no Area Job Type Unit Tag number Defect description
1 B PM 1 01-TE-0039 PM TO BE DONE 2 B PM 1 01-TE-0040A PM TO BE DONE 3 B PM 1 01-TE-0040B PM TO BE DONE 4 B PM 1 01-TE-0041 PM TO BE DONE 5 B CM 1 01-FT-0020 READING WAS FLUCTUATING 6 B PM 1 01-TE-0044 AS PER PM PLAN 7 B PM 1 01-TE/TT-0045 AS PER PM PLAN 8 B PM 1 01-TE/TT-0046 AS PER PM PLAN 9 B PM 1 01-TE/TT-0047 AS PER PM PLAN 10 B CM 1 01-FT-0020 READING WAS FLUCTUATING 11 B CM 5 05-LT-0028 READING WAS WRONG 12 B PM 1 01-TE-0160 AS PER PM PLAN 13 B PM 1 01-TE-0161 AS PER PM PLAN 14 B PM 1 01-TE-0162 AS PER PM PLAN 15 B PM 1 01-TE-0163 AS PER PM PLAN 16 B PM 1 01-TE-0165A AS PER PM PLAN 17 B PM 1 01-TE-0165B AS PER PM PLAN 18 B PM 1 01-TE-0166 AS PER PM PLAN 19 B PM 1 01-TE-0167 AS PER PM PLAN 20 B PM 1 01-FT-0017 AS PER PM PLAN DLH CABLE KEPT UPSIDE 21 B CM 1 01-DLH-0005 FOR MECHANICAL WORK 22 B PM 5 05-TT-0021F AS PER PM PLAN 23 B PM 5 05-TE-0022A AS PER PM PLAN 24 B PM 5 05-TT-0022A AS PER PM PLAN 25 B PM 6 06-TE-0030F AS PER PM PLAN 26 B PM 6 06-TT-0030F AS PER PM PLAN 27 B PM 6 06-TE-0031A AS PER PM PLAN 28 B PM 6 06-TT-0031A AS PER PM PLAN 29 B PM 1 01-FT-0018 AS PER PM PLAN 30 B PM 1 01-FT-0019 AS PER PM PLAN 31 B PM 1 01-LT-0007A AS PER PM PLAN 32 B PM 1 01-LT-0007B AS PER PM PLAN 33 B PM 1 01-LV-0007A AS PER PM PLAN 34 B PM 1 01-PT-0018 AS PER PM PLAN 35 B PM 1 01-PV-0018B AS PER PM PLAN 36 B PM 1 01-PT-0019 AS PER PM PLAN 37 B PM 1 01-PG-0026 AS PER PM PLAN 38 B PM 1 01-PG-0027 AS PER PM PLAN 39 B PM 1 01-PG-0029A AS PER PM PLAN 40 B CM 1 01-FT-0148 READING WAS WRONG 41 B CM 1 01-DGT-0042 FAULT ALARM 42 B PM 1 01-PG-0029B AS PER PM PLAN 43 B PM 1 01-PG-0039 AS PER PM PLAN 44 B PM 1 01-PG-0064 AS PER PM PLAN 45 B PM 1 01-TE-0051 AS PER PM PLAN 46 B PM 1 01-TT-0051 AS PER PM PLAN 47 B PM 1 01-TV-0051 AS PER PM PLAN 48 B PM 1 01-TE-0052 AS PER PM PLAN 49 B PM 1 01-TT-0052 AS PER PM PLAN 50 B PM 1 01-TE-0053 AS PER PM PLAN 51 B PM 1 01-TT-0053 AS PER PM PLAN 52 B PM 1 01-TE-0120 AS PER PM PLAN 53 B PM 1 01-TT-0120 AS PER PM PLAN 54 B PM 1 01-TV-0052 AS PER PM PLAN 55 B CM 1 01-LT-0041 READING WAS WRONG 56 B CM 1 01-FT-0044 READING WAS WRONG 57 B CM 1 01-FT-0048 READING WAS WRONG 58 B CM 1 01-FT-0137 READING WAS WRONG 59 B PM 1 01-FT-0020 AS PER PM PLAN 60 B PM 1 01-FT-0021 AS PER PM PLAN 61 B PM 1 01-LT-0009 AS PER PM PLAN 62 B PM 1 01-FIF-0017 AS PER PM PLAN 63 B PM 1 01-FIF-0018 AS PER PM PLAN 64 B PM 1 01-PT-0020 AS PER PM PLAN 65 B PM 1 01-PT-0021 AS PER PM PLAN 66 B PM 1 01-PT-0052 AS PER PM PLAN 67 B PM 1 01-PG-0065 AS PER PM PLAN 68 B PM 1 01-PG-0066 AS PER PM PLAN 69 B PM 1 01-PG-0067 AS PER PM PLAN 70 B CM 1 01-FV-0520 VALVE WAS AT STUCK 71 B PM 1 01-PG-0068 AS PER PM PLAN 72 B PM 1 01-PG-0069 AS PER PM PLAN 73 B PM 1 01-PG-0070 AS PER PM PLAN 74 B PM 1 01-PG-0154 AS PER PM PLAN 75 B PM 1 01-TE-0054 AS PER PM PLAN 76 B PM 1 01-TT-0054 AS PER PM PLAN 77 B PM 1 01-TE-0055 AS PER PM PLAN 78 B CM 1 01-TT-0517 READING WAS WRONG 79 B CM 1 01-FT-0542A READING WAS WRONG 80 B CM 1 01-FT-0506B READING WAS WRONG 81 B CM 1 01-LT-0036 READING WAS WRONG
82 B CM 1 01-FT-0064A READING WAS WRONG
83 B CM 1 01-FT-0064B READING WAS WRONG
84 B PM 1 01-TE-0059 AS PER PM PLAN
85 B PM 1 01-TT-0059 AS PER PM PLAN 86 B PM 1 01-TE-0060 AS PER PM PLAN 87 B PM 1 01-TT-0060 AS PER PM PLAN 88 B PM 6 06-TXE-0044 AS PER PM PLAN 89 B PM 6 06-TXE-0045 AS PER PM PLAN 90 B PM 6 06-TXE-0046 AS PER PM PLAN 91 B PM 6 06-TXE-0047 AS PER PM PLAN 92 B CM 6 06-LT-0017 READING WAS FLUCTUATING 93 B PM 5 05-TT-0023F AS PER PM PLAN 94 B PM 5 05-TE-0024A AS PER PM PLAN 95 B PM 5 05-TT-0024A AS PER PM PLAN 96 B CM 5 05-PG-0103 GAUGE GLASS WAS MISSING 97 B PM 1 01-PT-9006BA AS PER PM PLAN 98 B PM 1 01-PT-9006BB AS PER PM PLAN 99 B PM 1 01-PG-0071A AS PER PM PLAN 100 B PM 1 01-PG-0071B AS PER PM PLAN 101 B PM 1 01-PG-0072 AS PER PM PLAN 102 B PM 1 01-PG-0073 AS PER PM PLAN 103 B PM 1 01-PG-0204 AS PER PM PLAN 104 B PM 1 01-PG-0205 AS PER PM PLAN 105 B PM 1 01-PDG-0006A AS PER PM PLAN 106 B PM 1 01-PDG-0006B AS PER PM PLAN 107 B PM 1 01-TE-0213 AS PER PM PLAN 108 B PM 1 01-TT-0213 AS PER PM PLAN 109 B CM 1 01-TT-0011 READING WAS WRONG 110 B CM 1 01-TT-0012 READING WAS WRONG 111 B CM 1 01-LT-0004 READING WAS WRONG 112 B CM 1 01-LT-0036 READING WAS WRONG 113 B PM 1 01-TG-0078 AS PER PM PLAN 114 B PM 1 01-FT-0025 AS PER PM PLAN 115 B PM 1 01-FT-0126 AS PER PM PLAN 116 B PM 1 01-FIF-0019 AS PER PM PLAN 117 B PM 1 01-FV-0126 AS PER PM PLAN 118 B CM 1 01-FT-0016B READING WAS WRONG 119 B PM 1 01-FT-0023 AS PER PM PLAN 120 B PM 1 01-FV-0023 AS PER PM PLAN 121 B PM 1 01-FT-0024 AS PER PM PLAN 122 B PM 1 01-FV-0024 AS PER PM PLAN 123 B PM 1 01-LT-0010 AS PER PM PLAN 124 B PM 1 01-LV-0010 AS PER PM PLAN 125 B PM 1 01-TE-0065 AS PER PM PLAN 126 B PM 1 01-TT-0065 AS PER PM PLAN 127 B PM 1 01-PT-9005A AS PER PM PLAN 128 B PM 1 01-PT-9005B AS PER PM PLAN 129 B PM 1 01-PG-0074 AS PER PM PLAN 130 B PM 1 01-PG-0075 AS PER PM PLAN 131 B CM 1 01-FT-0020 READING WAS WRONG 132 B CM 1 01-FT-0012F READING WAS WRONG 133 B CM 1 01-FT-0013F READING WAS WRONG 134 B CM 1 01-FT-0012B READING WAS WRONG 135 B CM 1 01-FT-0012B READING WAS WRONG 136 B PM 1 01-PG-0077 AS PER PM PLAN 137 B PM 1 01-PG-0078 AS PER PM PLAN 138 B PM 1 01-PG-0079 AS PER PM PLAN 139 B PM 1 01-PG-0080 AS PER PM PLAN 140 B PM 1 01-TE-0061 AS PER PM PLAN 141 B PM 1 01-TT-0061 AS PER PM PLAN 142 B CM 1 01-FT-0013B READING WAS WRONG 143 B PM 1 01-TE-0062 AS PER PM PLAN 144 B PM 1 01-TT-0062 AS PER PM PLAN 145 B PM 1 01-TE-0063 AS PER PM PLAN 146 B PM 1 01-TT-0063 AS PER PM PLAN 147 B PM 1 01-TE-0064 AS PER PM PLAN 148 B PM 1 01-TT-0064 AS PER PM PLAN 149 B PM 1 01-TY-0064 AS PER PM PLAN 150 B CM 1 01-FT-0048 READING WAS WRONG 151 B CM 1 01-LT-0036 READING WAS WRONG 152 B CM 1 01-PG-0503 READING WAS WRONG 153 B CM 1 01-LT-0036 READING WAS WRONG
154 B CM 1 01-LT-0507 READING WAS WRONG
155 B PM 1 01-TE-0110 AS PER PM PLAN 156 B PM 1 01-TT-0110 AS PER PM PLAN 157 B PM 1 01-FT-0026 AS PER PM PLAN 158 B PM 1 01-FT-0027 AS PER PM PLAN 159 B PM 1 01-PT-9007AA AS PER PM PLAN 160 B PM 1 01-PT-9007AB AS PER PM PLAN 161 B PM 1 01-PT-9007BA AS PER PM PLAN 162 B PM 1 01-PT-9007BB AS PER PM PLAN 163 B PM 1 01-PT-9008AA AS PER PM PLAN 164 B PM 1 01-PT-9008AB AS PER PM PLAN 165 B PM 1 01-PT-9008BA AS PER PM PLAN 166 B PM 1 01-PT-9008BB AS PER PM PLAN 167 B PM 1 01-PG-0082A AS PER PM PLAN 168 B CM 1 01-FT-0044 READING WAS WRONG 169 B CM 1 01-FT-0048 READING WAS WRONG 170 B CM 1 01-FT-0137 READING WAS WRONG 171 B CM 1 01-LT-0507 READING WAS WRONG 172 B PM 1 01-PG-0082B AS PER PM PLAN 173 B PM 1 01-PG-0083A AS PER PM PLAN 174 B PM 1 01-PG-0083B AS PER PM PLAN 175 B PM 1 01-TE-0066 AS PER PM PLAN 176 B PM 1 01-TT-0066 AS PER PM PLAN 177 B PM 1 01-TE-0067 AS PER PM PLAN 178 B PM 1 01-TT-0067 AS PER PM PLAN 179 B CM 1 01-PT-0511 READING WAS WRONG 180 B CM 1 01-TT-0029B READING WAS WRONG 181 B CM 1 01-TT-9219 READING WAS WRONG 182 B CM 1 01-FT-0030 READING WAS WRONG 183 B PM 1 01-FT-0148 AS PER PM PLAN 184 B PM 1 01-TE-0068A AS PER PM PLAN 185 B PM 1 01-TT-0068A AS PER PM PLAN 186 B PM 1 01-TE-0068B AS PER PM PLAN 187 B PM 1 01-TT-0068B AS PER PM PLAN 188 B PM 1 01-TE-0080 AS PER PM PLAN 189 B PM 1 01-TT-0080 AS PER PM PLAN 190 B PM 1 01-TT-9204 AS PER PM PLAN 191 B PM 1 01-TT-9205 AS PER PM PLAN 192 B PM 1 01-TT-9206 AS PER PM PLAN 193 B PM 1 01-TT-9207 AS PER PM PLAN 194 B PM 1 01-TT-9208 AS PER PM PLAN 195 B PM 1 01-TT-9209 AS PER PM PLAN 196 B CM 1 01-DGT-0037 FAULT ALARM 197 B CM 1 01-DGT-0038 FAULT ALARM 198 B CM 1 01-DGT-0042 FAULT ALARM 199 B CM 4 04-PCV-5405 SET POINT TO BE ADJUSTED 200 B CM 15 15-FT-0011A READING WAS WRONG 201 B CM 15 15-FT-0011B READING WAS WRONG 202 B CM 15 15-FT-0009A READING WAS WRONG 203 B CM 15 15-FT-0009B READING WAS WRONG 204 B CM 4 04-XV-0579 CABLE TO BE DISCONNECTED 205 B CM 4 04-XV-0581 CABLE TO BE DISCONNECTED 206 B CM 4 04-LT-0507 LT TO BE ISOLATED 207 B CM 13 1A1-13SM-101F/R WIRING TO BE TIGHTEN 208 B CM 13 1A1-13SM-201F/R WIRING TO BE TIGHTEN 209 B CM 14 1A1-14SM-101F/R WIRING TO BE TIGHTEN 210 B CM 14 1A1-14SM-201F/R WIRING TO BE TIGHTEN 211 B CM 15 1A1-15SM-101F/R WIRING TO BE TIGHTEN 212 B CM 15 1A1-15SM-201F/R WIRING TO BE TIGHTEN 213 B CM 15 1A1-15SM-202F/R WIRING TO BE TIGHTEN 214 B CM 6 06-XV-0013 AIR REGULATOR WAS LEAKING
215 B CM 14 14-UV-7206 VALVE WAS HUNTING
216 B CM 1 01-FT-0506D READING WAS WRONG
217 B CM 1 01-FT-0506H READING WAS WRONG 218 B CM 1 06-FV-0049A VALVE TO BE INSTALLED
219 B CM 1 06-FV-0049B VALVE TO BE INSTALLED
220 B CM 14 14-PV-0022A VALVE WAS NOT WORKING 221 B CM 1 01-FT-0012H READING WAS WRONG 222 B CM 1 01-FT-0016A READING WAS WRONG 223 B CM 1 01-FT-0016B READING WAS WRONG 224 B CM 1 01-FT-0016C READING WAS WRONG 225 B CM 1 01-FT-0017 READING WAS WRONG 226 B CM 1 01-FT-0012D READING WAS WRONG 227 B CM 1 01-FT-0012H READING WAS WRONG 228 B CM 1 01-FT-0044 READING WAS WRONG 229 B CM 1 01-LT-0506 READING WAS WRONG 230 B CM 1 01-TXE-9018 READING WAS WRONG 231 B CM 1 01-FT-1515 READING WAS WRONG 232 B CM 1 01-FT-0137 READING WAS WRONG 233 B CM 1 01-FT-0005 READING WAS WRONG 234 B CM 1 01-FT-0006 READING WAS WRONG 235 B CM 1 01-LT-0013 READING WAS WRONG DISCONNECTED BY THE 236 B CM 1 01-TT-0120 REQUEST OF OPERATION 237 B CM 2 02-LT-0002 READING WAS WRONG 238 B CM 1 01-FT-0012D READING WAS WRONG 239 B CM 1 01-FT-0013D READING WAS WRONG 240 B CM 1 01-FT-0012F READING WAS WRONG 241 B CM 1 01-FT-0013F READING WAS WRONG 242 B CM 1 01-FT-0012G READING WAS WRONG 243 B CM 1 01-FT-0013G READING WAS WRONG 244 B CM 1 01-LT-0007B READING WAS WRONG 245 B CM 1 01-PT-0510 READING WAS WRONG 246 B CM 1 01-LT-0006 READING WAS WRONG 247 B CM 1 01-LT-0037 READING WAS WRONG 248 B CM 1 01-FT-0024 READING WAS WRONG 249 B CM 1 04-FT-0017 READING WAS WRONG 250 B CM 1 04-PCV-5405 SET POINT TO BE ADJUSTED 251 B CM 1 04-PCV-5407 SET POINT TO BE ADJUSTED BURNER FEEDBACK NOT 252 B CM 1 06-BS-0002D COMING 253 B CM 1 06-BS-0001D PILOT FEED BACK NOT COMING 254 B CM 52 52-FT-0131 READING WAS WRONG 255 B CM 1 01-FT-0011 READING WAS WRONG 256 B CM 1 01-FT-1514 READING WAS WRONG 257 B CM 1 01-TXE-9213 READING WAS WRONG 258 B CM 1 01-FT-0533A READING WAS WRONG 259 B CM 1 01-FT-0533B READING WAS WRONG 260 B CM 13 13-DGT-0001 FAULT ALARM 261 B CM 13 13-DGT-0002 FAULT ALARM 262 B CM 13 13-DGT-0003 FAULT ALARM 263 B CM 13 13-DGT-0004 FAULT ALARM 264 B CM 14 14-DGT-0001 FAULT ALARM 265 B CM 14 14-DGT-0002 FAULT ALARM 266 B CM 14 14-DGT-0003 FAULT ALARM 267 B CM 14 14-DGT-0004 FAULT ALARM 268 B CM 4 04-PCV-5405 SET POINT TO BE ADJUSTED 269 B CM 1 01-FT-0139 READING WAS WRONG 270 B CM 14 14-UV-7405 FEEDBACK WAS NOT STABLE
271 B CM 4 04-PCV-5405 PCV SET POINT ADJUST
272 B CM 2 02-FT-0019 wrong Reading showing
VALVE FEEDBACK DISCREPENCY
273 B CM 13 13-UV-7604 ALARM COMING
274 B CM 15 15-TI-5227B wrong Reading showing
level gauge reading showing
275 B CM 16 01-LG-0007 zero VALVE FEEDBACK DISCREPENCY 276 B CM 13 13-UV-7604 ALARM COMING
277 B CM 15 15-FT-0011A/B wrong Reading showing
278 B CM 15 15-FT-0009A/B wrong Reading showing
279 B CM 4 04-PCV-5407 PCV SET POINT ADJUST
280 B CM 4 04-PCV-5405 PCV SET POINT ADJUST
Valve not fully open and
281 B CM 4 04-XV-0571 Discrepancy alarm coming
Valve not fully open and
282 B CM 4 04-XV-0572 Discrepancy alarm coming
283 B CM 4 04-XV-0581 Valve Passing
Level transmitter and level
284 B CM 2 02-LT-0004 gauge reading not matching
285 B CM 4 04-XV-0581 Valve Passing
285 B CM 4 04-XV-0581 Valve Re-installed
286 B CM 13 13-FT-0122A wrong Reading showing
287 B CM 6 06-FT-0008B Manifold leakge
Issuer Issue Date Root cause Action by Clear Date PM DONE MEJO March 27, 2024 PM DONE MEJO March 27, 2024 PM DONE MEJO March 27, 2024 PM DONE MEJO March 27, 2024 OPERATION March 27, 2024 LINE FLUSHED AND NORMAL MEJO March 27, 2024 PM PLAN March 28, 2024 PM AS PER SCHEDULE MEJO March 28, 2024 PM PLAN March 28, 2024 PM AS PER SCHEDULE MEJO March 28, 2024 PM PLAN March 28, 2024 PM AS PER SCHEDULE MEJO March 28, 2024 PM PLAN March 28, 2024 PM AS PER SCHEDULE MEJO March 28, 2024 OPERATION March 28, 2024 LINE FLUSHED AND NORMAL MEJO March 28, 2024 CHECKED LG, LT AND FOUND OPERATION March 29, 2024 MEJO March 29, 2024 AS ACTUAL READING PM PLAN March 30, 2024 PM AS PER SCHEDULE MEJO March 30, 2024 PM PLAN March 30, 2024 PM AS PER SCHEDULE MEJO March 30, 2024 PM PLAN March 31, 2024 PM AS PER SCHEDULE MEJO March 31, 2024 PM PLAN March 31, 2024 PM AS PER SCHEDULE MEJO March 31, 2024 PM PLAN March 31, 2024 PM AS PER SCHEDULE MEJO March 31, 2024 PM PLAN March 31, 2024 PM AS PER SCHEDULE MEJO March 31, 2024 PM PLAN March 31, 2024 PM AS PER SCHEDULE MEJO March 31, 2024 PM PLAN March 31, 2024 PM AS PER SCHEDULE MEJO March 31, 2024 PM PLAN March 31, 2024 PM AS PER SCHEDULE MEJO March 31, 2024 OPERATION March 31, 2024 DLH CABLE REINSTALLED MEJO March 31, 2024 PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024 PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024 PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024 PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024 PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024 PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024 PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024 PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024 PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024 PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024 PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024 PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024 PM PLAN April 02, 2024 PM AS PER SCHEDULE MEJO April 02, 2024 PM PLAN April 02, 2024 PM AS PER SCHEDULE MEJO April 02, 2024 PM PLAN April 02, 2024 PM AS PER SCHEDULE MEJO April 02, 2024 PM PLAN April 02, 2024 PM AS PER SCHEDULE MEJO April 02, 2024 PM PLAN April 02, 2024 PM AS PER SCHEDULE MEJO April 02, 2024 PM PLAN April 02, 2024 PM AS PER SCHEDULE MEJO April 02, 2024 OPERATION April 02, 2024 FLUSHING AND LINE UP MEJO April 02, 2024 OPERATION April 02, 2024 FOUND AS NORMAL MEJO April 02, 2024 PM PLAN April 03, 2024 PM AS PER SCHEDULE MEJO April 03, 2024 PM PLAN April 03, 2024 PM AS PER SCHEDULE MEJO April 03, 2024 PM PLAN April 03, 2024 PM AS PER SCHEDULE MEJO April 03, 2024 PM PLAN April 03, 2024 PM AS PER SCHEDULE MEJO April 03, 2024 PM PLAN April 03, 2024 PM AS PER SCHEDULE MEJO April 03, 2024 PM PLAN April 03, 2024 PM AS PER SCHEDULE MEJO April 03, 2024 PM PLAN April 03, 2024 PM AS PER SCHEDULE MEJO April 03, 2024 PM PLAN April 04, 2024 PM AS PER SCHEDULE MEJO April 04, 2024 PM PLAN April 04, 2024 PM AS PER SCHEDULE MEJO April 04, 2024 PM PLAN April 04, 2024 PM AS PER SCHEDULE MEJO April 04, 2024 PM PLAN April 04, 2024 PM AS PER SCHEDULE MEJO April 04, 2024 PM PLAN April 04, 2024 PM AS PER SCHEDULE MEJO April 04, 2024 PM PLAN April 04, 2024 PM AS PER SCHEDULE MEJO April 04, 2024 DISPLACER WAS FELL DOWN OPERATION April 04, 2024 MEJO April 04, 2024 AND NOW REINSTALLED OPERATION April 06, 2024 FLUSHING AND LINE UP MEJO April 06, 2024 OPERATION April 06, 2024 FLUSHING AND LINE UP MEJO April 06, 2024 OPERATION April 06, 2024 FLUSHING AND LINE UP MEJO April 06, 2024 PM PLAN April 06, 2024 PM AS PER SCHEDULE MEJO April 06, 2024 PM PLAN April 06, 2024 PM AS PER SCHEDULE MEJO April 06, 2024 PM PLAN April 06, 2024 PM AS PER SCHEDULE MEJO April 06, 2024 PM PLAN April 06, 2024 PM AS PER SCHEDULE MEJO April 06, 2024 PM PLAN April 06, 2024 PM AS PER SCHEDULE MEJO April 06, 2024 PM PLAN April 07, 2024 PM AS PER SCHEDULE MEJO April 07, 2024 PM PLAN April 07, 2024 PM AS PER SCHEDULE MEJO April 07, 2024 PM PLAN April 07, 2024 PM AS PER SCHEDULE MEJO April 07, 2024 PM PLAN April 07, 2024 PM AS PER SCHEDULE MEJO April 07, 2024 PM PLAN April 07, 2024 PM AS PER SCHEDULE MEJO April 07, 2024 PM PLAN April 07, 2024 PM AS PER SCHEDULE MEJO April 07, 2024 STROKE CHECK DONE OPERATION April 07, 2024 MEJO April 07, 2024 AND NORMAL PM PLAN April 08, 2024 PM AS PER SCHEDULE MEJO April 08, 2024 PM PLAN April 08, 2024 PM AS PER SCHEDULE MEJO April 08, 2024 PM PLAN April 08, 2024 PM AS PER SCHEDULE MEJO April 08, 2024 PM PLAN April 08, 2024 PM AS PER SCHEDULE MEJO April 08, 2024 PM PLAN April 08, 2024 PM AS PER SCHEDULE MEJO April 08, 2024 PM PLAN April 08, 2024 PM AS PER SCHEDULE MEJO April 08, 2024 PM PLAN April 08, 2024 PM AS PER SCHEDULE MEJO April 08, 2024 OPERATION April 08, 2024 WIRING TIGHTEN AND NORMAL MEJO April 08, 2024 OPERATION April 08, 2024 FLUSHING AND LINE UP MEJO April 08, 2024 OPERATION April 08, 2024 FLUSHING AND LINE UP MEJO April 08, 2024 OPERATION April 10, 2024 DRAIN AND LINE UP ALMERY April 10, 2024 TRANSMITTER SWAPPED WITH ALMERY/ OPERATION April 10, 2024 01-FT-0064B AND DOWNLOAD TO BE April 10, 2024 MEJO DONE TRANSMITTER SWAPPED WITH ALMERY/ OPERATION April 10, 2024 01-FT-0064A AND DOWNLOAD TO BE April 10, 2024 MEJO DONE PM PLAN April 10, 2024 PM AS PER SCHEDULE MEJO April 10, 2024 PM PLAN April 10, 2024 PM AS PER SCHEDULE MEJO April 10, 2024 PM PLAN April 10, 2024 PM AS PER SCHEDULE MEJO April 10, 2024 PM PLAN April 10, 2024 PM AS PER SCHEDULE MEJO April 10, 2024 PM PLAN April 10, 2024 PM AS PER SCHEDULE MEJO April 10, 2024 PM PLAN April 10, 2024 PM AS PER SCHEDULE MEJO April 10, 2024 PM PLAN April 10, 2024 PM AS PER SCHEDULE MEJO April 10, 2024 PM PLAN April 10, 2024 PM AS PER SCHEDULE MEJO April 10, 2024 WIRING TIGHTEN AND OPERATION April 10, 2024 MEJO April 10, 2024 UNDER OBSERVATION PM PLAN April 10, 2024 PM AS PER SCHEDULE MEJO April 10, 2024 PM PLAN April 10, 2024 PM AS PER SCHEDULE MEJO April 10, 2024 PM PLAN April 10, 2024 PM AS PER SCHEDULE MEJO April 10, 2024 OPERATION April 13, 2024 NEW GLASS INSTALLED MEJO April 13, 2024 PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024 PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024 PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024 PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024 PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024 PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024 PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024 PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024 PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024 PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024 PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024 PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024 OPERATION April 14, 2024 READING IS ACTUAL MEJO April 14, 2024 OPERATION April 14, 2024 READING IS ACTUAL MEJO April 14, 2024 OPERATION April 14, 2024 DRAIN AND LINE UP MEJO April 14, 2024 OPERATION April 14, 2024 DRAIN AND LINE UP MEJO April 14, 2024 PM PLAN April 15, 2024 PM AS PER SCHEDULE MEJO April 15, 2024 PM PLAN April 15, 2024 PM AS PER SCHEDULE MEJO April 15, 2024 PM PLAN April 15, 2024 PM AS PER SCHEDULE MEJO April 15, 2024 PM PLAN April 15, 2024 PM AS PER SCHEDULE MEJO April 15, 2024 PM PLAN April 15, 2024 PM AS PER SCHEDULE MEJO April 15, 2024 OPERATION April 15, 2024 DRAIN AND LINE UP MEJO April 16, 2024 PM PLAN April 16, 2024 PM AS PER SCHEDULE MEJO April 16, 2024 PM PLAN April 16, 2024 PM AS PER SCHEDULE MEJO April 16, 2024 PM PLAN April 16, 2024 PM AS PER SCHEDULE MEJO April 16, 2024 PM PLAN April 16, 2024 PM AS PER SCHEDULE MEJO April 16, 2024 PM PLAN April 16, 2024 PM AS PER SCHEDULE MEJO April 16, 2024 PM PLAN April 16, 2024 PM AS PER SCHEDULE MEJO April 16, 2024 PM PLAN April 16, 2024 PM AS PER SCHEDULE MEJO April 16, 2024 PM PLAN April 17, 2024 PM AS PER SCHEDULE MEJO April 17, 2024 PM PLAN April 17, 2024 PM AS PER SCHEDULE MEJO April 17, 2024 PM PLAN April 17, 2024 PM AS PER SCHEDULE MEJO April 17, 2024 PM PLAN April 17, 2024 PM AS PER SCHEDULE MEJO April 17, 2024 PM PLAN April 17, 2024 PM AS PER SCHEDULE MEJO April 17, 2024 OPERATION April 17, 2024 FLUSHING AND LINE UP MEJO April 17, 2024 OPERATION April 17, 2024 FLUSHING AND LINE UP MEJO April 17, 2024 OPERATION April 17, 2024 FLUSHING AND LINE UP MEJO April 17, 2024 OPERATION April 17, 2024 FLUSHING AND LINE UP MEJO April 17, 2024 OPERATION April 18, 2024 FLUSHING AND LINE UP MEJO April 18, 2024 PM PLAN April 18, 2024 PM AS PER SCHEDULE MEJO April 18, 2024 PM PLAN April 18, 2024 PM AS PER SCHEDULE MEJO April 18, 2024 PM PLAN April 18, 2024 PM AS PER SCHEDULE MEJO April 18, 2024 PM PLAN April 18, 2024 PM AS PER SCHEDULE MEJO April 18, 2024 PM PLAN April 18, 2024 PM AS PER SCHEDULE MEJO April 18, 2024 PM PLAN April 18, 2024 PM AS PER SCHEDULE MEJO April 18, 2024 OPERATION April 18, 2024 FLUSHING AND LINE UP MEJO April 18, 2024 PM PLAN April 20, 2024 PM AS PER SCHEDULE MEJO April 20, 2024 PM PLAN April 20, 2024 PM AS PER SCHEDULE MEJO April 20, 2024 PM PLAN April 20, 2024 PM AS PER SCHEDULE MEJO April 20, 2024 PM PLAN April 20, 2024 PM AS PER SCHEDULE MEJO April 20, 2024 PM PLAN April 20, 2024 PM AS PER SCHEDULE MEJO April 20, 2024 PM PLAN April 20, 2024 PM AS PER SCHEDULE MEJO April 20, 2024 PM PLAN April 20, 2024 PM AS PER SCHEDULE MEJO April 20, 2024 OPERATION April 20, 2024 FLUSHING AND LINE UP MEJO April 20, 2024 OPERATION April 20, 2024 FOUND AS NORMAL MEJO April 20, 2024 OPERATION April 20, 2024 FLUSHING AND LINE UP MEJO April 20, 2024 WIRING WAS DISCONNECTED. OPERATION April 21, 2024 MEJO April 21, 2024 NOW CONNECTED AND NORMAL NEW TRANSMITTER INSTALLED OPERATION April 21, 2024 MEJO April 21, 2024 AND DOWNLOAD TO BE DONE PM PLAN April 21, 2024 PM AS PER SCHEDULE MEJO April 21, 2024 PM PLAN April 21, 2024 PM AS PER SCHEDULE MEJO April 21, 2024 PM PLAN April 21, 2024 PM AS PER SCHEDULE MEJO April 21, 2024 PM PLAN April 21, 2024 PM AS PER SCHEDULE MEJO April 21, 2024 PM PLAN April 21, 2024 PM AS PER SCHEDULE MEJO April 21, 2024 PM PLAN April 21, 2024 PM AS PER SCHEDULE MEJO April 21, 2024 PM PLAN April 22, 2024 PM AS PER SCHEDULE MEJO April 22, 2024 PM PLAN April 22, 2024 PM AS PER SCHEDULE MEJO April 22, 2024 PM PLAN April 22, 2024 PM AS PER SCHEDULE MEJO April 22, 2024 PM PLAN April 22, 2024 PM AS PER SCHEDULE MEJO April 22, 2024 PM PLAN April 22, 2024 PM AS PER SCHEDULE MEJO April 22, 2024 PM PLAN April 22, 2024 PM AS PER SCHEDULE MEJO April 22, 2024 PM PLAN April 22, 2024 PM AS PER SCHEDULE MEJO April 22, 2024 OPERATION April 22, 2024 FLUSHING AND LINE UP MEJO April 22, 2024 OPERATION April 22, 2024 FLUSHING AND LINE UP MEJO April 22, 2024 OPERATION April 22, 2024 FLUSHING AND LINE UP MEJO April 22, 2024 OPERATION April 22, 2024 CALIBRATED AND NORMAL MEJO April 22, 2024 PM PLAN April 23, 2024 PM AS PER SCHEDULE MEJO April 23, 2024 PM PLAN April 23, 2024 PM AS PER SCHEDULE MEJO April 23, 2024 PM PLAN April 23, 2024 PM AS PER SCHEDULE MEJO April 23, 2024 PM PLAN April 23, 2024 PM AS PER SCHEDULE MEJO April 23, 2024 PM PLAN April 23, 2024 PM AS PER SCHEDULE MEJO April 23, 2024 PM PLAN April 23, 2024 PM AS PER SCHEDULE MEJO April 23, 2024 PM PLAN April 23, 2024 PM AS PER SCHEDULE MEJO April 23, 2024 OPERATION April 23, 2024 FLUSHING AND LINE UP MEJO April 23, 2024 OPERATION April 24, 2024 WIRING CHECKED AND NORMAL MEJO April 24, 2024 OPERATION April 24, 2024 FOUND AS ACTUAL TEMPERATURE MEJO April 24, 2024 OPERATION April 24, 2024 DP CHECKED AND NORMAL MEJO April 24, 2024 PM PLAN April 24, 2024 PM AS PER SCHEDULE MEJO April 24, 2024 PM PLAN April 24, 2024 PM AS PER SCHEDULE MEJO April 24, 2024 PM PLAN April 24, 2024 PM AS PER SCHEDULE MEJO April 24, 2024 PM PLAN April 24, 2024 PM AS PER SCHEDULE MEJO April 24, 2024 PM PLAN April 24, 2024 PM AS PER SCHEDULE MEJO April 24, 2024 PM PLAN April 24, 2024 PM AS PER SCHEDULE MEJO April 24, 2024 PM PLAN April 25, 2024 PM AS PER SCHEDULE MEJO April 25, 2024 PM PLAN April 25, 2024 PM AS PER SCHEDULE MEJO April 25, 2024 PM PLAN April 25, 2024 PM AS PER SCHEDULE MEJO April 25, 2024 PM PLAN April 25, 2024 PM AS PER SCHEDULE MEJO April 25, 2024 PM PLAN April 25, 2024 PM AS PER SCHEDULE MEJO April 25, 2024 PM PLAN April 25, 2024 PM AS PER SCHEDULE MEJO April 25, 2024 PM PLAN April 25, 2024 PM AS PER SCHEDULE MEJO April 25, 2024 OPERATION April 25, 2024 CHECKED AND NORMAL MEJO April 25, 2024 OPERATION April 25, 2024 CHECKED AND NORMAL MEJO April 25, 2024 OPERATION April 25, 2024 CHECKED AND NORMAL MEJO April 25, 2024 SET POINT ADJUSTED AND OPERATION April 30, 2024 MEJO April 30, 2024 NORMAL OPERATION May 02, 2024 FLUSHING AND LINE UP MEJO May 02, 2024 OPERATION May 02, 2024 FLUSHING AND LINE UP MEJO May 02, 2024 OPERATION May 02, 2024 FLUSHING AND LINE UP MEJO May 02, 2024 OPERATION May 02, 2024 FLUSHING AND LINE UP MEJO May 02, 2024 OPERATION May 06, 2024 CABLE AND AIRLINE DISCONNECTED MEJO May 06, 2024 OPERATION May 06, 2024 CABLE AND AIRLINE DISCONNECTED MEJO May 06, 2024 OPERATION May 06, 2024 LT ISOLATED (RADIO ACTIVE) MEJO May 06, 2024 RANA May 09, 2024 WIRING HAS TIGHTEN MEJO May 09, 2024 RANA May 09, 2024 WIRING HAS TIGHTEN MEJO May 09, 2024 RANA May 09, 2024 WIRING HAS TIGHTEN MEJO May 09, 2024 RANA May 09, 2024 WIRING HAS TIGHTEN MEJO May 09, 2024 RANA May 09, 2024 WIRING HAS TIGHTEN MEJO May 09, 2024 RANA May 09, 2024 WIRING HAS TIGHTEN MEJO May 09, 2024 RANA May 09, 2024 WIRING HAS TIGHTEN MEJO May 09, 2024 OPERATION May 11, 2024 REGULATOR CLEANED AND NORMAL MEJO May 11, 2024 POSITIONER REPLACED WITH NEW OPERATION May 12, 2024 ONE AND CALIBRATED.NOW NORMAL MEJO May 12, 2024 AND CONFIRMED WITH DCS OPERATION May 14, 2024 ZERO CHECKED AND NORMAL MEJO May 14, 2024 OPERATION May 14, 2024 ZERO CHECKED AND NORMAL MEJO May 14, 2024 WIRING , TUBING CONNECTED AND OPERATION May 16, 2024 MEJO May 16, 2024 STROKE TEST DONE WIRING , TUBING CONNECTED AND OPERATION May 16, 2024 MEJO May 16, 2024 STROKE TEST DONE OPERATION May 18, 2024 VALVE CALIBRATED AND NORMAL MEJO May 18, 2024 OPERATION May 18, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 18, 2024 OPERATION May 18, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 18, 2024 OPERATION May 18, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 18, 2024 OPERATION May 18, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 18, 2024 OPERATION May 19, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 19, 2024 OPERATION May 19, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 19, 2024 OPERATION May 19, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 19, 2024 OPERATION May 19, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 19, 2024 OPERATION May 19, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 19, 2024 OPERATION May 19, 2024 RESISTANCE CHECKED AND NORMAL MEJO May 19, 2024 OPERATION May 19, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 19, 2024 OPERATION May 19, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 19, 2024 OPERATION May 20, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 20, 2024 OPERATION May 20, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 20, 2024 OPERATION May 20, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 20, 2024 TT REINSTALLED AS PER OPERATION OPERATION May 20, 2024 MEJO May 20, 2024 REQUEST OPERATION May 20, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 20, 2024 OPERATION May 20, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 20, 2024 OPERATION May 20, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 20, 2024 OPERATION May 20, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 20, 2024 OPERATION May 20, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 20, 2024 OPERATION May 20, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 20, 2024 OPERATION May 20, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 20, 2024 OPERATION May 20, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 20, 2024 OPERATION May 21, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 21, 2024 OPERATION May 21, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 21, 2024 OPERATION May 21, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 21, 2024 OPERATION May 21, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 21, 2024 OPERATION May 21, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 21, 2024 OPERATION May 21, 2024 SET POINT ADJUSTED TO 0.07KG/CM2 MEJO May 21, 2024 OPERATION May 21, 2024 SET POINT ADJUSTED TO 0.07KG/CM2 MEJO May 21, 2024 OPERATION May 21, 2024 SCANNER ADJUSTED AND NORMAL MEJO May 21, 2024 OPERATION May 21, 2024 TO BE CHECKED BY DAY SHIFT MEJO ONGOING OPERATION May 22, 2024 CONFIGURATION DONE AND NORMAL MEJO May 22, 2024 OPERATION May 22, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 22, 2024 OPERATION May 22, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 22, 2024 OPERATION May 23, 2024 READING FOUND AS ACTUAL MEJO May 23, 2024 OPERATION May 23, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 23, 2024 OPERATION May 23, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 23, 2024 OPERATION May 23, 2024 RESET AND NORMAL MEJO May 23, 2024 OPERATION May 23, 2024 RESET AND NORMAL MEJO May 23, 2024 OPERATION May 23, 2024 RESET AND NORMAL MEJO May 23, 2024 OPERATION May 23, 2024 RESET AND NORMAL MEJO May 23, 2024 OPERATION May 23, 2024 RESET AND NORMAL MEJO May 23, 2024 OPERATION May 23, 2024 RESET AND NORMAL MEJO May 23, 2024 OPERATION May 23, 2024 RESET AND NORMAL MEJO May 23, 2024 OPERATION May 23, 2024 RESET AND NORMAL MEJO May 23, 2024 OPERATION May 24, 2024 SET POINT ADJUSTED TO 0.07KG/CM2 MEJO May 24, 2024 OPERATION May 24, 2024 READING CHECKED AND NORMAL MEJO May 24, 2024 OPERATION May 25, 2024 CALIBRATED AND NORMAL MEJO May 25, 2024 AS PER OPERATION REQUEST PCVSSET OPERATION May 26, 2024 POINT HAS BEEN ADJUSTED SARFARAZ May 26, 2024 0.07KG/CM2)
OPERATION May 27, 2024 Flush out and Zero check SARFARAZ May 27, 2024
During trouble shooting found
OPERATION May 28, 2024 potentiometer not working SARFARAZ May 28, 2024 properly.installed new Metso positioner
Temperature element side cable loose.
OPERATION May 29, 2024 After cable tightness reading showing SARFARAZ May 29, 2024 normal confired by DCS operator
level gauge flush out and line up its
OPERATION May 31, 2024 reading is matching with level SARFARAZ May 31, 2024 transmitter During troubleshooting found valve feed response slow and position feedback hunting. New Metso positioner installed and OPERATION June 04, 2024 SARFARAZ June 04, 2024 calibrated and stroke test with DCS operator. The activity has been carreid out together with KR instrument team
Flush out and Zero check.
line up the transmitter.Readings are OPERATION June 05, 2024 SARFARAZ June 05, 2024 showing correctly confirmed by DCS Operator.
Flush out and Zero check.
line up the transmitter.Readings are OPERATION June 05, 2024 SARFARAZ June 05, 2024 showing correctly confirmed by DCS Operator.
AS PER OPERATION REQUEST PCVSSET
OPERATION June 05, 2024 POINT HAS BEEN ADJUSTED SARFARAZ June 05, 2024 0.08KG/CM2) AS PER OPERATION REQUEST PCVSSET OPERATION June 05, 2024 POINT HAS BEEN ADJUSTED SARFARAZ June 05, 2024 0.07KG/CM2)
During troubleshooting found valve was
stuck so,we directly connected the air OPERATION June 12, 2024 supply to the actuator and successfully SARFARAZ June 12, 2024 open the valve as confirmed by the DCS operator.
During troubleshooting found valve was
stuck so,we directly connected the air OPERATION June 12, 2024 supply to the actuator and successfully SARFARAZ June 12, 2024 open the valve as confirmed by the DCS operator.
As per operation request cable gland and
OPERATION June 12, 2024 SARFARAZ June 12, 2024 tube connection removed
Zero check and Naptha filling in
Condenset port LP side and line up the OPERATION June 13, 2024 SARFARAZ June 13, 2024 transmitter.after that level gauge and level transmitter reading is matching
As per operation request cable gland and
OPERATION June 13, 2024 SARFARAZ June 13, 2024 tube connection removed
Cable and gland and tube connection
OPERATION June 13, 2024 Connected and after that open and close SARFARAZ June 13, 2024 verify by the operation team Adjust low pass filter and reading is OPERATION June 17, 2024 showing normal as confirmed by DCS SARFARAZ June 17, 2024 Operator
Leak arrest and blind plug properly
OPERATION June 18, 2024 SARFARAZ June 18, 2024 installed