Sr.

no Area Job Type Unit Tag number Defect description


1 B PM 1 01-TE-0039 PM TO BE DONE
2 B PM 1 01-TE-0040A PM TO BE DONE
3 B PM 1 01-TE-0040B PM TO BE DONE
4 B PM 1 01-TE-0041 PM TO BE DONE
5 B CM 1 01-FT-0020 READING WAS FLUCTUATING
6 B PM 1 01-TE-0044 AS PER PM PLAN
7 B PM 1 01-TE/TT-0045 AS PER PM PLAN
8 B PM 1 01-TE/TT-0046 AS PER PM PLAN
9 B PM 1 01-TE/TT-0047 AS PER PM PLAN
10 B CM 1 01-FT-0020 READING WAS FLUCTUATING
11 B CM 5 05-LT-0028 READING WAS WRONG
12 B PM 1 01-TE-0160 AS PER PM PLAN
13 B PM 1 01-TE-0161 AS PER PM PLAN
14 B PM 1 01-TE-0162 AS PER PM PLAN
15 B PM 1 01-TE-0163 AS PER PM PLAN
16 B PM 1 01-TE-0165A AS PER PM PLAN
17 B PM 1 01-TE-0165B AS PER PM PLAN
18 B PM 1 01-TE-0166 AS PER PM PLAN
19 B PM 1 01-TE-0167 AS PER PM PLAN
20 B PM 1 01-FT-0017 AS PER PM PLAN
DLH CABLE KEPT UPSIDE
21 B CM 1 01-DLH-0005
FOR MECHANICAL WORK
22 B PM 5 05-TT-0021F AS PER PM PLAN
23 B PM 5 05-TE-0022A AS PER PM PLAN
24 B PM 5 05-TT-0022A AS PER PM PLAN
25 B PM 6 06-TE-0030F AS PER PM PLAN
26 B PM 6 06-TT-0030F AS PER PM PLAN
27 B PM 6 06-TE-0031A AS PER PM PLAN
28 B PM 6 06-TT-0031A AS PER PM PLAN
29 B PM 1 01-FT-0018 AS PER PM PLAN
30 B PM 1 01-FT-0019 AS PER PM PLAN
31 B PM 1 01-LT-0007A AS PER PM PLAN
32 B PM 1 01-LT-0007B AS PER PM PLAN
33 B PM 1 01-LV-0007A AS PER PM PLAN
34 B PM 1 01-PT-0018 AS PER PM PLAN
35 B PM 1 01-PV-0018B AS PER PM PLAN
36 B PM 1 01-PT-0019 AS PER PM PLAN
37 B PM 1 01-PG-0026 AS PER PM PLAN
38 B PM 1 01-PG-0027 AS PER PM PLAN
39 B PM 1 01-PG-0029A AS PER PM PLAN
40 B CM 1 01-FT-0148 READING WAS WRONG
41 B CM 1 01-DGT-0042 FAULT ALARM
42 B PM 1 01-PG-0029B AS PER PM PLAN
43 B PM 1 01-PG-0039 AS PER PM PLAN
44 B PM 1 01-PG-0064 AS PER PM PLAN
45 B PM 1 01-TE-0051 AS PER PM PLAN
46 B PM 1 01-TT-0051 AS PER PM PLAN
47 B PM 1 01-TV-0051 AS PER PM PLAN
48 B PM 1 01-TE-0052 AS PER PM PLAN
49 B PM 1 01-TT-0052 AS PER PM PLAN
50 B PM 1 01-TE-0053 AS PER PM PLAN
51 B PM 1 01-TT-0053 AS PER PM PLAN
52 B PM 1 01-TE-0120 AS PER PM PLAN
53 B PM 1 01-TT-0120 AS PER PM PLAN
54 B PM 1 01-TV-0052 AS PER PM PLAN
55 B CM 1 01-LT-0041 READING WAS WRONG
56 B CM 1 01-FT-0044 READING WAS WRONG
57 B CM 1 01-FT-0048 READING WAS WRONG
58 B CM 1 01-FT-0137 READING WAS WRONG
59 B PM 1 01-FT-0020 AS PER PM PLAN
60 B PM 1 01-FT-0021 AS PER PM PLAN
61 B PM 1 01-LT-0009 AS PER PM PLAN
62 B PM 1 01-FIF-0017 AS PER PM PLAN
63 B PM 1 01-FIF-0018 AS PER PM PLAN
64 B PM 1 01-PT-0020 AS PER PM PLAN
65 B PM 1 01-PT-0021 AS PER PM PLAN
66 B PM 1 01-PT-0052 AS PER PM PLAN
67 B PM 1 01-PG-0065 AS PER PM PLAN
68 B PM 1 01-PG-0066 AS PER PM PLAN
69 B PM 1 01-PG-0067 AS PER PM PLAN
70 B CM 1 01-FV-0520 VALVE WAS AT STUCK
71 B PM 1 01-PG-0068 AS PER PM PLAN
72 B PM 1 01-PG-0069 AS PER PM PLAN
73 B PM 1 01-PG-0070 AS PER PM PLAN
74 B PM 1 01-PG-0154 AS PER PM PLAN
75 B PM 1 01-TE-0054 AS PER PM PLAN
76 B PM 1 01-TT-0054 AS PER PM PLAN
77 B PM 1 01-TE-0055 AS PER PM PLAN
78 B CM 1 01-TT-0517 READING WAS WRONG
79 B CM 1 01-FT-0542A READING WAS WRONG
80 B CM 1 01-FT-0506B READING WAS WRONG
81 B CM 1 01-LT-0036 READING WAS WRONG

82 B CM 1 01-FT-0064A READING WAS WRONG

83 B CM 1 01-FT-0064B READING WAS WRONG

84 B PM 1 01-TE-0059 AS PER PM PLAN


85 B PM 1 01-TT-0059 AS PER PM PLAN
86 B PM 1 01-TE-0060 AS PER PM PLAN
87 B PM 1 01-TT-0060 AS PER PM PLAN
88 B PM 6 06-TXE-0044 AS PER PM PLAN
89 B PM 6 06-TXE-0045 AS PER PM PLAN
90 B PM 6 06-TXE-0046 AS PER PM PLAN
91 B PM 6 06-TXE-0047 AS PER PM PLAN
92 B CM 6 06-LT-0017 READING WAS FLUCTUATING
93 B PM 5 05-TT-0023F AS PER PM PLAN
94 B PM 5 05-TE-0024A AS PER PM PLAN
95 B PM 5 05-TT-0024A AS PER PM PLAN
96 B CM 5 05-PG-0103 GAUGE GLASS WAS MISSING
97 B PM 1 01-PT-9006BA AS PER PM PLAN
98 B PM 1 01-PT-9006BB AS PER PM PLAN
99 B PM 1 01-PG-0071A AS PER PM PLAN
100 B PM 1 01-PG-0071B AS PER PM PLAN
101 B PM 1 01-PG-0072 AS PER PM PLAN
102 B PM 1 01-PG-0073 AS PER PM PLAN
103 B PM 1 01-PG-0204 AS PER PM PLAN
104 B PM 1 01-PG-0205 AS PER PM PLAN
105 B PM 1 01-PDG-0006A AS PER PM PLAN
106 B PM 1 01-PDG-0006B AS PER PM PLAN
107 B PM 1 01-TE-0213 AS PER PM PLAN
108 B PM 1 01-TT-0213 AS PER PM PLAN
109 B CM 1 01-TT-0011 READING WAS WRONG
110 B CM 1 01-TT-0012 READING WAS WRONG
111 B CM 1 01-LT-0004 READING WAS WRONG
112 B CM 1 01-LT-0036 READING WAS WRONG
113 B PM 1 01-TG-0078 AS PER PM PLAN
114 B PM 1 01-FT-0025 AS PER PM PLAN
115 B PM 1 01-FT-0126 AS PER PM PLAN
116 B PM 1 01-FIF-0019 AS PER PM PLAN
117 B PM 1 01-FV-0126 AS PER PM PLAN
118 B CM 1 01-FT-0016B READING WAS WRONG
119 B PM 1 01-FT-0023 AS PER PM PLAN
120 B PM 1 01-FV-0023 AS PER PM PLAN
121 B PM 1 01-FT-0024 AS PER PM PLAN
122 B PM 1 01-FV-0024 AS PER PM PLAN
123 B PM 1 01-LT-0010 AS PER PM PLAN
124 B PM 1 01-LV-0010 AS PER PM PLAN
125 B PM 1 01-TE-0065 AS PER PM PLAN
126 B PM 1 01-TT-0065 AS PER PM PLAN
127 B PM 1 01-PT-9005A AS PER PM PLAN
128 B PM 1 01-PT-9005B AS PER PM PLAN
129 B PM 1 01-PG-0074 AS PER PM PLAN
130 B PM 1 01-PG-0075 AS PER PM PLAN
131 B CM 1 01-FT-0020 READING WAS WRONG
132 B CM 1 01-FT-0012F READING WAS WRONG
133 B CM 1 01-FT-0013F READING WAS WRONG
134 B CM 1 01-FT-0012B READING WAS WRONG
135 B CM 1 01-FT-0012B READING WAS WRONG
136 B PM 1 01-PG-0077 AS PER PM PLAN
137 B PM 1 01-PG-0078 AS PER PM PLAN
138 B PM 1 01-PG-0079 AS PER PM PLAN
139 B PM 1 01-PG-0080 AS PER PM PLAN
140 B PM 1 01-TE-0061 AS PER PM PLAN
141 B PM 1 01-TT-0061 AS PER PM PLAN
142 B CM 1 01-FT-0013B READING WAS WRONG
143 B PM 1 01-TE-0062 AS PER PM PLAN
144 B PM 1 01-TT-0062 AS PER PM PLAN
145 B PM 1 01-TE-0063 AS PER PM PLAN
146 B PM 1 01-TT-0063 AS PER PM PLAN
147 B PM 1 01-TE-0064 AS PER PM PLAN
148 B PM 1 01-TT-0064 AS PER PM PLAN
149 B PM 1 01-TY-0064 AS PER PM PLAN
150 B CM 1 01-FT-0048 READING WAS WRONG
151 B CM 1 01-LT-0036 READING WAS WRONG
152 B CM 1 01-PG-0503 READING WAS WRONG
153 B CM 1 01-LT-0036 READING WAS WRONG

154 B CM 1 01-LT-0507 READING WAS WRONG


155 B PM 1 01-TE-0110 AS PER PM PLAN
156 B PM 1 01-TT-0110 AS PER PM PLAN
157 B PM 1 01-FT-0026 AS PER PM PLAN
158 B PM 1 01-FT-0027 AS PER PM PLAN
159 B PM 1 01-PT-9007AA AS PER PM PLAN
160 B PM 1 01-PT-9007AB AS PER PM PLAN
161 B PM 1 01-PT-9007BA AS PER PM PLAN
162 B PM 1 01-PT-9007BB AS PER PM PLAN
163 B PM 1 01-PT-9008AA AS PER PM PLAN
164 B PM 1 01-PT-9008AB AS PER PM PLAN
165 B PM 1 01-PT-9008BA AS PER PM PLAN
166 B PM 1 01-PT-9008BB AS PER PM PLAN
167 B PM 1 01-PG-0082A AS PER PM PLAN
168 B CM 1 01-FT-0044 READING WAS WRONG
169 B CM 1 01-FT-0048 READING WAS WRONG
170 B CM 1 01-FT-0137 READING WAS WRONG
171 B CM 1 01-LT-0507 READING WAS WRONG
172 B PM 1 01-PG-0082B AS PER PM PLAN
173 B PM 1 01-PG-0083A AS PER PM PLAN
174 B PM 1 01-PG-0083B AS PER PM PLAN
175 B PM 1 01-TE-0066 AS PER PM PLAN
176 B PM 1 01-TT-0066 AS PER PM PLAN
177 B PM 1 01-TE-0067 AS PER PM PLAN
178 B PM 1 01-TT-0067 AS PER PM PLAN
179 B CM 1 01-PT-0511 READING WAS WRONG
180 B CM 1 01-TT-0029B READING WAS WRONG
181 B CM 1 01-TT-9219 READING WAS WRONG
182 B CM 1 01-FT-0030 READING WAS WRONG
183 B PM 1 01-FT-0148 AS PER PM PLAN
184 B PM 1 01-TE-0068A AS PER PM PLAN
185 B PM 1 01-TT-0068A AS PER PM PLAN
186 B PM 1 01-TE-0068B AS PER PM PLAN
187 B PM 1 01-TT-0068B AS PER PM PLAN
188 B PM 1 01-TE-0080 AS PER PM PLAN
189 B PM 1 01-TT-0080 AS PER PM PLAN
190 B PM 1 01-TT-9204 AS PER PM PLAN
191 B PM 1 01-TT-9205 AS PER PM PLAN
192 B PM 1 01-TT-9206 AS PER PM PLAN
193 B PM 1 01-TT-9207 AS PER PM PLAN
194 B PM 1 01-TT-9208 AS PER PM PLAN
195 B PM 1 01-TT-9209 AS PER PM PLAN
196 B CM 1 01-DGT-0037 FAULT ALARM
197 B CM 1 01-DGT-0038 FAULT ALARM
198 B CM 1 01-DGT-0042 FAULT ALARM
199 B CM 4 04-PCV-5405 SET POINT TO BE ADJUSTED
200 B CM 15 15-FT-0011A READING WAS WRONG
201 B CM 15 15-FT-0011B READING WAS WRONG
202 B CM 15 15-FT-0009A READING WAS WRONG
203 B CM 15 15-FT-0009B READING WAS WRONG
204 B CM 4 04-XV-0579 CABLE TO BE DISCONNECTED
205 B CM 4 04-XV-0581 CABLE TO BE DISCONNECTED
206 B CM 4 04-LT-0507 LT TO BE ISOLATED
207 B CM 13 1A1-13SM-101F/R WIRING TO BE TIGHTEN
208 B CM 13 1A1-13SM-201F/R WIRING TO BE TIGHTEN
209 B CM 14 1A1-14SM-101F/R WIRING TO BE TIGHTEN
210 B CM 14 1A1-14SM-201F/R WIRING TO BE TIGHTEN
211 B CM 15 1A1-15SM-101F/R WIRING TO BE TIGHTEN
212 B CM 15 1A1-15SM-201F/R WIRING TO BE TIGHTEN
213 B CM 15 1A1-15SM-202F/R WIRING TO BE TIGHTEN
214 B CM 6 06-XV-0013 AIR REGULATOR WAS LEAKING

215 B CM 14 14-UV-7206 VALVE WAS HUNTING

216 B CM 1 01-FT-0506D READING WAS WRONG


217 B CM 1 01-FT-0506H READING WAS WRONG
218 B CM 1 06-FV-0049A VALVE TO BE INSTALLED

219 B CM 1 06-FV-0049B VALVE TO BE INSTALLED


220 B CM 14 14-PV-0022A VALVE WAS NOT WORKING
221 B CM 1 01-FT-0012H READING WAS WRONG
222 B CM 1 01-FT-0016A READING WAS WRONG
223 B CM 1 01-FT-0016B READING WAS WRONG
224 B CM 1 01-FT-0016C READING WAS WRONG
225 B CM 1 01-FT-0017 READING WAS WRONG
226 B CM 1 01-FT-0012D READING WAS WRONG
227 B CM 1 01-FT-0012H READING WAS WRONG
228 B CM 1 01-FT-0044 READING WAS WRONG
229 B CM 1 01-LT-0506 READING WAS WRONG
230 B CM 1 01-TXE-9018 READING WAS WRONG
231 B CM 1 01-FT-1515 READING WAS WRONG
232 B CM 1 01-FT-0137 READING WAS WRONG
233 B CM 1 01-FT-0005 READING WAS WRONG
234 B CM 1 01-FT-0006 READING WAS WRONG
235 B CM 1 01-LT-0013 READING WAS WRONG
DISCONNECTED BY THE
236 B CM 1 01-TT-0120
REQUEST OF OPERATION
237 B CM 2 02-LT-0002 READING WAS WRONG
238 B CM 1 01-FT-0012D READING WAS WRONG
239 B CM 1 01-FT-0013D READING WAS WRONG
240 B CM 1 01-FT-0012F READING WAS WRONG
241 B CM 1 01-FT-0013F READING WAS WRONG
242 B CM 1 01-FT-0012G READING WAS WRONG
243 B CM 1 01-FT-0013G READING WAS WRONG
244 B CM 1 01-LT-0007B READING WAS WRONG
245 B CM 1 01-PT-0510 READING WAS WRONG
246 B CM 1 01-LT-0006 READING WAS WRONG
247 B CM 1 01-LT-0037 READING WAS WRONG
248 B CM 1 01-FT-0024 READING WAS WRONG
249 B CM 1 04-FT-0017 READING WAS WRONG
250 B CM 1 04-PCV-5405 SET POINT TO BE ADJUSTED
251 B CM 1 04-PCV-5407 SET POINT TO BE ADJUSTED
BURNER FEEDBACK NOT
252 B CM 1 06-BS-0002D
COMING
253 B CM 1 06-BS-0001D PILOT FEED BACK NOT COMING
254 B CM 52 52-FT-0131 READING WAS WRONG
255 B CM 1 01-FT-0011 READING WAS WRONG
256 B CM 1 01-FT-1514 READING WAS WRONG
257 B CM 1 01-TXE-9213 READING WAS WRONG
258 B CM 1 01-FT-0533A READING WAS WRONG
259 B CM 1 01-FT-0533B READING WAS WRONG
260 B CM 13 13-DGT-0001 FAULT ALARM
261 B CM 13 13-DGT-0002 FAULT ALARM
262 B CM 13 13-DGT-0003 FAULT ALARM
263 B CM 13 13-DGT-0004 FAULT ALARM
264 B CM 14 14-DGT-0001 FAULT ALARM
265 B CM 14 14-DGT-0002 FAULT ALARM
266 B CM 14 14-DGT-0003 FAULT ALARM
267 B CM 14 14-DGT-0004 FAULT ALARM
268 B CM 4 04-PCV-5405 SET POINT TO BE ADJUSTED
269 B CM 1 01-FT-0139 READING WAS WRONG
270 B CM 14 14-UV-7405 FEEDBACK WAS NOT STABLE

271 B CM 4 04-PCV-5405 PCV SET POINT ADJUST

272 B CM 2 02-FT-0019 wrong Reading showing

VALVE FEEDBACK DISCREPENCY


273 B CM 13 13-UV-7604
ALARM COMING

274 B CM 15 15-TI-5227B wrong Reading showing

level gauge reading showing


275 B CM 16 01-LG-0007
zero
VALVE FEEDBACK DISCREPENCY
276 B CM 13 13-UV-7604
ALARM COMING

277 B CM 15 15-FT-0011A/B wrong Reading showing

278 B CM 15 15-FT-0009A/B wrong Reading showing

279 B CM 4 04-PCV-5407 PCV SET POINT ADJUST

280 B CM 4 04-PCV-5405 PCV SET POINT ADJUST

Valve not fully open and


281 B CM 4 04-XV-0571
Discrepancy alarm coming

Valve not fully open and


282 B CM 4 04-XV-0572
Discrepancy alarm coming

283 B CM 4 04-XV-0581 Valve Passing

Level transmitter and level


284 B CM 2 02-LT-0004
gauge reading not matching

285 B CM 4 04-XV-0581 Valve Passing

285 B CM 4 04-XV-0581 Valve Re-installed


286 B CM 13 13-FT-0122A wrong Reading showing

287 B CM 6 06-FT-0008B Manifold leakge


Issuer Issue Date Root cause Action by Clear Date
PM DONE MEJO March 27, 2024
PM DONE MEJO March 27, 2024
PM DONE MEJO March 27, 2024
PM DONE MEJO March 27, 2024
OPERATION March 27, 2024 LINE FLUSHED AND NORMAL MEJO March 27, 2024
PM PLAN March 28, 2024 PM AS PER SCHEDULE MEJO March 28, 2024
PM PLAN March 28, 2024 PM AS PER SCHEDULE MEJO March 28, 2024
PM PLAN March 28, 2024 PM AS PER SCHEDULE MEJO March 28, 2024
PM PLAN March 28, 2024 PM AS PER SCHEDULE MEJO March 28, 2024
OPERATION March 28, 2024 LINE FLUSHED AND NORMAL MEJO March 28, 2024
CHECKED LG, LT AND FOUND
OPERATION March 29, 2024 MEJO March 29, 2024
AS ACTUAL READING
PM PLAN March 30, 2024 PM AS PER SCHEDULE MEJO March 30, 2024
PM PLAN March 30, 2024 PM AS PER SCHEDULE MEJO March 30, 2024
PM PLAN March 31, 2024 PM AS PER SCHEDULE MEJO March 31, 2024
PM PLAN March 31, 2024 PM AS PER SCHEDULE MEJO March 31, 2024
PM PLAN March 31, 2024 PM AS PER SCHEDULE MEJO March 31, 2024
PM PLAN March 31, 2024 PM AS PER SCHEDULE MEJO March 31, 2024
PM PLAN March 31, 2024 PM AS PER SCHEDULE MEJO March 31, 2024
PM PLAN March 31, 2024 PM AS PER SCHEDULE MEJO March 31, 2024
PM PLAN March 31, 2024 PM AS PER SCHEDULE MEJO March 31, 2024
OPERATION March 31, 2024 DLH CABLE REINSTALLED MEJO March 31, 2024
PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024
PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024
PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024
PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024
PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024
PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024
PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024
PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024
PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024
PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024
PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024
PM PLAN April 01, 2024 PM AS PER SCHEDULE MEJO April 01, 2024
PM PLAN April 02, 2024 PM AS PER SCHEDULE MEJO April 02, 2024
PM PLAN April 02, 2024 PM AS PER SCHEDULE MEJO April 02, 2024
PM PLAN April 02, 2024 PM AS PER SCHEDULE MEJO April 02, 2024
PM PLAN April 02, 2024 PM AS PER SCHEDULE MEJO April 02, 2024
PM PLAN April 02, 2024 PM AS PER SCHEDULE MEJO April 02, 2024
PM PLAN April 02, 2024 PM AS PER SCHEDULE MEJO April 02, 2024
OPERATION April 02, 2024 FLUSHING AND LINE UP MEJO April 02, 2024
OPERATION April 02, 2024 FOUND AS NORMAL MEJO April 02, 2024
PM PLAN April 03, 2024 PM AS PER SCHEDULE MEJO April 03, 2024
PM PLAN April 03, 2024 PM AS PER SCHEDULE MEJO April 03, 2024
PM PLAN April 03, 2024 PM AS PER SCHEDULE MEJO April 03, 2024
PM PLAN April 03, 2024 PM AS PER SCHEDULE MEJO April 03, 2024
PM PLAN April 03, 2024 PM AS PER SCHEDULE MEJO April 03, 2024
PM PLAN April 03, 2024 PM AS PER SCHEDULE MEJO April 03, 2024
PM PLAN April 03, 2024 PM AS PER SCHEDULE MEJO April 03, 2024
PM PLAN April 04, 2024 PM AS PER SCHEDULE MEJO April 04, 2024
PM PLAN April 04, 2024 PM AS PER SCHEDULE MEJO April 04, 2024
PM PLAN April 04, 2024 PM AS PER SCHEDULE MEJO April 04, 2024
PM PLAN April 04, 2024 PM AS PER SCHEDULE MEJO April 04, 2024
PM PLAN April 04, 2024 PM AS PER SCHEDULE MEJO April 04, 2024
PM PLAN April 04, 2024 PM AS PER SCHEDULE MEJO April 04, 2024
DISPLACER WAS FELL DOWN
OPERATION April 04, 2024 MEJO April 04, 2024
AND NOW REINSTALLED
OPERATION April 06, 2024 FLUSHING AND LINE UP MEJO April 06, 2024
OPERATION April 06, 2024 FLUSHING AND LINE UP MEJO April 06, 2024
OPERATION April 06, 2024 FLUSHING AND LINE UP MEJO April 06, 2024
PM PLAN April 06, 2024 PM AS PER SCHEDULE MEJO April 06, 2024
PM PLAN April 06, 2024 PM AS PER SCHEDULE MEJO April 06, 2024
PM PLAN April 06, 2024 PM AS PER SCHEDULE MEJO April 06, 2024
PM PLAN April 06, 2024 PM AS PER SCHEDULE MEJO April 06, 2024
PM PLAN April 06, 2024 PM AS PER SCHEDULE MEJO April 06, 2024
PM PLAN April 07, 2024 PM AS PER SCHEDULE MEJO April 07, 2024
PM PLAN April 07, 2024 PM AS PER SCHEDULE MEJO April 07, 2024
PM PLAN April 07, 2024 PM AS PER SCHEDULE MEJO April 07, 2024
PM PLAN April 07, 2024 PM AS PER SCHEDULE MEJO April 07, 2024
PM PLAN April 07, 2024 PM AS PER SCHEDULE MEJO April 07, 2024
PM PLAN April 07, 2024 PM AS PER SCHEDULE MEJO April 07, 2024
STROKE CHECK DONE
OPERATION April 07, 2024 MEJO April 07, 2024
AND NORMAL
PM PLAN April 08, 2024 PM AS PER SCHEDULE MEJO April 08, 2024
PM PLAN April 08, 2024 PM AS PER SCHEDULE MEJO April 08, 2024
PM PLAN April 08, 2024 PM AS PER SCHEDULE MEJO April 08, 2024
PM PLAN April 08, 2024 PM AS PER SCHEDULE MEJO April 08, 2024
PM PLAN April 08, 2024 PM AS PER SCHEDULE MEJO April 08, 2024
PM PLAN April 08, 2024 PM AS PER SCHEDULE MEJO April 08, 2024
PM PLAN April 08, 2024 PM AS PER SCHEDULE MEJO April 08, 2024
OPERATION April 08, 2024 WIRING TIGHTEN AND NORMAL MEJO April 08, 2024
OPERATION April 08, 2024 FLUSHING AND LINE UP MEJO April 08, 2024
OPERATION April 08, 2024 FLUSHING AND LINE UP MEJO April 08, 2024
OPERATION April 10, 2024 DRAIN AND LINE UP ALMERY April 10, 2024
TRANSMITTER SWAPPED WITH
ALMERY/
OPERATION April 10, 2024 01-FT-0064B AND DOWNLOAD TO BE April 10, 2024
MEJO
DONE
TRANSMITTER SWAPPED WITH
ALMERY/
OPERATION April 10, 2024 01-FT-0064A AND DOWNLOAD TO BE April 10, 2024
MEJO
DONE
PM PLAN April 10, 2024 PM AS PER SCHEDULE MEJO April 10, 2024
PM PLAN April 10, 2024 PM AS PER SCHEDULE MEJO April 10, 2024
PM PLAN April 10, 2024 PM AS PER SCHEDULE MEJO April 10, 2024
PM PLAN April 10, 2024 PM AS PER SCHEDULE MEJO April 10, 2024
PM PLAN April 10, 2024 PM AS PER SCHEDULE MEJO April 10, 2024
PM PLAN April 10, 2024 PM AS PER SCHEDULE MEJO April 10, 2024
PM PLAN April 10, 2024 PM AS PER SCHEDULE MEJO April 10, 2024
PM PLAN April 10, 2024 PM AS PER SCHEDULE MEJO April 10, 2024
WIRING TIGHTEN AND
OPERATION April 10, 2024 MEJO April 10, 2024
UNDER OBSERVATION
PM PLAN April 10, 2024 PM AS PER SCHEDULE MEJO April 10, 2024
PM PLAN April 10, 2024 PM AS PER SCHEDULE MEJO April 10, 2024
PM PLAN April 10, 2024 PM AS PER SCHEDULE MEJO April 10, 2024
OPERATION April 13, 2024 NEW GLASS INSTALLED MEJO April 13, 2024
PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024
PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024
PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024
PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024
PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024
PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024
PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024
PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024
PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024
PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024
PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024
PM PLAN April 14, 2024 PM AS PER SCHEDULE MEJO April 14, 2024
OPERATION April 14, 2024 READING IS ACTUAL MEJO April 14, 2024
OPERATION April 14, 2024 READING IS ACTUAL MEJO April 14, 2024
OPERATION April 14, 2024 DRAIN AND LINE UP MEJO April 14, 2024
OPERATION April 14, 2024 DRAIN AND LINE UP MEJO April 14, 2024
PM PLAN April 15, 2024 PM AS PER SCHEDULE MEJO April 15, 2024
PM PLAN April 15, 2024 PM AS PER SCHEDULE MEJO April 15, 2024
PM PLAN April 15, 2024 PM AS PER SCHEDULE MEJO April 15, 2024
PM PLAN April 15, 2024 PM AS PER SCHEDULE MEJO April 15, 2024
PM PLAN April 15, 2024 PM AS PER SCHEDULE MEJO April 15, 2024
OPERATION April 15, 2024 DRAIN AND LINE UP MEJO April 16, 2024
PM PLAN April 16, 2024 PM AS PER SCHEDULE MEJO April 16, 2024
PM PLAN April 16, 2024 PM AS PER SCHEDULE MEJO April 16, 2024
PM PLAN April 16, 2024 PM AS PER SCHEDULE MEJO April 16, 2024
PM PLAN April 16, 2024 PM AS PER SCHEDULE MEJO April 16, 2024
PM PLAN April 16, 2024 PM AS PER SCHEDULE MEJO April 16, 2024
PM PLAN April 16, 2024 PM AS PER SCHEDULE MEJO April 16, 2024
PM PLAN April 16, 2024 PM AS PER SCHEDULE MEJO April 16, 2024
PM PLAN April 17, 2024 PM AS PER SCHEDULE MEJO April 17, 2024
PM PLAN April 17, 2024 PM AS PER SCHEDULE MEJO April 17, 2024
PM PLAN April 17, 2024 PM AS PER SCHEDULE MEJO April 17, 2024
PM PLAN April 17, 2024 PM AS PER SCHEDULE MEJO April 17, 2024
PM PLAN April 17, 2024 PM AS PER SCHEDULE MEJO April 17, 2024
OPERATION April 17, 2024 FLUSHING AND LINE UP MEJO April 17, 2024
OPERATION April 17, 2024 FLUSHING AND LINE UP MEJO April 17, 2024
OPERATION April 17, 2024 FLUSHING AND LINE UP MEJO April 17, 2024
OPERATION April 17, 2024 FLUSHING AND LINE UP MEJO April 17, 2024
OPERATION April 18, 2024 FLUSHING AND LINE UP MEJO April 18, 2024
PM PLAN April 18, 2024 PM AS PER SCHEDULE MEJO April 18, 2024
PM PLAN April 18, 2024 PM AS PER SCHEDULE MEJO April 18, 2024
PM PLAN April 18, 2024 PM AS PER SCHEDULE MEJO April 18, 2024
PM PLAN April 18, 2024 PM AS PER SCHEDULE MEJO April 18, 2024
PM PLAN April 18, 2024 PM AS PER SCHEDULE MEJO April 18, 2024
PM PLAN April 18, 2024 PM AS PER SCHEDULE MEJO April 18, 2024
OPERATION April 18, 2024 FLUSHING AND LINE UP MEJO April 18, 2024
PM PLAN April 20, 2024 PM AS PER SCHEDULE MEJO April 20, 2024
PM PLAN April 20, 2024 PM AS PER SCHEDULE MEJO April 20, 2024
PM PLAN April 20, 2024 PM AS PER SCHEDULE MEJO April 20, 2024
PM PLAN April 20, 2024 PM AS PER SCHEDULE MEJO April 20, 2024
PM PLAN April 20, 2024 PM AS PER SCHEDULE MEJO April 20, 2024
PM PLAN April 20, 2024 PM AS PER SCHEDULE MEJO April 20, 2024
PM PLAN April 20, 2024 PM AS PER SCHEDULE MEJO April 20, 2024
OPERATION April 20, 2024 FLUSHING AND LINE UP MEJO April 20, 2024
OPERATION April 20, 2024 FOUND AS NORMAL MEJO April 20, 2024
OPERATION April 20, 2024 FLUSHING AND LINE UP MEJO April 20, 2024
WIRING WAS DISCONNECTED.
OPERATION April 21, 2024 MEJO April 21, 2024
NOW CONNECTED AND NORMAL
NEW TRANSMITTER INSTALLED
OPERATION April 21, 2024 MEJO April 21, 2024
AND DOWNLOAD TO BE DONE
PM PLAN April 21, 2024 PM AS PER SCHEDULE MEJO April 21, 2024
PM PLAN April 21, 2024 PM AS PER SCHEDULE MEJO April 21, 2024
PM PLAN April 21, 2024 PM AS PER SCHEDULE MEJO April 21, 2024
PM PLAN April 21, 2024 PM AS PER SCHEDULE MEJO April 21, 2024
PM PLAN April 21, 2024 PM AS PER SCHEDULE MEJO April 21, 2024
PM PLAN April 21, 2024 PM AS PER SCHEDULE MEJO April 21, 2024
PM PLAN April 22, 2024 PM AS PER SCHEDULE MEJO April 22, 2024
PM PLAN April 22, 2024 PM AS PER SCHEDULE MEJO April 22, 2024
PM PLAN April 22, 2024 PM AS PER SCHEDULE MEJO April 22, 2024
PM PLAN April 22, 2024 PM AS PER SCHEDULE MEJO April 22, 2024
PM PLAN April 22, 2024 PM AS PER SCHEDULE MEJO April 22, 2024
PM PLAN April 22, 2024 PM AS PER SCHEDULE MEJO April 22, 2024
PM PLAN April 22, 2024 PM AS PER SCHEDULE MEJO April 22, 2024
OPERATION April 22, 2024 FLUSHING AND LINE UP MEJO April 22, 2024
OPERATION April 22, 2024 FLUSHING AND LINE UP MEJO April 22, 2024
OPERATION April 22, 2024 FLUSHING AND LINE UP MEJO April 22, 2024
OPERATION April 22, 2024 CALIBRATED AND NORMAL MEJO April 22, 2024
PM PLAN April 23, 2024 PM AS PER SCHEDULE MEJO April 23, 2024
PM PLAN April 23, 2024 PM AS PER SCHEDULE MEJO April 23, 2024
PM PLAN April 23, 2024 PM AS PER SCHEDULE MEJO April 23, 2024
PM PLAN April 23, 2024 PM AS PER SCHEDULE MEJO April 23, 2024
PM PLAN April 23, 2024 PM AS PER SCHEDULE MEJO April 23, 2024
PM PLAN April 23, 2024 PM AS PER SCHEDULE MEJO April 23, 2024
PM PLAN April 23, 2024 PM AS PER SCHEDULE MEJO April 23, 2024
OPERATION April 23, 2024 FLUSHING AND LINE UP MEJO April 23, 2024
OPERATION April 24, 2024 WIRING CHECKED AND NORMAL MEJO April 24, 2024
OPERATION April 24, 2024 FOUND AS ACTUAL TEMPERATURE MEJO April 24, 2024
OPERATION April 24, 2024 DP CHECKED AND NORMAL MEJO April 24, 2024
PM PLAN April 24, 2024 PM AS PER SCHEDULE MEJO April 24, 2024
PM PLAN April 24, 2024 PM AS PER SCHEDULE MEJO April 24, 2024
PM PLAN April 24, 2024 PM AS PER SCHEDULE MEJO April 24, 2024
PM PLAN April 24, 2024 PM AS PER SCHEDULE MEJO April 24, 2024
PM PLAN April 24, 2024 PM AS PER SCHEDULE MEJO April 24, 2024
PM PLAN April 24, 2024 PM AS PER SCHEDULE MEJO April 24, 2024
PM PLAN April 25, 2024 PM AS PER SCHEDULE MEJO April 25, 2024
PM PLAN April 25, 2024 PM AS PER SCHEDULE MEJO April 25, 2024
PM PLAN April 25, 2024 PM AS PER SCHEDULE MEJO April 25, 2024
PM PLAN April 25, 2024 PM AS PER SCHEDULE MEJO April 25, 2024
PM PLAN April 25, 2024 PM AS PER SCHEDULE MEJO April 25, 2024
PM PLAN April 25, 2024 PM AS PER SCHEDULE MEJO April 25, 2024
PM PLAN April 25, 2024 PM AS PER SCHEDULE MEJO April 25, 2024
OPERATION April 25, 2024 CHECKED AND NORMAL MEJO April 25, 2024
OPERATION April 25, 2024 CHECKED AND NORMAL MEJO April 25, 2024
OPERATION April 25, 2024 CHECKED AND NORMAL MEJO April 25, 2024
SET POINT ADJUSTED AND
OPERATION April 30, 2024 MEJO April 30, 2024
NORMAL
OPERATION May 02, 2024 FLUSHING AND LINE UP MEJO May 02, 2024
OPERATION May 02, 2024 FLUSHING AND LINE UP MEJO May 02, 2024
OPERATION May 02, 2024 FLUSHING AND LINE UP MEJO May 02, 2024
OPERATION May 02, 2024 FLUSHING AND LINE UP MEJO May 02, 2024
OPERATION May 06, 2024 CABLE AND AIRLINE DISCONNECTED MEJO May 06, 2024
OPERATION May 06, 2024 CABLE AND AIRLINE DISCONNECTED MEJO May 06, 2024
OPERATION May 06, 2024 LT ISOLATED (RADIO ACTIVE) MEJO May 06, 2024
RANA May 09, 2024 WIRING HAS TIGHTEN MEJO May 09, 2024
RANA May 09, 2024 WIRING HAS TIGHTEN MEJO May 09, 2024
RANA May 09, 2024 WIRING HAS TIGHTEN MEJO May 09, 2024
RANA May 09, 2024 WIRING HAS TIGHTEN MEJO May 09, 2024
RANA May 09, 2024 WIRING HAS TIGHTEN MEJO May 09, 2024
RANA May 09, 2024 WIRING HAS TIGHTEN MEJO May 09, 2024
RANA May 09, 2024 WIRING HAS TIGHTEN MEJO May 09, 2024
OPERATION May 11, 2024 REGULATOR CLEANED AND NORMAL MEJO May 11, 2024
POSITIONER REPLACED WITH NEW
OPERATION May 12, 2024 ONE AND CALIBRATED.NOW NORMAL MEJO May 12, 2024
AND CONFIRMED WITH DCS
OPERATION May 14, 2024 ZERO CHECKED AND NORMAL MEJO May 14, 2024
OPERATION May 14, 2024 ZERO CHECKED AND NORMAL MEJO May 14, 2024
WIRING , TUBING CONNECTED AND
OPERATION May 16, 2024 MEJO May 16, 2024
STROKE TEST DONE
WIRING , TUBING CONNECTED AND
OPERATION May 16, 2024 MEJO May 16, 2024
STROKE TEST DONE
OPERATION May 18, 2024 VALVE CALIBRATED AND NORMAL MEJO May 18, 2024
OPERATION May 18, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 18, 2024
OPERATION May 18, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 18, 2024
OPERATION May 18, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 18, 2024
OPERATION May 18, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 18, 2024
OPERATION May 19, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 19, 2024
OPERATION May 19, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 19, 2024
OPERATION May 19, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 19, 2024
OPERATION May 19, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 19, 2024
OPERATION May 19, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 19, 2024
OPERATION May 19, 2024 RESISTANCE CHECKED AND NORMAL MEJO May 19, 2024
OPERATION May 19, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 19, 2024
OPERATION May 19, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 19, 2024
OPERATION May 20, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 20, 2024
OPERATION May 20, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 20, 2024
OPERATION May 20, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 20, 2024
TT REINSTALLED AS PER OPERATION
OPERATION May 20, 2024 MEJO May 20, 2024
REQUEST
OPERATION May 20, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 20, 2024
OPERATION May 20, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 20, 2024
OPERATION May 20, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 20, 2024
OPERATION May 20, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 20, 2024
OPERATION May 20, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 20, 2024
OPERATION May 20, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 20, 2024
OPERATION May 20, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 20, 2024
OPERATION May 20, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 20, 2024
OPERATION May 21, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 21, 2024
OPERATION May 21, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 21, 2024
OPERATION May 21, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 21, 2024
OPERATION May 21, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 21, 2024
OPERATION May 21, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 21, 2024
OPERATION May 21, 2024 SET POINT ADJUSTED TO 0.07KG/CM2 MEJO May 21, 2024
OPERATION May 21, 2024 SET POINT ADJUSTED TO 0.07KG/CM2 MEJO May 21, 2024
OPERATION May 21, 2024 SCANNER ADJUSTED AND NORMAL MEJO May 21, 2024
OPERATION May 21, 2024 TO BE CHECKED BY DAY SHIFT MEJO ONGOING
OPERATION May 22, 2024 CONFIGURATION DONE AND NORMAL MEJO May 22, 2024
OPERATION May 22, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 22, 2024
OPERATION May 22, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 22, 2024
OPERATION May 23, 2024 READING FOUND AS ACTUAL MEJO May 23, 2024
OPERATION May 23, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 23, 2024
OPERATION May 23, 2024 FLUSHING, LINE UP AND NORMAL MEJO May 23, 2024
OPERATION May 23, 2024 RESET AND NORMAL MEJO May 23, 2024
OPERATION May 23, 2024 RESET AND NORMAL MEJO May 23, 2024
OPERATION May 23, 2024 RESET AND NORMAL MEJO May 23, 2024
OPERATION May 23, 2024 RESET AND NORMAL MEJO May 23, 2024
OPERATION May 23, 2024 RESET AND NORMAL MEJO May 23, 2024
OPERATION May 23, 2024 RESET AND NORMAL MEJO May 23, 2024
OPERATION May 23, 2024 RESET AND NORMAL MEJO May 23, 2024
OPERATION May 23, 2024 RESET AND NORMAL MEJO May 23, 2024
OPERATION May 24, 2024 SET POINT ADJUSTED TO 0.07KG/CM2 MEJO May 24, 2024
OPERATION May 24, 2024 READING CHECKED AND NORMAL MEJO May 24, 2024
OPERATION May 25, 2024 CALIBRATED AND NORMAL MEJO May 25, 2024
AS PER OPERATION REQUEST PCVSSET
OPERATION May 26, 2024 POINT HAS BEEN ADJUSTED SARFARAZ May 26, 2024
0.07KG/CM2)

OPERATION May 27, 2024 Flush out and Zero check SARFARAZ May 27, 2024

During trouble shooting found


OPERATION May 28, 2024 potentiometer not working SARFARAZ May 28, 2024
properly.installed new Metso positioner

Temperature element side cable loose.


OPERATION May 29, 2024 After cable tightness reading showing SARFARAZ May 29, 2024
normal confired by DCS operator

level gauge flush out and line up its


OPERATION May 31, 2024 reading is matching with level SARFARAZ May 31, 2024
transmitter
During troubleshooting found valve feed
response slow and position feedback
hunting.
New Metso positioner installed and
OPERATION June 04, 2024 SARFARAZ June 04, 2024
calibrated and stroke test with DCS
operator.
The activity has been carreid out
together with KR instrument team

Flush out and Zero check.


line up the transmitter.Readings are
OPERATION June 05, 2024 SARFARAZ June 05, 2024
showing correctly confirmed by DCS
Operator.

Flush out and Zero check.


line up the transmitter.Readings are
OPERATION June 05, 2024 SARFARAZ June 05, 2024
showing correctly confirmed by DCS
Operator.

AS PER OPERATION REQUEST PCVSSET


OPERATION June 05, 2024 POINT HAS BEEN ADJUSTED SARFARAZ June 05, 2024
0.08KG/CM2)
AS PER OPERATION REQUEST PCVSSET
OPERATION June 05, 2024 POINT HAS BEEN ADJUSTED SARFARAZ June 05, 2024
0.07KG/CM2)

During troubleshooting found valve was


stuck so,we directly connected the air
OPERATION June 12, 2024 supply to the actuator and successfully SARFARAZ June 12, 2024
open the valve as confirmed by the DCS
operator.

During troubleshooting found valve was


stuck so,we directly connected the air
OPERATION June 12, 2024 supply to the actuator and successfully SARFARAZ June 12, 2024
open the valve as confirmed by the DCS
operator.

As per operation request cable gland and


OPERATION June 12, 2024 SARFARAZ June 12, 2024
tube connection removed

Zero check and Naptha filling in


Condenset port LP side and line up the
OPERATION June 13, 2024 SARFARAZ June 13, 2024
transmitter.after that level gauge and
level transmitter reading is matching

As per operation request cable gland and


OPERATION June 13, 2024 SARFARAZ June 13, 2024
tube connection removed

Cable and gland and tube connection


OPERATION June 13, 2024 Connected and after that open and close SARFARAZ June 13, 2024
verify by the operation team
Adjust low pass filter and reading is
OPERATION June 17, 2024 showing normal as confirmed by DCS SARFARAZ June 17, 2024
Operator

Leak arrest and blind plug properly


OPERATION June 18, 2024 SARFARAZ June 18, 2024
installed