Workshop & Proposal_Stds_June 2024

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

` PENTECOST UNIVERSITY

FESAC

SYSTEMS ADMINISTRATION
INDIVIDUAL ASSIGNMENT

SYSTEMS ADMINISTRATION PROPOSAL AND DEVELOPMENT PROJECT SKILLS


ASSESSMENT (50%)

TASK REQUIRED:
In your role as a systems administrator, choose a domain area and create a project proposal to address
a specific issue within your organization. Be sure to incorporate the following elements as shown in
the example below.
SAMPLE PROJECT
Proposal Title/Topic: Developing an Automated Backup System for the Organization’s Critical Data
Target/Project Domain: Systems Administration
Introduction: As a systems administrator, this project aims to address the need for a robust backup
solution within our organization. The proposed system will provide data protection and recovery
mechanisms to safeguard critical information.
Background: Organizations rely heavily on data for their day-to-day operations. Data loss due to
hardware failures, human errors, or cyber threats can have severe consequences. Therefore,
implementing an effective backup system is crucial.
Problem Statements:
1. Lack of a centralized and automated backup solution.
2. Inadequate data protection measures.
3. Manual backup processes are time-consuming and error-prone.
Objectives:
1. To create an efficient and reliable backup system for critical organizational data.
2. To minimize data loss and ensure data availability in case of system failures.
3. To enhance disaster recovery capabilities.
Significance of the Project: The proposed backup system will ensure data integrity, reduce downtime,
and enhance overall system reliability. It will contribute to the organization’s continuity and resilience.
Scope of the Project: The project will focus on designing, implementing, and testing the backup
system. It will cover data selection, backup frequency, storage options, and recovery procedures.
Literature Review: Research will explore existing backup solutions, best practices, and industry
standards. (Provide a brief review)

Self Pro_Dev_by Maggor=


Methodology: (Mention and indicate your model)
1. Requirement analysis
2. System design
3. Implementation
4. Testing and validation
Research Question and Proposed Areas of Investigation: (Optional)
1. What are the optimal backup strategies for our organization?
2. How can we ensure data consistency during backups?
Timeline:/Draw Gantt Chart
 Requirement analysis: 2 weeks
 System design: 3 weeks
 Implementation: 6 weeks
 Testing and validation: 4 weeks
Resource Person/Presenter: The project will involve collaboration with experts in data management
and system administration.

PROPOSAL CONTENTS DEVELOPMENT AND DOMAIN AREAS FOR ONSIDERATION.


1. General Knowledge in ICT and IT
2. Computer Architecture and organization (Hardware and Software)
3. Data Communication and Networking
4. Computer Security and Disaster Recovery
5. Computer Network and Information Security
6. Data Communication and Security
7. Computer Network Security
8. Computer and Network Security
9. Information Security
10. Cyber Security
11. Internet of Things (IoT)
12. Systems Administration
13. Networking and Systems Administration
14. Systems Administration and Security
15. Information Technology Administration and Security
16. System Design and Security Management
17. Wireless Networks Security and Administration
18. Cloud Computing and Emerging Technologies
19. Mobile Computing
20. Cloud and Mobile computing

Self Pro_Dev_by Maggor=


21. Internet and Higher-Layer Protocols
22. Cloud and IoT Networking and Security
23. Network Services and Administration
24. Design of Wireless Networks: 4/5G Architecture and Services
25. Computer Forensic and Digital Evidence for Computing Security
26. Network Management and Security
27. Cryptography and Network Security
28. Smart Home Network Security Monitoring Systems
29. Small Business Network Security
30. Data network security

Self Pro_Dev_by Maggor=

You might also like