PROPOSED 24 METER W

IDE
RR
OW

95.1 95.2 95.3 98 91


BUILDING NO. 27
87 10
85
89 88
10

W
E RRO
WID
TER 109
ME
24
ED
POS 92 93
PRO 110 107 99 96 97 94.1 94.2 94.3
86 84

100 106 108


90

29.2 29.1
29
71.5 70.2

OW
70.3 45 83
49 83

RR
53 52 46 29.3
71.2
70.5
50

E
100

WID
71.3
54
55

METER
70.4
43 42
70.6 MONUMENT
AREA A
65 70 11
71.2 70.2 82

24
70.5
71 70.1

ED
POS
44
71.6 71.4 71.1

PRO
10
111

26
38
44 5
PARKING

63 62
3

15 15 24
PARKING 1 PARKING
MONUMENT
AREA B 69

8 8
PARKING PARKING 68
6
25
TANK
DISPLAY
FORMATION GROUND
SEC CHECKING
32
PARKING 8

72 UN AVENUE
3
UN AVENUE
E
LOOS
G ON
RKIN ARSE
69 PA EL CO
GRAV

4
UE
EN 59
AV
UN

29.3

74

73.5

73.5

73.3

73.2
73.7
73.6
UE

29
EN

FOR FUTURE
AV

EXPANSION
UN

73.4
60
28

27
61

10 51 64
73.1

47
W
O 48
R
R
E 40
ID 73
W
R
E 37
T
E
UP

M 56
4 35
2
D 17.1
E
S
O 19.1
P
RAMP
DN

16.1
O 2.30M DROP
2.20M DROP

R 17.2
P 29.3 36 76
39 UP

79 UP

4 LEVELS @.45M
3.00M

17.10 17.3
57 4 LEVELS @.45M
3.00M 17.24
78

17.11 17.4 32 31
32 17.23 GENSET 5
58 16.2
E
UP

17.12 17.5
U

17.22 19.2
N

ECO WASTE
TRUCK
E

PARKING
AREA
V

80 17.6
UP
A

17.13 17.21 UP

17.30
N
U

4.7 77 17.7 17.20


17.14 +3.67

41.3 17.8 17.29


17.19
29 41.1 23.1 17.15 17.9
17.28
4.6 +67.80
+3.67

41.4 23.2 17.16 +67.60

+66.55
+4.20
17.27
4.3 +3.15
+67.70

17.17 17.26
81 +65.50 +67.60
+4.20
+2.10 +66.55
+65.50 +3.15
33
17.18 +2.10
16.3
UP

RET

17.25
L
WAL

41.2
AINI

34
UP

NG
NG

+67.60 WAL
AINI

+4.20 L
RET

+65.50
+2.10

+65.50

GENSET 6
UP

+2.10

+1.05
K

+65.50 12 STEPS
DEC

+64.45
+2.10 +63.00
VIEW

+1.57

23.3
18 STEPS

23.8 +65.50
+1.05
+64.97

+4.72
+64.97
6
STE
PS
+2.62
+66.02 19.3
+64.45
+1.57
+2.10 +0.0

29 +0.0
+63.4 +64.97

23.4 23.7
+1.05 +64.45
+0.0
+1.05
UP

4.2
MONUMENT AREA C
23.5 23.6
KILL ZONE 15
4.5
21.1
UP

10 STEPS DN
12

4
5
6 UP
36.4 10
UP

19.4 7

14 12
4.1
UP

21.2
4.4 13
18.2
UP

101.2 4.4
UE
EN 21.3
AV
OW UN 18.4 19.5 UP

RR
UP

101.3
DE
WI
UP

R
TE 7.6
ME 101.1 21.4
24 7.6
E D 101.4
OS
OP 18.1
PR 18.3
21.5
UP

7.1
UP

102
7.3 7.7 18.6
18.5
10
21.6
UP
UP

7.6 105.2 22
75 18.9
7.4 21.8 21.7
20.2
7.2 105.1 18.7 8
UE 18.8
EN
36.2 7.5 AV 103.3 20.5
UN

103.2

9 103.1
20.1
104.2
STP-1
104.1 20.4
103.6

103.5

103.4

20.3

30
9

66
STP-2

36.3 PMC MASTER PLAN - SCHEME 1

10
PMC MASTER PLAN - SCHEME 1

CONSULTANT: DESIGNED BY: OWNER: PROJECT TITLE: DRAWN BY DRAWN DATE REVISIONS SHEET CONTENTS: SHEET NO.
SYM DESCRIPTION BY DATE

BASES CONVERSION AND CONSTRUCTION OF VARIOUS CHECKED BY CHECKED DATE

DEVELOPMENT AUTHORITY
LUIS I. MALLONGA MARIA TERESA P. ELLOVIDO STRUCTURES AND FACILITIES AT
PROJECT MANAGER SANITARY ENGINEER
BATAAN TECHNOLOGY PARK - PACKAGE 2 DESIGNED BY DESIGNED DATE

PTR NO. 7031457 REG NO. 0021873 PTR NO. 7031480 REG NO. 1608
ISSUED ON 01-13-2021 ISSUED AT VALENZUELA CITY ISSUED ON 01-13-21 ISSUED AT VALENZUELA CITY MARK P. TORRES PROJECT CODE:
OFFICER-IN-CHARGE LOCATION: REVIEWED BY REVIEWED DATE
T.I.N. 109-385-825 T.I.N. 152-451-264
ENGINEERING AND SOCIAL SUPPORT DEPARTMENT MORONG, BATAAN B-B19-040
1 1' 2 3 4 5 6 7 8 9 10 11 11' 12
59500

8300 3450 4850 3200 5550 2800 3200 2800 5550 3200 4850 3450 8300

A
5200

STAGE
UP UP

B
7400

DN DN DN DN DN DN DN DN DN

112 SEATS VIP AREA 112 SEATS


90 SEATS

DN DN DN DN DN DN
23100

PUBLIC AREA
PUBLIC AREA

C
UP UP
3200

FEMALE TOILET 16
PWD TOILET MALE TOILET 27-106 PWD TOILET
27-117 27-115 27-107
D MONOBLOCK STORAGE
27-114 MEDIA CONTROL RM &
RAMP VIP RECIEVING AREA VIP LOUNGE RAMP
PUBLIC AFFAIRS OFFICE DN
DN 27-111 27-109 JANITOR ROOM
3900

27-108
27-105

JANITOR RM. STORAGE


27-116 27-118
UP UP
E RC RAMP W/
CONCRETE PUBLIC RC RAMP W/
FLOOR HARDENER PUBLIC ENTRY CONCRETE
3400

ENTRY PANTRY FLOOR HARDENER


LOBBY MALE TOILET
27-112
TOILET 27-101 27-104
27-113

FEMALE TOILET.
27-103
UP
EE RM.
27-102

CONSULTANT: DESIGNED BY: OWNER: PROJECT TITLE: DRAWN BY DRAWN DATE REVISIONS SHEET CONTENTS: SHEET NO.
SYM DESCRIPTION BY DATE

BASES CONVERSION AND CONSTRUCTION OF VARIOUS CHECKED BY CHECKED DATE

DEVELOPMENT AUTHORITY
LUIS I. MALLONGA MARIA TERESA P. ELLOVIDO STRUCTURES AND FACILITIES AT
PROJECT MANAGER SANITARY ENGINEER
BATAAN TECHNOLOGY PARK - PACKAGE 2 DESIGNED BY DESIGNED DATE

PTR NO. 7031457 REG NO. 0021873 PTR NO. 7031480 REG NO. 1608
ISSUED ON 01-13-2021 ISSUED AT VALENZUELA CITY ISSUED ON 01-13-21 ISSUED AT VALENZUELA CITY MARK P. TORRES PROJECT CODE:
OFFICER-IN-CHARGE LOCATION: REVIEWED BY REVIEWED DATE
T.I.N. 109-385-825 T.I.N. 152-451-264
ENGINEERING AND SOCIAL SUPPORT DEPARTMENT MORONG, BATAAN B-B19-040
1 1' 2 3 4 5 6 7 8 9 10 11 11' 12
59500

8300 3450 4850 3200 5550 2800 3200 2800 5550 3200 4850 3450 8300

A
5200

LINE OF ROOF ABOVE


STAGE
DN DN

B
7400

VIP AREA
23100

PUBLIC AREA PUBLIC AREA

C 100 SEATS
DN DN
100 SEATS
DN DN
3200

DN DN DN DN
D CONTROL RM FOR
CONTROL PANELS EMCEE BOOTH
27-201 27-202
3900

SLOPE
STORAGE STORAGE
SLOPE
27-203 27-204
E
3400

SLOPE

SLOPE

CONSULTANT: DESIGNED BY: OWNER: PROJECT TITLE: DRAWN BY DRAWN DATE REVISIONS SHEET CONTENTS: SHEET NO.
SYM DESCRIPTION BY DATE

BASES CONVERSION AND CONSTRUCTION OF VARIOUS CHECKED BY CHECKED DATE

DEVELOPMENT AUTHORITY
LUIS I. MALLONGA MARIA TERESA P. ELLOVIDO STRUCTURES AND FACILITIES AT
PROJECT MANAGER SANITARY ENGINEER
BATAAN TECHNOLOGY PARK - PACKAGE 2 DESIGNED BY DESIGNED DATE

PTR NO. 7031457 REG NO. 0021873 PTR NO. 7031480 REG NO. 1608
ISSUED ON 01-13-2021 ISSUED AT VALENZUELA CITY ISSUED ON 01-13-21 ISSUED AT VALENZUELA CITY MARK P. TORRES PROJECT CODE:
OFFICER-IN-CHARGE LOCATION: REVIEWED BY REVIEWED DATE
T.I.N. 109-385-825 T.I.N. 152-451-264
ENGINEERING AND SOCIAL SUPPORT DEPARTMENT MORONG, BATAAN B-B19-040
1 1' 2 3 4 5 6 7 8 9 10 11 11' 12

61200
700 8300 3450 4850 3200 5550 2800 3200 2800 5550 3200 4850 3450 8300 1000

A
2450
5200

B
7400

SLOPE SLOPE SLOPE SLOPE

C
3200

27100

D
3900

E
3400

F
6350

SLOPE SLOPE SLOPE SLOPE

CONSULTANT: DESIGNED BY: OWNER: PROJECT TITLE: DRAWN BY DRAWN DATE REVISIONS SHEET CONTENTS: SHEET NO.
SYM DESCRIPTION BY DATE

BASES CONVERSION AND CONSTRUCTION OF VARIOUS CHECKED BY CHECKED DATE

DEVELOPMENT AUTHORITY
LUIS I. MALLONGA MARIA TERESA P. ELLOVIDO STRUCTURES AND FACILITIES AT
PROJECT MANAGER SANITARY ENGINEER
BATAAN TECHNOLOGY PARK - PACKAGE 2 DESIGNED BY DESIGNED DATE

PTR NO. 7031457 REG NO. 0021873 PTR NO. 7031480 REG NO. 1608
ISSUED ON 01-13-2021 ISSUED AT VALENZUELA CITY ISSUED ON 01-13-21 ISSUED AT VALENZUELA CITY MARK P. TORRES PROJECT CODE:
OFFICER-IN-CHARGE LOCATION: REVIEWED BY REVIEWED DATE
T.I.N. 109-385-825 T.I.N. 152-451-264
ENGINEERING AND SOCIAL SUPPORT DEPARTMENT MORONG, BATAAN B-B19-040
CONSULTANT: DESIGNED BY: OWNER: PROJECT TITLE: DRAWN BY DRAWN DATE REVISIONS SHEET CONTENTS: SHEET NO.
SYM DESCRIPTION BY DATE

BASES CONVERSION AND CONSTRUCTION OF VARIOUS CHECKED BY CHECKED DATE

DEVELOPMENT AUTHORITY
LUIS I. MALLONGA MARIA TERESA P. ELLOVIDO STRUCTURES AND FACILITIES AT
PROJECT MANAGER SANITARY ENGINEER
BATAAN TECHNOLOGY PARK - PACKAGE 2 DESIGNED BY DESIGNED DATE

PTR NO. 7031457 REG NO. 0021873 PTR NO. 7031480 REG NO. 1608
ISSUED ON 01-13-2021 ISSUED AT VALENZUELA CITY ISSUED ON 01-13-21 ISSUED AT VALENZUELA CITY MARK P. TORRES PROJECT CODE:
OFFICER-IN-CHARGE LOCATION: REVIEWED BY REVIEWED DATE
T.I.N. 109-385-825 T.I.N. 152-451-264
ENGINEERING AND SOCIAL SUPPORT DEPARTMENT MORONG, BATAAN B-B19-040
CONSULTANT: DESIGNED BY: OWNER: PROJECT TITLE: DRAWN BY DRAWN DATE REVISIONS SHEET CONTENTS: SHEET NO.
SYM DESCRIPTION BY DATE

BASES CONVERSION AND CONSTRUCTION OF VARIOUS CHECKED BY CHECKED DATE

DEVELOPMENT AUTHORITY
LUIS I. MALLONGA MARIA TERESA P. ELLOVIDO STRUCTURES AND FACILITIES AT
PROJECT MANAGER SANITARY ENGINEER
BATAAN TECHNOLOGY PARK - PACKAGE 2 DESIGNED BY DESIGNED DATE

PTR NO. 7031457 REG NO. 0021873 PTR NO. 7031480 REG NO. 1608
ISSUED ON 01-13-2021 ISSUED AT VALENZUELA CITY ISSUED ON 01-13-21 ISSUED AT VALENZUELA CITY MARK P. TORRES PROJECT CODE:
OFFICER-IN-CHARGE LOCATION: REVIEWED BY REVIEWED DATE
T.I.N. 109-385-825 T.I.N. 152-451-264
ENGINEERING AND SOCIAL SUPPORT DEPARTMENT MORONG, BATAAN B-B19-040
CONSULTANT: DESIGNED BY: OWNER: PROJECT TITLE: DRAWN BY DRAWN DATE REVISIONS SHEET CONTENTS: SHEET NO.
SYM DESCRIPTION BY DATE

BASES CONVERSION AND CONSTRUCTION OF VARIOUS CHECKED BY CHECKED DATE

DEVELOPMENT AUTHORITY
LUIS I. MALLONGA MARIA TERESA P. ELLOVIDO STRUCTURES AND FACILITIES AT
PROJECT MANAGER SANITARY ENGINEER
BATAAN TECHNOLOGY PARK - PACKAGE 2 DESIGNED BY DESIGNED DATE

PTR NO. 7031457 REG NO. 0021873 PTR NO. 7031480 REG NO. 1608
ISSUED ON 01-13-2021 ISSUED AT VALENZUELA CITY ISSUED ON 01-13-21 ISSUED AT VALENZUELA CITY MARK P. TORRES PROJECT CODE:
OFFICER-IN-CHARGE LOCATION: REVIEWED BY REVIEWED DATE
T.I.N. 109-385-825 T.I.N. 152-451-264
ENGINEERING AND SOCIAL SUPPORT DEPARTMENT MORONG, BATAAN B-B19-040
CONSULTANT: DESIGNED BY: OWNER: PROJECT TITLE: DRAWN BY DRAWN DATE REVISIONS SHEET CONTENTS: SHEET NO.
SYM DESCRIPTION BY DATE

BASES CONVERSION AND CONSTRUCTION OF VARIOUS CHECKED BY CHECKED DATE

DEVELOPMENT AUTHORITY
LUIS I. MALLONGA MARIA TERESA P. ELLOVIDO STRUCTURES AND FACILITIES AT
PROJECT MANAGER SANITARY ENGINEER
BATAAN TECHNOLOGY PARK - PACKAGE 2 DESIGNED BY DESIGNED DATE

PTR NO. 7031457 REG NO. 0021873 PTR NO. 7031480 REG NO. 1608
ISSUED ON 01-13-2021 ISSUED AT VALENZUELA CITY ISSUED ON 01-13-21 ISSUED AT VALENZUELA CITY MARK P. TORRES PROJECT CODE:
OFFICER-IN-CHARGE LOCATION: REVIEWED BY REVIEWED DATE
T.I.N. 109-385-825 T.I.N. 152-451-264
ENGINEERING AND SOCIAL SUPPORT DEPARTMENT MORONG, BATAAN B-B19-040