3,868.90
size 1-1/2"x3" of 16 SWG welded with M.S. flat 1"x1/8"
continuously and welded over M.S. square bars 5/8"x5/8"
punched in M.S. flat 2 ¾' high @ 5½" c/c fixed in steps of
stair I/C painting 3 coats complete.

chapter-25(Iron work) Page 195


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

35 Providing and fixing terrace railing of 2" (50 mm) i/d Per Rft. 410.85 1,965.15 Metre 1,347.93 6,447.34 -do-
conduit pipe 16 SWG, welded with 5/8"x5/8" (16x16 mm)
square bar 2.75 ft. (838 mm) high fixed at 5" (125 mm)
centre to centre, in reinforced cement concrete slab with
suitable arrangement, complete in all respects, as per
design and drawing.
36 Providing and fixing collapsible gate made of 2"x2"x"¼" Per Sft. 801.20 2,067.20 sq.m 8,620.95 22,243.00
(50x50x6 mm) tee iron at top and bottom, channel iron
verticals ¾"x¼"x¼"x1/8" (20x6x6x3 mm) at 3" (75 mm) to
5" (125 mm) centre to centre (approximate) and flat iron
crosses 3"x3/16" (75x5 mm), and best quality rollers at
bottom of 3" (75 mm) diameter including holdfasts,
handles 12" (300 mm) long of ¾"x¼"x¼"x1/8" (20x6x6x3
mm) channel iron, locking arrangement inside and
outside, painting 3 coats of black Japan enameled,
complete in working order.
37 Providing and fixing 24 SWG G.I. sheet rolling shutter, Per Sft. 178.75 779.50 sq.m 1,923.35 8,387.30
consisting of steel frame of M.S. channel 2"x1¼"x1/8"
(50x30x3 mm), angle iron 1½"x1½"x1/8" (40x40x3 mm),
M.S. plate 1'x1'x1/8" (300x300x3 mm), G.I. pipe 1½" (37
mm) dia, springs 2' (600 mm) centre to centre, rollers, 24
SWG G.I. covering 1 ft. x 1 ft. (300x300 mm), handles,
holdfast, and painting three coats, complete in all
respects.
38 Providing and fixing M.S. angle iron 1½"x1½"x¼" Per Rft. 86.20 464.20 Metre 282.75 1,523.00
(40x40x6 mm) edge protector nozing of steps of stairs,
having holdfast or 3/8" (10 mm) dia M.S. bars 8" (200 mm)
long welded at 2' (600 mm) centre to centre and
embedded in cement concrete on steps, complete in all
respects.
39 Providing and fixing stair railing of 2½" (63 mm) i/d G.I. Per Rft. 465.70 2,303.75 Metre 1,527.95 7,558.15 The composite rate shall be
pipe, welded with 5/8"x5/8" (16x16 mm) square M.S. bars reduced or increased by Rs. 31.90
2'-9" (838 mm) high, fixed in each step, complete in all for each foot of reduction or
respects, including painting, polishing three coats. addition in the height of the square
bars.
40 Providing and fixing G.I. wire gauze 24 SWG, 12x12 Per Sft. 81.40 195.85 sq.m 875.85 2,107.40
meshes per square inch, fixed to steel windows or doors,
etc., complete in all respects.
41 Providing and fixing steel windows with openable glazed
panels, using beam section for frame 1½"x1"x5/8"x1/8" For fixed pannels, the composite
(40x25x16x3 mm), Z-section for leaves ¾"x1"x¾"x1/8" rate will be reduced by Rs.30.00
(20x25x20x3 mm), T-section sashes 1"x1"x1/8" (25x25x3 per Sft. or Rs. 305.00 per Sq.
mm), glass panes, wooden screed for glazing embedded metre.
over a thin layer of putty duly screwed with leaves, brass
fittings, holdfast, duly painted, complete in all respects,
including all cost of material and labour, etc. as per
chapter-25(Iron work) Page 196
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
approved design and as directed by the
Engineer-in-charge:-
a) without wire gauze:
i) glass pane 2 mm thick Per Sft. 206.75 1,012.95 sq.m 2,224.80 10,899.40
ii) glass pane 2.5 mm thick ditto 206.75 1,027.35 ditto 2,224.80 11,054.30
iii) glass pane 3 mm thick ditto 206.75 1,087.35 ditto 2,224.80 11,699.90
iv) glass pane 4 mm thick ditto 206.75 1,147.35 ditto 2,224.80 12,345.50
v) glass pane 5 mm thick ditto 206.75 1,192.95 ditto 2,224.80 12,836.20
b) fixed with wire gauze, 22 SWG
i) glass pane 2 mm thick Per Sft. 292.65 1,254.35 sq.m 3,148.75 13,496.75
ii) glass pane 2.5 mm thick ditto 292.65 1,268.75 ditto 3,148.75 13,651.70
iii) glass pane 3 mm thick ditto 292.65 1,328.75 ditto 3,148.75 14,297.30
iv) glass pane 4 mm thick ditto 292.65 1,388.75 ditto 3,148.75 14,942.90
v) glass pane 5 mm thick ditto 292.65 1,434.35 ditto 3,148.75 15,433.55
42 Providing and fixing steel windows using M.S. sheet (16
SWG) moulded tubular pipe 1½"x1½" (40x40mm) for
frame and 1¼"x1¼" (30x30mm) for leaves including M.S.
square bars ¼"x¼" (6x6 mm) welded around each panel
of frame, 5 mm thick glass panes fixed with double M.S.
square tubular pipe 3/8"x3/8" (10x10mm) (22 SWG)
beading with U' shaped rubber lining, brass fitting,
holdfast, including painting three coats complete in all
respects.
a) For openable panels fixed with wire Per Sft. 146.85 1,347.00 Sq.m 1,579.95 14,493.75
gauze 24 SWG, 12x12 mesh and glass
panes ¼" (6 mm) thick.
b) For fixed panels without wire gauze. ditto 140.75 747.90 ditto 1,514.25 8,047.25
43 Providing and fixing windows consisting of M.S. box Per Sft. 195.75 1,837.60 Sq.m 2,106.40 19,772.35
section frame 2"x1½" (50x40mm), leaves frame 1-½"x1"
(40x25mm) box section frame for glazing 3/8"x3/8"
(10x10mm) using 16 SWG sheet 'U' shaped rubber
supported with 1"x1/8" (25x3mm) M.S. flat for fixing 3/16"
(5 mm) thick glass panes M.S. box section ½"x½"
(13x13mm) of 16 SWG for fixing 24 SWG wire gauze on
outer side by means of ¾"x1/8" (20x3mm) M.S. flat and
screws I/C all C.P. fitting and painting 3 coats complete in
all respect.
44 Providing and fixing windows consisting of M.S. box Per Sft. 264.95 2,195.70 Per Sft. 2,850.90 23,625.60
section frame 2"x1½", (50x40mm) leaves frame 1½"x1"
(40x25mm) box section frame for glazing 3/8"x3/8"

chapter-25(Iron work) Page 197


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
(10x10mm) using 16 SWG sheet 'U' shaped rubber
supported with 1"x1/8" (25x3mm) M.S. flat for fixing 3/16"
(5 mm) thick glass panes M.S. box section ½"x½"
(13x13mm) of 16 SWG for fixing 24 SWG wire gauze on
outer side by means of ¾"x1/8" (20x3mm) M.S. flat and
screws including grill of M.S. flat ½"x1/8" (13x3mm) or
¼"x¼" (6x6mm) square bar with independent frame of
½"x½" (13x13mm) box section of 16 SWG i/c all C.P.
fitting and painting 3 coats complete in all respect.
45 Flapping G.I. pipes for bath room drains. Each 1,831.50 1,945.50 Each 1,831.50 1,945.50
46 Supply and fixing iron grating for fire place. Per Sft. 338.25 548.25 sq.m 3,639.55 5,899.15
47 Fixing copper flashing, including cutting of sheets, Per Lft. 144.10 Metre 472.65
grooving and rivetting.
48 Providing and fixing angle iron railing, using 2½"x2½"x3/8" Per Rft. 231.15 2,617.15 Metre 758.35 8,586.45
(63x63x10 mm) angle iron post 4½" (113 mm) long, 5' to
6' (1500 to 1800 mm) apart, with 2½"x2½"x3/8" (63x63x10
mm) angle iron top rail, and two rows of M.S. flat 2½"x¼"
(63x6 mm) including fixing to side of Bridge/structure with
U.bolt 1½' (450 mm) long ¾" (20 mm) dia, painting posts,
etc. complete in all respects.
49 Providing and fixing barbed wire fencing on compound 100Rft. 5,241.35 31,279.30 Metre 171.95 1,026.20
wall, consisting of 1½"x1½"x3/16" (40x40x5 mm), angle
iron post 3¼ ft. (990 mm) long, 5 to 6 ft. (1500 to 1800
mm) centre to centre, embedded in cement concrete
1:4:8, base of size 9"x9"x12" (225x225x300 mm), and
three rows of barbed wire, painting posts, etc. complete in
all respects.

50 Providing and fixing barbed wire fencing on compound 100Rft. 8,718.85 40,067.30 Metre 286.05 1,314.55
wall, consisting of 1½"x1½"x3/16" (40x40x5mm) angle
iron post 3' (900 mm) long, 4' (1200 mm) apart embedded
in cement concrete 1:4:8 base of size 6"x6"x9"
(150x150x225 mm) and 4 rows of barbed wire, including
binding wire, painting posts, etc. complete in all respects.
51 Providing and fixing all types of partly fixed and partly (1) Increase composite rate by
openable glazed anodised/ powder coated Rs. 168.65 per Sft if sections
aluminium doors, using delux section of M/s Al-Cop or Pakistan thickness is 2 mm.
Cables, having chowkat frame of size 40 x 100 mm (1½" x
4") and leaf frame of 60x40mm (2½"x1½") wide sections (2) Reduce rate by Rs.17.20 per Sft
including the cost of ¼" (5 mm) thick tinted if sections are of dull aluminimum
glass with aluminium triangular gola and rubber gasket to shade.
support the glass and leaf edging, using approved
standard fittings, locks, 3" (75 mm) wide long handles
etc., and hardware any required as approved by the
engineer in-charge. Per Sft 268.70 1,566.25 sq. m 2,891.20 16,852.85
chapter-25(Iron work) Page 198
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

52 Providing and fitting all types of glazed aluminium Per Sft 233.75 1,312.45 sq. m 2,515.15 14,121.95 (1) Reduce composite rate by
windows of anodised/ powder coated partly fixed Rs.64.50 if aluminum section
and partly sliding using delux sections of approved manufacturer thickness is 1.2 mm used.
having frame size of 100 x 30 mm (4"x1-1/4") and (2) Reduce rate by Rs.12.00 P.Sft if
leaf frame sections of 50 x 20 mm (2"x¾"), all of 1.6mm sections are of dull aluminium shade.
thickness including 5 mm thick imported tinted glass with
rubber gasket using approved standard latches, hardware
etc., as approved by the Engineer in-charge.

53 Providing and fixing Aluminum Fly screen comprising of Fiber / Per Sft 90.05 544.15 P.Sqm 969.05 5,855.20 (1) Reduce composite rate by
Aluminum wire guaze (Malasian) fixed in aluminum frame of Rs.64.50 if aluminum section
approved manufacturer / powder coated of size 1-1/2"x1/2" and thickness is 1.2 mm used.
1.6mm thick with rubber gasket i/c cost of Hardwares as approved
and directed by the engineer incharge. complete in all respect.

54 P/F MS box section window of 16 SWG, having frames of 2” x 1- Per Sft 174.70 1,687.15 P.Sqm 1,879.50 18,153.95 i. If Brass stays will be provided, rate
1/2” , leave frame of T-type box section of 2” x1” x1” , with ½” x1/2” of Rs.20/- P.Sft will be paid.
box section using, U shaped rubber for fixing 5 mm thick glass ii. For fixed pannels without guaze,
panes i/c the cost of fixing of 24 SWG wire guaze on inner side by reduce rate of Rs.150/- P.Sft.
means of ½” x1/8” MS flat patti, MS grill fitted within the window Iii. If box sections of 18SWG used,
frame and screws including hinges, brass handles and painting 3 reduce rate of Rs. 25/- P.Sft.
coats. Complete in all respect
55 Providing / Laying M.S Liner of specified thickness for concrete Cwt 1.50 8.10 P.Kg 76.85 411.85
bored piles, placed at the upper part of bore, as mentioned on
drawings etc complete in all respect.

56 Providing and fixing 2 mm thick Double glazed aluminium windows If natural color sections are used,
of anodize / powder coated partly fixed and party sliding using reduce composite rate by Rs 47.45
deluxe section of 100mm x 40mm x2 mm using frame (70501) at Psft or Rs 510.70 P.Sq Mtr.
bottom, (70502) at Top & Side made of Pakistan Cables/Alcop or
approved equivalent manufacturer having Leaf Frame size 31mm x Add extra Rs.9.00 P.Sft for tempering
60mm x2 mm (70506) at Top & Bottom, 35mm x 60mm x2 mm of 1mm each
(70505) at center and 35mm x 60mm x2 mm(70503) at sides ,
fixing one side Tinted and one side clear double glass, and air tight
using double tape, chemical strips, Silicon using approved latches,
wheels for channel, stopper, brush channel angle joint and hardware
etc.( excluding the cost of Fly Proofing). Complete in all respect as
approved and directed by the Engineer Incharge.
a) 5mm thick Glass Per Sft 458.25 2,735.00 Sq.m 4,930.60 29,428.50
b) 6mm thick Glass Per Sft 458.25 2,767.40 Sq.m 4,930.60 29,777.15

chapter-25(Iron work) Page 199


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

57 Providing and fixing aluminium glazed partition of anodized / Per Sft 434.80 1,612.10 Sq.m 4,678.20 17,346.35 If natural color sections are used,
powder coated using section of M/s. Al-Cop/ Pakistan Cable or reduce composite rate by Rs 47.45
approved equivalent manufacturer, having 2 mm thick Frame size Psft or Rs 510.70 P.Sq Mtr.
D48-A , i/c 12 mm Tempered glass with sand blasting and edge
polishing i/c the cost of tear resistance film,rubber gasket and
hardware etc. complete in all respect as approved and directed by the
Engineer Incharge.(Floor hinge will be paid separately)
58 Providing and fixing M.S. flat ½"x1/8" (13mm x 3mm) grill Per Sft. 175.80 654.30 sq.m 1,891.85 7,040.50
including ¾" x 1/8" (20 mmx3 mm) M.S. flat frame, in
windows of approved design, including painting three
coats, complete in all respects.
59 Providing and fixing M.S. grill fabricated with MS Square polished
Vertical/horizontal Bars of specified size @ 4" c/c ' passed through
punched holes in MS Patti of 1-1/4"x1/8" i/c the cost of 1-1/4"x1/8''
MS patti for Frame of windows and painting 3 coat complete in all
respect as approved and directed by the Engineer Incharge.

(i) 3/8" Square Bars Per Sft 331.65 1,093.35 Sq.m 3,568.35 11,764.20
(ii) 1/2" Square Bars Per Sft 331.65 1,248.20 Sq.m 3,568.35 13,430.65
60 P/F Double locking arrangement for steel grated door consisting of Each 3,639.90 15,683.50 Each 3,639.90 15,683.50
MS Box of size 9"x13-1/2"x9" made with 1/4" thick MS sheet i/c
double sliding bolt of 1-1/4" dia rod operated with 1-1/2" dia GI
pipe duly embedded with cement concrete (1:2:4) i/c holdfast i/c
painting 3 coats complete in all respect as approved and directed by
the Engineer Incharge.
61 P/F 1.5' deep gun racks comprising of 18 SWG M.S Sheet and M.S Per Sft 388.00 2,252.65 Sq.m 4,174.75 24,238.60
angle iron 1-1/2"x1-1/2"x1/4" for frame including 02-Nos
Sheesham wood planks 1-1/2" thick with polishing for guns hold i/c
all labour and painting with hammer paint complete in all respect as
approved and directed by the Engineer Incharge.
62 P/F Iron door comprising of specified leaves made of 1-1/4” x1-
1/4” x3/16" MS angle iron for leaf frame, diagonal and horizontal
braces duly welded with MS. sheet 18-SWG i/c the cost of sliding
bolt, tower bolt and painting 3-coats but excluding the cost of
Chowkat complete in all respect as approved and directed by the
Engineer incharge.
(i) Single Leaf Per Sft 103.05 1,196.60 Sq.m 1,108.65 12,875.50
(ii) Double Leaf Per Sft 112.70 1,652.35 Sq.m 1,212.75 17,779.35

chapter-25(Iron work) Page 200


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

63 Providing and fixing 5.00 ft dia MS spiral stair comprising of P. Rft 325.60 8,392.95 P.Meter 1,067.95 27,528.80
triangular steps made of 1-1/4"x1-1/4"x3/16" duly welded with Height Height
3/8"MS squar bars steps, supported/welded with main vertical post
of 4" dia GI pipe (Medium Quality) embeded in PCC in ground i/c
the cost of pipe railing comprising of 2" dia MS pipe of 16 SWG
supportrd with 2 no 5/8" squar bars in each step, i/c fixing &
painting complete in all respects as approved and directed by the
Engineer Incharge(Measurement will be made above ground level).

64 Providing and fixing 2'-9" high stair railing comprising of non Per Rft 432.30 3,352.70 Meter 1,417.95 10,996.90
magnetic (304) Stain less steel 2" dia pipe railing of 18 SWG
welded with vertical posts of 2" dia stainless steel round/ Squar pipe/
Tong (chimta) @ 2-ft c/c fixed on alternate steps with 3" long steel
screws and brass rawal plugs , 3-Nos diagonal stainless steel pipes
of 1/2" dia passes through goties fixed on vertical post, i/c stainles
steel welding, fixing & polishing complete in all respects as
approved and directed by the Engineer Incharge.
65 Providing and fixing 2" dia 18 SWG non-magnetic Stain less steel Per Rft 242.55 575.55 Meter 795.55 1,887.80
pipe (304) wall mounted hand rail comprising fixed with 2" long
steel bracket with screws i/c the cost of hardware etc. & stainless
steel welding & polishing complete in all respects as approved and
directed by the Engineer Incharge.
66 Providing and fixing 2.00 ft deep M.Steel Lockers (Wardrobes) Per Sft 368.15 2,531.40 Sq.m 3,961.55 27,237.60
consisting of 1-1/4” x1-1/4” x3/16” angle Iron Frame & 1” x1” x1/8”
MS Flat for center vertical bracing duly welded with MS sheet 24-
SWG Sheet on all Sides, Back & Top and for partitions / Shelves
and 1"x1"x1/8" Angle Iron for Leaf Frame duly welded with 18-
SWG for Front Door and hinges and locking arragement ,handles
duly painted with hammar paint 3-coats complete in all respect as
approved by the Engineer Incharge.
67 Providing and Fixing steel grating on windows comprising of ¾” Per Sft 123.30 1,387.45 Sq.m 1,326.85 14,929.00
MS square bars of 4"c/c penetrated through punched holes of 3 no
Ms flat 2” x3/8” duly welded wiith 2” x2” x3/8" angle iron frame i/c
three coat painting complete in all respect as approved by the
Engineer incharge.
68 P/F iron grated doors comprising of 2-1/2” x2-1/2” x3/8” angle iron Per Sft 110.05 3,314.40 Sq.m 1,184.10 35,662.75
chowkat ,2” x2” x3/8” angle iron frame and with ¾” square bar at 4”
center to center penetrate through punch holes of 2-nos 2” x3/8” MS
flat horizantal bracings i/c cost of gussest plates of 3/8” MS sheet,
hinges, MS Sliding Bolts and three coats of painting complete in all
respect as approved and directed by the Engineer incharge.

chapter-25(Iron work) Page 201


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

69 Providing and fixing rolling Shutter, comprising of 8 mm dia plain Per Sft 154.25 640.30 Sq.m 1,659.70 6,889.35
MS steel bars duly bent in the shape of sine waves roll in MS
Channels of size 2"X 1-1/4"X 1/8" i/c the cost of 1-1/2" dia G1
Pipe for rolling,pullies , springes, 24 SWG G1 sheet covering box
for machine,puling handles of of angle iron 1-1/2"X1-1/2"X1/8",
holdfast and painting charges , complete in all respects as approved
and directed by the Engineer Incharge.
70 Providing and fixing MS louvered door comprising of 3/4"x3/4"x2" Per Sft 216.25 1,470.00 Sq.m 2,326.60 15,817.30
louvers of 16 SWG MS sheet welded with door frame of size 2"x4"
16 SWG MS pipe with lock rail i/c the cost of handles, 1" dia MS
sliding bolt ,three coats of fire proof paint complete in all respect as
approved and directed by the Engineer Incharge.

chapter-25(Iron work) Page 202


26. MISCELLANEOUS
Rates for all finished works include the removal of surplus debris, unused material and byproducts.

MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

1 Notice board made of cement, sand mortar 1:3. Per Sft. 185.65 212.20 P. Sqm 1,997.35 2,283.20 The board is to be of cement
plaster ½" (13 mm) thick, with 2"
(50 mm) wide and 1" (25 mm) thick
beading.
2 Fixing handles to iron hammers. Each 254.40 - Each 254.40 -
3 Providing and fixing barbed wire fencing, with 4 horizontal 100Rft. 19,149.45 69,314.05 Per Metre 628.25 2,274.10 Vertical bars in straining and
and 2 number cross wires fixed with posts of R.C.C., 1:2:4 stiffening posts to be 4 No. each by
(straining posts 7'x9"x9" (2.13 mx225x225 mm) at 100' ½" (13 mm) dia and for
(30 m) centre to centre, stiffening posts 7'x6"x6" (2.13 intermediate posts to be 4 No. of
mx150x150 mm) at 50 ft. (15 m) interval and intermediate 3/8" (10 mm) dia Stirrups for all
post 7'x5"x5" (2.13 mx125x125 mm) at 8 ft.(2.4 m) centre posts to be ¼" (6 mm) dia. at 12"
to centre), including cost of steel, its fabrication and (300 mm) centre to centre.
placing of steel reinforcement, eye bolts, washers, etc.
complete.
Surveying and M aping
4 Supplying Bamboo Jhandies 10' to 12' (3.00 to 3.65 m) with Each 107.40 1,159.80 Each 107.40 1,159.80
iron shoes, and flags 15" (375mm) square.
5 Supplying wooden pegs for levelling, 1½" (40 mm) dia, 6" 100Nos. 407.00 440.70 100Nos. 407.00 440.70
(150mm) long.
6 Supplying wooden pegs for alignment, 2" to 3" dia (50 to 100Nos. 976.80 1,365.60 100Nos. 976.80 1,365.60
75 mm), 9" (225 mm) long.
7 Fixing enamalled iron gauges flush with masonry, including Per Rft 216.15 233.45 Per Metre 709.15 765.85
cost of hooks.
8 Placing boundary pillars in position, including digging pits. Each 144.10 - Each 144.10 -
9 Fixing main line type distance mark in position, including Each 620.40 999.20 Each 620.40 999.20 Composite rate does not include
making 1:3:6 cement concrete base block, size cost of iron distance marks.
14"x10"x15" (350x250x375 mm).
10 Detailed Plan & Profile, Levelling of Carriageway road at 100'
interval, Observing cross sections at 200' interval or as directed by
the Engineer incharge, Marking of Benchmarks at safe places (01)
one number in each km. Preparing of existing Plan & Profile, Cross
Sections on Computer, fixing of proposed profile line after
finalization by the Engineer Incharge. Providing (4) four sets of plan
& profile drawings and computerized calculation sheets of earth
work after profile finalization, complete in all respect upto the entire
satisfaction of Engineer Incharge.
a) Plain Terrain
i) Single Carriageway P.KM - 23,399.90 P.KM - 23,399.90
ii) Dual Carriageway P.KM - 30,174.15 P.KM - 30,174.15
b) Hilly Terrain
i) Single Carriageway P.KM - 30,024.10 P.KM - 30,024.10
ii) Dual Carriageway P.KM - 33,089.65 P.KM - 33,089.65

chapter-26( Misc) Page 203


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

11 Topographic Survey with coordinates for buildings, bridge P.Kanal - 479.70 P.Kanal - 479.70
construction or road covering detail of all existing features within
1000' each side. Existing Cross Sections at specified intervals of the
area of interest at each change in topographic feature or as directed
by the Engineer Incharge. Plan and Profile data of Existing Roads,
collecting all utilities data such as Buildings, telephone poles, electric
lines/poles, HT Lines, Manholes etc complete in all respect upto the
entire satisfaction of the Engineer Incharge.
Hand Pumps & Pressure Pipes
12 Cutting pipes, upto 2" (50 mm) dia. Per cut 144.10 - Per cut 144.10 -
13 Cutting pipe, above 2" (50 mm) dia. Per cut 265.00 - Per cut 265.00 -
14 Threading pipe ends, 1½" (40 mm) to 4" (100 mm) dia. Each 184.80 - Each 184.80 -
End End
15 Assembling 1½" (40 mm) dia pressure pipe. 100Lft. 657.95 - Per Metre 21.60 -
16 Boring and fixing 1½" (40 mm) dia pressure pipe:
a) in ordinary soil Per Rft. 225.65 - Per Metre 740.30 -
b) in clay Per Rft. 437.25 - Per Metre 1,434.55 -
c) in shingle Per Rft. 648.86 - Per Metre 2,128.80 -
17 Repairs to hand pump, pulling out and refitting. Per Rft. 99.65 - Per Metre 326.95 -

18 Fixing hand pump (Machine only) Each 488.40 - Each 488.40 -


Rest House Furniture & Fuel, etc.
19 Washing Niwar of bed. Per bed 1,410.75 1,511.55 Per bed 1,410.75 1,511.55

20 Washing Durries. 100Sft. 1,881.00 2,121.00 sq.m 202.50 228.30


21 Recaning chairs:
i) office chairs, single caning seat only. Each 854.70 921.50 Each 854.70 921.50
ii) office chairs, double canning seat only. Each 1,098.90 1,193.20 Each 1,098.90 1,193.20
iii) office chairs, single caning back only. Each 610.50 614.75 Each 610.50 614.75
iv) office chairs, double caning back only. Each 976.80 1,012.95 Each 976.80 1,012.95
v) easy chairs, single caning seat only. Each 610.50 700.10 Each 610.50 700.10
vi) easy chairs, double caning seat only. Each 1,709.40 1,843.00 Each 1,709.40 1,843.00
vii) easy chairs, single caning only, back and seat in one Each 2,442.00 2,992.20 Each 2,442.00 2,992.20
piece.
viii) easy chairs, double caning back & seat in one piece Each 3,663.00 4,999.20 Each 3,663.00 4,999.20
or couches with caned area about 16 Sft (1.5 Sqm).
22 Making and fixing Hat pegs ordinary. Each 439.55 2,954.00 Each 439.55 2,954.00
23 Weaving charpoy. Each 1,587.30 - Each 1,587.30 -
24 Sweeping chimney. Each 313.50 314.85 Each 313.50 314.85
25 Picture railing, including making, fixing and painting. Per Lft. 125.75 420.00 Per LM 412.60 1,378.00
26 Cutting fuel wood, from plantation. 100Kg 419.85 - 100Kg 419.85 -
27 Splitting fuel wood. 100Kg 879.45 - 100Kg 879.45 -
28 Burning charcoal, including loading, unloading and 100Kg of 1,496.15 - 100Kg of 1,496.15 -
repairing kilns. Char- Char-
coal coal

chapter-26( Misc) Page 204


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

29 Filling cement bags with coal and sewing (including cost 100Cft. 3,856.05 3,859.35 cu.m 1,361.95 1,363.10
of strings).
30 Supplying manure. Cart 470.25 697.05 Cart 470.25 697.05 Capacity of cart, 20 Cft. (0.57 cu.m).
Load Load
31 Washing punkha frills. Each 488.40 - Each 488.40 -
32 Washing:-
a) table cloth Each 122.10 - Each 122.10 -
b) napkins, dusters, etc. Each 81.40 - Each 81.40 -
33 Hoisting and placing sleepers for centring, including Each 171.60 - Each 171.60 -
carriage within one chain. No. No.
34 Dismantling sleepers from centring, including stacking Each 195.10 - Each 195.10 -
within one chain. No. No.
35 Dredging Sumps. Per 7,053.75 - Per 7,053.75 - Not less than five gangmen to be
Shift Shift employed for each shift to ensure
effective dredging.
36 Fixing `U' bolt in masonry or concrete, including levelling Each 563.75 - Each 563.75 -
and tying for fixing angle iron post.
37 Bailing out water:-

a) by hand 1000 Cft. 5,643.00 - P.Cum 199.30 - Rate includes cost of providing
b) by pump 1000 Cft. 675.45 1,126.90 P.Cum 23.85 39.80 pump, POL and operation charges,
etc.
38 Drilling holes in R.C. Trough. Per Nos. 360.25 - Per Nos. 360.25 -

39 Supplying and laying polythene sheet over D.P.C. under The rate includes overlaps.
floors and on roofs, etc.

i) 300 gauge (.003" thick) Per Sft. 3.65 8.30 P.Sqm 39.40 89.40
ii) 500 gauge (.005" thick) Per Sft. 7.35 11.20 P.Sqm 78.85 120.65

40 Laying 2" (50 mm) thick sand and bitumen carpet, on top 100Sft. 3,861.15 13,749.85 P.Sqm 415.45 1,479.50
of foundation of oil tank.

41 Cutting hole 4"x6" (100x150 mm) in stone masonry or Per 617.55 - Per 617.55 - Same rate to be paid for other type
brick wall with chisel, repairing masonry and removing Hole Hole of masonry and R.C.C. work.
debris within one chain lead.

42 Making 1½"x1½" (40x40 mm) groove in wall of stone or Per 540.40 - Per 540.40 -
brick masonry in cement for fixing planks upto 9" (225 Plank Plank
mm) deep.

43 Drilling holes in stone or brick masonry upto 2" (50 mm) Per hole 188.10 Per hole 75.25
dia, per inch (25 mm) depth. per inch per c.m
depth depth
44 Providing and fixing barbed wire fencing, with 4 horizontal
and two cross wires, with R.C.C. 1:2:4 posts, 5.5'x6"x9"
(1.68mx150mmx225 mm) at 8 ft. (2.45 m) centre to
centre, reinforced with 4 No. 3/8" (10 mm) dia vertical bars
and 1/8" (3 mm) dia stirrups 12" (300 mm) centre to
centre, complete in all respects.

chapter-26( Misc) Page 205


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

i) without cement concrete base. 100Rft. 20,439.90 65,545.25 Per Metre 670.45 2,149.90
ii) in cement concrete 1:4:8 base of size 12"x12"x21" 100Rft. 22,623.00 72,404.00 Per Metre 742.05 2,374.85
(300x300x525 mm).
45 Spraying termite proofing by using liquid FMC/ Biflex/ Terminex Per Sft 1.75 12.55 P.Sqm 18.70 135.25 (Only applicable for new buildings)
Exin/ Ms Hextar or equivalent @ specified suspension concenterate
(SC), Mixing Ability-HEXTAR with Ratio (1:250) = 540 Sft or
equivalent approved liquid applying with shower and certificate will
be provided by the contractor for 10-years complete in all respect .as
approved by the Engineer Incharge.
46 Supply and Erection of Car Parking Shed consisting of 3 mm thick
fiber glass sheet roof (3-layers) fixed / riveted on moulded curved
frame of M.S box pipe 1-1/2"x1-1/2"16-SWG supported on trusses
of MS angle iron 1-1/2"x1-1/2"x3/16" all around duly supported
on M.S sheet 6"x6"x1/4" welded on GI pipe post (Medium Quality)
of specified diameter embeded in P:C:C (1:2:4 ) i/c the cost of
excavation,cutting straightening assembling, bending as per design,
welding / grinding of joints and painting three coats complete in all
respect as approved and directed by the Engineer Incharge.

(i) 4" dia GI Pipe Supports Per Sft 39.00 963.85 P.Sqm 419.70 10,371.30
(ii) 3" dia GI pipe Supports Per Sft 39.00 885.40 P.Sqm 419.70 9,526.65
47 Supply and Erection of 10 ft high Cantiliver type Car Parking Shed
consisting of 3 mm thick fiber glass sheet roof fixed / riveted with
moulded curved frame comprising of 1-1/2"x1-1/2" 16-SWG MS
box placed @ 2 ft C/C both sides and 1-1/2"x3" M.S box 16-SWG at
front and back side welded on cantillever arch type MS pipe 3" dia
arms welded with 3/8" thick and 8 " dia Main Post duly welded with
1/2" thick 1.5'x1.5' base plate and 4 no stiffeners of 1/2" thick MS
sheet embeded in PCC 2'x2'x3' with 18" long nut bolts 1"dia i/c
cost of foundation,cutting straightening assembling, bending as per
drawing, welding / grinding of joints and painting three coats
complete in all respect as approved by the Engineer Incharge.

(i) One side Cantilever Per Sft 57.85 984.45 P.Sqm 622.55 10,592.50
(ii) Both side Cantilever Per Sft 40.10 827.45 P.Sqm 431.55 8,903.15
48 Providing and fixing anti climb high security galvanized razor cut
wire having double sharp four U-shaped pointed 0.5 mm thick (
22mmx15 mm barbs) spaced @ 33 mm c/c cladded over 2.5 mm dia
high tensile Core wire making coil fencing of specified diameter @
4" c/c fixed on 2'-3" high M/S angle iron post
1½"x1½"x3/16"embeded in base of PCC (1:2:4) (4"x4"x9") @ 4'
apart i/c the cost of 2 No. bars 3/8" dia welded horizantally with
angle iron posts , binding wire, painting of posts, etc. complete in all
respects as pproved and directed by the Engineer incharge.
(i) 24 " diameter Per Rft 143.05 672.45 Per Metre 1,539.00 7,235.55
(ii) 18 " diameter Per Rft 143.05 617.05 Per Metre 1,539.00 6,639.65

chapter-26( Misc) Page 206


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

49 Providing and fixing hot dipped Galvanized Iron chainlink


mesh/fence of 2"x2"mesh made of wire of specified guage, with the
help of 1"x1/8" GI patti, GI.clamps and screws, i/c the cost of 3 nos 8
SWG GI tie wires penetrated through mesh at top,middle and bottom,
fixed on vertical posts of 2" diameter GI pipes (medium quality)
erected @ 8 ft C/C duly embeded in PCC(1:2:4) etc. complete in all
respect as approved and directed by the Engineer Incharge.

(i) 8 SWG Per Sft 32.75 503.00 P.Sqm 352.45 5,412.50


(ii) 10 SWG Per Sft 32.75 473.90 P.Sqm 352.45 5,099.20
50 Providing and fixing slip joint sandwich panels composed of two
steel layers injected in between with polyurethane foam on existing
surface, lightweight of specified density and fire resistance grade-B.
The steel sheet layers are polyester coated hot dipped galvanized ,
sandwich sheets panels are painted with reflective, anti dust and
durable electrostatic paint from both sides i/c the cost of flasing
trims,screws,revits,sealants,tapes etc.complete in all respects as
approved and directed by the Engineer Incharge.

(a) 40 Kg/m3
(i) 50 mm thick Per Sft 66.60 1,138.50 P.Sqm 716.90 12,255.05
(ii) 60 mm thick Per Sft 66.60 1,276.55 P.Sqm 716.90 13,740.70
(iii) 75 mm thick Per Sft 66.60 1,650.45 P.Sqm 716.90 17,765.25
(iv)100 mm thick Per Sft 66.60 2,168.50 P.Sqm 716.90 23,342.00
(v)125 mm thick Per Sft 66.60 2,673.20 P.Sqm 716.90 28,774.60
(vi)150 mm thick Per Sft 66.60 3,683.65 P.Sqm 716.90 39,650.85

chapter-26( Misc) Page 207


27. Heating Ventilation & Air Conditioning
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI
Sr. Rate (British System) Rate (Metric System) Spec.
Description No. Remarks
No. Unit Labour Composite Unit Labour Composite
1 Supplying, fabrication and installation of duct using prime quality hot
dipped G.I sheet metal (Z-275) of specified thickness including the
cost of hangers , tees, bends , reducers, elbows, turning vanes and
23.60
splitter etc coupled with jointing sealant , mounting supports @ 8 ft
c/c and smoke testing charges complete in all respects as approved and
directed by the Engineer Incharge.
(i)28-SWG Per Sft 32.75 233.70 P. Sqm 352.40 2,514.60
(ii)26-SWG Per Sft 32.75 250.20 P. Sqm 352.40 2,691.90
(iii)24-SWG Per Sft 32.75 299.25 P. Sqm 352.40 3,220.10
(iv)22-SWG Per Sft 42.15 352.20 P. Sqm 453.55 3,789.55
(v)20-SWG Per Sft 42.15 392.30 P. Sqm 453.55 4,221.10
(vi)18-SWG Per Sft 42.15 483.05 P. Sqm 453.55 5,197.55
2 Supplying, fabrication and installation of round flue duct of specified Per Sft 37.55 736.85 P. Sqm 404.00 7,928.50
diameter,using prime quality MS sheet of 12 SWG duly welded i/c the
cost of hangers , tees, bends , reducers, elbows , mounting supports @
6 ft c/c complete in all respects as approved and directed by the
Engineer Incharge.
3 Supplying, fabrication and installation of round welded type grease Per Sft 37.55 524.80 P. Sqm 404.00 5,646.70
exhaust duct of specified diameter,using prime quality MS sheet of 14
SWG duly welded i/c the cost of hangers , tees, bends , reducers,
elbows ,cleanout access panel, mounting supports @ 6 ft c/c complete
in all respects as approved and directed by the Engineer Incharge.

4 Supply & Installation of foil faced round flexible duct made of


reinforced Fabric mechanically interlocked with corrosion resitant
metal spiral helix with 1" factory applied fibreglass insulation of
specified size i/c the cost of insulation and supports as per drawings
with all accessories and fittings complete in all respect as approved and
directed by Engineer Incharge.
(i) 6" dia Per Rft 53.30 355.15 Per Metre 174.75 1,164.85
(ii) 8" dia Per Rft 53.30 448.25 Per Metre 174.75 1,470.30
(iii) 10" Dia Per Rft 53.30 541.40 Per Metre 174.75 1,775.75
(iv) 12" Dia Per Rft 53.30 639.55 Per Metre 174.75 2,097.75
(v) 14" Dia Per Rft 53.30 717.55 Per Metre 174.75 2,353.65
(vi) 16" Dia Per Rft 53.30 815.75 Per Metre 174.75 2,675.65
5 Supply, wrapping of 3" thick foil-faced Rockwool thermal Insulation
of nominal density with built in GI wire mesh as per specifications and
drawings conforming to BS 5422:2009 complete in all respect as
approved and directed by the Engineer Incharge.
(i) 30-40 kg/m3 Per Sft 8.20 159.80 Per Metre 88.45 1,719.25
(ii) 45-50 kg/m3 Per Sft 8.20 202.80 Per Metre 88.50 2,183.10
(iii) 55-60 kg/m3 Per Sft 8.20 229.00 Per Metre 88.50 2,465.10
(iv) 65-80 kg/m3 Per Sft 8.20 268.30 Per Metre 88.50 2,888.05
(v) 85-90 kg/m3 Per Sft 8.20 298.25 Per Metre 88.50 3,210.30
(vi) 95-100 kg/m3 Per Sft 8.20 326.30 Per Metre 88.50 3,512.40

chapter-27(HVAC) Page 208


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI
Sr. Rate (British System) Rate (Metric System) Spec.
Description No. Remarks
No. Unit Labour Composite Unit Labour Composite
6 Providing and wrapping foil-faced fiber glass blanket insulation having
specified density & thickness with factory applied vapour
barrier/Aluminium foil i/c the cost of 8 oz canvas cloth wrapping
around with 2" wide self adhesive Aluminium tape and PVC
mechanical fasteners.All longitudinal and circumferential joints shall
be sealed complete in all respects as approved and directed by Engineer
Incharge.
a) 12 kg/m3
(i)1" thick Per Sft 22.20 107.25 P. Sqm 238.85 1,154.25
(ii)2" thick Per Sft 22.20 109.70 P. Sqm 238.85 1,180.40
b) 16 kg/m3
(i)1" thick Per Sft 22.20 95.85 P. Sqm 238.85 1,031.25
(ii)2" thick Per Sft 22.20 112.20 P. Sqm 238.85 1,207.50
c) 24 kg/m3
(i)1" thick Per Sft 22.20 97.10 P. Sqm 238.85 1,044.80
(ii)2" thick Per Sft 22.20 113.50 P. Sqm 238.85 1,221.05
7 Providing and fixing 1" thick bonded fiberglass Blanket sound liner Per Sft 18.50 201.15 P. Sqm 199.05 2,164.40
(Acoustic Liner) having density of 24 kg/m3 with NRC (Noise
Reduction Coefficient of 0.6 ) in ducts, fire retardant type with 100%
surface applied with adhesive as well as mechanical fasteners (
Gripnails) complete in all respect as aprroved and directed by
Engineer Incharge,
8 Providing and installation extruded anodized/Powder coated aluminum Per Sft 277.50 4,763.40 P. Sqm 2,985.90 51,254.05
Supply Air registers have horizontal and vertical adjustable deflecting
bars and opposed blade volume control dampers adjustable from face
with a removable key with minimum of 75% free area complete in all
respects as approved and directed by the Engineer Incharge.

9 Providing and installation Return/Exhaust Air grilles made of specified


material having horizontal and vertical adjustable deflecting
bars,grilles with minimum of 75% free area complete in all respects as
approved and directed by the Engineer Incharge .
a) Electrostatic oven Cured Powder Coated/Anodized
Extruded Aluminum
(i) 1.00 mm thick Per Sft 277.50 3,243.55 P. Sqm 2,985.90 34,900.50
(i) 1.20 mm thick Per Sft 277.50 3,378.35 P. Sqm 2,985.90 36,351.15
b) Powder Coated ACRYLONI TRI LE BUTADI ENE
STYRENE (ABS) Plastic made
(i) 2 mm Thick Per Sft 277.50 3,049.50 P. Sqm 2,985.90 32,812.60
(ii) 3 mm Thick Per Sft 277.50 3,175.50 P. Sqm 2,985.90 34,168.40
(iii) 4 mm Thick Per Sft 277.50 3,301.50 P. Sqm 2,985.90 35,524.15
(iv) 5 mm Thick Per Sft 277.50 3,427.50 P. Sqm 2,985.90 36,879.90
10 Providing and installation Air Difuser made of specified material (of
any shape, round, square , rectangular or linear and furnished with
multi-louver type volume dampers in neck controlled from face of the
diffusers) complete in all respects as approved and directed by the
Engineer Incharge.

chapter-27(HVAC) Page 209


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI
Sr. Rate (British System) Rate (Metric System) Spec.
Description No. Remarks
No. Unit Labour Composite Unit Labour Composite
a) Electrostatic oven Cured Powder Coated/Anodized
Extruded Aluminum
(i) 1.00 mm thick Per Sft 222.00 3,188.05 P. Sqm 2,388.70 34,303.30
(ii) 1.20 mm thick Per Sft 222.00 3,322.85 P. Sqm 2,388.70 35,753.95
(iii) Linear Slotted Diffuser Per Sft 222.00 1,284.00 P. Sqm 2,388.70 13,815.85
b) Powder Coated ACRYLONI TRI LE BUTADI ENE
STYRENE (ABS) Plastic made
(i) 2 mm Thick Per Sft 222.00 2,994.00 P. Sqm 2,388.70 32,215.45
(ii) 3 mm Thick Per Sft 222.00 3,120.00 P. Sqm 2,388.70 33,571.20
(iii) 4 mm Thick Per Sft 222.00 3,246.00 P. Sqm 2,388.70 34,926.95
(iv) 5 mm Thick Per Sft 222.00 3,372.00 P. Sqm 2,388.70 36,282.70
11 Providing and installing opposed blade Volume Dampers (Air-
Handler) , of Prime Quality G.I sheet of specified thickness,(The
quadrant volume damper shall be muti-leaf type, with a mximum blade
width of 8", heavy duty quadrant operators of brass with stand off
mountings on thermally insulated ducts to provide clearance between
the duct surface and operator, equal to the thickness of the insulation ,
capable of being locked at desired position conveniently, provided with
a baked enamel finish complete in all respects as approved and directed
by the Engineer Incharge.

(i) 16 SWG Per Sft 138.75 4,174.35 P. Sqm 1,492.95 44,916.00


(ii) 18 SWG Per Sft 138.75 3,395.55 P. Sqm 1,492.95 36,536.10
12 Supply & Installation of multi layer aluminium sheet jacketting of
specified thickness,coated with UV ( Ultra Violet) protection &
polymer backing having saltwater resistance and fire performance
conformimg to ASTM-C1729M over exposed duct/pipe insulations
where required and specified i/c the cost of Metal banding solution
sealant as approved and directed by Engineer Incharge.
i) 0.3 mm Thick Per Sft 12.55 115.80 P. Sqm 135.10 1,245.95
ii) 0.4 mm Thick Per Sft 12.55 148.35 P. Sqm 135.10 1,596.50
iii) 0.5 mm Thick Per Sft 12.55 180.95 P. Sqm 135.10 1,947.05
iv) 0.6 mm Thick Per Sft 12.55 213.55 P. Sqm 135.10 2,297.55
v) 0.8 mm Thick Per Sft 12.55 278.70 P. Sqm 135.10 2,998.65
vi) 1.00 mm Thick Per Sft 12.55 343.85 P. Sqm 135.10 3,699.70
vii) 1.20 mm Thick Per Sft 12.55 397.60 P. Sqm 135.10 4,278.25
13 Supply & Installation of duct flexible connector of specified material
and coatings and width as per drawings with all accessories and fittings
complete in all respect as approved and directed by Engineer Incharge.

a) Robust Polyester with PVC Coating


(i) 9" Wide Per Rft 44.40 418.95 Per Metre 145.65 1,374.15
(ii) 6" Wide Per Rft 44.40 303.70 Per Metre 145.65 996.15
b) Glassfiber with Neoprene Coating
(i) 9" Wide Per Rft 44.40 1,053.75 Per Metre 145.65 3,456.30
(ii) 6" Wide Per Rft 44.40 830.75 Per Metre 145.65 2,724.80
c) Glassfiber with Polyurethane Coating
(i) 9" Wide Per Rft 44.40 843.95 Per Metre 145.65 2,768.20

chapter-27(HVAC) Page 210


MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI
Sr. Rate (British System) Rate (Metric System) Spec.
Description No. Remarks
No. Unit Labour Composite Unit Labour Composite
(ii) 6" Wide Per Rft 44.40 777.80 Per Metre 145.65 2,551.20
d) Glassfiber with Silicon Coating
(i) 9" Wide Per Rft 44.40 976.25 Per Metre 145.65 3,202.15
(ii) 6" Wide Per Rft 44.40 777.80 Per Metre 145.65 2,551.20
14 Supply & Installation of bellow type pipe flexible connector
manufactured with high resistant - impregnated rubber and metal
flanges made of Econosto (Holand), Tozen (Japan) or Scon (Pakistan)
i/c the cost of Gaskit and not bolts, as approved and directed by
Engineer Incharge.
i) 6" dia Each 1,572.00 32,852.60 Each 1,572.00 32,852.60
ii) 8" dia Each 1,572.00 39,769.45 Each 1,572.00 39,769.45
iii) 10" dia Each 1,572.00 66,198.90 Each 1,572.00 66,198.90
15 Supply & Installation of pre-formed tube of Elastomaric closed cell FM
foam type insulation of specified thickness having density of 40-65 Kg
3
/ m and thermal condcutivity of 0.035 W/M at 25 degree centigrade of
fire performance conforming to UK building regulation of class - 0
rating C2, complete including the cost of adhesives and sealers as
specified for chilled water piping and fittings including valves,
strainers as approved and directed by Engineer Incharge.
a) 19 mm thick
(i) 3/4"dia Per Rft 19.65 367.20 Per Metre 64.45 1,204.35
(ii) 1" dia Per Rft 19.65 532.35 Per Metre 64.45 1,746.05
(iii) 1-1/4" dia Per Rft 19.65 603.70 Per Metre 64.45 1,980.15
(iv) 1-1/2" dia Per Rft 19.65 659.50 Per Metre 64.45 2,163.20
(v) 2" dia Per Rft 39.30 802.45 Per Metre 128.90 2,632.05
(vi) 2-1/2" dia Per Rft 39.30 1,015.30 Per Metre 128.90 3,330.15
(vii) 3"dia Per Rft 39.30 1,274.85 Per Metre 128.90 4,181.50
(viii) 4" dia Per Rft 58.95 1,450.25 Per Metre 193.35 4,756.75
b) 25 mm thick
(i) 5" dia Per Rft 58.95 1,631.95 Per Metre 193.35 5,352.70
(ii) 6" dia Per Rft 58.95 1,768.20 Per Metre 193.35 5,799.70
(iii) 8" dia Per Rft 78.60 2,092.85 Per Metre 257.80 6,864.50
c) 32 mm thick
(i) 10" dia Per Rft 78.60 2,355.00 Per Metre 257.80 7,724.35
(ii) 12" dia Per Rft 78.60 2,670.35 Per Metre 257.80 8,758.75
(iii) 14" dia Per Rft 98.25 2,988.50 Per Metre 322.25 9,802.25
16 3
Supply & Installation of High Density ( 64 Kg/m ) Aluminum foil
faced fiberglass pipe insulation for chilled/hot water pipeing and
fittings and protections of valves,strainers etc i/c the cost of canvas
cloth as approved and directed by Engineer Incharge.
a) 25 mm thick
(i) 3/4"dia Per Rft 39.30 407.20 Per Metre 128.90 1,335.65
(ii) 1" dia Per Rft 39.30 434.80 Per Metre 128.90 1,426.05
(iii) 1-1/4" dia Per Rft 39.30 467.70 Per Metre 128.90 1,534.00
(iv) 1-1/2" dia Per Rft 39.30 498.80 Per Metre 128.90 1,636.10
(v) 2" dia Per Rft 58.95 576.25 Per Metre 193.35 1,890.15
(vi) 2-1/2" dia Per Rft 58.95 705.15 Per Metre 193.35 2,312.85
(vii) 3"dia Per Rft 58.95 748.40 Per Metre 193.35 2,454.75
b) 50 mm thick
(i) 4" dia Per Rft 78.60 1,021.45 Per Metre 257.80 3,350.30
chapter-27(HVAC) Page 211
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI
Sr. Rate (British System) Rate (Metric System) Spec.
Description No. Remarks
No. Unit Labour Composite Unit Labour Composite
(ii) 5" dia Per Rft 78.60 1,293.35 Per Metre 257.80 4,242.20
(iii) 6" dia Per Rft 78.60 1,429.30 Per Metre 257.80 4,688.15
(iv) 8" dia Per Rft 78.60 1,492.60 Per Metre 257.80 4,895.70
(v) 10" dia Per Rft 98.25 1,924.25 Per Metre 322.25 6,311.50
(vi) 12" dia Per Rft 98.25 2,387.75 Per Metre 322.25 7,831.80
17 Supply & Installation built in Microban Elastomeric closed cell FM
3
approved Foam type insulation of 40-65 kg/m density and thermal
condcutivity of 0.035 W/M at 25 degree centigrade of fire performance
closely woven fiberglass cloth conforming to UK building regulation of
clause - 0 rating as specified, complete including the cost of adhesives
and sealers as approved and directed by Engineer Incharge.

(i) 6 mm thick Per Sft 15.70 134.45 P.Sqm 169.20 1,447.05


(ii) 9 mm thick Per Sft 15.70 168.60 P.Sqm 169.20 1,814.80
(iii) 12 mm thick Per Sft 15.70 208.30 P.Sqm 169.20 2,241.85
(iv) 19 mm thick Per Sft 15.70 244.50 P.Sqm 169.20 2,631.95
18 Supply & Installation of 5 mm thick polyethelene (PE) insulation for
condensate drain pipes of required size for AHU and FCU pipes
covered with PVC tape as per specifications /drawings with all
accessories and fittings as approved and directed by Engineer Incharge.

(i)3/4 " dia pipe Per Rft 19.65 100.85 Per Metre 64.45 330.80
(ii)1 " dia pipe Per Rft 19.65 198.10 Per Metre 64.45 649.70
(iii)1-1/4" dia pipe Per Rft 39.30 278.90 Per Metre 128.90 914.75
(iv)1-1/2 " dia pipe Per Rft 39.30 332.20 Per Metre 128.90 1,089.65
(v)2 " dia pipe Per Rft 39.30 358.85 Per Metre 128.90 1,177.10
19 Supply & Installation of washable aluminium metal mesh filter consists
primarily of layers of aluminium slit and expanded into mesh of
differing densities duly fixed in frame of specified thickness for AHUs
fabricated with min. 12 mesh layers at fresh air intake on outside of
AHU as approved and directed by Engineer Incharge.

(i) 1" Thick Per Sft 98.25 587.50 P.Sqm 1,057.15 6,321.25
(ii) 2" Thick Per Sft 98.25 791.40 P.Sqm 1,057.15 8,515.25
(iii) 3" Thick Per Sft 98.25 995.30 P.Sqm 1,057.15 10,709.30
20 Supply & Installation of Electrostatic Ovencured Powder coated/ Per Sft 49.15 1,517.15 P.Sqm 528.60 16,324.65
extruded anodized rectangular/Squar aluminium louver duly fixed in
frame of specified thickness for intake/Exhaust air with fine finishing
as approved and directed by Engineer Incharge.
21 Supply & installation closed cell type Aluminium foil faced XLPE
(Cross linked polyethelene) polyolefin pipe insulation tube of density
25 Kg/m³ of specified thickness & thermal conductivity 0.035 w/m °C
and fire retardent of Class "o" rating as specified for refrigerant copper
piping as approved by the Engineer Incharge.
a) 20 mm thick
(i) 1/4"dia Per Rft 9.85 224.40 Per Metre 32.25 736.05
(ii) 3/8" dia Per Rft 9.85 247.75 Per Metre 32.25 812.65
(iii) 1/2" dia Per Rft 9.85 326.95 Per Metre 32.25 1,072.35
(iv) 5/8" dia Per Rft 19.65 352.35 Per Metre 64.45 1,155.65
(v) 3/4" dia Per Rft 19.65 370.50 Per Metre 64.45 1,215.25
(vi) 7/8" dia Per Rft 19.65 396.45 Per Metre 64.45 1,300.35
chapter-27(HVAC) Page 212
MRS, 2nd BI-ANNUAL-2024 (01.07.2024 to 31.12.2024) DISTRICT RAWALPINDI
Sr. Rate (British System) Rate (Metric System) Spec.
Description No. Remarks
No. Unit Labour Composite Unit Labour Composite
(vii) 1"dia Per Rft 39.30 431.70 Per Metre 128.90 1,415.90
(viii) 1-1/8" dia Per Rft 39.30 453.75 Per Metre 128.90 1,488.25
(ix) 1-1/4" dia Per Rft 39.30 465.40 Per Metre 128.90 1,526.60
(x) 1-1/2" dia Per Rft 58.95 500.65 Per Metre 193.35 1,642.10
(xi) 1-5/8" dia Per Rft 58.95 533.10 Per Metre 193.35 1,748.55
(xii) 1-3/4" dia Per Rft 58.95 572.00 Per Metre 193.35 1,876.25
(xiii) 2" dia Per Rft 78.60 618.95 Per Metre 257.80 2,030.10
(xiv) 2-1/2" dia Per Rft 78.60 790.25 Per Metre 257.80 2,591.95
(xv) 3" dia Per Rft 78.60 808.75 Per Metre 257.80 2,652.75
b) 25 mm thick
(i) 1/4"dia Per Rft 9.85 260.20 Per Metre 32.25 853.55
(ii) 3/8" dia Per Rft 9.85 291.10 Per Metre 32.25 954.85
(iii) 1/2" dia Per Rft 9.85 311.10 Per Metre 32.25 1,020.40
(iv) 5/8" dia Per Rft 19.65 362.70 Per Metre 64.45 1,189.70
(v) 3/4" dia Per Rft 19.65 382.70 Per Metre 64.45 1,255.25
(vi) 7/8" dia Per Rft 19.65 433.55 Per Metre 64.45 1,422.10
(vii) 1"dia Per Rft 39.30 484.10 Per Metre 128.90 1,587.85
(viii) 1-1/8" dia Per Rft 39.30 515.00 Per Metre 128.90 1,689.20
(ix) 1-1/4" dia Per Rft 39.30 544.05 Per Metre 128.90 1,784.55
(x) 1-1/2" dia Per Rft 58.95 585.50 Per Metre 193.35 1,920.50
(xi) 1-5/8" dia Per Rft 58.95 612.25 Per Metre 193.35 2,008.20
(xii) 1-3/4" dia Per Rft 58.95 645.50 Per Metre 193.35 2,117.15
(xiii) 2" dia Per Rft 78.60 760.40 Per Metre 257.80 2,494.05
(xiv) 2-1/2" dia Per Rft 78.60 837.75 Per Metre 257.80 2,747.75
(xv) 3" dia Per Rft 78.60 935.80 Per Metre 257.80 3,069.35
22 Supply & installation of mild steel closed cylinderical diaphragm
type,pre-charged replaceble butyl bladder & pressurized type expansion
tank of specified capacity to withstand the specified water supply
pressure for specified water heater capacity, duly Epoxy coated paint
for heating/cooling ,made of Steam Master (Pak), Caleffi (Italy), Elbi
(Italy), Flamco (UK) complete i/c the cost of Air Trol Fittings,Tank
drainer,Sight glass with valves,Hoze nozzle,and Hoze pipe ,as shown
on the drawings as approved and directed by the Engineer Incharge

(i) 2- Gal Capacity, Size 12-1/2"x8" Each 982.50 32,412.90 Each 982.50 32,412.90
(ii) 3.2 Gal Capacity, Size 12-1/2"x11" Each 982.50 40,056.90 Each 982.50 40,056.90
(iii) 4.5 Gal Capacity, Size 15"x11" Each 982.50 54,580.50 Each 982.50 54,580.50
(iv) 7.0 Gal Capacity, Size 11"x21-3/8" Each 982.50 59,931.30 Each 982.50 59,931.30
(v)14 Gal Capacity, Size 20"x15-1/2" Each 982.50 65,282.10 Each 982.50 65,282.10
(vi) 20 Gal Capacity, Size 27"x15-1/2" Each 982.50 119,554.50 Each 982.50 119,554.50

chapter-27(HVAC) Page 213