Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 49

PACKAGE #1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON PEOPLES BUS

SERVICE ROUTES IN DEFFERENT DISTRICTS OF KARACHI (LOT#1)


SUMMERY OF BILLS (IPA 02)

BILL NO DESCRIPTION Original BOQ Previous IPC This IPC Upto Date

1 BILL # 1: REPAIR OF WATER SUPPLY LINES 25,033,348.00 4,455,315.36 - 4,455,315.36

2 BILL # 2: REPAIR OF SEWER LINES 53,584,774.85 70,190,356.54 19,285,542.44 89,475,898.98

3 BILL # 3: EMP IMPLEMENTATION COST 3,392,800.00 908,000.00 - 908,000.00

4 BILL # 4: PROVISIONAL SUMS 7,496,000.00 6,414,532.00 - 6,414,532.00

SUB TOTAL 89,506,922.85 81,968,203.90 19,285,542.44 101,253,746.34

SALES TAX (SST) @ 13% 11,635,899.97 10,655,866.51 2,507,120.52 13,162,987.02

PRICE FOR LOT-1 (CARRIED FORWARD TO


101,142,822.82 92,624,070.41 21,792,662.95 114,416,733.36
GRAND SUMMARY)

Contractor's Representative Consultant's Representative


PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF
KARACHI (LOT#1)

BILL # 01: REPAIR OF WATER SUPPLY LINES

Original BOQ Previous IPC This IPC (IPC 02) Upto Date IPC
Sr. # Description Rate Amount (PKR) Amount
Unit Quantity Qunatity Amount (PKR) Qunatity Amount Qunatity
(PKR) (PKR)
Supply, installation, testing, disinfection and
commissioning of the following items of work (unless
specifically stated otherwise) including all jointing
material, wastages,labour, tools, accessories and
other incidentals, etc. required for completion of each
item as per specification, drwaings and / or as
directed by the Enginner/ Project manager.
(Provisional Quantites have been taken,to be
executed after approval of the Engineer)

CIVIL WORKS
1 Breaking of Existing Road Pavement Stucture 100Cft 45.00 5,000.00 225,000.00 4,089.13 204,456.53 - 4,089.13 204,456.53
Dismentling reinforced cement concrete
2 100Cft 1.00 8,000.00 8,000.00 - - - -
Dismentling reinforced cement concrete separating
3 reinforcemnt from concrete cleaning and 100Cft 5.00 8,000.00 40,000.00 - - - -
straightening the same

Excavation for pipe line in trenches, and pits in all


kind of soils of murum including trimming and
dressing sides to true alignment and shape levelling
of beds of trenches to correct level and grade,
cutting joint holes and disposal of surplus earth
4 1,000 Cft 19.20 35,000.00 672,000.00 10,085.41 352,989.35 - 10,085.41 352,989.35
within a one chain as directed by Engineer. Providing
fence guards, lights, flags and temporary
crossings for non-Vehicular traffic where ever
required lift upto 5ft. (1.52m) and lead upto one
chain (100ft).
Excavation for pipe line in trenches, and pit in hard
soils including trimming and dressing sides to ture
aligment and shape leveling of beds of trenches to
correct level and grade, cutting joint holes and
disposal of surplus earth within a one chain as
5 1,000 Cft 9.60 55,000.00 528,000.00 - - - -
directed by Engineer. Providing fence guards, lights,
flags and temporary crossings for non-Vehicular
traffic wherever required lift upto 5ft. (1.52m) and
lead upto one chain (100ft).
PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF
KARACHI (LOT#1)

BILL # 01: REPAIR OF WATER SUPPLY LINES

Original BOQ Previous IPC This IPC (IPC 02) Upto Date IPC
Sr. # Description Rate Amount (PKR) Amount
Unit Quantity Qunatity Amount (PKR) Qunatity Amount Qunatity
(PKR) (PKR)

Excavation for pipe line in trenches, and pits in soft


rock by hammering and chiseling where blasting is
not practicable or prohibited including trimming and
dressing sides to ture aligment and shape levelling
of beds of trenches to correct level and grade, cutting
6 1,000 Cft 3.20 55,000.00 176,000.00 - - - -
joint holes and disposal of surplus earth within a
one chain as directed by Engineer. Providing fence
guards, lights, flags and temporary crossings for
non-Vehicular traffic wherever required lift upto 5ft.
(1.52m) and lead upto one chain (100ft).

7 Earth for slush or daldal including dewatering 1000Cft 9.60 55,000.00 528,000.00 - - - -
Add for additional lift of every three ft. or part
8 thereof in excavation for pipelines & storage - -
tanks trenches and pits.

Lift from 5 ft to 8ft 1,000 Cft 8.00 35,000.00 280,000.00 4,889.18 171,121.45 - 4,889.18 171,121.45
Lift from 8 ft to 11ft 1,000 Cft 8.00 45,000.00 360,000.00 1,704.04 76,681.78 - 1,704.04 76,681.78
Lift from 11 ft to 14ft 1,000 Cft 4.00 55,000.00 220,000.00 - - -
Providing, laying and compacting (90% modified
AASHTO) sewer pipe bedding. The bedding material
shall be well grade granular fill with fine particles not
9 more than 15%. The granular fill aggregate shall be 100 Cft 9.00 12,000.00 108,000.00 - - - -
1" to 1-1/2" size complete in all respect as per
drawings, specification and direction by the
Engineer.
Supplying and filling sand over pipe line under road
10 100 Cft 15.00 12,000.00 180,000.00 - - - -
structure.
Providing and laying plain cement concrete including
all kind of form work. Hgoisting, placing
11 compacting. Finishing curing complete in all 100 Cft 1.00 90,000.00 90,000.00 - - - -
respect as shown on the drawing. Minimum
cylindrical strength 3000 Psi.
CHAMBERS - -
Providing and laying plain cement concrete including
all kind of form work. Hgoisting, placing
12 compacting. Finishing curing complete in all 100 Cft 1.00 90,000.00 90,000.00 - - - -
respect as shown on the drawing. Minimum
cylindrical strength 1500 Psi.
PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF
KARACHI (LOT#1)

BILL # 01: REPAIR OF WATER SUPPLY LINES

Original BOQ Previous IPC This IPC (IPC 02) Upto Date IPC
Sr. # Description Rate Amount (PKR) Amount
Unit Quantity Qunatity Amount (PKR) Qunatity Amount Qunatity
(PKR) (PKR)
Providing and laying reinforced cement concrete
having 3000 psi cylindrical strength including all kind
13 of form work. Hoisting, placing, compacting, 100 Cft 6.00 90,000.00 540,000.00 - - - -
Finishing, curing complete in all respect as shown on
the drawing.
Fabrication of mild steel reinforcement for cement
concrete including cutting, bending, laying in
14 position, making joints and fastenings including 100 Kg 27.00 35,000.00 945,000.00 - - - -
cost of binding wire (also include removal of rust).
Using tor bars (Grade-60).
Providing "expansion joint" in concrete work of 9"
wide corrugated PVC waterstoper (with bulb),
15 conforming to ASTM D2240 and D638 Type IV, Rft 74.67 1,900.00 141,873.00 - - - -
including soldering cost of material and labour etc.
complete.

Bitumen coating to plastered or cement concrete


16 100 Sft 5.00 8,000.00 40,000.00 - - - -
surface (20 lbs per 100Sft).
Poviding and fixing 6" thick R.C.C manhole cover
including all reinforcement with tee shaped C.I frame
17 of 22" i/d (frame weighting 37.324 Kg complete in all Each 4.00 18,000.00 72,000.00 - - - -
respect per drawing, Specifications and as
directed by the Engineer.

Providing and fixing Malleable Iron Steps (weight not


less than 5 Kg) in manholes, conforming to
18 specification as per drawing including carriage and Each 16.00 1,500.00 24,000.00 - - - -
setting the same to correct line and levels to
complete satisfaction of the Engineer.
19 RESTORATION OF ROAD - - - -
i Compaction of Natural Ground 100 Sft 30.00 800.00 24,000.00 - - - -
Formation of Embankment from Borrow Excavation
ii 100 Cft 60.00 8,000.00 480,000.00 - - - -
in common material
iii Subgrade Preparation in Earth Cut 100 Sft 30.00 1,800.00 54,000.00 - - - -

iv Granular Subbsae 100 Cft 23.00 8,000.00 184,000.00 11,403.01 912,241.11 - 11,403.01 912,241.11
v Aggregate Base Course 100 Cft 30.00 10,000.00 300,000.00 - - -
vi Asphaltic Base Course Plant mix (Class B) 100 Cft 6.00 90,000.00 540,000.00 - - - -
vii Cut - Back Asphlt for Bituminous Prime Coat 100 Sft 30.00 900.00 27,000.00 - - - -
viii Cut - Back Asphlt for Bituminous Tack Coat 100 Sft 30.00 900.00 27,000.00 - - - -
PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF
KARACHI (LOT#1)

BILL # 01: REPAIR OF WATER SUPPLY LINES

Original BOQ Previous IPC This IPC (IPC 02) Upto Date IPC
Sr. # Description Rate Amount (PKR) Amount
Unit Quantity Qunatity Amount (PKR) Qunatity Amount Qunatity
(PKR) (PKR)
ix Asphaltic Concrete for Wearing Course (Class "A") 100 Cft 6.00 90,000.00 540,000.00 - - - -
Refilling the excavated stuff in trenches 6" thick layer
20 i/c watering rammaning to full compaction etc. 1,000 Cft 26.00 35,000.00 910,000.00 2,223.57 77,825.06 - - 2,223.57 77,825.06
complete.
Transportation of Earth all types when the total
distance, including the lead covered in the item of - -
work, Is more than 1000 ft. (300m)
a) upto 1/4 mile (400m) 1,000 Cft 7.00 9,000.00 63,000.00 - - - -
b) for every 330 ft (100m) additional lead or part
therefore, beyond 1/4 mile (400m) upto one mile 1,000 Cft 7.00 5,000.00 35,000.00 - - - -
21
(1.6 Km).
c) for every 1/4 mile (400) additional lead or part
therefore, beyond one mile (1.6 Km) up to 5 mile 1,000 Cft 7.00 5,000.00 35,000.00 - - - -
(8Km).
d) for every 1/2 mile (800m) additional lead or part
therefore, beyond 5 miles (8 Km) for lead 35Km 1,000 Cft 7.00 5,000.00 35,000.00 - - - -

PIPING / MECHANICAL WORKS - -

Designing, manufacturing/fabrication, testing at


manufacturer's works, furnishing, installing, painting,
testing and commissioning at Site, placing in
satisfactory operating conditions of horizontal non
clogging trolley mounted pumping set (including
diesel Engine) with 15m head for diversion / disposal
22 of wastewater during construction of pipe line at - -
lower depth and for pumping out water found at
any depth from trenches and chambers along with
suction and delivery pipes of adequate length as per
specifications and as approved by the Engineer.
(Pump set shall be handed over to KWSB after the
completion of the project).

i) Capacity 2 cusec No 1.00 600,000.00 600,000.00 - - -

H.S diesel for trolley mounted Pumping set to be


23 Liters 4,800.00 350.00 1,680,000.00 - - -
consumed as per direction of the Engineer
Providing, fixing, jointing and testing of C.I flanged
sluice/ gate valve of aoproved quailty. Including
24 nuts, bolts, gasket and washers etc. Complete in - - - -
all respect as per drawings, specifications and as
directed by Engineer.
i 6" i/d Each 1.00 50,000.00 50,000.00 - - - -
PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF
KARACHI (LOT#1)

BILL # 01: REPAIR OF WATER SUPPLY LINES

Original BOQ Previous IPC This IPC (IPC 02) Upto Date IPC
Sr. # Description Rate Amount (PKR) Amount
Unit Quantity Qunatity Amount (PKR) Qunatity Amount Qunatity
(PKR) (PKR)
ii 16" i/d Each 1.00 300,000.00 300,000.00 - - - -
iii 18" i/d Each 2.00 350,000.00 700,000.00 - - - -
Providing, and fixing, double orifice Air Valve 3"
internal dia BSS quality and weight including the
25 cost of jointing material with all fittings and Each 5.00 200,000.00 1,000,000.00 - - - -
accessories Complete in all respect as approved by
the Engineer.
Providing, fixing, jointing and testing of M.S flanges
including Rubber gasket Complete in all respect as
26 - -
per drawings, specifications and as directed by
Engineer.
i 6" i/d Each 4.00 15,000.00 60,000.00 - - - -
ii 16" i/d Each 2.00 20,000.00 40,000.00 - - - -
iii 18" i/d Each 4.00 30,000.00 120,000.00 - - - -

Providing, fixing, jointing and testing of M.S Tail


Piece (Dholki) on existing pipes (PRCC, AC etc.) to
join HDPE pipe, fabricated with 3/8" thick M.S.
27 - -
plate including the cost of labour and sealing
material etc. Complete in all respect as per drawings,
specifications and as directed by Engineer.

i 6" i/d Each 2.00 25,000.00 50,000.00 - - - -


Providing, laying, cutting, butt fusion jointing, testing,
commissioning & disinfecting the High Density
Polyethylene Pipe (HDPE) PE - 100, PN-8 (SDR
28 21) conforming to ISO 4427 or DN8074/8075 or - -
equivalent to the satisfaction of Engineer. The pipe
shall be from reputable manufacturer approved by
the Engineer.

i 180mm Rft. 11.00 2,000.00 22,000.00 - - - -

ii 450mm Rft. 33.00 6,000.00 198,000.00 - - - -

iii 560mm Rft. 66.00 8,000.00 528,000.00 - - - -

iv 710mm Rft. 33.00 12,000.00 396,000.00 - - - -

v 1000mm Rft. 220.00 28,000.00 6,160,000.00 - - - -


PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF
KARACHI (LOT#1)

BILL # 01: REPAIR OF WATER SUPPLY LINES

Original BOQ Previous IPC This IPC (IPC 02) Upto Date IPC
Sr. # Description Rate Amount (PKR) Amount
Unit Quantity Qunatity Amount (PKR) Qunatity Amount Qunatity
(PKR) (PKR)
Providing, laying, jointing testing, disinfecting and
commissioning the High Density Polyethylene Pipe
fittings and specials such as bend, Tee, Taper core,
stab end etc. (HDPE) (PE - 100), PN-10 (SDR 17)
29 - - - -
conforming to relevant ASTM standard and ISO
4427, DIN8074/75 complete in all respects (including
injection moulded fittings) as approved by the
Engineer.

Bends - -
i 180mm Each 1.00 25,000.00 25,000.00 - - - -

ii 450mm Each 1.00 30,000.00 30,000.00 - - - -

iii 560mm Each 1.00 50,000.00 50,000.00 - - - -


iv 710mm Each 1.00 60,000.00 60,000.00 - - - -

v 1000mm Each 1.00 100,000.00 100,000.00 - - - -

Tees - -

i 180mm Each 1.00 25,000.00 25,000.00 - - - -


ii 450mm Each 1.00 30,000.00 30,000.00 - - - -
iii 560mm Each 1.00 35,000.00 35,000.00 - - - -
iv 710mm Each 1.00 40,000.00 40,000.00 - - - -

v 1000mm Each 1.00 100,000.00 100,000.00 - - - -


Reducers - -
i 180mm Each 1.00 25,000.00 25,000.00 - - - -

ii 450mm Each 1.00 30,000.00 30,000.00 - - - -


iii 560mm Each 1.00 50,000.00 50,000.00 - - - -

iv 710mm Each 1.00 60,000.00 60,000.00 - - - -


v 1000mm Each 1.00 100,000.00 100,000.00 - - - -

Reducing Tee - -
i 180mm Each 1.00 25,000.00 25,000.00 - - - -

ii 450mm Each 1.00 30,000.00 30,000.00 - - - -


iii 560mm Each 1.00 40,000.00 40,000.00 - - - -
PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF
KARACHI (LOT#1)

BILL # 01: REPAIR OF WATER SUPPLY LINES

Original BOQ Previous IPC This IPC (IPC 02) Upto Date IPC
Sr. # Description Rate Amount (PKR) Amount
Unit Quantity Qunatity Amount (PKR) Qunatity Amount Qunatity
(PKR) (PKR)
iv 710mm Each 3.00 50,000.00 150,000.00 - - - -
v 1000mm Each 3.00 60,000.00 180,000.00 - - - -
Stub Ends - -

i 180mm Each 2.00 25,000.00 50,000.00 - - - -


Providing & fixing MS Split collar on PRCC pipe, 18"
wide fabricated with 1/8" thick M.S plate 1-1/4" wide
1/8" thick ring at center 1/2" thick M.S squre bar on
30 - -
both ends. It includes the cost of 4 nos-1/2" thick
flanges, nuts & bolts rubber packing, labour and the
sealing material.
i 4" i/d Each 1.00 15,000.00 15,000.00 - - - -

ii 6" i/d Each 1.00 25,000.00 25,000.00 - - - -

iii 8" i/d Each 1.00 50,000.00 50,000.00 - - - -

iv 10" i/d Each 1.00 60,000.00 60,000.00 - - - -

Providing & fixing MS Split collar on PRCC pipe, 18"


wide fabricated with 3/8" thick M.S plate 1-1/4" wide
3/8" thick ring at center 3/4" thick M.S square bar on
31 - - - -
both ends. It includes the cost of 4 nos-3/4" thick
flanges, nuts & bolts rubber packing, labour and the
sealing material.

i 15" i/d Each 2.00 50,000.00 100,000.00 - - - -

ii 18" i/d Each 3.00 60,000.00 180,000.00 2.00 120,000.00 - 2.00 120,000.00

iii 24" i/d Each 2.00 80,000.00 160,000.00 1.00 80,000.00 - 1.00 80,000.00

iv 33" i/d Each 10.00 90,000.00 900,000.00 - - - -

Providing & fixing MS Split stepped collar on PRCC


pipe, 18" wide fabricated with 1/8" thick M.S plate,
32 1/2" thick M.S square bars on both ends. It includes - -
the cost of 4 nos- 1/2" thick M.S flanges, nut & bolts
rubber packing, labour and the sealing material.

i 4" i/d Each 1.00 15,000.00 15,000.00 - - - -

ii 6" i/d Each 1.00 25,000.00 25,000.00 - - - -


PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF
KARACHI (LOT#1)

BILL # 01: REPAIR OF WATER SUPPLY LINES

Original BOQ Previous IPC This IPC (IPC 02) Upto Date IPC
Sr. # Description Rate Amount (PKR) Amount
Unit Quantity Qunatity Amount (PKR) Qunatity Amount Qunatity
(PKR) (PKR)
iii 8" i/d Each 1.00 50,000.00 50,000.00 - - - -

iv 10" i/d Each 1.00 50,000.00 50,000.00 - - - -

Providing & fixing M.S Split stepped collar on PRCC


pipe, 18" wide on PRCC pipe, 18" wide fabricated
with 3/8" thick M.S plate, 3/4" thick M.S squre bars
33 - -
on both ends. It includes the cost of 4 nos- 3/4" thick
M.S flanges, nut & bolts rubber packing, labour and
the sealing material.

i 15" i/d Each 2.00 60,000.00 120,000.00 - - - -

ii 18" i/d Each 3.00 50,000.00 150,000.00 4.00 200,000.00 - 4.00 200,000.00

iii 24" i/d Each 2.00 45,000.00 90,000.00 6.00 270,000.00 - 6.00 270,000.00

iv 33" i/d Each 10.00 80,000.00 800,000.00 4.00 320,000.00 - 4.00 320,000.00
Repair of leaking joint on PRCC pipe of following
diameters. It includes the cost of sealing with gunny
34 begs, spun yarn, lead wool, rapid hardning cement - -
etc. Complete in all respect.

i 16" i/d Each 1.00 30,000.00 30,000.00 - - - -

ii 18" i/d Each 1.00 40,000.00 40,000.00 6.00 240,000.00 - - 6.00 240,000.00

iii 24" i/d Each 1.00 50,000.00 50,000.00 7.00 350,000.00 - - 7.00 350,000.00

iv 33" i/d Each 2.00 60,000.00 120,000.00 18.00 1,080,000.00 - - 18.00 1,080,000.00

Repair of leaking joint on M.S pipes Including the


cost of cutting the damaged portion of pipe and
35 Sft 25.00 4,000.00 100,000.00 - - - -
replace it with 3/8" thick M.S sheets, welding etc.
Complete in all respect.
Providing & fixing Rubber Packing under M.S Collars
for making it water tight complete in all respects,
36 as per Drawings, specifications and as directed by KG 484.95 500.00 242,475.00 - - - -
the Engineer.

TOTAL AMOUNT BILL #01 25,033,348.00 4,455,315.28 - 4,455,315.28


PACKAGE#3 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER SUPPLY LINES & SEWER ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRUICTS OF KARACHI (LOT#1)

BILL #01: REPAIR OF WATER SUPPLY LINES


Original BOQ Revised BOQ as per V.O # 01 Variation to Original BOQ
Sr. # Description Remarks
Unit Quantity Rate (PKR) Amount (PKR) Quantity Rate (PKR) Amount (PKR) Quantity Rate (PKR) Amount (PKR)

Supply, installation, testing, disinfection and


commissioning of the following items of work (unless
specifically stated otherwise) including all jointing
material, wastages,labour, tools, accessories and other
incidentals, etc. required for completion of each item
as per specification, drwaings and / or as directed by
the Enginner/ Project manager.(Provisional Quantites
have been taken,to be executed after approval of the
Engineer)

CIVIL WORKS
Additional Works Assigned at
1 Breaking of Existing Road Pavement Stucture 100Cft 1,346.00 2,500.00 3,365,000.00 #REF! 2,500.00 #REF! #REF! 2,500.00 #REF! Different Location as per Instructions
of Consultant/Client)
Dismentling reinforced cement concrete
2 100Cft 20.00 8,000.00 160,000.00 20.00 8,000.00 160,000.00 - 8,000.00 -
Dismentling reinforced cement concrete separating
3 reinforcemnt from concrete cleaning and straightening 100Cft 144.00 3,000.00 432,000.00 144.00 3,000.00 432,000.00 - 3,000.00 -
the same

Excavation for pipe line in trenches, and pits in all kind


of soils of murum including trimming and dressing
sides to true alignment and shape levelling of beds of
trenches to correct level and grade, cutting joint holes Additional Works Assigned at
4 and disposal of surplus earth within a one chain as 1,000 Cft 562.80 20,000.00 11,256,000.00 622.85 20,000.00 12,456,940.00 60.05 20,000.00 1,200,940.00 Different Location as per Instructions
directed by Engineer. Providing fence guards, of Consultant/Client)
lights, flags and temporary crossings for non-Vehicular
traffic where ever required lift upto 5ft. (1.52m)
and lead upto one chain (100ft).

Excavation for pipe line in trenches, and pit in hard


soils including trimming and dressing sides to ture
aligment and shape leveling of beds of trenches to
correct level and grade, cutting joint holes and
5 disposal of surplus earth within a one chain as directed 1,000 Cft 281.40 22,000.00 6,190,800.00 281.40 22,000.00 6,190,800.00 - 22,000.00 -
by Engineer. Providing fence guards, lights, flags and
temporary crossings for non-Vehicular traffic wherever
required lift upto 5ft. (1.52m) and lead upto one chain
(100ft).

Excavation for pipe line in trenches, and pits in soft


rock by hammering and chiseling where blasting is not
practicable or prohibited including trimming and
dressing sides to ture aligment and shape levelling of
beds of trenches to correct level and grade, cutting
6 1,000 Cft 93.80 30,000.00 2,814,000.00 93.80 30,000.00 2,814,000.00 - 30,000.00 -
joint holes and disposal of surplus earth within a one
chain as directed by Engineer. Providing fence guards,
lights, flags and temporary crossings for non-
Vehicular traffic wherever required lift upto 5ft.
(1.52m) and lead upto one chain (100ft).

7 Earth for slush or daldal including dewatering 1000Cft 281.40 20,000.00 5,628,000.00 281.40 20,000.00 5,628,000.00 - 20,000.00 -

Add for additional lift of every


8 three ft. or part thereof in excavation for
pipelines & storage tanks trenches and pits.
Lift from 5 ft to 8ft 1,000 Cft 234.00 15,000.00 3,510,000.00 234.00 15,000.00 3,510,000.00 - 15,000.00 -
Lift from 8 ft to 11ft 1,000 Cft 209.00 5,000.00 1,045,000.00 209.00 5,000.00 1,045,000.00 - 5,000.00 -
Lift from 11 ft to 14ft 1,000 Cft 106.00 25,000.00 2,650,000.00 106.00 25,000.00 2,650,000.00 - 25,000.00 -
Providing, laying and compacting (90% modified
AASHTO) sewer pipe bedding. The bedding
material shall be well grade granular fill with fine
9 particles not more than 15%. The granular fill 100 Cft 274.00 10,000.00 2,740,000.00 274.00 10,000.00 2,740,000.00 - 10,000.00 -
aggregate shall be 1" to 1-1/2" size complete in all
respect as per drawings, specification and direction by
the Engineer.
Supplying and filling sand over pipe line under road
10 100 Cft 427.00 6,000.00 2,562,000.00 427.00 6,000.00 2,562,000.00 - 6,000.00 -
structure.
Providing and laying plain cement concrete including
all kind of form work. Hgoisting, placing
11 compacting. Finishing curing complete in all 100 Cft 20.00 60,000.00 1,200,000.00 20.00 60,000.00 1,200,000.00 - 60,000.00 -
respect as shown on the drawing. Minimum
cylindrical strength 3000 Psi.
CHAMBERS
Providing and laying plain cement concrete including
all kind of form work. Hgoisting, placing
12 compacting. Finishing curing complete in all 100 Cft 3.00 80,000.00 240,000.00 3.00 80,000.00 240,000.00 - 80,000.00 -
respect as shown on the drawing. Minimum cylindrical
strength 1500 Psi.

Providing and laying reinforced cement concrete


having 3000 psi cylindrical strength including all kind
13 of form work. Hoisting, placing, compacting, 100 Cft 18.00 60,000.00 1,080,000.00 18.00 60,000.00 1,080,000.00 - 60,000.00 -
Finishing, curing complete in all respect as shown on
the drawing.

Fabrication of mild steel reinforcement for cement


concrete including cutting, bending, laying in position,
14 making joints and fastenings including cost of 100 Kg 82.00 30,000.00 2,460,000.00 82.00 30,000.00 2,460,000.00 - 30,000.00 -
binding wire (also include removal of rust). Using tor
bars (Grade-60).

Providing "expansion joint" in concrete work of 9"


wide corrugated PVC waterstoper (with bulb),
15 conforming to ASTM D2240 and D638 Type IV, Rft 317.33 6,000.00 1,903,980.00 317.33 6,000.00 1,903,980.00 - 6,000.00 -
including soldering cost of material and labour etc.
complete.
Bitumen coating to plastered or cement concrete
16 100 Sft 22.00 8,000.00 176,000.00 22.00 8,000.00 176,000.00 - 8,000.00 -
surface (20 lbs per 100Sft).
Poviding and fixing 6" thick R.C.C manhole cover
including all reinforcement with tee shaped C.I
17 frame of 22" i/d (frame weighting 37.324 Kg complete Each 17.00 20,000.00 340,000.00 17.00 20,000.00 340,000.00 - 20,000.00 -
in all respect per drawing, Specifications and as
directed by the Engineer.

Providing and fixing Malleable Iron Steps (weight not


less than 5 Kg) in manholes, conforming to
18 specification as per drawing including carriage and Each 68.00 2,000.00 136,000.00 68.00 2,000.00 136,000.00 - 2,000.00 -
setting the same to correct line and levels to complete
satisfaction of the Engineer.
19 RESTORATION OF ROAD
i Compaction of Natural Ground 100 Sft 898.00 800.00 718,400.00 898.00 800.00 718,400.00 - 800.00 -
Formation of Embankment from Borrow Excavation in
ii 100 Cft 1,796.00 5,000.00 8,980,000.00 1,796.00 5,000.00 8,980,000.00 - 5,000.00 -
common material
iii Subgrade Preparation in Earth Cut 100 Sft 898.00 800.00 718,400.00 898.00 800.00 718,400.00 - 800.00 -
iv Granular Subbsae 100 Cft 673.00 8,000.00 5,384,000.00 673.00 8,000.00 5,384,000.00 - 8,000.00 -
v Aggregate Base Course 100 Cft 902.00 9,000.00 8,118,000.00 902.00 9,000.00 8,118,000.00 - 9,000.00 -
vi Asphaltic Base Course Plant mix (Class B) 100 Cft 153.00 60,000.00 9,180,000.00 153.00 60,000.00 9,180,000.00 - 60,000.00 -
vii Cut - Back Asphlt for Bituminous Prime Coat 100 Sft 898.00 300.00 269,400.00 898.00 300.00 269,400.00 - 300.00 -
viii Cut - Back Asphlt for Bituminous Tack Coat 100 Sft 898.00 300.00 269,400.00 898.00 300.00 269,400.00 - 300.00 -
ix Asphaltic Concrete for Wearing Course (Class "A") 100 Cft 153.00 60,000.00 9,180,000.00 153.00 60,000.00 9,180,000.00 - 60,000.00 -

Refilling the excavated stuff in trenches 6" thick layer Additional Works Assigned at
20 i/c watering rammaning to full compaction etc. 1,000 Cft 751.00 8,000.00 6,008,000.00 811.05 8,000.00 6,488,376.00 60.05 8,000.00 480,376.00 Different Location as per Instructions
complete. of Consultant/Client)
Transportation of Earth all types when the total
distance, including the lead covered in the item of
work, Is more than 1000 ft. (300m)
a) upto 1/4 mile (400m) 1,000 Cft 188.00 6,000.00 1,128,000.00 188.00 6,000.00 1,128,000.00 - 6,000.00 -
b) for every 330 ft (100m) additional lead or part
therefore, beyond 1/4 mile (400m) upto one mile (1.6 1,000 Cft 188.00 2,000.00 376,000.00 188.00 2,000.00 376,000.00 - 2,000.00 -
21 Km).
c) for every 1/4 mile (400) additional lead or part
therefore, beyond one mile (1.6 Km) up to 5 mile 1,000 Cft 188.00 2,000.00 376,000.00 188.00 2,000.00 376,000.00 - 2,000.00 -
(8Km).

d) for every 1/2 mile (800m) additional lead or part


1,000 Cft 188.00 2,000.00 376,000.00 188.00 2,000.00 376,000.00 - 2,000.00 -
therefore, beyond 5 miles (8 Km) for lead 35Km

PIPING / MECHANICAL WORKS

Designing, manufacturing/fabrication, testing at


manufacturer's works, furnishing, installing, painting,
testing and commissioning at Site, placing in
satisfactory operating conditions of horizontal non
clogging trolley mounted pumping set (including diesel
Engine) with 15m head for diversion / disposal of
22 wastewater during construction of pipe line at lower
depth and for pumping out water found at any depth
from trenches and chambers along with suction and
delivery pipes of adequate length as per specifications
and as approved by the Engineer. (Pump set shall be
handed over to KWSB after the completion of the
project).

i) Capacity 2 cusec No 2.00 1,000,000.00 2,000,000.00 2.00 1,000,000.00 2,000,000.00 - 1,000,000.00 -


H.S diesel for trolley mounted Pumping set to be
23 Liters 9,600.00 250.00 2,400,000.00 9,600.00 250.00 2,400,000.00 - 250.00 -
consumed as per direction of the Engineer
Providing, fixing, jointing and testing of C.I flanged
sluice/ gate valve of approved quailty. Including nuts,
24 bolts, gasket and washers etc. Complete in all
respect as per drawings, specifications and as directed
by Engineer.
i 6" i/d Each 1.00 50,000.00 50,000.00 1.00 50,000.00 50,000.00 - 50,000.00 -
ii 8" i/d Each 1.00 80,000.00 80,000.00 1.00 80,000.00 80,000.00 - 80,000.00 -
iii 10" i/d Each 1.00 100,000.00 100,000.00 1.00 100,000.00 100,000.00 - 100,000.00 -
iv 12" i/d Each 7.00 120,000.00 840,000.00 7.00 120,000.00 840,000.00 - 120,000.00 -
v 16" i/d Each 1.00 200,000.00 200,000.00 1.00 200,000.00 200,000.00 - 200,000.00 -
vi 18" i/d Each 1.00 300,000.00 300,000.00 1.00 300,000.00 300,000.00 - 300,000.00 -
vii 33" i/d Each 1.00 2,500,000.00 2,500,000.00 1.00 2,500,000.00 2,500,000.00 - 2,500,000.00 -
viii 48" i/d Each 3.00 8,000,000.00 24,000,000.00 3.00 8,000,000.00 24,000,000.00 - 8,000,000.00 -
ix 66" i/d Each 1.00 20,000,000.00 20,000,000.00 1.00 20,000,000.00 20,000,000.00 - 20,000,000.00 -

Providing, and fixing, double orifice Air Valve 3"


internal dia BSS quality and weight including the cost
25 Each 6.00 80,000.00 480,000.00 6.00 80,000.00 480,000.00 - 80,000.00 -
of jointing material with all fittings and accessories
Complete in all respect as approved by the Engineer.

Providing, fixing, jointing and testing of M.S flanges


26 including Rubber gasket Complete in all respect as per
drawings, specifications and as directed by Engineer.
i 180 mm Each 4.00 15,000.00 60,000.00 4.00 15,000.00 60,000.00 - 15,000.00 -
ii 225 mm Each 4.00 20,000.00 80,000.00 4.00 20,000.00 80,000.00 - 20,000.00 -
iii 280 mm Each 4.00 30,000.00 120,000.00 4.00 30,000.00 120,000.00 - 30,000.00 -
Additional Work Assigned of HDPE
Pipeline at 5000 Road Near KDA
iv 355 mm Each 16.00 40,000.00 640,000.00 20.00 40,000.00 800,000.00 4.00 40,000.00 160,000.00
Office Surjani Town (Total Length =
80Rft)
ii 450 mm Each 4.00 50,000.00 200,000.00 4.00 50,000.00 200,000.00 - 50,000.00 -
iii 500 mm Each 6.00 60,000.00 360,000.00 6.00 60,000.00 360,000.00 - 60,000.00 -
i 1000 mm Each 4.00 100,000.00 400,000.00 4.00 100,000.00 400,000.00 - 100,000.00 -
ii 1400 mm Each 10.00 120,000.00 1,200,000.00 10.00 120,000.00 1,200,000.00 - 120,000.00 -
iii 1600 mm Each 4.00 150,000.00 600,000.00 4.00 150,000.00 600,000.00 - 150,000.00 -
Providing and Fixing of uPVC Flange Dia 225mm Additional Works at Sector 7A & 7B
26a Each - - - 8.00 20,000.00 160,000.00 8.00 20,000.00 160,000.00
having GI Bolts & Nuts size 4inches Surjani Town
Additional Works at Sector 7A & 7B
26b Providing and Fixing of uPVC Sockets Dia 225mm Each - - - 2.00 28,000.00 56,000.00 2.00 28,000.00 56,000.00
Surjani Town

Providing, fixing, jointing and testing of M.S Tail


Piece (Dholki) on existing pipes (PRCC, AC etc.) to
join HDPE pipe, fabricated with 3/8" thick M.S. plate
27
including the cost of labour and sealing material etc.
Complete in all respect as per drawings, specifications
and as directed by Engineer.

i 6" i/d Each 2.00 10,000.00 20,000.00 2.00 10,000.00 20,000.00 - 10,000.00 -
ii 8" i/d Each 2.00 15,000.00 30,000.00 2.00 15,000.00 30,000.00 - 15,000.00 -
iii 10" i/d Each 2.00 20,000.00 40,000.00 2.00 20,000.00 40,000.00 - 20,000.00 -
iv 12" i/d Each 2.00 30,000.00 60,000.00 2.00 30,000.00 60,000.00 - 30,000.00 -
v 16" i/d Each 2.00 40,000.00 80,000.00 2.00 40,000.00 80,000.00 - 40,000.00 -
vi 18" i/d Each 4.00 40,000.00 160,000.00 4.00 40,000.00 160,000.00 - 40,000.00 -
vii 33" i/d Each 2.00 50,000.00 100,000.00 2.00 50,000.00 100,000.00 - 50,000.00 -
vii 48" i/d Each 4.00 100,000.00 400,000.00 4.00 100,000.00 400,000.00 - 100,000.00 -
vii 66" i/d Each 2.00 150,000.00 300,000.00 2.00 150,000.00 300,000.00 - 150,000.00 -
Providing, laying, cutting, butt fusion jointing, testing,
commissioning & disinfecting the High Density
Polyethylene Pipe (HDPE) PE - 100, PN-8 (SDR 21)
28 conforming to ISO 4427 or DN8074/8075 or
equivalent to the satisfaction of Engineer. The pipe
shall be from reputable manufacturer approved by the
Engineer.
i 180mm Rft. 198.00 1,600.00 316,800.00 198.00 1,600.00 316,800.00 - 1,600.00 -
ii 225mm Rft. 198.00 1,800.00 356,400.00 198.00 1,800.00 356,400.00 - 1,800.00 -
iii 280mm Rft. 165.00 2,000.00 330,000.00 165.00 2,000.00 330,000.00 - 2,000.00 -
Additional Works at Banaras Chowk
03 Nos HDPE Pipelines (Total
Length = 1800Rft)
iv 355mm Rft. 6,600.00 3,000.00 19,800,000.00 8,480.00 3,000.00 25,440,000.00 1,880.00 3,000.00 5,640,000.00
Additional Works at 5000 Road Near
KDA Office Surjani Town (Total
Length = 80Rft)
v 450mm Rft. 220.00 6,000.00 1,320,000.00 220.00 6,000.00 1,320,000.00 - 6,000.00 -
vi 500mm Rft. 275.00 7,000.00 1,925,000.00 275.00 7,000.00 1,925,000.00 - 7,000.00 -
vii 1000mm Rft. 33.00 30,000.00 990,000.00 33.00 30,000.00 990,000.00 - 30,000.00 -
viii 1400mm Rft. 3,069.00 50,000.00 153,450,000.00 3,069.00 50,000.00 153,450,000.00 - 50,000.00 -
ix 1600mm Rft. 550.00 65,000.00 35,750,000.00 550.00 65,000.00 35,750,000.00 - 65,000.00 -
Providing, laying, cutting, jointing, testing,
commissioning & disinfecting the uPVC Dia 225mm
28a (SDR 80) conforming to the satisfaction of Engineer.
The pipe shall be from reputable manufacturer
approved by the Engineer.
i) 225mm Rft. - - - 20.00 2,500.00 50,000.00 20.00 2,500.00 50,000.00
Providing, laying, jointing testing, disinfecting and
commissioning the High Density Polyethylene Pipe
fittings and specials such as bend, Tee, Taper core,
stab end etc. (HDPE) (PE - 100), PN-10 (SDR 17)
29
conforming to relevant ASTM standard and ISO 4427,
DIN8074/75 complete in all respects (including
injection moulded fittings) as approved by the
Engineer.
Bends
i 180mm Each 1.00 15,000.00 15,000.00 1.00 15,000.00 15,000.00 - 15,000.00 -
ii 225mm Each 1.00 20,000.00 20,000.00 1.00 20,000.00 20,000.00 - 20,000.00 -
iii 280mm Each 1.00 25,000.00 25,000.00 1.00 25,000.00 25,000.00 - 25,000.00 -
iv 355mm Each 14.00 20,000.00 280,000.00 14.00 20,000.00 280,000.00 - 20,000.00 -
v 450mm Each 1.00 35,000.00 35,000.00 1.00 35,000.00 35,000.00 - 35,000.00 -
i 500mm Each 1.00 35,000.00 35,000.00 1.00 35,000.00 35,000.00 - 35,000.00 -
ii 1000mm Each 1.00 100,000.00 100,000.00 1.00 100,000.00 100,000.00 - 100,000.00 -
iii 1400mm Each 7.00 125,000.00 875,000.00 7.00 125,000.00 875,000.00 - 125,000.00 -
iv 1600mm Each 2.00 210,000.00 420,000.00 2.00 210,000.00 420,000.00 - 210,000.00 -
Tees
i 180mm Each 1.00 15,000.00 15,000.00 1.00 15,000.00 15,000.00 - 15,000.00 -
ii 225mm Each 1.00 20,000.00 20,000.00 1.00 20,000.00 20,000.00 - 20,000.00 -
iii 280mm Each 1.00 25,000.00 25,000.00 1.00 25,000.00 25,000.00 - 25,000.00 -
iv 355mm Each 14.00 30,000.00 420,000.00 14.00 30,000.00 420,000.00 - 30,000.00 -
v 450mm Each 1.00 33,000.00 33,000.00 1.00 33,000.00 33,000.00 - 33,000.00 -
vi 500mm Each 1.00 40,000.00 40,000.00 1.00 40,000.00 40,000.00 - 40,000.00 -
vii 1000mm Each 1.00 80,000.00 80,000.00 1.00 80,000.00 80,000.00 - 80,000.00 -
viii 1400mm Each 7.00 100,000.00 700,000.00 7.00 100,000.00 700,000.00 - 100,000.00 -
ix 1600mm Each 2.00 100,000.00 200,000.00 2.00 100,000.00 200,000.00 - 100,000.00 -
Reducers
i 180mm Each 1.00 5,000.00 5,000.00 1.00 5,000.00 5,000.00 - 5,000.00 -
ii 225mm Each 1.00 10,000.00 10,000.00 1.00 10,000.00 10,000.00 - 10,000.00 -
iii 280mm Each 1.00 15,000.00 15,000.00 1.00 15,000.00 15,000.00 - 15,000.00 -
iv 355mm Each 14.00 18,000.00 252,000.00 14.00 18,000.00 252,000.00 - 18,000.00 -
v 450mm Each 1.00 20,000.00 20,000.00 1.00 20,000.00 20,000.00 - 20,000.00 -
vi 500mm Each 1.00 25,000.00 25,000.00 1.00 25,000.00 25,000.00 - 25,000.00 -
vii 1000mm Each 1.00 50,000.00 50,000.00 1.00 50,000.00 50,000.00 - 50,000.00 -
viii 1400mm Each 7.00 80,000.00 560,000.00 7.00 80,000.00 560,000.00 - 80,000.00 -
ix 1600mm Each 2.00 100,000.00 200,000.00 2.00 100,000.00 200,000.00 - 100,000.00 -
Reducing Tee
i 180mm Each 1.00 10,000.00 10,000.00 1.00 10,000.00 10,000.00 - 10,000.00 -
ii 225mm Each 1.00 15,000.00 15,000.00 1.00 15,000.00 15,000.00 - 15,000.00 -
iii 280mm Each 1.00 20,000.00 20,000.00 1.00 20,000.00 20,000.00 - 20,000.00 -
iv 355mm Each 27.00 15,000.00 405,000.00 27.00 15,000.00 405,000.00 - 15,000.00 -
v 450mm Each 1.00 25,000.00 25,000.00 1.00 25,000.00 25,000.00 - 25,000.00 -
vi 500mm Each 2.00 30,000.00 60,000.00 2.00 30,000.00 60,000.00 - 30,000.00 -
vii 1000mm Each 1.00 50,000.00 50,000.00 1.00 50,000.00 50,000.00 - 50,000.00 -
viii 1400mm Each 13.00 80,000.00 1,040,000.00 13.00 80,000.00 1,040,000.00 - 80,000.00 -
ix 1600mm Each 3.00 100,000.00 300,000.00 3.00 100,000.00 300,000.00 - 100,000.00 -
Stub Ends
i 180mm Each 2.00 40,000.00 80,000.00 2.00 40,000.00 80,000.00 - 40,000.00 -
Additonal Work at 5000 Road
II 225mm Each 2.00 50,000.00 100,000.00 4.00 50,000.00 200,000.00 2.00 50,000.00 100,000.00
nearKDA Office
III 280mm Each 2.00 80,000.00 160,000.00 2.00 80,000.00 160,000.00 - 80,000.00 -
IV 355mm Each 15.00 30,000.00 450,000.00 15.00 30,000.00 450,000.00 - 30,000.00 -
V 450mm Each 2.00 60,000.00 120,000.00 2.00 60,000.00 120,000.00 - 60,000.00 -
VI 500mm Each 5.00 80,000.00 400,000.00 5.00 80,000.00 400,000.00 - 80,000.00 -
VII 1000mm Each 2.00 100,000.00 200,000.00 2.00 100,000.00 200,000.00 - 100,000.00 -
VII 1400mm Each 10.00 250,000.00 2,500,000.00 10.00 250,000.00 2,500,000.00 - 250,000.00 -
IX 1600mm Each 3.00 250,000.00 750,000.00 3.00 250,000.00 750,000.00 - 250,000.00 -
Providing & fixing MS Split collar on PRCC pipe, 18"
wide fabricated with 1/8" thick M.S plate 1-1/4" wide
1/8" thick ring at center 1/2" thick M.S squre bar on
30
both ends. It includes the cost of 4 nos-1/2" thick
flanges, nuts & bolts rubber packing, labour and the
sealing material.
i 6" i/d Each 1.00 25,000.00 25,000.00 1.00 25,000.00 25,000.00 - 25,000.00 -
ii 8" i/d Each 1.00 50,000.00 50,000.00 1.00 50,000.00 50,000.00 - 50,000.00 -
iii 10" i/d Each 1.00 80,000.00 80,000.00 1.00 80,000.00 80,000.00 - 80,000.00 -
iv 12" i/d Each 5.00 80,000.00 400,000.00 5.00 80,000.00 400,000.00 - 80,000.00 -
Providing & fixing MS Split collar on PRCC pipe, 18"
wide fabricated with 3/8" thick M.S plate 1-1/4" wide
3/8" thick ring at center 3/4" thick M.S square bar on
31
both ends. It includes the cost of 4 nos-3/4" thick
flanges, nuts & bolts rubber packing, labour and the
sealing material.
i 16" i/d Each 1.00 30,000.00 30,000.00 1.00 30,000.00 30,000.00 - 30,000.00 -
ii 18" i/d Each 1.00 50,000.00 50,000.00 1.00 50,000.00 50,000.00 - 50,000.00 -
iii 33" i/d Each 1.00 60,000.00 60,000.00 1.00 60,000.00 60,000.00 - 60,000.00 -
iv 48" i/d Each 5.00 80,000.00 400,000.00 5.00 80,000.00 400,000.00 - 80,000.00 -
iv 66" i/d Each 1.00 200,000.00 200,000.00 1.00 200,000.00 200,000.00 - 200,000.00 -

Providing & fixing MS Split stepped collar on PRCC


pipe, 18" wide fabricated with 1/8" thick M.S plate,
32 1/2" thick M.S square bars on both ends. It includes
the cost of 4 nos- 1/2" thick M.S flanges, nut & bolts
rubber packing, labour and the sealing material.

i 6" i/d Each 1.00 25,000.00 25,000.00 1.00 25,000.00 25,000.00 - 25,000.00 -
ii 8" i/d Each 1.00 30,000.00 30,000.00 1.00 30,000.00 30,000.00 - 30,000.00 -
iii 10" i/d Each 1.00 50,000.00 50,000.00 1.00 50,000.00 50,000.00 - 50,000.00 -
iv 12" i/d Each 5.00 40,000.00 200,000.00 5.00 40,000.00 200,000.00 - 40,000.00 -
Providing & fixing M.S Split stepped collar on PRCC
pipe, 18" wide on PRCC pipe, 18" wide fabricated
with 3/8" thick M.S plate, 3/4" thick M.S squre bars on
33
both ends. It includes the cost of 4 nos- 3/4" thick M.S
flanges, nut & bolts rubber packing, labour and the
sealing material.
i 16" i/d Each 1.00 70,000.00 70,000.00 1.00 70,000.00 70,000.00 - 70,000.00 -
ii 18" i/d Each 1.00 80,000.00 80,000.00 1.00 80,000.00 80,000.00 - 80,000.00 -
iii 33" i/d Each 1.00 100,000.00 100,000.00 1.00 100,000.00 100,000.00 - 100,000.00 -
iv 48" i/d Each 5.00 100,000.00 500,000.00 5.00 100,000.00 500,000.00 - 100,000.00 -
v 66" i/d Each 1.00 300,000.00 300,000.00 1.00 300,000.00 300,000.00 - 300,000.00 -
Repair of leaking joint on PRCC pipe of following
diameters. It includes the cost of sealing with gunny
34
begs, spun yarn, lead wool, rapid hardning cement etc.
Complete in all respect.
i 6" i/d Each 1.00 30,000.00 30,000.00 1.00 30,000.00 30,000.00 - 30,000.00 -
ii 8" i/d Each 1.00 40,000.00 40,000.00 1.00 40,000.00 40,000.00 - 40,000.00 -
iii 10" i/d Each 1.00 40,000.00 40,000.00 1.00 40,000.00 40,000.00 - 40,000.00 -
iv 12" i/d Each 1.00 50,000.00 50,000.00 1.00 50,000.00 50,000.00 - 50,000.00 -
v 16" i/d Each 1.00 60,000.00 60,000.00 1.00 60,000.00 60,000.00 - 60,000.00 -
vi 18" i/d Each 1.00 80,000.00 80,000.00 1.00 80,000.00 80,000.00 - 80,000.00 -
vii 33" i/d Each 1.00 200,000.00 200,000.00 38.00 200,000.00 7,600,000.00 37.00 200,000.00 7,400,000.00
viii 48" i/d Each 1.00 200,000.00 200,000.00 11.00 200,000.00 2,200,000.00 10.00 200,000.00 2,000,000.00
ix 66" i/d Each 1.00 350,000.00 350,000.00 1.00 350,000.00 350,000.00 - 350,000.00 -
Repair of leaking joint on M.S pipes Including the cost
of cutting the damaged portion of pipe and replace it
35 Sft 50.00 30,000.00 1,500,000.00 50.00 30,000.00 1,500,000.00 - 30,000.00 -
with 3/8" thick M.S sheets, welding etc. Complete in
all respect.
MS Jointing Clamps Dia 225mm Length 12 inches
35a Each - - - 12.00 22,000.00 264,000.00 12.00 22,000.00 264,000.00
conforming to standard practices
Providing and Fixing of MS Jointing Clamps Dia
35b 225mm Length 4 inches conforming to standard Each - - - 2.00 5,200.00 10,400.00 2.00 5,200.00 10,400.00
practices
Providing & fixing Rubber Packing under M.S Collars
Additional Works Assigned at
for making it water tight complete in all respects, as
36 KG 415.83 1,800.00 748,494.00 665.83 1,800.00 1,198,494.00 250.00 1,800.00 450,000.00 Different Location as per Instructions
per Drawings, specifications and as directed by the
of Consultant/Client)
Engineer.
TOTAL AMOUNT BILL #01 390,117,074.00 #REF! #REF!

Contractor's Representative Consultant's Representative Client's Representative


Bill # No 01: Repair Of Water Supply lines

-
PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF KARACHI
(LOT#1)
BILL # 02: REPAIR OF SEWER LINES
Original BOQ Previous IPC This IPC (IPC 01) Upto Date IPC
Sr. # Description
Unit Quantity Rate (PKR) Amount (PKR) Qunatity Amount (PKR) Qunatity Amount (PKR) Qunatity Amount (PKR)
Replacement of Sewer Line b/w Manholes

The following items shall be executed at site including


supply of labour, material, tools, equipment, testing,
commissioning etc. complete in all respects till
successfully operation of the system as per specification,
drawings and as directed by the Engineer/ Project
Manager. (Provisional Quantities have been taken, to be
executed after approval of the Engineer/ Project Manager)

Dismantling cement concrete plain 1:02:04


1 1.06 100 Cft 4500 4,770.00 4,197.05 188,867.25 - - 4,197.05 188,867.25
AM
Dismantling reinforced cement concrete, separating
reinforcement from concrete cleaning and straightening
2 7.74 100 Cft 6500 50,310.00
the same (including the dismantling of RCC sewer Pipe
and its lifting from trench).
3 Breaking of Existing Road Pavement Structure 4600 Cft 25 115,000.00 60,956.20 1,523,905.00 - - 60,956.20 1,523,905.00
Excavation for pipe line in trenches, and pits in all kind of
soils of murum including trimming and dressing sides to
true alignment and shape, leveling of beds of trenches to
correct level and grade, cutting joint holes and disposal of
surplus earth within one chain as directed by the
4 Engineer. Providing fence guards (GI Sheet barricade), 20.64 1000Cft 25000 516,000.00 434,588.600 10,864,715.00 - 434,588.60 10,864,715.00
lights, flags and temporary crossing where ever required
lift upto 5 ft (1.52 m) and lead upto one chain (100 ft)

Excavation for pipe line in trenches, and pit in hard soils


including trimming and dressing sides to true alignment
and shape, leveling of beds of trenches to correct level
and grade, cutting joint holes and disposal of surplus
earth with in one chain as directed by the Engineer.
5 Providing fence guards (GI Sheet barricade), lights, flags 7.37 1000Cft 45000 331,650.00 - - -
and temporary crossing for where ever required lift upto 5
ft (1.52 m) and lead upto one chain (100 ft).

Excavation for pipe line in trenches, and pits in soft rock


by hammering and chiseling where blasting is not
practicable or prohibited including trimming and dressing
sides to true alignment and shape levelling of beds of
trenches to correct level and grade, cutting joint holes and
6 1.47 1000Cft 45000 66,150.00 2,800.00 126,000.00 - - 2,800.00 126,000.00
disposal of surplus earth within a one chain as directed by
Engineer. Providing fence guards (GI Sheet barricade),
lights, flags and temporary crossings for where ever
required lift upto 5 ft. ( 1.52m) and lead upto one chain
(100 ft).
7 Extra for slush or daldal including dewatering. 11.8 1000Cft 15000 177,000.00 - - -
Add for additional lift of every three ft. or part thereof in
8 excavation for pipelines & storage tanks trenches and - - -
pits.

i 5 ft. to 8 ft.(1.5 to 2.4 m) depth 12.52 1000Cft. 25000 313,000.00 113,805.00 2,845,125.00 - - 113,805.00 2,845,125.00

ii 8ft. to 11 ft.(2.4 to 3.9 m) depth 7.51 1000Cft. 30000 225,300.00 112,534.30 3,376,029.00 - - 112,534.30 3,376,029.00

iii 11 ft. to 14 ft.(3.9 to 5.5 m) depth 6.66 1000Cft. 35000 233,100.00 75,948.70 2,658,204.50 - - 75,948.70 2,658,204.50

iv 14 ft. to 17 ft.(5.5 to 6.4 m) depth 2.8 1000Cft. 45000 126,000.00 726.70 32,701.50 - - 726.70 32,701.50
Providing, and fixing / driving the shuttering timbering
for trench support during excavation and laying of
9 - - -
sewers, complete in all respect as per drawings,
specification and direction by the Engineer.
i) for depth upto 10ft 27 100Sft 8000 216,000.00 - - -
ii) for depth above 10ft 3 100Sft 9500 28,500.00 2,240.00 212,800.00 - - 2,240.00 212,800.00

Providing and laying left over ( left in place ) shuttring


and timbering which include kikar wood, sawing, nuts,
10 100 Per Cft 500 50,000.00 - - -
bolts and nails complete in all respects in sewer
trenche ( where required ) after approval of Enginner.
PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF KARACHI
(LOT#1)
BILL # 02: REPAIR OF SEWER LINES
Original BOQ Previous IPC This IPC (IPC 01) Upto Date IPC
Sr. # Description
Unit Quantity Rate (PKR) Amount (PKR) Qunatity Amount (PKR) Qunatity Amount (PKR) Qunatity Amount (PKR)
Providing, laying and compacting (90% modified
AASHTO) sewer pipe bedding. The beding material shall
be well graded granular fill with fine particles not more
11 2828 Cft 9 25,452.00 46,797.87 421,180.83 - - 46,797.87 421,180.83
than 15%. The granular fill aggregate shall be 1" to 1-1/2"
size complete in all respect as per drawings, specification
and direction by the Engineer.
Providing and laying R.C.C. pipe sewers, moulded with
cement concrete 4000 psi conforming to ASTM
Specification C-76, Class II, Wall B, carriage of pipe from
12 factory to site of work, lowering in trenches to correct - - -
alignment and grade, jointing with rubber ring, cutting
pipes where necessary, testing, etc., complete.
i) 12" (300 mm) i/d 88 Rft 2000 176,000.00 1,101.00 2,202,000.00 - - 1,101.00 2,202,000.00
ii) 24" (600 mm) i/d 58 Rft 5000 290,000.00 - - - -
Providing and laying R.C.C. pipe sewers, moulded with
cement concrete 4000 psi conforming to ASTM
Specification C-76, Class III, Wall B, carriage of pipe from
13 factory to site of work, lowering in trenches to correct
alignment and grade, jointing with rubber ring, cutting
pipes where necessary, testing, etc., complete.

(i) 12" (300 mm) i/d 44 Rft 2000 88,000.00 - - -


(ii) 24" (610 mm) i/d 203 Rft 5000 1,015,000.00 2,300.00 11,500,000.00 40.00 200,000.00 2,340.00 11,700,000.00

Providing and laying R.C.C. pipe sewers, moulded with


cement concrete 4000 psi conforming to ASTM
Specification C-76, Class IV, Wall B, carriage of pipe from
14 - - -
factory to site of work, lowering in trenches to correct
alignment and grade, jointing with rubber ring, cutting
pipes where necessary, testing, etc., complete.
(i) 310 mm (12") i/d 44 Rft 2000 88,000.00 - - -
(ii) 610 mm (24") i/d 29 Rft 5000 145,000.00 4,090.00 20,450,000.00 - - 4,090.00 20,450,000.00
Providing and applying Epoxy coating of approved quality
with coverage @ 0.31 Kg/m2 of approved brand by the
competent authority on internal surface of RCC waste
15 13147.59 Sft 200 2,629,518.00 43,607.71 8,721,542.00 - - 43,607.71 8,721,542.00
water sewer Pipe including preparation of surface,
application of primer complete in all respect as per
specification.
Refilling the excavated soil, watering and compacting in
layers of 6" by plate compactor, Sheep Foot Roller, Power
16 - - -
Roller or any appropriate compaction equipment with
optimum moisture content.
(a) For 95-100% modified AASHO density 13.41 1000Cft. 25000 335,250.00 425,727.30 10,643,182.45 425,727.30 10,643,182.45
(b) For 90% modified AASHO density. 13.41 1000Cft. 25000 335,250.00 - - -
Supplying and filling sand over RCC pipe line and under
17 55.69 100Cft. 3500 194,915.00 - - -
road structure.
Transportation including loading and
18 unloading of earth all types. (same material may be - - -
transported back, if required)
a) upto ¼ mile (400 m). 27869.99 Cft 6 167,219.94 - - -
b) for every 330 ft. (100 m) additional lead or
part thereof, beyond ¼ mile (400 m) upto one 27869.99 Cft 3 83,609.97 - - -
mile. (1.6 Km.)
c) for every ¼ mile (400 m) additional lead or
part thereof, beyond one mile (1.6 Km.) upto 5 27869.99 Cft 3 83,609.97 - - -
mile (8 Km).
d) for every ½ mile (800 m) additional lead
or part thereof, beyond 5 miles (8 27869.99 Cft 3 83,609.97 - - -
Km) upto 35 km.

Designing, manufacturing/fabrication, testing at


manufacturer’s works, furnishing, installing, painting,
testing and commissioning at Site, placing in satisfactory
operating conditions of horizontal non clogging trolley
mounted pumping set (including diesel Engine) with 15m
head for diversion/ disposal of wastewater during
19 - - -
construction of RCC pipe line at lower depth and for
pumping out water found at any depth from trenches and
manholes alongwith suction and delivery pipes of
adequate length as per specifications and as approved by
the Engineer. (Pump set shall be handed over to KWSB
after the completion of the Project.
PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF KARACHI
(LOT#1)
BILL # 02: REPAIR OF SEWER LINES
Original BOQ Previous IPC This IPC (IPC 01) Upto Date IPC
Sr. # Description
Unit Quantity Rate (PKR) Amount (PKR) Qunatity Amount (PKR) Qunatity Amount (PKR) Qunatity Amount (PKR)
i) Capacity 2 cusec 1 No 600000 600,000.00 - - - -
ii) Capacity 5 cusec 1 No 800000 800,000.00 - - - -
H.S diesel for trolley mounted Pumping set to be
20 16800 Liters 250 4,200,000.00 - - - -
consumed as per direction of the Engineer
PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF KARACHI
(LOT#1)
BILL # 02: REPAIR OF SEWER LINES
Original BOQ Previous IPC This IPC (IPC 01) Upto Date IPC
Sr. # Description
Unit Quantity Rate (PKR) Amount (PKR) Qunatity Amount (PKR) Qunatity Amount (PKR) Qunatity Amount (PKR)

MANHOLES - - -

Excavation for pipe line in trenches, and pits in all kind of


soil murum including trimming and dressing sides to true
alignment and shape, leveling of beds of trenches to
correct level and grade cutting joints holes and disposal of
21 surplus earth with in a one chain as directed by the 41.71 1000 Cft. 25000 1,042,750.00 23,312.66 582,816.50 - - 23,312.66 582,816.50
Engineer, providing fence guard, light, flags and
temporary crossing for non-vehicular traffic where ever
required lift upto 5 ft (1.52 m) and lead upto one chain
(100 ft)

Excavation for pipe line in trenches, and pit in hard soils


including trimming and dressing sides to true alignment
and shape levelling of beds of trenches to correct level
and grade, cutting joint holes and disposal of surplus
earth within a one chain as directed by Engineer,
22 Providing fence guards, lights, flags and temporary 14.9 1000 Cft. 45000 670,500.00 - - -
crossings for non-vehicular traffic where ever required lift
upto 5 ft. (1.52 m) and lead upto one chain (100 ft)

Excavation for pipe line in trenches, and pits in soft rock


by hammering and chiseling where blasting is not
practicable or prohibited including trimming and dressing
sides to true alignment and shape levelling of beds of
trenches to correct level and grade, cutting joint holes and
23 2.98 1000 Cft. 45000 134,100.00 - - -
disposal of surplus earth within a one chain as directed by
Engineer. Providing fence guards , lights, flags and
temporary crossings for non-vehicular traffic where ever
required lift upto 5 ft. ( 1.52 m) and lead upto one chain
(100 ft).
Extra for slush or daldal
24 5.96 1000 Cft. 55000 327,800.00 - - -
including dewatering.
Add for additional lift of every three ft. or part thereof in
excavation for pipelines & storage tanks trenches and - - -
pits.
i) 5 ft. to 8 ft. (1.5 to 2.4 m) depth 12.52 1002 Cft. 25000 313,000.00 - - -
ii) 8 ft. to 11 ft. (2.4 to 3.9 m) depth 7.51 1003 Cft. 30000 225,300.00 - - -

iii) 11 ft. to 14 ft. (3.9 to 5.5 m) depth 6.66 1004 Cft. 35000 233,100.00 - - -

iv) 14 ft. to 17 ft. (5.5 to 6.4 m) depth 2.8 1005 Cft. 40000 112,000.00 - - -
Providing and laying plain cement concrete including all
kind of form work, hoisting, placing compacting,
25 finishing, curing complete in all respect as shown on - - -
the drawing

Minimum cylindrical strength 1500 psi (Lean) 2.89 100Cft 30000 86,700.00 254.00 76,200.24 - - 254.00 76,200.24
Minimum cylindrical strength 3000 psi (Benching) 8.03 100Cft 50000 401,500.00 393.37 196,683.17 - - 393.37 196,683.17
Providing and laying cement concrete having 4000 psi
cylindrical strength including all kind of form work/ mould,
hoisting, placing, compacting, finishing and curing
26 0.91 100Cft 90000 81,900.00 839.93 755,933.39 - 839.93 755,933.39
complete in all respect as shown on the drawing.
(Manholes and RCC pipe casing concrete for repairing of
crown)

Providing and laying Precast reinforced cement concrete


having 4000 psi cylindrical strength including all kind of
form work, compensation for special mould, hoisting,
27 124.49 100 Cft 90000 11,204,100.00 2,197.78 1,978,004.99 - - 2,197.78 1,978,004.99
placing, compacting, finishing, curing, handling, lifting,
transporting, lowering in trench and fixing complete in all
respect as shown on the drawing.

Fabrication of mild steel reinforcement for cement


concrete including cutting, bending, laying in position,
28 - - -
making joints and fastenings including cost of binding wire
(also include removal of rust)
Using Tor bars (Grade-60) 511.92 100 Kg 30000 15,357,600.00 4,054.99 1,216,495.83 - - 4,054.99 1,216,495.83
PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF KARACHI
(LOT#1)
BILL # 02: REPAIR OF SEWER LINES
Original BOQ Previous IPC This IPC (IPC 01) Upto Date IPC
Sr. # Description
Unit Quantity Rate (PKR) Amount (PKR) Qunatity Amount (PKR) Qunatity Amount (PKR) Qunatity Amount (PKR)
Bitumen coating to plastered or cement concrete
29 100.06 100 Sft 5500 550,330.00 4,748.22 261,152.10 - - 4,748.22 261,152.10
surface (20 lbs per 100 Sft).

Providing and fixing 36" dia 8" thick R.C.C. manhole cover
30 including all reinforcement complete in all respect per 58 Each 9000 522,000.00 - - -
drawing, specifications and as directed by the Engineer.

Providing and fixing 22"dia 6" thick R.C.C. manhole cover


31 including all reinforcement complete in all respect per 79 Each 8000 632,000.00 37.00 296,000.00 37.00 296,000.00
drawing, specifications and as directed by the Engineer.

Refilling the excavated soil, watering and compacting in


layers of 6" by Sheep Foot Roller, Power Roller or any
32 - - -
appropriate compaction equipment with optimum moisture
content.
(a) For 95-100% modified
22.52 36000 810,720.00 - - -
AASHTO density. 1000 Cft.
(b) For 90% modified AASHTO
22.52 36000 810,720.00 - - -
density. 1000 Cft.

Providing and fixing Malleable Iron Steps (weight not less


than 5 Kg) in manholes, conforming to specification as per
33 474 Each 1000 474,000.00 104.00 104,000.00 104.00 104,000.00
drawing including carriage and setting the same to correct
line and levels to complete satisfaction of the Engineer.

Fabrication of heavy steel work with angles, tees, flat


iron, round iron and sheet iron for making trusses,
girders, tends etc. including cutting, tanks etc.
34 including cutting, drilling riveting, handling assembling 5.49 100Kg 50000 274,500.00 - - -
and fixing including erection in position. . (For Fixing of
MS 3/8'' sheet over RCC pipe for Repairing of Crown
failed Pipe)

Providing, manufacturing and fixing of 1'-6" wide MS


collar 12mm (1/2") thickness with rubber gasket all around
at the joint of RCC sewer pipe with bolts including cutting,
35 rolling, carriage from market to site, cost of labour and - - -
hire charges of machinery for lowering and fixing of MS
collar complete in all respects to satisfaction of The
Engineer
i) For 12'' i/d RCC sewer Pipe 10 Each 20000 200,000.00 - - -
ii) For 24'' i/d RCC sewer Pipe 8 Each 40000 320,000.00 - - -
Removal of debris and silt from crown failed RCC pipe
36 - - -
complete in all respact.
i) For 12'' i/d RCC sewer Pipe 80 Rft 500 40,000.00 - - -

ii) For 24'' i/d RCC sewer Pipe 60 600 36,000.00 - - -


Rft
Restoration of Road - - - -
37 Subgrade Preparation in Earth Cut 9450 Sft 10 94,500.00 - - -
38 Granular Subbase 4720 Cft 60 283,200.00 18,979.06 1,138,743.60 18,979.06 1,138,743.60
39 Aggregate Base Course 6229 Cft 80 498,320.00 - - -
40 Asphaltic Base Course Plant mix (Class B) 2415 Cft 600 1,449,000.00 - - -
Cut - Back Asphalt for Bituminous
41 9055 8 72,440.00 63,804.22 510,433.74 63,804.22 510,433.74
Prime Coat Sft
Cut - Back Asphalt for Bituminous take
42 9055 8 72,440.00 - - -
Coat Sft
Asphaltic Concrete for Wearing
43 1509 600 905,400.00 10,655.30 6,393,182.64 10,655.30 6,393,182.64
Course (Class "A") Cft
Providing and laying plain cement concrete including all
kind of form work, hoisting, placing compacting,
44 - - -
finishing, curing complete in all respect as shown on
the drawing.
Minimum cylindrical strength 3000 psi (PCC
i 3.9 Cft 800 3,120.00 - - -
Road)
Minimum cylindrical strength 3000 psi (Lean
ii 1 Cft 900 900.00 - - -
concrete)
Precast Curb in Concrete Class A-1 of size 450 x 150 mm
45 1586 Rft 300 475,800.00 - - -
Including Bedding & Haunching
Pavement Marking in Reflective TP Paint for line of 15cm
46 2012 Rft 35 70,420.00 - - -
width
Reflectorized Plastic Pavement Studs (Raised Profile
47 1509 Each 600 905,400.00 - - -
Type - Single/Double)
48 Traffic Road Signs, Triangular Category -1 1 Each 50000 50,000.00 - - -
49 Traffic Road Signs, Circular, Category - 2 1 Each 50000 50,000.00 - - -
PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF KARACHI
(LOT#1)
BILL # 02: REPAIR OF SEWER LINES
Original BOQ Previous IPC This IPC (IPC 01) Upto Date IPC
Sr. # Description
Unit Quantity Rate (PKR) Amount (PKR) Qunatity Amount (PKR) Qunatity Amount (PKR) Qunatity Amount (PKR)
BILL NO. 2 ) SUB TOTAL = 53,584,774.85 70,190,356.54 19,285,542.44 89,475,898.74
Bill # 2: Repair Of Sewer Lines
PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON PEOPLES
BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF KARACHI (LOT#1)
Bill # 2: Repair Of Sewer Lines
Item No 13:providing and laying RCC pipe sewer 24 inch (600) i/d
Sr. # Location/Area Chainage pipe dia length Quantity Remarks
Cft

Shahrah e Quaideen to ghazali


1 0+00 to 0+6445 24 1nch 40 40.00
road to alama iqbal road to

NET PAYABLE IPC NO 03 40.00

Contractor's Representative Consultant's Representative


PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON
PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF KARACHI (LOT#1)
Bill # 2: Repair Of Sewer Lines
Item No 16: Refilling the Excavated Soil (a) For 95-100% modified AASHTO density.
Total Mean
Sr. # Location/Area CHAINAGE Total depth/profile Pipe Diameter L W Depth Depth Quantity

1 Bahadurabad Chowk 0+00 to 0+ 278 12 inch 278 4 4.75 5,282.00


2 Shahrah e Quaideen 0+00 to 0+ 300 12 inch 300 4 3.95 4,740.00
Block 2
3 0+300 to 0+ 680 12 inch 380 4 5.75 8,740.00
4 Sindhi muslim society 0+00 to 0+ 79 12 inch 79 4 3.75 1,185.00
5 0+00 12.72 24 inch 100 5 11.97
6 0+100 10.89 24 inch 100 5 10.14 11.055 5,527.50

7 0+200 9.77 24 inch 100 5 9.02 9.58 4,790.00

8 0+300 11.85 24 inch 100 5 11.1 10.06 5,030.00


Tariq Road Graveyard to
9 Ghazali Road to alama 0+400 9.83 24 inch 100 5 9.08 10.09 5,045.00
ibal road to hali road to 4,910.00
10 sir syed road 0+500 11.31 24 inch 100 5 10.56 9.82
11 0+600 11.9 24 inch 100 5 11.15 10.855 5,427.50

12 0+700 12.05 24 inch 100 5 11.3 11.225 5,612.50

13 0+800 12.09 24 inch 100 5 11.34 11.32 5,660.00

14 0+900 12.35 24 inch 100 5 11.6 11.45 5,725.00

15 0+1000 12.98 24 inch 100 5 12.23 11.915 5,957.50

16 0+1100 13.48 24 inch 100 5 12.73 12.48 6,240.00

17 0+1200 13.98 24 inch 100 5 13.23 12.98 6,490.00

18 0+1300 14.48 24 inch 100 5 13.73 13.48 6,740.00

19 0+1400 14.98 24 inch 100 5 14.23 13.98 6,990.00

20 0+1500 15.49 24 inch 100 5 14.74 14.485 7,242.50

21 0+1600 15.99 24 inch 100 5 15.24 14.99 7,495.00

22 0+1700 16.49 24 inch 100 5 15.74 15.49 7,745.00

23 0+1800 16.99 24 inch 100 5 16.24 15.99 7,995.00

24 0+1900 17.49 24 inch 100 5 16.74 16.49 8,245.00

25 0+2000 18.5 24 inch 100 5 17.75 17.245 8,622.50


PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON
PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF KARACHI (LOT#1)
Bill # 2: Repair Of Sewer Lines
26 0+2100 18.4 24 inch 100 5 17.65 17.7 8,850.00

27 0+2200 18.30 24 inch 100 5 17.55 17.6 8,800.00

28 0+2300 18.20 24 inch 100 5 17.45 17.5 8,750.00

29 0+2400 18.10 24 inch 100 5 17.35 17.4 8,700.00

30 0+2500 18.00 24 inch 100 5 17.25 17.3 8,650.00

31 0+2600 17.90 24 inch 100 5 17.15 17.2 8,600.00

32 0+2700 17.80 24 inch 100 5 17.05 17.1 8,550.00

33 0+2800 17.70 24 inch 100 5 16.95 17 8,500.00

34 0+2900 17.60 24 inch 100 5 16.85 16.9 8,450.00

35 0+3000 17.50 24 inch 100 5 16.75 16.8 8,400.00

36 0+3100 17.45 24 inch 100 5 16.7 16.725 8,362.50

37 0+3200 17.40 24 inch 100 5 16.65 16.675 8,337.50

38 0+3300 17.35 24 inch 100 5 16.6 16.625 8,312.50

39 0+3400 17.30 24 inch 100 5 16.55 16.575 8,287.50

40 0+3500 17.25 24 inch 100 5 16.5 16.525 8,262.50

41 0+3600 17.20 24 inch 100 5 16.45 16.475 8,237.50

42 0+3700 17.15 24 inch 100 5 16.4 16.425 8,212.50

43 0+3800 17.10 24 inch 100 5 16.35 16.375 8,187.50

44 0+3900 17.05 24 inch 100 5 16.3 16.325 8,162.50

45 0+4000 17.00 24 inch 100 5 16.25 16.275 8,137.50

46 0+4100 17.00 24 inch 100 5 16.25 16.25 8,125.00

47 0+4200 16.95 24 inch 100 5 16.2 16.225 8,112.50

48 0+4300 16.90 24 inch 100 5 16.15 16.175 8,087.50

49 0+4400 16.80 24 inch 100 5 16.05 16.1 8,050.00

50 0+4500 16.75 24 inch 100 5 16 16.025 8,012.50

51 0+4600 16.70 24 inch 100 5 15.95 15.975 7,987.50

52 0+4700 16.65 24 inch 100 5 15.9 15.925 7,962.50

53 0+4800 16.60 24 inch 100 5 15.85 15.875 7,937.50

54 0+4900 16.55 24 inch 100 5 15.8 15.825 7,912.50

55 0+5000 16.50 24 inch 100 5 15.75 15.775 7,887.50

56 0+5100 16.45 24 inch 100 5 15.7 15.725 7,862.50


PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON
PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF KARACHI (LOT#1)
Bill # 2: Repair Of Sewer Lines
57 0+5200 16.40 24 inch 100 5 15.65 15.675 7,837.50

58 0+5300 16.35 24 inch 100 5 15.6 15.625 7,812.50

59 0+5400 16.30 24 inch 100 5 15.55 15.575 7,787.50

60 0+5500 16.25 24 inch 100 5 15.5 15.525 7,762.50

61 0+5600 16.20 24 inch 100 5 15.45 15.475 7,737.50

62 0+5700 16.15 24 inch 100 5 15.4 15.425 7,712.50

63 0+5800 16.10 24 inch 100 5 15.35 15.375 7,687.50

64 0+5900 16.05 24 inch 100 5 15.3 15.325 7,662.50

65 0+6000 16.00 24 inch 100 5 15.25 15.275 7,637.50

66 0+6100 15.90 24 inch 100 5 15.15 15.2 7,600.00

67 0+6200 15.82 24 inch 100 5 15.07 15.11 7,555.00

68 0+6300 15.75 24 inch 100 5 15 15.035 7,517.50

69 0+6400 13.50 24 inch 100 5 12.75 13.875 6,937.50

70 0+6450 13.00 24 inch 50 5 12.25 12.5 3,125.00


Additional width
Noorani kabab 5,370.00
71 0+1350 to 0+1425 14.48 24 inch 75 5 13.73 14.32
Additional width sir syed
road crossing 9,606.25
72 0+6395 to 0+6445 13.25 24 inch 145 5 12.5 13.25

TOTAL QTY 521,473.25


DEDUCTION OF MANHOLE 37 37 5 5.5 15 15,262.50
DEDUCTION OF MANHOLE 18 18 4 5.5 4.55 1,801.80
DEDUCTION OF PIPE AREA 24 INCH DIA = (4.90)SFT 4.9 6241 30,580.90
DEDUCTION OF PIPE AREA 24 INCH DIA = (1.389)SFT 1.389 938 1,302.88
Deduction of Bedding Material Paid 46797.87 46,797.87
NET PAYABLE IPC NO 03 425,727.30

Contractor's Representative Consultant's Representative


PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES
& SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF
KARACHI (LOT#1)

Bill # No 02 : Repair of Sewers lines (MANHOLES)


Item No 31 : Providing and Fixing 22 inch dia 6 inch thick RCC Manhole Cover
Quantity
Sr. # Location/Area Man Holes Nos COVERS Nos Rft Remarks

15 ft Deep RCC
Manholes at shah rahe
1 qaideen to Ghazali road 15 1 18.00
to alama iqbal to hali
road
2 Bahadur abad chowk 5 1 5.00
Shah rah e Qaideen
3 block -2 13 1 13.00
4 Sindhi mulim society 1 1 1.00
Grand Total for Sewer Lines 37.00

Contractor's Representative Consultant's Representative


PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES
& SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF
KARACHI (LOT#1)

Bill # No 02 : Repair of Sewers lines (MANHOLES)


Item No 33 : Providing and Fixing Malleable iron steps in man holes
Quantity
Sr. # Location/Area Man Holes Nos Steps Nos Rft Remarks

15 ft Deep RCC
Manholes at shah rahe
1 qaideen to Ghazali road 13 8 104.00
to alama iqbal to hali
road

Grand Total for Sewer Lines 104.00

Contractor's Representative Consultant's Representative


PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES &
SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF KARACHI
(LOT#1)
Bill # 2: Repair Of Sewer Lines
Item No 41: Cut back asphalt for bituminous prime coat
Sr. # Location/Area CHAINAGE L W Mean width Quantity
5 0+036 7
6 0+100 64 8 7.50 480.00

7 0+200 100 9 8.50 850.00

8 0+300 100 9.58 9.29 929.00


Tariq Road Graveyard to
9 Ghazali Road to alama 0+400 100 8 8.79 879.00
ibal road to hali road to 775.00
10 sir syed road 0+500 100 7.5 7.75
11 0+600 100 7.5 7.50 750.00

12 0+700 100 8.33 7.92 791.50

13 0+800 100 8.16 8.25 824.50

14 0+900 100 8.42 8.29 829.00

15 0+1000 100 10 9.21 921.00

16 0+1100 100 7.5 8.75 875.00

17 0+1200 100 8 7.75 775.00

18 0+1300 100 8 8.00 800.00

0+1333 33 8 8.00 264.00

24 0+1900 100 8 -

25 0+2030 130 12 10.00 1,300.00


PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES &
SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF KARACHI
(LOT#1)
Bill # 2: Repair Of Sewer Lines
26 0+2100 100 9 10.50 1,050.00

27 0+2200 100 9 9.00 900.00

28 0+2300 100 9 9.00 900.00

29 0+2400 100 9 9.00 900.00

30 0+2500 100 9 9.00 900.00

31 0+2600 100 9.33 9.17 916.50

32 0+2700 100 10.16 9.75 974.50

33 0+2800 100 10.58 10.37 1,037.00

34 0+2900 100 11.16 10.87 1,087.00

35 0+3000 100 12 11.58 1,158.00

36 0+3100 100 12 12.00 1,200.00

37 0+3200 100 9.16 10.58 1,058.00

38 0+3300 100 9.33 9.25 924.50

39 0+3400 100 10.83 10.08 1,008.00

40 0+3500 100 9 9.92 991.50

41 0+3600 100 9.33 9.17 916.50

42 0+3700 100 10.16 9.75 974.50

43 0+3800 100 10.25 10.21 1,020.50

44 0+3900 100 9.83 10.04 1,004.00

45 0+4000 100 11 10.42 1,041.50

46 0+4100 100 9.83 10.42 1,041.50

47 0+4200 100 10 9.92 991.50

48 0+4300 100 12 11.00 1,100.00

49 0+4400 100 12 12.00 1,200.00

50 0+4470 70 14 13.00 910.00

50 0+4500 30 10.83 11.42 342.45

51 0+4600 100 11 10.92 1,091.50

52 0+4700 100 9.83 10.42 1,041.50

53 0+4800 100 10 9.92 991.50

54 0+4900 100 9.75 9.88 987.50

55 0+5000 100 9.75 9.75 975.00


PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES &
SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF KARACHI
(LOT#1)
Bill # 2: Repair Of Sewer Lines
56 0+5100 100 9.75 9.75 975.00

57 0+5200 100 9.83 9.79 979.00

58 0+5300 100 9.67 9.75 975.00

59 0+5400 100 11.25 10.46 1,046.00

60 0+5500 100 11.67 11.46 1,146.00

61 0+5600 100 10.83 11.25 1,125.00

62 0+5700 100 9.33 10.08 1,008.00

63 0+5800 100 11.25 10.29 1,029.00

64 0+5900 100 11.25 11.25 1,125.00

65 0+6000 100 10.6 10.93 1,092.50

66 0+6100 100 9.75 10.18 1,017.50

67 0+6200 100 9.75 9.75 975.00

68 0+6300 100 9.25 9.50 950.00

69 0+6400 100 9.5 9.38 937.50

70 0+6450 45 17.00 765.00

B EXTRA BOX -

71 EXTRA BOX AT 0+36 11 8.00 88.00

72 EXTRA BOX AT 0+200 18 2.00 36.00

73 EXTRA BOX AT 0+1400 22 2.00 44.00

74 EXTRA BOX AT 0+1400 28 3.00 84.00

75 EXTRA BOX AT 0+2000 33 32.00 1,056.00

76 EXTRA BOX AT 0+2000 13 7.00 91.00

77 EXTRA BOX AT 0+3100 16 36.00 576.00

78 EXTRA BOX AT 0+3200 44 9.00 396.00

79 EXTRA BOX AT 0+3200 31 9.00 279.00

80 EXTRA BOX AT 0+3400 25 5.00 125.00

81 EXTRA BOX AT 0+3450 18 4.00 72.00

82 EXTRA BOX AT 0+3700 10 2.00 20.00

83 EXTRA BOX AT 0+4500 22 3.00 66.00

84 EXTRA BOX AT 0+4500 25 5.00 125.00

85 EXTRA BOX AT 0+4700 22 9.50 209.00


PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES &
SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF KARACHI
(LOT#1)
Bill # 2: Repair Of Sewer Lines
86 EXTRA BOX AT 0+4900 72 9.50 684.00

87 EXTRA BOX AT 0+5100 24 2.00 48.00

88 EXTRA BOX AT 0+5400 10 2.00 20.00

89 EXTRA BOX AT 0+5400 20 2.00 40.00

90 EXTRA BOX AT 0+5400 15 1.00 15.00

91 EXTRA BOX AT 0+5600 24 7.00 168.00

92 EXTRA BOX AT 0+6150 24 55.00 1,320.00

93 EXTRA BOX AT 0+56250 17 3.00 51.00

94 EXTRA BOX AT 0+5300 14.5 33.00 478.50

TOTAL QTY 63,914.45

DEDUCTION OF MANHOLE 37 36 3.06 110.23


NET PAYABLE IPC NO 03 63,804.22

Contractor's Representative Consultant's Representative


PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON
PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF KARACHI (LOT#1)
Bill # 2: Repair Of Sewer Lines
Item No 43: Asphaltic Concret for Wearing Course (Class "A")
Sr. # Location/Area CHAINAGE L W Mean width D Quantity
5 0+036 7
6 0+100 64 8 7.50 0.167 80.16

7 0+200 100 9 8.50 0.167 141.95

8 0+300 100 9.58 9.29 0.167 155.14


Tariq Road Graveyard to
9 Ghazali Road to alama 0+400 100 8 8.79 0.167 146.79
ibal road to hali road to 129.43
10 sir syed road 0+500 100 7.5 7.75 0.167
11 0+600 100 7.5 7.50 0.167 125.25

12 0+700 100 8.33 7.92 0.167 132.18

13 0+800 100 8.16 8.25 0.167 137.69

14 0+900 100 8.42 8.29 0.167 138.44

15 0+1000 100 10 9.21 0.167 153.81

16 0+1100 100 7.5 8.75 0.167 146.13

17 0+1200 100 8 7.75 0.167 129.43

18 0+1300 100 8 8.00 0.167 133.60

0+1333 33 8 8.00 0.167 44.09

24 0+1900 100 8 -

25 0+2030 130 12 10.00 0.167 217.10


PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON
PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF KARACHI (LOT#1)
Bill # 2: Repair Of Sewer Lines
26 0+2100 100 9 10.50 0.167 175.35

27 0+2200 100 9 9.00 0.167 150.30

28 0+2300 100 9 9.00 0.167 150.30

29 0+2400 100 9 9.00 0.167 150.30

30 0+2500 100 9 9.00 0.167 150.30

31 0+2600 100 9.33 9.17 0.167 153.06

32 0+2700 100 10.16 9.75 0.167 162.74

33 0+2800 100 10.58 10.37 0.167 173.18

34 0+2900 100 11.16 10.87 0.167 181.53

35 0+3000 100 12 11.58 0.167 193.39

36 0+3100 100 12 12.00 0.167 200.40

37 0+3200 100 9.16 10.58 0.167 176.69

38 0+3300 100 9.33 9.25 0.167 154.39

39 0+3400 100 10.83 10.08 0.167 168.34

40 0+3500 100 9 9.92 0.167 165.58

41 0+3600 100 9.33 9.17 0.167 153.06

42 0+3700 100 10.16 9.75 0.167 162.74

43 0+3800 100 10.25 10.21 0.167 170.42

44 0+3900 100 9.83 10.04 0.167 167.67

45 0+4000 100 11 10.42 0.167 173.93

46 0+4100 100 9.83 10.42 0.167 173.93

47 0+4200 100 10 9.92 0.167 165.58

48 0+4300 100 12 11.00 0.167 183.70

49 0+4400 100 12 12.00 0.167 200.40

50 0+4470 70 14 13.00 0.167 151.97

50 0+4500 30 10.83 11.42 0.167 57.19

51 0+4600 100 11 10.92 0.167 182.28

52 0+4700 100 9.83 10.42 0.167 173.93

53 0+4800 100 10 9.92 0.167 165.58

54 0+4900 100 9.75 9.88 0.167 164.91

55 0+5000 100 9.75 9.75 0.167 162.83


PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON
PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF KARACHI (LOT#1)
Bill # 2: Repair Of Sewer Lines
56 0+5100 100 9.75 9.75 0.167 162.83

57 0+5200 100 9.83 9.79 0.167 163.49

58 0+5300 100 9.67 9.75 0.167 162.83

59 0+5400 100 11.25 10.46 0.167 174.68

60 0+5500 100 11.67 11.46 0.167 191.38

61 0+5600 100 10.83 11.25 0.167 187.88

62 0+5700 100 9.33 10.08 0.167 168.34

63 0+5800 100 11.25 10.29 0.167 171.84

64 0+5900 100 11.25 11.25 0.167 187.88

65 0+6000 100 10.6 10.93 0.167 182.45

66 0+6100 100 9.75 10.18 0.167 169.92

67 0+6200 100 9.75 9.75 0.167 162.83

68 0+6300 100 9.25 9.50 0.167 158.65

69 0+6400 100 9.5 9.38 0.167 156.56

70 0+6450 45 17.00 0.167 127.76

B EXTRA BOX
71 EXTRA BOX AT 0+36 11 8.00 0.167 14.70

72 EXTRA BOX AT 0+200 18 2.00 0.167 6.01

73 EXTRA BOX AT 0+1400 22 2.00 0.167 7.35

74 EXTRA BOX AT 0+1400 28 3.00 0.167 14.03

75 EXTRA BOX AT 0+2000 33 32.00 0.167 176.35

76 EXTRA BOX AT 0+2000 13 7.00 0.167 15.20

77 EXTRA BOX AT 0+3100 16 36.00 0.167 96.19

78 EXTRA BOX AT 0+3200 44 9.00 0.167 66.13

79 EXTRA BOX AT 0+3200 31 9.00 0.167 46.59

80 EXTRA BOX AT 0+3400 25 5.00 0.167 20.88

81 EXTRA BOX AT 0+3450 18 4.00 0.167 12.02

82 EXTRA BOX AT 0+3700 10 2.00 0.167 3.34

83 EXTRA BOX AT 0+4500 22 3.00 0.167 11.02

84 EXTRA BOX AT 0+4500 25 5.00 0.167 20.88

85 EXTRA BOX AT 0+4700 22 9.50 0.167 34.90


PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON
PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF KARACHI (LOT#1)
Bill # 2: Repair Of Sewer Lines
86 EXTRA BOX AT 0+4900 72 9.50 0.167 114.23

87 EXTRA BOX AT 0+5100 24 2.00 0.167 8.02

88 EXTRA BOX AT 0+5400 10 2.00 0.167 3.34

89 EXTRA BOX AT 0+5400 20 2.00 0.167 6.68

90 EXTRA BOX AT 0+5400 15 1.00 0.167 2.51

91 EXTRA BOX AT 0+5600 24 7.00 0.167 28.06

92 EXTRA BOX AT 0+6150 24 55.00 0.167 220.44

93 EXTRA BOX AT 0+56250 17 3.00 0.167 8.52

94 EXTRA BOX AT 0+5300 14.5 33.00 0.167 79.91


TOTAL QTY 10,673.71
DEDUCTION OF MANHOLE 37 36 3.06 0.17 18.41
NET PAYABLE IPC NO 03 10,655.30

Contractor's Representative Consultant's Representative


PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON
PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF KARACHI (LOT#1)
Bill # 2: Repair Of Sewer Lines (Restoration of Road)
Item No 38: Granuler Sub base
Sr. # Location/Area Chainage L W Total Depth Quantity Remarks
Cft

Shahrah e Quaideen to
1 ghazali road to alama 0+00 to 0+6445 6445 6 0.5 19,335.00
iqbal road to

Deduction of Manhole Cover Rings Area 36 inch dia 9.62 37 355.94

NET PAYABLE IPC NO 03 18,979.06

Contractor's Representative Consultant's Representative


PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF KARACHI
(LOT#1)

BILL # 3: EMP IMPLEMENTATION COST


Original BOQ Previous IPC This IPC Upto Date IPC
Sr. # Description
Unit Quantity Rate (PKR) Amount Qunatity Amount (PKR) Qunatity Amount (PKR) Qunatity Amount (PKR)

A) Health, Safety & Enviroment (HSE)


1 Medical Sreening for Workers Persons 80.00 500.00 40,000.00 - - - 0 -
2 Tarpauplines Each 8.00 4,500.00 36,000.00 4 18,000.00 - 4 18,000.00
3 Handling of Hazarduos Material Per Month 2.00 100,000.00 200,000.00 - - 0 -
4 Handling of Solid Waste Per Month 2.00 100,000.00 200,000.00 - - 0 -
DCP Fire Extinguisher in case of fire Each 8.00 50,000.00 400,000.00 - - 0 -
5 CO2 Fire Extinguihser in case of fire Each 8.00 50,000.00 400,000.00 - - 0 -
Fire Alarm Each 8.00 100,000.00 800,000.00 - - 0 -
6 Special Measure for Covid-19 L.S - - - 0 0
B) Personal Protective Equipment (PPEs) - - 0 0
1 Ear Plugs Each 160.00 500.00 80,000.00 60 30,000.00 - 60 30,000.00
2 Helmets Each 80.00 1,000.00 80,000.00 40 40,000.00 - 40 40,000.00
3 Safety Shoes Each 80.00 1,000.00 80,000.00 40 40,000.00 - 40 40,000.00
4 Protective Goggles Each 80.00 500.00 40,000.00 30 15,000.00 - 30 15,000.00
5 Gloves Each 160.00 300.00 48,000.00 50 15,000.00 - 50 15,000.00
6 H2S Mask and Kit Each 8.00 100.00 800.00 - - 0 0
7 Dust Mask Each 640.00 100.00 64,000.00 500 50,000.00 - 500 50,000.00
8 Face Shield Each 8.00 500.00 4,000.00 - - 0 0
9 First-Aid Kit Each 8.00 15,000.00 120,000.00 - - 0 -
C) Institutional Strengthening Cost - 0 0
1 Environmental Expert/HSE Expert (02 x 01 Nos.) Per Month 2.00 100,000.00 200,000.00 1 500,000.00 4.00 5 500,000.00
2 Social /Ressettement/Gender Expert (02 x 01 Nos.) Per Month 2.00 100,000.00 200,000.00 1 200,000.00 1.00 2 200,000.00
D) Institutional Training 0 0
1 Environment Code of Practices/Gender Aspects Nos. 1.00 100,000.00 100,000.00 - 0 -
Awareness workshop regarding Covid-19 and other
2 Nos. 1.00 100,000.00 100,000.00 - 0 -
vector borne deseases
3 Waste Management Nos. 1.00 100,000.00 100,000.00 - 0 -
4 Community/Occupational Health & Safety Nos. 1.00 100,000.00 100,000.00 - 0 -
TOTAL AMOUNT BILL #03 3,392,800.00 908,000.00 - 908,000.00
BILL # 4: PROVISIONAL SUMS
Original BOQ Previous IPC This IPC (IPC 01) Upto Date IPC
Sr. # Description
Unit Quantity Rate (PKR) Amount (PKR) Qunatity Amount (PKR) Qunatity Amount (PKR) Qunatity Amount (PKR)
The following items shall be provided complete in all
respect and upto the satisfaction of the Project
Manager/ The Employer.Payment will be made as per
actual bill.
Provisional sum for shifting of utilities including gas,
1 L.S 1.00 3,500,000.00 3,500,000.00 - - 0 0
electricity, telecom etc. (where required)
2 Providing superviory staff facilities L.S 1.00 3,621,000.00 3,621,000.00 6,289,532.00 1.00 1 6,289,532.00
Provide, Registration and Supply of brand new 70 cc
3 Nos 3.00 125,000.00 375,000.00 125,000.00 - - 0 125,000.00
motor bike
TOTAL AMOUNT BILL #04 7,496,000.00 6,414,532.00 - 6,414,532.00
Annexure B: Excavation Quantity Sheet
Sr. # Location/Area Point # Coordinates Pipe Diameter L W D Quantity Remarks
1 Point # 01 245641.50599N 67014.91543E 36 inch 8 7 10 560.00
2 Point # 02 245642.5607N 67015.22018E 36 inch 6 6 8 288.00
3 Point # 03 245642.9866N 67015.54328 E 36 inch 7 7 8 392.00
4 Point # 04 245643.4867N 67016.03218E 36 inch 7 7 8 392.00
5 Point # 05 36 inch 6 6 11 396.00
6 Point # 06 245646.23877N 67018.00982E 36 inch 8 23 7 1,288.00
7 Point # 07 245653.17765N 67022.20093E 36 inch 13 8 9 936.00
8 Point # 08 245647.33323N 67019.188E 36 inch 6 6.5 6.5 253.50
9 Point # 09 245641.25621N 67014.94902E 36 inch 12 11 13 1,716.00
10 Point # 10 245640.02907N 67018.10105E 36 inch 11 12 10 1,320.00
11 Point # 11 245639.16137N 67019.89782E 36 inch 10 15 9 1,350.00
12 Point # 12 245638.09216N 67031.12206E 36 inch 10 12 9 1,080.00
13 Point # 13 245639.16137N 67019.89782E 36 inch 10 12 9 1,080.00
14 Point # 14 245621.43898N 67051.73097E 36 inch 10 13 9 1,170.00
15 Point # 15 245622.59964N 67048.92195E 36 inch 10 11 8.5 935.00
Orangi Town Qasba Colony near Post Office
16 Point # 16 245618.2047N 67057.42393E 36 inch 16 12 10 1,920.00
17 Point # 17 245639.29985N 67019.2386E 36 inch 10 11 9 990.00
18 Point # 18 245639.58139N 67020.84493E 36 inch 11 11 9.5 1,149.50
19 Point # 19 245635.96834N 67024.82337 E 36 inch 13 11 9 1,287.00
20 Point # 20 245639.42852N 67013.3092E 36 inch 13 11 9 1,287.00
21 Point # 21 245652.5894N 67022.25232E 36 inch 12 11 9 1,188.00
22 Point # 22 245645.97008N 6708.39492E 36 inch 11 11 9 1,089.00
23 Point # 23 245620.0652N 67054.7992E 36 inch 12 11 9 1,188.00
24 Point # 24 245622.69824N 6713.79344E 36 inch 13 11 8 1,144.00
25 Point # 25 245622.67556N 6714.13148E 36 inch 11 10 9 990.00
26 Point # 26 245622.70832N 6713.7344E 36 inch 13 11 8 1,144.00
27 Point # 27 245622.38576N 6714.69668E 36 inch 12 10 9 1,080.00
28 Point # 28 36 inch 13 11 8 1,144.00
29 Point # 29 36 inch 11 10 9 990.00
30 Point # 30 36 inch 12 11 9 1,188.00
31 Point # 01 48 inch 15 14 11 2,310.00
32 Point # 02 245614.6256N 665957.43212E 48 inch 15 14 11 2,310.00
33 Point # 03 245610.4784N 6702.38932E 48 inch 15 14 11 2,310.00
34 Point # 04 245610.542N 6702.68776E 48 inch 15 14 11 2,310.00
35 Point # 05 48 inch 15 14 11 2,310.00
Choudhary School To Post Office
36 Point # 06 48 inch 15 14 11 2,310.00
37 Point # 07 48 inch 15 14 11 2,310.00
38 Point # 08 48 inch 15 14 11 2,310.00
39 Point # 09 48 inch 15 14 11 2,310.00
40 Point # 10 48 inch 15 14 11 2,310.00 23,100.00
At Road 5000 Near KDA Office, Surjan Town
Point # 01 255mm 84 13 14 15,288.00
41 (Additional Work)
42 Point # 01 250131N 670350E 225 mm 10 7 6 420.00 UPVc Pipes
43 Point # 02 250148N 670347E 225 mm 8 7 6 336.00
44 Point # 03 250142N 670350E 225 mm 8 7 6 336.00
45 Point # 04 250139N 670350E 225 mm 9 7 6 378.00
46 Point # 05 250137N 670350E 225 mm 11 7 6 462.00
47 Point # 06 250136N 670350E 225 mm 25 7 6 1,050.00 Pipe Replacement
48 Point # 07 250134N 670350E 225 mm 10 7 6 420.00
At Sector Between 7A & & 7B (Additional
49 Point # 08 250149N 670353E 225 mm 9 7 6 378.00
Work) uPVC Line
50 Point # 09 250149N 670356E 225 mm 6 7 6 252.00
51 Point # 10 250149N 670357E 225 mm 8 7 6 336.00
52 Point # 11 250149N 670406E 225 mm 8 7 6 336.00
53 Point # 12 250150N 670401E 225 mm 8 7 6 336.00
54 Point # 13 250150N 670402E 225 mm 8 7 6 336.00
55 Point # 14 250150N 670403E 225 mm 8 7 6 336.00
56 Point # 15 250150N 670407E 225 mm 8 7 6 336.00
57 Point # 01 250149N 670351E 24 inch 12 9 9 972.00
58 Point # 02 250149N 670350E 24 inch 11 10 9 990.00
59 Point # 03 250149N 670349E 24 inch 12 11 9 1,188.00
At Sector Between 7A & & 7B (Additional
60 Point # 04 250149N 670348.5E 24 inch 14 10 9 1,260.00
Work) 24 Inch PRCC
61 Point # 05 250149N 670348E 24 inch 12 11 9 1,188.00
62 Point # 06 250149N 670347.5E 24 inch 11 12 9 1,188.00
63 Point # 07 250149N 670347E 24 inch 10 11 9 990.00
Total Quantity 83,147.00

Contractor's Representative Consultant's Representative


Annexure C: Backfiling Quantity Sheet
Sr. # Location/Area Point # Pipe Diameter L W D Quantity Remarks
1 Point # 01 36 inch 8 7 10 560.00
2 Point # 02 36 inch 6 6 8 288.00
3 Point # 03 36 inch 7 7 8 392.00
4 Point # 04 36 inch 7 7 8 392.00
5 Point # 05 36 inch 6 6 11 396.00
6 Point # 06 36 inch 8 23 7 1,288.00
7 Point # 07 36 inch 13 8 9 936.00
8 Point # 08 36 inch 6 6.5 6.5 253.50
9 Point # 09 36 inch 12 11 13 1,716.00
10 Point # 10 36 inch 11 12 10 1,320.00
11 Point # 11 36 inch 10 15 9 1,350.00
12 Point # 12 36 inch 10 12 9 1,080.00
13 Point # 13 36 inch 10 12 9 1,080.00
14 Point # 14 36 inch 10 13 9 1,170.00
15 Point # 15 36 inch 10 11 8.5 935.00
Orangi Town Qasba Colony near Post Office
16 Point # 16 36 inch 16 12 10 1,920.00
17 Point # 17 36 inch 10 11 9 990.00
18 Point # 18 36 inch 11 11 9.5 1,149.50
19 Point # 19 36 inch 13 11 9 1,287.00
20 Point # 20 36 inch 13 11 9 1,287.00
21 Point # 21 36 inch 12 11 9 1,188.00
22 Point # 22 36 inch 11 11 9 1,089.00
23 Point # 23 36 inch 12 11 9 1,188.00
24 Point # 24 36 inch 13 11 8 1,144.00
25 Point # 25 36 inch 11 10 9 990.00
26 Point # 26 36 inch 13 11 8 1,144.00
27 Point # 27 36 inch 12 10 9 1,080.00
28 Point # 28 36 inch 13 11 8 1,144.00
29 Point # 29 36 inch 11 10 9 990.00
30 Point # 30 36 inch 12 11 9 1,188.00
31 Point # 01 48 inch 15 14 11 2,310.00
32 Point # 02 48 inch 15 14 11 2,310.00
33 Point # 03 48 inch 15 14 11 2,310.00
34 Point # 04 48 inch 15 14 11 2,310.00
35 Point # 05 48 inch 15 14 11 2,310.00
Choudhary School To Post Office
36 Point # 06 48 inch 15 14 11 2,310.00
37 Point # 07 48 inch 15 14 11 2,310.00
38 Point # 08 48 inch 15 14 11 2,310.00
39 Point # 09 48 inch 15 14 11 2,310.00
40 Point # 10 48 inch 15 14 11 2,310.00 23,100.00
At Road 5000 Near KDA Office, Surjan Town
41 Point # 01 255mm 84 13 14 15,288.00
(Additional Work)
42 Point # 01 225 mm 10 7 6 420.00 UPVc Pipes
43 Point # 02 225 mm 8 7 6 336.00
44 Point # 03 225 mm 8 7 6 336.00
45 Point # 04 225 mm 9 7 6 378.00
46 Point # 05 225 mm 11 7 6 462.00
47 Point # 06 225 mm 25 7 6 1,050.00 Pipe Replacement
48 Point # 07 225 mm 10 7 6 420.00
At Sector Between 7A & & 7B (Additional
49 Point # 08 225 mm 9 7 6 378.00
Work) uPVC Line
50 Point # 09 225 mm 6 7 6 252.00
51 Point # 10 225 mm 8 7 6 336.00
52 Point # 11 225 mm 8 7 6 336.00
53 Point # 12 225 mm 8 7 6 336.00
54 Point # 13 225 mm 8 7 6 336.00
55 Point # 14 225 mm 8 7 6 336.00
56 Point # 15 225 mm 8 7 6 336.00
57 Point # 01 24 inch 12 9 9 972.00
58 Point # 02 24 inch 11 10 9 990.00
59 Point # 03 24 inch 12 11 9 1,188.00
At Sector Between 7A & & 7B (Additional
60 Point # 04 24 inch 14 10 9 1,260.00
Work) 24 Inch PRCC
61 Point # 05 24 inch 12 11 9 1,188.00
62 Point # 06 24 inch 11 12 9 1,188.00
63 Point # 07 24 inch 10 11 9 990.00
Total Quantity 83,147.00

Contractor's Representative Consultant's Representative


Annexure D: Addiotional Works Other Than BOQ Items As Instructed By Client/Consultant
Sr. # Item Description Unit Unit Price Quantity Amount Remarks

Providing, laying, cutting, butt fusion jointing,


testing, commissioning & disinfecting the uPVC
1 Dia 225mm (SDR 80) conforming to the Rft. 2,500.00 20.00 50,000.00
satisfaction of Engineer. The pipe shall be from
reputable manufacturer approved by the Engineer.

MS Jointing Clamps Dia 225mm Length 12 inches


2 Nos. 22,000.00 12.00 264,000.00 Hydroplast
conforming to standard practices
Providing and Fixing of uPVC Flange Dia 225mm
3 Nos. 16,000.00 8.00 128,000.00 Hydroplast
having GI Bolts & Nuts size 4inches
Providing and Fixing of uPVC Sockets Dia
4 Nos. 28,000.00 2.00 56,000.00
225mm
Providing and Fixing of MS Jointing Clamps Dia
5 225mm Length 4 inches conforming to standard Nos. 5,200.00 2.00 10,400.00
practices
6 Excavation 20 5,628.00 112,560.00
7 Backfilling Cft 8 6,048.00 48,384.00
8 Dewatering Nos. 16 3,000.00 48,000.00 Dewatering for each Point
Grand Total Amount 717,344.00

Contractor's Representative Consultant's Representative


COORDINATES OF LEAKAGE POINTS
Sr. # Location/Area Point # Coordinates Pipe Diameter Remarks
1 Point # 01 245641.50599N 67014.91543E 36 inch
2 Point # 02 245642.5607N 67015.22018E 36 inch
3 Point # 03 245642.9866N 67015.54328 E 36 inch
4 Point # 04 245643.4867N 67016.03218E 36 inch
5 Point # 05 245643.4987N 67016.03218E 36 inch
6 Point # 06 245646.23877N 67018.00982E 36 inch
7 Point # 07 245653.17765N 67022.20093E 36 inch
8 Point # 08 245647.33323N 67019.188E 36 inch
9 Point # 09 245641.25621N 67014.94902E 36 inch
10 Point # 10 245640.02907N 67018.10105E 36 inch
11 Point # 11 245639.16137N 67019.89782E 36 inch
12 Point # 12 245638.09216N 67031.12206E 36 inch
13 Point # 13 245639.16137N 67019.89782E 36 inch
14 Point # 14 245621.43898N 67051.73097E 36 inch
15 Point # 15 245622.59964N 67048.92195E 36 inch
Orangi Town Qasba Colony near Post Office
16 Point # 16 245618.2047N 67057.42393E 36 inch
17 Point # 17 245639.29985N 67019.2386E 36 inch
18 Point # 18 245639.58139N 67020.84493E 36 inch
19 Point # 19 245635.96834N 67024.82337 E 36 inch
20 Point # 20 245639.42852N 67013.3092E 36 inch
21 Point # 21 245652.5894N 67022.25232E 36 inch
22 Point # 22 245645.97008N 6708.39492E 36 inch
23 Point # 23 245620.0652N 67054.7992E 36 inch
24 Point # 24 245622.69824N 6713.79344E 36 inch
25 Point # 25 245622.67556N 6714.13148E 36 inch
26 Point # 26 245622.70832N 6713.7344E 36 inch
27 Point # 27 245622.38576N 6714.69668E 36 inch
28 Point # 28 245623.39576N 6715.69668E 36 inch
29 Point # 29 245622.395 N 6715.6866 E 36 inch
30 Point # 30 245621.38576 N 6719.69668E 36 inch
31 Point # 01 245608 N 670004 E 48 inch
32 Point # 02 245614.6256 N 665957.43212E 48 inch
33 Point # 03 245610.4784 N 6702.38932E 48 inch
34 Point # 04 245610.542 N 6702.68776E 48 inch
35 Point # 05 245612.2245 N 6704.62775 48 inch
36 Choudhary School To Post Office Point # 06 245614.21235 N 6706.82175E 48 inch
37 Point # 07 245616.21335 N 6708.81E 48 inch
38 Point # 08 245618.12535 N 6710.1817E 48 inch
39 Point # 09 245607 N 670009E 48 inch
40 Point # 10 245607 N 670010 E 48 inch
Point # 11 245611 N 665909E
At Road 5000 Near KDA Office, Surjan Town 2515.51604N 67349.69764
Point # 01 255mm
41 (Additional Work)
42 Point # 01 250131N 670350E 225 mm UPVc Pipes
43 Point # 02 250148N 670347E 225 mm
44 Point # 03 250142N 670350E 225 mm
45 Point # 04 250139N 670350E 225 mm
46 Point # 05 250137N 670350E 225 mm
47 Point # 06 250136N 670350E 225 mm
48 Point # 07 250134N 670350E 225 mm
At Sector Between 7A & & 7B (Additional
49 Point # 08 250149N 670353E 225 mm
Work) uPVC Line
50 Point # 09 250149N 670356E 225 mm
51 Point # 10 250149N 670357E 225 mm
52 Point # 11 250149N 670406E 225 mm
53 Point # 12 250150N 670401E 225 mm
54 Point # 13 250150N 670402E 225 mm
55 Point # 14 250150N 670403E 225 mm
56 Point # 15 250150N 670407E 225 mm
57 Point # 01 250149N 670351E 24 inch
58 Point # 02 250149N 670350E 24 inch
59 Point # 03 250149N 670349E 24 inch
At Sector Between 7A & & 7B (Additional
60 Point # 04 250149N 670348.5E 24 inch
Work) 24 Inch PRCC
61 Point # 05 250149N 670348E 24 inch
62 Point # 06 250149N 670347.5E 24 inch
63 Point # 07 250149N 670347E 24 inch
Total Quantity

Contractor's Representative Contractor's Representative


MEASUREMENT OF PRESSURE
Banaras Chowk
Sr. # Date Time Pressure Reading Remarks
1 3/22/2023 17:00 2.3 Bar 48 inch Dia PRCC Pipeline
2 3/22/2023 18:00 2.3 Bar 48 inch Dia PRCC Pipeline
3 3/22/2023 19:00 2.3 Bar 48 inch Dia PRCC Pipeline
4 3/22/2023 20:00 2.4 Bar 48 inch Dia PRCC Pipeline
5 3/22/2023 21:00 2.6 Bar 48 inch Dia PRCC Pipeline
6 3/22/2023 22:00 2.3 Bar 48 inch Dia PRCC Pipeline
7 3/22/2023 23:00 3.0 Bar 48 inch Dia PRCC Pipeline
8 3/23/2023 23:59 2.4 Bar 48 inch Dia PRCC Pipeline
9 3/23/2023 1:00 2.4 Bar 48 inch Dia PRCC Pipeline
10 3/23/2023 2:00 2.4 Bar 48 inch Dia PRCC Pipeline
11 3/23/2023 3:00 2.4 Bar 48 inch Dia PRCC Pipeline
12 3/23/2023 4:00 2.4 Bar 48 inch Dia PRCC Pipeline
13 3/23/2023 5:00 2.3 Bar 48 inch Dia PRCC Pipeline
14 3/23/2023 6:00 2.3 Bar 48 inch Dia PRCC Pipeline
15 3/23/2023 7:00 2.3 Bar 48 inch Dia PRCC Pipeline
16 3/23/2023 8:00 2.3 Bar 48 inch Dia PRCC Pipeline
17 3/23/2023 9:00 2.4 Bar 48 inch Dia PRCC Pipeline
18 3/23/2023 10:00 2.4 Bar 48 inch Dia PRCC Pipeline
19 3/23/2023 11:00 2.4 Bar 48 inch Dia PRCC Pipeline
20 3/23/2023 12:00 2.4 Bar 48 inch Dia PRCC Pipeline
21 3/23/2023 13:00 2.3 Bar 48 inch Dia PRCC Pipeline
22 3/23/2023 14:00 2.3 Bar 48 inch Dia PRCC Pipeline
23 3/23/2023 15:00 2.3 Bar 48 inch Dia PRCC Pipeline
24 3/23/2023 16:00 2.3 Bar 48 inch Dia PRCC Pipeline
MEASUREMENT OF PRESSURE
Banaras Chowk
Sr. # Date Time Pressure Reading Remarks
1 3/19/2023 14:05 2 Bar 12 inch Dia PRCC Pipeline
2 3/19/2023 14:24 2.3 Bar 12 inch Dia PRCC Pipeline
3 3/19/2023 15:05 2.1 Bar 12 inch Dia PRCC Pipeline
4 3/19/2023 15:34 1.8 Bar 12 inch Dia PRCC Pipeline
5 3/19/2023 16:00 0.4 Bar 12 inch Dia PRCC Pipeline
6 3/19/2023 16:20 0.2 Bar 12 inch Dia PRCC Pipeline
7 3/19/2023 17:00 0 Bar 12 inch Dia PRCC Pipeline
8 3/19/2023 18:00 0 Bar 12 inch Dia PRCC Pipeline
9 3/19/2023 19:00 0 Bar 12 inch Dia PRCC Pipeline
10 3/19/2023 20:00 0 Bar 12 inch Dia PRCC Pipeline
11 3/19/2023 21:00 0 Bar 12 inch Dia PRCC Pipeline
12 3/19/2023 22:00 0 Bar 12 inch Dia PRCC Pipeline
13 3/19/2023 23:00 0 Bar 12 inch Dia PRCC Pipeline
14 3/19/2023 0:00 0 Bar 12 inch Dia PRCC Pipeline
15 3/20/2023 1:00 0 Bar 12 inch Dia PRCC Pipeline
16 3/20/2023 2:00 0 Bar 12 inch Dia PRCC Pipeline
17 3/20/2023 3:00 2.2 Bar 12 inch Dia PRCC Pipeline
18 3/20/2023 4:00 2.6 Bar 12 inch Dia PRCC Pipeline
19 3/20/2023 5:00 2.6 Bar 12 inch Dia PRCC Pipeline
20 3/20/2023 6:00 0 Bar 12 inch Dia PRCC Pipeline
21 3/20/2023 7:00 0 Bar 12 inch Dia PRCC Pipeline
22 3/20/2023 8:00 0 Bar 12 inch Dia PRCC Pipeline
23 3/20/2023 9:00 0 Bar 12 inch Dia PRCC Pipeline
24 3/20/2023 10:00 0 Bar 12 inch Dia PRCC Pipeline
25 3/20/2023 11:00 0 Bar 12 inch Dia PRCC Pipeline
26 3/20/2023 12:00 0 Bar 12 inch Dia PRCC Pipeline

You might also like