Task performed :
Reading and understanding the PPR report of MRTS phase 3rd metro Corridors in Hyderabad
MRTS phase 3 Corridors in Hyderabad
PPR report
A PPR or Preliminary Project Report, plays a vital role in mitigating risks and ensuring a project's success in
construction. Here's a breakdown of its function:
1. The PPR report includes a thorough examination and evaluation of the plans, budgets, and project
documentation. This thorough evaluation assists in identifying possible issues, omissions, or
mistakes that can later cause delays, cost overruns, or even legal conflicts.
2. Through the early identification of these possible obstacles it helps to decide on the project's
feasibility and associated hazards with knowledge before any work is done.
3. The project's budget and schedule are optimized with the use of a PPR report. Before construction
starts, the report's identification of potential overruns in costs or unrealistic schedules enables cost-
saving and course-correction measures to be put in place.
Task performed : :
Comparison and Change Analysis of Addendum 1 and 2 of CMRL- Phase II -GC-1(NKAB) Staffing
Schedule and Explain changes to Senior Vice President
In this i have thoroughly gone through two Addendums of Chennai metro rail project ongoing project to find
out the the parameters causing change in Total billing Amount .
After carrying out thorough analysis i came into conclusion that basically two parameters are the cause es of
change in Total amount. Viz 1.Man Months 2.Bill rate
I tracked down changes for all position codes,Sorted in the order of Package with respect to addendum 2
After analysis i prepared 6 different spreadsheets
1. Addendum Comparison Observation sheet
2. Increase in Man Months of positions of INR payments
3. Reduction in Man Months of positions of inr payments
4. Reduction in Man Months of positions of USD payments
5. New Job Positions in INR
6. New Job Positions in USD
7. Reduction in Total Billing Amount of Position (INR payment)
8. Reduction in Total Billing Amount of Position (USD payment)
after preparing these sheets i had explained them to Senior Vice President sir
Deduce a method to make work easy and fast.
I was given the Monthly Attendence sheets of Aarvee Associates and Urban New employee positions
deployed at CMRL project site.
Following operations were performed by me
• Sorted the Positions in ascending order of employee codes so that it could be easy to track.
• Extracted data from monthly Attendence sheet of years 2022,2023 and 2024 and put them in a
summary sheet for Comparison between CMRL attendence data with respect to Aarvee to check if
there is a discrepancy in recorded data using commands of VLOOKUP, etc.
• Checked for any Resignations and new deployment in place of those Resignations.
• Linked the yearwise overall Manmonths to the summary sheet and Addendum sheets,so that any
change input in yearly sheet should reflect in Summary sheet and addendum sheet subsequently
1. Preparing Draft CVs of candidates to deployed at CMRL site by Reading and Extracting information from
their Resumes and preparing Draft CVs of candidates to deployed at CMRL site by Reading and Extracting
information from their Resumes and Cvs.
2. Followed up the candidates for missing required information in CMRL draft CV in their Resume or CV.
3. Matched the Information in the CV from the Candidate Documents such as Marksheets ,Experience
certificates etc.
1. Preparing Draft CVs of candidates to deployed at CMRL site by Reading and Extracting information from
their Resumes and preparing Draft CVs of candidates to deployed at CMRL site by Reading and Extracting
information from their Resumes and Cvs.
2. Followed up the candidates for missing required information in CMRL draft CV in their Resume or CV.
3. Matched the Information in the CV from the Candidate Documents such as Marksheets ,Experience
certificates etc.
Learnings : Good experience with interacting with Candidates having Expertize in the field and long working
experience in India and Foreign countries.
1. Extracting out abbrevations from the inception report of preparation of detailed project report (dpr) for
introducing mass rapid transit system between poonamalle and Parandur as part of cmrl network and putting
them in draft report for submission to the client .
2. Preparing Draft CVs of candidates to deployed at CMRL site by Reading and Extracting information from
their Resumes and Preparing Draft CVs of candidates to be deployed at CMRL site
2. Followed up the candidates for missing required information of CMRL draft CV
3. Matched the Information in the CV from the Candidate Documents such as Educational
Marksheets ,Experience certificates etc.
Week 8 : 8 July to 12 July 2024
1.Reading and understanding Request for proposal Report of preparation of Detailed Project Report
(DPR) for Mass Rapid Transit System In Madurai
Preparing Draft CVs of candidates to deployed at CMRL site by Reading and Extracting information from
their Resumes and professional CVs
2. Followed up the candidates for missing required information of CMRL draft CV
3. Matched the Information in the CV from the Candidate Documents such as Educational
Marksheets ,Experience certificates etc.