emay_company_profile

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 134

COMPANY PROFILE

COMPANY PROFILE

ANKARA İSTANBUL
Rabat Sokak No: 10 06700 Kısıklı Caddesi No: 27 34662
Gaziosmanpaşa / ANKARA / TÜRKİYE Altunizade / İSTANBUL / TÜRKİYE
tel : +90 (312) 300 0 300 tel : +90 (216) 400 04 00
fax : +90 (312) 300 0 333 fax : +90 (216) 562 16 16

emay@emay.com

http://www.emay.com
COMPANY PROFILE

CONTENTS
1.Company Profile

2.Fields of Activity and Services

3.Human Resources

4.Certificates & Memberships

5.Selected Projects
5.1. Road & Highway
5.2. Metro & Railway
5.3. Building
CONTENTS

5.4. Water & Environment


5.5. Airport
COMPANY PROFILE

INTERNATIONAL ENGINEERING and CONSULTANCY Inc. :

▪ Established in 1980,

▪ Leading Engineering and Technical Consultancy Company in Türkiye,

▪ Design, engineer, manage projects essential for modern life and economic growth,

▪ Projects undertaken from feasibility and design to project management and


construction supervision,

▪ Over 1000 professional technical staff; growing steadily,


1. COMPANY PROFILE

▪ Reputation gained for completing projects in budget, on time and with desired quality,

▪ ISO 9001:2015 Quality Certificate.

▪ ISO 14001:2015 Environmental Management Systems Certificate.

▪ ISO 45001:2018 Occupational Health and Safety Management Systems Certificate.


2. FIELDS of ACTIVITY and SERVICES COMPANY PROFILE
COMPANY PROFILE

employs over 1000 professional technical personnel having expertise and


experience in various disciplines:

✔ Architects,
✔ Urban and Regional Planners,
✔ Landscape Architects,
✔ Civil Engineers (Structural, Seismic, Geotechnical, Transportation / Traffic and Hydraulic Engineering),
✔ Geomatics Engineers,
✔ Geological Engineers,
✔ Geophysics Engineers,
3. HUMAN RESOURCES

✔ Mining Engineers,
✔ Environmental Engineers,
✔ Electrical / Electronics Engineers,
✔ Mechanical Engineers,
✔ Economists,
✔ Financial Analysts,
✔ Lawyers and Legal Advisors.
COMPANY PROFILE

CERTİFİCATES

ISO 9001:2015 Quality


Management System certificate

ISO 14001:2015 Environmental


Management System certificate
4.1. CERTIFICATES

ISO 45001:2018 Occupational Health


and Safety Management System
certificate
COMPANY PROFILE

International Federation of Consulting Engineers (FIDIC)

European Federation of Engineering Consultancy Associations (EFCA)

Federation of Consultants from Islamic Countries (FCIC)

International Association for Bridge and Structural Engineering (IABSE)


4.2. MEMBERSHIPS

Association of Turkish Consulting Engineers and Architects

Union of Chambers of Turkish Engineers and Architects - Chamber of Civil Engineers

Turkish Road Association


COMPANY PROFILE

TRANSPORT
COMPANY PROFILE

Northern Marmara (including 3rd Bosphorus Bridge) Motorway Project,


Istanbul / Türkiye

Client : General Directorate of Highways (KGM)


Investment Value : 2.5 Billion USD (Public Private Partnership Project)
Project Duration : 36 Months
Works : 1408 m long (main span) suspension bridge;
• 60 km motorway (2x4 lanes);
• 55 km connection roads (2x3 lanes);
• 4 # tunnels, 2x0,6 km + 2x0,6 km executed by NATM (excavation width of 22 m and height of 13
m), 36 # viaducts (prestressed beams and incremental launching), ~150 over / underpasses,
• ~200 culverts and various other structures.
Services by EMAY : Geodesic and geotechnical surveys and analyses;
preliminary, final and as-built design; technical consultancy during construction.
5.1. ROAD & HIGHWAY
COMPANY PROFILE

Northern Marmara (including 3rd Bosphorus Bridge) Motorway Project,


Istanbul / Türkiye
5.1. ROAD & HIGHWAY
COMPANY PROFILE

Northern Marmara Motorway Project, Nakkas - Basaksehir Part, Istanbul / Türkiye

Client : General Directorate of Highways (KGM)


Investment Value : 1.2 Billion USD (Public-Private Partnership Project)
Project Duration : 48 Months
Works : 24 km 2x4 motorway, 24 km 2x2, 2x3 and 2x4 connection roads, side roads, intersections and its
approach legs, cable stayed bridges, viaducts, bridges, underpasses and overpasses, tunnels,
retaining structures and drainage systems, landscape, traffic and road safety, preparation of maps,
soil investigation works, laboratory experiments, analysis, projects (all kinds of projects,
technical specifications, calculations, drawings, reports, measurements, technical specifications,
sketches, models, presentations and other technical information etc.), engineering services,
all research and studies related to the reclamation Project after the highway section is opened.

Services by EMAY :
All kinds of base maps and digital site model generation, preparation
5.1. ROAD & HIGHWAY

of expropriation plans, All kinds of soil investigation and in-situ tests


and laboratory services, pre/final geological and geotechnical reports
for the route and structures, Material and quarry research,
Preliminary and final drawings and calculations for highways,
connection roads, side roads, approach roads and intersections,
drainage, service areas and service facilities, infrastructure
displacement, traffic and highway safety, landscape and irrigation,
lighting, engineering structures, electro-mechanical systems for
tunnels, As-Built drawings.
COMPANY PROFILE

Gebze - Orhangazi - Izmir Motorway Project (including Izmit Bay Crossing Bridge), Türkiye
Client : General Directorate of Highways (KGM)
Investment Value : 6.8 Billion USD (Public Private Partnership Project)
Project Duration : 87 Months
Works : A total of 384 km of highway including 384 km long motorway with 2x3 lanes, 42 km long motorway
connection road with 2x2 lanes, including road infrastructure works (soil works, drainage works),
Bituminous Hot Mix road superstructure (sub-base, plent mix base, bituminous base, binder, surface
layer) works, landscaping works, traffic and security works, secondary works, electronic toll collection
system and small and big engineering structures listed below and tunnels;
• 1 nos. 2.907 m long suspension bridge (main span 1550 m, World 4th long),
• 38 nos. viaducts (total viaduct length 21571 m), 103 nos. bridges (one way 7199 m of total bridge
length), 35 nos. İnterchanges, 4528 m 76 nos overpasses, 3 nos tunnel (total length 6445 m), 33
highway servive facilities, 6 maintenance and operation centers, 1 main control center and
miscellaneous retaining walls.
5.1. ROAD & HIGHWAY

Services by EMAY : Design review, project management and


construction supervision for all aspects of the
bridge and the motorway including soil
improvement, excavation, all structures
(viaducts, bridges, underpasses, overpasses),
asphalt concrete coating, guardrail, bridge
insulation, traffic signs, road marking and
electromechanical works during construction
and maintenance period.
COMPANY PROFILE

Gebze - Orhangazi - Izmir Motorway Project, Kocaeli, Yalova, Bursa, Balikesir, Manisa, Izmir / Türkiye
5.1. ROAD & HIGHWAY
COMPANY PROFILE

Bursa Peripheral Motorway, Bursa / Türkiye


Client : General Directorate of Highways (KGM)
Construction Value : 350 Million USD
Project Duration : 171 Months
Works : 32 km 2x3 lane Bursa Ring Motorway and
9.5 km 2x2 lane link roads including 2 # tunnel
(2x0,5) km executed by NATM

Services by EMAY : Technical consultancy; design review;


construction supervision for all aspects
including soil improvement, earth works,
tunnel, viaducts, bridge and electromechanical
works.
5.1. ROAD & HIGHWAY
COMPANY PROFILE

Izmir - Urla - Cesme Motorway, Izmir / Türkiye


Client : General Directorate of Highways (KGM)
Construction Value : 806 Million USD
Project Duration : 210 Months
Works : A total of 286,96 km of highway including 101,25 km long motorway with 2x3 lanes, 65,68 km long motorway
connection road with 2x2 lanes, 46,05 km long motorway junction, 73,96 km long state road and side roads
including all road infrastructure works (soil works, drainage works), all Bituminous Hot Mix road superstructure
(sub-base, plant mix base, bituminous base, binder, surface layer) works, landscaping works, traffic and
security works, secondary works, electronic toll collection system and small and big engineering structures
listed below and tunnels:
• 18 nos. interchanges (flyover) and 13 nos. at-grade intersections
• 4 nos. viaducts (total viaduct length 5688 meters, 2x3 lanes), 25 nos. bridges (including 2143 meters of total
bridge length and Konak Bridge built with 235 meters length of post tensioning system), 53 nos. underpasses,
274 nos. culverts, 1 cut-cover tunnel and various number of retaining walls.

Services by EMAY : Project management, construction supervision and consultancy services for all works, i.e. soil improvement,
5.1. ROAD & HIGHWAY

excavation, tunnel, viaduct, bridge, asphalt concrete coating, guardrail, bridge insulation, traffic signs, road
marking and electromechanical works during construction and maintenance period.
COMPANY PROFILE

Izmir Peripheral Motorway and Aydin Motorway, Izmir - Aydin / Türkiye


Client : General Directorate of Highways (KGM)
Construction Value : 1.623 Billion USD
Project Duration : 303 Months
Works : A total of 303,16 km of motorway including 148,89 km long motorway with 2x3 lanes, 21 km long motorway
connection road with 2x2 lanes, 73,58 km long motorway junction, 89,69 km long state road and side roads
including all road infrastructure works (soil works, drainage works), all Bituminous Hot Mix road superstructure
(sub-base, plent mix base, bituminous base, binder, surface layer) works, landscaping works, traffic and
security works, secondary Works (tunnel ventilation, lighting, fire fighting, CCTV, electromechanical and
various control systems), road facilities, buildings, electronic toll collection system and small and big
engineering structures listed below and tunnels.
• 34 nos. interchanges (flyover) and 5 nos. at-grade intersections
• 9 nos. viaducts (total viaduct length 6186 meters, 2x3 lanes), 95 nos. bridges (including 5476 meters of
total bridge length), 51 nos. underpasses, 395 nos. culverts and various number of retaining walls.
• 75th Year Selatin tunnels built with 2x3 lanes and NATM method, a twin-tube 3043 + 3018 meters long
tunnels and Bayraklı-1 tunnels a twin tube with each 317 meters and Bayraklı-2 tunnels a twin tube with
each 1875 meters long.
5.1. ROAD & HIGHWAY

Services by EMAY : Project management, construction supervision and consultancy services for all works, i.e. soil improvement,
excavation, tunnel, viaduct, bridge, asphalt concrete coating, guardrail, bridge insulation, traffic signs, road
marking and electromechanical works during construction and maintenance period.
COMPANY PROFILE

Aydin - Denizli Motorway, Aydin / Türkiye


Client : General Directorate of Highways (KGM)
Construction Value : 699 Million Euro
Project Duration : 36 Months
Works : Project works include :
• Motorway : 140 Km 2×3 lanes
• Motorway Connection Roads : 23 Km 2×2 lanes
• Viaducts : 19 Pieces
• Underpass : 19 Pieces
• Overpass : 136 Pieces
• Culverts : 439 Pieces
• Bridge Junction : 19 Pieces (9 Pieces on the Motorway and 10 Pieces on the
Motorway Connection Road)
• Intersections : 32 Km
• Service Facility Areas
5.1. ROAD & HIGHWAY

: 5 Pieces

Services by EMAY: Project management, construction


supervision and consultancy services for all works, including
soil improvement, all structures (viaducts, bridges,
underpasses, overpasses), asphalt concrete coating,
guardrail, bridge insulation, traffic signs, road marking and
electromechanical works during construction and
maintenance period.
COMPANY PROFILE

Construction Supervision, Engineering and Consultancy Services for


Highway Construction Works Under the Responsibility of Various Regional
Directorates of General Directorate of Highways, Türkiye
Client : Regional Directorates of General Directorate of Highways (KGM)
Regional Directorates : 2nd Regional Directorate (Izmir and neighbour cities),
4th Regional Directorate (Ankara and neighbour cities),
6th Regional Directorate (Kayseri and neighbour cities),
10th Regional Directorate (Trabzon and neighbour cities),
14th Regional Directorate (Bursa and neighbour cities),
15th Regional Directorate (Kastamonu and neighbour cities)
Service Durations : 36 months
Scope of Works : All works executed under Regional Directorates, either during construction or during
planning stage, i.e. highway, interchanges, tunnels, viaducts, bridges, over /underpasses,
culverts, drainage systems, electrical, mechanical, marking, landscaping, etc.
5.1. ROAD & HIGHWAY

Services by Emay : Design review, project management and construction supervision services covering,
▪ Infrastructure works
▪ Earthworks
▪ Soil improvement, prevention works of landslide and slope stability (Stone column, retaining
wall, shotcrete, geomat, etc.)
▪ Superstructure works
▪ Engineering structure works (bridge, viaduct, culvert, retaining wall etc.)
▪ Tunnelling works
▪ Electromechanical works (Fire fighting, lighting, signalling, etc.)
▪ Traffic regulatory signs and guardrails
▪ Landscaping works
COMPANY PROFILE

Construction Supervision, Engineering and Consultancy Services for


Highway Construction Works Under the Responsibility of Various Regional
Directorates of General Directorate of Highways, Türkiye
5.1. ROAD & HIGHWAY

2nd Regional Directorate Highways, Izmir – Aydin – Mugla – Usak – Manisa – Denizli / Türkiye
4th Regional Directorate Highways, Ankara – Kirikkale – Karabuk – Bolu – Duzce – Eskisehir – Cankiri / Türkiye
6th Regional Directorate Highways, Kayseri – Kirsehir – Nevsehir – Nigde – Yozgat / Türkiye
10th Regional Directorate Highways, Trabzon – Gumushane – Bayburt – Giresun – Rize – Artvin / Türkiye
14th Regional Directorate Highways, Bursa – Balikesir – Bilecik – Canakkale – Kutahya / Türkiye
15th Regional Directorate Highways, Zonguldak – Bartin – Kastamonu / Türkiye
COMPANY PROFILE

Seismic Retrofit of Bridges, Viaducts and Tunnels on Anatolian Motorway,


Izmit, Sakarya / Türkiye
Client : General Directorate of Highways (KGM)
Construction Value : 60 Million USD
Project Duration : 86 Months
Works : Within the Project structural retrofitting and seismic
reinforced works of existing engineering structures
realised, including:165 pcs. Bridge (overpass,
underpass, junction and river bridges),33 pcs.
Viaducts, 10 # and 5,0 km tunnels in total, 2x1,0
km+2x0,6+2x0,3+2x0,2+2x0,3 km
Services by EMAY : Design review, project management and construction
supervision services.
5.1. ROAD & HIGHWAY
COMPANY PROFILE

Intelligent Transportation Systems, Türkiye

Client : General Directorate of Highways (KGM)


Project Duration : 24 Months
Services by EMAY : Services include;
• Country Reports (Türkiye, US, EU, Japan,
S.Korea)
• ITS Architecture and Application Plan
• Technical Reports on
✔ intelligent road and intelligent vehicle;
✔ finance, management and operation;
✔ social and legal issues;
✔ production on national level
• Technical Specifications and Tender
Documents and Training
5.1. ROAD & HIGHWAY

APPLICATION PLAN FOR REGIONAL INTELLIGENT TRANSPORTATION SYSTEMS OF HIGHWAYS


COMPANY PROFILE

Kayseri Transportation Master Plan, Kayseri / Türkiye


Client : Kayseri Metropolitan Municipality
Project Duration : 15 Months
Objectives : Preparation of the 2030 Kayseri Transportation
Master Plan (TMP), which will define the
transportation infrastructure and operating
systems and legal and organizational
arrangements to cover the borders of Kayseri
Metropolitan Municipality,
Perform necessary site surveys and preparation of
preliminary design of transport infrastructure to be
determined for TMP implementation,
Preparation of feasibility studies of public
transportation corridors and preliminary designs
to be determined for the first stage (first 5 years) Services by EMAY:
5.1. ROAD & HIGHWAY

of TMP, ▪ Data Collection Studies


Development of Transportation and Traffic ▪ Travel Demand Forecasts
Improvement Surveys and Designs with Micro ▪ Establishment and Calibration of Transport
Simulation in intersections and corridors Model
considered necessary by the Client, ▪ Preparation of preliminary design for City roads
Determining the principles for the management corridor, at grade junctions and flyover junctions
and development of the change process to be ▪ Preparation of Preliminary Design for Railway
realized in public transportation infrastructure, Systems
unit-diversity integration of vehicle fleet, technical ▪ Preparation of Feasibility Reports for Public
infrastructure and facilities of public transportation Transportation Systems
and management systems,
▪ Financial and Economic Analysis of the Project
Training of the Technical Personnel with
▪ Coordination with the Ministry
information transfer and technical support.
▪ Capacity Building and Consultancy services
COMPANY PROFILE

Determination of the Procedures and Principles of Guardrail Applications To


Minimize Loss of Life and Property that May Occur in Any Possible Crashes on
the Roads, Türkiye
Client : General Directorate of Highways (KGM)
Project Duration : 9 Months
Objectives : Project works include :
• Examining and comparing the procedures
and principles of the applications at Europe
and America to develop the application
standards of the guardrails used as passive
protection systems on the highways in our
country,
• Determination of application-based technical
criteria for the selection and use of guardrail
systems,
5.1. ROAD & HIGHWAY

• Developing a software for determining


whether there is a need for guardrails in road
section and, if necessary, to determine the
guardrail class.
Services by EMAY :  Preparation of countries reports and
comparison reports
 Determination of the principles and procedures
of application of guardrails for Türkiye
 Making a software to determine whether
guardrail is needed and, if necessary, its class
 Conferences where all studies are evaluated
 Preparation of Guardrail Procedures and
Principles Guide
COMPANY PROFILE

Revision of National Transport Master Plan / Preparation of a National Transport


and Logistics Master Plan, Ankara / Türkiye
Client : Republic of Türkiye Ministry of Transportation and
Infrastructure – Strategy Development Department,
Project Duration : 13 Months
Objectives : Stage 1: Collection, Analysis and Evaluation
of Current Data
• Socio-Demographic Data
• Land Use Data,
• Data of Transportation Systems (Number of
vehicles by modes, AADT Data, etc.)
• Tourism Data,
• ITS Infrastructure Data (Intelligent
Transportation System Applications etc.)
Stage 2: Modelling
Stage 3: Preparation of a National Transport
5.1. ROAD & HIGHWAY

and Logistics Master Plan

Services by EMAY :  Current Situation Analysis,


 Gathering New Information, Data Analysis,
 Creation and Calibration of the Transportation Model,
 Alternative Scenarios- Socio-Economic Analysis and
Financial Analysis Reports
 Recommendations for Intelligent Transportation
Systems
 Development of Logistics Activity Areas and
Transportation Strategies Proposal Report,
 Conferences,
 Consultancy Services,
 Coordination with the Ministry
COMPANY PROFILE

Consultancy Services for Investment Planning, Monitoring and Program


Management, Ankara / Türkiye
Client : Republic of Türkiye Ministry of Transportation and
Infrastructure – Strategy Development Department,

Project Duration : 36 Months

Objectives : 1. Program Planning


• Investment Planning / Strategy
• Development of Asset Management Plan
• Cost-Benefit Analysis
2.Project Management
• Coordination of Projects,
• Cost and Change Control of Projects
• Quality Assurance/Quality Control and
Occupational Health and Safety-Environmental
Inspection
• Contract/Specification Documents
5.1. ROAD & HIGHWAY

3.Preparation of Reports
4.Web-based Project Management System
5.Communication Consultancy Services
• Preparation of Strategic Communication Plan
6.Establishment of Service Quality
Management System
Services by EMAY :  Analysis, Project Management Procedures,
Building Information Modelling, Transportation
Management System Software, Training,
 Consultancy Services,
 Coordination with the Ministry
COMPANY PROFILE

Nissibi Bridge, Adiyaman - Diyarbakir / Türkiye


Client : General Directorate of Highways (KGM)
Construction Value : 45 Million USD
Project Duration : 36 Months
Works : A cable-stayed bridge (with 2x2 traffic lanes and
2,95 m wide pedestrian paths on both sides) built
on Atatürk Dam Lake with total length of 610 m;
main span with a length of 400 m and width of
24,50 m, main span formed by with orthotropic
steel deck with a height of 2,7 m and wing spans
formed by two pieces post tensioned reinforced
concrete floorings with a length of 105 m and a
width of 24,50 m; which has two opposite-Y-type
reinforced concrete pylons.
5.1. ROAD & HIGHWAY

Services by EMAY : Design review, project management and construction supervision services.
COMPANY PROFILE

Ovit Tunnels, Ikizdere - Ispir Highway,


Rize - Erzurum / Türkiye

Client : General Directorate of Highways (KGM)


Construction Value : 260 Million USD
Project Duration : 44 Months
Works : 2 # tunnels 2x12.7 km long 2x2 lane, executed
by NATM (Türkiye’s longest, World’s 3rd longest).

Engineering structures, bridge and superstructure works of Ovit Tunnel in a total length of 28161,60 meters composing of 2 main
highway tunnel constructed by NATM tunnel in length of 12636,5 m (left tube) and 12627 (right tube) as well as snow shed tunnels
in length of 1426 m (left tube) and 1472 m (right tube) [having 10,60 m internal diameter, 8 m x 5 traffic flow section (gauge),
ventilation tunnel in length of 1651 m (9,12 m internal diameter)] and Divided Road in a total length of 5885 m as 2941x 2.

Services by EMAY: Design review; Project management, construction supervision and consultancy services of the construction
5.1. ROAD & HIGHWAY

works, electro-mechanical works, tunnel monitoring and supervision system works


COMPANY PROFILE

Highway Tunnels, Istanbul / Türkiye


❖Dolmabahce - Levazim - Armutlu - Cendere - Ayazaga - Cayirbasi,
❖Sariyer - Kilyos,

❖Kagithane - Eyup - Bayrampasa - Esenler - Bagcilar - Bahcelievler - Kucukcekmece,

❖Avcilar - Esenyurt - Buyukcekmece

Client : Istanbul Metropolitan Municipality (IBB)


Project Duration : 900 Days
Works : Within the scope of this project, a total of 43.8 km long (55.50 km total line length) double track
highway tunnels are designed:
▪ Dolmabahce - Levazim - Armutlu - Cendere - Ayazaga - Cayirbasi (12.7 km in total),
▪ Sariyer - Kilyos (7.0 km),
▪ Kagithane - Eyup - Bayrampasa - Esenler - Bagcilar - Bahcelievler - Kucukcekmece (15.8 km in
total),
▪ Avcilar - Esenyurt - Buyukcekmece (8.3 km in total),
Services by EMAY : Geodetic and geotechnical surveys and analyzes; Preparation of preliminary, final and detailed designs.
5.1. ROAD & HIGHWAY
COMPANY PROFILE

Dolmabahce - Dolapdere - Piyalepasa - Kagithane Tunnels, Istanbul / Türkiye


Client : Istanbul Metropolitan Municipality
Construction Value : 200 Million USD
Project Duration : 12 Months (EMAY Services only)
Works : Project has 4 # tunnels 2x1,5 + 2x2,3
km executed by NATM, connecting
Dolmabahce to Kagithane. Project
consists of double tube tunnel
Kagithane - Piyalepasa (2x1,5 km)
and double tube tunnel
Bomonti - Dolmabahce (2x2,3 km).

Services by EMAY : Geodesic and geotechnical surveys and analyses; preliminary, final and as-built design; technical
5.1. ROAD & HIGHWAY

consultancy during construction.


COMPANY PROFILE

Design Various Road-Intersection-Tunnel Projects in Istanbul, Istanbul / Türkiye


Client : Istanbul Metropolitan Municipality (IBB),
Project Duration : 540 Days
Works : Within the scope of this project, bridges, junctions, multi-storey intersections, All works performed
within the scope of project preparation services are as follows:

64 km Road, 50.59 km Mapping, 5022.80 m2 soil boring, 32099 m2 Retaining structures, 28.93 km
Wastewater and Freshwater network, 3 Pedestrian Bridges, 68342 m2 Bridge, 13140 m Tunnel.
Camlica Hill access roads project is the highway of Camlica Mosque with a capacity of 50
thousand people. It is the inner city tunnel network prepared and built in order to provide
transportation. Route three single tube consists of tunnel. The T1 tunnel starts at the Libadiye
junction and ends at Camlica Mosque, and the t2 tunnel ends at Camlica. It starts at the mosque
and ends at the Libadiye junction. T1 tunnel 1.205 m, T2 tunnel 1.400 m and T3 tunnel It is 572
meters long and the total amount of tunnels reaches 3,177 meters.
Services by EMAY:
5.1. ROAD & HIGHWAY

 Preliminary Research and Reporting


 Existing Infrastructure Information and Sheets
 Determination of Existing Land Uses
 Transportation Analysis and Report
 Property Detection and Layouts
 Plan Information and Layouts
 Synthesis Sheet
 Research Report
 Preliminary Project, Application Project
 Infrastructure Services
 Preparation of Road Projects
 Project Presentation
 Preparation of Tender File with Approximate Cost and
Technical Specifications and Authority's Opinions and
Approvals
COMPANY PROFILE

Highway Projects in Istanbul-1, Istanbul / Türkiye


Client : Istanbul Metropolitan Municipality (IBB),
Project Duration : 730 Days
Works : Within the scope of this project, design of the following routes are prepared.

• Kagithane - Buyukcekmece Highway Tunnels: The route is a continuation project of the


existing Dolmabahce - Kagithane Tunnel. Total Route Length: 34.309 km, Total Tunnel Length:
25,630 km
• Yenisahra - Bostanci Highway Tunnels.
• Sariyer - Kilyos Highway Tunnels: Total Route Length: Left tunnel axis: 7.857.03 m + Right
tunnel axis: 8.074.91 m, Total Tunnel Length: Left tunnel: 6.892.78 m + Right tunnel: 6.864.77 m,
Total Bridge area: 5784 m²

Services by EMAY : Geodetic and Geotechnical studies and analysis; Preparation of preliminary, final and
5.1. ROAD & HIGHWAY

application design.
COMPANY PROFILE

Highway Projects in Istanbul-2, Istanbul / Türkiye


Client : Istanbul Metropolitan Municipality (IBB),
Project Duration : 730 Days (ongoing)
Works : Within the scope of this project, design of the following routes are prepared.

• Kagithane - Yahya Kemal Tunnel Project: It is a 140-meter-long Highway Tunnel project that
connects Kagithane Ayazma Road and Guzeldere Street.
• Catladikapi - Eminonu Tunnel Project: It starts in front of Catladikapi Social Facilities and
emerges in Sarayburnu. It is approximately 2200 m long.
• Bagcilar Otogar Project: It is a project for the construction of a bus station and the planning of
connection roads in the area between the Northern Marmara Motorway, Habibler and Basaksehir
Junctions.

Services by EMAY : Geodetic and Geotechnical studies and analysis; preparation of preliminary, final and
application design.
5.1. ROAD & HIGHWAY
COMPANY PROFILE

Highway Projects in Istanbul-3, Istanbul / Türkiye


Client : Istanbul Metropolitan Municipality (IBB),
Project Duration : 360 Days (ongoing)
Works : Within the scope of this project, design of the following routes are prepared.

• Basin Ekspres Road Sefakoy Junction Project: It is the work of expanding the existing
intersection bridges for the addition of vehicle separation and joining lanes in the existing Sefakoy
intersection arms.
• D-100 Highway Yenibosna Metrobus Platform Area and Pedestrian Overpass Project:
Expanding the existing Yenibosna Metrobus station and revising the pedestrian bridges.
• Gaziosmanpasa (Istanbul Street) – Eyup (Ataturk Avenue) Highway Tunnel Project: It is a
highway tunnel project that will provide the connection between Gaziosmanpasa Street and TEM.
In Project; Approximately 6 kilometers of road preliminary project, approximately 2.4 kilometers of
tunnel preliminary project has been prepared.
5.1. ROAD & HIGHWAY

Services by EMAY : Geodetic and Geotechnical studies and analysis; preparation of preliminary, final and
application design.
COMPANY PROFILE

Highway Tunnel Projects within the Boundaries of Istanbul Metropolitan


Municipality

Highway tunnels, the application projects of which were


made by EMAY

Highway tunnels with application projects made by EMAY


KİLYOS

Highway tunnels whose preliminary projects were made


by EMAY 43

Existing Cayirbasi-Sariyer tunnel SARIYER

ÇAYIRBAŞI

AYAZAĞA

42
CENDERE
ARMUTLU
5.1. ROAD & HIGHWAY

GAZİOSMANPAŞA
41
SİLAHTARAĞA LEVAZIM 40
62
KAĞITHANE
KAVACIK
TEMAPARK BOMONTİ ALTI
ÇENGELKÖY
BAYRAMPAŞA
SÜTLÜCE

B.ÇEKMECE ÇAMLICA
K.ÇEKMECE
HALKALI DOLMABAHÇE
AVCILAR
16
KASIMPAŞA BEYLERBEYİ
47 LİBADİYE
BAĞCILAR
BASIN EKSPRES
(OLİMPİYAT YOLU) YENİ SAHRA
HARAMİDERE HAREM

37

BOSTANCI
COMPANY PROFILE

Highway and Junction Projects within the Boundaries of Istanbul Metropolitan


Municipality

Metrobus Line, whose application projects were made by


EMAY and put into service

Northern Marmara Highway, whose application projects


were made by EMAY and put into service

Hasdal-Kemerburgaz State Highway, whose application


projects have been made by EMAY and put into service
57 39
Various road-intersection and square projects whose
implementation/preliminary projects
51
27
49
59
5.1. ROAD & HIGHWAY

24
17 14
50
60
38 76
33 12 52

54
75
68
44 55
20 18 36 31 29
63 23 30
15
53
28 25 58
61
34 67
66
19
26

56
45
65
10
77
64
COMPANY PROFILE

Sabuncubeli Tunnels, Manisa / Türkiye


Client : General Directorate of Highways (KGM)
Investment Amount : 100 Million USD (Public Private Partnership Project)
Project Duration : 12 Months (EMAY Services only)
Works : Project is 2 # tunnels. In the project, the double-tube, 2-lane tunnel with a total length of 7939 m
(3973 m + 3966 m) connecting Manisa and Izmir was built with the NATM method.

Services by EMAY : Geodesic and geotechnical surveys and analyses; preliminary, final and as-built design;
technical consultancy during construction.
5.1. ROAD & HIGHWAY
COMPANY PROFILE

Libadiye - Camlica Highway Tunnel, Istanbul / Türkiye


Client : Istanbul Metropolitan Municipality (IBB)
Construction Value : 225 Million TL (with 2008 prices) (approx.195 million USD)
Project Duration : 600 Days
Works : The project includes three main lines and secondary
connections:
• T1 main line providing Libadiye - Camlica connection is
1594 m in total.
• T2 main line providing Camlica - Libadiye connection is
1803 m in total.
• T3 main ring around Camlica Mosque and Camlica Hill,
totaling 1502 m.
Services by EMAY : Preparation of detailed design, Project management and
construction supervision services.
5.1. ROAD & HIGHWAY
COMPANY PROFILE

Dolmabahce - Levazim - Baltalimani Highway Tunnel, Istanbul / Türkiye


Client : Istanbul Metropolitan Municipality (IBB)
Project Duration : 720 Days (EMAY Services)
Works : Within the scope of this project, a total of 15.543,72 m long 15.543,72 m highway tunnels;
• Existing Roads and Surrounding Settlements in Dolmabahce – Levazim – Baltalimani.
• Project has 2 # tunnels T1 7714 + T2 7110 m executed, connecting Dolmabahce –
Levazim – Baltalimani Highway Tunnel.
• 14.823,72 m Highway Tunnel, 720 m Connecting Tunnel and Connecting Roads.

Services by EMAY : Preparation of detailed design, Project management and construction supervision services.
5.1. ROAD & HIGHWAY
COMPANY PROFILE

Erdemli - Silifke - Tasucu Km: 158+799.790 - 177+664.477 Highway, Mersin / Türkiye


Client : General Directorate of Highways (KGM)
Project Duration : 14 Months (EMAY Services only)
Works : Project works include :
• 36 km highway (2x2 lanes);
• 8 # twin tube tunnels with total length of
13798 m twin tube total (T1: 1176 m,
T2: 2609 m, T3: 1304 m,T4: 2231 m,
T5: 755 m, T6: 559 m, T7: 1616 m;
T8: 3548 m)
• 3 # viaduct (2x140 m, 1x500m balanced
cantilever); miscellenaus engineering
structures.

Services by EMAY : Geodesic and geotechnical surveys and analyses; preliminary, final and as-built design; technical
5.1. ROAD & HIGHWAY

consultancy during construction.


COMPANY PROFILE

Ordu - Ulubey Junction Topcam (2nd Section) Tunnels, Ordu / Türkiye


Client : General Directorate of Highways (KGM)
Project Duration : 15 Months (EMAY Services only)
Works : Project Length of Alignment: 3866 m including
2 # tunnels 1,0 km + 1,6 km executed by NATM

Services by EMAY : Geodesic and geotechnical surveys and analyses;


preliminary, final and as-built design; technical
consultancy during construction.
5.1. ROAD & HIGHWAY
COMPANY PROFILE

Iskenderun - Hatay Motorway (km= 5+000 - 43+000) Project, Hatay / Türkiye


Client : General Directorate of Highways (KGM)
Project Duration : 24 Months
Works : Project works include :
34.919 m total length, 3# (2x2 Lanes) 6.772 m Access
Roads, 4# (2x2 Lanes) 7.219 m State Roads, 5
Interchanges, 26# 15.406 m Junction Roads, 3
roundabouts, 9.991 m 19 Roads, 14# 4.706 m Stream
Diversions, 2 Tunnels with a total length of 8.675 m, 1
Viaduct and 5 River Bridges with a total length of 1.305 m
and a total area of 34.085 m2, 36# 32.849 m2 Bridge
Area, 108 Culverts with a total length of 5.987 m, 23#
7.011 m Walls, 2.295.000 m2 ground improvement, 5 toll
collection stations
5.1. ROAD & HIGHWAY

Services by EMAY : Preparation of; all kinds of base maps, expropriation


plans, all kinds of soil investigation and in-situ tests and
laboratory services, pre/final geological and geotechnical
reports for the route and structures, preliminary and final
projects for highways, connection roads, side roads and
intersections, drainage projects, projects of service
facilities, infrastructure displacement projects, traffic and
highway safety projects, landscape and irrigation
projects, lighting projects, pre and final projects for
engineering structures, electro-mechanical projects for
tunnels.
COMPANY PROFILE

Dortyol - Hassa Motorway and Railway Project, Hatay / Türkiye


Client : General Directorate of Infrastructure Investments
Project Duration : 20 Months
Works : MOTORWAY PROJECT INFORMATION (24.550 m):
• 2 # (Platform Width: 2x8,00 m) 18.630 m motorway tunnel,
• A total of 16 Bridges with a length of 790 m and an area of 14.425 m2,
• 1 # (2x4 lanes) 640 m Connection Road,
• Isdemir Intersection: 2 Lanes 4 # (Platform Width 11 m) Total Length: 3.485 m,
1 Lane 9 # (Platform Width 7,5 m) Total Length: 5.142 m,
• Hassa Intersection: 2 Lanes 8 # (Platform Width 11 m) Total Length: 6.410 m,
• 3 # Culvert, 3 # Toll Collection Stations.

RAILWAY PROJECT INFORMATION (53.893,24 m):


• Single Track (2 Sections) (Platform Width 7,18 m) 16.630 m and Double Track Train Crossing
Zone (Platform Width 14,35 m) 2000 m, total 18.630 m Railway Tunnel
•Bridges and viaducts with a span greater than 30 m; 9 in total, with a length of 763 m and an
5.1. ROAD & HIGHWAY

area of 8,650 m2
•Bridges with a span of less than 30 m; 28 in total, 455 m in length and 5,560 m2 in area
•1018.20 m 2 # Connection Roads
•972 m Stream Diversion, 2 # 600 m Wall, 3 # Culvert
•3 # Railway Stations
•2 # Approach Roads totaling 14 052 m (6.00 m Diameter Metro TBM)

Services by EMAY : Mapping Works, soil investigations, laboratory tests, final design of all structures including
tunnels, bridges, retaining walls and station facilities and the railway, railway superstructure,
electrification, signaling and telecommunication projects, preparation of EIA report, estimation
and preparation of bill of quantities.
COMPANY PROFILE

Dortyol - Hassa Motorway and Railway Project, Hatay / Türkiye


5.1. ROAD & HIGHWAY
COMPANY PROFILE

Metrobus (Bus Rapid Transit) System, Istanbul / Türkiye


Client : Istanbul Metropolitan Municipality (IBB)
Constrution Value : 250 Million USD
Project Duration : 35 Months
Works : Project works include :
• 49 km BRT line with segregated permanent way,
• 44 stations,
• 55,000 m² depot area,
• Bridges, Vehicle over / underpasses, Pedestrian over / underpasses, Culverts, Walls in various
quantities,
• Metrobus (Bus Rapid Transit) system currently carries 1,000,000 passengers per day.

Services by EMAY : Survey, design, project management and construction supervision services covering,
 Traffic circulation and corridor analysis
5.1. ROAD & HIGHWAY

 Surveying and geotechnical studies


 Drainage and utilities
 Rubber-tyre permanent way
 Civil works
 Architectural and Finishing works
 Escalators and Elevators
 Electrical and Mechanical Systems
 Testing, Commissioning and Final Acceptance
COMPANY PROFILE

Metrobus (Bus Rapid Transit) System, Istanbul / Türkiye


5.1. ROAD & HIGHWAY
COMPANY PROFILE
COMPANY PROFILE

Otogar - Bagcilar - Ikitelli - Basakkonutlari Metro, Istanbul / Türkiye


Client : Istanbul Metropolitan Municipality (IBB)
Construction Value : 1.35 Billion USD
Project Duration : 72 Months
Works : Project works include :
• 5.8 km LRT line including 3.9 km TBM tunnel, 800 m cut-cover tunnel, 500 m viaduct, 600 m at
grade and U-sections, 5 stations, with capacity of 36,000 pphpd
• Total of 2 Metro lines, 15.9 km in length, including 8.9 km TBM tunnel, 1.9 km NATM tunnel, 4.4
km cut-cover tunnel, 500 m viaduct, 200 m at grade sections, 11 stations, with capacity of 70,000
pphpd
• 16 stations; 10 being cut-cover, 5 being top-down, 1 being at grade,
• Total of 21.7 km rail system and 25.5 km TBM + 3.8 km NATM + 5.8 km cut-cover tunnel in total,
509,100 m2 covered station area,
• Depot area built on 75 acres of land with workshop building having 12,000 m² closed area,
• Rolling Stock (80 Metro + 34 LRT).
5.2. METRO & RAILWAY

Services by EMAY : Design review, project management and construction supervision services covering,
▪ Civil works (Earthworks, Tunnels, Viaducts, Stations, Depot and Workshop Building)
▪ Architectural and Finishing works
▪ Track works
▪ Power Supply and Rigid Catenary Systems
▪ Signalling and Safety Systems
▪ Control and Communication Systems (Scada, Radio, Phone, Passenger Information, Public Announce,
Central Clock, CCTV, Fare Collection, Entrance Security, etc.)
▪ Earthing and Cathodic Protection
▪ Electrical Installations (Low Voltage, Lighting, Fire Alarm, etc.)
▪ Ventilation (Tunnels and Stations) / Air Conditioning Systems
▪ Escalators and Elevators
▪ Mechanical Installations (Water, Sewage, Pumps, Fire Fighting, etc.)
▪ Workshop Equipment
▪ Rolling Stock
▪ Testing, System Integration, Commissioning, Operation and Maintenance Organisation
COMPANY PROFILE

Otogar - Bagcilar - Ikitelli - Basakkonutlari Metro, Istanbul / Türkiye


5.2. METRO & RAILWAY
COMPANY PROFILE

Uskudar - Umraniye - Cekmekoy (Sancaktepe) Metro, Istanbul / Türkiye


Client : Istanbul Metropolitan Municipality (IBB)
Construction Value : 683 Million EURO
Project Duration : 78 Months
Works : Project works include :
• 2x17,06 km Metro line, fully-automated driverless system with capacity of 64,800 pphpd,
including 2.70 km connection tunnel to the depot area / maintenance-control center,
• 26.0 km TBM tunnel, 19.0 km NATM tunnel in total,
• 16 stations, all underground,
• Depot area with workshop building,
• Rolling Stock (126 #).
Services by EMAY : Design review, project management and construction supervision services covering,
▪ Civil works (Earthworks, Tunnels, Viaducts, Stations, Depot and Workshop Building)
5.2. METRO & RAILWAY

▪ Architectural and Finishing works


▪ Track works
▪ Power Supply and Rigid Catenary Systems
▪ Signalling and Safety Systems
▪ Control and Communication Systems (Scada, Radio, Phone, Passenger Information, Public
Announce, Central Clock, CCTV, Fare Collection, Entrance Security, etc.)
▪ Earthing and Cathodic Protection
▪ Electrical Installations (Low Voltage, Lighting, Fire Alarm, etc.)
▪ Ventilation / Air Conditioning Systems
▪ Escalators and Elevators
▪ Mechanical Installations (Water, Sewage, Fire Fighting, etc.)
▪ Workshop Equipment
▪ Rolling Stock
▪ Testing, System Integration, Commissioning, Operation and Maintenance Organisation
COMPANY PROFILE

Uskudar - Umraniye - Cekmekoy (Sancaktepe) Metro, Istanbul / Türkiye


5.2. METRO & RAILWAY
COMPANY PROFILE

Kabatas - Mahmutbey Metro, Istanbul / Türkiye


Client : Istanbul Metropolitan Municipality (IBB)
Construction Value : 1.5 Billion USD
Project Duration : 84 Months
Works : Project works include :
• 2x23.0 km Metro line, fully-automated driverless system with capacity of 70,000 pphpd,
• 22.49 km TBM tunnel, 26.95 km NATM tunnel, 0.4 km cut-cover tunnel in total, 1.287 km
viaduct, 300 m at grade
• 19 stations; 12 being deep tunnel, 5 being cut-cover, 2 being viaduct,
• Depot area with workshop building,
• Rolling Stock (300 #).
Services by EMAY : Design review, project management and construction supervision services covering,
▪ Civil works (Earthworks, Tunnels, Viaducts, Stations, Depot and Workshop Building)
▪ Architectural and Finishing works
5.2. METRO & RAILWAY

▪ Track works
▪ Power Supply and Rigid Catenary Systems
▪ Signalling and Safety Systems
▪ Control and Communication Systems (Scada, Radio, Phone, Passenger Information, Public
Announce, Central Clock, CCTV, Fare Collection, Entrance Security, etc.)
▪ Earthing and Cathodic Protection
▪ Electrical Installations (Low Voltage, Lighting, Fire Alarm, etc.)
▪ Ventilation / Air Conditioning Systems
▪ Escalators and Elevators
▪ Mechanical Installations (Water, Sewage, Fire Fighting, etc.)
▪ Workshop Equipment
▪ Rolling Stock
▪ Testing, System Integration, Commissioning, Operation and Maintenance Organisation
COMPANY PROFILE

Kabatas - Mahmutbey Metro, Istanbul / Türkiye


5.2. METRO & RAILWAY
COMPANY PROFILE

Halic Metro Bridge, Istanbul / Türkiye


Client : Istanbul Metropolitan Municipality (IBB)
Construction Value : 197 Million USD
Project Duration : 20 Months
Works : Project works include :
• 936 m long cable – stayed steel bridge, including one metro station.
• The bridge is passing over the Golden Horn and connecting north – south bounds of heavy
metro line in Istanbul. The steel bridge is cable – stayed over 4 piers.
Services by Emay : Design review, project management and construction supervision services covering,
▪ Civil works (Bridge and Station)
▪ Architectural and Finishing works
▪ Track works
▪ Power Supply and 3rd Rail Systems
5.2. METRO & RAILWAY

▪ Signalling and Safety Systems


▪ Control and Communication Systems (Scada, Radio, Phone, Passenger Information, Public
Announce, Central Clock, CCTV, Fare Collection, Entrance Security, etc.)
▪ Earthing and Cathodic Protection
▪ Electrical Installations (Low Voltage, Lighting, Fire Alarm, etc.)
▪ Ventilation / Air Conditioning Systems
▪ Escalators and Elevators
▪ Mechanical Installations (Water, Sewage, Fire Fighting, etc.)
▪ Testing, System Integration, Commissioning, Final Acceptance
COMPANY PROFILE

Halic Metro Bridge, Istanbul / Türkiye


5.2. METRO & RAILWAY
COMPANY PROFILE

Atakoy - Ikitelli Metro, Istanbul / Türkiye


Client : Istanbul Metropolitan Municipality (IBB)
Construction Value : 338 Million Euro (excluding Rolling stocks)
Project Duration : 1140 Days (ongoing)
Works : Project works include :
• 2 x 13.4 km Metro line, fully-automated driverless
• system, with capacity of 70,000 pphpd,
• 8,2 km Cut-Cover TBM tunnel, 4.1 km NATM tunnel, 1 km cut-cover tunnel,
• 11 stations; 7 being deep tunnel and 4 being cut-cover,
• Rolling Stock (72#).
Services by Emay : Design review, project management and construction supervision services covering,
▪ Civil works (Earthworks, Tunnels, Viaducts, Stations, Depot and Workshop Building)
▪ Architectural and Finishing works

5.2. METRO & RAILWAY

Track works
▪ Power Supply and Rigid Catenary Systems
▪ Signalling and Safety Systems
▪ Control and Communication Systems (Scada, Radio, Phone, Passenger Information, Public
Announce, Central Clock, CCTV, Fare Collection, Entrance Security, etc.)
▪ Earthing and Cathodic Protection
▪ Electrical Installations (Low Voltage, Lighting, Fire Alarm, etc.)
▪ Ventilation / Air Conditioning Systems
▪ Escalators and Elevators
▪ Mechanical Installations (Water, Sewage, Fire Fighting, etc.)
▪ Rolling Stock
▪ Testing, System Integration, Commissioning, Operation and Maintenance Organisation
COMPANY PROFILE

Atakoy - Ikitelli Metro, Istanbul / Türkiye


5.2. METRO & RAILWAY
COMPANY PROFILE

Umraniye - Atasehir - Goztepe Metro, Istanbul / Türkiye

Client : Istanbul Metropolitan Municipality (IBB)


Construction Value : 2,5 Billion TL (with 2017 prices) (approx. 700 million USD) (excluding Rolling stocks)
Project Duration : 1200 Days (ongoing)
Works : Project works include :
• 2 x 13 km Metro line, fully-automated driverless system, with capacity of 40,000 pphpd,
• 20,4 km Cut-Cover m TBM tunnel, 11.2 km NATM tunnel,
• Rolling Stock (72 #).

Services by Emay : Design review, project management and construction supervision services covering,

 Civil works (Earthworks, Tunnels, Viaducts, Stations, Depot and Workshop Building)
 Architectural and Finishing works
5.2. METRO & RAILWAY

 Track works
 Power Supply and Rigid Catenary Systems
 Signalling and Safety Systems
 Control and Communication Systems (Scada, Radio, Phone, Passenger Information, Public
Announce, Central Clock, CCTV, Fare Collection, Entrance Security, etc.)
 Earthing and Cathodic Protection
 Electrical Installations (Low Voltage, Lighting, Fire Alarm, etc.)
 Ventilation / Air Conditioning Systems
 Escalators and Elevators
 Mechanical Installations (Water, Sewage, Fire Fighting, etc.)
 Workshop Equipment
 Rolling Stock
 Testing, System Integration, Commissioning, Operation and Maintenance Organisation
COMPANY PROFILE

Umraniye - Atasehir - Goztepe Metro, Istanbul / Türkiye


5.2. METRO & RAILWAY
COMPANY PROFILE

Mahmutbey - Bahcesehir - Esenyurt Metro, Istanbul / Türkiye


Client : Istanbul Metropolitan Municipality (IBB)
Constrution Value : 3 Billion TL (with 2017 prices) (approx. 870 million USD)
(excluding Rolling stocks : 1200 Days (ongoing)
Project Duration : 1260 Days (ongoing)
Works : Project works include :
• 2x18.0 km Metro line, fully-automated driverless
system with capacity of 20,000 pphpd,
• 13.0 km TBM tunnel, 6,0 km NATM tunnel, 4 being
cut-cover tunnel in total, 600 m viaduct, 1 km at
grade,
• Rolling Stock
Services by EMAY : Design review, project management and construction supervision services covering,
▪ Civil works (Earthworks, Tunnels, Viaducts, Stations, Depot and Workshop Building)
5.2. METRO & RAILWAY

▪ Architectural and Finishing works


▪ Track works
▪ Power Supply and Rigid Catenary Systems
▪ Signalling and Safety Systems
▪ Control and Communication Systems (Scada, Radio, Phone, Passenger Information, Public
Announce, Central Clock, CCTV, Fare Collection, Entrance Security, etc.)
▪ Earthing and Cathodic Protection
▪ Electrical Installations (Low Voltage, Lighting, Fire Alarm, etc.)
▪ Ventilation / Air Conditioning Systems
▪ Escalators and Elevators
▪ Mechanical Installations (Water, Sewage, Fire Fighting, etc.)
▪ Workshop Equipment
▪ Rolling Stock
▪ Testing, System Integration, Commissioning, Operation and Maintenance Organisation
COMPANY PROFILE

Mahmutbey - Bahcesehir - Esenyurt Metro, Istanbul / Türkiye


5.2. METRO & RAILWAY
COMPANY PROFILE

Konya Rail System Lines Phase 1, Konya / Türkiye


Client : General Directorate of Infrastructure Investments
Constrution Value : 1,2 Billion Euro
Project Duration : 1650 Days (ongoing)
Works : Project works include :
• 2x21.1 km Ring HRS Line, capacity of 20,660 pphpd, 120 m Platform Length
• 22 # stations; 20 being deep tunnel and 2 being cut-cover type stations.
• Rolling Stock (104 #)

Services by EMAY : Design Review, Project Management, Construction Supervision and Consultancy
Services covering,

 Construction and Electromechanical works


 Civil works (Earthworks, Tunnels, Viaducts, Stations, Depot and Workshop Building)
5.2. METRO & RAILWAY

 Architectural and Finishing works


 Track works
 Power Supply and Rigid Catenary Systems
 Signalling and Safety Systems
 Control and Communication Systems (Scada, Radio, Phone, Passenger Information, Public
Announce, Central Clock, CCTV, Fare Collection, Entrance Security, etc.)
 Earthing and Cathodic Protection
 Electrical Installations (Low Voltage, Lighting, Fire Alarm, etc.)
 Ventilation / Air Conditioning Systems
 Escalators and Elevators
 Mechanical Installations (Water, Sewage, Fire Fighting, etc.)
 Workshop Equipment
 Rolling Stock
 Testing, System Integration, Commissioning, Operation and Maintenance Organisation
COMPANY PROFILE

Konya Rail System Lines Phase 1, Konya / Türkiye


5.2. METRO & RAILWAY
COMPANY PROFILE

Altunizade - Bosna Boulevard Rail System Line, Istanbul / Türkiye


Client : General Directorate of Infrastructure Investments
Construction Value : 425 Million TL
Project Duration : 30 Months (Ongoing)
Works : Project works include :
• Line length: 4.53 km
• Stations: 4 (Altunizade, Kisikli Mahallesi, Ferah Mahallesi, Bosna Bulvari)
• Vehicle: 5 x 2 rows (10 Vehicles) Platform areas, siding and tail lines as 10 rows in case of 1 row
• Passenger Capacity: (Passenger/Time/Direction) system capacity 8.100 persons

Serviced by EMAY : Design review, project management and construction supervision services covering,
 Civil works (Earthworks, Tunnels, Viaducts, Stations, Depot and Workshop Building)

5.2. METRO & RAILWAY

Architectural and Finishing works


 Track works
 Power Supply and Rigid Catenary Systems
 Signalling and Safety Systems
 Control and Communication Systems (Scada, Radio, Phone, Passenger Information, Public
Announce, Central Clock, CCTV, Fare Collection, Entrance Security, etc.)
 Earthing and Cathodic Protection
 Electrical Installations (Low Voltage, Lighting, Fire Alarm, etc.)
 Ventilation / Air Conditioning Systems
 Escalators and Elevators
 Mechanical Installations (Water, Sewage, Fire Fighting, etc.)
 Workshop Equipment
 Rolling Stock
 Testing, System Integration, Commissioning, Operation and Maintenance Organisation
COMPANY PROFILE

Altunizade - Bosna Boulevard Rail System Line, Istanbul / Türkiye


5.2. METRO & RAILWAY
COMPANY PROFILE

Dudullu - Bostanci Metro, Istanbul / Türkiye


Client : Istanbul Metropolitan Municipality (IBB)
Senbay + Kolin + Kalyon JV (Contractor)
Constrution Value : 559 Million Euro (excluding Rolling stocks and O&M Equipment)
Project Duration : 36 Months (ongoing)
Works : Project works include :
• Main line twin tunnels about 14 km long between Dudullu - Bostanci.
• 13 # stations; 7 being deep tunnel and 6 being cut-cover type
stations. 5 # diamond crossing NATM tunnel,
• Goztepe - Atasehir - Umraniye Metro (GAU) Line Connection Tunnel,
• 2 # multi-storey car parks (Bostanci, Kozyatagi), Vehicle Park
• Control Building, Administrative / Control Center Building
and indoor and outdoor parking areas in Depot Area.
5.2. METRO & RAILWAY

Services by EMAY : Mapping, Soil investigations, Application design and construction shop drawings, including,
▪ Civil works (Earthworks, Tunnels, Viaducts, Stations, Depot and Workshop Building)
▪ Vehicle Park Control Building, Administrative / Control Center Building
▪ Architectural and Finishing works
▪ Track works
▪ Power Supply and Rigid Catenary Systems
▪ Safety and Security Systems
▪ Control and Communication Systems (Scada, Radio, Phone, Passenger Information, Public
Announce, Central Clock, CCTV, Fare Collection, Entrance Security, etc.)
▪ Earthing and Cathodic Protection
▪ Electrical Installations (Low Voltage, Lighting, Fire Alarm, etc.)
▪ Ventilation / Air Conditioning Systems
▪ Escalators and Elevators
▪ Mechanical Installations (Water, Sewage, Fire Fighting, etc.)
COMPANY PROFILE

Dudullu - Bostanci Metro, Istanbul / Türkiye


5.2. METRO & RAILWAY
COMPANY PROFILE

Bandirma - Bursa - Yenisehir - Osmaneli High Standard Railway, Bursa / Türkiye


Client : General Directorate of Infrastructure Investments
Construction Value : 725 Million USD
Project Duration : 36 Months (ongoing)
Works : Project works include;
• 18 single tube tunnels of 20.91 km in total, 11 escape tunnels of 7.65 km in total, 5 cut-
cover tunnels of 995 m in total,
• 4 Viaducts of 3695 m in total, 18 overpasses and 28 Railway bridges, 66 underpasses,
155 culverts,
• 201 Km Line superstructure, electrification, signaling, tunnel E&M, telecommunication.
Serviced by EMAY : Mapping, Soil investigations, Application design and construction shop drawings, including,
 Engineering Structures,
 Tunnels,
 Railway Superstructure,
5.2. METRO & RAILWAY

 Expropriation and Zoning,


 Geological-Geotechnical and Soil Improvement Projects, Reporting,
 Temporary Displacement and Traffic Marking,
 Landscaping,
 Passenger Stations, Technical Buildings - CTC and Signaling Technical Buildings
Architectural, Structural and Electromechanical Projects,
 Infrastructure Projects (Route),
 Electromechanical Systems (Energy Transmission Line, Transformer Section, Catenary
System, Signaling System, Communication System, Tunnel Electromechanical Systems)
 Systems Engineering,
 As-Built Projects Works and Project modeling and BIM-based execution of the project
management process.
COMPANY PROFILE

Bandirma - Bursa - Yenisehir - Osmaneli High Standard Railway, Bursa / Türkiye


5.2. METRO & RAILWAY
COMPANY PROFILE

Ankara - Izmir High Speed Railway (Polatli - Banaz), Ankara - Usak / Türkiye
Client : General Directorate of Infrastructure Investments
Construction Value : 1.100 Million USD
Project Duration : 60 Months (ongoing)
Works : Project works include;
• 279 Km railway infrastructure, superstructure, electrification, signaling, tunnel E&M,
telecommunication.

Serviced by EMAY : Design review, project management and construction supervision services covering,
 Civil works (Earthworks, Tunnels, Viaducts, Bridges, Stations)
 Architectural and Finishing works
 Track works
 Power Supply and Catenary Systems
 Signalling and Safety Systems
 Control and Communication Systems
5.2. METRO & RAILWAY

 Electrical and Mechanical Installations


 Testing, System Integration, Commissioning, Operation and Maintenance Organization
COMPANY PROFILE

Ankara - Izmir High Speed Railway Line (Polatli - Banaz), Ankara - Usak / Türkiye
5.2. METRO & RAILWAY
COMPANY PROFILE

Consultancy and Engineering Services for Rail System Projects, Istanbul / Türkiye

Client : Istanbul Metropolitan Municipality (IBB) Projects:


• SGAY – Sultangazi Arnavutkoy Metro Line
Project Duration : 720 Days • IIK – ITU – Istinye – Kagithane Metro Line
Services by EMAY : Consultancy, control and auditing services for • SK – Sabiha Gokcen – Kurtkoy Metro Line
final designs of all railway system lines procured • SAB – Seyrantepe Alibeykoy Metro Line
under the responsibility of Railway System • KSC1 – Kazlicecesme Sogutlucesme 1.st Stage Metro
Project Directorate (Administration) of Istanbul Line
Metropolitan Municipality. Establishment of • STB – Sarigazi Turkis Metro Line
relevant Design Criteria and Standards. • KSM – Kadikoy Sultanbeyli Metro Line
• KBBK – Kabatas Bagcilar Tram Line and Basaksehir
Kayasehir Metro Extension (2 Projects – Single
Contractor)
ISTANBUL RAIL SYSTEMS, NOW AND PROJECTION BEYOND 2019
• EBES – Eyup Bayrampasa Metro Line and Esenler
5.2. METRO & RAILWAY

Nostaljik Tram
• (2 Projects – Single Contractor)
COMPANY PROFILE

Altunizade - Camlica Rail System, Istanbul / Türkiye


Client : Istanbul Metropolitan Municipality (IBB)
Constrution Value : 90 Million USD
Project Duration : 8 Months
Works : 3.5 km long 4 Station Altunizade - Camlica Rail System Line
Services by EMAY : Preparation of preliminary and final design services.

Yenibosna - Ataturk Airport LRTS, Istanbul / Türkiye


5.2. METRO & RAILWAY

Client : Istanbul Metropolitan Municipality (IBB)


Constrution Value : 45 Million USD
Project Duration : 19 Months
Works : Project works include :
● 1934 m extension of LRTS, consisting of civil
structures (bored tunnel, cut-cover tunnel, 2
stations, 970 m long steel-composite
superstructure viaduct), track and electro-
mechanical works.
Services by EMAY : Preparation of preliminary and final design services.
COMPANY PROFILE

Carsamba - Terme - Unye - Fatsa Railway, Samsun - Ordu / Türkiye


Client : General Directorate of Infrastructure Investments,
Ministry of Transport
Constrution Value : 740 Million USD
Project Duration : 14 Months
Works : 102.6 km long double-track speed railway line for
passenger and freight transport with 4 stations,5 deep
tunnels, 2 cut-cover tunnels, 33 bridges, 111 over /
underpasses, 117 culverts.
Services by EMAY : Feasibility study, EIA, geodesic and geotechnical,
surveys, preliminary and final design for the railway
including all the structures, trackworks,
electro-mechanical works (power supply, electrification,
signalling and telecommunication), preparation of
5.2. METRO & RAILWAY

tender documents, bill of quantities and cost estimates.

Ankara - Istanbul High Speed Railway, Eskisehir Crossing, Eskisehir / Türkiye


Client : Turkish State Railways (TCDD)
Constrution Value : 50 Million USD
Project Duration : 74 Months
Works : Total 3,4 km long (2240 m of cut-cover tunnel and
1151m of U-section) railway lines (2 high speed lines, 2
conventional lines and 1 freight line) and an
underground train station.
Services by EMAY : Construction supervision and consultancy services.
COMPANY PROFILE

Test Tracks for Rail Vehicles, Eskisehir / Türkiye


Client : Anadolu University
Constrution Value : 120 Million USD
Project Duration : 24 Months
Works : Rail vehicles test center and test tracks for;
• High speed passenger trains with design speed of
400 km/h, electrified, signalized (TSI), 1435 mm
track gauge,axle load of 25 tons
• Conventional trains for passenger and freight,
with max. speed of 180 km/h, diesel or electrified,
signalized, 1435 mm track gauges, axle load of 30
tons
• Intercity railway vehicles (metro, tram, etc.),
electrified (3rd rail and catenary), signalized.
5.2. METRO & RAILWAY

Services by EMAY : Planning, survey and design services including electromechanical systems, preparation of
technical specifications, tender documents and cost estimates.

Ring test line


COMPANY PROFILE
COMPANY PROFILE

BUILDING REFERENCES
Residential / Commercial Education Healthcare

70.000 units 101 schools 12 hospitals


10.5 million m2 total area 2100 classrooms 850 beds
550.000 m2 total area 175.000 m2 total area
Lodging Governmental Sports and
Entertaintment
5.3. BUILDINGS

13 dormitories 440.000 m2 total area 4 stadiums


8200 beds 155.000 total spectators
200.000 m2 total area capacity
COMPANY PROFILE

BUILDING REFERENCES
Services by Emay includes: Design or Design review, project management and construction supervision services covering,

1. Consultancy Services During Construction Phase


▪ Soil improvement and earthworks,
▪ Design Consultancy,
✔Soil investigation for all buildings and open residential areas,
✔Geotechnical reports for all buildings and soil improvements,
✔Architectural Design,
✔Statical Design,
✔Mechanical Design,
✔Electrical Design,
✔Infrastructure Design,
✔Landscaping Design,
✔Preparation of BoQs, Technical Specifications and Tendering Documents,
✔Project Model Preparation,
▪ Project Management / Construction Supervision Services
5.3. BUILDINGS

2. Consultancy Services Post Construction Phase


▪ Provisional acceptance
▪ Final account services
▪ Settlement reports, permissions
▪ Deed, zoning, housing, registration services
▪ Final acceptance services
COMPANY PROFILE

RESIDENTIAL / COMMERCIAL
5.3.1. RESIDENTIAL / COMMERCIAL

1173 Residences, Merkezefendi / Denizli 466 Residences, Korucuk / Adapazari / Sakarya

753 Residences, Kayabasi / Basaksehir / Istanbul 1344 Residences, Canik / Samsun


COMPANY PROFILE

RESIDENTIAL / COMMERCIAL
5.3.1. RESIDENTIAL / COMMERCIAL

Revenue Sharing in Return for Land Sales, 523 Lodgement, 1 Social Services Building and
Gaziosmanpasa / Istanbul Administrative Building, Basaksehir / Istanbul

94 Residences, Meric / Edirne 110 Residences , 1 Mosque, Ihsangazi / Kastamonu


COMPANY PROFILE

RESIDENTIAL / COMMERCIAL
5.3.1. RESIDENTIAL / COMMERCIAL

482 Residences, Kayabasi / Istanbul 275 Residences and Trade Center, Mosque, Cilimli / Duzce

345 Residences and Trade Center, Mosque, Inkoy / Kutahya


COMPANY PROFILE

RESIDENTIAL / COMMERCIAL
5.3.1. RESIDENTIAL / COMMERCIAL

385 Residences- Mosque, 384 Residences, Akyazi / Sakarya


Cayirova / Kocaeli – Yahyakaptan / Izmit

301 Residences, Soma / Manisa Alba Residences, Yunusemre / Manisa


COMPANY PROFILE

RESIDENTIAL / COMMERCIAL
5.3.1. RESIDENTIAL / COMMERCIAL

Revenue Sharing Work, Eyup / Istanbul 1101 Houses, Akgedik / Yunusemre / Manisa

Urban Renewal Project, Mamak / Ankara Besiktas Area Settlement Project, Istanbul
COMPANY PROFILE

RESIDENTIAL / COMMERCIAL
5.3.1. RESIDENTIAL / COMMERCIAL

Industrial Site, Sinop

Selimiye Mosque, Selimiye / Edirne


COMPANY PROFILE

RESIDENTIAL / COMMERCIAL
Flame Towers, Baku / Azerbaijan
Client : Azinko Development MMC
Construction Value : 350 Million USD
Project Duration : 13 Months
Works : The project consists of a shopping center,
hotel, residence and office blocks, podium
5.3.1. RESIDENTIAL / COMMERCIAL

and car park, with total construction area of


248,532 m².
Services by EMAY : Design review, construction supervision and
project management services.

Akkoza Housing, Istanbul / Türkiye


Client : Garanti Koza in Association with AKIS
Project Duration : 12 Months
Works : 252.000 m2 total buildings with with inclusion
of approximately 96.000 m2 residential area,
7000 m2 shopping mall and 41.000 m2
parking area.

Services by EMAY : Design review, project management and


construction supervision services covering,
COMPANY PROFILE

RESIDENTIAL / COMMERCIAL
Trabzon Metropolitan Municipality Investments for 2020-2023, Istanbul / Türkiye
Client : Trabzon Metropolitan Municipality
Project Duration : 53 Month
Scope of Works : Supervision Service Includes The Following Works;
• 19.961,17m² Bazaar Parking Lot and Social Areas (4 units), 5.023,17m Street Base Renewal (3 streets), 2.300m Street Facade
Renovation (2 streets), 2.250m² Science Center - Planetarium and Exhibition Hall (1 unit), 29.231,82m² Terminal Building and
5.3.1. RESIDENTIAL / COMMERCIAL

Social Areas (1 unit), 200.000 m² Coastal Band Arrangement and Social Areas, 30.060,47m² Municipal Service Building and
Social Areas (1 unit), 156.000m² Infrastructure and Landscaping (1 unit)

Project Service Includes The Following Works;


• 10.274m² Women's Life Center, 11.744m² Trabzon Cultural Center, 7.204,29m² Theater Building, 4.407m² Disaster Education
Park Building and Project, 23.403m² Long street floor arrangement facade sanitization, 63.475,83m² Arakli Street Arrangement,
17.741,8m² Akcaabat Marketplace, 2.329m² Marketplace and Parking Lot Construction (Cayirbagi), 12.326m² Arrangement of
Kunduracilar Street, Gazi Pasa Street, Cumhuriyet Street, 5.784,5m² National Garden Implementation, 345m² Caykara City
Square and Landscaping Project, 5.450m² Of Marketplace, 126.507m² Akcaabat Coastal Recreation, 5.238m² Cukurcayir Park
Project, 39.500m² Otizm Campus,1.500m² Caykara Marketplace Project, 8.696m² Arakli Beach Arrangement, 2.200m² Carsibasi
Youth Center, 72.354m² Vakfikebir Parking Lot Project

Services by Emay : Design review, construction supervision and project management services.
COMPANY PROFILE

EDUCATION

Primary School with 32 Classrooms, 1 Anatolian High Primary School with 32 Classrooms and Anatolian High
School with 32 Classrooms, Bagcilar / Istanbul School with 75, Bafra / Samsun
5.3.2. EDUCATION

Primary School with 24 Classrooms, Bolcek / Kutahya


COMPANY PROFILE

EDUCATION

24 Classrooms High School, 32 Classrooms Primary 40 Classrooms Primary School, Kayabasi / Istanbul
School, Tarsus - Toroslar / Mersin
5.3.2. EDUCATION

24 Classroom Girls Vocational High School, Siralak / Duzce 16 Classrooms Anatolian Teacher High School,
Samanli / Yalova
COMPANY PROFILE

EDUCATION

Private School, Cankaya / Ankara


5.3.2. EDUCATION

32 Classrooms Primary School, 1 Mosque, 24 Classrooms Secondary School, Buca / Izmir


Basaksehir / Istanbul
COMPANY PROFILE

HEALTHCARE

250 Bed Kirklareli State Hospital, Kirklareli 70 Bed Malkara State Hospital, Tekirdag
5.3.3. HEALTHCARE

100 Bed Osmancik Corum State Hospital, Corum 30 Bed Samsun Ladik State Hospital, Samsun
COMPANY PROFILE

HEALTHCARE

100 Bed Niksar State Hospital, Niksar / Tokat 100 Bed Tokat Zile State Hospital, Tokat
5.3.3. HEALTHCARE

50 Bed Resadiye State Hospital, Tokat 100 Bed Corum State Hospital, Iskilip / Corum
COMPANY PROFILE

LODGING

500 Person Dormitory, Sapanca / Sakarya 4100 Person Dormitory 78.476,00 Maltepe / Istanbul
5.3.4. LODGING

400 Person Dormitory 11.519,00, Akyazi / Sakarya 750 Person Dormitory, Kirikkale
COMPANY PROFILE

LODGING

500 Person Dormitory, Soke / Aydin 500 Person Dormitory, Karaman


5.3.4. LODGING

400 Person Dormitory, Erdemli / Mersin 2 Pieces of 52 Units IGVPY, Urla / Izmir
COMPANY PROFILE

GOVERNMENTAL

Municipal Service Building - Cultural Center, Trade Center, Arnavutkoy / Istanbul


5.3.5. GOVERNMENTAL

Tax Office Service Building, Esenler / Istanbul Social Security Provincial Directorate Building, Corum
COMPANY PROFILE

GOVERNMENTAL

Prison, Ilkadim / Samsun Public Education Building, Yesilyurt / Tokat


5.3.5. GOVERNMENTAL

Provincial Police Department Service Building, Manisa Police Station Service Building, Amasya
COMPANY PROFILE

GOVERNMENTAL

Government Office, Cine / Aydin Government Office, Akhisar / Manisa


5.3.5. GOVERNMENTAL

Government Office, Gaziosmanpasa / Istanbul RTUK Istanbul Service Building, Besiktas / Istanbul
COMPANY PROFILE

SPORTS AND ENTERTAINTMENT


5.3.6. SPORTS AND ENTERTAINTMENT

33,000 capacity stadium, Kocaeli 40,000 capacity stadium, Akyazi / Trabzon

15,000 capacity stadium, Goztepe / Izmir 52,000 capacity stadium Turk Telekom Arena, Istanbul
5. SELECTED PROJECTS / BUILDINGS COMPANY PROFILE

Museum of Orhun Monuments, Mongolia TUVTURK Vehicle Inspection Centers / TR

Organized Industrial Zone, Baku / Azerbaijan


COMPANY PROFILE

Square and Seafront Arrangement Design, Istanbul / Türkiye


Client : Istanbul Metropolitan Municipality
Project Duration : 18 Month
Scope of Works : Works include;
• Istanbul Asian Side Coastal Development Policies (General Report)
• Landscape Project of Silivri Mimar Sinan Bridge Surroundings (110.000 m2),
• Kartal Beach Arrangement and Water Sports Center Project (905,911 m2),
• Kartal Orhantepe Beach Arrangement and Water Sports Center Project (817,659 m2),
• Kadikoy Bostanci Landscape Design and Water Sports Center (3,537 m2),
• Buyukcekmece Albatros Coastal Area and Water Sports Center (102.400 m2),

5.4. WATER & ENVIRONMENT

Zeytinburnu Cirpici Public Park Design (339.815 m2),


• Besiktas Ulus Valley Public Park Design (238.232 m2),
• Zeytinburnu Multi-Storey Car Park Project (5158 m2),
• Landscape Arrangement Project of Ottoman Archive Service Building (107,455 m²)

Services by Emay : Design, Engineering and Visualization Services.

Kartal Orhantepe Beach Arrangement and Water Sports Center Landscape Arrangement Around Ottoman Archive Service Building
COMPANY PROFILE

Square and Seafront Arrangement Design, Istanbul / Türkiye


5.4. WATER & ENVIRONMENT

Bostanci Landscape / Türkiye Bostanci Landscape / Türkiye

Orhantepe Landscape / Türkiye Orhantepe Landscape / Türkiye


COMPANY PROFILE

Project-1: Public Gardens, Türkiye


Client : Housing Development Administration (TOKI)
Project Duration : 18 Month
Scope of Works : Public Gardens totaling 3,5 million m2 and their social facilites totalling 86.000 m2 covered area, in
the below listed cities
Adiyaman, Bursa Osmangazi, Kastamonu, Kutahya, Afyonkarahisar Cetinkaya, Cankiri Orta,
Kirikkale Kesin, Manisa Soma, Ankara Akyurt, Duzce, Kirikkale, Mardin Midyat, Ankara Cubuk,
Hakkari, Kocaeli Derince, Mugla Seydikemer, Ankara Sincan, Istanbul Besiktas, Kocaeli Dilovasi,
Rize Guneysu, Antalya Serik, Istanbul Catalca, Kocaeli Golcuk, Sanliurfa Viransehir, Ardahan,
Istanbul Gungoren, Konya Beysehir, Yozgat Cekerek, Bingol Genc, Istanbul Umraniye, Konya
5.4. WATER & ENVIRONMENT

Eregli, Usak, Bolu, Izmir Cigli, Konya Yalihuyuk.

Services by Emay : Design and Project Management Services

Yozgat Cekerek Public Gardens, Yozgat / Türkiye Rize Guneysu Public Gardens, Rize / Türkiye
COMPANY PROFILE

PUBLIC GARDENS
5.4. WATER & ENVIRONMENT

Kocaeli Golcuk Public Gardens, Kocaeli / Türkiye Kocaeli Dilovasi Public Gardens, Kocaeli / Türkiye

Kutahya Public Gardens, Kutahya / Türkiye Kocaeli Derince Public Gardens, Kocaeli / Türkiye
COMPANY PROFILE

PUBLIC GARDENS
5.4. WATER & ENVIRONMENT

Mardin Midyat Public Gardens, Mardin / Türkiye Bingol Genc Public Gardens, Bingol / Türkiye

Afyonkarahisar Public Gardens, Afyonkarahisar / Türkiye Sanliurfa Viransehir Public Gardens, Sanliurfa / Türkiye
COMPANY PROFILE

PUBLIC GARDENS
5.4. WATER & ENVIRONMENT

Konya Eregli Public Gardens, Konya / Türkiye Ankara Akyurt Public Gardens, Ankara / Türkiye

Antalya Serik Public Gardens, Antalya / Türkiye Manisa Soma Public Gardens, Manisa / Türkiye
COMPANY PROFILE

Project-2: Public Gardens, Türkiye


Client : Housing Development Administration (TOKI)
Project Duration : 12 Month
Scope of Works : Public Gardens totaling 4,8 million m2 and their social facilites totalling 102.000 m2 covered area,
in the below listed cities :
Ankara GATA, Artvin Yusufeli, Balikesir Avsa, Bartin, Bitlis, Bitlis Tatvan, Bursa Osmangazi,
Canakkale, Cankiri Karatekin, Cankiri Orta, Denizli Merkezefendi, Diyarbakir Hani, Edirne Kesan,
Giresun, Hatay Antakya, Hatay Iskenderun Kutuphane, Hakkari, Yuksekova, Karabuk, Karabuk
Safranbolu, Kirikkale, Konya, Kocaeli, Nevsehir, Izmir Bayrakli / Cigli, Istanbul / Besiktas / Sancaktepe /
Beykoz / Sile / Sultangazi / Gaziosmanpasa / Gungoren, Isparta, Mardin Kiziltepe, Mugla, Sinop
5.4. WATER & ENVIRONMENT

Boyabat, Tunceli, Trabzon Carsibasi, Usak

Services by Emay : Design and Project Management Services

Cankiri Orta Public Gardens, Cankiri / Türkiye Giresun Public Gardens, Giresun / Türkiye
COMPANY PROFILE

PUBLIC GARDENS
5.4. WATER & ENVIRONMENT

Bitlis Tatvan Public Gardens, Mardin / Türkiye Izmir Bayrakli Public Gardens, Izmir / Türkiye

Diyarbakir Hani Public Gardens, Diyarbakir / Türkiye Mardin Kiziltepe Public Gardens, Mardin / Türkiye
COMPANY PROFILE

PUBLIC GARDENS
5.4. WATER & ENVIRONMENT

Karabuk Safranbolu Public Gardens, Karabuk / Türkiye Kocaeli Basiskele Public Gardens, Kocaeli / Türkiye

Trabzon Carsibasi Public Gardens, Trabzon / Türkiye Kirikkale Keskin Public Gardens, Kirikkale / Türkiye
COMPANY PROFILE

PUBLIC GARDENS
5.4. WATER & ENVIRONMENT

Istanbul Beykoz Public Gardens, Istanbul / Türkiye Edirne Kesan Public Gardens, Edirne / Türkiye

Bursa Osmangazi Public Gardens, Bursa / Türkiye Mugla Seydikemer Public Gardens, Mugla / Türkiye
COMPANY PROFILE

WASTE WATER TREATMENT PLANTS


1. Diyarbakir OIZ Waste Water Treatment Plant (2022 - ongoing) (CEMA is a member of EMAY Group of Companies)
2. ASAT - Kemer-Camyuva WWTP and Connected Infrastructure Facilities (2022 –
ongoing) 33. Baku Waste Water Treatment Plant (2011)
3. ASAT - Manavgat WWTP&Gazipasa WWTP&Lara WWTP Deap Sea Outfall 34. Tuzla Dericiler Waste Water Treatment Plant (2011 - 2012)
(2021 - ongoing) 35. Doganbey Waste Water Treatment Plant (2010 - 2011)
4. ASAT - Kumluca WWTP Pretreatment Facilities and Connected Infrastructure 36. Zonguldak Waste Water Treatment Plant (2010 - 2011)
Facilities (2021 - 2023) 37. Konacik Waste Water Treatment Plant (2010)
5. IZSU - Izmir Institute of Technology WWTP (2020 - ongoing) 38. Turkelli Waste Water Treatment Plant (2010)
6. ASAT - Serik 2 WWTP (2019 - 2022) 39. GOSB Waste Water Treatment Plant (2009 - 2010)
7. IBB - Seymen Leachate TP (2018 - ongoing) 40. Saruhanli Waste Water Treatment Plant (2009 - 2011)
8. HATSU – Uçgulluk WWTP (2018 - 2022) 41. Canakkale Waste Water Treatment Plant (2008 - 2010)
9. TESKI - Marmaraereglisi WWTP (2018) 42. Basra Waste Water Treatment Plant (2009 - 2010)
5.4. WATER & ENVIRONMENT

10. KOSKI - Cumra WWTP (2017 - 2019) 43. Eskisehir Waste Water Treatment Plant (2008 - 2009)
11. TESKI - Murefte WWTP (2017 - 2018) 44. Simav Waste Water Treatment Plant (2008 - 2010)
12. ISKI - Kadıkoy WWTP (2017) 45. Eti - Bor Waste Water Treatment Plant (2008)
13. TESKI - Kumbag WWTP (2017) 46. Çigli Waste Water Treatment Plant Extension (2007)
14. PROVINCE BANK - Alpullu WWTP (2016 - 2017) 47. Astana Water Supply and Sewerage Project (including Water Intake, Water Treatment Plant
15. PROVINCE BANK - Ovacik WWTP (2016 - 2018) Extension, Sewage Treatment Plant Extension, Intermediate Pump Stations) (2007 - 2010)
16. PROVINCE BANK - Kaynarca WWTP (2016 - 2017) 48. Menemen Waste Water Treatment Plant (2007)
17. PROVINCE BANK - Karaatli WWTP (2016 - 2017) 49. Kemalpasa Waste Water Treatment Plant (2007)
18. PROVINCE BANK - Palu&Kovancilar WWTP (2016 - 2018) 50. Bayindir Waste Water Treatment Plant (2007)
19. PROVINCE BANK - Duragan WWTP (2016) 51. Ayrancilar Waste Water Treatment Plant (2007)
20. PROVINCE BANK - Pehlivankoy WWTP (2016 - 2017) 52. Gebze Makineciler Organized Industrial Zone, Wastewater Water Treatment Plant -
21. PROVINCE BANK - Tarakli WWTP (2015 - 2018) Preparation of Application Projects (2007)
22. PROVINCE BANK - Alaca WWTP (2015 - 2018) 53. Antalya Hurma Wastewater Treatment Plant Extension Projects (2006)
23. ASAT - Expansion and Rehabilitation of Kemer WWTP (2015 - ongoing) 54. Dubai Al-Aweer Sewage Treatment Plant Extension Projects (2006)
24. PANCAR OIZ WWTP (2015 - 2016) 55. Antalya East Area (Lara) WWTP - Preparation of Application Projects (2005)
25. BASKI - Kepsut WWTP (2015 - 2016) 56. Ministry of Defense, Bodrum Military Campus, Capacity Expansion for Potable Water
26. ASAT - Expansion and Rehabilitation of WWTP & Intermediate Pump Stations Treatment Plant and Renewal of Water Distribution Lines - Preparation of Applications
(2014 - 2015) Projects (2005)
27. Yesilcevre Waste Water Treatment Plant (2012 - 2015) 57. Mugla Gocek Municipality, Wastewater Treatment Plant - Preparation of Application
28. Atakoy Waste Water Treatment Plant Stage II (2013 - 2014) Projects (2004 - 2005)
29. Mosul Sewage Treatment Plant (2013 - ongoing) 58. Bursa Demirtas Organized Industrial Zone, WWTP - Preparation of Application Projects
30. THY-HABOM Waste Water Treatment Plant (2012) (2004 - 2005)
31. Ramadi Waste Water Treatment Plant (2011 - 2014) 59. Kocaeli University, Umuttepe Campus, WWTP - Preparation of Application Projects (2003)
32. Kucukcekmece Waste Water Treatment Plant (2011 - ongoing) 60. Diyarbakir Waste Water Treatment Plant - Preparation of Application Projects (2000 - 2003)
COMPANY PROFILE

WATER TREATMENT PLANTS


(CEMA is a member of EMAY Group of Companies)

1. ASAT - Oymapinar Water Treatment Plant Rehabilitation Feasibility Report (2021 - ongoing)
2. IZSU - Aliaga Water Treatment Plant And Filterpress Units Addition To Existing Cesme Water
Treatment Plant (2019 - 2020)
3. DSI - Turhal WTP (2018 - 2022)
4. ISKI - Elmali WTP (2016 - 2017)
5. Mukry Water Treatment Plant (2013)
5.4. WATER & ENVIRONMENT

6. Balad Water Treatment Plant (2012)


7. Khan Bani Saad Water Treatment Plant (2011)
8. Al Shamiya Water Treatment Plant (2011)
9. Astana Water Supply and Sewerage Project (including Water Intake, Water Treatment Plant
Extension, Sewage Treatment Plant Extension, Intermediate Pump Stations) (2007 - 2010)
10. Dashoguz Water Treatment Plant (2007)
11. Erzurum Water Treatment Plant Project (2004 - 2005)
COMPANY PROFILE

INFRASTRUCTURE PROJECTS
(CEMA is a member of EMAY Group of Companies)
1. ISKI - Water Supply Tunnel (2019 - ongoing)
2. AZERSU Baku Infrastructure System (2012 - ongoing)
3. GOSB Tembelova Infrastructure System - Construction Supervision (2011 - 2012)
4. Potable Water Plants in Various Water Basins 8 (2006 - 2007)
5. Potable Water Plants in Various Water Basins 4 (2005 - 2007)
6. Kasimpasa Rain Water Tunnels, Dolapdere and Baruthane Streams Remediation Waste Water Seperator Channels Project (2002 - 2003)
5.4. WATER & ENVIRONMENT

7. ISKI Cavusbasi Tunnels (2003)


8. K.U. Umuttepe Campus Substructure Project (2000 - 2004)
9. Bistrica Stream Remediation Project (2008 - 2010)
10. Aslanbucak Substructure Project (2008)
11. Adrasan Substructure Project (2009)
12. ISKI - Pendik Waste Water Tunnels Project
13. Sinanville Villas On-Site Drenaige Project
14. Manisa WWTP Pumping Stations Projects
15. Sirtkoy Villas Substructure Projects
16. Substructure Projects of Uskumrukoy Houses
17. KHANZAD Hotel Substructure Projects
18. Kucukyali Stream Remediation and Accommodation Road Projects
19. 9. and 10. Potable Water Units Projects of Eregli Iron and Steel Factory
COMPANY PROFILE

(CEMA is a member of EMAY Group of Companies)


MANAVGAT WASTE WATER
TREATMENT PLANTS, Antalya / Türkiye
Client: ASAT
Works: Flow Rate: 50.000 m3/day (pre.+rehab.) + 25.000 m3/day (plan.) +
25.000 m3/day (future)
Process: Domestic / Advanced Biological / Sludge Dewatering
Services by Cema: Process, Hydraulic, Field Architect, Structural,
5.4. WATER & ENVIRONMENT

Mechanical, Electrical Shop Drawings and Tender Documents

SERIK WASTE WATER TREATMENT PLANTS, Antalya / Türkiye


Client: ASAT
Works: Flow Rate: 25.000 m3/day (plan)
Process: Domestic / Advanced Biological / Sludge Dewatering
Services by Cema : Process, Hydraulic, Field Architect, Structural,
Mechanical, Electrical Shop Drawings and Tender Documents
COMPANY PROFILE

(CEMA is a member of EMAY Group of Companies)


YESIL CEVRE WASTE
WATER TREATMENT PLANTS, Bursa / Türkiye
Client: S.S.YESIL CEVRE TREATMENT PLANT IS.COOP.
Works: Flow Rate: 52.500 m3/day (pre.) + 47.500 m3/day (plan.)
Process: Domestic + Industrial / Advanced Biological / Sludge Dewatering/
Color Removal
Services by Cema: Tender Documents and Process, Construction /
5.4. WATER & ENVIRONMENT

Manufacturing Control / Consultancy

ATAKOY WASTE WATER TREATMENT PLANTS STAGE II,


Istanbul / Türkiye
Client: ISKI / WTE
Works: Flow Rate: 360.000 m3/day (pre.) + 240.000 m3/day (plan.)
Process: Domestic / Advanced Biological
Services by Cema: Process, Hydraulic, Field Architect Shop Drawings
COMPANY PROFILE

(CEMA is a member of EMAY Group of Companies)


THY-HABOM WASTE WATER
TREATMENT PLANTS, Istanbul / Türkiye
Client: Turkish Airlines / AE Architecture
Works: Flow Rate: 50.000 m3/day (plan)
Process: Industrial + Domestic
Services by Cema: Structural Shop Drawings
5.4. WATER & ENVIRONMENT

KUCUKCEKMECE ADVANCED BIOLOGICAL TREATMENT


PLANT, Istanbul / Türkiye
Client: ISKI
Works: Flow Rate: 300.000 m3/day (plan)
Process: Domestic / Advanced Biological
Services by Cema: Site Survey, Process, Hydraulic, Field Architect,
Structural, Mechanical, Electrical Shop Drawings and Tender Documents
COMPANY PROFILE

(CEMA is a member of EMAY Group of Companies)


IDOSB WASTE WATER
TREATMENT PLANT SLUDGE
DRYING AND DIGESTION PLANT PROJECT, Istanbul / Türkiye
Client: Istanbul Leather Organization / STULZ PLANAQUA
Works: Flow Rate: 12.000 m3/day (rehab.)
Process: Domestic+Industrial / Chemical + Advanced Biological / Sludge
Dewatering, Drying and Digestion/Biogas
5.4. WATER & ENVIRONMENT

Services by Cema: Site Survey, Structural Shop Drawings

DOGANBEY WASTE WATER TREATMENT PLANTS,


Izmir / Türkiye
Client: IZSU
Works: Flow Rate: 25.000 m3/day (plan) + 25.000 m3/day (future)
Process: Domestic / Advanced Biological /Sludge Dewatering
Services by Cema: Site Survey, Process, Hydraulic, Field Architect,
Structural, Mechanical, Electrical Shop Drawings and Tender Documents
COMPANY PROFILE

(CEMA is a member of EMAY Group of Companies)


ZONGULDAK SEWERAGE
AND WASTE WATER TREATMENT PLANTS, Zonguldak / Türkiye
Client: Zonguldak Municipality / MASS
Works: Flow Rate: 34.128 m3/day (plan.) + 6.720 m3/day (future)
Process: Domestic / Advanced Biological / Sludge Dewatering and Digestion/
Biogas + Number of 7 Pumping Station and Sewerage Lines
Services by Cema: Process, Hydraulic, Field Architect, Structural Shop
5.4. WATER & ENVIRONMENT

Drawings

GOSB WASTE WATER TREATMENT PLANTS, Kocaeli / Türkiye


Client: GOSB / MASS-GEZER
Works: Flow Rate: 6.400 m3/day (plan)
Process: Domestic+Industrial / Chemical + Biological / Sludge Dewatering
Services by Cema: Process, Hydraulic, Field Architect, Structural,
Mechanical, Electrical Shop Drawings
COMPANY PROFILE

(CEMA is a member of EMAY Group of Companies)


SARUHANLI WASTE WATER
TREATMENT PLANTS, Manisa / Türkiye
Client: Bank of Province
Works: Flow Rate: 3.000 m3/day (plan) + 2.040 m3/day (future)
Process: Advanced Biological Treatment/Sludge Dewatering
Services by Cema: Site Survey, Process, Hydraulic, Field Architect,
Structural, Mechanical, Electrical Shop Drawings and Tender Documents
5.4. WATER & ENVIRONMENT

CANAKKALE WASTE WATER TREATMENT PLANTS,


Canakkale / Türkiye
Client: Canakkale Municipality
Works: Flow Rate: 21.000 m3/day (plan) + 8.250 m3/day (future)
Process: Advanced Biological Treatment/Sludge Dewatering
Services by Cema: Process, Hydraulic, Field Architect, Structural,
Mechanical, Electrical Shop Drawings and Tender Documents
COMPANY PROFILE

(CEMA is a member of EMAY Group of Companies)


ESKISEHIR WASTE WATER
TREATMENT PLANTS, Eskisehir / Türkiye
Client: PWT-ALKE
Works: Flow Rate: 55.200 m3/day (plan) + 76.800 m3/day (plan)
Process: Domestic / Advanced Biological
Services by Cema: Architectural, Structural Shop Drawings
5.4. WATER & ENVIRONMENT

CIGLI WASTE WATER TREATMENT PLANTS, Izmir / Türkiye


Client: IZSU
Works: Flow Rate: 691.200 m3/day (pre.) + 432.000 m3/day (plan.)
Process: Domestic / Advanced Biological
Services by Cema: Process, Hydraulic, Field Architect, Structural,
Mechanical, Electrical Shop Drawings and Tender Documents, Taking the
Ministerial Approval
COMPANY PROFILE

ASTANA WATER SUPPLY (CEMA is a member of EMAY Group of Companies)

AND SEWERAGE PROJECT,


Astana / Kazakhstan
Client: Governorship of Astana / Aslim-Alarko
Works: Flow Rate: 100.000 m3/day (pre.) +36.000 m3/day (plan)
Process: Domestic / Biological / Sludge Dewatering And Digestion / Biogas +
17 Pumping Station + 21 km Line
5.4. WATER & ENVIRONMENT

Services by Cema: Field Architect, Structural, Mechanical, Electrical Shop


Drawing and As-built Projects

MENEMEN WASTE WATER TREATMENT PLANTS, Izmir /


Türkiye
Client: IZSU
Works: Flow Rate: 21.600 m3/day (plan) + 21.600 m3/day (future)
Process: Domestic / Biological Treatment / Sludge Dewatering
Services by Cema: Process, Hydraulic, Field Architect, Structural,
Mechanical, Electrical Shop Drawings and Tender Documents
COMPANY PROFILE

(CEMA is a member of EMAY Group of Companies)


KEMALPASA WASTE WATER
TREATMENT PLANTS, Izmir / Türkiye
Client: IZSU
Works: Flow Rate: 12.960 m3/day (plan.) + 12.960 m3/day (future)
Process: Domestic / Biological Treatment / Sludge Dewatering
Services by Cema: Process, Hydraulic, Field Architect, Structural,
Mechanical, Electrical Shop Drawings and Tender Documents
5.4. WATER & ENVIRONMENT

BAYINDIR WASTE WATER TREATMENT PLANTS, Izmir / Türkiye


Client: IZSU
Works: Flow Rate: 6.912 m3/day (plan) + 3.456 m3/day (future)
Process: Domestic / Biological Treatment / Sludge Dewatering
Services by Cema: Process, Hydraulic, Field Architect, Structural,
Mechanical, Electrical Shop Drawings and Tender Documents
COMPANY PROFILE

(CEMA is a member of EMAY Group of Companies)


AYRANCILAR WASTE WATER
TREATMENT PLANTS, Izmir / Türkiye
Client: IZSU
Works: Flow Rate: 6.912 m3/day (plan) + 3.456 m3/day (future)
Process: Domestic / Biological Treatment / Sludge Dewatering
Services by Cema: Process, Hydraulic, Field Architect, Structural,
Mechanical, Electrical Shop Drawings and Tender Documents
5.4. WATER & ENVIRONMENT

HURMA WASTE WATER TREATMENT PLANTS,


Antalya / Türkiye
Client: ASAT
Works: Flow Rate: 75.000 m3/day (pre.) + 135.000 m3/day (plan)
Process: Domestic / Biological Treatment/Sludge Dewatering, Drying and
Digestion / Biogas + Number of 5 Pumping Station
Services by Cema: Process, Hydraulic, Field Architect, Structural,
Mechanical, Electrical Shop Drawings and Tender Documents
COMPANY PROFILE

(CEMA is a member of EMAY Group of Companies)


AL-AWEER WASTE WATER
TREATMENT PLANTS, Dubai / United Arab Emirates
Client: MASS
Works: Flow Rate: 2.500 m3/day (plan)
Process: Domestic / Biological Treatment/Sludge Dewatering, Drying and
Digestion/Biogas
Services by Cema: Architectural, Structural, Mechanical, Electrical Shop
5.4. WATER & ENVIRONMENT

Drawings

LARA WASTE WATER TREATMENT PLANTS,


Antalya / Türkiye
Client: ASAT
Works: Flow Rate: 31.250 m3/day (plan) + 93.750 m3/day (future)
Process: Domestic / Biological Treatment/ Sludge Dewatering
Services by Cema: Process, Hydraulic, Field Architect, Structural,
Mechanical, Electrical Shop Drawings and Tender Documents
COMPANY PROFILE

(CEMA is a member of EMAY Group of Companies)


BODRUM SPECIAL TRAINING
COMMAND WASTE WATER TREATMENT PLANT PROJECT,
Mugla / Türkiye
Client: Izmir Cons. Estate and NATO Infs
Works: Flow Rate: 400 m3/day (pre.) + 200 m3/day (plan.)
Process: Domestic / Biological Treatment / Sludge Dewatering + Deep Sea
Outfall
5.4. WATER & ENVIRONMENT

Services by Cema: Site Survey, Process, Hydraulic, Field Architect,


Structural, Mechanical, Electrical Shop Drawings and Tender Documents

GOCEK WASTE WATER TREATMENT PLANTS PROJECT,


Mugla / Türkiye
Client: R.T. Ministry of Environment and Forestry
Works: Flow Rate: 4.500 m3/day (plan) + 4.500 m3/day (plan)
Process: Domestic / Biological Treatment(AKR) / Sludge Dewatering
Services by Cema: Process, Hydraulic, Field Architect, Structural,
Mechanical, Electrical Shop Drawings and Tender Documents
COMPANY PROFILE

(CEMA is a member of EMAY Group of Companies)


BURSA DEMIRTAS
ORGANIZED INDUSTRIAL ZONE WASTE WATER TREATMENT
PLANT PROJECT, Bursa / Türkiye
Client: Demirtas OSB / MITAS-MASS
Works: Flow Rate: 70.000 m3/day (plan)
Process: Chemical + Domestic / Chemical + Biological Treatment / Sludge
Dewatering
5.4. WATER & ENVIRONMENT

Services by Cema: Structural Shop Drawings

KOCAELI UNIVERSITY WASTE WATER TREATMENT PLANTS,


Kocaeli / Türkiye
Client: Kocaeli University
Works: Flow Rate: 3.000 m3/day (plan)
Process: Domestic / Biological Treatment / Sludge Dewatering
Services by Cema: Process, Hydraulic, Field Architect, Structural,
Mechanical, Electrical Shop Drawings and Tender Documents
COMPANY PROFILE

AZERSU BAKU INFRASTRUCTURE


SYSTEM, Baku / Azerbaijan
(CEMA is a member of EMAY Group of Companies)
Client: AZERSU / CBMC
Works: Water, Sewerage, Stormwater Networks and Collectors
Services by Cema: The Hydraulic Calculations, Architectural, Mechanical, Electrical
and Layout Shop Drawings Projects, Bill of Quantities and Estimates Approach
Reports and Specifications, Constitution The Tender Documents
5.4. WATER & ENVIRONMENT

GOSB TEMBELOVA INFRASTRUCTURE SYSTEM, Kocaeli / Türkiye


Client: GOSB
Works: Infrastructure System
Services by Cema: Technical Consultancy and Project Management

POTABLE WATER PLANTS IN VARIOUS WATER BASINS 8,


Istanbul / Türkiye
Client: ISKI
Works: Potable Water Distribution, Network and Plants
Services by Cema: The Hydraulic Calculations, Architectural, Mechanical,
Electrical and Layout Shop Drawings Projects, Bill of Quantities and Estimates
Approach Reports and Specifications, Contitution The Tender Documents
COMPANY PROFILE

POTABLE WATER PLANTS IN VARIOUS


WATER BASINS 4, Istanbul / Türkiye
(CEMA is a member of EMAY Group of Companies)
Client: ISKI
Works: Potable Water Distribution, Network and Plants
Services by Cema: The Hydraulic Calculations, Architectural, Mechanical, Electrical
and Layout Shop Drawings Projects, Bill of Quantities and Estimates Approach
Reports and Specifications, Contitution The Tender Documents

KASIMPASA RAIN WATER TUNNELS, DOLAPDERE AND BARUTHANE


5.4. WATER & ENVIRONMENT

STREAMS REMEDIATION WASTE WATER SEPARATOR CHANNELS


PROJECT, Istanbul / Türkiye
Client: ISKI
Works: Rain Water Tunnels (743 m)
Services by Cema: The Hydraulic Calculations, Architectural, Mechanical, Electrical
and Layout Shop Drawings Projects, Bill of Quantities and Estimates Approach
Reports and Specifications, Contitution The Tender Documents

ISKI CAVUSBASI TUNNELS, Istanbul / Türkiye


Client: Technical Structure
Works: Rain Water Tunnel
Services by Cema: The Hydraulic Calculations, Architectural, Mechanical, Electrical
and Layout Shop Drawings Projects, Bill of Quantities and Estimates Approach
Reports and Specifications, Contitution The Tender Documents
COMPANY PROFILE

K.U. UMUTTEPE CAMPUS


INFRASTRUCTURE PROJECT,
(CEMA is a member of EMAY Group of Companies)
Kocaeli / Türkiye
Client: Kocaeli University
Works: Substructure Projects
Services by Cema: The Hydraulic Calculations, Substructural and Layout Shop
Drawings Projects, Specifications, Bill of Quantities and Estimates, Constitution The
Tender Documents

BISTRICA STREAM REMEDIATION PROJECT, Prizren / Kosova


5.4. WATER & ENVIRONMENT

Client: Kosovo Ministry of Space and Environment


Works: Stream Remediation Project
Services by Cema: Site Survey, The Hydraulic Calculations, Architectural,
Mechanical, Electrical and Layout Shop Drawings Projects, Bill of Quantities and
Estimates Approach Reports and Specifications, Constitution The Tender
Documents

ASLANBUCAK INFRASTRUCTURE PROJECT, Antalya / Türkiye


Client: GATAB
Works: Waste Water and Clean Water Network Project
Services by Cema: The Hydraulic Calculations, Substructural and Layout Shop
Drawings Projects, Specifications, Bill of Quantities and Estimates, Constitution The
Tender Documents
COMPANY PROFILE

GOCEK ETIBANK MARINA, Mugla / Türkiye


(CEMA is a member of EMAY Group of Companies)
Client: Saglam GYO
Works: Marina Project (121.261 m²)
Services by Cema: Technical Consultancy and Project Management Services
5.4. WATER & ENVIRONMENT

PENDIK MARINA, Istanbul / Türkiye


Client: Saglam GYO
Works: Marina Project (72.000 m²)
Services by Cema: Technical Consultancy and Project Management Services

GOCEK PORUKLU MARINA, Mugla / Türkiye


Client: Saglam GYO
Works: Marina Project (19.992 m²)
Services by Cema: Technical Consultancy and Project Management Services
COMPANY PROFILE
COMPANY PROFILE

Sabiha Gokcen International Airport, Istanbul / Türkiye

Client : THY Teknik Inc.


(CEMA is a member of EMAY Group of Companies)
Scope of Works : Sabiha Gokcen HABOM (Aviation Maintenance)
Facilities:
▪ Wide Hangar, Narrow Hangar
▪ Storey Car Park, Car and Bus Park
▪ Energy Center, Chemical Depot
▪ Administration, Social and Personnel Buildings
▪ Treatment, Waste Storage Facilities, Water
Tanks
▪ Service Tunnels, Service Bridges

Services by Cema : Infrastructure Design (Detail design, BoQ,


Specifications and Tender Documentation)
(Total 35 hectare)
▪ Apron, roads and building drainage of rainwater
▪ Under Soil and foundation drainage
▪ Earthworks and optimization
▪ Water Supply
▪ Chemical waste water disposal
5.5. AIRPORTS

▪ Sewage disposal
▪ Site Fire Fighting Hydrant
▪ Irrigation
▪ Apron, Access Road, Vehicle Roads, Security
▪ Roads, Carparks, Crossroads and traffic signs
▪ Utility galeries
COMPANY PROFILE

Ataturk International Airport Expansion, Istanbul / Türkiye


Client : TAV Tepe Akfen Investment Construction &
(CEMA is a member of EMAY Group of Companies)
Operation Co.
Scope of Works : Infrastructure design (tender and shop drawings,
BoQ and Specifications) services for Ataturk Airport
Expansion (including Administration Building and
Car Parking)
Project : (Total 5,6 ha)
▪ Administrative Building
▪ Apron Expansion
▪ Car Parking
▪ Access Road
▪ Service Roads

Services by Cema : Infrastructure Design (Detail design, BoQ,


Specifications and Tender Documentation)
▪ Roads, car parking and building drainage of
rainwater
▪ Sewage disposal
5.5. AIRPORTS

▪ Site Fire Fighting Hydrant


▪ Existing infrastructure deplacement
▪ Access Road, Vehicle Roads, Security Roads,
▪ Carparks, Crossroads and covering details
COMPANY PROFILE

Esenboga International Airport Presidential Hangar,


Istanbul / Türkiye

(CEMA is a member of EMAY Group of Companies)


Client : State Airport Authority of Türkiye,
General Directorate (DHMI)

Scope of Works : Infrastructure design (tender and shop


drawings, BoQ and Specifications)
services for Esenboga
Airport Presidential Hangar : (Total 42 ha)
▪ Presidential Hangar and Maintenance
(Plane, helicopter)
▪ Water Reservoir
▪ Substation
▪ Security
▪ Fuel Reservoir
▪ Taxiway, Aprons, Vehicle Roads

Services by Cema : PAT, roads and building drainage of


rainwater
5.5. AIRPORTS

▪ Under Soil and foundation drainage


▪ Earthworks and optimization
▪ Water Supply
▪ Sewage disposal
▪ Site Fire Fighting Hydrant
▪ Irrigation
▪ PAT, Roads and Landscape Lighting
▪ PAT signalisation
COMPANY PROFILE

TAV Enfidha Zine Al Abidine Ben Ali International Airport,


Enfidha / Tunisia

Client : TAV Tepe Akfen Investment Construction & Operation Co. (CEMA is a member of EMAY Group of Companies)

Scope of Works : Infrastructure design (shop drawings and as-builts, BoQ) (including structural design of some
annex buildings) services for Enfidha Airport with capacity of 20.000.000 passenger/year:
(Total 160,00 km2)
▪ Passenger Ter., Freight Ter., Control Tow.
▪ Presidential Pavilion, Otels, Bussiness Aviation
▪ Administration, Logements
▪ Fuel Farm, Energy Center, Gas Stations, Substation
▪ Water Reservoirs, Water Treatment Plant
▪ Runway, Taxiway, Aprons, Vehicle Roads, Viaduct
▪ Annex Structure etc.

Services by Cema : Infrastructure System :


▪ Overflow protection of full site
▪ PAT, roads and building drainage of rainwater
▪ Under Soil and foundation drainage
▪ Earthworks and optimization Superstructure Design :
▪ Water Supply ▪ Passenger Viaduct
5.5. AIRPORTS

▪ Sewage disposal ▪ Water Reservoirs and Drill Wells


▪ Site Fire Fighting Hydrant ▪ Pump Stations, Oil Separators, Septic Tanks
▪ Irrigation ▪ Fuel Tanks
▪ PAT, Roads and Landscape Lighting ▪ Substations
▪ PAT signalisation ▪ Freight Terminal
▪ PAT, Access Road, Vehicle Roads, Security Roads, ▪ Waste Stock Building
Carparks, Crossroads and traffic signs
▪ Utility galeries
COMPANY PROFILE

ANKARA İSTANBUL
Rabat Sokak No: 10 06700 Kısıklı Caddesi No: 27 34662
Gaziosmanpaşa / ANKARA / TÜRKİYE Altunizade / İSTANBUL / TÜRKİYE
tel : +90 (312) 300 0 300 tel : +90 (216) 400 04 00
fax : +90 (312) 300 0 333 fax : +90 (216) 562 16 16

emay@emay.com

http://www.emay.com

You might also like