BIAYA TOTAL BIAYA PRODUKSI ACTIVITY Rp/BCM Overburden Rp 841.222.222 Rp 86.279 Coal Getting Rp 151.666.667 Rp 15.556 General & Support Rp 92.100.000 Rp 9.446 Salary & Meal Rp 59.700.000 Rp 6.123 Grand Total Rp 1.144.688.889 Rp 117.404 Total Cost Production Rp 117.404 /BCM Total Jam Kerja Excavator 1 395 Jam Excavator 2 395 Jam Bulldozer 200 Jam
TOTAL BIAYA PRODUKSI DAN LAHAN
Total Biaya Produksi Rp 117.404 Total Fee Lahan Rp 35.000 Rp 152.404