Project_Logs SYN 02
Project_Logs SYN 02
TELECOMMUNICATION ENGINEERING
PROJECT GUIDE
LT COL ABHEET PATIL
SYNDICATE 02
Research & Discussion on the Topic
Project Guide explained on how to define scope of the project & what is
expected
Guided us on the basic outline of the project, what all research needs to be done,
creating training labs related to the topic was discussed
Distribution of research work within the syndicate done
Project Design
The syndicate discussed on design of the website
Discussion on framework that can be used
Finalization on distribution of work within the Syn for framework was done
Finalization
Finalization of the Trg Lab done
Discussion on Website Design
Finalization on the framework
Progress Update
Integration of our four trg lab as one
Project Guide suggested to test the working of labs with someone out of the Syn
Interim Project Presentation
Working of first training lab Displayed
Instructor gave inputs to add pop ups giving hints to make the labs more user
friendly add burpsuite with lab .
Instructor also advised the Syn to add Quiz after using the Training labs in order
to check the Knowledge of the Individual using the labs
Integration of Labs
Integration of all 05 CWEs with a total of 06 Labs done
Testing of the Labs was also done