Project : Penanganan Perlintasan Sebidang JPL 150A KM. 148+006 (Fly Over + JPO PUSDIKPOM)
BH - P2.EJ1
Client : PT Karyabaru Adyapratama
Location : PUSDIKPOM Cimahi
Date Commence : June 12th, 2024 Drilling Rig : XY Coordinate
Date Complete : June 20th, 2024 Hammer Type : Automatic Easting : 0781127 m (GPS HH)
Drilled by : RR Borehole dia : 89 mm Northing : 9237689 m (GPS HH)
Logged by : DMH Inclination : - 90 o Elevation : + 761.00 m (GPS HH)
Checked by : MYS Total Depth : 60.00 m (0.00 - 20.00 m) UTM : 48 M
DRILLING SAMPLING FIELD MATERIAL DESCRIPTION
USCS SYMB.
ELEVATION
PERMEABILITY (cm/s)
SAMPLE
SPT TEST
(metres)
(metres)
PROFILE
RQD (%)
Cassing
Type Test
SOIL / ROCK MATERIAL DESCRIPTION N-SPT Value
DEPTH
K (cm/s)
(MSL)
Lugeon
BORE
DATE
UNIT
GWL
N1 N2 N3 N
0 10 20 30 40 50 60
Fill Material.
ML SILT, brown, soft.
1 + 760
ML SILT, blackish brown, soft.
June 12th, 2024
SPT-1 1 1 1 2
2 + 759
ML Gravelly SILT, dark brown, soft to stiff.
3 + 758
DS-1
SPT-2 4 6 9 15
4 + 757
ML Sandy SILT, grayish brown, with a few of boulder, stiff to
very stiff.
5 + 756
SPT-3 12 16 19 35
6 + 755
7 + 754
ML SILT, brown, stiff to very stiff.
GWL
GL.
June 13th, 2024
-8.04 m SPT-4 4 5 9 14
8 + 753
9 + 752
Cassing Ø 89 mm
DS-2
SPT-5 10 13 17 30
10 + 751
ML Sandy SILT, grayish brown, with a few of gravel, very stiff to
hard
11 + 750
SPT-6 14 17 21 38
12 + 749
13 + 748
SPT-7 10 16 22 38
14 + 747
SM Silty SAND, grayish brown, a few of gravel, dense.
15 + 746
SPT-8 9 15 21 36
16 + 745
June 14th, 2024
17 + 744
DS-3
SPT-9 13 17 22 39
18 + 743
19 + 742
SPT-10 15 19 24 43
20 + 741
Note :
Undisturbed Sample Disturbed Sample *GPS HH (Global Positioning System Handheld)
BORING LOG :
Project : Penanganan Perlintasan Sebidang JPL 150A KM. 148+006 (Fly Over + JPO PUSDIKPOM)
BH - P2.EJ1
Client : PT Karyabaru Adyapratama
Location : PUSDIKPOM Cimahi
Date Commence : June 12th, 2024 Drilling Rig : XY Coordinate
Date Complete : June 20th, 2024 Hammer Type : Automatic Easting : 0781127 m (GPS HH)
Drilled by : RR Borehole dia : 89 mm Northing : 9237689 m (GPS HH)
Logged by : DMH Inclination : - 90 o Elevation : + 761.00 m (GPS HH)
Checked by : MYS Total Depth : 60.00 m (20.00 - 40.00 m) UTM : 48 M
DRILLING SAMPLING FIELD MATERIAL DESCRIPTION
USCS SYMB.
ELEVATION
PERMEABILITY (cm/s)
SAMPLE
SPT TEST
(metres)
(metres)
PROFILE
RQD (%)
Cassing
Type Test
SOIL / ROCK MATERIAL DESCRIPTION N-SPT Value
DEPTH
K (cm/s)
(MSL)
Lugeon
BORE
DATE
UNIT
GWL
N1 N2 N3 N
0 10 20 30 40 50 60
21 + 740
SM Silty SAND, gray, dense.
SPT-11 13 17 21 38
22 + 739
SM Silty SAND, blackish gray, with a few of gravel, dense.
23 + 738
SPT-12 13 16 22 38
June 15th, 2024
24 + 737
25 + 736
SPT-13 15 19 24 43
26 + 735
SP Gravelly SAND, grayish black, dense.
27 + 734
SPT-14 12 18 22 40
28 + 733
29 + 732
Cassing Ø 89 mm
SPT-15 10 17 24 41
30 + 731
SP Gravelly SAND, blackish gray, dense.
31 + 730
SPT-16 14 18 25 43
June 16th, 2024
32 + 729
33 + 728
SPT-17 15 21 27 48
34 + 727
35 + 726
SP Gravelly SAND, grayish black, dense.
SPT-18 17 21 29 50
36 + 725
37 + 724
SP Gravelly SAND, blackish gray, dense.
SPT-19 10 15 25 40
38 + 723
June 18th, 2024
39 + 722
SPT-20 12 17 27 44
40 + 721
Note :
Undisturbed Sample Disturbed Sample *GPS HH (Global Positioning System Handheld)
BORING LOG :
Project : Penanganan Perlintasan Sebidang JPL 150A KM. 148+006 (Fly Over + JPO PUSDIKPOM)
BH - P2.EJ1
Client : PT Karyabaru Adyapratama
Location : PUSDIKPOM Cimahi
Date Commence : June 12th, 2024 Drilling Rig : XY Coordinate
Date Complete : June 20th, 2024 Hammer Type : Automatic Easting : 0781127 m (GPS HH)
Drilled by : RR Borehole dia : 89 mm Northing : 9237689 m (GPS HH)
Logged by : DMH Inclination : - 90 o Elevation : + 761.00 m (GPS HH)
Checked by : MYS Total Depth : 60.00 m (40.00 - 60.00 m) UTM : 48 M
DRILLING SAMPLING FIELD MATERIAL DESCRIPTION
USCS SYMB.
ELEVATION
PERMEABILITY (cm/s)
SAMPLE
SPT TEST
(metres)
(metres)
PROFILE
RQD (%)
Cassing
Type Test
SOIL / ROCK MATERIAL DESCRIPTION N-SPT Value
DEPTH
K (cm/s)
(MSL)
Lugeon
BORE
DATE
UNIT
GWL
N1 N2 N3 N
0 10 20 30 40 50 60
41 + 720
SPT-21 13 18 26 44
Cassing Ø 89 mm
June 18th, 2024
42 + 719
SP Gravelly SAND, black, dense.
43 + 718
SPT-22 14 18 27 45
44 + 717
45 + 716
SP Gravelly SAND, grayish black, dense.
SPT-23 14 17 26 43
46 + 715
47 + 714
SPT-24 17 19 27 46
48 + 713
June 19th, 2024
49 + 712
SP Gravelly SAND, black, dense.
SPT-25 17 21 28 49
50 + 711
51 + 710
SPT-26 16 20 27 47
52 + 709
53 + 708
SPT-27 15 20 27 47
54 + 707
55 + 706
SPT-28 16 21 29 50
June 20th, 2024
56 + 705
57 + 704
SPT-29 16 22 29 >50
58 + 703
59 + 702