Balance Qty. Satyam -G
Balance Qty. Satyam -G
PROJECT - CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER FROM EXISTING KM: 0.000 TO 55.610 (DESIGN KM 0.000 TO 54.048
UTTAR PRADESH.
STRIP CHART
BC
TC
DBM
TC
LEFT CARRIAGEWAY
PC
WMM-Top
WMM-I
GSB-Top
SG-Top
SG-I
EMB-Top
OGL
C&G
19+600
19+700
19+800
19+900
20+000
20+100
20+200
20+300
20+400
20+500
20+600
20+700
20+800
20+900
21+000
21+100
21+200
21+300
21+400
21+500
21+600
21+700
21+800
21+900
22+000
22+100
22+200
22+300
22+400
22+500
22+600
22+700
22+800
22+900
CHAINAGE
C&G
OGL
EMB-Top
RIGHT CARRIAGEWAY
SG-I
SG-Top
GSB-Top
WMM-I
WMM-Top
PC
TC
DBM
TC
BC
TCS TYPE
TS
O
T
(DESIGN KM 0.000R
00 TO 55.610 ### 5 TO 54.048) OF NH-124D ON EPC MODE IN STATE OF PROJECT - CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER FROM EXIST
DESH. I5
.P
ART 6
1
BC C
0
TC H
DBM (A
D
TC R
LEFT CARRIAGEWAY
PC E
WMM-Top ST
WMM-I
I
G
GSB-Top
N
SG-Top
SG-I K
EMB-Top M
OGL 31.05.24 30.05.24 29.05.24
C&G 0 2/18/2024 2/18/2024 2/19/2024 2/19/2024
.
23+000
23+100
23+200
23+300
23+400
23+500
23+600
23+700
23+800
23+900
24+000
24+100
24+200
24+300
24+400
24+500
24+600
24+700
24+800
24+900
25+000
25+100
25+200
25+300
25+400
25+500
25+600
25+700
25+800
25+900
26+000
26+100
26+200
26+300
CHAINAGE 0
0
C&G
0 2/18/2024 2/18/2024 2/19/2024 2/19/2024
OGL 31.05.24 29.05.24 29.05.24
EMB-Top
T
O
RIGHT CARRIAGEWAY
SG-I
SG-Top
5
GSB-Top 4
WMM-I .
WMM-Top 0
PC 4
TC 8
DBM )
TC
BC O
TCS TYPE F
N
H
-
1
2
4
TS
O
T
ANE WITH PAVED R
SHOULDER FROM
5 EXISTING KM: 0.000 TO 55.610 (DESIGN KM 0.000 TO 54.048) OF NH-124D ON EPC MODE IN STATE OF PROJECT - CONSTRUCTIO
###
I5 UTTAR PRADESH.
.P
6 STRIP CHART
1
BC C
0
TC H
DBM (A
D
TC R
LEFT CARRIAGEWAY
PC E
WMM-Top ST
WMM-I
I
G
GSB-Top
N
SG-Top
SG-I K
EMB-Top M 12.06.24 12.06.24
OGL 26.05.24
C&G 0 2/20/2024 2/20/2024 3/19/2024
.
26+400
26+500
26+600
26+700
26+800
26+900
27+000
27+100
27+200
27+300
27+400
27+500
27+600
27+700
27+800
27+900
28+000
28+100
28+200
28+300
28+400
28+500
28+600
28+700
28+800
28+900
29+000
29+100
29+200
29+300
29+400
29+500
29+600
29+700
CHAINAGE 0
0
C&G
0 2/20/2024 2/20/2024 3/19/2024
OGL 26.05.24
EMB-Top
T 12.06.24 12.06.24
O
RIGHT CARRIAGEWAY
SG-I
SG-Top
5
GSB-Top 4
WMM-I .
WMM-Top 0
PC 4
TC 8
DBM )
TC
BC O
TCS TYPE F
N
H
-
1
2
4
TS
O
T
R
PROJECT - CONSTRUCTION
5 OF TWO LANE WITH PAVED SHOULDER FROM EXISTING KM: 0.000 TO 55.610 (DESIGN KM 0.000 TO 54.048) OF NH-124D
###
I5 UTTAR PRADESH.
.P
6 STRIP CHART
1
BC C
0
TC H
DBM (A
D
TC R
LEFT CARRIAGEWAY
PC E
WMM-Top ST
WMM-I
I
G
GSB-Top
N
SG-Top
SG-I K
EMB-Top M
OGL 27.05.24 26.05.24 29.05.24 27.05.24
C&G 0
3/19/2024 4/22/2024 3/20/2024 2/21/2024
.
29+800
29+900
30+000
30+100
30+200
30+300
30+400
30+500
30+600
30+700
30+800
30+900
31+000
31+100
31+200
31+300
31+400
31+500
31+600
31+700
31+800
31+900
32+000
32+100
32+200
32+300
32+400
32+500
32+600
32+700
32+800
32+900
33+000
33+100
CHAINAGE 0
0
C&G
0
3/19/2024 4/22/2024 3/20/2024 2/21/2024
OGL 27.05.24 26.05.24 27.05.24 27.05.24
EMB-Top
T 12.06.24
O
RIGHT CARRIAGEWAY
SG-I
SG-Top
5
GSB-Top 4
WMM-I .
WMM-Top 0
PC 4
TC 8
DBM )
TC
BC O
TCS TYPE F
N
H
-
1
2
4
TS
O
T
DESIGN KM 0.000 TO 54.048) OFR
5 NH-124D ON EPC MODE IN STATE OF PROJECT - CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER FROM EXISTING KM: 0.000
###
I5 UTTAR PRADES
.P
6 STRIP CHAR
1
BC C
0
TC H
DBM (A
D
TC R
LEFT CARRIAGEWAY
PC E
WMM-Top
TS
WMM-I
I
G
GSB-Top
N
SG-Top
SG-I K
EMB-Top M
OGL 27.05.24 28.05.24 25.05.24 28.0524
C&G 0 2/21/2024 2/21/2024 2/22/2024 2/22/
.
33+200
33+300
33+400
33+500
33+600
33+700
33+800
33+900
34+000
34+100
34+200
34+300
34+400
34+500
34+600
34+700
34+800
34+900
35+000
35+100
35+200
35+300
35+400
35+500
35+600
35+700
35+800
35+900
36+000
36+100
36+200
36+300
36+400
36+500
CHAINAGE 0
0
C&G
0 2/21/2024 2/21/2024 2/22/2024 2/22/
OGL 27.05.24 28.05.24 25.05.24 28.0524
EMB-Top
T
12.06.24
O
RIGHT CARRIAGEWAY
SG-I
SG-Top
5
GSB-Top 4
WMM-I .
WMM-Top 0
PC 4
TC 8
DBM )
TC
BC O
TCS TYPE F
N
H
-
1
2
4
TS
O
T
VED SHOULDER FROM EXISTINGR5KM: 0.000 TO 55.610 (DESIGN KM 0.000 TO 54.048) OF NH-124D ON EPC MODE IN STATE OF PROJECT - CONSTRUCTION OF TWO LA
###
I5 PRADESH.
UTTAR
.P
STRIP 6 CHART
1
BC C
0
TC H
DBM (A
D
TC R
LEFT CARRIAGEWAY
PC E
WMM-Top ST
WMM-I
I
G
GSB-Top
N
SG-Top
SG-I K 27.04.24 25.04.24 25.04.24
EMB-Top M 05.05.24 26.04.24 28.04.24 10.05.24 23.04.24
OGL 14.04.24 15.04.24 17.04.24
C&G 0 2/22/2024 3/16/2024
.
36+600
36+700
36+800
36+900
37+000
37+100
37+200
37+300
37+400
37+500
37+600
37+700
37+800
37+900
38+000
38+100
38+200
38+300
38+400
38+500
38+600
38+700
38+800
38+900
39+000
39+100
39+200
39+300
39+400
39+500
39+600
39+700
39+800
39+900
CHAINAGE 0
0
C&G
0 2/22/2024 3/16/2024
OGL 14.04.24 17.04.24
EMB-Top
T 05.05.24 30.04.24 26.04.24 27.04.24 23.04.24
O
RIGHT CARRIAGEWAY
SG-I 25.04.24
SG-Top
5
GSB-Top 4
WMM-I .
WMM-Top 0
PC 4
TC 8
DBM )
TC
BC O
TCS TYPE F
N
H
-
1
2
4
TS
O
T
PROJECT -### R
CONSTRUCTION OF
5 TWO LANE WITH PAVED SHOULDER FROM EXISTING KM: 0.000 TO 55.610 (DESIGN KM 0.000 TO 54.048) OF NH-124D ON EPC MODE
I5 UTTAR PRADESH.
.P
6 STRIP CHART
1
BC C
0
TC H
DBM (A
D
TC R
LEFT CARRIAGEWAY
PC E
WMM-Top ST
WMM-I
I
G
GSB-Top
N
SG-Top
SG-I 25.04.24
K 23.05.24
EMB-Top 23.04.24
M 26.04.24 27.04.24 18.04.24 26.04.24 04.05.24 23.04.24 26.04.24
OGL 17.04.24 18.04.24 31.03.24 03.04.24 07.04.24 08.04.24 09.04.24 10.04.24 31.05.24 10.04.24
3/16/2024C&G 0 3/18/2024 20.03.24 31.05.24 3/29/202
.
40+000
40+100
40+200
40+300
40+400
40+500
40+600
40+700
40+800
40+900
41+000
41+100
41+200
41+300
41+400
41+500
41+600
41+700
41+800
41+900
42+000
42+100
42+200
42+300
42+400
42+500
42+600
42+700
42+800
42+900
43+000
43+100
43+200
43+300
CHAINAGE 0
0
3/16/2024C&G
0 3/18/2024 20.03.24 31.05.24 3/29/202
OGL 17.04.24 18.04.24 31.03.24 02.04.24 06.04.24 07.04.24 8.04.24 09.04.24 10.04.24 31.05.24 10.04.24
EMB-Top
T
23.04.24 27.04.24 27.04.24 06.04.24 26.04.24 27.05.24 01.05.24 23.04.24 26.04.24
O
RIGHT CARRIAGEWAY
N
H
-
1
2
4
TS
O
T
OF NH-124D ON R
00 TO 54.048)### 5EPC MODE IN STATE OF PROJECT - CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER FROM EXISTING KM: 0.000 TO 55.610 (DE
I5 UTTAR PRADESH.
.P
6 STRIP CHART
1
BC C
0
TC H
DBM A(
D
TC R
LEFT CARRIAGEWAY
PC E
WMM-Top
TS
WMM-I
I
G
GSB-Top
N
SG-Top 25.05.24
SG-I K 19.05.24 23.05.24
EMB-Top M 09.05.24 26.05.24 22.0524 14.05.24
OGL 10.04.24 12.04.24 13.04.24 25.04.24 28.04.24
C&G 0 3/29/2024 3/29/2024 3/30/2024 3/30/2024 3/3
.
43+400
43+500
43+600
43+700
43+800
43+900
44+000
44+100
44+200
44+300
44+400
44+500
44+600
44+700
44+800
44+900
45+000
45+100
45+200
45+300
45+400
45+500
45+600
45+700
45+800
45+900
46+000
46+100
46+200
46+300
46+400
46+500
46+600
46+700
CHAINAGE 0
0
C&G
0 3/29/2024 3/29/2024 3/30/2024 3/30/2024 3/3
OGL 10.04.24 12.04.24 13.04.24 25.04.24 28.04.24
EMB-Top
T 09.05.24 26.0524 21.05.24 22.05.24 21.0524 15.05.24
O
RIGHT CARRIAGEWAY
SG-I 20.05.24
SG-Top 27.05.24
5
GSB-Top 4
WMM-I .
WMM-Top 0
PC 4
TC 8
DBM )
TC
BC O
TCS TYPE F
N
H
-
1
2
4
TS
O
T
TH PAVED SHOULDER FROM EXISTING KM: 0.000 TO R555.610 (DESIGN KM 0.000 TO 54.048) OF NH-124D ON EPC MODE IN STATE OF
UTTAR PRADESH. I5
###
.P
STRIP CHART 61
BC C
0
TC H
DBM (A
D
TC R
LEFT CARRIAGEWAY
PC E
WMM-Top ST
WMM-I
I
G
GSB-Top
N
SG-Top 11.06.24 11.06.24 12.06.24 12.06.24
SG-I K 05.06.24 31.05.24 06.06.24 06.06.24 11.06.24
EMB-Top M 13.05.24 19.05.24 26.05.24 29.05.24 03.06.24 09.06.24
OGL 10.05.24 11.05.24 12.05.24
C&G 0 3/31/2024 3/31/2024
.
46+800
46+900
47+000
47+100
47+200
47+300
47+400
47+500
47+600
47+700
47+800
47+900
48+000
48+100
48+200
48+300
48+400
48+500
48+600
48+700
48+800
48+900
CHAINAGE 0
0
C&G
0 3/31/2024 3/31/2024
OGL 08.05.24 10.05.24 11.05.24 12.05.24
T
EMB-Top 15.05.24 16.05.24 19.05.24 26.05.24 29.05.24 03.06.24 09.06.24
O
RIGHT CARRIAGEWAY
N
H
-
1
2
4
TS
O
T
R
5 PROJECT - CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER FROM EXISTING KM: 0.000 TO 55.610 (DESIGN KM 0.000 TO 54.0
###
I5 UTTAR PRADESH.
P
.
6 STRIP CHART
1
BC C
0
TC H
DBM (A
D
TC R
LEFT CARRIAGEWAY
PC E
WMM-Top
TS
WMM-I
I
G
GSB-Top
N
SG-Top
SG-I 11.06.24
K 12.06.24
EMB-Top 09.06.24
M 09.06.24 11.06.24
OGL 12.05.24 16.05.24 18.05.24 22.0524 25.05.24 19.05.24 17.05.24
C&G 0 2/22/2024 2/19/2024 4/30/2024
.
49+000
49+100
49+200
49+300
49+400
49+500
49+600
49+700
49+800
49+900
50+000
50+100
50+200
50+300
50+400
50+500
50+600
50+700
50+800
50+900
51+000
51+100
51+200
51+300
51+400
51+500
51+600
51+700
51+800
51+900
52+000
52+100
52+200
52+300
CHAINAGE 0
0
C&G
0 2/22/2024 2/19/2024 4/30/2024
OGL 12.05.24 16.05.24 22.0524 25.05.24 19.05.24 17.05.24
EMB-Top
T
09.06.24 05.06.24 12.06.24 09.06.24 11.06.24
O
RIGHT CARRIAGEWAY
N
H
-
1
2
4
TS
O
T
HOULDER FROM EXISTING KM: 0.000 TO 55.610 R
(DESIGN KM 0.000
5 TO 54.048) OF NH-124D ON EPC MODE IN STATE OF
UTTAR PRADESH.
###
I5
.P
STRIP CHART 6
1
BC C
0
TC H
DBM (A
D
TC R
LEFT CARRIAGEWAY
PC E
WMM-Top ST
WMM-I
I
G
GSB-Top
N
SG-Top
SG-I K
EMB-Top M 12.06.24
OGL 26.05.24 25.05.24
4/30/2024
C&G 0 24.05.24 10.05.24
.
52+400
52+500
52+600
52+700
52+800
52+900
53+000
53+100
53+200
53+300
53+400
53+500
53+700
53+800
53+900
54+048
CHAINAGE 0
0
4/30/2024
C&G
0 24.05.24 10.05.24
OGL 26.05.24 25.05.24
EMB-Top
T
O
RIGHT CARRIAGEWAY
SG-I
SG-Top
5
GSB-Top 4
WMM-I .
WMM-Top 0
PC 4
TC 8
DBM )
TC
BC O
TCS TYPE F
N
H
-
1
2
4
6/7/2024
BC
TC
DBM
TC
PC
WMM-Top
LEFT CARRIAGEWAY
WMM-I
GSB-Top
SG-Top
SG-I
EMB-Top
EMB-X
EMB-III
EMB-II
EMB-I
OGL
C&G
0+000
0+100
0+200
0+300
0+400
0+500
0+600
0+700
CHAINAGE
C&G
OGL
EMB-I
EMB-II
EMB-III
EMB-X
RIGHT CARRIAGEWAY
EMB-XI
EMB-Top
SG-I
SG-Top
GSB-Top
WMM-I
WMM-Top
PC
TC
DBM
TC
BC
TCS TYPE
0+800
0+900
1+000
1+100
1+200
1+300
1+400
1+500
1+600
1+700
PROJECT - CONSTRUCTION OF TWO LANE WITH PAVED S
WO LANE WITH PAVED SHOULDER FROM EXISTING KM: 0.000 TO 55.610 (DESIGN KM 0.000 TO 54.048) OF NH
STRIP CHART
1+800
1+900
2+000
2+100
2+200
2+300
2+400
2+500
2+600
2+700
0.000 TO 54.048) OF NH-124D ON EPC MODE IN STATE OF UTTAR PRADESH.
2+800
2+900
3+000
3+100
3+200
3+300
3+400
3+500
3+600
3+700
3+800
3+900
4+000
4+100
4+200
4+300
4+400
4+500
4+600
4+700
4+800
4+900
5+000
5+100
5+200
5+300
5+400
5+500
5+600
5+700
PROJECT - CONSTRUCTION OF TWO LANE WITH PAVED SHOULDE
5+800
5+900
6+000
6+100
6+200
6+300
6+400
6+500
6+600
6+700
WITH PAVED SHOULDER FROM EXISTING KM: 0.000 TO 55.610 (DESIGN KM 0.000 TO 54.048) OF NH-124D O
STRIP CHART
6+800
6+900
7+000
7+100
7+200
7+300
7+400
7+500
7+600
7+700
O 54.048) OF NH-124D ON EPC MODE IN STATE OF UTTAR PRADESH.
7+800
7+900
8+000
8+100
8+200
8+300
8+400
8+500
8+600
8+700
8+800
8+900
9+000
9+100
9+200
9+300
9+400
9+500
9+600
9+700
9+800
9+900
10+000
10+100
10+200
10+300
10+400
10+500
10+600
10+700
10+800
10+900
11+000
11+100
11+200
11+300
11+400
11+500
11+600
11+700
PROJECT - CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER FROM
AVED SHOULDER FROM EXISTING KM: 0.000 TO 55.610 (DESIGN KM 0.000 TO 54.048) OF NH-124D ON EPC M
STRIP CHART
11+800
11+900
12+000
12+100
12+200
12+300
12+400
12+500
12+600
12+700
12+800
12+900
13+000
13+100
13+200
13+300
) OF NH-124D ON EPC MODE IN STATE OF UTTAR PRADESH.
13+400
13+500
13+600
13+700
13+800
13+900
14+000
14+100
14+200
14+300
14+400
14+500
14+600
14+700
14+800
14+900
15+000
15+100
15+200
15+300
15+400
15+500
15+600
15+700
PROJECT - CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER FROM EXISTING
15+800
15+900
16+000
16+100
16+200
16+300
16+400
16+500
16+600
16+700
OULDER FROM EXISTING KM: 0.000 TO 55.610 (DESIGN KM 0.000 TO 54.048) OF NH-124D ON EPC MODE IN
STRIP CHART
16+800
16+900
17+000
17+100
17+200
17+300
17+400
17+500
17+600
17+700
17+800
17+900
18+000
18+100
18+200
124D ON EPC MODE IN STATE OF UTTAR PRADESH.
18+300
18+400
18+500
18+600
18+700
18+800
18+900
19+000
19+100
19+200
19+300
19+400
19+500
19+600
19+700
19+800
19+900
20+000
20+100
20+200
20+300
20+400
20+500
20+600
20+700
PROJE
PROJECT - CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER FROM EXISTING KM: 0.
S
20+800
20+900
21+000
21+100
21+200
21+300
21+400
21+500
21+600
21+700
FROM EXISTING KM: 0.000 TO 55.610 (DESIGN KM 0.000 TO 54.048) OF NH-124D ON EPC MODE IN STATE O
STRIP CHART
21+800
21+900
22+000
22+100
22+200
22+300
22+400
22+500
22+600
22+700
22+800
22+900
23+000
23+100
N EPC MODE IN STATE OF UTTAR PRADESH.
23+200
23+300
23+400
2/18/2024
2/18/2024
23+500
23+600
23+700
23+800
23+900
24+000
24+100
24+200
2/18/2024
2/18/2024
24+300
24+400
24+500
24+600
24+700
31.05.24
31.05.24
PROJECT - CON
24+900
25+000
25+100
25+200
25+300
25+400
25+500
25+600
25+700
2/19/2024 2/19/20
31.05.24 29.05.24 29.05.24
PROJECT - CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER FROM EXISTING KM: 0.000 TO 5
STRIP CH
EMB TOP
29.05.24
2/19/2024 2/20/2024
25+800
25+900
26+000
26+100
26+200
26+300
26+400
26+500
26+600
26+700
2/19/2024 2/20/2024
29.05.24
EMB TOP
XISTING KM: 0.000 TO 55.610 (DESIGN KM 0.000 TO 54.048) OF NH-124D ON EPC MODE IN STATE OF UTTAR
STRIP CHART
26.05.24
2/20/2024 2/20/2024
26+800
26+900
27+000
27+100
27+200
27+300
27+400
27+500
27+600
27+700
2/20/2024 2/20/2024
26.05.24
05.24
05.24
27+800
2/20/2024
2/20/2024
27+900
28+000
ODE IN STATE OF UTTAR PRADESH.
28+100
28+200
28+300
28+400
28+500
28+600
28+700
28+800
28+900
29+000
29+100
29+200
29+300
29+400
29+500
29+600
29+700
3/19/2024
3/19/2024
29+800
3/19/2024
3/19/2024
29+900
30+000
30+100
30+200
30+300
30+400
30+500
30+600
30+700
PROJECT - CONSTRUCT
PROJECT - CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER FROM EXISTING KM: 0.000 TO 55.610 (D
STRIP CHART
27.05.24
4/22/2024
30+800
30+900
31+000
31+100
31+200
31+300
31+400
31+500
31+600
31+700
4/22/2024
27.05.24
KM: 0.000 TO 55.610 (DESIGN KM 0.000 TO 54.048) OF NH-124D ON EPC MODE IN STATE OF UTTAR PRADES
STRIP CHART
EMB TOP
26.05.24 29.05.24
3/20/2024 2/21/2024
31+800
31+900
32+000
32+100
32+200
32+300
32+400
32+500
32+600
32+700
3/20/2024 2/21/2024
26.05.24 27.05.24
EMB TOP
TATE OF UTTAR PRADESH.
32+900
33+000
33+100
33+200
33+300
33+400
33+500
33+600
33+700
2/21/2024 2/21/2024
27.05.24 27.05.24 28.05.24
12.06.24
EMB TOP
33+900
34+000
34+100
34+200
34+300
34+400
34+500
34+600
34+700
/2024 2/21/2024
28.05.24 25.05.24 28.0524
EMB TOP
PROJECT - CONSTRUCTION OF
EMB TO
28.0524
2/22/2024
34+800
34+900
35+000
35+100
35+200
35+300
35+400
35+500
35+600
35+700
2/22/2024
28.0524
EMB TO
T - CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER FROM EXISTING KM: 0.000 TO 55.610 (DESIGN KM
STRIP CHART
EMB TOP
2/22/2024
35+800
35+900
36+000
36+100
36+200
36+300
36+400
36+500
36+600
36+700
2/22/2024
EMB TOP
00 TO 55.610 (DESIGN KM 0.000 TO 54.048) OF NH-124D ON EPC MODE IN STATE OF UTTAR PRADESH.
RIP CHART
2/22/2024
36+800
36+900
37+000
37+100
37+200
37+300
37+400
37+500
37+600
37+700
2/22/2024
UTTAR PRADESH.
04.05.24
03.05.24
14.04.24
37+800
37+900
38+000
38+100
38+200
38+300
38+400
38+500
38+600
38+700
14.04.24
04.05.24
05.05.24
07.05.24
27.04.24 25.04.24
04.05.24 29.04.24
03.05.24 25.04.24 18.04.24 22.04.24
14.04.24 15.04.24 17.04.24
3/16/2024
38+800
38+900
39+000
39+100
39+200
39+300
39+400
39+500
39+600
39+700
3/16/2024
14.04.24 17.04.24
04.05.24 28.04.2024 24.04.24
05.05.24 29.04.24
PROJECT - CONSTRUCTION OF TWO LAN
25.04.24
EMB TOP
22.04.24 24.04.24
17.04.24 18.04.24
39+800
39+900
40+000
40+100
40+200
40+300
40+400
40+500
40+600
40+700
17.04.24 18.04.24
22.04.24 24.04.24
26.04.24 26.04.24
EMB TOP
25.04.24
STRUCTION OF TWO LANE WITH PAVED SHOULDER FROM EXISTING KM: 0.000 TO 55.610 (DESIGN KM 0.000
STRIP CHART
23.05.24
24.04.24
08.04.24
06.04.24
31.03.24 03.04.24
3/18/2024
40+800
40+900
41+000
41+100
41+200
41+300
41+400
41+500
41+600
41+700
3/18/2024
31.03.24 02.04.24 06.04.24
04.04.24 05.04.24 09.04.24
07.04.24 06.04.24 15.04.24 16.04.24
25.04.24 19.04.24
.610 (DESIGN KM 0.000 TO 54.048) OF NH-124D ON EPC MODE IN STATE OF UTTAR PRADESH.
ART
23.05.24
23.04.24 29.04.24
18.04.24 20.04.24
11.04.24 12.04.24 13.04.24 14.05.24 15.04.24
07.04.24 08.04.24 09.04.24 10.04.24
20.03.24
41+800
41+900
42+000
42+100
42+200
42+300
42+400
42+500
42+600
42+700
20.03.24
07.04.24 8.04.24 09.04.24 10.04.24
12.04.24 13.04.24 14.05.24 15.04.24
16.04.24 17.04.24 18.04.24 20.04.24
29.04.24
23.05.24
RADESH.
08.05.24
2
31.05.24 10.04.24 12.04.24
31.05.24 3/29/2024
42+800
42+900
43+000
43+100
43+200
43+300
43+400
43+500
43+600
43+700
31.05.24 3/29/2024
31.05.24 10.04.24 12.04.24
2
08.05.24
EMB TOP
09.05.24
08.05.24 08.05.24
25.04.24 10.05.24
12.04.24 13.04.24
3/29/2024
43+800
43+900
44+000
44+100
44+200
44+300
44+400
44+500
44+600
44+700
3/29/2024
12.04.24 13.04.24
25.04.24
08.05.24 08.05.24
09.05.24
EMB TOP
PROJECT - CONSTRUCTION OF TWO LANE WITH
19.05.24
22.0524
25.04.24 2
3/30/2024
44+800
44+900
45+000
45+100
45+200
45+300
45+400
45+500
45+600
45+700
3/30/2024
25.04.24 2
11.05.24 11.05.24
12.05.24
13.05.24
EMB TOP
ON OF TWO LANE WITH PAVED SHOULDER FROM EXISTING KM: 0.000 TO 55.610 (DESIGN KM 0.000 TO 54.04
STRIP CHART
SG TOP
19.05.24 SG 1ST LAYER
22.0524 14.05.24
12.05.24
11.05.24 10.05.24
10.05.24
28.04.24
3/30/2024
45+800
45+900
46+000
46+100
46+200
46+300
46+400
46+500
46+600
46+700
3/30/2024
28.04.24
10.05.24
12.05.24
13.05.24
15.05.24
SG 1ST LAYER
SIGN KM 0.000 TO 54.048) OF NH-124D ON EPC MODE IN STATE OF UTTAR PRADESH.
SG TOP SG TOP
SG 1ST LAYER SG 1ST
13.05.24 19.05.24
12.05.24 13.05.24
10.05.24 11.05.24 12.05.24
10.05.24 12.05.24
3/31/2024
46+800
46+900
47+000
47+100
47+200
47+300
47+400
47+500
47+600
47+700
3/31/2024
08.05.24
10.05.24 12.05.24
12.05.24
10.05.24 11.05.24
3/31/2024
47+800
47+900
48+000
48+100
48+200
48+300
48+400
48+500
48+600
48+700
3/31/2024
10.05.24 11.05.24
SG 1ST SG 1ST
SG TOP SG TOP
SG TOP
SG 1ST
EMB TOP
12.05.24 16.05.24
2/22/2024
48+800
48+900
49+000
49+100
49+200
49+300
49+400
49+500
49+600
49+700
2/22/2024
12.05.24 16.05.24
EMB TOP
SG 1ST
SG TOP
PROJECT - CONSTRUCTION OF TWO LANE WITH
18.05.24 22.0524
2/19/2024
49+800
49+900
50+000
50+100
50+200
50+300
50+400
50+500
50+600
50+700
2/19/2024
22.0524
ON OF TWO LANE WITH PAVED SHOULDER FROM EXISTING KM: 0.000 TO 55.610 (DESIGN KM 0.000 TO 54.04
STRIP CHART
SG 1st
09.06.24
25.05.24 19.05.24
50+800
50+900
51+000
51+100
51+200
51+300
51+400
51+500
51+600
51+700
25.05.24 19.05.24
12.06.24 09.06.24
SG 1st
SIGN KM 0.000 TO 54.048) OF NH-124D ON EPC MODE IN STATE OF UTTAR PRADESH.
17.05.24 26.05.24
4/30/2024
51+800
51+900
52+000
52+100
52+200
52+300
52+400
52+500
52+600
52+700
4/30/2024
17.05.24 26.05.24
05.24 25.05.24
24.05.24
52+800
52+900
53+000
53+100
53+200
53+300
53+400
53+500
53+600
53+700
24.05.24
05.24 25.05.24
EMB TOP
EMB TOP
10.05.24
53+800
53+800
53+948
10.05.24
21.14
10.35
10.79
9.4
1.39 2.3
1.2
0.19
1.39
CH. Length (m)
S.NO Current Position Side
From TO
1 EMB Top 24800 28000 BHS 3200
2 EMB Top 31800 32600 BHS 800
3 EMB Top 33900 34900 BHS 1000
4 EMB Top 35700 36100 BHS 400
5 EMB Top 38500 41400 BHS 2900
6 EMB Top 41400 42700 BHS 1300
7 EMB Top 43700 44700 BHS 1000
8 EMB Top 44800 46200 BHS 1400
9 SG 1st layer 46400 46700 RHS 300
10 SG 1st layer 47600 47800 BHS 200
11 EMB & SG Layer 48000 48100 BHS 100
12 EMB Top 48000 49200 BHS 1200
13 SG 1st layer 49200 49340 BHS 140
14 EMB layer WIP 49340 49700 BHS 360
15 SG Top 50800 52190 BHS 1390
16 EMB Top 52200 53500 BHS 1300
17 SG 1st & 2nd layer 52500 52700 RHS 200
18 SG 1st & 2nd layer 53600 53800 LHS 200
19 SG Layer 53600 53800 LHS 200
Total (Cum)
Req. Qty
40800
9600
12000
4560
17400
11115
11200
13720
600
NR
1800
NR
2520
19440 10 layer (2 metre)
2606.25
6240
1200
600
650
115251.25