Grounding and bonding is the single most important practice for the protection of people and property.
The National Electric Code (NEC), NFPA 70, defines grounding and bonding and provides requirements
for the grounding of a building’s electrical system. In our industry, the TIA-607-B Commercial Building
Grounding (Earthing) and Bonding Requirements for Telecommunications is designed to enable
the planning, design, and installation of a telecommunications grounding and bonding system.

One of the biggest myths in the likelihood of electrical shock, equipment which type of system you’re installing!
telecommunications industry involves damage, and data contamination To bond all the components of the
the grounding and bonding of shielded from voltage and current noise. telecommunications infrastructure,
twisted-pair (STP) copper cabling the current TIA-607-B requires
Within a building, there is one common
systems. Throughout the industry, there the following (see Figure 1):
ground for all electrical systems, which
is a misconception that grounding
the NEC refers to as the grounding • Telecommunications main
and bonding of STP systems is more
electrode system. According to the grounding busbar (TMGB): The
difficult, more time consuming, and
NEC, the grounding electrode system TMGB is the central attachment
more technique sensitive. This is simply
is the responsibility of the electrical point for all components of the
not true. In this white paper, you will
contractor, and the telecommunications telecommunications system’s
learn how to properly ground and bond
installer NEVER actually installs a grounding (bonding) infrastructure.
an STP copper cabling system, and
grounding system unless he or she is also Located in the telecommunications
you will see that it is straightforward
a licensed electrical installer. However, entrance facility (TEF), the TMGB
and essentially no different than
the telecommunications contractor is is a predrilled copper busbar with
grounding and bonding a UTP system..
required to bond the components of the holes for use with standard-sized
telecommunications system and bond the lugs that must be insulated to ensure
Grounding and
entire system to a suitable ground point. it is electrically isolated from the
Bonding Basics wall or other mounting surface. The

You know that grounding and Bonding STP & UTP standard requires the TMGB to be
a.minimum of 6.3 mm (0.25 in) thick
bonding is absolutely necessary, Telecommunications
by 100 mm (4 in) wide and variable in
but what exactly is grounding and Systems length. The TMGB should be bonded
what is bonding? Let’s start with the
to the building’s nearest (within 30’)
definitions according to the NEC: Not only is grounding and bonding
grounding electrode system via the
important for the protection of the
• Grounding: Establishing a ac main service electrical panelboard
people and property, proper bonding
connection, whether intentional or located at the TEF. An alternate
of the telecommunications system
accidental, between an electrical solution is to attach the bonding
per the current TIA-607-B standard
circuit or equipment and the earth conductor to the nearest grounded
is also vital to ensure reliable data
or to some conducting body that ac electrical branch circuit panel. For
transmission performance. Proper
serves in place of the earth. additional redundancy, the TMGB
bonding is necessary to ensure that
must also be bonded to the nearest
the effects of unwanted noise signals
• Bonding: The permanent joining of ground point, which in most cases
(antenna effect) on telecommunications
metallic parts to form an electrically is the building’s structural steel.
cables do not interfere with the overall
conductive path that ensures electrical
network performance. Grounding and
continuity and the capacity to conduct • Telecommunications grounding busbar
bonding is also a life safety issue since
safely any current likely to be imposed. (TGB): The TGB is the attachment
metallic parts may become accidentally point for all telecommunications
Let’s clarify those definitions further. energized, causing an electrical hazard. systems and equipment in a specific
Grounding provides a path for surges telecommunications space. Therefore,
First and foremost, it’s imperative to
in the power systems, components. each telecommunications room
understand that the following bonding
When this happens, the electrons (TR) throughout the building should
requirements of a telecommunications
can damage any equipment in its have a TGB. Also a predrilled copper
system are applicable to both STP
path. Proper bonding, or achieving a busbar with holes for standard sized
and UTP systems. It doesn’t matter
common ground potential, reduces the

BROADBAND NETWORK SOLUTIONS /// WHITE PAPER


BONDING AND GROUNDING AMP NETCONNECT
COPPER CABLING SYSTEM

Roof ACEG: Alternating current


Red Iron equipment ground
Backbone Pathway BC: Bonding conductor
Suspended Ceiling Area
BCT: Bonding conductor for
TR TR
telecommunications
GE GE
EF: Entrance facility
ER: Equipment room
TGB TGB GE: Grounding equalizer
GEC: Grounding electrode
External building wall

Red Iron

External building wall


conductor
Building steel

Backbone Pathway
TBB: Telecommunications

Building steel
Suspended Ceiling Area
bonding backbone
TR TR TBB
TGB: Telecommunications
grounding busbar
TMGB: Telecommunications
TGB TGB main grounding
TBB
busbar
Red Iron TR: Telecommunications
Backbone Pathway room
Sleeve
Suspended Ceiling Area
ACEG TR TR
TBB within TBB
conduit
Primary Panel
board
cable
protection
Electrical TMGB TGB
EF
Source: BICSI TDM Manual
GEC BCT
Figure 1: Bonding and grounding system

lugs, the TGB must be at least 6.3 should also be bonded to the nearest telecommunications pathways and
mm (0.25) thick by 50 mm wide ground point, which in most cases is spaces (independent of cable). The
(2 in). TGBs must be insulatedw to the building’s structural steel. Each size of the TBB is dependent on the
ensure they are electrically isolated TGB should be bonded to the TMGB length, up to a maximum size of
from the wall or other mounting via the TBB if specified (see below). 3/0 AWG for lengths greater than
surface. A bonding connection should 20 meters (66 feet). The TBB is an
• Telecommunications bonding
always be made to the equipment optional design method. Each TGB
backbone (TBB): The TBB is a 6
grounding busbar located in the should be bonded to the ac electrical
AWG or larger grounding (bonding)
nearest electrical panel board that panel board servicing that floor with
conductor that bonds all TGBs
supplies the ac electrical power. For a supplemental bonding connection
with the TMGB as part of the
additional redundancy, each TGB to the metal frame of the building.

PROPER GROUNDING AND BONDING IS A SIZEABLE JOB.


Proper grounding and bonding is a sizeable job whether it is UTP or STP, and there is virtually no difference in
the requirements between the two. It’s as simple as properly terminating the shielded jack and using shielded
components throughout the channel. In today’s IT world, it is VITAL for customers who rely so heavily on
their communication system to ensure proper grounding and bonding – whether it’s a UTP or STP system.

PAGE 3
BONDING AND GROUNDING AMP NETCONNECT
COPPER CABLING SYSTEM

• Grounding Equalizer (GE): Whenever Once all of the components of the complete. This process is absolutely no
two or more TBBs exist in a multistory telecommunications infrastructure are different than what is required for UTP
building, they must be bonded properly bonded, the system must be systems. The most common problem with
together with a GE at the top floor and bonded to the building’s ground, which grounding and bonding occurs when the
at every third floor in between. The provides a connection to the earth. When patch panel and racks are not properly
GE is also sized the same as the TBB. the telecommunications system is bonded bonded to the TGB – and that problem
to the building’s ground, it is at the same applies to both UTP and STP systems.
• Bonding conductor for ground potential as other electrical
telecommunications (BCT): From the systems in the building. This is achieved Grounding & Bonding
telecommunications entrance facility, by bonding the TMGB and all TGBs to the
the TMGB is bonded to the building’s at the Workstation
building’s grounding electrode system.
grounding electrode system with the Many installers question if they are
BCT. The BCT is also sized like the Straightforward supposed to ground and bond an STP
TBB and GE at a minimum of 6 AWG. cabling system at both ends – the TR
Answers to STP
and at the workstation. The answer is
There is often confusion about what
STP cable and connectivity has been on much simpler and more straightforward
components of the telecommunications
the market for many years and have been than you might think. The easiest way
infrastructure should be bonded. To
widely deployed and proven throughout to look at grounding and bonding
determine what should be bonded,
the world. STP has always offered of a system at the workstation is to
installers need to ask themselves if
better RFI/EMI immunity, security, and consider the difference between a
a metallic component is attached
an electrically superior performance. permanent link and a channel.
to the telecommunications cabling
With 10 Gigabit Ethernet over copper
infrastructure, or if it comes in contact • Permanent Link: The permanently
now a reality, the performance of
with any other metallic component installed horizontal cable and
STP systems offers significantly more
attached to the infrastructure. If the connecting hardware from the
headroom over 10 Gigabit UTP systems.
answer is yes, it must be bonded. workstation outlet to the patch panel
Furthermore, STP offers a smaller cable
That includes the following: in the telecommunications room.
diameter and better fill ratio, providing
• Racks higher density and cost savings. • Channel: An end-to-end
transmission path, which includes
• Ladders While performance and density prevail
the horizontal permanent link,
for STP, one of the biggest myths
• Enclosures plus patch cords on either end
surrounding STP is that installation
to connect the communications
is more time consuming and difficult
• Equipment like patch panels, hardware (i.e. switch, laptop, PC).
due to grounding and bonding issues.
routers, and switches
But grounding and bonding of an STP In a permanent link, the shield is
• Surge protection devices system is absolutely no different than bonded to ground only at the TR end
with UTP. In this section, we will take as previously described above. The
• Metallic cable tray the guesswork out of grounding and workstation end of the permanent link
bonding STP systems by providing
In each TR, the metallic components are is not bonded to ground. This is the
answers to common questions and
bonded to the TGB with a grounding same for both UTP and STP systems.
setting straight the misconceptions.
(bonding) conductor using two-
In a channel, the bonding of the
hole lugs. Code requires all clamp
and compression connections to be Grounding & Bonding permanent link shield to ground at
the workstation end is accomplished
UL 486A listed. When bonding in the TR
by connecting a shielded patch cord
patch panels, racks, and other Grounding and bonding of STP systems between the outlet and the equipment.
painted equipment or components in the TR is done exactly as described This results in a ground condition at both
to the TGB, a low resistance path is in the standard – by bonding the ends of the channel. It’s as simple as that!
achieved by scraping the paint or patch panels, racks, and other metallic Computers and networking equipment
other means that will assure a good components to the TGB. Shielded all include shielded jacks where the
ground. At Tyco Electronics, we patch panels, jacks, and cable have the shield of the jack is bonded to the
provide a paint piercing star washer grounding and bonding built in. So once ground conductor of the electrical cord.
with TE Connectivity patch panels to the cable is properly terminated to the Absolutely no special jacks or interface
avoid having to scrape paint and to jack and the jack mounted to the patch cards are required. The equipment
ensure a proper bonding connection. panel, the bonding and grounding is is grounded through the electrical

BROADBAND NETWORK SOLUTIONS /// WHITE PAPER


BONDING AND GROUNDING AMP NETCONNECT
COPPER CABLING SYSTEM

receptacle, tying both the electrical and Some may want to have their grounding
telecommunications system to ground. and bonding system independently
tested or certified by a qualified electrical
Even if a shielded patch cord is not contractor or engineer. Locating an
used, or the workstation equipment is independent grounding and bonding test
not grounded through the electrical engineer may be difficult, but if you do
receptacle, the channel is tied to ground request a certified test, do your research
back in the telecommunications room, and only use qualified consultants.
which prevents the risk of electrical shock

Testing for Ground Summary


Grounding Busbar
Loops and Proper In the past, little was known about
properly grounding and bonding
Grounding & Bonding
telecommunications systems. As
TGB In an electrical system, a ground loop a result, many problems occurred.
refers to an unwanted current that Because the first generation of
flows in a conductor connecting two telecommunications cabling was
points that are at different voltages. shielded, many associated grounding
Another misconception surrounding and bonding issues with these systems.
shielded cable is that ground loops will But times have changed. Grounding and
always be a problem. However, ground bonding is now a science that qualified
loops that affect network performance installers understand and practice,
Maintaining Continuity can only occur when a system has and STP cabling and components
of the Shield from more than one path to ground and have evolved dramatically since the
the voltage difference between the early days of inception. The problems
Cable to Plug to Jack
two points are more than 1 Volt. If the associated with previous versions of
In an STP system, the shield should components of a telecommunications shielded systems are no longer.
completely surround the cable along system are properly bonded, and
Proper grounding and bonding is a
its entire length, and the shield should the system is effectively bonded to
sizeable job whether it is UTP or STP,
remain continuous along the entire length the building’s grounding electrode
and there is virtually no difference in the
of the channel from the transmitter system, there is virtually no condition
requirements between the two.
to receiver. This is accomplished where a ground loop is possible..
Yes, the shield must maintain continuity
by using only shielded products
The only way to ensure proper grounding throughout a channel, but achieving that
throughout the entire channel, from
and bonding for either a UTP or STP condition does not require any additional
cable to plug to jack to patch panel.
system is to test upon completion. labor or technique. It’s as simple as
Proper installation is also central to Ground potential difference should properly terminating the shielded
maintaining continuity of the shield. When not exceed 1 Volt. Testing for ground jack and using shielded components
terminating a shielded jack, the shield potential difference can be done using throughout the channel. In today’s IT
must make contact with the connector. an Earth Ground Resistance Tester with world, it is VITAL for customers who rely
With some of the newer technology in the entire building in operation. In other so heavily on their communication system
connecting hardware available today, words, nothing needs to be shut down to ensure proper grounding and bonding
ensuring that contact is quite simple. For to test the grounding and bonding. – whether it’s a UTP or STP system.
example, Tyco Electronics’ AMPTWIST Earth Ground Resistance Testers can
shielded jacks are all metal and feature be purchased pretty much anywhere
a spring-loaded cable strain relief that telecommunications testers are sold. For more information on grounding and
automatically provides a 360-degree bonding and installing an TE Connectivity
It is imperative to test the potential
contact to the terminated shield. In shielded cabling system, contact
difference between the TMGB and
fact, the entire process of terminating customer service at
the electrical ground and between
an AMP NETCONNECT shielded jack 1-800-553-0938.
the TMGB and each TGB. Within
to STP cable takes 60 seconds or less. For more information on the
the telecommunications space,
Once the jack is properly terminated, TIA-607-B Grounding and Bonding
testing should also be done between
simply placing the jack in the patch S tandard visit www.tiaonline.org.
the TGB and all racks, cable tray,
panel provides the electrical bond
and electronic equipment.
between the panel and the shield.

PAGE 5
te.com
WHITE PAPER
TE Connectivity, TE Connectivity (logo) and Every Connection Counts are trademarks. All other logos, products
and/or company names referred to herein might be trademarks of their respective owners.
Contact us
The information given herein, including drawings, illustrations and schematics which are intended for illustration
P.O. Box 1101
purposes only, is believed to be reliable. However, TE Connectivity makes no warranties as to its accuracy or
Minneapolis, Minnesota
completeness and disclaims any liability in connection with its use. TE Connectivity‘s obligations shall only be
USA 55440-1101
as set forth in TE Connectivity‘s Standard Terms and Conditions of Sale for this product and in no case will TE
Connectivity be liable for any incidental, indirect or consequential damages arising out of the sale, resale, use Tel: 1-800-366-3891 x73000
or misuse of the product. Users of TE Connectivity products should make their own evaluation to determine the 1-952-917-3000
suitability of each such product for the specific application.
Fax: 1-952-917-3237
© 2014 TE Connectivity Ltd. family of companies All Rights Reserved.
www.te.com/bns
320116AE 04/15 Original 2015

BROADBAND NETWORK SOLUTIONS /// WHITE PAPER

You might also like