Document No.

ACX-IMS-HSE-01

Format for EHS Walk Down Rev. No. 00


Rev. Date 00

Project Name : PNQ-26 Visit by : ACX and Date


Completion NCC
Location : PUNE Preapred By : Ch Ramesh Status
Date : Action
11.June.2024
items Corrective/ preventive Action
By whom By when
S.
No.
1 Road markings are required for Ensure that road markings are Mr.
the new assembly area. correctly applied in the new Nageshwar
Rao & Ch. 16-06.2024
assembly area to enhance safety
and organization. Ramesh
2 Hard barricading and clear
Hard barrication Strong
Mr.
markings should be provided at Nageshwar 15-06-2024
barricades shall be erected.
the UG tank. Rao
3 Two gates are required at the Mr. Narayan
NCCL Office Site Entrance Area Gates should be provided by
22-06-2024
and the DC Tower Crane No. 02 NCCL office and DC TC-02 Ara
Entrance Area.
4 The canteen to be maintained in a The canteen should be Mr. Shyam
neat and clean condition sundhar Daily
consistently maintained with high
monotiring
standards of cleanliness and
required
hygiene to prevent future lapses.
5 New rest shelter to be pro for the New rest shelter should be Mr . D uma
DC workers 20-06-2024
established for DC workers sankar
6 The wheel wash pit should be Complete the wheel wash pit Mr .G
completed promptly to avoid further delays yedukondalu
17-06-2024
and reduce accidents with vehicle
cleaning facilities.
7 The pedestrian crossing at the Pedestrian crossing at ACX New Mr Nageswara
ACX new office should be Office should be suitably rao
modified and painted with white modified and painted with white Information
paint paint to improve visibility and
safety for pedestrians.

Picture of Visit
Document No. ACX-IMS-HSE-01

Format for EHS Walk Down Rev. No. 00


Rev. Date 00

Observation Photos.

Before After
Document No. ACX-IMS-HSE-01

Format for EHS Walk Down Rev. No. 00


Rev. Date 00

Signature

Prepare by: