Professional Documents
Culture Documents
20230509 - AMPP - Elevation B - Zone 3 - Entrance New Concept
20230509 - AMPP - Elevation B - Zone 3 - Entrance New Concept
20230509 - AMPP - Elevation B - Zone 3 - Entrance New Concept
0
UP
1
3
5
96
50
1
ALU. COMPOSITE PANEL FL-150
25
99
LIGHTING FL-150
30 20 27
0 0 12 50
50
64
13
16
21
COMPOSITE PANEL (MIRROR) 15 30
00 0
0
BY A-WORK
30
30
12
DOWNSPOUT PVC @ 90
50
00
21
00
24
50
29
5
13
93
67
0
30
ALU. COMPOSITE PANEL
12
47 GFL DOWSPOUT FL-150
0
21
00
36
0
30
13
0
70
30
21
0
50
99 "WIND VEIL" & SUPPORT FRAME
85
30 BY C-WORK
5
32
75
10
0
0
55
B
0
0
47 80
10
0
A
18
MAIN FRAME BY A-WORK
35
0
0
35
2 40
50
10
53
0
14
45 75
0
42
0
00
11
NT
ING
0
ME
50
SH
BY C-WORK
VE
INI
PA
EF
30
0
TIL
2FL REFLECTED PLAN
OLD CANOPY
GFL
0
00
11
26
30
ALU. COMPOSITE PANEL
COVER DOWNSPOUT NEW CANOPY GFL DOWSPOUT
00
22
00
29
(BMB WILL
0
30
GLASS WITH WHITE SHEET
44
BY A-WORK 00
DESIGN THIS 40
00
30
0 34
NEW CANOPY) 80
0
45
82
0
39
GFL ENTRANCE 3 30 GFL ENTRANCE 3
30
50
0
5
GF FL +0~-20 GF FL +0~-20
85
12
01
TILE FINISHING TILE FINISHING
30
GF FL +0 GF FL +0
0
30
GL+100 GUTTER GL+100
B
B
0
11
A A 11
00
00
100 11 100
11
RAMP 1 00 RAMP 1
(E 00
(E 00
2 2
X)
X)
GF FL +0~-700 GF FL +0~-700
-1
-1
FL
FL
d
d
oa
oa
in R
in R
Ma
Ma
(E 70
(E 70
X)
X)
-3
-3
FL
FL
R500
R500
1250
1250
1250
1250
1200
300
NEW CANOPY 750 9820 430 3050 3875 700 550 750
1197
OLD CANOPY NEW CANOPY OLD CANOPY 11300
GFLComposite panel (Mirror) 650 ACP
ACP
ACP
by A-work
GFL ACP GFL
1197
(BMB WILL 300 1650
Main frame
Composite panel (Mirror) GFL Corner cover by C-work
4750
Glass with white sheet by(BMB
A-work WILL ACP
by A-work
DESIGNA-work THIS
6050
6050
6050
1197
by Glass with white sheet
"Wind veil" "Wind veil"
900 2150 &Support frame byDESIGN
A-work THIS & Support frame
NEW CANOPY) by C-work Main frame by A-work by C-work
1197
2113 300 2113 300 2113 300 2113
1F FL ±0 NEW CANOPY) 1F FL ±0
Main frame by A-work
1F FL ±0
12400
"Wind veil" & Support frame
3930
650
1300
by C-work 470 10530 750
1197
9350
300 Expansion joint
300 300
890
890
890
890
110
50 1510 50
50 1510 50
Digital vision 3630 300 7070 4400
300 2200
4400 H:1562mm x W8114mm ACP
1610
4210
4210
4210
4210
ACP Corner: ACP (White)
3000
Downspout
2600
2600
2630 by A-work
GFL Canopy
450 GF FL ±0 GF FL ±0 GF FL ±0
50
900 2000
PARK
X96 X97 YA21 YA22 X96 X97
825 9025
1250
ACP
Main frame by A-work
Expansion joint
"Wind veil"
1F FL ±0
& Support frame
by C-work 1100 2112 300 2113 300 2113 300 1238 1300
890
110
74 1562 74
1635
Digital vision
H:1562mm x W8114mm
65
8114 Downspout
4210
2FL Canopy
2500
Downspout
GFL Canopy
GF FL ±0
ELEVATION B
600
1000
320
RC Parapet
900 w=320. h=1000
450 450
900
4P2.GX1
1810
330
180 N
4700
4700
4700
4P2.GY1
900
2838
2290
New Canopy GFL 4F FL ±0
120 330
4F FL ±0
P2.C12
ISSUED FOR
L1 L1 TENDER
1000
1055 APPROVAL
200
4300
4500
4500
ASBUILT
P2.C13 P2.C12
3300
LEGEND:
+2365 Px P1
2165
2365
2165 -The scales are correct in A1 size only.
RC Curb 2F FL+200 400 2550
- In A3 size, scale will be a half of the written scale.
LSD-1
200100
3F FL ±0 3P2.B4 3PB6 3F FL ±0
300 200
200
NO DESCRIPTION OF REVISION DATE
500
900
900
1 Updated RC. post to support facade B 22 - Nov - 22
3P2.GX1 3P2.B4
180 450 2 Updated Lintel, RC Post for dropwall 30 - Dec - 22
3F FL+200 3P2.CG2 600x900 630 3F FL+200 3P2.CG1 600x900 3 Update framing 31 - Jan - 23
300
4 Remove brick wall 31 - Jan - 23
3835
2875
1725 5 Update concrete wall information 31 - Jan - 23
2600
Wall (C-work) 6 Additional RC Post, Lintel 09 - Mar - 23
P1 HALL A Adjusted hanging post 09 - Mar - 23
7
6000
6000
Wall (C-work) P2.C13 L1 L1 L1
200
200
200
CORRIDOR
HALL A STORAGE
P2.C12
2875
2700
2700
2365
450 3000 3425 3000 450
200 200
2F FL ±0 2F FL ±0
2PB11
700 50
320
950
2P2.GX1 2F FL-50 2PB11 900x800
22900
180 450 2PB10
1320
1520
2880 630
1186 200 2240 4773 200 2400
2400
200
P1 P1
L1 L1 ° L1 L1
120
6000
6000
L1 L1 L1 RESTAURANT P1
P2.C10
200
P1 RC Wall t=180
L1
200
RC post 180x200 RC post 180x200
3630
3680
4M20 Chemical Bolts [2+2]
630 900 P2.C12 +3660 P2.C10
2800
2650
3710
180 450 630 270 Kicker pipe for hanging Kicker pipe for hanging 1FL FL-50
S1 ACW6
6M20 Chemical Bolts [3+3] 1386 7014 2600 OWNER
RETAIL
1F FL ±0 1F FL ±0 S1 1F FL ±0
60°
1P2.GX2 Using 6 bolts for safety,1P2.GX2
to
900 50
900 50
50
900 50
reduce the risk of failed
Chemical bolts. Additional concrete ( 1F FL-50) 1P2.GX2 (600x900) AEON MALL
950
200 1020
1130
1220
Trench Trench
500
L1 L1 L1 L1
2100
W=150, D=30 RAMP C
W=150, D=30 Steel box to support sub RC Lintel Steel box to support sub RC Wall t=180
300x500 P2.C10 -frame of ACP (same50
-frame of ACP (same
consideration with Old
consideration with Old 400 300 2000 300 2350 300 2350 300 2250 450 RAMP C
RC.G2 RC.B2 Canopy)
S1
1118
Canopy) L1
RC.G1 GFFL+3774 RC.B2 300x600 RC.G1 RC.G2
6400
200
160°
RC.B2 (450x900) P3 180x300 P3 180x300 MAIN CONTRACTOR
150 300 3 36 5 ~ + 4640) RC.G1 x900 (hanging post to beam) (hanging post to beam)
5450
4320
4230
4280
P2.C12 RC.G1 Ben Nghe Ward, Dist.1, Ho Chi Minh City, Vietnam.
3150
3112
RETAIL
RC post 180x200 +4230
P2.C10
CAMBODIA OFFICE
P2.C10 P2.C10 4280 OBAYASHI Royal PSL Serviced Apartment, No.24, Corner of St. 360 &
GF FL-50 St. 57, Sangkat Boeung Keng Kang 1, Khan Chamkamorn,
900x900 900x900 Phnom Penh, Cambodia.
ANTE-ROOM 11 ACW6
0 °
GF FL ±0 GF FL ±0 GF FL ±0 RESTAURANT
200
250
APPOVED BY
50
50
50
50
RC Curb 80x250 RC Curb 80x250 400 1150 9000 450 KENICHI INOUE
GP2.GX2 GP2.GX2 10150 900 CHECKED BY
450 450 450 450 450 9425 450
11000 KENICHI INOUE
900 OBIQUE SURFACE 900 10325 1575
DRAWN BY
9000
OVC
Y95 Y96 YA22 S1 YA21 Y68 X97 X96
PROJECT No.
OVA210080
WALL TYPE PLAN PROJECT:
180
180
.80
.80
DRAWING TITLE:
Y.
200
. 200
. X. Y. X.
GFL-3FL - FRAMING ELEVATION E9-E8
L1(180x200) L2(80x200) Lx(180xX) Ly(80xY) Lxy(XxY)
DRAWING No. SCALE
200
200
.X
III-B-1A/11/FE-9/10 1/75
Y.
Y.
REVISION No. DATE
180
. .80 180
. .80 X.
REV 04 02 - Mar - 2023