BOQ PERIMETER FENCE jan 12

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 166

PROJECT PROPOSED FARMHOUSE RESIDENCE 27-Nov

LOCATION B4L4 FARMVILLE 3, KATITINGA 2, ALFONSO, CAVITE


ALFONSO, CAVITE
OWNER MS. NERI QUIPONES
SUBJECT BILL OF QUANTITY

ITEMS SCOPE OF WORKS QTY UNIT UNIT RATE TOTAL AMOUNT

A. GENERAL REQUIREMENTS
1.00 Mobilization 1.00 lot 50,000.00 50,000.00
2.00 Permit and Licenses
a. Building Permit
BY OWNER
b.Occupancy Permit
c. Municipality Contractors tax
SUB-TOTAL 50,000.00
B. CIVIL-STRUCTURAL WORKS
1.00 Excavation works m3
a. Foundation
F1 3.46 m3 500.00 1,730.00
F2 6.30 m3
F3 1.15 m3
FF1 0.86 m3
b. Tie beam
FTB 5.33 m3 500.00 2,665.00
c. Wall Footing
WF-1 1.64 m3 500.00 820.00
WF-2 2.57 m3 500.00 1,285.00
WF-3 0.81 m3 500.00 405.00
FWF1 2.37 m3 500.00 1,185.00
2.00 Backfilling 1.04 m3 500.00 519.00
3.00 Soil Poisoning 114.00 m3 120.00 13,680.00
4.00 Gravel Bed (G1) 75.00 m3 1,500.00 112,500.00
5.00 Disposal/Haul-out of Construction debris 25.00 m3 200.00 5,000.00
SUB-TOTAL 139,789.00
C. REBARS (Grade 40)
1.00 Foundation
F1,F2,F3&F4
16mm 5530.00 kg 50.00 276,500.00
2.00 Tie beam/Wall Footing
10mm 2914 kg 50.00 145,700.00
16mm 1128.12 kg 50.00 56,406.00
3.00 Columns
All Columns
10mm 2976.00 kg 50.00 148,800.00
16mm 625.68 kg 50.00 31,284.00
4.00 Slab on grade (SOG)
10mm 628.68 kg 50.00 31,434.00
12mm 624.46 kg 50.00 31,223.20
5.00 Lintel beams
10mm 15.50 kg 50.00 775.00
6.00 Beam/Suspended Slab
10mm 2914.00 kg 50.00 145,700.00
12mm 253.65 kg 50.00 12,682.50
16mm 1128.12 kg 50.00 56,406.00
7.00 Counter top
12mm 13.35 kg 50.00 667.50
8.00 Stairs
10mm 71.00 kg 50.00 3,550.00
12mm 59.00 kg 50.00 2,950.00
9.00 Walls
10mm 1294.00 kg 50.00 64,700.00
10.00 Sagrod
10mm 6.82 kg 50.00 341.00
SUB-TOTAL 1,009,119.20
D. FORMWORK
1.00 Foundation
F1,F2,F3&F4 725.04 M2 300.00 217,512.00
2.00 Tie beam/Wall Footing 98.32 M2 300.00 29,496.00
3.00 Columns 270.70 M2 300.00 81,210.00
4.00 Slab on grade (SOG) 506.00 M2 300.00 151,800.00
5.00 Lintel beams 9.76 M2 300.00 2,928.00
6.00 Beam/Suspended Slab 129.00 M2 300.00 38,700.00
7.00 Counter top 0.00 M2 300.00 -
8.00 Carpentry works - labor 1738.82 M2 100.00 173,882.00
SUB-TOTAL 695,528.00
E. CONCRETING
1.00 Foundation (Main house , caretaker house, stora
F1 (1.5x1.5x.30) x 4 2.70 cum - -
F2 (1.3x1.3x.30) x 13 6.59 cum - -
F4 (0.6x0.6x.0.2) 0.43 cum - -
FF1 (0.6x0.6x.20) x 20 labor 1.44 cum - -
2.00 Tie beam/Wall Footing (Main house , caretaker 5.29 cum - -
3.00 Columns (Main house , caretaker house, storage) -
C1 (0.3X0.3) 5.29 cum - -
C2 (0.3X0.2) 7.26 cum - -
C2A (0.3X0.3) 0.26 cum - -
C3 (0.2X0.2) 1.06 cum - -
FC1 (0.2X0.2) 1.63 cum - -
4.00 Slab (Main house , caretaker house, storage) - -
SOG 50.60 cum - -
S1 1.89 cum - -
S2 11.73 cum - -
CS1 2.53 cum - -
5.00 Lintel beams 2.00 m3 - -
MAIN HOUSE 0.02 m3
CARETAKER 0.00 m3
STORAGE 0.00 m3
6.00 Beam/Girders - -
2B 5.40 cum
2CB 0.90 cum
LRB 0.67 cum
RB 2.40 cum
7.00 Counter top 0.09 cum - -

8.00 Stairs 4.62 cum - -


SUB-TOTAL -

F. ROOFING
MAIN HOUSE
1.00 Angular Bar - 2" x 2" x 3/16" 240.00 kg - -
2.00 Rafter - 2" x 6" x 1.5mm 640.00 kg - -
3.00 C - Purlins 2880.00 kg - -
5.00 Pre-painted Gutter, GA 24(0.701mm) x 2.44m 229.35 ln/m - -
6.00 Pre-painted Metal Roofing Sheet Ga. 26 x 2.44m 160.23 sqm - -
7.00 Steel Fabrication & installation labor 3760.00 kg - -
8.00 Roof Installation labor 160.23 sqm - -
9.00 Erection & dismantling of scaffoldings 144.00 sqm - -
CARETAKE HOUSE
1.00 Angular Bar - 2" x 2" x 3/16" 80.00 kg - -
2.00 Rafter - 2" x 6" x 1.5mm 160.00 kg - -
3.00 C - Purlins 480.00 kg - -
5.00 Pre-painted Gutter, GA 24(0.701mm) x 2.44m 32.57 ln/m - -
6.00 Pre-painted Metal Roofing Sheet Ga. 26 x 2.44m 22.80 sqm - -
7.00 Steel Fabrication & installation labor 720.00 kg - -
8.00 Roof Installation labor 22.80 sqm - -
9.00 Erection & dismantling of scaffoldings 0.00 sqm - -

STORAGE
1.00 Rafter - 2" x 6" x 1.5mm 160.00 kg - -
2.00 C - Purlins - 2" x 4" x 1.8 mm 400.00 kg - -
3.00 Pre-painted Gutter, GA 24(0.701mm) x 2.44m 37.24 ln/m - -
4.00 Pre-painted Metal Roofing Sheet Ga. 26 x 2.44m 26.07 sqm - -
5.00 Steel Fabrication & installation labor 560.00 kg - -
6.00 Roof Installation labor 26.07 sqm - -
7.00 Erection & dismantling of scaffoldings 0.00 sqm - -

SUB-TOTAL -

G. MASONRY
5.00 CHB Laying - -
GRD FLR -MAIN HOUSE
Interior 36.00 sqm
Exterior 143.00 sqm
2ND FLR
Interior 37.00 sqm
Exterior 130.00 sqm
PERIMETER FENCE 260.00 sqm
GRD FLR - CARETAKER HOUSE
Interior 42.00 sqm
Exterior 53.00 sqm
GRD FLR -STORAGE HOUSE
Interior sqm
Exterior 32.00 sqm

6.00 PLASTERING 0.00 sqm - -


GRD FLR -MAIN HOUSE
Interior 36.00 sqm
Exterior 143.00 sqm
2ND FLR -MAIN HOUSE
Interior 37.00 sqm
Exterior 130.00 sqm
PERIMETER FENCE 260.00 sqm
GRD FLR - CARETAKER HOUSE
Interior 42.00 sqm
Exterior 53.00 sqm
GRD FLR -STORAGE HOUSE
Interior sqm
Exterior 32.00 sqm

SUB-TOTAL -

TOTAL COST STRUCTURAL -


PROJECT PROPOSED FARMHOUSE RESIDENCE
LOCATION B4L4 FARMVILLE 3, KATITINGA 2, ALFONSO, CAVITE
ALFONSO, CAVITE
OWNER MS. NERI QUIPONES OUTDOOR TOILETS ONLY
SUBJECT BILL OF QUANTITY FLOOR AREA
TOTAL COST

ITEMS SCOPE OF WORKS QTY UNIT UNIT RATE

A. GENERAL REQUIREMENTS
1.00 Mobilization 1.00 lot 50,000.00
2.00 Permit and Licenses
a. Building Permit
BY OWNER
b.Occupancy Permit
c. Municipality Contractors tax
SUB-TOTAL
B. CIVIL-STRUCTURAL WORKS
1.00 Excavation works m3
a. Foundation
F1 3.60 m3 500.00
FF1 0.00 m3
b. Tie beam
FTB 5.33 m3 500.00
c. Wall Footing
WF-1 1.64 m3 500.00
WF-2 0.00 m3 500.00
WF-3 0.00 m3 500.00
FWF1 0.00 m3 500.00
2.00 Backfilling 540.00 m3 500.00
3.00 Soil Poisoning 114.00 m3 120.00
4.00 Gravel Bed (G1) 75.00 m3 1,500.00
5.00 Disposal/Haul-out of Construction debr 25.00 m3 200.00
SUB-TOTAL
C. REBARS (Grade 40)
1.00 Foundation
16mm F1
16mm 632.00 kg 50.00
2.00 Tie beam/Wall Footing
10mm 2914 kg 50.00
16mm 1128.12 kg 50.00
3.00 Columns
All Columns
10mm 2976.00 kg 50.00
16mm 625.68 kg 50.00
4.00 Slab on grade (SOG)
10mm 628.68 kg 50.00
12mm 624.46 kg 50.00
5.00 Lintel beams
10mm 15.50 kg 50.00
6.00 Beam/Suspended Slab
10mm 2914.00 kg 50.00
12mm 253.65 kg 50.00
16mm 1128.12 kg 50.00
7.00 Counter top
12mm 13.35 kg 50.00
8.00 Stairs
10mm 71.00 kg 50.00
12mm 59.00 kg 50.00
9.00 Walls
10mm 1294.00 kg 50.00
10.00 Sagrod
10mm 6.82 kg 50.00
SUB-TOTAL
D. FORMWORK
1.00 Foundation
F1,F2,F3&F4 725.04 M2 300.00
2.00 Tie beam/Wall Footing 98.32 M2 300.00
3.00 Columns 270.70 M2 300.00
4.00 Slab on grade (SOG) 506.00 M2 300.00
5.00 Lintel beams 9.76 M2 300.00
6.00 Beam/Suspended Slab 129.00 M2 300.00
7.00 Counter top 0.00 M2 300.00
8.00 Carpentry works - labor 1738.82 M2 100.00
SUB-TOTAL
E. CONCRETING
1.00 Foundation (Main house , caretaker ho
F1 (1.5x1.5x.30) x 4 2.70 cum -
2.00 Tie beam/Wall Footing (Main house , 5.29 cum -
3.00 Columns (Main house , caretaker house, storage) -
C1 (0.3X0.3) 5.29 cum -
4.00 Slab (Main house , caretaker house, storage) -
SOG 50.60 cum -
S1 1.89 cum -
S2 11.73 cum -
CS1 2.53 cum -
5.00 Lintel beams 2.00 m3 -
CARETAKER 0.00 m3
6.00 Beam/Girders -
2B 5.40 cum
2CB 0.90 cum
LRB 0.67 cum
RB 2.40 cum
7.00 Counter top 0.09 cum -
8.00 Stairs 4.62 cum -
SUB-TOTAL

F. ROOFING
MAIN HOUSE
1.00 Angular Bar - 2" x 2" x 3/16" 240 kg 55.00
2.00 Rafter - 2" x 6" x 1.5mm 640 kg 55.00
3.00 C - Purlins 3754 kg 55.00
5.00 Pre-painted Gutter, GA 24(0.701mm) 229 ln/m 55.00
6.00 Pre-painted Metal Roofing Sheet Ga. 540 sqm 65.00
7.00 Steel Fabrication & installation labor 4634 kg 20.00
8.00 Roof Installation labor 540 sqm 55.00
9.00 Erection & dismantling of scaffoldings 540 sqm 55.00

SUB-TOTAL

G. MASONRY
5.00 CHB Laying -
GRD FLR
Interior 45 sqm 150.00
Exterior 208 sqm 150.00

6.00 PLASTERING
Interior 45.00 sqm 200.00
Exterior 208.00 sqm 200.00

SUB-TOTAL

TOTAL COST STRUCTURAL


UTDOOR TOILETS ONLY
58 sqm

TOTAL
AMOUNT

50,000.00

BY OWNER

50,000.00

1,800.00

2,665.00

820.00
-
-
-
270,000.00
13,680.00
112,500.00
5,000.00
406,465.00

31,600.00

145,700.00
56,406.00

148,800.00
31,284.00

31,434.00
31,223.20

775.00

145,700.00
12,682.50
56,406.00

667.50

3,550.00
2,950.00

64,700.00

341.00
764,219.20

217,512.00
29,496.00
81,210.00
151,800.00
2,928.00
38,700.00
-
173,882.00
695,528.00

-
-

-
-
-
-
-
-
-

-
-
-

LEN 54
spacing 0.4
13,200
35,200 2X4 QTY 136
206,470
12,614 tot length 1360
35,100 unit wt 2.76
92,680
29,700 total wt 3753.6
29,700

454,664

6,750
31,200

9,000.00
41,600.00

88,550.00

2,459,426.21
PROJECT PROPOSED FARMHOUSE RESIDENCE FLOOR AREA 21.34 SQM
LOCATION B4L4 FARMVILLE 3, KATITINGA 2, ALFONSO, CAVITE TOTAL COST #REF! PESOS
OWNER MS. NERI QUIPONES
SUBJECT BILL OF QUANTITY & ESTIMATE PERMITER FENCE ONLY

UNIT TOTAL
ITEMS SCOPE OF WORKS QTY UNIT
RATE AMOUNT
A. GENERAL REQUIREMENTS
1.00 Mobilization 0.00 lot 50,000.00 -
2.00 Permit and Licenses
a. Building Permit SHARED WITH THE MAIN
b.Occupancy Permit STRUCTURE
c. Municipality Contractors tax
SUB-TOTAL -

B. EARTHWORKS & FOUNDATION


1.00 Excavation works 33.66 m3 300.00 10,098
a. Footing
FF1 0.96 m3 500.00 480
b. Tie beam
FTB 0.00 m3 500.00 -
c. Wall Footing
WF-1 8.64 m3 500.00 4,320
2.00 Backfilling 16.65 m3 300.00 4,994
3.00 Soil Poisoning 2.48 m 3
400.00 990
4.00 Gravel Bed (G1) 4.91 m3 1,500.00 7,358
5.00 Grading and compaction 38.16 m2 300.00 11,448
6.00 Disposal/Hauling of Construction debris 4.36 m 3
300.00 1,309
SUB-TOTAL 40,997

C. CONCRETING
1.00 Foundation
1.1 FF1 0.96 m3 6,850.00 6,576
2.00 Tie beam - -
2.1 FTB 0.88 m3 6,850.00 6,028
3.00 Wall Footing 5.84 m3 6,850.00 40,004
4.00 Columns -
4.1 CF1 0.96 m3 6,850.00 6,576
4.2 FC1 0.96 m3 6,850.00 6,576
5.00 Slab - -
5.10 SOG 2.48 m3 6,850.00 16,954
5.20 Roof Deck 0.48 m3 6,850.00 3,315
6.00 Lintel beams - -
6.10 Top of fence 0.00 m3 6,850.00 -
7.00 Beam/Girders/lintels -
7.40 LINTEL (top of fence) 0.00 m3 6,850.00 -
SUB-TOTAL 86,029

D. REBARS (Grade 40)


1.00 Foundation
1.1 Isolated Footing
1.2 16mm 76.00 kg 70.00 5,320
1.3 #16 tie wire 77 kg 80.00 6,144
2.00 Wall Footing (WF)
2.1 10mm 133.23 kg 70.00 9,326
2.2 #16 tie wire 1 kg 80.00 48
3.00 Columns
3.1 10mm 130.37 kg 70.00 9,126
3.2 16mm 654.00 kg 70.00 45,780
3.3 #16 tie wire 15.94 kg 80.00 1,275
4.00 Slab
5.00 Beam/Girders/tie beams/lintel beams
5.1 10mm 179.20 kg 70.00 12,543.83
5.2 12mm 52.44 kg 70.00 3,671.11
5.3 16mm 205.47 kg 70.00 14,382.84
5.4 #16 tie wire 8.91 kg 80.00 712
6.00 Walls
6.10 10mm 377.53 kg 70.00 26,427
SUB-TOTAL 134,757
E. MASONRY
1.00 CHB Laying - -
1.2 Exterior 108.28 m2 750.00 81,210
SUB-TOTAL 81,210
2.00 PLASTERING - -
2.2 Exterior 287.68 m 2
350.00 100,688
SUB-TOTAL 100,688
F. FORMWORK
1.00 Foundation
1.1 F2 (1.0 x 1.0 x.30) 5.76 m2 300.00 1,728
1.2 F3 (0.8 x 0.8 x.30) #REF! m2 300.00 #REF!
2.00 Wall Footing
2.1 WF 3.30 m2 300.00 990
3.00 Columns
3.1 C2 (0.3 X 0.2) 19.20 m2 300.00 5,760
3.1 C3 (0.2 X 0.2) 19.20 m2 300.00 5,760
4.00 Beam/girders
4.1 Tie beam 5.82 m2 300.00 1,746
4.2 2nd floor & roof beams 24.68 m2 300.00 7,403
4.3 Lintel beams 1.08 m 2
300.00 324
5.00 Slab -
5.1 SOG 2.91 m2 300.00 873
5.2 Roof Deck 5.72 m 2
300.00 1,716
SUB-TOTAL #REF!

G. STEELWORKS & ROOFING


1.00 C - Purlins - 2" x 4" x 2.0 mm 135.00 kg 55.00 7,425
2.00 Rafter - 2"x 6" x 2.0 mm 85.40 kg 55.00 4,697
3.00 1 1/2" x 1 1/2" x 3/16 angle 48.00 kg 55.00 2,640
2.00 Pre-painted bended accessories, GA 24(0.701mm) x 2.44m 14.00 ln/m 300.00 4,200
3.00 Pre-painted Metal Roofing Sheet Ga. 26 x 2.44m 24.32 m2 400.00 9,728
4.00 Steel Fabrication & installation labor 220.40 kg 20.00 4,408
5.00 Roof Installation labor 24.32 m2 350.00 8,512
6.00 Erection & dismantling of scaffoldings 24.32 m2 100.00 2,432
SUB-TOTAL 84,042
TOTAL COST STRUCTURAL #REF!
BOQ SUMMARY

QTY UOM DSCRIPTION

116 SQM CHB LAYING


232 SQM PLASTERING
#REF! KG 10 MM REINFORCEMENTS

WALL
MARK
FLOOR WALL TYPE EMBEDMENT LENGTH HEIGHT

GRID NUM INTERIOR/EXTERIOR (M) (M) (M)

7 EXTERIOR 2 6.2 2
X 01' INTERIOR 2 0.5 3
GRD

SUBTOTAL

Y FF
GG
EXTERIOR
EXTERIOR
2
2
7.5
16.8
3
3
SUBTOTAL

GRAND TOTAL
UNIT TOTAL PRICE PER
COST AMOUNT CUM
800 92800 800
1700 394400
55 #REF!
#REF!

WALL WINDOW OPENINGS


TOT
THICKNESS QTY GROSS AREA WIDTH HEIGHT QTY
MARK AREA
(M) (PCS) (SQM) (M) (M) (PCS) (SQM)
`
0.13 1 25.8 W1 1.8 1.2 0 0
0.13 0 2.5 W3B 1.2 1.2 0 0
X- SUBTOTAL 28.3 0

0.13 0 37.5 W6 0.8 1.2 2 1.92


0.13 1 85
Y- SUBTOTAL 122.5 1.92

GRAND TOTAL #REF! #REF!


C
DOOR DIMENSION/CLEAR OPENING (CO) BOQ
BREAKAGE NET AREA
ALLOWANCE (BOQ) INTERIOR
MARK WIDTH HEIGHT QTY TOT AREA
(M) (M) (PCS) (SQM) (%) (SQM) (SQM)

CO 3.8 3 0 0 5 25.80
D2 1.5 2.1 0 0 5 2.50 0.00
0 28.30 0.00

D6 0.6 2.1 2 2.52 5 33.06


SD-1 1.2 2.1 1 2.52 5 82.48
5.04 115.54 0.00

#REF! #REF!

CHB LAYING
MORTAR FACTOR
CHB SIZE CEMENT
4 0.525
MASONRY
CHB LAYING MORTAR PLASTERING MORTAR
BOQ CEMENT SAND TOTAL CEMENT
CHB CHB SURFACE
AREA
EXTERIOR COUNT SIZE QTY QTY QTY
FACTOR FACTOR (BOQ) FACTOR
(SQM) (PCS) (INCH) (BAGS) (CUM) (FACE) (SQM)

25.80 339 5 1.013 26 0.0844 2.18 2 51.6 0.288


33 4 0.525 1 0.525 1.31 2 5 0.288
25.80 372 27 3.49 2 56.6

0.00 434 5 1.013 33 0.0844 2.79 2 66.12 0.288


82.48 1083 5 1.013 84 0.0844 6.96 2 164.96 0.288
82.48 1517 117 9.75 231.08

108.28 #REF! #REF! #REF!

5 ASSUME
CHB LAYING PLASTERING 10 X
FACTOR 4 MORTAR FACTOR 10 Y
SAND 4 CHB SIZE CEMENT SAND area sqm
0.0438 5 4 0.525 0.0438 wt per sqm
PLASTERING MORTAR EQUIVALENT REINFORCEMENTS
IMAGINARY SIZE
CEMENT SAND ALONG X ALONG Y
BAR SIZE TOTAL
QTY
FACTOR
QTY X Y SPACING QTY
LENGTH
SPACING

(BAGS) (CUM) (M) (M) (MM) (M) (PCS) (M) (M)

15 0.016 0.826 12.90 2.00 10 0.6 23 46 0.6


1 0.016 0.080 1.25 2.00 10 0.6 4 8 0.6
16 0.906

19 0.016 1.058 16.53 2.00 10 0.6 29 58 0.6


48 0.016 2.639 41.24 2.00 10 0.6 70 140 0.6
66.55104 3.69728 10 0.6 1 0 0.6

#REF! #REF!

mtr
LEN spacinf QTY tot len
2 0.6 5.00 10
2 0.6 4.00 8
4 18
wt per sqm 2.777778
NFORCEMENTS
ALONG Y
WT PER TOTAL
TOTAL MTR WEIGHT
QTY
LENGTH
(PCS) (M) (KG/M) (KG)

5 64.5 0.617 68.21


5 6.25 0.617 8.80
77.01

5 82.65 0.617 86.82


5 206.2 0.617 213.70
1 0 0.617 0.00
300.52

GRAND TOTAL 377.53

unit total
weight/m weight
0.617284 6.1728395 kg
0.617284 4.9382716 kg
11.111111 kg
MARK WALL
FLOOR WALL LOCATION
GRID NUM HEIGHT LENGTH THICKNESS
( (M) (M) (M)
INTERIOR/EXTERIOR)
X-01 EXTERIOR 3 2.2 0.13
GRD
X-01' INTERIOR 3 0.5 0.13

X
X-02' INTERIOR 3 2.2 0.1
X-02'.1 INTERIOR 3 2.2 0.1
Y Y-FF INTERIOR 3 7.5 0.1
Y-GG INTERIOR 3 7.5 0.1
WALL WINDOW OPENINGS DOOR DIMENSION
QTY GROSS AREA Y X QTY TOT AREA HEIGHT WIDTH
(PCS) (SQM) (M) (M) (PCS) (SQM) (M) (M)
2 13.2 1 1 0 0 2.1 1
1 1.5 1 1 0 0 2.1 1
1 6.6 1 0.6 0 0 2.1 0.7
1 6.6 1 0.6 0 0 2.1 1
1 22.5 1 0.6 0 0 2.1 2
1 22.5 1 0.6 0 0 2.1 0.7
CHB LAYING
DOOR DIMENSION BREAKAGE NET AREA CHB CHB
QTY TOT AREA ALLOWANCE ALL interior exterior COUNT SIZE
(PCS) (SQM) (%) (SQM) (SQM) (SQM) (PCS) (INCH)
0 0 5 13.20 13.2 174 5
0 0 5 1.50 1.5 20 5
1 1.47 5 5.13 5.13 68 4
0 0 5 6.60 6.6 87 4
1 4.2 5 18.30 18.3 241 4
0 0 5 22.50 22.5 296 4
5 67.23 54.03 13.2 886
CHB LAYING PLASTERING
CEMENT SAND SURFACE TOTAL AREA CEMENT SAND
QTY QTY QTY interior exterior QTY
FACTOR (BAGS) FACTOR (CUM) (FACE) (SQM) (SQM) FACTOR (BAGS) FACTOR

1.013 13 1.013 13 2 26.4 0.288 8 0.016


1.013 2 1.013 2 2 3 0.288 1 0.016
0.525 3 0.525 3 2 10.26 0.288 3 0.016
0.525 3 0.525 3 2 13.2 0.288 4 0.016
0.525 10 0.525 10 2 36.6 0.288 11 0.016
0.525 12 0.525 12 2 45 0.288 13 0.016
5 1.013 0.0844 108.06 26.4 wt per sqm #REF!
`
`
BILL OF QUANTITY (BOQ) BILL OF MATERIALS (B
SAND UNIT TOTAL QTY UOM
QTY UOM PARTICULARS
QTY COST AMOUNT
(CUM) 13.20 (SQM) CHB LAYING 100 1320 21 bags
0.422 26.40 13.2 PLASTERING 200 5280 21 CUM
0.048 3.00 1.5 SURFACE QTY 200 600 2 CUM
0.164 10.26 5.13 0 200 2052 6 CUM
0.211 13.20 6.6 (FACE) 200 2640 7 CUM
0.586 36.60 18.3 (FACE) 200 7320 20 CUM
0.720 45.00 22.5 2 200 9000 25 CUM
BILL OF MATERIALS (BOM) LABOR
PARTICULARS UNIT TOTAL QTY UOM PARTICULARS UNIT COST TOTAL
COST AMOUNT 13.20 SQM CHB LAYING 150 163.20
CEMENT 260 260 26.40 SQM PLASTERING 200 226.40
SAND 950 950 389.60
SAND 950 950 616.00
SAND 950 950 1005.60
SAND 950 950 1621.60
SAND 950 950 1621.60
SAND 950 950 4248.80
EQUIPMENT
QTY UOM PARTICULARS UNIT COST TOTAL
ENTER NO OF FOOTING 999 <OK>

CONCRETING
STRUCTURAL SPECIFICATIONS & DIMENSIONS
BOQ BOM
EMBEDMENT
DEPTH
X Y Z QTY UNIT VOL TOTAL VOL CEMENT
MARK
(M) (M) (M) (PCS) (M) (CUM) (CUM) (BAGS)
FF1 0.60 0.60 0.20 12 1.00 0.08 0.96 9
NG REINFORCE
note hook not considered LENGTH ALONG SPACE ALONG
BOM
CONCRETE COVER BAR CLEAR
X Y X Y
SIZE COVER
SAND GRAVEL TOP BOT X Y
(CUM) (CUM) (cm) (cm) (cm) (cm) (mm) (m) (m) (m) (m) (m)
1 1 0.075 0.075 0.075 0.075 16 0.05 0.45 0.45 0.2 0.2
REINFORCEMENT BARS FORMWORKS
QTY ALONG TOT BAR LENGTH BOQ BOM BOQ
QTY BARS @ area per area for
X Y X Y UNIT WT OF TOTAL 6M COM LEN # TIE ftg all ftg
BAR BAR WT WIRES
(m) (m) (m) (m) KG/M (KG) (PCS) (KG) (sqm) (sqm)
4 4 2 2 1.58 76 1 76.8 0.48 5.76
ENTER NO OF COLUMNS 999 <OK>

STRUCTURAL SPECIFICATIONS
FTG COLUMN DIMENSION
@BOTTOM
REF FOOTING DIMENSIONS @ BOTTOM

MARK QTY EMBEDMENT X


MARK X Y Z (thickness)

(M) (M) (M) (PCS) (M) (M)


CF1 FF1 0.60 0.60 0.30 6 1.00 0.2
FC1 F3 0.60 0.60 0.30 6 1.00 0.2
L SPECIFICATIONS CONCRET
COLUMN DIMENSIONS CONCRETE COVER BOQ

FLR TO FLR Z ( EFFECTIVE VOLUME PER


Y TOP BOT X Y
HEIGHT HEIGHT) COL

(M) (M) (M) (M) (M) (M) (M) (CUM)


0.2 3 4.00 0.025 0.025 0.025 0.025 0.16
0.2 3 4.00 0.025 0.025 0.025 0.025 0.16
End Hook/ L hook

CONCRETING
BOQ BOM MAIN VERTICAL BARS

VOLUME ALL CEMENT SAND GRAVEL BAR SIZE UNIT BAR QTY PER COL HOOK
COLS WT LENGTH

(CUM) (BAGS) (CUM) (CUM) (mm) KG/M (PCS)


0.96 9 0.5 1 16 1.580 8 0.3
0.96 9 0.5 1 16 1.580 8 0.3
MAIN VERTICAL BARS

COL SPACE TIE 1


TOT BAR BOQ
EFF BAR LENGTH INCL LENGTH PER BAR SIZE UNIT WEIGHT
EMBEDMENT & HOOK COL
PER COL ALL QTY @SPACE
COLUMNS

(M) (M) (KG) (KG) (mm) (kg/m) (PCS) (mm)


4.30 34.4 54 327 10.00 0.62 2.00 50.00
4.30 34.4 54 327 10.00 0.62 2.00 50.00
REINFORCEMENTS
LATERAL COLUMN TIES

COL SPACE TIE 2 COL SPACE TIE 3 REST TIES


TOTAL HEIGHT
OCCUPIED BY GIVEN CLEAR HT OF
TIES COLUMN
REMAINING HEIGHT
QTY @SPACE QTY SPACE OF REST TIES QTY

(PCS) (mm) (PCS) (mm) (mm) (M) (M) (PCS)


5.00 75.00 6.00 100.00 2150.00 3.70 1.55 9
5.00 75.00 6.00 100.00 2150.00 3.70 1.55 9
N TIES

ST TIES BOQ

TOTAL QTY LENGTH TOTAL LENGTH OF ALL TOTAL LENGTH OF


EACH TIES PER COL TIES ALL COL
SPACE UNIT WEIGHT TOTAL WT OF
ALL COL TIES

(mm) (PCS) (M) (M) (M) KG/M (KG)


200.00 22 0.80 18 106 0.62 65
200.00 22 0.80 18 106 0.62 65
FORMWORKS

BOM #16 TIE WIRE


BOM @ 6 M
COMMERCIAL AREA PER COL AREA ALL COL
LENGTH

(PCS) (KG) (sqm) (sqm)


18 8 3.20 19.20
18 8 3.20 19.20
COLUMN ATTACHEMENTS WALL FOOTING DIMENSI
LOCATION
X Y QTY X Y
MARK
MARK GRID LINE (M) (M) (PCS) (M) (M)
WF1 X 7 CF1 0.60 0.60 6.00 6.2 0.4
FWF1 Y GG FC1 0.60 0.60 5.00 0.35 17.3

MARK
FLOOR
GRID NUM

X-01
GRD

X-01'
X

X-02'
X-02'.1
Y-FF
Y

Y-GG
CONCRETING FORMWORKS

WALL FOOTING DIMENSIONS BOQ BOM


UNIT AREA ALL AREA
Thickness (Z) LENGTH QTY TOT VOL CEMENT SAND GRAVEL

(M) (M) (PCS) CUM (BAGS) (CUM) (CUM) (SQM) (SQM)


0.25 1 5.84 53 3 5.84 3.3 3.3
0.25 1 6 54 3 6 8.825 8.825
REINFORCEMENTS
splice length
available MAIN TRANSVERSE BARS TEMPERATURE BARS
(40db)
bar size bar UNIT WT BOQ
length bar length bar length
40.00 db SPACING QTY
needed needed
(mm) (m) (mm) (m) (m) (PCS) (kg/m) (kg) (m)
10 6 0.4 0.6 0.3 22 0.62 8.15 6.05
10 6 0.4 11.7 0.3 3 0.62 21.67 0.2

`
NTS
TEMPERATURE BARS
TOTAL #16 TIE
QTY UNIT WT BOQ
WEIGHT WIRE
SPACING

(m) (PCS) (kg/m) (kg) (kg) (kg)


0.2 32 0.62 193.6 201.75 6.0
8.65 2 0.62 0.4 22.07 1.0
7
DATE 12/03/2022
PROJECT
OWNER
SUBJECT WALL FOOTING
last update JAN 7, 2023
GIVEN

FOOTING MARK X Y Z QTY


(m) (m) (m) sets
FF1 0.60 0.60 0.20 12.00

MARK LENGTH WIDTH THICKNESS QTY


(m) (m) (m)

WALL FTG WF-1 7.55 0.40 0.20 1.00

A. FLOOR AREA # of L W (+/-)


sets (m) (m) (sq m)

A.1.1 GROUND FLOOR 1.00 2.20 7.50


0.00 4.30 3.20

A.1.2 ROOF DECK 1.00 2.200 2.20


0.00 4.30 3.20

B. EARTHWORKS

B.1 EXCAVATION MARK QTY X Y Z


sets (m) (m) (m)
B.1.1 FOOTING
F-2 6 0.60 0.60 0.20
F-3 2 0.80 0.80 ,3

B.1.2 WALL FOOTING WF-2 1 0.40 13.00 0.30


B.1.3 TIE BEAM FTB 1.00 0.30 0.30 9.70

B.2 GRAVEL BED (100mm THK) QTY LENGTH WIDTH t


MARK sets (m) (m) (m)
B.2.1 FOOTING F-1 1.00 0.130
F-3 1.00 0.130

B.2.2 WALL FOOTING 1.00 0.130


B.2.3 S.O.G OUTDOOR TOILETS 1.00 7.50 2.20 0.100

B.3 EXCESS FROM EXCAVATED SOIL

B.3.1 VOLUME OF CONCRETE (FOOTING)


B.3.2 VOLUME OF CONCRETE (WALL FOOTING)
B.3.3 VOLUME OF GRAVEL BED (FOOTING)
B.3.4 VOLUME OF GRAVEL BED (WALL FOOTING)

C. CUT AND FILL


C.1 CUT # of L W depth
sets (m) (m) (m)assume

C.1.1 ENTRY PORCH 3.875 3.00 0.00

C.2 FILL # of L W depth


sets (m) (m) (m)assume

C.2.1 GROUND FLOOR 2.20 7.50 0.00


THREE QUARTER BATH 2.50 1.95
ENTRY PORCH 3.875 3.00

C.2.2 THREE QUARTER BATH 2.50 1.95 0.000

D. BACKFILL AND COMPACTION


D.1 BACKFILL VOLUME VOLUME VOLUME VOLUME
FILL CUT Excavated Concrete

D.1.1 FOOTING 14.02 0.94


D.1.2 SOG 0.00 0.00
D.1.3 WALL FOOTING 8.64 0.60
D.1.4 COLUMN @ 0.9m depth OPTIONAL

E. GRADING AND COMPACTION


E.1 COMPACTION LAYER Area (sq.m)

E.1.1 SOG 1 16.50 16.50


E.1.2 FOOTING 1 7.26 7.26
E.1.3 WALL FOOTING 1 14.40 14.40
38.16

E.2 TERMITE CONTROL Area (sq.m)


E.2.1 SOF 16.50
16.50

E.3 HAULING/LOADING/DUMPING OF TOTAL EXCESS EXCAVATED SOIL VOLUME


(cu m)

E.3.1 CUT 0.000


E.3.2 FILL 0.000
E.3.3 EXCESS VOLUME 4.36
4.36

F CONCRETE WORKS
C.1 FOOTING # of L W h
sets (m) (m) (m)

FF1 6 0.60 0.60 0.20

6 TOTAL =

C.2 WALL FOOTING # of L W t


sets (m) ES (m)

WF-1 1 7.55 0.40 0.20

TOTAL =

C.3 WALL FOOTING GRID MARK QTY LENGTH WID=TH t


(m) (m) (m)
1.00 7.55 0.40 0.20
EMBED DEPTH AREA COL MARK VOLUME
(m) assume (sq.m) (cu.m)
1.000 0.36 a ok

EMBED DEPTH AREA VOLUME

0.60 3.02
0.60
0.60
#VALUE!

T AREA VOLUME
(m) (sq m) (cu m)

0.15 16.50 2.48


0.15 0.00 0.00
16.50 2.48
0.10 4.84 0.48
0.10 0.00 0.00
4.84 0.48

EMBEDMENT SPACE FOR excv area per ITEM excv area all ITEM TOT EXCV VOL ALL SUB
(m)DEPTH
assume FORMWORKS(m) (sq.m) (sq.m) FTG
(cu.m) TOTAL

1.00 0.5 1.21 7.26 7.26


2.00 0.5 1.69 3.38 6.76
14.020 7.26
0.60 0.5 14.40 14.40 8.640 8.64
1.00 0.50 11.000 11.000 11.000 11.00

26.90

AREA VOLUME FORMWORKS


(sq m) (cu m) UNIT AREA ALL AREAS
7.26 0.94
3.38 0.44
10.64 1.38

14.40 1.87
16.50 1.65 1.94 1.94
52.18 3.52 1.94 1.94

VOLUME
(cu m)
0.94
0.60
0.94
1.87 4.36
4.36

Area VOLUME
(sq.m) (cu.m)

11.625 0.00
0.00

Area VOLUME
(sq.m) (cu.m)

16.50
-4.875
-11.625
0.00 0.00
4.875 0.00
0.00

VOLUME VOLUME
Gravel Bed (cu m)

0.94 12.13
1.65 -1.65
1.87 6.16

16.65
VOLUME FORMs # of
(cu m) (sq m) pcs

0.432 3.12 8.00 8.00 -


8.00 8.00 -
0.43 3.12

VOLUME FORMs # of
(cu m) (sq m) (pcs)

0.60 0.80 1.00 -


0.00 -

0.60 0.80 Rf =

MAIN TRANSVERSE BARS

bar size available bar length splice length (40db) bar length needed SPACING QTY

(mm) (m) (m) (m) (m) (PCS)


10 6 0.4 2.00 0.3 27
1.5
0.7

160

FORMWORKS
(sq.m)

K
K

5.82
0.61728395062

cut length
dia. CL U/W REBAR
mm (m) kgs/lm (kgs) Weight

10 mm x 7.5 0.616 36.96


12 mm x 7.5 0.888 53.28
Rf = 208.89 kgs/m3 90.24 92.95

dia. CL U/W REBAR


(kgs/lm) (kgs)

10 mm x 6.0 0.61728395062 3.70


10 mm x 6.0 0.616 0.00

0.00 kgs/m3 3.70 3.81

NSVERSE BARS TEMPERATURE BARS


bar length
UNIT WT BOQ SPACING QTY UNIT WT BOQ
needed
(KG) (KG) (m) (m) (PCS) (KG) (KG)
0.61728 33.33 7.40 0.2 3 4.50000 99.90
Forms Volume
L ROFF #
Longhtdnl 0.7000 1.100 8
Trnvrs 0.7000 1.100 8
3.21 0.44

L ROFF #
Longhtdnl 1.35 7.55 3
trnvrs 0.340 0.35 26

0.82 0.62

TOTAL
#16 TIE WIRE
WEIGHT
(KG) (KG)
133.23 0.6000
WASTAGE
6.00 7.50 9.00 10.5 12 (m)
6 7.5 5.45 6.82 8.18 9.55 10.91 0.9
6 7.5 5.45 6.82 8.18 9.55 10.91 0.9

6.00 7.50 9.00 10.5 12


1.3 6.0
17 6.0 17.14 21.43 25.71 30.00 34.29
BILL OF QUANTITY (BOQ)
UNIT TOTAL
QTY UOM PARTICULARS
COST AMOUNT

33.66 CUM EXCAVATION 200 6732

16.65 CUM BACKFILLING 200 6732

6732

SUMMARY

TOTAL MATERIALS
QUANTITY
(pcs.)
8.00
8.00
BILL OF MATERIALS (BOM) LABOR
QTY UOM PARTICULARS UNIT TOTAL QTY UOM PARTICULARS
COST AMOUNT #REF! SQM CHB LAYING

0 CUM SAND 950 950

0 PCS 4" CHB 16 16

966
ABOR EQUIPMENT
UNIT COST TOTAL QTY UOM PARTICULARS UNIT COST TOTAL
150 #REF!

#REF!
STRUCTURAL SPECIFICATIONS CONCRETING

DIMENSIONS CONCRETE COVER BOQ

REF VOLUME
MARK VOLUME
OBJECT QTY X Y Z (LEN) TOP BOT X Y
PER BEAM ALL
BEAMS

(PCS) (M) (M) (M) (M) (M) (M) (M) (CUM) (CUM)
FTB 1 0.30 0.30 9.70 0.075 0.075 0.075 0.075 0.88 0.88
0.88 0.88

2BX3 2 0.25 0.40 2.20 0.025 0.025 0.025 0.025 0.22 0.44
0.22 0.44
2BY3 2 0.25 0.40 2.20 0.025 0.025 0.025 0.025 0.22 0.44
1 0.25 0.40 2.00 0.025 0.025 0.025 0.025 0.20 0.20
1 0.25 0.40 3.00 0.025 0.025 0.025 0.025 0.30 0.30
0.72 0.94
LRB1 2 0.25 0.40 2.20 0.025 0.025 0.025 0.025 0.22 0.44
1 0.25 0.40 2.00 0.025 0.025 0.025 0.025 0.20 0.20
1 0.25 0.40 3.30 0.025 0.025 0.025 0.025 0.33 0.33
0.75 0.97
LINTEL D1 1 0.10 0.10 1.20 0.025 0.025 0.025 0.025 0.02 0.02
D6 2 0.10 0.10 0.60 0.025 0.025 0.025 0.025 0.01 0.02
W6 2 0.10 0.10 0.60 0.025 0.025 0.025 0.025 0.01 0.02
0.04 0.06
CONCRETING
CONTINUOU
BOM MAIN BARS TOTAL WEIGHT (KG)
@TOP @BOTTOM BOQ

CEMENT SAND GRAVEL BAR UNIT BAR WT PER


SIZE WT QTY LENGTH SIZE UNIT WT QTY LENGTH BEAM

(BAGS) (CUM) (CUM) (mm) KG/M (PCS) (M) (mm) KG/M (PCS) (M) (KG)
8 0.5 0.9 12 0.89 2 10.3 12 0.89 2 10.3 36.6222

4 0.3 0.5 16 1.58 2 2.8 16 1.58 2 2.8 17.6988

4 0.3 0.5 16 1.58 2 2.8 16 1.58 2 2.8 17.6988


2 0.1 0.2 16 1.58 2 2.6 16 1.58 2 2.6 16.4346
3 0.2 0.3 16 1.58 2 3.6 16 1.58 2 3.6 22.7556

4 0.3 0.5 16 1.58 2 2.8 16 1.58 2 2.8 17.6988


2 0.1 0.2 16 1.58 2 2.6 16 1.58 2 2.6 16.4346
3 0.2 0.4 16 1.58 2 3.9 16 1.58 2 3.9 24.6519

1 0.1 0.1 10 0.62 1 1.80 10 0.62 2 1.8 3.33333


1 0.1 0.1 10 0.62 1 1.20 10 0.62 2 1.2 2.22222
1 0.1 0.1 10 0.62 1 1.20 10 0.62 2 1.2 2.22222
CONTINUOUS LONGITUDINAL BARS
87.23 WEB BARS TOTAL WEIGHT (KG)
BOQ @LEFT SIDE FACE @RIGHT SIDE FACE BOQ

WT ALL BAR UNIT WT PER


BEAM SIZE WT QTY LENGTH BAR SIZE UNIT WT QTY LENGTH BEAM

(KG) (mm) KG/M (PCS) (M) (mm) KG/M (PCS) (M) (KG)
36.62 12 0.89 0 10.3 12 0.89 0 10.3 0.00
36.62

35.40 12 0.89 1 2.8 12 0.89 1 2.8 4.98

35.40 12 0.89 1 2.8 12 0.89 1 2.8 4.98


16.43 12 0.89 1 2.6 12 0.89 1 2.6 4.62
22.76 12 0.89 1 3.6 12 0.89 1 3.6 6.40

35.40 12 0.89 1 2.8 12 0.89 1 2.8 4.98


16.43 12 0.89 1 2.6 12 0.89 1 2.6 4.62
24.65 12 0.89 1 3.9 12 0.89 1 3.9 6.93
186.47
3.33 12 0.89 0 1.8 10 0.62 0 1.8 0.00
4.44 12 0.89 0 1.2 10 0.62 0 1.2 0.00
4.44 12 0.89 0 1.2 10 0.62 0 1.2 0.00
12.22
REINFOR
DISCONTINUOUS LONGITUDINAL BARS
24.53 EXTRA BARS
BOQ LEFT SUPPORT TOP BAR @ L/4 MID SPAN BOTTOM BAR @L/3 RIGHT SUPPORT T

WT ALL
BEAM BAR SIZE UNIT WT QTY LENGTH BAR SIZE UNIT WT QTY LENGTH BAR SIZE

(KG) (mm) KG/M (PCS) (M) (mm) KG/M (PCS) (M) (mm)
0.00 12 0.889 0 2.425 16 1.580247 0 0.025 12

9.96 16 1.580 1 0.55 16 1.580247 1 0.008333 16

9.96 16 1.580 1 0.55 16 1.580247 1 0.008333 16


4.62 16 1.580 1 0.5 16 1.580247 1 0.008333 16
6.40 16 1.580 1 0.75 16 1.580247 1 0.008333 16

9.96 16 1.580 0 0.55 16 1.580247 0 0.008333 16


4.62 16 1.580 0 0.5 16 1.580247 0 0.008333 16
6.93 16 1.580 0 0.825 16 1.580247 0 0.008333 16

0.00 16 1.580 0 0.3 16 1.580247 0 0.008333 16


0.00 16 1.580 0 0.15 16 1.580247 0 0.008333 16
0.00 16 1.580 0 0.15 16 1.580247 0 0.008333 16
52.44
REINFORCEMENT BARS
NAL BARS
TOTAL WEIGHT (KG) 15
RIGHT SUPPORT TOP BAR @ L/4 BOQ BEAM SPACE FOR ZONE 1

BAR SIZE UNIT


WT PER WT ALL WEIGHT
UNIT WT QTY LENGTH BEAM BEAM QTY @SPACE

KG/M (PCS) (M) (KG) (KG) (mm) (KG/M) (PCS) (mm)


0.889 0 0.125 0 0 10 0.62 2 50

1.580 1 0.075 3 6 10 0.62 2 50

1.580 1 0.075 3 6 10 0.62 2 50


1.580 1 0.025 3 3 10 0.62 2 50
1.580 1 0.05 4 4 10 0.62 2 50

1.580 0 0.075 0 0 10 0.62 2 50


1.580 0 0.025 0 0 10 0.62 2 50
1.580 0 0.05 0 0 10 0.62 2 50
19
1.580 0 0.025 2 2 10 0.62 2 50
1.580 0 0.025 1 2 10 0.62 2 50
1.580 0 0.025 1 2 10 0.62 2 50
6
STIRRUPS FOR THE ENTIRE BEAM SPAN
BEAM SPACE FOR ZONE 2 BEAM SPACE FOR ZONE 3 REST SPACE STIRRUPS
TOTAL CLEAR
LENGTH REMAINING
LENGTH LENGTH OF REMAINING
QTY @SPACE QTY SPACE OF GIVEN OF BEAM
STIRRUPS REST QTY
STIRRUPS
(PCS) (mm) (PCS) (mm) (mm) (M) (M) (PCS)
5 75 6 100 2150 10 8 39

5 75 6 100 2150 2 0 2

5 75 6 100 2150 2 0 2
5 75 6 100 2150 2 0 1
5 75 6 100 2150 3 1 6

5 75 6 100 2150 2 0 2
5 75 6 100 2150 2 0 1
5 75 6 100 2150 3 1 7

0 75 0 100 200 1 1 0
0 75 0 100 200 1 0 0
0 75 0 100 200 1 0 0
TOTAL WEIGHT (KG)

PACE STIRRUPS BOQ BOM


TOTAL TOTAL LENGTH TOTAL LENGTH
QTY OF LENGTH OF ALL OF ALL @6 M
SPACING FOR BEAM EACH STIRRUPS PER STIRRUPS ALL UNIT TOTAL WT OF
REMAING STIRRUPS BEAM BEAMS WEIGHT ALL \STIRRUPS COMMERCIAL
LENGTH

(mm) (PCS) (M) (M) (M) KG/M (KG) (PCS)


200 52 1.20 62 62 0.62 38.52 11
52

200 15 1.30 20 39 0.62 24.07 8


15
200 15 1.30 20 39 0.62 24.07 8
200 14 1.30 18 18 0.62 11.23 4
200 19 1.30 25 25 0.62 15.25 5

200 15 1.30 20 39 0.62 24.07 8


200 14 1.30 18 18 0.62 11.23 4
200 20 1.30 26 26 0.62 16.05 5

200 2 0.40 1 1 0.62 0.49 1


200 2 0.40 1 2 0.62 0.99 1
200 2 0.40 1 2 0.62 0.99 1
166.98
FORMWORKS
59
FORMWORKS

#16 TIE AREA PER AREA ALL


WIRE BEAM BEAM

(KG) (sqm) (sqm)


1.57 5.82 5.82

1.36 2.31 4.62

1.36 2.31 4.62


0.63 2.10 2.10 11.34
0.86 3.15 3.15 9.87

1.36 2.31 4.62 9.87


0.63 2.10 2.10 9.87
0.91 3.47 3.47 10.19
17.75 24.68
0.05 0.36 0.36
0.09 0.18 0.36
0.09 0.18 0.36
8.91 0.72 1.08
MARK QTY INNER SLAB DIMENSIONS SURFACE
X Y Z AREA
S2-1 1
(FT) (FT) (IN) (SQM)
X Y Z
FT ENGLISH 7.216 7.216 0.328
M METRIC 2.2 2.2 0.1 4.84

0.98 0.91

3.2 3m
10.496 9.84 ft
TOP BARS ( - )

Y DIRECTION X DIRECTION

@TOP SUPPORT (Y1)


@LEFT SUPPORT (X1)
MARK QTY INNER SLAB DIMENSIONS
X Y Z
S2-2 0
(FT) (FT) (IN)
X Y Z
ENGLISH 11.808 9.84 0.328
METRIC 3.6 3 0.1
X DIRECTION
@LEFT SUPPORT (X1)
TOP BARS ( - )

Y DIRECTION

@TOP SUPPORT (Y1)

MARK QTY INNER SLAB DIMENSIONS


X Y Z
S2-3 0
(FT) (FT) (IN)
X Y Z
ENGLISH 12.136 9.84 0.328
METRIC 3.7 3 0.1
X DIRECTION
@LEFT SUPPORT (X1)
TOP BARS ( - )

Y DIRECTION

@TOP SUPPORT (Y1)

MARK QTY INNER SLAB DIMENSIONS


X Y Z
S2-4 0
S2-4 0
(FT) (FT) (IN)
X Y Z
ENGLISH 10.496 14.104 0.328
METRIC 3.2 4.3 0.1
TOP BARS ( - )

Y DIRECTION X DIRECTION

@TOP SUPPORT (Y1)


@LEFT SUPPORT (X1)
CONCRETING FORMWORKS REINFORCEMEN
TOTAL PERIMITER AREA
SLAB TO BEAM SUPPORTS\
VOLUME X-DIR @TOP
(CUM) (SQM) @BOTTOM
EFF DIM

0.484 5.72 POSITIVE REINFORCEMENTS (+)

X DIRECTION
BOTTOM BARS ( + )

Y DIRECTION

NEGATIVE REINFORCEMENTS (+)


X DIRECTION
TOP BARS (-)
@LEFT SUPPORT

INCH
ENGLISH (INCH) 6
METRIC (CM) 15.24

ENGLISH
VALUE
DIAMETER 0.5
ASSUMED SPACING 6
BAR QTY 16
ACTUAL SPACING 5.77
LENGTH 1.80
@LEFT SUPPORT (X1) AREA 3.14
VOLUME 68.01
SLAB WEIGHT 19.29
QUANTITY 1.00
TOTAL WEIGHT 19.29
DIAMETER 0.50
ASSUMED SPACING 6
BAR QTY 16
ACTUAL SPACING 5.77
LENGTH 1.80
@TOP SUPPORT (Y1) AREA 3.14
VOLUME 68.01
SLAB WEIGHT 19.29
QUANTITY 1.00
TOTAL WEIGHT 19.29

TOTAL WEIGHT SUMMARY


X DIRECTION
TOP BARS (-)
@LEFT SUPPORT

ENGLISH (LBS) 19.29


METRIC (KG) 8.75
SLAB TO BEAM SUPPORTS\
X-DIR @TOP
@BOTTOM
EFF DIM
FT
M POSITIVE REINFORCEMENTS (+)

X DIRECTION
BOTTOM BARS ( + )

Y DIRECTION

NEGATIVE REINFORCEMENTS (+)


X DIRECTION
TOP BARS (-)
@LEFT SUPPORT
TOP BARS (-)
@LEFT SUPPORT

ENGLISH (INCH) 6
METRIC (CM) 15.24

ENGLISH
VALUE
DIAMETER 0.5
ASSUMED SPACING 6
BAR QTY 16
ACTUAL SPACING 5.77
LENGTH 1.80
@LEFT SUPPORT (X1) AREA 3.14
VOLUME 68.01
SLAB WEIGHT 19.29
QUANTITY 0.00
TOTAL WEIGHT 0.00
DIAMETER 0.50
ASSUMED SPACING 6
BAR QTY 25
ACTUAL SPACING 3.61
LENGTH 1.80
@TOP SUPPORT (Y1) AREA 4.91
VOLUME 106.26
SLAB WEIGHT 30.13
QUANTITY 0.00
TOTAL WEIGHT 0.00

TOTAL WEIGHT SUMMARY


X DIRECTION
TOP BARS (-)
@LEFT SUPPORT

ENGLISH (LBS) 0.00


METRIC (KG) 0.00

SLAB TO BEAM SUPPORTS\


X-DIR @TOP
@BOTTOM
EFF DIM
FT
M POSITIVE REINFORCEMENTS (+)

X DIRECTION
BOTTOM BARS ( + )

Y DIRECTION

NEGATIVE REINFORCEMENTS (+)


X DIRECTION
TOP BARS (-)
@LEFT SUPPORT

ENGLISH (INCH) 6
METRIC (CM) 15.24

ENGLISH
VALUE
DIAMETER 0.5
ASSUMED SPACING 6
BAR QTY 16
ACTUAL SPACING 5.77
LENGTH 1.80
@LEFT SUPPORT (X1) AREA 3.14
VOLUME 68.01
SLAB WEIGHT 19.29
QUANTITY 0.00
TOTAL WEIGHT 0.00
DIAMETER 0.50
ASSUMED SPACING 6
BAR QTY 26
ACTUAL SPACING 3.46
LENGTH 1.80
@TOP SUPPORT (Y1) AREA 5.11
VOLUME 110.51
SLAB WEIGHT 31.34
QUANTITY 0.00
TOTAL WEIGHT 0.00

TOTAL WEIGHT SUMMARY


X DIRECTION
TOP BARS (-)
@LEFT SUPPORT

ENGLISH (LBS) 0.00


METRIC (KG) 0.00

SLAB TO BEAM SUPPORTS\


X-DIR @TOP
@BOTTOM
EFF DIM
FT
M POSITIVE REINFORCEMENTS (+)

X DIRECTION
BOTTOM BARS ( + )

Y DIRECTION

NEGATIVE REINFORCEMENTS (+)


X DIRECTION
TOP BARS (-)
@LEFT SUPPORT
ENGLISH (INCH) 6
METRIC (CM) 15.24

ENGLISH
VALUE
DIAMETER 0.5
ASSUMED SPACING 6
BAR QTY 16
ACTUAL SPACING 5.77
LENGTH 1.80
@LEFT SUPPORT (X1) AREA 3.14
VOLUME 68.01
SLAB WEIGHT 19.29
QUANTITY 0.00
TOTAL WEIGHT 0.00
DIAMETER 0.50
ASSUMED SPACING 6
BAR QTY 22
ACTUAL SPACING 4.12
LENGTH 1.80
@TOP SUPPORT (Y1) AREA 4.32
VOLUME 93.51
SLAB WEIGHT 26.52
QUANTITY 0.00
TOTAL WEIGHT 0.00

TOTAL WEIGHT SUMMARY


X DIRECTION
TOP BARS (-)
@LEFT SUPPORT

ENGLISH (LBS) 0.00


METRIC (KG) 0.00
REINFORCEMENTS
TO BEAM SUPPORTS\
9 Y-DIR @LEFT 9
9 @RIGHT 9
8.716 EFF DIM 8.716

ENTS (+) ASSUMED SPACING 6 INCH


BAR DIAMETER 0.5 INCH

ENGLISH METRIC
VALUE UOM VALUE UOM check

DIAMETER 0.5 INCH 1.27 CM 1.27


ASSUSMED SPACING 6 INCH 15.24 CM 15.24
BAR QTY 15 PCS 16 PCS
ACTUAL SPACING 6.19 INCH 14.67 CM 15.71
AREA 2.95 SQ INCH 20.27 SQ CM 19
LENGTH 104.59 INCH 265.73 CM
VOLUME 308.05 CU INCH 5385.93 CU CM 5048
UNIT WEIGHT 87.35 LBS/cuf 42.28 KG 39.705
QUANTITY 1 PCS 1 PCS
TOTAL WEIGHT 87.35 LBS 42.28 KG 39.705
DIAMETER 0.5 INCH 1.27 CM 1.27
ASSUMED SPACING 6 INCH 15.24 CM 15.24
BAR QTY 15 PCS 16 PCS
ACTUAL SPACING 6.19 INCH 14.67 CM 15.71
AREA 2.95 SQ INCH 20.27 SQ CM 19
LENGTH 104.59 INCH 265.73 CM 265.66
VOLUME 308.05 CU INCH 5385.93 CU CM 5048
UNIT WEIGHT 87.35 LBS.cuf 42.28 KG 39.705
QUANTITY 1.00 PCS 1.00 PCS
TOTAL WEIGHT
87.35 LBS 42.28 KG 39.705

#16 TIE WIRE 1.94 KG

ASSUMED SPACING 6 INCH


NFORCEMENTS (+)
BAR DIAMETER 0.5 INCH
X DIRECTION Y DIRECTION
@BOTTOM
@RIGHT SUPPORT @TOP SUPPORT
SUPPORT

INCH INCH INCH


6 6 6
15.24 15.24 15.24

ENGLISH METRIC
UOM VALUE UOM check
INCH 1.27 CM 1.27
INCH 15.24 CM 15.24
PCS 16 PCS
INCH 14.67 CM 14.662912
FT 0.55 MTR 0.55 k @RIGHT
SQ INCH 20.27 SQ CM 20.268299164 kk SUPPORT (X
CU INCH 1114.76 CU CM 1114.4710764 k
LBS 8.75 KG 8.7659161681 k
PCS 1.00 PCS
LBS 8.75 KG 8.7659161681
INCH 1.27 CM K
INCH 15.24 CM K
PCS 15 PCS k
INCH 0.00 CM k
FT 0.55 MTR 0.55 @BOTTOM
SQ INCH 19.00 SQ CM 20.268299164 SUPPORT (Y
CU INCH 1045.08 CU CM 1114.4710764
LBS 8.20 KG 8.7659161681
PCS 1.00 PCS
LBS 8.20 KG 8.7659161681
#16 TIE WIRE 1.811 KG

TOTAL WEIGHT SUMMARY


X DIRECTION Y DIRECTION
@BOTTOM TOTAL
@RIGHT SUPPORT @TOP SUPPORT
SUPPORT WEIGHT

19.29 19.29 19.29 77.14


8.75 8.20 8.75 34.46
TO BEAM SUPPORTS\
9 Y-DIR @LEFT 9
9 @RIGHT 9
13.308 EFF DIM 11.34

ENTS (+) ASSUMED SPACING 6 INCH


BAR DIAMETER 0.5 INCH

ENGLISH METRIC
VALUE UOM VALUE UOM check

DIAMETER 0.5 INCH 1.27 CM 1.27


ASSUSMED SPACING 6 INCH 15.24 CM 15.24
BAR QTY 21 PCS 21 PCS
ACTUAL SPACING 5.90 INCH 15.00 CM 15
AREA 4.12 SQ INCH 26.60 SQ CM 26.602
LENGTH 136.08 INCH 345.73 CM
VOLUME 561.10 CU INCH 9197.20 CU CM 9195
UNIT WEIGHT 159.11 LBS 72.20 KG 72.322
QUANTITY 0 PCS 0 PCS
TOTAL WEIGHT 0.00 LBS 0.00 KG 0
DIAMETER 0.5 INCH 1.27 CM 1.27
ASSUMED SPACING 6 INCH 15.24 CM 15.24
BAR QTY 25 PCS 25 PCS
ACTUAL SPACING 3.61 INCH 15.00 CM 9.1643
AREA 4.91 SQ INCH 31.67 SQ CM 31.669
LENGTH 159.70 INCH 405.73 CM 405.63
VOLUME 783.91 CU INCH 12849.21 CU CM 12846
UNIT WEIGHT 222.29 LBS 100.87 KG 101
QUANTITY 0.00 PCS 1.00 PCS
TOTAL WEIGHT
0.00 LBS 100.87 KG 0

#16 TIEWIRE 0.00 KG

ASSUMED SPACING 6 INCH


NFORCEMENTS (+)
BAR DIAMETER 0.5 INCH
X DIRECTION Y DIRECTION
@BOTTOM
@RIGHT SUPPORT @TOP SUPPORT
SUPPORT
@BOTTOM
@RIGHT SUPPORT @TOP SUPPORT
SUPPORT

6 6 6
15.24 15.24 15.24

ENGLISH METRIC
UOM VALUE UOM check
INCH 1.27 CM 1.27
INCH 15.24 CM 15.24
PCS 16 PCS
INCH 14.67 CM 14.662912
FT 0.55 MTR 0.55 k @RIGHT
SQ INCH 20.27 SQ CM 20.268299164 kk SUPPORT (X
CU INCH 1114.76 CU CM 1114.4710764 k
LBS 8.75 KG 8.7659161681 k
PCS 0.00 PCS
LBS 0.00 KG 0
INCH 1.27 CM K
INCH 15.24 CM K
PCS 24 PCS k
INCH 0.00 CM k
FT 0.55 MTR 0.55 @BOTTOM
SQ INCH 30.40 SQ CM 31.669217444 SUPPORT (Y
CU INCH 1672.13 CU CM 1741.3610568
LBS 13.13 KG 13.696744013
PCS 0.00 PCS
LBS 0.00 KG 0
#16 TIE WIRE 0.000 KG

TOTAL WEIGHT SUMMARY


X DIRECTION Y DIRECTION
@BOTTOM TOTAL
@RIGHT SUPPORT @TOP SUPPORT
SUPPORT WEIGHT

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00

TO BEAM SUPPORTS\
9 Y-DIR @LEFT 9
9 @RIGHT 9
13.636 EFF DIM 11.34

ENTS (+) ASSUMED SPACING 6 INCH


BAR DIAMETER 0.5 INCH

ENGLISH METRIC
VALUE UOM VALUE UOM check

DIAMETER 0.5 INCH 1.27 CM 1.27


ASSUSMED SPACING 6 INCH 15.24 CM 15.24
BAR QTY 21 PCS 21 PCS
ACTUAL SPACING 5.90 INCH 15.00 CM 15
AREA 4.12 SQ INCH 26.60 SQ CM 26.602
LENGTH 136.08 INCH 345.73 CM
VOLUME 561.10 CU INCH 9197.20 CU CM 9195
UNIT WEIGHT 159.11 LBS 72.20 KG 72.322
QUANTITY 0 PCS 0 PCS
TOTAL WEIGHT 0.00 LBS 0.00 KG 0
DIAMETER 0.5 INCH 1.27 CM 1.27
ASSUMED SPACING 6 INCH 15.24 CM 15.24
BAR QTY 25 PCS 25 PCS
ACTUAL SPACING 3.61 INCH 15.42 CM 9.1643
AREA 4.91 SQ INCH 31.67 SQ CM 31.669
LENGTH 163.63 INCH 415.73 CM 415.63
VOLUME 803.23 CU INCH 13165.90 CU CM 13163
UNIT WEIGHT 227.77 LBS 103.35 KG 103.53
QUANTITY 0.00 PCS 1.00 PCS
TOTAL WEIGHT
0.00 LBS 103.35 KG 0

#16 TIE WIRE 0.00 KG

ASSUMED SPACING 6 INCH


NFORCEMENTS (+)
BAR DIAMETER 0.5 INCH
X DIRECTION Y DIRECTION
@BOTTOM
@RIGHT SUPPORT @TOP SUPPORT
SUPPORT

6 6 6
15.24 15.24 15.24

ENGLISH METRIC
UOM VALUE UOM check
INCH 1.27 CM 1.27
INCH 15.24 CM 15.24
PCS 16 PCS
INCH 14.67 CM 14.662912
FT 0.55 MTR 0.55 k @RIGHT
SQ INCH 20.27 SQ CM 20.268299164 kk SUPPORT (X
CU INCH 1114.76 CU CM 1114.4710764 k
LBS 8.75 KG 8.7659161681 k
PCS 0.00 PCS
LBS 0.00 KG 0
INCH 1.27 CM K
INCH 15.24 CM K
PCS 25 PCS k
INCH 0.00 CM k
FT 0.55 MTR 0.55 @BOTTOM
SQ INCH 31.67 SQ CM 32.935986141 SUPPORT (Y
CU INCH 1741.81 CU CM 1811.0154991
LBS 13.67 KG 14.244613773
PCS 0.00 PCS
LBS 0.00 KG 0

#16 TIE WIRE 0.00 KG

TOTAL WEIGHT SUMMARY


X DIRECTION Y DIRECTION
@BOTTOM TOTAL
@RIGHT SUPPORT @TOP SUPPORT
SUPPORT WEIGHT

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00

TO BEAM SUPPORTS\
9 Y-DIR @LEFT 9
9 @RIGHT 9
11.996 EFF DIM 15.604

ENTS (+) ASSUMED SPACING 6 INCH


BAR DIAMETER 0.5 INCH

ENGLISH METRIC
VALUE UOM VALUE UOM check

DIAMETER 0.5 INCH 1.27 CM 1.27


ASSUSMED SPACING 6 INCH 15.24 CM 15.24
BAR QTY 29 PCS 29 PCS
ACTUAL SPACING 6.04 INCH 15.36 CM 15.353
AREA 5.69 SQ INCH 36.74 SQ CM 36.736
LENGTH 187.25 INCH 475.73 CM
VOLUME 1066.22 CU INCH 17476.62 CU CM 17472
UNIT WEIGHT 302.34 LBS 137.19 KG 137.43
QUANTITY 0.00 PCS 0 PCS
TOTAL WEIGHT 0.00 LBS 0.00 KG 0
DIAMETER 0.5 INCH 1.27 CM 1.27
ASSUMED SPACING 6 INCH 15.24 CM 15.24
BAR QTY 22 PCS 22 PCS
ACTUAL SPACING 4.12 INCH 15.24 CM 10.474
AREA 4.32 SQ INCH 27.87 SQ CM 27.869
LENGTH 143.95 INCH 365.73 CM 365.64
VOLUME 621.83 CU INCH 10192.54 CU CM 10190
UNIT WEIGHT 176.33 LBS 80.01 KG 80.149
QUANTITY 0.00 PCS 1.00 PCS
TOTAL WEIGHT
0.00 LBS 80.01 KG 0

ASSUMED SPACING 6 INCH


NFORCEMENTS (+)
BAR DIAMETER 0.5 INCH
X DIRECTION Y DIRECTION
@BOTTOM
@RIGHT SUPPORT @TOP SUPPORT
SUPPORT
6 6 6
15.24 15.24 15.24

ENGLISH METRIC
UOM VALUE UOM check
INCH 1.27 CM 1.27
INCH 15.24 CM 15.24
PCS 16 PCS
INCH 14.67 CM 14.662912
FT 0.55 MTR 0.55 k @RIGHT
SQ INCH 20.27 SQ CM 20.268299164 kk SUPPORT (X
CU INCH 1114.76 CU CM 1114.4710764 k
LBS 8.75 KG 8.7659161681 k
PCS 0.00 PCS
LBS 0.00 KG 0
INCH 1.27 CM K
INCH 15.24 CM K
PCS 21 PCS k
INCH 0.00 CM k
FT 0.55 MTR 0.55 @BOTTOM
SQ INCH 26.60 SQ CM 27.86891135 SUPPORT (Y
CU INCH 1463.12 CU CM 1532.39773
LBS 11.49 KG 12.053134731
PCS 0.00 PCS
LBS 0.00 KG 0
#16 TIE WIRE 0.000 KG

TOTAL WEIGHT SUMMARY


X DIRECTION Y DIRECTION
@BOTTOM TOTAL
@RIGHT SUPPORT @TOP SUPPORT
SUPPORT WEIGHT

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
ENGLISH METRIC
VALUE UOM VALUE UOM check
DIAMETER 0.5 INCH 1.27 CM 1.27
ASSUMED SPACING 6 INCH 15.24 CM 15.24
BAR QTY 16 PCS 16 PCS
ACTUAL SPACING 5.77 INCH 14.67 CM 14.66291
@RIGHT LENGTH 1.804 INCH 0.55 MTR 0.55
SUPPORT (X2) AREA 3.14 SQ INCH 20.27 SQ CM 20.2683
VOLUME 68.01 CU INCH 1114.76 CU CM 1114.471
SLAB WEIGHT 19.29 UOM 8.75 KG 8.765916
QUANTITY 1.00 PCS 1.00 PCS
TOTAL WEIGHT 19.29 LBS 8.75 KG 8.765916
DIAMETER 0.50 INCH 1.27 CM 1.27
ASSUMED SPACING 6 INCH 15.24 CM 15.24
BAR QTY 16 PCS 16 PCS
ACTUAL SPACING 5.77 INCH 0.00 CM 14.66291
@BOTTOM LENGTH 1.80 FT 0.55 MTR 0.55
SUPPORT (Y1) AREA 3.14 SQ INCH 20.27 SQ CM 20.2683
VOLUME 68.01 CU INCH 1114.76 CU CM 1114.471
SLAB WEIGHT 19.29 LBS 8.75 KG 8.765916
QUANTITY 1.00 PCS 1.00 PCS
TOTAL WEIGHT 19.29 LBS 8.75 KG 8.765916
#16 TIE WIRE 1.94 KG
ENGLISH METRIC
VALUE UOM VALUE UOM check
DIAMETER 0.5 INCH 1.27 CM 1.27
ASSUMED SPACING 6 INCH 15.24 CM 15.24
BAR QTY 16 PCS 16 PCS
ACTUAL SPACING 5.77 INCH 14.67 CM 14.66291
@RIGHT LENGTH 1.804 INCH 0.55 MTR 0.55
SUPPORT (X2) AREA 3.14 SQ INCH 20.27 SQ CM 20.2683
VOLUME 68.01 CU INCH 1114.76 CU CM 1114.471
SLAB WEIGHT 19.29 UOM 8.75 KG 8.765916
QUANTITY 0.00 PCS 0.00 PCS
TOTAL WEIGHT 0.00 LBS 0.00 KG 0
DIAMETER 0.50 INCH 1.27 CM 1.27
ASSUMED SPACING 6 INCH 15.24 CM 15.24
BAR QTY 16 PCS 21 PCS
ACTUAL SPACING 5.77 INCH 0.00 CM 14.66291
@BOTTOM LENGTH 1.80 FT 0.55 MTR 0.55
SUPPORT (Y1) AREA 3.14 SQ INCH 26.60 SQ CM 20.2683
VOLUME 68.01 CU INCH 1463.12 CU CM 1114.471
SLAB WEIGHT 19.29 LBS 11.49 KG 8.765916
QUANTITY 0.00 PCS 0.00 PCS
TOTAL WEIGHT 0.00 LBS 0.00 KG 0
#16 TIE WIRE 0.000
ENGLISH METRIC
VALUE UOM VALUE UOM check
DIAMETER 0.5 INCH 1.27 CM 1.27
ASSUMED SPACING 6 INCH 15.24 CM 15.24
BAR QTY 16 PCS 16 PCS
ACTUAL SPACING 5.77 INCH 14.67 CM 14.66291
@RIGHT LENGTH 1.804 INCH 0.55 MTR 0.55
SUPPORT (X2) AREA 3.14 SQ INCH 20.27 SQ CM 20.2683
VOLUME 68.01 CU INCH 1114.76 CU CM 1114.471
SLAB WEIGHT 19.29 UOM 8.75 KG 8.765916
QUANTITY 0.00 PCS 0.00 PCS
TOTAL WEIGHT 0.00 LBS 0.00 KG 0
DIAMETER 0.50 INCH 1.27 CM 1.27
ASSUMED SPACING 6 INCH 15.24 CM 15.24
BAR QTY 16 PCS 21 PCS
ACTUAL SPACING 5.77 INCH 0.00 CM 14.66291
@BOTTOM LENGTH 1.80 FT 0.55 MTR 0.55
SUPPORT (Y1) AREA 3.14 SQ INCH 26.60 SQ CM 20.2683
VOLUME 68.01 CU INCH 1463.12 CU CM 1114.471
SLAB WEIGHT 19.29 LBS 11.49 KG 8.765916
QUANTITY 0.00 PCS 0.00 PCS
TOTAL WEIGHT 0.00 LBS 0.00 KG 0

#16 TIE WIRE 0.00 KG


ENGLISH METRIC
VALUE UOM VALUE UOM check
DIAMETER 0.5 INCH 1.27 CM 1.27
ASSUMED SPACING 6 INCH 15.24 CM 15.24
BAR QTY 16 PCS 16 PCS
ACTUAL SPACING 5.77 INCH 14.67 CM 14.66291
@RIGHT LENGTH 1.804 INCH 0.55 MTR 0.55
SUPPORT (X2) AREA 3.14 SQ INCH 20.27 SQ CM 20.2683
VOLUME 68.01 CU INCH 1114.76 CU CM 1114.471
SLAB WEIGHT 19.29 UOM 8.75 KG 8.765916
QUANTITY 0.00 PCS 0.00 PCS
TOTAL WEIGHT 0.00 LBS 0.00 KG 0
DIAMETER 0.50 INCH 1.27 CM 1.27
ASSUMED SPACING 6 INCH 15.24 CM 15.24
BAR QTY 16 PCS 30 PCS
ACTUAL SPACING 5.77 INCH 0.00 CM 14.66291
@BOTTOM LENGTH 1.80 FT 0.55 MTR 0.55
SUPPORT (Y1) AREA 3.14 SQ INCH 38.00 SQ CM 20.2683
VOLUME 68.01 CU INCH 2090.17 CU CM 1114.471
SLAB WEIGHT 19.29 LBS 16.41 KG 8.765916
QUANTITY 0.00 PCS 0.00 PCS
TOTAL WEIGHT 0.00 LBS 0.00 KG 0
#16 TIE WIRE 0.000 KG
length #DIV/0! in
#DIV/0! ft
length #DIV/0! in
#DIV/0! ft
length #DIV/0! in
#DIV/0! ft
length #DIV/0! in
#DIV/0! ft
Steel Calculation of RCC Beam

Enter number of top bars 21


Enter the size of top bars = # = 4 # 0.5 inch
Enter the bottom of bars = # = 2
Enter the size of bottom bars = # = 4 # 0.5 inch
enter the length of beam 16.25 ft 5.0 m
enter the density of beam 7850 kg/m3

MARK AA01-BB-02 Y X X
QUANTITY 1 400 CM 250
Length (ft) (Y) 400 Width (X) 250

RCC SLAB STEEL ESTIMATION (Negative Steel)


MARK AA01-BB-02
QUANTITY 1
Y X X
BEAM CROSSECTIONAL SIZE in meters 400 cm 250

Length (ft) X Width


mtr
QUANTITY
Enter the inner slab dimensions = 10.09 ft 10.5
The Total Slab Dimensions = 11.59 12
Enter the steel diameter 1 in the X direction = inch
Enter the steel spacing 1 in X direction = inch
Enter the steel diameter 2 in the X direction = inch
Enter the steel spacing 2 in X direction = inch
Enter the steel diameter 1 in the Y direction = inch
Enter the steel spacing 1 in Y direction = inch
Enter the steel diameter 2 in the Y direction = inch
Enter the steel spacing 2 in Y direction = inch
enter the density of steel 490 lb/cft

SLAB SUPPORT TOP BOTTOM


BEAM MARK X Y MARK X Y
BOUNDARY & 250 400 250 400
SECTION 2BX3 2BX3
98.43 157.48 98.43 157.48

GRID MARK TYPE SECTION LENGTH METRIC LENGTH


INNER SLAB AA-01 X 280 CM 110.24
DIMENSIONS TO S2 Y 263 CM 103.54
BB-02 Z (t) 10 CM 3.94
MM INCH
DIAMETER 1 12 0.5

STEEL REINFORCEMENTS

X DIRECTION
SPACING 1 23 9
DIAMETER 2 12 0.5
SPACING 2 23 9
DIAMETER 1 12 0.5

Y DIRECTION
SPACING 1 23 9
DIAMETER 2 12 0.5
SPACING 2 23 9

QTY 15 PCS
LENGTH 2.52 ft
X DIRECTION

X1 BARS AREA 2.95 inch2


VOLUME 89.15 inch3
MASS 25.3 LBS
QTY 15 PCS
LENGTH 2.52 ft
X2 BARS AREA 2.95 inch2
TOTAL VOLUME 89.15 inch3
50.6 MASS 25.3 LBS
QTY 15 PCS
BAR LENGTH 3 ft
Y DIRECTION

Y1 BARS AREA 2.95 inch2


VOLUME 106.03 inch3
MASS 30.1 LBS
QTY 15 PCS
BAR LENGTH 2.625 ft
Y2 BARS AREA 2.95 inch2
TOTAL VOLUME 92.78 inch3
56.37 MASS 26.3 LBS
TOTAL WEIGHT OF STEEL IN X & Y DIRECTION 106.93 LBS

Solution

density = mass/volume
Area of bars in X1 direction = inch2
volume of bars in X1 direction = inch3
Area of bars in X2 direction = inch2
volume of bars in X2 direction = inch3
Area of bars in Y1 direction inch2
volume of bars in Y1 direction inch3
Area of bars in Y2 direction inch2
volume of bars in Y2 direction inch3
mass of bars in the X1 direction = lb
mass of bars in the X2 direction = lb
mass of bars in the Y1 direction = lb
mass of bars in the Y2 direction = lb

total amount of longitudinal steel 106.935 lb 48.61


QUANTITY
0.0127 m

0.0127 m

BB01-CC- Y X
CM 2 CM 400 CM 250
Length (ft 400 Width (X)

BB01-CC-02
1
` Y X X
cm 400 cm 250 cm

Length (ft) X Width


mtr mtr mtr

ft 10.08 ft 11.08 ft
11.58 12.58
0.5
9 inch
0.5
9 inch
0.5
9 inch
0.5
9 inch
L/4 490 lb/cft L/4

LEFT RIGHT UOM


MARK X Y MARK X Y
250 400 250 400 CM
2BY3 2BY3
98.43 157.48 98.43 157.48 INCH

ENGLISH REMARKS
INCH
INCH
INCH
15 Length of Bar X1 = 2.52
15 Length of Bar X2 = 2.52
16 Length of Bar Y1 = 3.145
16 Length of BarY2 = 2.77

2.95 inch2
89.06 inch3
2.95 inch2
89.06 inch3
3.14 inch2
118.56 inch3
3.14 inch2
104.43 inch3
25.3 lb
25.3 lb
33.62 lb
29.61 lb

kg 113.743 lb 51.70 kg
DD01-EE-02 Y X
1 CM 400 CM 250
Length (ft) (Y) 400 Width (X)
ft
ft
ft
ft

#REF! #REF!

#REF! #REF!
CONCRETE COVER

LENGTH (Y) 54
WIDTH (X) 10 columns
BAY SPACING 6 slab
NUMBER OF BAYS 9 footing
NUMBER OF FTGS 20 tie beam
beam
ENGLISH METRIC
density of steel 490 lb/cft 7850 KG/M3

CONCRETE COVER WINDOW SIZES


ITEM TOP BOTTOM LEFT RIGHT MARK X
(m) (m) (m) (m) W1 1.8
COLUMNS 0.05 0.05 0.05 0.05 W2 1.8
SLABS 0.05 0.05 0.05 0.05 W3B 1.2
BEAMS 0.05 0.05 0.05 0.05 W4 1.8
FOOTINGS 0.075 0.075 0.075 0.075

CHB LAYING
QTY CHB PER SQM 12.5 W5 0.8
W6 0.8
PLASTERING FACTOR W3A 1.2
CEMENT 0.288
SAND 0.016

WALL REBAR SPACING (M)


ALONG X 0.6
ALONG Y 0.6
CONCRETE COVER
TOP BOTTOM X Y
(m) (m) (m) (m)
0.025 0.025 0.025 0.025
0.025 0.025 0.025 0.025
0.075 0.075 0.075 0.075
0.075 0.075 0.075 0.075
0.025 0.025 0.025 0.025

DOORS SIZES
Y AREA QTY MARK X Y AREA QTY
1.2 2.16 6 D1 1.1 2.1 2.31 1
0.6 1.08 1 D2 0.9 2.1 1.89 7
1 1.2 2 D3 1 2.1 2.1 2
1.2 2.16 1 D4 0.9 2.1 1.89 4

1.2 0.96 6 D5 0.9 2.1 1.89 5


0.5 0.4 3 D6 0.6 2.1 1.26 2
1 1.2 2 D7 0.6 2.1 1.26 1
FORMWORKS CONCRETING

STRUCTURAL SPECIFICATIONS & DIMENTIONS BOQ BOQ BILL OF MATERIALS (BOM)

TOTAL
SURFACE TOTAL
MARK QTY X Y t PERIMETER CEMENT SAND GRAVEL
AREA VOLUME
AREA

sets (m) (m) (m) (sq m) (sq m) (cu m) (BAGS) (CUM) (CUM)
SOG 1.00 2.20 7.50 0.150 16.5 2.91 2.475 23 1.2 2.5
2.475

B.2 GRAVEL BED (100mm THK)

B.2.1 FOOTING
B.2.2 WALL FOOTING
B.2.3 S.O.G
CRETING REINFORCEMENTS BARS
OF MATERIALS (BOM) LENGTH ALONG SPACE ALONG QTY ALONG TOTAL LENGTH OF BARS BOQ

BAR
SIZE UNIT WT TOTAL
CLEAR COVER X Y X Y X Y X Y
OF BAR BAR WT

(m) (mm) (m) (m) (m) (m) (m) (m) (m) (m) KG/M (KG)
0.025 10 2.20 7.50 0.3 0.3 9 26 19.8 195 0.617 133
133
X Y
GRAVEL BED (100mm THK) QTY t AREA VOLUME
MARK sets (m) (m) (m) (sq m) (cu m)

FOOTING F-1 1.00 0.130 #REF! #REF!


WALL FOOTING 0.130 #REF! #REF!
### 10.00 0.100 540.00 54.00

#REF! #REF!
BILL OF QUANTITY (BOQ) BILL OF M
BOM QTY
UNIT TOTAL
QTY bars @ QTY UOM PARTICULARS
# TIE COST AMOUNT
6m WIRES
commercial
length
(PCS) (KG) 2 cum concreting 2500 6188 22
37 1.77 133 KG 10 MM REBARS 55 7315 1
1.77 13503 20
#REF!
SUMMARY

TOTAL MATERIALS
BILL OF MATERIALS (BOM) LABOR
UOM PARTICULARS UNIT TOTAL QTY UOM
COST AMOUNT 2.48 SQM

bags CEMENT 260 5791.5 2.48 CUM


CUM SAND 950 1175.625 133 KG
sqm FORMWORKS 350 7000 1 SQM
KG 10 mm rebars 55 #REF!

#REF!

SUMMARY
TOTAL MATERIALS #REF!
TOTAL LABOR 4849.95
TOTAL LABOR AND MATERIALS #REF!
TOTAL VOLUME OF SLAB 2.475
TOTAL

PRICE PER CUM #REF!


LABOR EQUIPMENT

PARTICULARS UNIT COST TOTAL QTY UOM PARTICULARS


POURING OF CONCRETE 2200 2202.48

POURING OF CONCRETE 2500 2502.48


REBAR FABRICATION 6 139.00
FORMWORKS FABRICATION 5 6.00
FORMWORKS INSTALL/DISMANTLE
4849.95
PMENT

UNIT COST TOTAL


TRUSS
ITEM MARK LOCATION STEEL SECTION MEMBER
LENGTH
(M)
PURLIN 2" X 4" X 2.0MM y-axis 1
x-axis 6.8

TRUSS T1 UPPER ROOF 2 1/2"X2 1/2"X3/16" Top Chord 10.1


2 1/2"X2 1/2"X3/16" Middle Chord 10.1
2 1/2"X2 1/2"X3/16" Bottom Chord 10.1
2 "X2 "X3/16" Vertical Chord 1.3
2 "X2 "X3/16" king post 1
2 "X2 "X3/16" Diagonal Chord 1.4

TRUSS T2 MAIN ROOF 2 "X2 "X3/16" Top Chord 10.1


2 "X2 "X3/16" Bottom Chord 10.1
2 "X2 "X3/16" Vertical Chord 0.4
2 "X2 "X3/16" king post 0.6
2 "X2 "X3/16" Diagonal Chord 0.8

RAFTER R3 2X6X2.0 MM TUBULAR main roof 6.8

TOTAL
2 1/2"X2 1/2"X3/16" 14
3"X3"X1/4"x 3/16 40
2" X 4" X 2.0MM 0
MEMBER TOTAL UNIT TOTAL ROOF MARK STEEL SECTION
BOQ
QTY LENGTH WEIGHT WEIGHT QTY
(PCS) (M) KG/MTR (KG) (PCS) (KG)
0 0 2.7 0 1 0 P1 2" X 4" X 2.0MM
0 0 3.47 0 1 0
0 0 0

0 8.8 4.6 40 1 40
0 0 4.6 0 1 0
0 0 4.6 0 1 0
0 1.3 3.57 5 1 5
0 1.3 3.57 5 1 5
0 1.3 3.57 5 1 5
12.7 54 54
0 0 11.8 0 9 0
0 0 11.8 0 9 0
0 0 3.57 0 9 0
0 0.6 3.57 2 9 19
0 0 3.57 0 9 0
0.6 2 19
57 74

3 20.4 8.99 183.396 1 183


PURLINS
LOCATION UNIT TOTAL ITEM
LENGTH MEMBER TOTAL BOQ
QTY LENGTH WEIGHT WEIGHT QTY
(M) (PCS) (M) KG/MTR (KG) (PCS) (KG)
y-axis 7.7 4 30.8 2.5 77 1 77
5.6 3 16.8 2.5 42 1 42
x-axis 3.2 2 6.4 2.5 16 1 16
135 135

2.5
2x4

x
RAFTERS
MARK STEEL SECTION LOCATION UNIT TOTAL
LENGTH MEMBER TOTAL
QTY LENGTH WEIGHT WEIGHT
(M) (PCS) (M) KG/MTR (KG)
R1 2" X 6" X 1.5mm 3.2 4 12.8 6.10 78.08
1.2 1 1.2 6.10 7.32
14 85
0

x
2x5

#NAME?
GUSSET PLATES
ITEM MARK STEEL SECTION LOCATION
BOQ LENGTH MEMBER
QTY QTY
(PCS) (KG) (M) (PCS)
1 78.08 P1 2" X 4" X 2.0MM y-axis 11.7 0
1 7.32 x-axis 6.3 0
85.4
ET PLATES
TOTAL UNIT TOTAL ITEM
BOQ
LENGTH WEIGHT WEIGHT QTY
(M) KG/MTR (KG) (PCS) (KG)
0 2.5 0 1 0
0 2.5 0 1 0
0 0 0
0
DIMENSIONS CONCRETE COVER UNIT VOL

X Y Z X Y Z VOLUME

MM2 (M) (M) (M) (M) (M) (M) (cum)


CT1 1266745 0.6 1.5 0.08 0.025 0.025 0.025 0.072
CT2 1821864 1 0.6 0.08 0.025 0.025 0.025 0.048
REINFORCEMENTS
TOTAL FORMWORKS X-BARS
BAR UNIT ASSUMED QTY ACTUAL TOTAL
QTY WT SPACING SPACING LENGTH
VOLUME AREA SIZE
(SQM) (MM) (KG/M) (M) (PCS) (M) (M)
3 0.216 1.236 10 0.617 0.120 14 0.115385 7.7
1 0.048 0.856 10 0.617 0.120 6 0.12 5.7
0.264 2.092

MAIN BARS
@TOP @BOTTO
UNIT
BAR SIZE WT QTY LENGTH BAR SIZE

(mm) KG/M (PCS) (M) (mm)


16 1.58 2 0.6 16
Y-BARS
TOTAL BAR UNIT ASSUMED QTY ACTUAL TOTAL #16 TIE
WEIGHT SIZE WT SPACING SPACING WEIGHT WIRES
(KG) (MM) (KG/M) (M) (PCS) (M) (KG) `
4.75 10 0.617 0.120 6 0.120 1.20 1.91
3.52 10 0.617 0.120 10 0.111 1.11 0.45
8.27 ` 2.31 2.36
(KG)

TOTAL WEIGHT (KG)


@BOTTOM
UNIT
WT QTY LENGTH

KG/M (PCS) (M)


1.58 2 0.6
COST 3000

LEN 2.4
WIDTH 1.2
AREA 2.88

1041.667 P/SQM

COL SIZE
LEN 0.3
WIDTH 0.3
HETGHT 0.6
EFF LEN INNER
1.2 2.4 3.6
0.3 COST
0.6 0.72 SQM 0.432 0.72

2.16 SQM 2250


BAR 300
2550
OUTDOOR TOILETS GRD 2NDFLR (Z) EFF
DOORS MARK WIDTH QTY QTY ALLOWANCE WIDTH
D6 0.7 6 2 0.2 0.9
D4 0.9 1 1 0.2 1.1

WINDOWS W3A 1 0 1 0.2 1.2


W6 0.5 3 1 0.2 0.7
1.9
y x TOTAL UNIT ALL FORMWORKS
HEIGHT DEPTH LENGTH VOL VOL UNIT AREA
0.1 0.1 7.2 0.009 0.072 0.27
0.1 0.1 2.2 0.011 0.022 0.33

1 1 1.2 0.0000000012 0.00000 3.6


1 1 2.8 7E-10 0.00000 2.1
TOTAL 13.4 0.0200000019 0.09400
0.188000008
FORMWORKS CARETAKER GRD 2NDFLR EFF
ALL AREA DOORS MARK WIDTH QTY QTY ALLOWANCE LENGTH
2.16 D6 70 6 2 20 90
0.66 D6 70 6 2 20 90

3.6 WINDOWS W1 180 0 20 200


8.4 W6 60 3 1 20 80
14.82
STORAGE GRD
HEIGHT DEPTH VOL DOORS MARK WIDTH QTY ALLOWANCE
100 100 0.0009 D6 70 2 20
100 100 0.0009 D6 70 2 20

100 100 0.002 WINDOWS W1 180 0 20


100 100 0.0008 W6 60 2 20
TOTAL 0.0046
EFF
LENGTH HEIGHT DEPTH VOL
90 100 100 0.0009
90 100 100 0.0009

200 100 100 0.002


80 100 100 0.0008
TOTAL 0.0046
STRUCTURE OUTSIDE TOILETS

FOOTING

Long Side (L) Short Side (S) Thickness (T) UNIT VOL
MARK
(M) (M) (M) (CUM)
f-2 1 1 0.3 0.3

1.2 1.2 0.3 0.432

Embedment
Depth of Excavation
Volume of Excavation
FOOTING EXCAVATION

CONCRETE COVER
QTY TOTAL VOL TOP BOT S-SIDE L-SIDE EMBEDMENT
(PCS) (CUM) (cm) (cm) (cm) (cm) (M)
12 3.6 75 75 75 75 1.5

14 1.5
EXCAVATION CONCRETING

DEPTH VOLUME TOT VOLUME CEMENT SAND GRAVEL BAR SIZE CLEAR COVER
(M) (M) (CUM) (BAGS) (CUM) (CUM) (mm) (M)
1.8 21.6 3.6 33 1.8 3.6 16 0.05

1.8 36.288 6.048 55 3.1 6.048 0.05


REINFORCEMENTS

BARS LENGTH ALONG BARS SPACING ALONG BAR QTY ALONG TOTAL LENGTH OF BARS
L S L S L S L S
0.9 0.9 0.2 0.2 6 6 6 6

9 9
6
WALL FOOTING

UNIT WT OF BAR TOTAL BAR WT # OF BARS # TIE WIRES Length (L) Width (L)
MARK
KG/M (KG) (PCS) (KG) (M) (M)
0.9 10.8 2 34.8 WF-2 8.25 0.5
8.25 0.5

1.1 1.1 46.2


CONCRETING REINFORCEMENT

Thickness (T) TOT VOL CEMENT SAND GRAVEL BAR SPACING


(M) CUM BAGS CUM CUM (M)
0.3 1.24 12 0.7 1.24 0.2
0.3 1.24 12 0.7 1.24
REINFORCEMENTS

TIES QTY HOR BAR QTY TOTAL BAR QTY USED #12 tie WIRE USED: MARK
(PCS) (PCS) (PCS) (KG) (KG)
43 5 9 0.7 C4
`
c1
COLUMN

DIMENSIONS CONCRETE COVER


FTG D1 D2 HEIGHT (H) BOT FTG TOP COL S-SIDE L-SIDE
REF (M) (M) (M) (M) (M) (M) (M)
f-2 0.3 0.2 8 0.75 0.4 0.4 0.4

0.25 0.25 5.9


BAR SIZE CLR COVER BARS LENGTH ALONGBARS SPACING ALONG BAR QTY ALONG
(mm) (M) L S L S L S

CONCRETING
VERTIC
MAIN BARS
UNIT VOLUME QTY TOT VOL CEMENT SAND GRAVEL BAR SIZE CLEAR COVER
(CUM) (PCS) (CUM) (BAGS) (CUM) (CUM) (mm) (M)
0.48 12 5.76 52 2.9 5.8 16 0.03

0.36875 11 4.05625 37 2.1 4.1 12

`
TOTAL LENGTH OF BARS UNIT WT OF BAR TOTAL BAR
L S KG/M (KG)

REINFORCEMENTS
VERTICAL BARS
MAIN BARS HOOKS LATERAL TIES
QTY HTIE SIZE L H1 H2 BAR SIZE LENGTH QTY SPACING
(PCS) (mm) (M) (M) (mm) (M) (PCS) (M)
6 6.818 0.256

8
# OF BARS# TIE WIRES
(PCS) (KG)

BEAMS
TOTAL

MARK BEAM DIMENSIONS COL VOLUME OF


LENGTH DEPTH WIDTH QTY CONCRETE CEMENT SAND
FTB-2 17.55 0.3 0.2 1 1.053 10 0.5
FTB-1 7.45 0.3 0.2 1 0.447 5 0.2

2BX-3 17.77 0.4 0.25 1 1.777 16 0.9


2BX-3 13.87 0.4 0.25 1 1.387 13 0.7
2BX-3 3.21 0.4 0.25 1 0.321 3 0.2
2BY-3 6.55 0.4 0.25 2 1.31 12 0.7
2BY-3 2.69 0.4 0.25 3 0.807 8 0.4
2BY-3 4.22 0.4 0.25 3 1.266 12 0.6
RBX-1 5.37 0.4 0.25 2 1.074 10 0.5
RBY-1 2.78 0.4 0.25 3 0.834 8 0.4
SLAB

MARK BEAM DIMENSIONS


GRAVEL AREA THICKNESS VOLUME
1.1 SOG 57.57 0.1 5.757
0.5 S2ALL 57.57 0.1 5.757

1.8 ROOF DECK 37 0.1 3.7


1.4
0.4
1.4
0.9
1.3
1.1
0.9