Professional Documents
Culture Documents
Attachment 1 - Arrangement and Outline for Minihydro Carpark
Attachment 1 - Arrangement and Outline for Minihydro Carpark
Attachment 1 - Arrangement and Outline for Minihydro Carpark
Stone
Longitudinal Joint Drainage
1%
1
2
Dra
inag
e
Flow of
Water
Drainage
500 Refer to KGL-DD-CI-08-01-122~124
Drainage Trench
200
1:1
1:1
300
Drainage Trench
One-way
Drainage
Traffic
CLIENT
Drainage
KAFUE GORGE LOWER HYDROPOWER PROJECT
CONTRACTOR
SINOHYDRO CORPORATION LIMITED
REV. :
A JC AC SY For Approval 2024-07-11 DWG No. SHEET 1 OF 2 A
Rev. Prep. Check Appro. Modification Date
3172
Car Park Light T10 R8@150 c/c
200
200
500mm Drainage R8@150 c/c
500
T10 T10
mm
115
Dra
150
inag
600
Flow of
Water
e
2385 Septic
Tank
115
1000mm Drainage Trench
2385
115
400
115
300
100
2385
115
4000
100 mm Diameter Pole
1000mm Drainage Trench
One-way
Drainage
2385 Traffic
20mm thick Steel Plate
115
Drainage
500
REV. :
A JC AC SY For Approval 2024-05-23 DWG No. SHEET 2 OF 2 A
Rev. Prep. Check Appro. Modification Date
12mm dia
T12@200
200
R8 Base Plate
200
1100 4T12
T12@200 450 200 450
148
1100
20 mm thick Base Plate
200
T12
300
1000
T12@200
T12@200
2385 2385
1100 50mm Blinding Concrete
2000
20mm Base Plate
300
300
40mm Steel Pipe
CLIENT
3000
5000
KAFUE GORGE LOWER HYDROPOWER PROJECT
CONTRACTOR
SINOHYDRO CORPORATION LIMITED
DWG NAME
OUTLINE OF CAR PARK AT MINI-POWERHOUSE
REV. :
A JC AC SY For Approval 2024-05-23 DWG No. SHEET 3 OF 3 A
Rev. Prep. Check Appro. Modification Date