SEQUENCING
L110
L45
L22
L30
L07
L05
Variable speed
L-SR Compressor Sequencing
• When the L-SR variable speed compressor is
used in conjunction with a new or existing
“on-load / off-load” machine; a compressor
sequencer is not necessarily required.
• The following slides will show how to set up
these machines to operate efficiently
together.
L-SR Compressor Sequencing
• Before we begin, there are a couple of
important points:
The L55 still runs full load and the L75 SR slows down to
hold 6.5 Bar.
L-SR Compressor Sequencing
L55 Control Points L75 SR Control Points
7.2 P1 – Unload Pressure
Unload Pressure 7.0
When the pressure reaches 7.0 Bar, the L55 unloads (and
times out) while the L75 SR continues to run at minimum
speed.
L-SR Compressor Sequencing
L55 Control Points L75 SR Control Points
7.2 P1 – Unload Pressure
Unload Pressure 7.0
It’s now 8:00 AM; and production starts using 150 CFM. The
header pressure starts to fall.
L-SR Compressor Sequencing
L55 Control Points L75 SR Control Points
7.2 P1 – Unload Pressure
Unload Pressure 7.0
As long as the plant air demand stays below 431 CFM, the
L75 SR matches the air demand, keeping the header
pressure constant to within + 0.016 Bar of the target!
L-SR Compressor Sequencing
L55 Control Points L75 SR Control Points
7.2 P1 – Unload Pressure
Unload Pressure 7.0
Once the header reaches 6.2 Bar, the L55 reloads making
346 CFM. With the L75 SR making full flow, the air
pressure rises back up.
L-SR Compressor Sequencing
L55 Control Points L75 SR Control Points
7.2 P1 – Unload Pressure
Unload Pressure 7.0
The L55 unloads, and the pressure falls. As it reaches 6.5 Bar,
the L75 SR speeds up again to carry the 212 CFM load.
L-SR Compressor Sequencing
L55 Control Points L75 SR Control Points
7.2 P1 – Unload Pressure
Unload Pressure 7.0
All through the day, the process repeats itself. At times the
L75 SR is varying its speed to handle the demand all by
itself, while the L55 is off.
L-SR Compressor Sequencing
L55 Control Points L75 SR Control Points
7.2 P1 – Unload Pressure
Unload Pressure 7.0