Professional Documents
Culture Documents
Machine Perfomance Tracker (March 2020)
Machine Perfomance Tracker (March 2020)
Machine Perfomance Tracker (March 2020)
DT 14 24.00
DT 18 24.00
DT 19
0.37 DT 25
DT 26 4.00
DT 28
DT 29
DT 31
DT 32
DT 36 24.00
DT 38
DT 40
DT 41
DT 52 24.00
DT 53 24.00
DT 54
DT 55
DT 56 4.00
DT 57
DT 58
DT 59
DT 60
DT 61 24.00
DT 62
DT 63
DT 64
DT 65
DT 66 24.00
DT 67
DT 68
DT 69
Excavators
EX 01
EX 12
EX 24 24.00
EX 25
EX 28
EX 32
EX 37
EX 38 24.00
EX 40
EX 41
EX 44
Drill Rigs
DR 05
DR 07 24.00
DR 09 2.00
DR 10 11.00
DR 13
DR 14 11.00
DR 15
Dozers
TD 04
TD 09 8.00
TD 10
Grader
GR 01 24.00
GR 05 24.00
GR06 24.00
Loader
LDR 03
LDR 04
TLB
TLB 01 24.00
TLB 02 24.00
TLB 03 24.00
Water Bowser
WB 01 24.00
WB 03
WB 03 (CAT) 16.00
WB 05
WB 06 16.00
Crane
CR 01 16.00
CR 02 16.00
Water Pumps
WP 02
WP 03
WP 05 24.00
WP 06
WP 07
WP 10
WP 12
WP 14
WP 15
MACHINE PERFORMANCE DAILY TRACKER
SCHEDULED TIME LOSS (HOURS) PERFORMANCE INDICA
100.00% 86.29%
0.00% 0.00%
100.00% 86.29%
100.00% 86.29%
100.00% 86.29%
100.00% 86.29%
100.00% 0.00%
100.00% 86.29%
100.00% 86.29%
100.00% 86.29%
100.00% 85.25%
0.00% 0.00%
100.00% 77.96%
54.17% 40.46%
100.00% 86.29%
54.17% 40.46%
100.00% 86.29%
100.00% 100.00%
100.00% 52.96%
100.00% 86.29%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
100.00% 86.29%
100.00% 86.29%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
100.00% 0.00%
100.00% 100.00%
100.00% 19.08%
100.00% 100.00%
100.00% 19.08%
100.00% 19.42%
100.00% 19.42%
100.00% 86.29%
0.00% 0.00%
100.00% 86.29%
100.00% 86.29%
100.00% 86.29%
100.00% 86.29%
100.00% 100.00%
100.00% 86.29%