Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 5

Maintenance Instruction

Control Cabinets

RIG/PLANT REFERENCE REFERENCE DESCRIPTION


Pride No 1 V1379 Mud Control Systems
ADDITIONAL CODE SDRL CODE TOTAL PGS
5.3 5 This document contains proprietary and confidential National Oilwell Norway AS
information which belongs to National Oilwell Varco; it is P.O. Box 168
REMARKS loaned for limited purposes only and remains the property
of National Oilwell Varco. Reproduction, in whole or in N-1371 ASKER
part; or use of this design or distribution of this information NORWAY
MAIN TAG NUMBER DISCIPLINE to others is not permitted without the express written
consent of National Oilwell Varco. This document is to be
returned to National Oilwell Varco upon request and in Phone +47 64 00 50 00
CLIENT PO NUMBER any event upon completion of the use for which it was Fax +47 66 90 23 53
loaned.
© Copyright National Oilwell Varco - 2008

CLIENT DOCUMENT NUMBER DOCUMENT NUMBER REV

V1379-Z-MA-005 0

www.nov.com
Document number V1379-Z-MA-005
Revision 0
Page 2 of 5

REVISION HISTORY

0 09.09.2008 For Information TOHE INLO TOHE


Rev Date (dd.mm.yyyy) Reason for issue Prepared Checked Approved

CHANGE DESCRIPTION

Revision Change description


0

www.nov.com
Document number V1379-Z-MA-005
Revision 0
Page 3 of 5

TABLE OF CONTENTS

1 MAINTENANCE INSTRUCTIONS...................................................................................4
1.1 Periodic maintenance............................................................................................ 4
1.1.1 Visual Inspection, Control cabinets............................................................4
1.1.2 Electrical Checks/Maintenance..................................................................4
1.1.3 Mechanical checks and maintenance........................................................4
1.1.4 General sensor maintenance.....................................................................5
1.1.5 Cleaning.....................................................................................................5
1.2 Corrections and minor repairs................................................................................5
1.3 Major repairs and modifications.............................................................................5

www.nov.com
Document number V1379-Z-MA-005
Revision 0
Page 4 of 5

1 MAINTENANCE INSTRUCTIONS

1.1 Periodic maintenance


The control cabinets require only minimum maintenance. The field equipment should be
part of the general maintenance schedule for the rig.

Specific functions and applications are described in User Manual section 3.

It is very important that errors and unexpected operations are documented in


writing and as detailed as possible. A copy of these reports should be sent to
National Oilwell Varco’s service/support department.

1.1.1 Visual Inspection, Control cabinets

Visual inspection/maintenance on a monthly basis:


 Check the cabinets’ interior for moisture, cleanliness and damages.
 Check filters in cabinet doors.
 Check all equipment for abnormal conditions such as discoloration due to high
temperature, corrosion damages etc.

1.1.2 Electrical Checks/Maintenance

Inspection/maintenance on a monthly basis:


 Check that all wiring and grounding are still in perfect condition.

Inspection/maintenance on a yearly basis:


 Check / tighten all terminal, plugs and sockets screws at least once a year to
avoid loose connections.

1.1.3 Mechanical checks and maintenance

Inspection/maintenance on monthly basis:


 The control cubicle should be checked and inspected for mechanical damage,
cleanliness, moisture, corrosion and wear and tear both externally as well as
internally as a part of the periodic maintenance. Any deviations or errors should
be repaired immediately to avoid more serious problems to develop.

www.nov.com
Document number V1379-Z-MA-005
Revision 0
Page 5 of 5

1.1.4 General sensor maintenance


Inspection/maintenance on monthly basis:
 Check/tighten all sensors and sensor mounting details to avoid loosed fixation.
 Check all sensors for moisture, cleanliness and damages.

All the sensors used in this system are standard equipment and they are supplied with a
sub-supplier manual containing maintenance instructions, refer User Manual section 11.
These manuals are to be considered as the main source of maintenance instructions,
but special maintenance required due to application/installation is mentioned in this
document if applicable.

1.1.5 Cleaning
Conditioned that the control cabinet is located in a clean and dry area, no regular
cleaning is required.

1.2 Corrections and minor repairs

If any physical work is to be done on the control cabinet, the power shall be turned off
using the main switch, ref Circuit Diagrams in section 10.3, or necessary safety
precautions must be taken if any work is to be done on a hot cabinet.

Normally corrections are limited to replacement of broken parts.

1.3 Major repairs and modifications

Only to be done by qualified National Oilwell Varco personnel.

www.nov.com

You might also like