INSPECTION AND TEST PLAN FOR INSTALLATION & TESTING FOR ACOUSTIC FALSE CEILING & GYPSUM BOARD

FRAMING SYSTEMS

NEOM QUALITY MANAGEMENT SYSTEM EPM/PMC AECOM


NEOM QMS-PRO-00X-00X CONSTRUCTION OF PROJECT (ITP) FOR ACOUSTIC FALSE CEILING & GYPSUM BOARD
FRAMING SYSTEMS Contractor ALFANAR DEVELOPMENT & CONSTRUCTION

Rev.
Contract # No. 4800000765 Project HIGH DENSITY EXPANSION RESIDENTIAL UNITS AND CENTRAL AMENITIES ITP No.: 01 Date: 25/06/2024
No.:

Level of Participation Points


Controlling Document/ Acceptance
S No. Activity Phase Inspection / Test Method Remarks
Reference Standard Criteria NEOM ETSD
ALFANAR PMC/AECOM
Q&E

1 DOCUMENT REVIEW

Product Data Sheet, Evaluation Reports, Gypsum Board


1.1 Project specs 092216, sec 1.5, 1.6, 1.7 Client Apporved Submittals R/H R/H R/H
Framing mock-up

1.2 IFC / Approved Shop Drawing/Method Statement Contractual requirements IFC / Approved Shop Drawing R/H R/H R/H

2 MATERIAL RECEIVING INSPECTION

Framing System Material Receiving Inspection/Acoustic/False


2.1 Project Specification specs 092216, sec 2.1, 2.2, 2.3 Reference Standard/'NEIC-ARC-FRS-001 H W W
Ceiling

Handling, Storage and Preservation Inspection of Framing


2.2 Manufacturer Instructions Reference Standard H S S
System

3 INSTALLATION

3.1 Preparation /Framing System Pre-installation Inspection NEOM specs 092216, sec 3.1, 3.2, Specifcation 09 51 00 Reference Standard/NEIC-ARC-FRS-002 H H H

3.2 Framing System Installation Inspection NEOM specs 092216, sec 3.3, 3.4, 3.5 Reference Standard I H H

3.3 Suspended Ceiling Installation & Final Inspection NEOM specs 092216, sec 3.3, 3.4, 3.5 Reference Standard I W W

4 Documentation

4.1 All Records, Quality Verifying Documents on file QC Dossiier R/H R/H R/H

Sub-Contractor (If Applicable) Main Contractor NEOM (PMC/EPM) NEOM (ETSD Q & E)

Name: Name: Name: Name:

Signature: Signature: Signature: Signature:

Date: Date: Date: Date:

GENERAL NOTES:
1) The first (3) of each inspection or testing activities listed require 100% participation of client site inspection personnel. After this period, client inspection may adjust the level of it's participation based on the contractor's performance.
2) Hold: QA/QC team shall be notified of the schedule of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC Team/Client representative in attendance.
3) Review: Required qualification/certification/reports shall be submitted for the QA/QC team review and approval.
4) Witness: QA/QC team shall be notified of the schedule of inspection or test in advance. If the QA/QC Team/Client representative doesn’t come on time for inspection, the activity can proceed.
5) Surveillance: QA/QC team to monitor work in progress without notice from the construction organization/Random check selection.
6) Once NEOM has issued an acceptance of the ITP, CONTRACTOR shall not deviate from the requirements in it, unless prior written approval is received from NEOM. The acceptance of this ITP shall not release CONTRACTOR from any other obligations contained in the Schedule "Q", or any other Contractual Obligation.

Legend:

H Hold point for NEOM/ EPM/QC inspection/ test R Review of Documents S Surveillance

Witness Inspection / Test


W RH Review and Approval of Documents I 100% Contractor Inspection

DOCUMENT CODE : NEOM- NEN - SOP - 008_ FRM11 REVISION CODE: 01.00