ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A Pre-Installation Inspection
Proceed with installation only after unsatisfactory conditions have been NEOM specs
A2
corrected. 092216 sec 3.1.B
REMARKS:
REFERENCE DOCUMENTS:
1- Manufacturer Recommendations
2- Approved Material Submittal & Method Statement
3- NEOM Specifications
Contractor NEOM
Construction Representative* PMC/ EPM Representative
T&I
Work is Complete and Ready for Inspection: QC Record Reviewed Work Verified
Witnessed