PRODUCTION SUMMARY: PROJECT NAME-DV31 ATELP & PLANT CODE-1065

November Month Production

Month M-10 PCC Flyash M-15 PCC Flyash M-15 PCC M-20 Flyash M-25 RCC M-25 RCC Flyash M-30 RCC M-30 RCC Flyash M-35 RCC M-35 RCC Flyash M-35 Pile M-35 Pile Flyash M-40 RCC M-40 RCC M-45 RCC M-45 RCC Flyash M-50PSC M-50 PSC Flyash
Flyash
UNIT M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3
Code 2500000003 2500000005 2500000100 2500000006 2500000020 2500000104 2500000010 2500000102 2500000011 2500000109 2500000105 2500000021 2500000012 2500000130 2500000221 2500000013 2500000172 2500000248
11/1/2021 2.5 95 5.75 5.75 39.5
11/2/2021 3.5 92 54.50
11/3/2021 62 15.75 105.00
11/4/2021
11/5/2021 156 28.5 5.75 44.5
11/6/2021 5 6 31 8.50
11/7/2021 62 2.25
11/8/2021 10 156 59.5
11/9/2021 20 75 62 33.50 6
11/10/2021 85 7.00 37.5
11/11/2021 85.5 3.75 44.5
11/12/2021 10.5 85 5.00
11/13/2021 1.50 169.5 11.00
11/14/2021 6 83 7.00 105.75
11/15/2021 8 8.50 90.5 3.25 31.5
11/16/2021 1.50 101.5 28.25
11/17/2021 13.5 7.00 145 2
11/18/2021 12 7.00 2.5 87.5 33 106.50
11/19/2021 9.5 113 12.50 88.5
11/20/2021 5.5 116 46 68 54
11/21/2021 89 63 31.00
11/22/2021 20 84 6.50
11/23/2021 17 145 5.00
11/24/2021 6.5 118.5 10.50
11/25/2021 9.5 4.00 60 10.50
11/26/2021 5.5 58.5 5.50 8.50
11/27/2021 146 38 13.50
11/28/2021 126.5 95.5
11/29/2021 25.5 155 27 6.5
11/30/2021 9 150 117.5 13.00
TOTAL Nov-21 0 173.5 0 0 0 29.5 25.5 0 0 1062 0 2460.5 125.75 172.25 0 395 8.5 430.75
Name of Work :- Construction of Eight lane access controlled expressway starting from junction with SH-63 near Pratap Nagar village and ending at junction with NE-1 near Dodka village of Vadodara District (Ch-
824+920 to 844+382 , Design Ch-372+500 to 391+962) section Delhi -Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the state of Gujrat. (Package-31)

Batching Plant Production & Material Consumption Report (Updated)


Batching Plant Location - Lamdapura Camp Productio Productio
12/8/2021
Total
n from n from Production Consumption of Materials
Grade of Batching Batching Quantity of
Sl. No Date Location/ Chainage Side Structure Part of Structure Cement Flyash 20 MM 10 MM N. Sand Admixture Remarks
Concrete Plant -1 Plant -2 Concrete (MT) (MT) Agg. (MT) Agg. (MT) (MT) (kg)
(M³) (M³) (M3)
1 1-Mar-21 Lamdapura Camp Gantry FoundatiPCC M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 0.000

Abutment wall 2nd lift


2 1-Mar-21 Lamdapura Camp Casting Yard M35 (RCC) 2.5 0.950 0.000 1.797 1.185 1.978 0.000
anchoring end

PCC for Abt cap


3 2-Mar-21 Lamdapura Camp Casting Yard M15 (PCC) 5.5 1.430 0.000 4.180 2.756 4.598 0.000
stressing end

4 2-Mar-21 Lamdapura Camp Casting Yard Longitudinal bed PCC M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 0.000

5 3-Mar-21 Lamdapura Camp Casting Yard Longitudinal bed-2 M40 7.5 3.000 0.000 5.273 3.450 5.850 0.000

6 3-Mar-21 Lamdapura Camp Batching plant siSilo column final lift M25 3.0 1.020 0.000 2.208 1.455 2.427 0.000

7 3-Mar-21 Lamdapura Camp Weigh bridge Weigh bridge column M25 2.5 0.850 0.000 1.840 1.213 2.023 0.000

Longitudinal bed
8 4-Mar-21 Lamdapura Camp Casting Yard M40 1.0 0.400 0.000 0.703 0.460 0.780 0.000
Pedestal

9 4-Mar-21 Lamdapura Camp Casting Yard Longitudinal bed PCC M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 0.000

10 4-Mar-21 Lamdapura Camp Junior Mess PCC M15 (PCC) 5.0 1.300 0.000 3.800 2.505 4.180 0.000

Weigh bridge romm


11 4-Mar-21 Lamdapura Camp Weigh bridge M15 (PCC) 1.0 0.260 0.000 0.760 0.501 0.836 0.000
pcc
12 5-Mar-21 Lamdapura Camp Casting Yard Longitudinal bed-1 M40 10.0 4.000 0.000 7.030 4.600 7.800 32.000
Concrete cube
13 5-Mar-21 Lamdapura Camp Concrete cube block M15 (PCC) 7.0 1.820 0.000 5.320 3.507 5.852 14.560
block
14 6-Mar-21 Lamdapura Camp Casting Yard Longitudinal bed-1 M40 1.0 0.400 0.000 0.703 0.460 0.780 3.200
Abutment Cap
15 6-Mar-21 Lamdapura Camp Casting Yard M35 (RCC) 26.0 9.880 0.000 18.694 12.324 20.566 83.980
stressing end
16 6-Mar-21 Lamdapura Camp Casting yard PCC for Gantry bed M15 (PCC) 6.0 1.560 0.000 4.560 3.006 5.016 12.480
Concrete cube
17 6-Mar-21 Lamdapura Camp Concrete cube block M15 (PCC) 7.0 1.820 0.000 5.320 3.507 5.852 14.560
block
18 7-Mar-21 374+564 ROB Test Pile M35 (Pile) 3.5 1.418 0.000 2.447 1.614 2.692 17.010
19 8-Mar-21 Lamdapura Camp Casting Yard Longitudinal bed-1 M40 10.0 4.000 0.000 7.030 4.600 7.800 32.000
Abutment cap
20 8-Mar-21 Lamdapura Camp Casting Yard M35 (RCC) 25.5 9.690 0.000 18.335 12.087 20.171 82.365
anchoring end
PCC for Gantry bed
21 8-Mar-21 Lamdapura Camp Casting yard M15 (PCC) 3.0 0.780 0.000 2.280 1.503 2.508 6.240
(Longitudinal bed-1)
PCC for Gantry drain
22 9-Mar-21 Lamdapura Camp Casting yard M15 (PCC) 0.5 0.130 0.000 0.380 0.251 0.418 1.040
(Longitudinal bed-1)
Longitudinal bed-1
23 10-Mar-21 Lamdapura Camp Casting Yard M40 1.0 0.400 0.000 0.703 0.460 0.780 3.200
pedestal
Abutment cap 1st lift
24 10-Mar-21 Lamdapura Camp Casting Yard M35 (RCC) 6.5 2.470 0.000 4.674 3.081 5.142 20.995
end
PCC for Gantry bed
25 10-Mar-21 Lamdapura Camp Casting yard M15 (PCC) 4.0 1.040 0.000 3.040 2.004 3.344 8.320
(Longitudinal bed-1)
Longitudinal bed-2
26 11-Mar-21 Lamdapura Camp Casting Yard M40 10.0 4.000 0.000 7.030 4.600 7.800 32.000
Stressing end
Abutment cap-2
27 11-Mar-21 Lamdapura Camp Casting Yard M35 (RCC) 25.0 9.500 0.000 17.975 11.850 19.775 80.750
Stressing end
PCC for Gantry bed
28 11-Mar-21 Lamdapura Camp Casting yard M15 (PCC) 4.0 1.040 0.000 3.040 2.004 3.344 8.320
(Longitudinal bed-1)

29 12-Mar-21 Lamdapura Camp Casting yard PCC for Junior Quarter M15 (PCC) 12.0 3.120 0.000 9.120 6.012 10.032 24.960

Longitudinal bed-2
30 13-Mar-21 Lamdapura Camp Casting Yard M40 14.0 5.600 0.000 9.842 6.440 10.920 44.800
Stressing end
Abutment cap-2
31 13-Mar-21 Lamdapura Camp Casting Yard M35 (RCC) 27.0 10.260 0.000 19.413 12.798 21.357 87.210
Anchoring end
PCC for Jr Quarter &
32 13-Mar-21 Lamdapura Camp Jr. Quarter M15 (PCC) 8.5 2.210 0.000 6.460 4.259 7.106 17.680
Bathroom

Batching plant PCC for Air


33 14-Mar-21 Lamdapura Camp M15 (PCC) 0.5 0.130 0.000 0.380 0.251 0.418 1.040
silo foundation compressor(Silo)

Longitudinal bed-3
34 15-Mar-21 Lamdapura Camp Casting Yard M40 21.0 8.400 0.000 14.763 9.660 16.380 67.200
Stressing end
Longitudinal bed
35 15-Mar-21 Lamdapura Camp Casting Yard M40 1.5 0.600 0.000 1.055 0.690 1.170 4.800
Pedestal
PCC for Longitudinal
36 15-Mar-21 Lamdapura Camp Jr. Quarter M15 (PCC) 5.5 1.430 0.000 4.180 2.756 4.598 11.440
bed-1
Longitudinal bed-3
37 16-Mar-21 Lamdapura Camp Casting Yard M40 10.0 4.000 0.000 7.030 4.600 7.800 32.000
Stressing end
Longitudinal bed-2
38 16-Mar-21 Lamdapura Camp Casting Yard M40 1.5 0.600 0.000 1.055 0.690 1.170 4.800
Pedestal
39 17-Mar-21 Lamdapura Camp Casting Yard Longitudinal bed-3 M40 15.0 6.000 0.000 10.545 6.900 11.700 48.000
Tie member
40 17-Mar-21 Lamdapura Camp Casting Yard Longitudinal bed-1 & M40 2.5 1.000 0.000 1.757 1.150 1.950 8.000
2 anchoring end
Abutment cap-1 1st
41 17-Mar-21 Lamdapura Camp Casting Yard lift anchoring end & M35 (RCC) 7.5 2.850 0.000 5.393 3.555 5.933 24.225
Abt Wall
42 17-Mar-21 Lamdapura Camp Casting yard Raft for Gantry wall M25 6.0 2.040 0.000 4.416 2.910 4.854 17.340

Batching Plant Batching Plant


43 17-Mar-21 Lamdapura Camp M15 (PCC) 0.5 0.130 0.000 0.380 0.251 0.418 1.040
foundation foundation (PCC)

Abutment cap-3
44 18-Mar-21 Lamdapura Camp Casting Yard M35 (RCC) 29.0 11.020 0.000 20.851 13.746 22.939 93.670
stressing end

Abutment cap-1, 2nd


45 18-Mar-21 Lamdapura Camp Casting Yard M35 (RCC) 1.5 0.570 0.000 1.079 0.711 1.187 4.845
lift anchoring end

46 18-Mar-21 Lamdapura Camp Casting yard Raft for Gantry wall M25 6.0 2.040 0.000 4.416 2.910 4.854 17.340
47 18-Mar-21 Lamdapura Camp Casting yard PCC for LG bed -1 & 2 M15 (PCC) 3.5 0.910 0.000 2.660 1.754 2.926 7.280

Camp PCC for Septic tank of


48 18-Mar-21 Lamdapura Camp M15 (PCC) 5.0 1.300 0.000 3.800 2.505 4.180 10.400
Construction Office
Abutment cap-2 1st
49 19-Mar-21 Lamdapura Camp Casting Yard M35 (RCC) 6.0 2.280 0.000 4.314 2.844 4.746 19.380
lift stressing end

50 19-Mar-21 Lamdapura Camp Casting yard PCC for LG bed -1 & 2 M15 (PCC) 3.0 0.780 0.000 2.280 1.503 2.508 6.240
51 19-Mar-21 Lamdapura Camp Casting yard PCC for LG bed - 3 M15 (PCC) 3.5 0.910 0.000 2.660 1.754 2.926 7.280
52 19-Mar-21 Lamdapura Camp Casting yard PCC for LG bed - 4 M15 (PCC) 5.0 1.300 0.000 3.800 2.505 4.180 10.400
53 19-Mar-21 Lamdapura Camp Casting yard PCC for Gantry wall M15 (PCC) 4.0 1.040 0.000 3.040 2.004 3.344 8.320
Longitudinal bed- 3
54 19-Mar-21 Lamdapura Camp Casting Yard M40 2.0 0.800 0.000 1.406 0.920 1.560 6.400
pedestal
Longitudinal bed
55 20-Mar-21 Lamdapura Camp Casting Yard M40 0.5 0.200 0.000 0.352 0.230 0.390 1.600
Pedestal
56 20-Mar-21 Lamdapura Camp Casting yard Raft for Gantry wall M25 6.0 2.040 0.000 4.416 2.910 4.854 17.340
Weigh bridge
57 20-Mar-21 Lamdapura Camp Weigh bridge M25 5.5 1.870 0.000 4.048 2.668 4.450 15.895
retaining wall
PCC for LG bed 4 & LG
58 20-Mar-21 Lamdapura Camp Casting yard bed 1&2 middle floor M15 (PCC) 6.0 1.560 0.000 4.560 3.006 5.016 12.480
PCC

59 20-Mar-21 Lamdapura Camp Casting yard PCC for gantry rail line M15 (PCC) 0.5 0.130 0.000 0.380 0.251 0.418 1.040

Longitudinal bed-3
60 21-Mar-21 Lamdapura Camp Casting Yard M40 1.0 0.400 0.000 0.703 0.460 0.780 3.200
Pedestal
PCC for LG bed 4 & LG
61 21-Mar-21 Lamdapura Camp Casting yard bed 1&2 middle floor M15 (PCC) 1.0 0.260 0.000 0.760 0.501 0.836 2.080
PCC

62 21-Mar-21 Lamdapura Camp Casting yard PCC for gantry rail line M15 (PCC) 3.5 0.910 0.000 2.660 1.754 2.926 7.280
63 23-Mar-21 Lamdapura Camp Casting Yard Longitudinal bed-3 M40 6.0 2.400 0.000 4.218 2.760 4.680 19.200
Abutment cap-2 1st
64 23-Mar-21 Lamdapura Camp Casting Yard M40 2.0 0.800 0.000 1.406 0.920 1.560 6.400
lift anchoring end
Abutment cap-2 1st
65 23-Mar-21 Lamdapura Camp Casting Yard M35 (RCC) 5.0 1.900 0.000 3.595 2.370 3.955 16.150
lift anchoring end
Abutment cap-2 2nd
66 23-Mar-21 Lamdapura Camp Casting Yard M35 (RCC) 1.5 0.570 0.000 1.079 0.711 1.187 4.845
lift stressing end
Raft for Gantry wall
67 23-Mar-21 Lamdapura Camp Casting yard M25 5.0 1.700 0.000 3.680 2.425 4.045 14.450
stressing end

PCC for longitudinal


68 23-Mar-21 Lamdapura Camp Casting yard M15 (PCC) 5.5 1.430 0.000 4.180 2.756 4.598 11.440
bed 1&2 middle floor

PCC for Longitudinal


69 23-Mar-21 Lamdapura Camp Casting yard M15 (PCC) 1.0 0.260 0.000 0.760 0.501 0.836 2.080
bed-4
70 24-Mar-21 Lamdapura Camp Casting Yard Longitudinal bed-3 M40 23.0 9.200 0.000 16.169 10.580 17.940 73.600
Abutment cap-2 2nd
71 24-Mar-21 Lamdapura Camp Casting Yard M35 (RCC) 1.5 0.570 0.000 1.079 0.711 1.187 4.845
lift anchoring end
72 24-Mar-21 Lamdapura Camp Casting yard Raft for Gantry wall M25 5.0 1.700 0.000 3.680 2.425 4.045 14.450
73 24-Mar-21 Lamdapura Camp Casting yard Raft for Gantry wall M25 4.5 1.530 0.000 3.312 2.183 3.641 13.005
Abutment cap- 3
74 25-Mar-21 Lamdapura Camp Casting Yard M35 (RCC) 27.5 10.450 0.000 19.773 13.035 21.753 88.825
anchoring end

PCC for longitudinal


75 25-Mar-21 Lamdapura Camp Casting yard M15 (PCC) 6.0 1.560 0.000 4.560 3.006 5.016 12.480
bed 1&2 middle floor

76 26-Mar-21 Lamdapura Camp Casting Yard Longitudinal bed-3 M40 20.5 8.200 0.000 14.411 9.430 15.990 65.600
Pedestal Longitudinal
77 26-Mar-21 Lamdapura Camp Casting Yard M40 1.5 0.600 0.000 1.055 0.690 1.170 4.800
bed-3
Raft for Gantry wall
78 26-Mar-21 Lamdapura Camp Casting yard M25 6.0 2.040 0.000 4.416 2.910 4.854 17.340
RHS
79 26-Mar-21 Lamdapura Camp Casting yard PCC for Abt Cap -4 M15 (PCC) 1.5 0.390 0.000 1.140 0.752 1.254 3.120
Anchor Pile-1 near
80 27-Mar-21 383+916 MJB M35 (Pile) 38.0 15.390 0.000 26.562 17.518 29.222 152.000
Test Pile

81 27-Mar-21 Lamdapura Camp Casting yard Wall Gantry rail line M25 2.5 0.850 0.000 1.840 1.213 2.023 7.225

PCC for longitudinal


82 27-Mar-21 Lamdapura Camp Casting yard M15 (PCC) 5.0 1.300 0.000 3.800 2.505 4.180 10.400
bed 1&2 middle floor

Raft & wall for Gantry


83 31-Mar-21 Lamdapura Camp Casting yard M25 4.0 1.360 0.000 2.944 1.940 3.236 11.560
rail line

PCC for longitudinal


84 31-Mar-21 Lamdapura Camp Casting yard M15 (PCC) 6.0 1.560 0.000 4.560 3.006 5.016 12.480
bed 1&2 middle floor

PCC for Gantry wall &


85 31-Mar-21 Lamdapura Camp Casting yard longitudinal bed 1 M15 (PCC) 5.0 1.300 0.000 3.800 2.505 4.180 10.400
middle floor
Pedestal for
86 1-Apr-21 Lamdapura Camp Casting Yard M40 1.5 0.600 0.000 1.055 0.690 1.170 4.800
Longitudinal bed-3
Abutment cap-3 1st
87 1-Apr-21 Lamdapura Camp Casting Yard lift anchoring end & M35 (RCC) 13.0 4.940 0.000 9.347 6.162 10.283 41.990
Stressing end
88 1-Apr-21 Lamdapura Camp Casting yard Raft for Gantry wall M25 6.0 2.040 0.000 4.416 2.910 4.854 17.340
89 2-Apr-21 Lamdapura Camp Casting Yard Longitudinal bed-4 M40 12.0 4.800 0.000 8.436 5.520 9.360 38.400
Abutment cap-4
90 2-Apr-21 Lamdapura Camp Casting Yard M35 (RCC) 29.0 11.020 0.000 20.851 13.746 22.939 93.670
stressing end

91 Anchor Pile-2 for Test M35 (Pile) 34.5 13.973 0.000 24.115 15.905 26.531 167.670
2-Apr-21 383+916 MJB
Pile
92 3-Apr-21 Lamdapura Camp Casting Yard Longitudinal bed-4 M40 10.0 4.000 0.000 7.030 4.600 7.800 32.000
Abutment cap-4
93 3-Apr-21 Lamdapura Camp Casting Yard M35 (RCC) 29.0 11.020 0.000 20.851 13.746 22.939 93.670
stressing end

PCC for longitudinal


94 3-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 3.0 0.780 0.000 2.280 1.503 2.508 6.240
bed 1&2 middle floor

95 4-Apr-21 Lamdapura Camp Casting Yard Longitudinal bed-4 M40 6.0 2.400 0.000 4.218 2.760 4.680 19.200
Raft for Gantry wall
96 4-Apr-21 Lamdapura Camp Casting yard M25 5.0 1.700 0.000 3.680 2.425 4.045 14.450
stacking yard end
Abutment cap-3 2nd
97 4-Apr-21 Lamdapura Camp Casting Yard M35 (RCC) 1.5 0.570 0.000 1.079 0.711 1.187 4.845
lift anchoring end
98 4-Apr-21 Lamdapura Camp Casting yard PCC for Gantry raft M15 (PCC) 2.5 0.650 0.000 1.900 1.253 2.090 5.200
99 5-Apr-21 Lamdapura Camp Casting Yard Longitudinal bed-4 M40 12.0 4.800 0.000 8.436 5.520 9.360 38.400

Longitudinal bed-2&3
100 5-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 8.5 2.210 0.000 6.460 4.259 7.106 17.680
middle floor PCC

101 5-Apr-21 384+570 MJB Pile No-9 at RP-1 M35 (Pile) 26.5 10.733 0.000 18.524 12.217 20.379 128.790
102 6-Apr-21 Lamdapura Camp Casting Yard Longitudinal bed-4 M40 11.0 4.400 0.000 7.733 5.060 8.580 35.200

Longitudinal bed-2&3
103 6-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 8.0 2.080 0.000 6.080 4.008 6.688 16.640
middle floor PCC

Raft for Gantry wall


104 6-Apr-21 Lamdapura Camp Casting yard M25 12.0 4.080 0.000 8.832 5.820 9.708 34.680
stacking yard end
Abutment cap-3
105 6-Apr-21 Lamdapura Camp Casting Yard anchor block and tie M35 (RCC) 5.75 2.185 0.000 4.134 2.726 4.548 18.573
member bed 2&3
106 7-Apr-21 384+570 MJB Pile No-10 of RP-1 M35 (Pile) 26.5 10.733 0.000 18.524 12.217 20.379 128.790

Longitudinal bed-2&3
107 8-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 11.0 2.860 0.000 8.360 5.511 9.196 22.880
middle floor PCC

108 8-Apr-21 Lamdapura Camp Casting yard PCC for Gantry Wall M15 (PCC) 3.0 0.780 0.000 2.280 1.503 2.508 6.240
Gantry wall stacking
109 8-Apr-21 Lamdapura Camp Casting yard M25 4.0 1.360 0.000 2.944 1.940 3.236 11.560
yard end
110 Anchor Pile-3, near M35 (Pile) 36.0 14.580 0.000 25.164 16.596 27.684 174.960
8-Apr-21 383+916 MJB
test pile
Longitudinal bed- 4
111 9-Apr-21 Lamdapura Camp Casting Yard M40 1.5 0.600 0.000 1.055 0.690 1.170 4.800
Pedesta
Abutment cap-4 1st
112 9-Apr-21 Lamdapura Camp Casting Yard M35 (RCC) 6.25 2.375 0.000 4.494 2.963 4.944 20.188
lift Stressing end
113 9-Apr-21 384+570 MJB Pile no-10 for LP1 M35 (Pile) 29.0 11.745 0.000 20.271 13.369 22.301 140.940
114 12-Apr-21 Lamdapura Camp Casting yard PCC for Gantry wall M15 (PCC) 4.0 1.040 0.000 3.040 2.004 3.344 7.200
Raft for Gantry wall
115 12-Apr-21 Lamdapura Camp Casting yard M25 0.5 0.170 0.000 0.368 0.243 0.405 0.725
stacking yard end
116 12-Apr-21 384+570 LHS MJB Pile no-09 at LP1 M35 (Pile) 24.0 9.720 0.000 16.776 11.064 18.456 54.000
117 Anchor pile-4 for test M35 (Pile) 36.0 14.580 0.000 25.164 16.596 27.684 81.000
12-Apr-21 383+916 MJB
pile
118 13-Apr-21 Lamdapura Camp Casting yard PCC for Gantry wall M15 (PCC) 6.0 1.560 0.000 4.560 3.006 5.016 10.800
Gantry wall stacking
119 13-Apr-21 Lamdapura Camp Casting yard M25 6.0 2.040 0.000 4.416 2.910 4.854 8.700
yard end
120 13-Apr-21 384+570 RHS MJB Pile no-07 at RP1 M35 (Pile) 26.0 10.530 0.000 18.174 11.986 19.994 58.500

Longitudinal bed-2&3
121 14-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 3.0 0.780 0.000 2.280 1.503 2.508 5.400
middle floor PCC

Stressing end approch


122 14-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 1.0 0.260 0.000 0.760 0.501 0.836 1.800
PCC
Anchoring end
123 14-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 3.0 0.780 0.000 2.280 1.503 2.508 5.400
approch PCC
Abutment cap-4 2nd
124 14-Apr-21 Lamdapura Camp Casting Yard M35 (RCC) 1.50 0.570 0.000 1.079 0.711 1.187 4.845
lift Stressing end
Abutment cap-4 1st
125 14-Apr-21 Lamdapura Camp Casting Yard M35 (RCC) 6.00 2.280 0.000 4.314 2.844 4.746 19.380
lift Anchoring end
Pedestal (Longitudinal
126 14-Apr-21 Lamdapura Camp Casting Yard M40 1.5 0.600 0.000 1.055 0.690 1.170 4.800
bed-4)

Longitudinal bed-2&3
127 15-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 4.160
middle floor PCC

128 15-Apr-21 Lamdapura Camp Casting yard Raft for Gantry Wall M25 5.0 1.700 0.000 3.680 2.425 4.045 14.450
129 15-Apr-21 384+570 LHS MJB Pile no-08 at LP1 M35 (Pile) 29.0 11.745 0.000 20.271 13.369 22.301 116.000
Longitudinal bed-4
130 16-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 3.0 0.780 0.000 2.280 1.503 2.508 6.240
middle floor PCC
131 16-Apr-21 Lamdapura Camp Casting yard Gantry Wall Raft M15 (PCC) 1.0 0.260 0.000 0.760 0.501 0.836 2.080
132 16-Apr-21 Lamdapura Camp Casting Yard Tie Beam M35 (RCC) 5.00 1.900 0.000 3.595 2.370 3.955 16.150
133 16-Apr-21 384+570 RHS MJB Pile no-08 at RP1 M35 (Pile) 28.5 11.543 0.000 19.921 13.139 21.917 114.000
134 17-Apr-21 Lamdapura Camp Casting yard Rebar Cage M15 (PCC) 1.5 0.390 0.000 1.140 0.752 1.254 3.120
135 17-Apr-21 Lamdapura Camp Casting yard Rebar Cage M15 (PCC) 1.0 0.260 0.000 0.760 0.501 0.836 2.080
136 17-Apr-21 Lamdapura Camp Casting yard Rebar Cage M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 4.160
137 17-Apr-21 Lamdapura Camp Casting yard Rebar Cage M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 4.160
138 17-Apr-21 Lamdapura Camp Casting yard Gantry Raft M25 2.5 0.850 0.000 1.840 1.213 2.023 7.225
139 17-Apr-21 Lamdapura Camp Casting yard Gantry Raft M25 6.0 2.040 0.000 4.416 2.910 4.854 17.340
140 18-Apr-21 Lamdapura Camp Casting yard Rebar Cage M15 (PCC) 1.5 0.390 0.000 1.140 0.752 1.254 3.120
141 18-Apr-21 Lamdapura Camp Casting yard Rebar Cage M15 (PCC) 3.0 0.780 0.000 2.280 1.503 2.508 6.240
Office Side Septic
142 18-Apr-21 Lamdapura Camp Casting yard M25 3.0 1.020 0.000 2.208 1.455 2.427 8.670
Tank Slab
143 18-Apr-21 384+570 LHS MJB Pile no-05 at LA2 M35 (Pile) 31.5 12.758 0.000 22.019 14.522 24.224 126.000
144 19-Apr-21 384+570 RHS MJB Pile no-03 at RP1 M35 (Pile) 28.0 11.340 0.000 19.572 12.908 21.532 112.000
145 19-Apr-21 Lamdapura Camp Casting yard Rebar Cage M15 (PCC) 3.0 0.780 0.000 2.280 1.503 2.508 6.240
146 19-Apr-21 Lamdapura Camp Casting yard Rebar Cage M15 (PCC) 4.0 1.040 0.000 3.040 2.004 3.344 8.320
147 19-Apr-21 Lamdapura Camp Casting yard Rebar Cage M15 (PCC) 4.0 1.040 0.000 3.040 2.004 3.344 8.320
148 19-Apr-21 383+916 LHS MJB Pile no-08 at LP6 M35 (Pile) 28.0 11.340 0.000 19.572 12.908 21.532 112.000
Pedestal (Longitudinal
149 20-Apr-21 Lamdapura Camp Casting Yard M40 2.5 1.000 0.000 1.757 1.150 1.950 8.000
bed-4)
150 20-Apr-21 Lamdapura Camp Casting yard Rebar Cage M15 (PCC) 3.0 0.780 0.000 2.280 1.503 2.508 6.240
151 20-Apr-21 Lamdapura Camp Casting yard Rebar Cage M15 (PCC) 1.0 0.260 0.000 0.760 0.501 0.836 2.080
152 20-Apr-21 Lamdapura Camp Casting Yard Tie Beam M35 (RCC) 3.00 1.140 0.000 2.157 1.422 2.373 9.690
153 20-Apr-21 Lamdapura Camp Casting yard Gantry Wall Raft M25 4.0 1.360 0.000 2.944 1.940 3.236 11.560
154 20-Apr-21 Lamdapura Camp Casting Yard Tie Beam M35 (RCC) 1.00 0.380 0.000 0.719 0.474 0.791 3.230
155 21-Apr-21 Lamdapura Camp Casting yard LHS Gantry Wall M25 3.0 1.020 0.000 2.208 1.455 2.427 8.670
156 21-Apr-21 Lamdapura Camp Casting yard RHS Gantry Wall M25 1.0 0.340 0.000 0.736 0.485 0.809 2.890
157 21-Apr-21 384+570 LHS MJB Pile no-07 at LP1 M35 (Pile) 30.0 12.150 0.000 20.970 13.830 23.070 120.000
158 21-Apr-21 Lamdapura Camp Casting yard Tower foundation M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 4.160
159 21-Apr-21 384+570 RHS MJB Pile no-04 at RP1 M35 (Pile) 26.0 10.530 0.000 18.174 11.986 19.994 104.000
RHS Gantry Wall
160 22-Apr-21 Lamdapura Camp Casting yard M25 2.0 0.680 0.000 1.472 0.970 1.618 5.780
Shaft
161 23-Apr-21 Lamdapura Camp Casting yard RHS Gantry Wall M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 4.160
162 23-Apr-21 383+916 LHS MJB Pile no-08 at LP6 M35 (Pile) 30.0 12.150 0.000 20.970 13.830 23.070 120.000
163 23-Apr-21 383+916 LHS MJB Pile no-02 at LP6 M35 (Pile) 29.5 11.948 0.000 20.621 13.600 22.686 118.000
164 24-Apr-21 Lamdapura Camp Casting yard RHS Gantry Wall Raft M25 5.0 1.700 0.000 3.680 2.425 4.045 14.450
165 24-Apr-21 384+570 RHS MJB Pile no-05 at RP1 M35 (Pile) 27.5 11.138 0.000 19.223 12.678 21.148 110.000
166 25-Apr-21 384+570 RHS MJB Pile no-04 at RA1 M35 (Pile) 28.0 11.340 0.000 19.572 12.908 21.532 112.000
167 25-Apr-21 383+916 LHS MJB Pile no-03 at LP6 M35 (Pile) 28.0 11.340 0.000 19.572 12.908 21.532 112.000
Foundation of
168 26-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 1.0 0.260 0.000 0.760 0.501 0.836 2.080
Transformer
LG Bed -3&4 Middle
169 26-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 3.0 0.780 0.000 2.280 1.503 2.508 6.240
Floor PCC
LG Bed -3&4 Middle
170 26-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 4.0 1.040 0.000 3.040 2.004 3.344 8.320
Floor PCC
171 27-Apr-21 384+570 LHS MJB Pile no-07 at LA2 M35 (Pile) 31.0 12.555 0.000 21.669 14.291 23.839 124.000
172 27-Apr-21 Lamdapura Camp Casting yard RHS Gantry Wall Raft M25 3.5 1.190 0.000 2.576 1.698 2.832 10.115
173 28-Apr-21 384+570 RHS MJB Pile no-01 at RP1 M35 (Pile) 28.5 11.543 0.000 19.921 13.139 21.917 114.000
RHS Gantry Wall
174 28-Apr-21 Lamdapura Camp Casting yard M25 4.0 1.360 0.000 2.944 1.940 3.236 11.560
Shaft
175 28-Apr-21 Lamdapura Camp Casting Yard Tie Beam M35 (RCC) 1.50 0.570 0.000 1.079 0.711 1.187 4.845
LG Bed -3&4 Middle
176 28-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 4.160
Floor PCC
LG Bed -3&4 Middle
177 28-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 3.0 0.780 0.000 2.280 1.503 2.508 6.240
Floor PCC
178 28-Apr-21 Lamdapura Camp Casting yard Gantry Wall RHS M15 (PCC) 1.5 0.390 0.000 1.140 0.752 1.254 3.120
LG Bed -3&4 Middle
179 28-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 4.160
Floor PCC
180 28-Apr-21 384+570 LHS MJB Pile no-03 at LP1 M35 (Pile) 30.0 12.150 0.000 20.970 13.830 23.070 120.000
181 LG Bed -3&4 Middle M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 4.160
29-Apr-21 Lamdapura Camp Casting yard
Floor PCC
LG Bed -3&4 Middle
182 29-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 4.160
Floor PCC
183 30-Apr-21 383+916 LHS MJB Pile no-09 of LP6 M35 (Pile) 29.0 11.745 0.000 20.271 13.369 22.301 116.000
184 30-Apr-21 384+570 LHS MJB Pile no-02 of LP1 M35 (Pile) 29.5 10.384 2.596 20.296 13.393 20.562 129.800
LG Bed -3&4 Middle
185 30-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 3.5 0.788 0.280 2.653 1.750 2.688 10.150
Floor PCC
186 30-Apr-21 383+916 LHS MJB Pile no-04 of LP6 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
RHS Gantry Wall
187 1-May-21 Lamdapura Camp Casting yard M25 3.5 1.015 0.354 2.531 1.670 2.562 13.003
Shaft
188 1-May-21 384+570 RHS MJB Pile no-02 at RP1 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
RHS Gantry Wall
189 2-May-21 Lamdapura Camp Casting yard M25 1.5 0.435 0.152 1.085 0.716 1.098 5.573
Shaft
190 3-May-21 383+916 LHS MJB Pile no-02 at LP6 M35 (Pile) 31.0 10.912 2.728 21.328 14.074 21.607 136.400
191 3-May-21 Lamdapura Camp Casting yard RHS Gantry Wall Raft M25 6.0 1.740 0.606 4.338 2.862 4.392 22.290

PCC Flooring of LG
192 3-May-21 Lamdapura Camp Casting yard M15 (PCC) 3.0 0.675 0.240 2.274 1.500 2.304 8.670
Bed 3
193 4-May-21 388+594 LHS MJB Pile no-02 at LP3 M35 (Pile) 31.5 11.088 2.772 21.672 14.301 21.955 138.600
PCC Flooring of LG
194 5-May-21 Lamdapura Camp Casting yard M15 (PCC) 3.0 0.675 0.240 2.274 1.500 2.304 8.670
Bed 4
Office Parking Area
195 5-May-21 Lamdapura Camp Camp Office M15 (PCC) 1.0 0.225 0.080 0.758 0.500 0.768 2.890
PCC
196 5-May-21 388+594 LHS MJB Pile no-09 at LP1 M35 (Pile) 34.0 11.968 2.992 23.392 15.436 23.698 149.600
LHS Gantry Wall
197 5-May-21 Lamdapura Camp Casting yard M25 3.0 0.870 0.303 2.169 1.431 2.196 11.145
Shaft
PCC Flooring of LG
198 6-May-21 Lamdapura Camp Casting yard M15 (PCC) 3.0 0.675 0.240 2.274 1.500 2.304 8.670
Bed 4
PCC Flooring of LG
199 7-May-21 Lamdapura Camp Casting yard M15 (PCC) 2.0 0.450 0.160 1.516 1.000 1.536 5.780
Bed 4
200 7-May-21 388+594 LHS MJB Pile no-08 at LP1 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
PCC Flooring of LG
201 8-May-21 Lamdapura Camp Casting yard M15 (PCC) 5.0 1.125 0.400 3.790 2.500 3.840 14.450
Bed 4
202 8-May-21 384+570 LHS MJB Pile no-02 of LP1 M35 (Pile) 28.0 9.856 2.464 19.264 12.712 19.516 123.200
203 8-May-21 388+594 LHS MJB Pile no-01 of LP3 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
PCC Flooring of LG
204 9-May-21 Lamdapura Camp Casting yard M15 (PCC) 6.0 1.350 0.480 4.548 3.000 4.608 17.340
Bed 4
205 9-May-21 388+594 LHS MJB Pile no-03 of LP3 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
206 10-May-21 388+594 LHS MJB Pile no-02 of LP2 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
207 11-May-21 388+594 LHS MJB Pile no-08 of LP2 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
208 11-May-21 388+594 LHS MJB Pile no-03 of LP1 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
209 12-May-21 388+594 RHS MJB Pile no-08 of RP3 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
210 12-May-21 384+570 Girder No- 3&4 of M50 (PSC) 58.5 26.208 0.000 42.061 27.729 42.588 242.775
LHS MJB
LA1-LP1
211 13-May-21 388+594 LHS MJB Pile no-07 of LP1 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
212 13-May-21 388+594 LHS MJB Pile no-03 of LP2 M35 (Pile) 29.5 10.384 2.596 20.296 13.393 20.562 129.800
213 13-May-21 388+594 LHS MJB Pile no-07 of RP3 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
214 13-May-21 384+570 Girder No- 01 & 02 of M50 (PSC) 50.0 22.400 0.000 35.950 23.700 36.400 195.000
LHS MJB
LA1-LP1
215 14-May-21 388+594 LHS MJB Pile no-06 of LP1 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
216 15-May-21 Lamdapura Camp Batching Plant- Batching Plant-2
M25 2.5 0.725 0.253 1.807 1.193 1.830 9.288
2 Foundation Foundation
217 15-May-21 388+594 LHS MJB Pile no-09 of RP2 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
218 15-May-21 388+594 RHS MJB Pile no-04 of LP3 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
219 15-May-21 388+594 LHS MJB Pile no-06 of RP3 M35 (Pile) 29.0 11.745 0.000 20.271 13.369 22.301 65.250
220 17-May-21 388+594 LHS MJB Pile no-09 of LP2 M35 (Pile) 30.0 12.150 0.000 20.970 13.830 23.070 97.200
221 17-May-21 388+594 LHS MJB Pile no-04 of LP1 M35 (Pile) 30.0 12.150 0.000 20.970 13.830 23.070 97.200
222 17-May-21 374+937 MJB Test Pile M35 (Pile) 18.5 6.512 1.628 12.728 8.399 12.894 81.400
223 20-May-21 388+594 LHS MJB Pile no-08 of RP2 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
224 20-May-21 388+594 LHS MJB Pile no-09 of LP3 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
225 21-May-21 388+594 LHS MJB Pile no-05 of LP1 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
226 22-May-21 388+594 LHS MJB Pile no-05 of RP3 M35 (Pile) 32.5 11.440 2.860 22.360 14.755 22.653 143.000
227 22-May-21 388+594 LHS MJB Pile no-10 of LP2 M35 (Pile) 33.0 11.616 2.904 22.704 14.982 23.001 145.200
228 23-May-21 388+594 LHS MJB Pile no-06 of LP3 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
229 23-May-21 388+594 LHS MJB Pile no-07 of RP2 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
230 24-May-21 388+594 LHS MJB Pile no-02 of LP1 M35 (Pile) 32.5 11.440 2.860 22.360 14.755 22.653 143.000
231 24-May-21 388+594 LHS MJB Pile no-07 of LP2 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
232 24-May-21 388+594 RHS MJB Pile no-01 of RP3 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
233 24-May-21 388+594 RHS MJB Pile no-04 of RP2 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
234 24-May-21 384+570 Girder No- 05 & 06 of M50 (PSC) 50.5 22.624 0.000 36.310 23.937 36.764 237.350
LHS MJB
LA1-LP1
235 25-May-21 384+570 Girder No- 07 & 08 of M50 (PSC) 51.0 22.848 0.000 36.669 24.174 37.128 239.904
LHS MJB
LA1-LP1
236 26-May-21 383+934 LHS MJB Pile no-07 of LP6 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
237 26-May-21 388+594 LHS MJB Pile no-08 of LP3 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
238 26-May-21 388+594 LHS MJB Pile no-06 of LP2 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
239 26-May-21 388+594 RHS MJB Pile no-03 of RP2 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
240 26-May-21 388+594 LHS MJB Pile no-01 of LP1 M35 (Pile) 32.5 11.440 2.860 22.360 14.755 22.653 143.000
241 26-May-21 388+594 RHS MJB Pile no-02 of RP3 M35 (Pile) 26.0 9.152 2.288 17.888 11.804 18.122 114.400
242 27-May-21 388+594 LHS MJB Pile no-07 of LP3 M35 (Pile) 6.0 2.112 0.528 4.128 2.724 4.182 26.400
243 27-May-21 388+594 LHS MJB Pile no-04 of LP2 M35 (Pile) 4.5 1.584 0.396 3.096 2.043 3.137 19.800
244 27-May-21 384+570 LHS MJB Pile no-10 of RP1 M35 (Pile) 1.0 0.352 0.088 0.688 0.454 0.697 4.400
245 28-May-21 388+594 RHS MJB Pile no-04 of RP3 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
246 28-May-21 388+594 RHS MJB Pile no-10 of RP2 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
247 28-May-21 383+934 LHS MJB Pile no-06 of LP6 M35 (Pile) 30.5 10.736 2.684 20.984 13.847 21.258 134.200
248 29-May-21 388+594 LHS MJB Pile no-12 of LA2 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
249 29-May-21 388+594 LHS MJB Pile no-10 of LP3 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
250 29-May-21 Lamdapura Camp PCC for Girder M15 (PCC) 6.0 1.350 0.480 4.548 3.000 4.608 17.340
Casting yard
stacking yard
251 30-May-21 388+594 RHS MJB Pile no- 05 of RP2 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
252 30-May-21 388+594 LHS MJB Pile no- 05 of LP2 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
253 30-May-21 388+594 LHS MJB LP1 Pile cap PCC M15 (PCC) 9.0 2.025 0.720 6.822 4.500 6.912 26.010

254 30-May-21 Lamdapura Camp B. Plant-2, Silo PCC for Silo M15 (PCC) 4.5 1.013 0.360 3.411 2.250 3.456 13.005
Foundation Foundation

255 30-May-21 Lamdapura Camp Casting Yard PCC for Girder M15 (PCC) 6.0 1.350 0.480 4.548 3.000 4.608 17.340
stacking yard
256 31-May-21 374+937 LHS MJB Pile no- 01 of LP1 M35 (Pile) 23.5 8.272 2.068 16.168 10.669 16.380 103.400
257 31-May-21 388+594 RHS MJB Pile no- 03 of RP3 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
258 31-May-21 388+594 RHS MJB Pile no- 01 of RP2 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
259 1-Jun-21 Lamdapura Camp Casting yard Gantry Wall Shaft M25 FLYASH 2.5 0.725 0.253 1.807 1.193 1.830 9.288
260 1-Jun-21 Lamdapura Camp Casting Yard Raft for stacking yard M30 FLYASH 32.0 10.304 2.688 22.880 15.264 23.264 123.424
M35 (Pile)
261 1-Jun-21 388+594 LHS MJB Pile no- 01 of LP2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
262 2-Jun-21 388+594 LHS MJB Pile no- 09 of LA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
263 2-Jun-21 388+594 RHS MJB Pile no- 02 of RP2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
264 2-Jun-21 388+594 RHS MJB Pile no- 09 of RP3 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
265 2-Jun-21 383+916 RHS MJB Pile no- 09 of RP6 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH

Batching Plant- Batching Plant-2


266 3-Jun-21 Lamdapura Camp M25 FLYASH 5.0 1.450 0.505 3.615 2.385 3.660 18.575
2 Foundation Foundation

267 3-Jun-21 Lamdapura Camp Casting Yard Raft for stacking yard M30 FLYASH 33.0 10.626 2.772 23.595 15.741 23.991 127.281
M35 (Pile)
268 3-Jun-21 388+594 LHS MJB Pile no- 04 of LA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
269 3-Jun-21 383+916 RHS MJB Pile no- 01 of RP6 29.0 10.208 2.552 19.952 13.166 20.213 127.600
FLYASH
Hammer
Hammer casting for
270 4-Jun-21 Lamdapura Camp casting for pile M25 FLYASH 3.5 1.015 0.354 2.531 1.670 2.562 13.003
pile laod testing
laod testing

Subhelav Camp
271 4-Jun-21 Box Culvert Box Culvert segment M30 FLYASH 36.0 11.592 3.024 25.740 17.172 26.172 138.852
(PNC), Casting Yard
M35 (Pile)
272 4-Jun-21 388+594 RHS MJB Pile no- 08 of LA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
273 4-Jun-21 383+916 RHS MJB Pile no- 02 of RP6 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
Subhelav Camp
274 5-Jun-21 Box Culvert Box Culvert segment M30 FLYASH 30.0 9.660 2.520 21.450 14.310 21.810 115.710
(PNC), Casting Yard
M35 (Pile)
275 5-Jun-21 388+594 RHS MJB Pile no-11 of LA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
276 5-Jun-21 388+594 RHS MJB Pile no-09 of RP4 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
277 5-Jun-21 388+594 RHS MJB Pile no-09 of RA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
278 5-Jun-21 388+594 RHS MJB Pile no-06 of RP2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
279 5-Jun-21 383+934 LHS MJB Pile no-05 of LP6 31.5 11.088 2.772 21.672 14.301 21.955 138.600
FLYASH

Precast Girder No-


Lamdapura Camp,
280 5-Jun-21 MJB 04,03,02 & 01 of LP1- M50 (PSC) 105.0 47.040 0.000 75.495 49.770 76.440 470.400
Casting Yard
LA2, Ch-384+570

Lamdapura Camp, Slurry for Concrete


281 5-Jun-21 Slurry 4.5 0.675 0.675 0.000 0.000 0.000 0.000
Casting Yard Pump
282 6-Jun-21 388+594 RHS MJB Pile no-08 of RA2 M35 (Pile) 28.5 11.543 0.000 19.921 13.139 21.917 92.340
283 6-Jun-21 388+594 RHS MJB Pile no-01 of RP4 M35 (Pile) 28.5 11.543 0.000 19.921 13.139 21.917 92.340
M35 (Pile)
284 6-Jun-21 383+934 RHS MJB Pile no-10 of RP7 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M15 (PCC)
285 7-Jun-21 388+594 LHS MJB LP3 Pile cap PCC 9.0 2.025 0.720 6.822 4.500 6.912 26.010
FLYASH

Batching Plant- Batching Plant-2


286 7-Jun-21 Lamdapura Camp M25 FLYASH 5.0 1.450 0.505 3.615 2.385 3.660 18.575
2 foundation foundation

287 Lamdapura Camp Pedestal fpr girder M30 FLYASH 4.0 1.288 0.336 2.860 1.908 2.908 15.428
7-Jun-21 Casting yard
stacking yard
M35 (Pile)
288 7-Jun-21 388+594 RHS MJB Pile no-08 of RP4 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
289 7-Jun-21 388+594 LHS MJB Pile no-06 of LA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
290 7-Jun-21 384+570 LHS MJB Pile no-06 of LP1 29.0 10.208 2.552 19.952 13.166 20.213 127.600
FLYASH
M35 (Pile)
291 7-Jun-21 383+934 RHS MJB Pile no-10 of RP6 32.0 11.264 2.816 22.016 14.528 22.304 140.800
FLYASH
PCC for girder M15 (PCC)
292 8-Jun-21 Lamdapura camp Casting yard 5.0 1.125 0.400 3.790 2.500 3.840 14.450
stacking yard FLYASH
M35 (Pile)
293 8-Jun-21 388+594 RHS MJB Pile no-01 of RA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
294 8-Jun-21 383+934 RHS MJB Pile no-06 of RP6 29.0 10.208 2.552 19.952 13.166 20.213 127.600
FLYASH
M35 (Pile)
295 8-Jun-21 384+570 LHS MJB Pile no-01 of LP1 29.0 10.208 2.552 19.952 13.166 20.213 127.600
FLYASH
296 9-Jun-21 388+594 LHS MJB Pile cap PCC of LP2 M15 (PCC) 8.5 2.210 0.000 6.460 4.259 7.106 15.300
Febrication PCC for febrication
297 9-Jun-21 Lamdapura Camp M15 (PCC) 6.0 1.560 0.000 4.560 3.006 5.016 10.800
Yard yard
Electric panel Pcc for Electric panel M15 (PCC)
298 9-Jun-21 Lamdapura camp 2.0 0.450 0.160 1.516 1.000 1.536 5.780
foundation foundation FLYASH
299 9-Jun-21 388+594 RHS MJB Pile no-07 of RP4 M35 (Pile) 10.5 4.253 0.000 7.339 4.841 8.075 34.020
300 9-Jun-21 383+934 RHS MJB Pile no-05 of RP6 M35 (Pile) 30.0 12.150 0.000 20.970 13.830 23.070 97.200
301 9-Jun-21 388+594 LHS MJB Pile no-03 of LA2 M35 (Pile) 28.5 11.543 0.000 19.921 13.139 21.917 92.340
302 9-Jun-21 383+934 RHS MJB Pile no-07 of RP6 M35 (Pile) 30.0 12.150 0.000 20.970 13.830 23.070 97.200
303 9-Jun-21 388+594 RHS MJB Pile no-11 of RA2 M35 (Pile) 28.5 11.543 0.000 19.921 13.139 21.917 92.340
M35 (Pile)
304 9-Jun-21 388+594 RHS MJB Pile no-07 of RP4 18.0 6.336 1.584 12.384 8.172 12.546 79.200
FLYASH

305 10-Jun-21 Lamdapura Camp Security gate PCC for security gate M15 (PCC) 1.0 0.260 0.000 0.760 0.501 0.836 1.800

Subhelav Camp (PNc), Box Culvert segment


306 10-Jun-21 Casting yard Box Culvert M30 35.5 12.780 0.000 25.844 17.040 28.436 102.240
casting
307 10-Jun-21 388+594 RHS MJB Pile no-05 of RP4 M35 (Pile) 28.5 11.543 0.000 19.921 13.139 21.917 92.340
308 10-Jun-21 384+570 LHS MJB Pile no-05 of LP1 M35 (Pile) 30.0 12.150 0.000 20.970 13.830 23.070 97.200
309 10-Jun-21 388+594 LHS MJB Pile no-01 of LA2 M35 (Pile) 28.5 11.543 0.000 19.921 13.139 21.917 92.340
310 10-Jun-21 383+934 RHS MJB Pile no-06 of RP6 M35 (Pile) 30.0 12.150 0.000 20.970 13.830 23.070 97.200
311 10-Jun-21 388+594 RHS MJB Pile no-02 of RA2 M35 (Pile) 28.5 11.543 0.000 19.921 13.139 21.917 92.340
312 Pedestal for Girder M50 8.0 3.584 0.000 5.752 3.792 5.824 35.840
10-Jun-21 Lamdapura camp Casting yard
stacking yard
PCC for Girder
313 11-Jun-21 Lamdapura Camp Casting Yard M15 (PCC) 6.0 1.560 0.000 4.560 3.006 5.016 10.800
stacking yard

314 Batching Plant- Raft for silo


11-Jun-21 Lamdapura Camp M25 17.5 5.950 0.000 12.880 8.487 14.158 50.575
2 foundation foundation
315 Raft for Girder
11-Jun-21 Lamdapura Camp Casting Yard M30 34.0 12.240 0.000 24.752 16.320 27.234 97.920
Stacking Yard
316 11-Jun-21 383+934 RHS MJB Pile no-04 of RP6 M35 (Pile) 30.0 12.150 0.000 20.970 13.830 23.070 97.200
317 11-Jun-21 383+934 RHS MJB Pile no-08 of RP6 M35 (Pile) 30.0 12.150 0.000 20.970 13.830 23.070 97.200
318 11-Jun-21 388+594 RHS MJB Pile no-03 of RP4 M35 (Pile) 28.5 11.543 0.000 19.921 13.139 21.917 92.340
319 11-Jun-21 388+594 RHS MJB Pile no-12 of RA2 M35 (Pile) 28.5 11.543 0.000 19.921 13.139 21.917 92.340
320 12-Jun-21 388+594 RHS MJB Pile Cap PCC of RP3 M15 (PCC) 8.5 2.210 0.000 6.460 4.259 7.106 15.300
321 12-Jun-21 383+934 LHS MJB Pile no-10 of LP8 M35 (Pile) 31.5 12.758 0.000 22.019 14.522 24.224 102.060
322 12-Jun-21 383+934 LHS MJB Pile no-01 of LP8 M35 (Pile) 30.0 12.150 0.000 20.970 13.830 23.070 97.200
323 12-Jun-21 384+570 RHS MJB Pile no-06 of LA2 M35 (Pile) 36.0 14.580 0.000 25.164 16.596 27.684 116.640
324 12-Jun-21 388+594 LHS MJB Pile no-02 of LA2 M35 (Pile) 28.5 11.543 0.000 19.921 13.139 21.917 92.340
M35 (Pile)
325 13-Jun-21 388+594 LHS MJB Pile no-10 of LA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
326 13-Jun-21 388+594 RHS MJB Pile no-03 of RA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
327 13-Jun-21 388+594 LHS MJB Pile no-05 of LA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
328 13-Jun-21 383+934 LHS MJB Pile no-01 of LP9 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH
M35 (Pile)
329 13-Jun-21 384+570 RHS MJB Pile no-05 of RA1 32.0 11.264 2.816 22.016 14.528 22.304 140.800
FLYASH
Febrication M15 (PCC)
330 14-Jun-21 Lamdapura Camp PCC at febrication yard 4.0 0.900 0.320 3.032 2.000 3.072 11.560
yard FLYASH
M15 (PCC)
331 14-Jun-21 Lamdapura Camp Casting Yard PCC at bed-4 11.0 2.475 0.880 8.338 5.500 8.448 31.790
FLYASH

332 Batching Plant- Batching Plant-2


14-Jun-21 Lamdapura Camp M25 FLYASH 9.5 2.755 0.960 6.869 4.531 6.954 35.293
2 foundation foundation
M35 (Pile)
333 14-Jun-21 388+594 RHS MJB Pile no-10 of RP4 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M15 (PCC)
334 15-Jun-21 Lamdapura Camp Casting Yard PCC at bed-4 12.0 2.700 0.960 9.096 6.000 9.216 34.680
FLYASH
M15 (PCC)
335 15-Jun-21 Lamdapura Camp Labour colony PCC at labour colony 17.0 3.825 1.360 12.886 8.500 13.056 49.130
FLYASH

336 Girder stacking yard


15-Jun-21 Lamdapura Camp Casting Yard M30 FLYASH 7.0 2.254 0.588 5.005 3.339 5.089 26.999
pedestal
M35 (Pile)
337 15-Jun-21 388+594 LHS MJB Pile no-07 of LA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
338 15-Jun-21 388+594 RHS MJB Pile no-10 of RA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
339 15-Jun-21 384+570 LHS MJB Pile no-04 of LA2 32.0 11.264 2.816 22.016 14.528 22.304 140.800
FLYASH
M35 (Pile)
340 15-Jun-21 384+570 RHS MJB Pile no-04 of RA1 33.5 11.792 2.948 23.048 15.209 23.350 147.400
FLYASH
M15 (PCC)
341 16-Jun-21 Lamdapura Camp Casting Yard PCC at bed-4 3.0 0.675 0.240 2.274 1.500 2.304 8.670
FLYASH

Batching Plant- PCC at Batching Plant - M15 (PCC)


342 16-Jun-21 Lamdapura Camp 3.5 0.788 0.280 2.653 1.750 2.688 10.115
2 foundation 2 FLYASH

PCC for labour M15 (PCC)


343 16-Jun-21 Lamdapura Camp Labour colony 10.0 2.250 0.800 7.580 5.000 7.680 28.900
Quarter-3 FLYASH

344 Wall for Gantry rail


16-Jun-21 Lamdapura Camp Casting Yard M25 FLYASH 4.0 1.160 0.404 2.892 1.908 2.928 14.860
line
M35 (Pile)
345 16-Jun-21 388+594 MJB Pile Head 6.0 2.112 0.528 4.128 2.724 4.182 26.400
FLYASH
M35 (Pile)
346 16-Jun-21 388+594 RHS MJB Pile no-04 of RP4 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M15 (PCC)
347 17-Jun-21 Lamdapura Camp Security gate PCC at Security gate 0.5 0.113 0.040 0.379 0.250 0.384 1.445
FLYASH
M35 (Pile)
348 17-Jun-21 383+934 LHS MJB Pile no-09 of L10 24.0 8.448 2.112 16.512 10.896 16.728 105.600
FLYASH
M35 (Pile)
349 17-Jun-21 388+594 RHS MJB Pile no-04 of RA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
350 17-Jun-21 388+594 LHS MJB Pile no-08 of LA1 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
351 17-Jun-21 384+570 LHS MJB Pile no-03 of LA2 32.0 11.264 2.816 22.016 14.528 22.304 140.800
FLYASH
352 17-Jun-21 388+594 MJB Pile Head M50 6.0 2.688 0.000 4.314 2.844 4.368 26.880
M15 (PCC)
353 18-Jun-21 Lamdapura Camp Security gate Security gate fixing 2.0 0.450 0.160 1.516 1.000 1.536 5.780
FLYASH

354 Raft for girder


18-Jun-21 Lamdapura Camp Casting Yard M30 FLYASH 33.5 10.787 2.814 23.953 15.980 24.354 129.210
stacking yard
M35 (Pile)
355 18-Jun-21 388+594 RHS MJB Pile no-06 of RP4 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
356 18-Jun-21 383+934 LHS MJB Pile no-03 of L10 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH
M35 (Pile)
357 18-Jun-21 383+934 LHS MJB Pile no-10 of L10 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH
M35 (Pile)
358 18-Jun-21 384+570 RHS MJB Pile no-03 of RA2 32.0 11.264 2.816 22.016 14.528 22.304 140.800
FLYASH
M35 (Pile)
359 18-Jun-21 384+570 RHS MJB Pile no-06 of RA1 34.0 11.968 2.992 23.392 15.436 23.698 149.600
FLYASH
Febrication M15 (PCC)
360 19-Jun-21 Lamdapura Camp PCC at febrication yard 3.0 0.675 0.240 2.274 1.500 2.304 8.670
Yard PCC FLYASH

361 Batching Plant- Batching Plant-2 silo


19-Jun-21 Lamdapura Camp M25 FLYASH 3.0 0.870 0.303 2.169 1.431 2.196 11.145
2 foundation foundation
362 Wall for Gantry rail
19-Jun-21 Lamdapura Camp Casting Yard M25 FLYASH 3.5 1.015 0.354 2.531 1.670 2.562 13.003
line
363 19-Jun-21 383+934 LHS MJB Pile no-07 of LP10 M35 (Pile) 30.0 12.150 0.000 20.970 13.830 23.070 97.200
M35 (Pile)
364 19-Jun-21 383+934 LHS MJB Pile no-02 of LP10 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH
M35 (Pile)
365 19-Jun-21 383+934 LHS MJB Pile no-06 of LP10 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH
M35 (Pile)
366 19-Jun-21 383+934 LHS MJB Pile no-01 of LP10 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH
M35 (Pile)
367 19-Jun-21 384+570 LHS MJB Pile no-08 of LA2 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH
368 19-Jun-21 388+594 MJB Pile Head M50 2.0 0.896 0.000 1.438 0.948 1.456 8.960
PCC at Casting yard M15 (PCC)
369 20-Jun-21 Lamdapura Camp Casting Yard 3.0 0.675 0.240 2.274 1.500 2.304 8.670
bed-4 FLYASH

370 Girder stacking yard


20-Jun-21 Lamdapura Camp Casting Yard M30 FLYASH 8.0 2.576 0.672 5.720 3.816 5.816 30.856
pedestal
M35 (Pile)
371 20-Jun-21 388+594 RHS MJB Pile no-04 of LA1 24.0 8.448 2.112 16.512 10.896 16.728 105.600
FLYASH
M35 (Pile)
372 20-Jun-21 388+594 RHS MJB Pile no-05 of RA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
373 20-Jun-21 383+934 LHS MJB Pile no-05 of LP10 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH
M35 (Pile)
374 20-Jun-21 383+934 LHS MJB Pile no-08 of LP10 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH
M15 (PCC)
375 21-Jun-21 388+594 MJB Pile Cap PCC of LP1 3.0 0.675 0.240 2.274 1.500 2.304 8.670
FLYASH

376 Batching Plant- Batching Plant-2 silo


21-Jun-21 Lamdapura Camp M25 FLYASH 3.0 0.870 0.303 2.169 1.431 2.196 11.145
2 foundation foundation (Column)
M35 (Pile)
377 21-Jun-21 388+594 RHS MJB Pile no-02 of RP1 24.0 8.448 2.112 16.512 10.896 16.728 105.600
FLYASH
M35 (Pile)
378 21-Jun-21 388+594 RHS MJB Pile no-06 of RP4 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
379 21-Jun-21 383+934 RHS MJB Pile no-02 of RP10 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH
M35 (Pile)
380 21-Jun-21 384+570 RHS MJB Pile no-02 of RA1 32.0 11.264 2.816 22.016 14.528 22.304 140.800
FLYASH
M35 (Pile)
381 21-Jun-21 383+934 RHS MJB Pile no-08 of RP10 32.5 11.440 2.860 22.360 14.755 22.653 143.000
FLYASH
M35 (Pile)
382 21-Jun-21 383+934 LHS MJB Pile no-04 of LP10 34.5 12.144 3.036 23.736 15.663 24.046 151.800
FLYASH
383 21-Jun-21 388+594 MJB Pile Head M50 1.5 0.672 0.000 1.079 0.711 1.092 6.720

PCC at near anchoring


M15 (PCC)
384 22-Jun-21 Lamdapura Camp Casting yard end, Curing tank and 13.5 3.038 1.080 10.233 6.750 10.368 39.015
FLYASH
bed-4

M35 (Pile)
385 22-Jun-21 388+594 LHS MJB Pile no-06 of LA1 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
386 22-Jun-21 388+594 RHS MJB Pile no-06 of RA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
387 22-Jun-21 383+934 RHS MJB Pile no-09 of RP10 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH
M35 (Pile)
388 22-Jun-21 383+934 RHS MJB Pile no-03 of RP10 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH
M35 (Pile)
389 22-Jun-21 383+934 RHS MJB Pile no-10 of RP10 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH
390 22-Jun-21 388+594 MJB Pile Head M50 2.0 0.896 0.000 1.438 0.948 1.456 8.960
M15 (PCC)
391 23-Jun-21 388+594 MJB Pile cap PCC 4.0 0.900 0.320 3.032 2.000 3.072 11.560
FLYASH
392 23-Jun-21 384+570 RHS MJB Pile no-04 of RA2 M35 (Pile) 32.0 12.960 0.000 22.368 14.752 24.608 103.680
M35 (Pile)
393 23-Jun-21 384+570 LHS MJB Pile no-04 of LA1 26.0 9.152 2.288 17.888 11.804 18.122 114.400
FLYASH
M35 (Pile)
394 23-Jun-21 388+594 RHS MJB Pile no-03 of RP1 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
395 23-Jun-21 383+934 RHS MJB Pile no-07 of RP10 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH
M35 (Pile)
396 23-Jun-21 383+934 RHS MJB Pile no-01 of RP10 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH
M35 (Pile)
397 23-Jun-21 383+934 RHS MJB Pile no-06 of RP10 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH

398 Raft for Girder


24-Jun-21 Lamdapura Camp Casting Yard M30 FLYASH 32.0 10.304 2.688 22.880 15.264 23.264 123.424
stacking yard
M35 (Pile)
399 24-Jun-21 388+594 LHS MJB Pile no-03 of LA1 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
400 24-Jun-21 388+594 RHS MJB Pile no-07 of RA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
401 24-Jun-21 388+594 RHS MJB Pile Head M50 2.0 0.896 0.000 1.438 0.948 1.456 8.960
402 25-Jun-21 383+934 RHS MJB Pile no-04 of RP10 M35 (Pile) 30.0 12.150 0.000 20.970 13.830 23.070 97.200
403 25-Jun-21 383+934 RHS MJB Pile no-05 of RP10 M35 (Pile) 30.0 12.150 0.000 20.970 13.830 23.070 97.200
404 25-Jun-21 384+570 RHS MJB Pile no-01 of RA1 M35 (Pile) 27.0 10.935 0.000 18.873 12.447 20.763 87.480
405 Febrication PCC for Febrication M10 (PCC) 2.0 0.340 0.180 1.450 0.862 1.640 4.860
26-Jun-21 Lamdapura Camp
Yard Yard
M15 (PCC)
406 26-Jun-21 388+594 LHS MJB Pile Cap PCC of LA2 11.0 2.475 0.880 8.338 5.500 8.448 31.790
FLYASH
M35 (Pile)
407 26-Jun-21 388+594 RHS MJB Pile no-07 of LA1 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
408 26-Jun-21 388+594 RHS MJB Pile no-04 of RP1 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
PCC for Girder M15 (PCC)
409 27-Jun-21 Lamdapura Camp Casting Yard 5.0 1.125 0.400 3.790 2.500 3.840 14.450
stacking yard FLYASH

410 Pedestal for Girder


27-Jun-21 Lamdapura Camp Casting Yard M30 FLYASH 6.0 1.932 0.504 4.290 2.862 4.362 23.142
stacking yard
M35 (Pile)
411 27-Jun-21 384+570 LHS MJB Pile no-02 of LA2 23.0 8.096 2.024 15.824 10.442 16.031 101.200
FLYASH
M35 (Pile)
412 28-Jun-21 388+594 RHS MJB Pile no-08 of RP1 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
413 28-Jun-21 388+594 LHS MJB Pile no-02 of LA1 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
414 28-Jun-21 384+570 LHS MJB Pile no-01 of LA2 32.0 11.264 2.816 22.016 14.528 22.304 140.800
FLYASH
415 29-Jun-21 Lamdapura Camp Casting Yard PCC for Casting yard M15 (PCC) 3.5 0.910 0.000 2.660 1.754 2.926 6.300
416 Raft for Girder M30 33.5 12.060 0.000 24.388 16.080 26.834 96.480
29-Jun-21 Lamdapura Camp Casting Yard
Stacking yard
417 29-Jun-21 384+570 RHS MJB Pile no-02 of RA2 M35 (Pile) 24.0 9.720 0.000 16.776 11.064 18.456 77.760
418 29-Jun-21 384+570 RHS MJB Pile no-05 of RA1 M35 (Pile) 32.0 12.960 0.000 22.368 14.752 24.608 103.680
419 29-Jun-21 384+570 RHS MJB Pile no-01 of RA2 M35 (Pile) 32.0 12.960 0.000 22.368 14.752 24.608 103.680
420 29-Jun-21 384+570 LHS MJB Pile no-05 of LA1 M35 (Pile) 6.5 2.633 0.000 4.544 2.997 4.999 21.060
PCC for Girder M15 (PCC)
421 30-Jun-21 Lamdapura Camp Casting yard 7.0 1.575 0.560 5.306 3.500 5.376 20.230
stacking yard FLYASH
M35 (Pile)
422 30-Jun-21 388+594 RHS MJB Pile no-07 of RP1 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
423 30-Jun-21 384+570 RHS MJB Pile no-05 of RA2 32.0 11.264 2.816 22.016 14.528 22.304 140.800
FLYASH
M35 (Pile)
424 30-Jun-21 384+570 RHS MJB Pile no-08 of RA2 32.0 11.264 2.816 22.016 14.528 22.304 140.800
FLYASH
M35 (Pile)
425 30-Jun-21 384+570 RHS MJB Pile no-06 of RA2 32.0 11.264 2.816 22.016 14.528 22.304 140.800
FLYASH
Cement &
425 1-Jul-21 384+570 LHS MJB Pile no-05 of LA1 M35 (Pile) 20.0 7.040 1.760 13.760 9.080 13.940 88.000
Flyash
Cement &
426 1-Jul-21 388+594 LHS MJB Pile no-05 of LA1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
427 1-Jul-21 384+570 RHS MJB Pile no-07 of RA2 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Flyash
Cement &
428 1-Jul-21 384+570 LHS MJB Pile no-03 of LA1 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Flyash
Cement &
429 1-Jul-21 388+594 MJB Anchor pile-1 M35(Pile) 27.0 9.504 2.376 18.576 12.258 18.819 118.800
Flyash
Raft for Girder Cement &
430 1-Jul-21 Lamdapura Camp Casting Yard M30 33.5 10.787 2.814 23.953 15.980 24.354 129.210
Stacking yard Flyash
Pedestal for Girder Cement &
431 1-Jul-21 Lamdapura Camp Casting Yard M30 6.0 1.932 0.504 4.290 2.862 4.362 23.142
Stacking yard Flyash
PCC at Casting yard Cement &
432 1-Jul-21 Lamdapura Camp Casting yard M15 (PCC) 6.5 1.463 0.520 4.927 3.250 4.992 18.785
yard Flyash
Batching Plant- Cement &
433 1-Jul-21 Lamdapura Camp Material Bin fixing M15 (PCC) 1.5 0.338 0.120 1.137 0.750 1.152 4.335
2 foundation Flyash
Cement &
434 2-Jul-21 384+570 LHS MJB Pile no-06 of LA1 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Flyash
Cement &
435 2-Jul-21 388+594 RHS MJB Pile no-09 of RP1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
436 2-Jul-21 384+570 LHS MJB Pile no-02 of LA1 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Flyash
Cement &
437 2-Jul-21 383+934 LHS MJB Pile no-02 of LP8 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
438 2-Jul-21 388+594 LHS MJB Pile no-01 of LA1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
PCC at Casting yard Cement &
439 2-Jul-21 Lamdapura Camp Casting yard M15 (PCC) 1.0 0.225 0.080 0.758 0.500 0.768 2.890
yard Flyash
Batching Plant- Cement &
440 2-Jul-21 Lamdapura Camp Material Bin fixing M15 (PCC) 1.0 0.225 0.080 0.758 0.500 0.768 2.890
2 foundation Flyash
Cement &
441 3-Jul-21 384+570 LHS MJB Pile no-07 of LA1 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Flyash
Cement &
442 3-Jul-21 13.0 4.576 1.144 8.944 5.902 9.061 57.200
Flyash
388+594 RHS MJB Pile no-07 of RP4 M35 (Pile)
443 3-Jul-21 19.0 7.695 0.000 13.281 8.759 14.611 61.560 Cement

Cement &
444 3-Jul-21 388+594 RHS MJB Pile Cap of LP3 M35(RCC) 145.0 49.010 12.325 102.515 68.295 104.255 582.755
Flyash
Pedestal for Girder Cement &
445 3-Jul-21 Lamdapura Camp Casting Yard M30 6.0 1.932 0.504 4.290 2.862 4.362 23.142
Stacking yard Flyash
Batching Plant- Material Bin support Cement &
446 3-Jul-21 Lamdapura Camp M15 (PCC) 2.0 0.450 0.160 1.516 1.000 1.536 5.780
2 foundation fixing Flyash
Cement &
447 4-Jul-21 384+570 LHS MJB Pile no-08 of LA1 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Flyash
Cement &
448 4-Jul-21 388+594 RHS MJB Pile no-10 of RP1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Anchor Pile-2, near Cement &
449 4-Jul-21 388+594 MJB M35 (Pile) 28.0 9.856 2.464 19.264 12.712 19.516 123.200
Test Pile Flyash
Cement &
450 4-Jul-21 383+934 LHS MJB Pile no- 03 of LP8 M35(RCC) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Batching Plant- Material Bin support Cement &
451 4-Jul-21 Lamdapura Camp M15 (PCC) 6.0 1.350 0.480 4.548 3.000 4.608 17.340
2 foundation fixing Flyash
Cement &
452 5-Jul-21 384+570 RHS MJB Pile no-06 of RA1 M35 (Pile) 33.5 11.792 2.948 23.048 15.209 23.350 147.400
Flyash

453 5-Jul-21 388+594 RHS MJB Pile no-01 of RA1 M35 (Pile) 28.5 11.543 0.000 19.921 13.139 21.917 92.340 Cement

Cement &
454 5-Jul-21 388+594 RHS MJB Pile no-01 of RP1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash

455 5-Jul-21 388+594 RHS MJB Pile Head of RP2 M50 6.0 2.688 0.000 4.314 2.844 4.368 26.880 Cement

Cement &
456 6-Jul-21 383+934 RHS MJB Pile no-02 of RP8 M35 (Pile) 25.5 8.976 2.244 17.544 11.577 17.774 112.200
Flyash
Cement &
457 6-Jul-21 383+934 RHS MJB Pile no-01 of RP9 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Flyash
Cement &
458 6-Jul-21 383+934 RHS MJB Pile no-02 of RP9 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Flyash
Cement &
459 6-Jul-21 388+594 RHS MJB Pile Cap PCC of RP2 M15 (PCC) 10.0 2.250 0.800 7.580 5.000 7.680 28.900
Flyash
Cement &
460 6-Jul-21 Lamdapura Camp Casting yard Gantry Wall Shaft M25 3.5 1.015 0.354 2.531 1.670 2.562 13.003
Flyash
Cement &
461 6-Jul-21 388+594 LHS MJB Pier Starter LP3 M45 2.0 0.784 0.196 1.354 0.902 1.376 10.290
Flyash
Cement &
462 7-Jul-21 383+934 RHS MJB Pile no-03 of RP9 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
463 7-Jul-21 383+934 RHS MJB Pile no-03 of RP8 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Flyash
Cement &
464 7-Jul-21 383+934 LHS MJB Pile no-04 of LP8 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Flyash
Cement &
465 7-Jul-21 388+594 MJB Anchor pile-3 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Flyash
Cement &
466 7-Jul-21 388+594 RHS MJB Pile no-10 of RA1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
467 7-Jul-21 388+594 Labour Hutment M15 (PCC) 2.0 0.450 0.160 1.516 1.000 1.536 5.780
Flyash
PCC for Pile Cap Cement &
468 7-Jul-21 384+570 M15 (PCC) 1.0 0.225 0.080 0.758 0.500 0.768 2.890
(rectification) Flyash
Batching Plant- Material Bin support Cement &
469 7-Jul-21 Lamdapura Camp M15 (PCC) 9.5 2.138 0.760 7.201 4.750 7.296 27.455
2 Foundation fixing, Flyash
Cement &
470 8-Jul-21 383+934 RHS MJB Pile no-08 of RP8 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Flyash
Cement &
471 8-Jul-21 383+934 RHS MJB Pile no-06 of RP9 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Flyash
Cement &
472 8-Jul-21 388+594 RHS MJB Pile no-05 of RP1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
473 8-Jul-21 388+594 RHS MJB Pile no-02 of RA1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Raft for Girder Cement &
474 8-Jul-21 Lamdapura Camp Casting Yard M30 33.0 10.626 2.772 23.595 15.741 23.991 127.281
Stacking yard Flyash
Cement &
475 8-Jul-21 Lamdapura Camp Casting yard Gantry Wall M25 1.5 0.435 0.152 1.085 0.716 1.098 5.573
Flyash
Cement &
476 8-Jul-21 Lamdapura Camp Security gate PCC at Security gate M15 (PCC) 2.0 0.450 0.160 1.516 1.000 1.536 5.780
Flyash
Cement &
477 9-Jul-21 383+934 RHS MJB Pile no-05 of RP9 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
478 9-Jul-21 383+934 RHS MJB Pile no-01 of RP8 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
479 9-Jul-21 383+934 RHS MJB Pile no-07 of RP9 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Flyash
Anchor Pile no-04 for Cement &
480 9-Jul-21 388+594 RHS MJB M35 (Pile) 31.0 10.912 2.728 21.328 14.074 21.607 136.400
test pile Flyash
Cement &
481 9-Jul-21 388+594 RHS MJB Pile no-06 of RP1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
PCC for Pile Cap - Cement &
482 9-Jul-21 384+570 RHS MJB M15 (PCC) 7.5 1.688 0.600 5.685 3.750 5.760 21.675
RA2 Flyash
PCC for Pile Cap - Cement &
483 9-Jul-21 384+570 RHS MJB M15 (PCC) 6.0 1.350 0.480 4.548 3.000 4.608 17.340
RA2 Flyash
Cement &
484 10-Jul-21 383+934 RHS MJB Pile no-04 of RP9 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
485 10-Jul-21 388+594 RHS MJB Pile no-09 of RA1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
486 10-Jul-21 383+934 RHS MJB Pile no-05 of RP8 M35 (Pile) 31.5 11.088 2.772 21.672 14.301 21.955 138.600
Flyash
PCC for Pile Cap - Cement &
487 10-Jul-21 384+570 RHS MJB M15 (PCC) 6.0 1.350 0.480 4.548 3.000 4.608 17.340
LA1 Flyash
Pedestal for Girder Cement &
488 10-Jul-21 Lamdapura Camp Casting Yard M30 5.0 1.610 0.420 3.575 2.385 3.635 19.285
Stacking yard Flyash
Cement &
489 11-Jul-21 388+594 RHS MJB Pile Cap of RP3 M35 (RCC) 147.0 49.686 12.495 103.929 69.237 105.693 590.793
Flyash
Cement &
490 11-Jul-21 383+934 RHS MJB Pile no-08 of RP9 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
491 11-Jul-21 383+934 LHS MJB Pile no-08 of LP8 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
PCC for Pile Cap - Cement &
492 11-Jul-21 384+570 LHS MJB M15 (PCC) 9.5 2.138 0.760 7.201 4.750 7.296 27.455
LP1 Flyash
Cement &
493 12-Jul-21 388+594 RHS MJB Pile no-03 of RA1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
494 12-Jul-21 383+934 RHS MJB Pile no-06 of RP8 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
495 12-Jul-21 383+934 RHS MJB Pile no-09 of RP8 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
PCC for Pile Cap - Cement &
496 12-Jul-21 388+594 RHS MJB M15 (PCC) 10.0 2.250 0.800 7.580 5.000 7.680 28.900
RP4 Flyash
Cement &
497 13-Jul-21 388+594 RHS MJB Pile no-04 of RA1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
498 13-Jul-21 383+934 RHS MJB Pile no-10 of RP9 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
499 13-Jul-21 383+934 RHS MJB Pile no-09 of RP9 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
PCC for Pile Cap - Cement &
500 13-Jul-21 383+934 LHS MJB M15 (PCC) 9.5 2.138 0.760 7.201 4.750 7.296 27.455
LP6 Flyash
Mechanical Workshop Cement &
501 13-Jul-21 Lamdapura Camp MJB M15 (PCC) 12.0 2.700 0.960 9.096 6.000 9.216 34.680
PCC Flyash
Cement &
502 14-Jul-21 388+594 RHS MJB Pile no-05 of RA1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
503 14-Jul-21 383+934 RHS MJB Pile no-04 of RP8 M35 (Pile) 29.5 10.384 2.596 20.296 13.393 20.562 129.800
Flyash
Cement &
504 14-Jul-21 383+934 RHS MJB Pile no-10 of RP8 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
505 14-Jul-21 383+934 LHS MJB Pile no-07 of LP8 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
506 14-Jul-21 388+594 RHS MJB Pile Cap of RP2 M35(RCC) 148.00 50.024 12.580 104.636 69.708 106.412 594.812
Flyash
Cement &
507 15-Jul-21 388+594 RHS MJB Pile no-06 of RA1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
508 15-Jul-21 383+934 RHS MJB Pile no-07 of RP8 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
509 15-Jul-21 383+934 RHS MJB Pile no-06 of RP7 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Precast I Girder No-
Cement &
510 15-Jul-21 384+570 LHS MJB 05, 06, 07 & 08 of M50 (PSC) 103.0 43.260 10.815 70.658 47.071 66.023 459.380
Flyash
LP1-LA2
Cement &
511 15-Jul-21 388+594 LHS MJB Pier shaft LP3 M45(RCC) 34.50 13.524 3.381 23.357 15.560 23.736 177.503
Flyash
PCC for Pile Cap - Cement &
512 15-Jul-21 388+594 RHS MJB M15 (PCC) 6.0 1.350 0.480 4.548 3.000 4.608 17.340
LA1 Flyash
Cement &
513 16-Jul-21 388+594 RHS MJB Pile no-07 of RA1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
514 16-Jul-21 383+934 RHS MJB Pile no-05 of RP7 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
515 16-Jul-21 383+934 LHS MJB Pile no-05 of LP7 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
516 16-Jul-21 383+934 RHS MJB Pile no-07 of RP7 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
517 16-Jul-21 388+594 LHS MJB Pile Cap of LP1 M35(RCC) 150.0 50.700 12.750 106.050 70.650 107.850 602.850
Flyash
Cement &
518 17-Jul-21 388+594 RHS MJB Pile no-08 of RA1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
519 17-Jul-21 383+934 RHS MJB Pile no-04 of RP7 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
520 17-Jul-21 383+934 LHS MJB Pile no-05 of LP8 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
521 17-Jul-21 383+934 RHS MJB Pile no-09 of RP7 M35 (Pile) 33.0 11.616 2.904 22.704 14.982 23.001 145.200
Flyash
Pier shaft Starter RP2 Cement &
522 17-Jul-21 388+594 RHS MJB M45 (RCC) 3.5 1.372 0.343 2.370 1.579 2.408 18.008
& RP3 Flyash
HM Plant Cement &
523 17-Jul-21 Subhelav Camp(PNC) HM Plant Foundation M25 10.5 3.045 1.061 7.592 5.009 7.686 39.008
Foundation Flyash
Cement &
524 18-Jul-21 383+934 RHS MJB Pile no-08 of RP7 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
HM Plant Cement &
525 18-Jul-21 Subhelav Camp(PNC) HM Plant Foundation M10 (PCC) 5.0 0.850 0.450 3.625 2.155 4.100 12.150
Foundation Flyash
Cement &
526 19-Jul-21 384+570 RHS MJB Pile Cap of RP1 M35(RCC) 150.0 50.700 12.750 106.050 70.650 107.850 602.850
Flyash
Cement &
527 19-Jul-21 383+934 MJB PCC for Borewell M10 (PCC) 1.0 0.170 0.090 0.725 0.431 0.820 2.430
Flyash
Cement &
528 20-Jul-21 383+934 LHS MJB Pile no-06 of LP7 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
529 20-Jul-21 383+934 RHS MJB Pile no-03 of RP7 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
530 20-Jul-21 383+934 LHS MJB Pile no-09 of LP8 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
531 21-Jul-21 374+551 LHS ROB Pile no-06 of LP1 M35 (Pile) 14.0 4.928 1.232 9.632 6.356 9.758 61.600
Flyash
Cement &
532 21-Jul-21 388+594 RHS MJB Pier shaft RP2 M45 (RCC) 32.5 12.740 3.185 22.003 14.658 22.360 167.212
Flyash
Cement &
533 21-Jul-21 383+934 LHS MJB Pile no-09 of LP10 M35 6.0 2.112 0.528 4.128 2.724 4.182 26.400
Flyash
Cement &
534 21-Jul-21 Lamdapura Camp MJB Febrication yard M35 5.0 1.760 0.440 3.440 2.270 3.485 22.000
Flyash
Cement &
535 22-Jul-21 383+934 RHS MJB Pile no-02 of RP7 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Precast I Girder No-
Cement &
536 22-Jul-21 384+570 RHS MJB 01, 02, 03 & 04 of M50 (PSC) 103.0 43.260 10.815 70.658 47.071 66.023 459.380
Flyash
RP1-RA1
Cement &
537 22-Jul-21 388+594 RHS MJB Pier shaft Starter RP1 M45 (RCC) 1.5 0.588 0.147 1.016 0.677 1.032 7.717
Flyash
PCC for Pile Cap - Cement &
538 22-Jul-21 383+934 RHS MJB M15 (PCC) 10.0 2.250 0.800 7.580 5.000 7.680 28.900
LP10 Flyash
Cement &
539 22-Jul-21 Lamdapura Camp Girder Stacking yard M15 (PCC) 5.5 1.238 0.440 4.169 2.750 4.224 15.895
Flyash
Cement &
540 23-Jul-21 383+934 RHS MJB Pile no-01 of RP7 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
541 23-Jul-21 383+934 LHS MJB Pile no-06 of LP8 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
542 23-Jul-21 374+551 LHS MJB Pile no-01 of LP1 M35 (Pile) 14.0 4.928 1.232 9.632 6.356 9.758 61.600
Flyash
Cement &
543 23-Jul-21 388+594 RHS MJB Pier shaft starter LP1 M45 (RCC) 2.0 0.784 0.196 1.354 0.902 1.376 10.290
Flyash
PCC for Pile Cap - Cement &
544 23-Jul-21 388+594 RHS MJB M15 (PCC) 10.0 2.250 0.800 7.580 5.000 7.680 28.900
RP1 Flyash
Cement &
545 24-Jul-21 374+551 LHS MJB Pile no-05 of LP1 M35 (Pile) 14.0 4.928 1.232 9.632 6.356 9.758 61.600
Flyash
Precast I Girder No-
Cement &
546 24-Jul-21 384+570 RHS MJB 05, 06, 07 & 08 of M50 (PSC) 112.0 47.040 11.760 76.832 51.184 71.792 499.520
Flyash
RP1-RA1
PCC for Pile Cap - M15 (PCC) 0.225 0.080 0.758 0.500 0.768 2.890 Cement &
547 27-Jul-21 383+934 RHS MJB 1.0
LP10 Flyash

548 29-Jul-21 388+594 RHS MJB Pier shaft RP3 M45 (RCC) 32.0 12.544 3.136 21.664 14.432 22.016 164.640

549 29-Jul-21 LamdapuraCamp Steel Yard PedesSteel Yard Pedestal M15 (PCC) 1.5 0.338 0.120 1.137 0.750 1.152 4.335

Cement &
550 30-Jul-21 374+551 RHS MJB Pile no-04 of LP1 M35 (Pile) 12.0 4.224 1.056 8.256 5.448 8.364 52.800
Flyash
Precast I Girder No-
Cement &
551 30-Jul-21 384+570 RHS MJB 01, 02, 03 & 04 of M50 (PSC) 103.0 43.260 10.815 70.658 47.071 66.023 459.380
Flyash
RP1-RA2
Steel Yard
552 30-Jul-21 Lamdapura Camp Steel Yard Pedestal M15 (PCC) 1.0 0.225 0.080 0.758 0.500 0.768 2.890 d
Pedestal
Cement &
553 31-Jul-21 384+570 LHS MJB Pier shaft LP1 M45 (RCC) 13.5 5.292 1.323 9.140 6.089 9.288 69.458
Flyash
Cement &
554 31-Jul-21 374+564 LHS ROB Pile no-03 of LP1 M35(Pile) 12.0 4.224 1.056 8.256 5.448 8.364 52.800
Flyash
Cement &
555 31-Jul-21 374+564 LHS ROB Pile no-02 of LP1 M35(Pile) 12.0 4.224 1.056 8.256 5.448 8.364 52.800
Flyash
Cement &
556 8/1/2021 374+564 RHS ROB Pile no-01 of RP1 M35 (Pile) 12.0 4.224 1.056 8.256 5.448 8.364 52.800
Flyash
Cement &
557 8/1/2021 383+934 RHS MJB Pile cap PCC - RP9 M15 (PCC) 10.0 2.250 0.800 7.580 5.000 7.680 28.900
Flyash
Cement &
558 8/2/2021 374+564 RHS ROB Pile no-05 of RP1 M35 (Pile) 13.0 4.576 1.144 8.944 5.902 9.061 57.200
Flyash
Cement &
559 8/2/2021 374+564 LHS ROB Pile Cap PCC - LP1 M15 (PCC) 6.0 1.350 0.480 4.548 3.000 4.608 17.340
Flyash
Cement &
560 8/2/2021 388+594 MJB PCC M15 (PCC) 2.0 0.450 0.160 1.516 1.000 1.536 5.780
Flyash
Cement &
561 8/2/2021 Lamdapura Camp PCC near Office M15 (PCC) 1.5 0.338 0.120 1.137 0.750 1.152 4.335
Flyash
Cement &
562 8/3/2021 374+564 RHS ROB Pile no-04 of RP1 M35 (Pile) 13.0 4.576 1.144 8.944 5.902 9.061 57.200
Flyash
Cement &
563 8/3/2021 374+564 RHS ROB Pile no-06 of RP1 M35 (Pile) 16.0 5.632 1.408 11.008 7.264 11.152 70.400
Flyash
Cement &
564 8/3/2021 388+594 LHS MJB Pile Cap of LP1 M35 (RCC) 152.0 51.376 12.920 107.464 71.592 109.288 610.888
Flyash
Cement &
565 8/3/2021 383+934 RHS ROB Pile Cap PCC - RP6 M15 (PCC) 10.0 2.250 0.800 7.580 5.000 7.680 28.900
Flyash
Cement &
566 8/4/2021 374+564 RHS ROB Pile no-03 of RP1 M35 (Pile) 13.0 4.576 1.144 8.944 5.902 9.061 57.200
Flyash
Cement &
567 8/4/2021 374+564 RHS ROB Pile no-02 of RP1 M35 (Pile) 13.0 4.576 1.144 8.944 5.902 9.061 57.200
Flyash

Precast Girder No- 05,


Cement &
568 8/4/2021 384+570 RHS MJB 06, 07 & 08 of RP1- M50 111.0 46.620 11.655 76.146 50.727 71.151 495.060
Flyash
RA2

1.160 0.404 2.892 1.908 2.928 14.860 Cement &


569 8/4/2021 388+594 LHS MJB LP3 staging Pedestal M25 4.0
Flyash
Cement &
570 8/5/2021 374+564 LHS ROB Pile no-01 of LA1 M35 (Pile) 17.5 6.160 1.540 12.040 7.945 12.198 77.000
Flyash
Cement &
571 8/5/2021 383+934 RHS MJB Pile no-09 of RP1 M35 (Pile) 33.5 11.792 2.948 23.048 15.209 23.350 147.400
Flyash
Cement &
572 8/5/2021 383+934 LHS MJB Pile no-07 of LP7 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Flyash
Precast Girder No- 01,
Cement &
573 8/5/2021 388+594 LHS MJB 02, 03 & 04 of LA1- M50 103.0 43.260 10.815 70.658 47.071 66.023 459.380
Flyash
LP1
Cement &
574 8/6/2021 374+564 LHS ROB Pile no-05 of LA1 M35 (Pile) 14.0 4.928 1.232 9.632 6.356 9.758 61.600
Flyash
Cement &
575 8/6/2021 383+934 RHS MJB Pile no-10 of RP1 M35 (Pile) 34.0 11.968 2.992 23.392 15.436 23.698 149.600
Flyash

50.700 12.750 106.050 70.650 107.850 602.850 Cement &


576 8/6/2021 383+934 LHS MJB Pile Cap of LP6 M35 (RCC) 150.0
Flyash
Cement &
577 8/6/2021 388+594 LHS MJB Pier shaft LP1 M45 17.0 6.664 1.666 11.509 7.667 11.696 87.465
Flyash
Raft for Girder 10.143 2.646 22.522 15.026 22.901 121.496 Cement &
578 8/6/2021 Lamdapura Camp Casting Yard M30 31.5
stacking yard Flyash
Cement &
579 8/6/2021 383+934 RHS MJB Pile cap PCC of RP10 M15 (PCC) 10.0 2.250 0.800 7.580 5.000 7.680 28.900
Flyash
Cement &
580 8/6/2021 Lamdapura Camp Casting Yard Steel yard Pedestal M15 (PCC) 2.0 0.450 0.160 1.516 1.000 1.536 5.780
Flyash
Cement &
581 8/7/2021 374+564 LHS ROB Pile no-02 of LA1 M35 (Pile) 14.0 4.928 1.232 9.632 6.356 9.758 61.600
Flyash
Cement &
582 8/7/2021 374+564 LHS ROB Pile no-03 of LA1 M35 (Pile) 14.0 4.928 1.232 9.632 6.356 9.758 61.600
Flyash
Cement &
583 8/7/2021 383+934 RHS MJB Pile no-08 of RP1 M35 (Pile) 34.0 11.968 2.992 23.392 15.436 23.698 149.600
Flyash
Cement &
584 8/7/2021 388+594 LHS MJB Pile Cap of LA1 M35 (RCC) 111.0 37.518 9.435 78.477 52.281 79.809 446.109
Flyash
Cement &
585 8/7/2021 388+594 LHS MJB LP3 staging Pedestal M25 4.0 1.160 0.404 2.892 1.908 2.928 14.860
Flyash
Cement &
586 8/7/2021 388+594 RHS MJB RP4 PCC repair M15 (PCC) 2.5 0.563 0.200 1.895 1.250 1.920 7.225
Flyash
Cement &
587 8/7/2021 Lamdapura Camp Casting Yard Steel yard Pedestal M15 (PCC) 1.0 0.225 0.080 0.758 0.500 0.768 2.890
Flyash
Cement &
588 8/8/2021 374+564 LHS ROB Pile Cap PCC of RP1 M15 (PCC) 6.5 1.463 0.520 4.927 3.250 4.992 18.785
Flyash
Cement &
589 8/9/2021 374+564 LHS ROB Pile no-04 of LA1 M35 (Pile) 14.0 4.928 1.232 9.632 6.356 9.758 61.600
Flyash
Cement &
590 8/9/2021 383+934 LHS MJB Pile no-04 of LP7 M35 (Pile) 29.5 10.384 2.596 20.296 13.393 20.562 129.800
Flyash
Precast Girder No- 05,
Cement &
591 8/9/2021 388+594 LHS MJB 06, 07 & 08 of LA1- M50 103.0 43.260 10.815 70.658 47.071 66.023 459.380
Flyash
LP1
Cement &
592 8/10/2021 374+564 RHS ROB Pile no-03 of RA1 M35 (Pile) 13.0 4.576 1.144 8.944 5.902 9.061 57.200
Flyash
Cement &
593 8/10/2021 374+564 RHS ROB Pile no-04 of RA1 M35 (Pile) 13.0 4.576 1.144 8.944 5.902 9.061 57.200
Flyash
Pedestal for Girder Cement &
594 8/10/2021 Lamdapura Camp Casting Yard M30 6.0 1.932 0.504 4.290 2.862 4.362 23.142
stacking yard Flyash
Cement &
595 8/10/2021 Lamdapura Camp Casting Yard Stacking yard PCC M15 (PCC) 6.0 1.350 0.480 4.548 3.000 4.608 17.340
Flyash
Cement &
596 8/11/2021 383+934 LHS MJB Pier starter LP6 M45 2.0 0.784 0.196 1.354 0.902 1.376 10.290
Flyash
Cement &
597 8/11/2021 388+594 RHS MJB Pile Cap PCC of RA1 M15 (PCC) 9.0 2.025 0.720 6.822 4.500 6.912 26.010
Flyash
Cement &
598 8/11/2021 Lamdapura Camp Casting Yard Stacking yard PCC M15 (PCC) 3.5 0.788 0.280 2.653 1.750 2.688 10.115
Flyash
Cement &
599 8/12/2021 374+564 RHS ROB Pile no-02 of RA1 M35 (Pile) 13.0 4.576 1.144 8.944 5.902 9.061 57.200
Flyash
Cement &
600 8/12/2021 374+564 RHS ROB Pile no-01 of RA1 M35 (Pile) 17.0 5.984 1.496 11.696 7.718 11.849 74.800
Flyash
Cement &
601 8/12/2021 383+934 LHS MJB Pile no-03 of LP7 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
602 8/12/2021 388+594 LHS MJB Pier starter LP2 M45 2.0 0.784 0.196 1.354 0.902 1.376 10.290
Flyash
Precast Girder No- 01,
Cement &
603 8/12/2021 388+594 LHS MJB 02, 03 & 04 of LP2- M50 104.5 43.890 10.973 71.583 47.757 66.880 576.108
Flyash
LP3
Labour Cement &
604 8/12/2021 374+564 Labour room PCC M15 (PCC) 4.5 1.013 0.360 3.411 2.250 3.456 13.005
Hutment Flyash
Cement &
605 8/13/2021 374+564 RHS ROB Pile no-05 of RA1 M35 (Pile) 15.0 5.280 1.320 10.320 6.810 10.455 66.000
Flyash

52.390 13.175 109.585 73.005 111.445 622.945 Cement &


606 8/13/2021 388+594 RHS MJB Pile Cap of RP4 M35 (RCC) 155.0
Flyash
Subhelav Camp, Cement &
607 8/13/2021 LHS Box Culvert Box Culvert Raft M30 22.0 7.084 1.848 15.730 10.494 15.994 84.854
PNC, Ch-386+042 Flyash
Cement &
608 8/14/2021 383+934 RHS MJB Pile Cap PCC RP8 M15 (PCC) 10.0 2.250 0.800 7.580 5.000 7.680 28.900
Flyash
Cement &
609 8/14/2021 383+934 LHS MJB Pile Cap PCC LP8 M15 (PCC) 15.0 3.375 1.200 11.370 7.500 11.520 43.350
Flyash
Precast Girder No- 05, Cement &
610 8/14/2021 388+594 LHS MJB M50 105.0 44.100 11.025 71.925 47.985 67.200 578.865
06, 07, 08 of LP2-LP3 Flyash
Cement &
611 8/14/2021 374+564 LHS ROB Pile no-02 of LA2 M35 (Pile) 6.5 2.288 0.572 4.472 2.951 4.531 28.600
Flyash
Cement &
612 8/16/2021 374+564 LHS ROB Pile no-03 of LA2 M35 (Pile) 16.5 5.808 1.452 11.352 7.491 11.500 72.600
Flyash

25.857 6.503 54.085 36.032 55.003 307.454 Cement &


613 8/16/2021 374+551 RHS ROB Pile Cap of RP1 M35 (RCC) 76.5
Flyash

10.787 2.814 23.953 15.980 24.354 129.210 Cement &


614 8/16/2021 Lamdapura Camp Stocking Yard Raft M30 33.5
Flyash
Cement &
615 8/16/2021 388+594 RHS MJB Pile Cap PCC RA2 M15 (PCC) 11.0 2.475 0.880 8.338 5.500 8.448 31.790
Flyash
Cement &
616 8/16/2021 383+934 RHS MJB Pile no-03 of RP1 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Flyash
Cement &
617 8/16/2021 383+934 RHS MJB Pile no-07 of RP1 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Flyash
Cement &
618 8/17/2021 374+564 LHS ROB Pile no-05 of LA2 M35 (Pile) 16.5 5.808 1.452 11.352 7.491 11.500 72.600
Flyash
Cement &
619 8/17/2021 384+570 RHS MJB Pile Cap PCC RA1 M15 (PCC) 4.5 1.013 0.360 3.411 2.250 3.456 13.005
Flyash
Cement &
620 8/17/2021 383+934 RHS MJB Pile no-06 of RP1 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Flyash
Cement &
621 8/17/2021 383+934 LHS MJB Pile no-02 of LP7 M35 (Pile) 29.5 10.384 2.596 20.296 13.393 20.562 129.800
Flyash
Cement &
622 8/18/2021 374+564 LHS ROB Pile no-01 of LA2 M35 (Pile) 13.0 4.576 1.144 8.944 5.902 9.061 57.200
Flyash
Cement &
623 8/18/2021 374+564 LHS ROB Pile no-05 of LA2 M35 (Pile) 15.5 5.456 1.364 10.664 7.037 10.804 68.200
Flyash
Cement &
624 8/18/2021 383+934 RHS MJB Pile no-04 of RP1 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Flyash
Cement &
625 8/18/2021 388+594 LHS MJB Pier shaft LP2 M45 35.0 13.720 3.430 23.695 15.785 24.080 180.075
Flyash
Precast Box Culvert 3.864 1.008 8.580 5.724 8.724 46.284 Cement &
626 8/18/2021 Subhelav camp PNC M30 12.0
Segment Flyash
Cement &
627 8/19/2021 374+564 RHS ROB Pile no-01 of RA2 M35 (Pile) 14.0 4.928 1.232 9.632 6.356 9.758 61.600
Flyash
Cement &
628 8/19/2021 374+564 LHS ROB Pile Cap PCC LA1 M15 (PCC) 4.5 1.013 0.360 3.411 2.250 3.456 13.005
Flyash
Pile Head (for load Cement &
629 8/19/2021 388+594 MJB M50 2.5 1.050 0.263 1.713 1.143 1.600 13.782
test) Flyash
Cement &
630 8/20/2021 374+564 RHS ROB Pile no-03 of RA2 M35 (Pile) 16.5 5.808 1.452 11.352 7.491 11.500 72.600
Flyash
Precast Girder No- 01,
Cement &
631 8/20/2021 374+564 LHS ROB 02, 03 & 04 of LA1- M50 54.0 22.680 5.670 36.990 24.678 34.560 297.702
Flyash
LP1
Cement &
632 8/20/2021 383+934 RHS MJB Pile Cap PCC of RP7 M15 (PCC) 10.0 2.250 0.800 7.580 5.000 7.680 28.900
Flyash
Precast Girder Cement &
633 8/20/2021 Lamdapura Camp Casting Yard M30 22.0 7.084 1.848 15.730 10.494 15.994 84.854
Stacking yard pedestal Flyash
Cement &
634 8/21/2021 374+564 RHS ROB Pile no-01 of RA2 M35 (Pile) 14.0 4.928 1.232 9.632 6.356 9.758 61.600
Flyash
Cement &
635 8/21/2021 374+564 RHS ROB Pile no-04 of RA2 M35 (Pile) 14.0 4.928 1.232 9.632 6.356 9.758 61.600
Flyash
Cement &
636 8/21/2021 383+934 LHS MJB Pile no-01 of LP7 M35 (Pile) 29.5 10.384 2.596 20.296 13.393 20.562 129.800
Flyash

Precast Girder No- 01,


Cement &
637 8/21/2021 388+594 LHS MJB 02, 03 & 04 of LP3- M50 104.5 43.890 10.973 71.583 47.757 66.880 576.108
Flyash
LA2

52.390 13.175 109.585 73.005 111.445 622.945 Cement &


638 8/21/2021 384+570 LHS MJB Pile Cap of LP1 M35 (RCC) 155.0
Flyash
Cement &
639 8/22/2021 374+564 RHS ROB Pile no-05 of RA2 M35 (Pile) 15.0 5.280 1.320 10.320 6.810 10.455 66.000
Flyash
Cement &
640 8/22/2021 383+934 RHS MJB Pile no-05 of RP1 M35 (Pile) 36.0 12.672 3.168 24.768 16.344 25.092 158.400
Flyash
Cement &
641 8/23/2021 383+934 RHS MJB Pile no-02 of RP1 M35 (Pile) 33.5 11.792 2.948 23.048 15.209 23.350 147.400
Flyash
Cement &
642 8/23/2021 374+564 RHS ROB Pile Cap PCC of RA1 M15 (PCC) 4.5 1.013 0.360 3.411 2.250 3.456 13.005
Flyash
Precast Girder Cement &
643 8/23/2021 Lamdapura Camp Casting Yard M30 5.0 1.610 0.420 3.575 2.385 3.635 19.285
Stacking yard Pedestal Flyash
Cement &
644 8/23/2021 388+594 RHS MJB Pier Starter RP4 M45 2.0 0.784 0.196 1.354 0.902 1.376 10.290
Flyash
Cement &
645 8/23/2021 388+594 MJB Cribs Pedestal PCC M20 6.0 1.632 0.552 4.404 2.934 4.476 20.748
Flyash
Cement &
646 8/24/2021 383+934 RHS MJB Pile no-01 of RP1 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Flyash
Cement &
647 8/24/2021 374+564 RHS ROB Pile Cap PCC of RA2 M15 (PCC) 4.5 1.013 0.360 3.411 2.250 3.456 13.005
Flyash
Cement &
648 8/24/2021 374+564 LHS ROB Pile Cap PCC of LA2 M15 (PCC) 4.5 1.013 0.360 3.411 2.250 3.456 13.005
Flyash

1.015 0.354 2.531 1.670 2.562 13.003 Cement &


649 8/24/2021 388+594 LHS MJB LP3 staging Pedestal M25 3.5
Flyash
Precast Girder No- 05,
Cement &
650 8/24/2021 388+594 LHS MJB 06, 07 & 08 of LP3- M50 105.0 44.100 11.025 71.925 47.985 67.200 551.250
Flyash
LA2

11.440 2.860 22.360 14.755 22.653 143.000 Cement &


651 8/25/2021 383+934 RHS MJB Pile no-10 of RP2 M35 (Pile) 32.5
Flyash

11.968 2.992 23.392 15.436 23.698 149.600 Cement &


652 8/25/2021 383+934 RHS MJB Pile no-06 of RP2 M35 (Pile) 34.0
Flyash

0.704 0.176 1.376 0.908 1.394 8.800 Cement &


653 8/25/2021 384+570 MJB Pile head M35 (Pile) 2.0
Flyash
Precast Girder 1.932 0.504 4.290 2.862 4.362 23.142 Cement &
654 8/25/2021 Lamdapura Camp Casting Yard M30 6.0
Stacking yard Pedestal Flyash

5.796 1.512 12.870 8.586 13.086 69.426 Cement &


655 8/25/2021 Subhelav Camp, PNC Box Culvert Box Culvert Raft M30 18.0
Flyash
Cement &
656 8/26/2021 383+934 RHS MJB Pile no- 09 of RP2 M35 (Pile) 31.5 11.088 2.772 21.672 14.301 21.955 138.600
Flyash
Cement &
657 8/26/2021 383+934 RHS MJB Pile no-07 of RP2 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Flyash
LP3 staging cribs 1.015 0.354 2.531 1.670 2.562 13.003 Cement &
658 8/26/2021 388+594 LHS MJB M25 3.5
pedestal Flyash
Precast Girder No- 01,
Cement &
659 8/26/2021 388+594 LHS MJB 02, 03 & 04 of RA1 - M50 105.5 44.310 11.077 72.268 48.214 67.520 553.875
Flyash
RP1
Precast Box Culvert Cement &
660 8/26/2021 Subhelav Camp, PNC Box Culvert M30 28.5 9.177 2.394 20.377 13.595 20.720 109.925
Segment Flyash
Cement &
661 8/26/2021 383+934 MJB Labour Room PCC M15 (PCC) 2.0 0.450 0.160 1.516 1.000 1.536 5.780
Flyash
Cement &
662 8/27/2021 383+934 LHS MJB Pile no- 02 of LP1 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Flyash
Cement &
663 8/27/2021 383+934 LHS MJB Pile no-08 of LP7 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
664 8/27/2021 383+934 RHS MJB Pile no-04 of RP2 M35 (Pile) 32.5 11.440 2.860 22.360 14.755 22.653 143.000
Flyash
Precast Girder No- 05,
Cement &
665 8/27/2021 374+564 LHS ROB 06, 07 of LA1-LP1 & M50 53.5 22.470 5.618 36.648 24.450 34.240 280.875
Flyash
01 of LP1 - LP2
Precast Box Culvert Cement &
666 8/27/2021 Subhelav Camp, PNC Box Culvert M30 3.5 1.127 0.294 2.503 1.670 2.544 13.500
Haunch Flyash
Cement &
667 8/27/2021 388+594 RHS MJB Pile Head of RA2 M50 3.0 1.260 0.315 2.055 1.371 1.920 15.750
Flyash
Cement &
668 8/28/2021 383+934 LHS MJB Pile no- 08 of LP1 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Flyash
Cement &
669 8/28/2021 384+570 LHS MJB Pile Head M35 (RCC) 2.0 0.676 0.170 1.414 0.942 1.438 8.038
Flyash
Abutment Shaft of Cement &
670 8/28/2021 388+594 LHS MJB M40 4.0 1.444 0.364 2.776 1.852 2.824 18.984
LA1 Flyash
Precast Girder PCC for Precast Cement &
671 8/28/2021 Lamdapura Camp M15 (PCC) 9.0 2.025 0.720 6.822 4.500 6.912 26.010
Stacking Yard Girder Stacking Yard Flyash
Cement &
672 8/29/2021 383+934 LHS MJB Pile no- 07 of LP1 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Flyash
Cement &
673 8/29/2021 383+934 RHS MJB Pile no- 01 of RP2 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Flyash
Cement &
674 8/29/2021 384+570 LHS MJB Pile Cap of LP10 M35 (RCC) 153.0 51.714 13.005 108.171 72.063 110.007 614.907
Flyash
Cement &
675 8/30/2021 374+937 RHS MJB Pile no- 03 of RP1 M35 (Pile) 24.0 8.448 2.112 16.512 10.896 16.728 105.600
Flyash
Precast Girder PCC for Precast Cement &
676 8/31/2021 Lamdapura Camp M15 (PCC) 1.0 0.225 0.080 0.758 0.500 0.768 2.890
Stacking Yard Girder Stacking Yard Flyash
Cement &
677 9/1/2021 374+937 RHS MJB Pile no- 05 of RP1 M35(Pile) 22.5 0.0 22.5 7.920 1.980 15.480 10.215 15.683 99.000
Flyash
Cement &
678 9/1/2021 383+934 LHS MJB Pile no- 04 of LP1 M35(Pile) 33.0 0.0 33.0 11.616 2.904 22.704 14.982 23.001 145.200
Flyash

679 9/2/2021 374+937 RHS MJB Pile no- 04 of RP1 M35(Pile) 24.0 0.0 24.0 8.448 2.112 16.512 10.896 16.728 105.600

680 9/2/2021 383+934 RHS MJB Pile no-02 of RP2 M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Precast Girder No- 05,
681 9/2/2021 388+594 RHS MJB 06, 07 & 08 of RA1 - M50(PSC) 104.0 0.0 104.0 43.680 10.920 71.240 47.528 66.560 546.000
RP1
682 9/3/2021 374+937 RHS MJB Pile no- 02 of RP1 M35(Pile) 15.0 0.0 15.0 5.280 1.320 10.320 6.810 10.455 66.000

Abutment Shaft-2 of
683 9/3/2021 388+594 LHS MJB M40(RCC) 4.0 0.0 4.0 1.444 0.364 2.776 1.852 2.824 18.984
LA1

684 9/3/2021 374+564 RHS ROB PCC for RA1 M15(PCC) 1.0 0.0 1.0 0.225 0.080 0.758 0.500 0.768 2.890

685 9/4/2021 374+937 RHS MJB Pile no- 02 of RP1 M35(Pile) 7.0 0.0 7.0 2.464 0.616 4.816 3.178 4.879 30.800

686 9/4/2021 383+934 LHS MJB Pier Shaft of LP6 M45(RCC) 38.0 0.0 38.0 14.896 3.724 25.726 17.138 26.144 195.510

Precast Girder No-


687 9/4/2021 388+594 LHS MJB M50(PSC) 106.5 0.0 106.5 44.730 11.183 72.953 48.671 68.160 559.125
1,2,3,4 of LP1 - LP2
688 9/4/2021 383+934 LHS MJB Pile no- 09 of LP7 M35(Pile) 29.5 0.0 29.5 10.384 2.596 20.296 13.393 20.562 129.800
689 9/5/2021 388+594 LHS MJB Pier cap of LP3 M45(RCC) 91.0 0.0 91.0 35.672 8.918 61.607 41.041 62.608 468.650
690 9/6/2021 383+934 RHS MJB Pile no- 02 of RP3 M35(Pile) 33.5 0.0 33.5 11.792 2.948 23.048 15.209 23.350 147.400
PCC for
PCC for Contractor
691 9/6/2021 384+570 Contractor M15(PCC) 2.5 0.0 2.5 0.563 0.200 1.895 1.250 1.920 7.225
room
room
PCC for Panel
PCC for Panel precast
692 9/6/2021 Lamdapura Camp precast M15(PCC) 4.5 0.0 4.5 1.013 0.360 3.411 2.250 3.456 13.005
platform
platform
Precast Girder No-
693 9/7/2021 388+594 LHS MJB 5,6,7,&8 of LP1 - LP2 M50(PSC) 27.0 0.0 27.0 11.340 2.835 18.495 12.339 17.280 134.730
694 9/7/2021 383+934 RHS MJB Pile no- 03 of Rp3 M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
695 9/8/2021 383+934 RHS MJB Pile no- 01 of RP3 M35(Pile) 15.0 15.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Precast Girder No-
696 9/8/2021 388+594 LHS MJB 5,6,7,&8 of LP1 - LP2 M50(PSC) 78.5 0.0 78.5 33.755 8.243 53.773 35.875 50.240 391.715
697 9/8/2021 383+934 LHS MJB Pile Cap of LP8 M35(RCC) 121.00 36.0 157.0 53.066 13.345 110.999 73.947 112.883 630.983
698 9/9/2021 383+934 LHS MJB Pile no- 10 of LP7 M35(Pile) 29.5 0.0 29.5 10.384 2.596 20.296 13.393 20.562 129.800

Precast Girder No-


699 9/9/2021 374+564 LHS MJB M50(PSC) 53.0 0.0 53.0 22.260 5.565 36.305 24.221 33.920 278.250
2,3,4,5 of LP1 - LP2

PCC for Panel


PCC for Panel precast
700 9/9/2021 Lamdapura Camp precast M15(PCC) 4.0 0.0 4.0 0.900 0.320 3.032 2.000 3.072 11.560
platform
platform
701 9/9/2021 383+934 RHS MJB Pile no- 04 of RP3 M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
702 9/10/2021 383+934 RHS MJB Pile no.09 of RP2 M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Pile cap pcc Pile cap pcc repair
703 9/10/2021 383+934 M15(PCC) 1.5 0.0 1.5 0.338 0.120 1.137 0.750 1.152 4.335
repair RP6 RP6
704 9/11/2021 0 0 0 0 0 0 0 0 0 0 0 0 0 0
705 9/12/2021 0 0 0 0 0 0 0 0 0 0 0 0 0 0
706 9/13/2021 388+594 MJB Cribs pedestal M25 3.5 0.0 3.5 1.015 0.354 2.531 1.670 2.562 13.003
Precast Girder No-
707 9/14/2021 388+594 RHS MJB M50(PSC) 105.0 0.0 105.0 45.150 11.025 71.925 47.985 67.200 523.950
1,2,3&4 of RP1-RP2
Precast pedestal 05 1.160 0.404 2.892 1.908 2.928 14.860
708 9/15/2021 383+934 MJB M25 4.0 0.0 4.0
nos.
Precast panel 08 nos.
709 9/15/2021 388+594 LHS MJB M40(RCC) 4.0 0.0 4.0 1.444 0.364 2.824 1.880 2.868 14.464
for LA1-LP1
Precast Girder No-
710 9/16/2021 388+594 RHS MJB M50(PSC) 105.0 0.0 105.0 45.150 11.025 71.925 47.985 67.200 523.950
5,6,7&8 of RP1-RP2
711 9/16/2021 374+564 LHS ROB Pile Cap of LP1 M35(RCC) 72.00 0.0 72.0 24.336 6.120 50.904 33.912 51.768 289.368

complete total
dispatched qty.
712 9/17/2021 374+564 LHS ROB Pile Cap of LP1 M35(RCC) 8.50 0.0 8.5 2.873 0.723 6.010 4.004 6.111 34.162 including
previous day:-
80.5 cum
Precast Cribs pedestal 1.450 0.505 3.615 2.385 3.660 18.575
713 9/18/2021 383+934 MJB M25 5.0 0.0 5.00
5nos.
714 9/18/2021 383+934 LHS MJB Pile no- 09 of LP1 M35(Pile) 33.0 0.0 33.0 11.616 2.904 22.704 14.982 23.001 145.200
Precast panel nos.5 for
715 9/18/2021 388+594 LHS MJB M40(RCC) 2.75 0.0 2.75 0.993 0.250 1.942 1.293 1.972 9.944
LA1-LP1
716 9/19/2021 383+934 MJB Precast pedestal M25 3.0 0.0 3.00 0.870 0.303 2.169 1.431 2.196 11.145
717 9/19/2021 383+934 LHS MJB Pile no- 06 of LP1 M35(Pile) 37.0 0.0 37.0 13.024 3.256 25.456 16.798 25.789 162.800
718 9/20/2021 0 0 0 0 0 0 0 0 0 0 0 0 0 0
719 9/21/2021 383+934 LHS MJB Pile no- 05 of LP1 M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Precast Girder No-
720 9/22/2021 388+594 RHS MJB M50(PSC) 106.0 0.0 106.0 45.580 11.130 72.610 48.442 67.840 528.940
5,6,7&8 of RP2-RP3
721 9/22/2021 383+934 RHS ROB Pile Cap of LP1 M35(RCC) 50.00 0.0 50.0 16.900 4.250 35.350 23.550 35.950 200.950
722 9/22/2021 388+594 LHS MJB PCC for LA1 Pedestal M15(PCC) 4.5 0.0 4.5 1.013 0.360 3.411 2.250 3.456 13.005
723 9/22/2021 374+564 RHS ROB Pile Cap of RA1 M35(RCC) 8.0 0.0 8.0 2.704 0.680 5.656 3.768 5.752 32.152
724 9/22/2021 Lamdapura Camp Steel Yard PCC at Steel yard M15(PCC) 1.0 0.0 1.0 0.225 0.080 0.758 0.500 0.768 2.890
725 9/23/2021 383+934 RHS MJB Pile Cap of RP9 M35(RCC) 98.00 4.0 102.0 34.476 8.670 72.114 48.042 73.338 409.938
Precast panel 09 nos.
726 9/23/2021 388+594 LHS MJB M40(RCC) 4.5 0.0 4.5 1.624 0.410 3.177 2.115 3.226 16.272
for LA1-LP1

Precast Girder No-


727 9/24/2021 374+564 LHS ROB 06&07 of LP1-LP2, & M50(PSC) 54.0 0.0 54.0 22.680 5.670 36.990 24.678 34.560 269.460
01&02 of LP3-LA2

728 9/24/2021 383+934 LHS MJB Pile no- 06 of LP5 M35(Pile) 35.5 0.0 35.5 12.496 3.124 24.424 16.117 24.743 156.200
Precast pedestal 10 2.320 0.808 5.784 3.816 5.856 29.720
729 9/24/2021 383+934 MJB M25 8.0 0.0 8.00
nos.
Precast Girder No-
730 9/25/2021 388+594 RHS MJB 05,06,07&08 of RP2- M50(PSC) 105.5 0.0 105.5 44.310 11.077 72.268 48.214 67.520 526.445
RP3
Precast panel 09 nos.
731 9/25/2021 388+594 LHS MJB M40(RCC) 4.75 0.0 4.75 1.715 0.432 3.354 2.233 3.406 17.176
for LA1-LP1
732 9/25/2021 383+934 LHS MJB Pile no- 08 of LP5 M35(Pile) 35.5 0.0 35.5 12.496 3.124 24.424 16.117 24.743 156.200
Precast pedestal 05 1.160 0.404 2.892 1.908 2.928 14.860
733 9/25/2021 383+934 MJB M25 4.0 0.0 4.00
nos.
734 9/26/2021 374+564 RHS ROB Pier shaft RP1 1st lift M40(RCC) 23.50 0.0 23.50 8.484 2.139 16.591 11.045 16.850 111.625
735 9/27/2021 383+934 LHS MJB Pile no- 09 of LP5 M35(Pile) 35.5 0.0 35.5 12.496 3.124 24.424 16.117 24.743 156.200
736 9/28/2021 383+934 LHS MJB Pile no- 07 of LP5 M35(Pile) 35.5 0.0 35.5 12.496 3.124 24.424 16.117 24.743 156.200
Precast panel 09 nos.
737 9/28/2021 388+594 LHS MJB M40(RCC) 4.75 0.0 4.75 1.715 0.432 3.354 2.233 3.406 17.176
for LA1-LP1
Precast Girder No-
738 9/29/2021 388+594 RHS MJB 01,02,03,04 of RP3- M50(PSC) 105.0 0.0 105.0 44.100 11.025 71.925 47.985 67.200 523.950
RP4
Precast panel 04 nos.
739 9/29/2021 388+594 LHS MJB M40(RCC) 2.00 0.0 2.00 0.722 0.182 1.412 0.940 1.434 7.232
for LA1-LP1
Labour's Room
740 9/30/2021 384+570 PCC at labours room M15(PCC) 2.5 0.0 2.5 0.563 0.200 1.895 1.250 1.920 7.225
PCC
741 9/30/2021 374+564 LHS MJB Pile Cap of LA1 M35(RCC) 60.00 0.0 60.0 20.280 5.100 42.420 28.260 43.140 241.140
742 9/30/2021 383+934 LHS MJB Pile no- 10 of LP5 M35(Pile) 35.5 0.0 35.5 12.496 3.124 24.424 16.117 24.743 156.200
743 9/30/2021 383+934 MJB MS Pipe fixing M25 0.5 0.0 0.50 0.145 0.051 0.362 0.239 0.366 1.858
Labour's Room
744 10/1/2021 374+564 PCC at labours room M15(PCC) 1.0 0.0 1.0 0.225 0.080 0.758 0.500 0.768 2.890
PCC
745 10/1/2021 388+594 LHS MJB Pier Cap of LP1 M45(RCC) 30.0 6.0 36.0 14.112 3.528 24.372 16.236 24.768 185.220
746 10/1/2021 388+594 LHS MJB Pier Cap of LP1 M45(RCC) 52.5 0.0 52.5 22.575 0.000 36.645 24.413 40.425 215.250
747 10/1/2021 383+934 RHS MJB Pile no- 06 of RP5 M35(Pile) 35.5 0.0 35.5 14.378 0.000 24.815 16.366 27.300 138.450
748 10/1/2021 383+934 MJB MS Pipe fixing M25 0.5 0.0 0.50 0.145 0.051 0.362 0.239 0.366 1.858
Electric pole fixing 0.580 0.202 1.446 0.954 1.464 7.430
749 10/1/2021 383+934 MJB M25 2.0 0.0 2.00
and illumination
Precast Girder No-
750 10/2/2021 374+564 LHS ROB 03,04,05,&06 of LP3- M50(PSC) 53.0 0.0 53.0 22.260 5.565 36.305 24.221 33.920 264.470
LA2
751 10/2/2021 383+934 RHS MJB Pile no- 08 of RP5 M35(Pile) 12.5 24.0 36.5 12.848 3.212 25.112 16.571 25.440 160.600
752 10/2/2021 383+934 RHS MJB Pile no- 10 of RP5 M35(Pile) 29.5 6.0 35.5 12.496 3.124 24.424 16.117 24.743 156.200
753 10/2/2021 383+934 RHS MJB Pile Cap of RP6 M35(RCC) 53.50 96.0 149.5 50.531 12.708 105.697 70.414 107.491 600.841
754 10/3/2021 383+934 RHS MJB Pile no- 09 of RP5 M35(Pile) 35.5 0.0 35.5 12.496 3.124 24.424 16.117 24.743 156.200
755 10/3/2021 383+934 RHS MJB Pile no- 07 of RP5 M35(Pile) 35.5 0.0 35.5 12.496 3.124 24.424 16.117 24.743 156.200
Precast Girder No-
756 10/4/2021 388+594 RHS MJB 05,06,07,&08 of RP3- M50(PSC) 104.5 0.0 104.5 43.890 10.973 71.583 47.757 66.880 521.455
RP4
Precast panel 07 nos.
757 10/4/2021 388+594 LHS MJB M40(RCC) 3.50 0.0 3.50 1.264 0.319 2.471 1.645 2.510 12.656
for LA1-LP1
758 10/4/2021 383+934 RHS MJB Pile no- 08 of RP2 M35(Pile) 33.0 0.0 33.0 11.616 2.904 22.704 14.982 23.001 145.200
Labour's Room
759 10/5/2021 388+594 PCC for labours room M15(PCC) 6.5 0.0 6.5 1.463 0.520 4.927 3.250 4.992 18.785
PCC
Precast panel 06 nos.
760 10/5/2021 388+594 LHS MJB M40(RCC) 3.25 0.0 3.25 1.173 0.296 2.294 1.527 2.330 11.752
for LA1-LP1
761 10/5/2021 374+937 LHS MJB Pile no- 06 of LP1 M35(Pile) 10.0 0.0 10.0 3.520 0.880 6.880 4.540 6.970 44.000 Continue….
Precast panel Precast panel flooring
762 10/5/2021 Lamdapura Camp M15(PCC) 6.0 0.0 6.0 1.350 0.480 4.548 3.000 4.608 17.340
casting yard PCC
Precast pedestal 0.870 0.303 2.169 1.431 2.196 11.145
763 10/5/2021 388+594 MJB M25 3.0 0.0 3.00
casting
764 10/6/2021 383+934 RHS MJB Pile no- 09 of RP1A M35(Pile) 33.0 0.0 33.0 11.616 2.904 22.704 14.982 23.001 145.200
765 10/6/2021 374+937 LHS MJB Pile no- 01 of LA1 M35(Pile) 25.0 0.0 25.0 8.800 2.200 17.200 11.350 17.425 110.000
766 10/6/2021 374+937 LHS MJB Pile no- 03 of LA1 M35(Pile) 22.0 0.0 22.0 7.744 1.936 15.136 9.988 15.334 96.800
Balance Qty-10
767 10/6/2021 374+937 LHS MJB Pile no- 06 of LP1 M35(Pile) 10.0 0.0 10.0 3.520 0.880 6.880 4.540 6.970 44.000 cum. (Previous
day)
Cover Block
768 10/6/2021 Lamdapura Camp Cover Block Casting M35(RCC) 0.25 0.0 0.25 0.085 0.021 0.177 0.118 0.180 1.005
Casting
Precast Girder No-
769 10/7/2021 388+594 RHS MJB 01,02,03,&04 of RP4- M50(PSC) 92.0 12.5 104.5 43.890 10.973 71.583 47.757 66.880 521.455
RP5
770 10/7/2021 383+934 RHS MJB Pile no- 10 of RP1A M35(Pile) 0.0 30.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
771 10/7/2021 383+934 RHS MJB Pile no- 08 of RP1A M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
772 10/7/2021 388+594 LHS MJB Abutment Cap of LA1 M45(RCC) 47.0 0.0 47.0 18.424 4.606 31.819 21.197 32.336 241.815
773 10/8/2021 383+934 RHS MJB Pile no- 01 of RP1A M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
774 10/8/2021 383+934 RHS MJB Pile no- 02 of RP1A M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Precast panel 06 nos.
775 10/8/2021 388+594 LHS MJB M40(RCC) 3.00 0.0 3.00 1.083 0.273 2.118 1.410 2.151 10.848
for LA1-LP1
Precast Girder No-
776 10/9/2021 388+594 RHS MJB 05,06,07,&08 of RP4- M50(PSC) 103.5 0.0 103.5 43.470 10.868 70.898 47.300 66.240 516.465
RP5
Pier shaft starter of
777 10/9/2021 383+934 LHS MJB M45(RCC) 2.0 0.0 2.0 0.784 0.196 1.354 0.902 1.376 10.290
RP6
Precast panel 06 nos.
778 10/9/2021 388+594 LHS MJB M40(RCC) 3.25 0.0 3.25 1.173 0.296 2.294 1.527 2.330 11.752
for LA1-LP1
779 10/9/2021 374+564 RHS ROB Pier Shaft of RP1 M40(RCC) 10.50 0.0 10.50 3.790 0.956 7.413 4.935 7.528 37.968
780 10/9/2021 374+937 RHS MJB Pile no- 01 of RA1 M35(Pile) 20.0 0.0 20.0 7.040 1.760 13.760 9.080 13.940 88.000
781 10/9/2021 383+934 RHS MJB Pile no- 03 of RP1A M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 136.400
782 10/9/2021 374+937 LHS MJB Pile no- 02 of LA1 M35(Pile) 20.0 0.0 20.0 7.040 1.760 13.760 9.080 13.940 88.000
Precast pedestal 0.870 0.303 2.169 1.431 2.196 11.145
783 10/9/2021 388+594 MJB M25 3.0 0.0 3.00
casting

Precast Girder No-


784 10/10/2021 374+564 RHS ROB 07&01 of LP3-LA2 & M50(PSC) 54.5 0.0 54.5 22.890 5.723 37.333 24.907 34.880 271.955
02&03 of RA1-RP1

785 10/10/2021 383+934 RHS MJB Pile no- 04 of RP1A M35(Pile) 16.0 15.0 31.0 10.912 2.728 21.328 14.074 21.607 136.400
786 10/10/2021 383+934 RHS MJB Pile no- 05 of RP1A M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 136.400
787 10/10/2021 374+937 LHS MJB Pile no- 04 of LA1 M35(Pile) 20.0 0.0 20.0 7.040 1.760 13.760 9.080 13.940 88.000
Precast panel 04 nos.
788 10/11/2021 388+594 LHS MJB M40(RCC) 2.25 0.0 2.25 0.812 0.205 1.588 1.057 1.613 8.136
for LA1-LP1
789 10/11/2021 383+934 RHS MJB Pile no- 06 of RP1A M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 136.400
790 10/11/2021 383+934 RHS MJB Pile no- 07 of RP1A M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 136.400
791 10/11/2021 374+937 RHS MJB Pile no- 03 of RA1 M35(Pile) 22.0 0.0 22.0 7.744 1.936 15.136 9.988 15.334 96.800
792 10/12/2021 383+934 RHS MJB Pile no- 02 of RP2 M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
PCC for office PCC for office room at
793 10/12/2021 374+937 M15(PCC) 2.0 0.0 2.0 0.450 0.160 1.516 1.000 1.536 5.780
room at site site
794 10/13/2021 388+594 RHS MJB Pier shaft RP4 M45(RCC) 31.5 0.0 31.5 12.348 3.087 21.326 14.207 21.672 162.068
795 10/13/2021 384+570 RHS MJB Pile Cap of RA1 M35(RCC) 100.00 10.0 110.0 37.180 9.350 77.770 51.810 79.090 442.090
796 10/13/2021 374+937 RHS MJB Pile no- 05 of LP1 M35(Pile) 25.0 0.0 25.0 8.800 2.200 17.200 11.350 17.425 110.000
797 10/13/2021 383+934 LHS MJB Pile no- 01 of LP1B M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Precast pedestal 0.870 0.303 2.169 1.431 2.196 11.145
798 10/13/2021 388+594 MJB M25 3.0 0.0 3.00
casting
Precast pedestal 0.580 0.202 1.446 0.954 1.464 7.430
799 10/13/2021 374+564 ROB M25 2.0 0.0 2.00
casting
800 10/14/2021 383+934 RHS MJB Pier shaft RP6 M45(RCC) 39.0 0.0 39.0 15.288 3.822 26.403 17.589 26.832 200.655
801 10/14/2021 374+564 LHS ROB Pile Cap of LA2 M35(RCC) 63.00 0.0 63.0 21.294 5.355 44.541 29.673 45.297 253.197
802 10/14/2021 374+564 RHS ROB Pile no- 4 of RA1 M35(Pile) 20.0 0.0 20.0 8.100 0.000 13.980 9.220 15.380 78.000
803 10/14/2021 383+934 RHS MJB Pile no- 09 of RP1B M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
804 10/14/2021 383+934 RHS MJB Pile no- 10 of RP1B M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
805 10/14/2021 383+934 RHS MJB Pile no- 2 of RP1B M35(Pile) 30.0 0.0 30.0 12.150 0.000 20.970 13.830 23.070 117.000
Precast panel 04 nos.
806 10/14/2021 388+594 LHS MJB M40(RCC) 5.25 0.0 5.25 1.895 0.478 3.706 2.468 3.764 18.984
for LA1-LP1
807 10/15/2021 374+564 RHS ROB Pile no- 02 of RA1 M35(Pile) 20.0 0.0 20.0 8.100 0.000 13.980 9.220 15.380 78.000
808 10/15/2021 383+934 RHS MJB Pile no- 03 of RP1B M35(Pile) 29.0 0.0 29.0 11.745 0.000 20.271 13.369 22.301 113.100
809 10/16/2021 383+934 RHS MJB Pier shaft RP6 M45(RCC) 2.0 0.0 2.0 0.784 0.196 1.354 0.902 1.376 10.290
810 10/16/2021 384+570 LHS MJB Pile Cap of LA1 M35(RCC) 85.00 0.0 85.0 28.730 7.225 60.095 40.035 61.115 341.615
811 10/16/2021 384+570 LHS MJB Pile Cap of LA1 M35(RCC) 22.00 0.0 22.0 8.360 0.000 15.818 10.428 17.402 71.060
812 10/16/2021 374+564 RHS ROB Pile no- 4 of LP1 M35(Pile) 21.5 0.0 21.5 8.708 0.000 15.029 9.912 16.534 83.850
Precast Girder No-
813 10/16/2021 388+594 RHS MJB M50(PSC) 107.3 0.0 107.3 45.045 11.261 73.466 49.013 68.640 535.178
1,2,3&4 RP5-RA2
814 10/16/2021 383+934 RHS MJB Pile no- 4 of RP1B M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
815 10/16/2021 383+934 RHS MJB Pile no- 5 of RP1B M35(Pile) 30.0 0.0 30.0 12.150 0.000 20.970 13.830 23.070 117.000
PCC for RP7 &RP8
816 10/16/2021 383+934 RHS MJB M15(PCC) 5.0 0.0 5.0 1.125 0.400 3.790 2.500 3.840 14.450
Reparing Work
Precast panel 13 nos.
817 10/16/2021 388+594 LHS MJB M40(RCC) 6.75 0.0 6.75 2.437 0.614 4.765 3.173 4.840 24.408
for LA1-LP1
818 10/17/2021 383+934 RHS MJB Pile no- 8 of RP1B M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
819 10/17/2021 383+934 RHS MJB Pile no- 7 of RP1B M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
820 10/17/2021 383+934 RHS MJB Pile no- 6 of RP1B M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Pier Shaft 1st lift of
821 10/17/2021 374+564 LHS ROB M40(RCC) 23.00 0.0 23.00 8.303 2.093 16.238 10.810 16.491 83.168
LP1

822 10/17/2021 383+934 RHS MJB PCC for RP1 Pile Cap M15(PCC) 9.0 0.0 9.0 2.025 0.720 6.822 4.500 6.912 26.010

PCC for RP8 Reparing


823 10/17/2021 383+934 RHS MJB M15(PCC) 2.0 0.0 2.0 0.450 0.160 1.516 1.000 1.536 5.780
Work

824 10/17/2021 374+937 RHS MJB PCC for RA1 Pile Cap M15(PCC) 4.0 0.0 4.0 0.900 0.320 3.032 2.000 3.072 11.560
825 10/17/2021 Lamdapura Camp Steel Yard PCC for Steel Yard M15(PCC) 5.0 0.0 5.0 1.300 0.000 3.800 2.505 4.180 10.400
Precast Girder No-
826 10/18/2021 388+594 RHS MJB M50(PSC) 108.00 0.0 108.0 45.360 11.340 73.980 49.356 69.120 538.920
5,6,7&8 RP5-RA2
827 10/18/2021 374+937 LHS MJB Pile no- 03 of LP1 M35(Pile) 21.0 0.0 21.0 7.392 1.848 14.448 9.534 14.637 92.400
Abutment Shaft of
828 10/18/2021 384+570 RHS MJB M40(RCC) 4.50 0.0 4.5 1.624 0.410 3.177 2.115 3.226 16.272
RA1 (a)
Precast Panel (Deck
829 10/18/2021 388+594 LHS MJB M40(RCC) 4.25 0.0 4.25 1.534 0.387 3.000 1.997 3.047 15.368
slab) 08 Nos.
PCC for RP8 Reparing
830 10/18/2021 383+934 RHS MJB M15(PCC) 4.0 0.0 4.0 0.900 0.320 3.032 2.000 3.072 11.560
Work

831 10/18/2021 374+937 LHS MJB PCC for LA1 Pile Cap M15(PCC) 4.5 0.0 4.5 1.013 0.360 3.411 2.250 3.456 13.005

832 10/18/2021 384+570 Labour room PCC for Labour room M15(PCC) 3.0 0.0 3.0 0.675 0.240 2.274 1.500 2.304 8.670
833 10/19/2021 384+570 LHS MJB Pile no- 09 of LP2 M35(Pile) 31.5 0.0 31.5 11.088 2.772 21.672 14.301 21.955 138.600
834 10/19/2021 383+934 RHS MJB Pile repairing for RP7 M35(Pile) 2.0 0.0 2.0 0.704 0.176 1.376 0.908 1.394 8.800
Pier shaft starter for
835 10/19/2021 383+934 RHS MJB M45(RCC) 3.5 0.0 3.5 1.372 0.343 2.370 1.579 2.408 18.008
LP10 & LP8
Precast Panel for LP1-
836 10/19/2021 388+594 LHS MJB LP2 (Deck slab) 08 M40(RCC) 4.25 0.0 4.25 1.534 0.387 3.000 1.997 3.047 15.368
Nos.

837 10/19/2021 383+934 RHS MJB PCC for RP2 Pile Cap M15(PCC) 8.5 0.0 8.5 1.913 0.680 6.443 4.250 6.528 24.565

Precast Girder No-


838 10/20/2021 374+564 RHS MJB M50(PSC) 54.25 0.0 54.25 22.785 5.696 37.161 24.792 34.720 270.708
4,5,6&7 of RA1-RP1

Pier shaft LP1 & RA1


839 10/20/2021 384+570 RHS MJB M45(RCC) 25.0 0.0 25.0 9.800 2.450 16.925 11.275 17.200 128.625
Abutment collumn

Precast Panel for LP1-


840 10/20/2021 388+594 LHS MJB LP2 (Deck slab) 07 M40(RCC) 3.75 0.0 3.75 1.354 0.341 2.648 1.763 2.689 13.560
Nos.
841 10/20/2021 Lamdapura Camp MJB Raft for Gantry Wall M25 6.5 0.0 6.50 1.885 0.657 4.700 3.101 4.758 24.148
PCC for Labour
842 10/20/2021 Lamdapura Camp RHS MJB M15(PCC) 19.0 0.0 19.0 4.275 1.520 14.402 9.500 14.592 54.910
quarter
Precast Girder No-
843 10/21/2021 383+934 RHS MJB M50(PSC) 110.00 0.0 110.00 46.200 11.550 75.350 50.270 70.400 548.900
1,2,3&4 of RP6-RP7
844 10/21/2021 384+570 LHS MJB Pile no- 10 of LP2 M35(Pile) 32.5 0.0 32.5 11.440 2.860 22.360 14.755 22.653 143.000
845 10/21/2021 384+570 RHS MJB Pile no- 04 of RA2 M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
846 10/21/2021 374+934 RHS MJB Pile no- 03 of RA2 M35(Pile) 21.5 0.0 21.5 7.568 1.892 14.792 9.761 14.985 94.600
847 10/22/2021 384+570 RHS MJB Pile no- 06 of RA2 M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
848 10/22/2021 374+564 RHS ROB Pier shaft for RA1 M45(RCC) 23.0 0.0 23.0 9.016 2.254 15.571 10.373 15.824 118.335
849 10/22/2021 388+594 RHS MJB Pile Cap of RA1 M35(RCC) 48.00 0.0 48.0 16.224 4.080 33.936 22.608 34.512 192.912
850 10/22/2021 388+594 RHS MJB Pile Cap of RA1 M35(RCC) 89.00 0.0 89.0 33.820 0.000 63.991 42.186 70.399 287.470
851 10/22/2021 374+937 RHS MJB Pile no- 02 of RA2 M35(Pile) 22.0 0.0 22.0 8.910 0.000 15.378 10.142 16.918 85.800
852 10/22/2021 384+570 RHS MJB Pile no- 06 of RA2 M35(Pile) 32.0 0.0 32.0 12.960 0.000 22.368 14.752 24.608 124.800
Abutment Shaft of
853 10/22/2021 384+570 RHS MJB M40(RCC) 4.50 0.0 4.5 1.624 0.410 3.177 2.115 3.226 16.272
LA1
854 10/23/2021 384+570 RHS MJB Pile no- 09 of RA2 M35(Pile) 16.5 15.5 32.0 11.264 2.816 22.016 14.528 22.304 140.800
855 10/23/2021 384+570 RHS MJB Pile no- 01 of RA2 M35(Pile) 32.0 0.0 32.0 12.960 0.000 22.368 14.752 24.608 124.800
856 10/23/2021 384+570 RHS MJB Pile no- 07 of RA2 M35(Pile) 32.0 0.0 32.0 12.960 0.000 22.368 14.752 24.608 124.800
857 10/23/2021 374+937 LHS MJB Pile no- 02 of LP1 M35(Pile) 21.0 0.0 21.0 8.505 0.000 14.679 9.681 16.149 81.900
Precast decslab panel -
858 10/23/2021 388+594 LHS MJB M40(RCC) 9.00 0.0 9.0 3.600 0.000 6.327 4.140 7.020 28.800
16 nos. for LP1-LP2
Pier Shaft 2nd lift of
859 10/23/2021 374+564 RHS ROB M40(RCC) 10.50 0.0 10.5 4.200 0.000 7.382 4.830 8.190 33.600
LP1
Abutment Shaft of
860 10/23/2021 384+570 RHS MJB M40(RCC) 4.50 0.0 4.5 1.800 0.000 3.164 2.070 3.510 14.400
LA1(B)
Precast Girder No-
861 10/24/2021 383+934 RHS MJB M50(PSC) 106.00 0.0 106.00 44.520 11.130 72.610 48.442 67.840 528.940
5,6,7&8 of RP6-RP7
862 10/24/2021 384+570 RHS MJB Pile no- 02 of RA2 M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
863 10/24/2021 384+570 RHS MJB Pile no- 11 of LP2 M35(Pile) 25.5 0.0 25.5 8.976 2.244 17.544 11.577 17.774 112.200
864 10/24/2021 383+934 RHS MJB Pile Cap of RP8 M35(RCC) 54.00 0.0 54.0 18.252 4.590 38.178 25.434 38.826 217.026
865 10/24/2021 383+934 RHS MJB Pile Cap of RP8 M35(RCC) 24.00 0.0 24.0 9.120 0.000 17.256 11.376 18.984 77.520
866 10/24/2021 374+934 MJB Labour room PCC M15(PCC) 1.0 0.0 1.0 0.225 0.080 0.758 0.500 0.768 2.890
867 10/25/2021 384+570 RHS MJB Pile no- 01 of LA2 M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
868 10/25/2021 384+570 RHS MJB Pile no- 03 of RA2 M35(Pile) 26.0 6.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
869 10/25/2021 383+934 RHS MJB Pile Cap of RP8 M35(RCC) 54.00 0.0 54.0 20.520 0.000 38.826 25.596 42.714 174.420 Cum (Previous
Day Qty- 78.0,
870 10/25/2021 383+934 RHS MJB Pile Cap of RP8 M35(RCC) 18.00 0.0 18.0 6.084 1.530 12.726 8.478 12.942 72.342 Total= 150.0
PCC for Pier cap
871 10/25/2021 374+564 ROB M15(PCC) 2.5 0.0 2.5 0.563 0.200 1.895 1.250 1.920 7.225
staging
PCC for Labour
872 10/25/2021 Lamdapura camp Labour Quarter M15(PCC) 5.0 0.0 5.0 1.125 0.400 3.790 2.500 3.840 14.450
Quarter
Water tank stand 0.290 0.101 0.723 0.477 0.732 3.715
873 10/25/2021 Lamdapura Camp Water Tank M25 1.0 0.0 1.00
fixing
874 10/26/2021 374+937 RHS MJB Pile no- 04 of RA2 M35(Pile) 22.0 0.0 22.0 7.744 1.936 15.136 9.988 15.334 96.800
875 10/26/2021 384+570 LHS MJB Pile no- 02 of LA2 M35(Pile) 19.5 12.5 32.0 11.264 2.816 22.016 14.528 22.304 140.800
876 10/26/2021 388+594 LHS MJB Pile Cap of LP4 M35(RCC) 120.00 60.0 180.0 60.840 15.300 127.260 84.780 129.420 723.420
Pier shaft starter for
877 10/26/2021 383+934 RHS MJB M45(RCC) 2.0 0.0 2.0 0.784 0.196 1.354 0.902 1.376 10.290
RP9
878 10/26/2021 383+934 MJB Pile cap PCC of RP6 M15(PCC) 3.0 0.0 3.0 0.675 0.240 2.274 1.500 2.304 8.670
879 10/26/2021 Lamdapura Camp Gantry Wall Raft for Gantry Wall M25 (RCC) 6.0 0.0 6.00 1.740 0.606 4.338 2.862 4.392 22.290
880 10/27/2021 374+937 RHS MJB Pile no- 01 of RA2 M35(Pile) 22.0 0.0 22.0 7.744 1.936 15.136 9.988 15.334 96.800
881 10/27/2021 384+570 LHS MJB Pile no- 04 of LA2 M35(Pile) 32.5 0.0 32.5 11.440 2.860 22.360 14.755 22.653 143.000
882 10/27/2021 384+570 LHS MJB Pile no- 12 of LP2 M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
883 10/27/2021 384+570 LHS MJB Pile no- 03 of LA2 M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
884 10/27/2021 383+934 RHS MJB Pile Cap of RP7 M35(RCC) 150.00 0.0 150.0 50.700 12.750 106.050 70.650 107.850 602.850
Precast Panel for LP1-
885 10/27/2021 388+594 LHS MJB LP2 (Deck slab) 10 M40(RCC) 5.50 0.0 5.50 1.986 0.501 3.883 2.585 3.944 19.888
Nos.
886 10/28/2021 384+570 LHS MJB Pile no- 05 of LA2 M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
887 10/28/2021 384+570 LHS MJB Pile no- 06 of LA2 M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
888 10/28/2021 384+570 LHS MJB Pile no- 07 of LA2 M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Precast Panel for LP1-
889 10/28/2021 388+594 LHS MJB LP2 (Deck slab) 5 M40(RCC) 3.00 0.0 3.00 1.083 0.273 2.118 1.410 2.151 10.848
Nos.

890 10/28/2021 374+564 LHS ROB Pier Shaft LA1 1st Lift M40(RCC) 23.00 0.0 23.00 8.303 2.093 16.238 10.810 16.491 83.168

Pier Shaft RA1 Final


891 10/28/2021 374+564 RHS ROB M40(RCC) 10.00 0.0 10.00 3.610 0.910 7.060 4.700 7.170 36.160
Lift
892 10/28/2021 383+934 RHS MJB Pile Cap PCC RP1B M15(PCC) 6.0 0.0 6.0 1.350 0.480 4.548 3.000 4.608 17.340
893 10/28/2021 388+594 LHS MJB Pier Cap LP2 M50(RCC) 88.00 0.0 88.00 39.424 0.000 63.008 41.976 63.976 394.240
894 10/29/2021 384+570 RHS MJB Pile no- 09 of RP2 M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
895 10/29/2021 384+570 LHS MJB Pile no- 08 of LA2 M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Precast Panel for LP1-
896 10/29/2021 388+594 LHS MJB LP2 (Deck slab) 12 M40(RCC) 6.50 0.0 6.50 2.347 0.592 4.589 3.055 4.661 23.504
Nos.
897 10/29/2021 383+934 LHS MJB Pier shaft of LP8 M45(RCC) 38.0 0.0 38.0 14.896 3.724 25.726 17.138 26.144 195.510
898 10/30/2021 384+570 RHS MJB Pile no- 10 of RP2 M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
899 10/30/2021 383+934 LHS MJB Pile no- 01 of LP1 M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
900 10/30/2021 374+564 RHS ROB Pile Cap of RA2 M35(RCC) 62.00 0.0 62.0 20.956 5.270 43.834 29.202 44.578 249.178
Concrete
901 10/30/2021 388+594 RHS MJB Pile Cap of RP1 M35(RCC) 53.00 0.0 53.0 17.914 4.505 37.471 24.963 38.107 213.007 Production
Continued…
Precast Panel for LP1-
902 10/30/2021 388+594 LHS MJB LP2 (Deck slab) 05 M40(RCC) 2.75 0.0 2.75 0.993 0.250 1.942 1.293 1.972 9.944
Nos.
903 10/31/2021 383+934 RHS MJB Pile no- 08 of RP3 M35(Pile) 30.5 0.0 30.5 10.736 2.684 20.984 13.847 21.258 134.200

Total Production
Qty. including
904 10/31/2021 388+594 RHS MJB Pile Cap of RP1 M35(RCC) 96.00 0.0 96.0 32.448 8.160 67.872 45.216 69.024 385.824 previous day
(53+96) = 149.0
Cum

905 11/1/2021 383+934 RHS MJB Pile no- 07 of RP3 M35(Pile) 34.0 0.0 34.0 11.968 2.992 23.392 15.436 23.698 149.600
906 11/1/2021 383+934 RHS MJB Pile no- 05 of RP3 M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
907 11/1/2021 384+570 RHS MJB Pile no- 11 of RP2 M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 136.400
908 11/1/2021 383+934 RHS MJB Pier shaft of RP9 M45(RCC) 37.5 0.0 37.5 14.700 3.675 25.388 16.913 25.800 192.937
Pier shaft starter of
909 11/1/2021 383+934 RHS MJB M45(RCC) 2.0 0.0 2.0 0.784 0.196 1.354 0.902 1.376 10.290
RP8
Precast Panel for LP1-
LP2 (Deck slab) 04
910 11/1/2021 388+594 LHS MJB M40(RCC) 3.75 0.00 3.75 1.354 0.341 2.648 1.763 2.689 13.560
Nos. & 14 Nos. for
LP3-LP3
Precast Panel for LP1-
LP2 (Deck slab) 04
911 11/1/2021 388+594 LHS MJB M40(RCC) 0.00 5.75 5.75 2.300 0.000 4.042 2.645 4.485 18.400
Nos. & 14 Nos. for
LP3-LP3
Gantry Wall at girder
912 11/1/2021 Lamdapura Camp Casting Yard M40(RCC) 2.00 0.0 2.00 0.722 0.182 1.412 0.940 1.434 7.232
stacking yard
913 11/1/2021 374+564 ROB Labour Room PCC M15(PCC) 2.5 0.0 2.5 0.563 0.200 1.895 1.250 1.920 7.225
Precast Girder No-
914 11/2/2021 374+564 RHS ROB M50(PSC) 54.50 0.0 54.50 22.890 5.723 37.333 24.907 34.880 271.955
1,2,3&4 of RP1-RP2
915 11/2/2021 383+934 RHS MJB Pile no- 06 of RP3 M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
916 11/2/2021 383+934 RHS MJB Pile no- 10 of RP3 M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
917 11/2/2021 384+570 RHS MJB Pile no- 12 of RP2 M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
PCC for Pile cap of
918 11/2/2021 384+570 LHS MJB M15(PCC) 3.5 0.0 3.5 0.788 0.280 2.653 1.750 2.688 10.115
LP2
Precast Girder No-
919 11/3/2021 374+564 RHS ROB M50(PSC) 105.00 0.0 105.00 44.100 11.025 71.925 47.985 67.200 523.950
1,2,3&4 of RP1-RP2
920 11/3/2021 388+594 LHS MJB Pile no- 01 of LA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 125.400
921 11/3/2021 383+934 RHS MJB Pile no- 09 of RP3 M35(Pile) 33.5 0.0 33.5 11.792 2.948 23.048 15.209 23.350 147.400
Pier shaft of LA1 2nd
922 11/3/2021 374+564 LHS ROB M40(RCC) 11.50 0.00 11.50 4.151 1.047 8.119 5.405 8.246 41.584
lift
Precast Panel (Deck
923 11/3/2021 388+594 LHS MJB slab) 08 Nos. for LP3- M40(RCC) 4.25 0.00 4.25 1.534 0.387 3.000 1.997 3.047 15.368
LP3
924 11/4/2021 0 0 0 0 0 0.00 0.0 0.00 0.000 0.000 0.000 0.000 0.000 0.000
925 11/5/2021 388+594 LHS MJB Pile no- 03 of LA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Concrete
926 11/5/2021 388+594 RHS MJB Pile Cap of RP5 M35(RCC) 113.00 43.0 156.0 52.728 13.260 110.292 73.476 112.164 626.964 production
continue..
927 11/5/2021 383+934 RHS MJB Pier shaft of RP8 M45(RCC) 44.5 0.0 44.5 17.444 4.361 30.127 20.070 30.616 228.953
Precast Panel (Deck
928 11/5/2021 388+594 LHS MJB slab) 11 Nos. for LP3- M40(RCC) 5.75 0.00 5.75 2.300 0.000 4.042 2.645 4.485 18.400
LP3
929 11/6/2021 383+934 LHS MJB Pile no- 09 of LP1 M35(Pile) 0.0 31.0 31.0 10.912 2.728 21.328 14.074 21.607 136.400

Total Qty = 6.0 +


156.0 (Previous
930 11/6/2021 388+594 RHS MJB Pile Cap of RP5 M35(RCC) 0.00 6.0 6.0 2.028 0.510 4.242 2.826 4.314 24.114 day) + 19.0 (PNC
Subhelav Camp)
= 181.0 Cum.

Precast Panel (Deck


931 11/6/2021 388+594 LHS MJB slab) 11 Nos. for LP3- M40(RCC) 5.00 1.00 6.00 2.400 0.000 4.218 2.760 4.680 19.200
LP3
PCC for Pile cap of
932 11/6/2021 383+594 LHS MJB M15(PCC) 5.0 0.0 5.0 1.125 0.400 3.790 2.500 3.840 14.450
LP7
933 11/6/2021 Lamdapura Camp MJB Casting Yard M40 (RCC) 2.5 0.0 2.5 1.000 0.000 1.757 1.150 1.950 8.000
934 11/7/2021 383+934 LHS MJB Pile no- 06 of LP2 M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 136.400
935 11/7/2021 383+934 LHS MJB Pile no- 10 of LP1 M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 136.400
Precast Panel (Deck
936 11/7/2021 388+594 LHS MJB slab) 04 Nos. for LP3- M40(RCC) 2.25 0.00 2.25 0.900 0.000 1.582 1.035 1.755 7.200
LP3
937 11/8/2021 388+594 LHS MJB Pile no- 02 of LA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 125.400
938 11/8/2021 383+934 LHS MJB Pile no- 07 of LP2 M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 136.400
939 11/8/2021 383+934 RHS MJB Pile Cap of R10 M35(RCC) 156.00 0.0 156.0 52.728 13.260 110.292 73.476 112.164 626.964
PCC for Pile cap of
940 11/8/2021 383+934 LHS MJB M15(PCC) 5.0 0.0 5.0 1.125 0.400 3.790 2.500 3.840 14.450
LP7
PCC for Pile cap of
941 11/8/2021 384+570 RHS MJB M15(PCC) 5.0 0.0 5.0 1.125 0.400 3.790 2.500 3.840 14.450
RP2
942 11/9/2021 383+934 LHS MJB Pile no- 08 of LA2 M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 136.400
943 11/9/2021 383+934 LHS MJB Pile no- 04 of LA2 M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 136.400
Pier shaft starter of
944 11/9/2021 383+934 RHS MJB M45(RCC) 2.0 0.0 2.0 0.784 0.196 1.354 0.902 1.376 10.290
RP7
Pier shaft starter of
945 11/9/2021 388+594 RHS MJB M45(RCC) 4.0 0.0 4.0 1.568 0.392 2.708 1.804 2.752 20.580
RP1 & RP4
Pier Shaft 1st lift of
946 11/9/2021 374+564 LHS ROB M40(RCC) 23.00 0.00 23.00 9.200 0.000 16.169 10.580 17.940 73.600
LA2
Precast Panel (Deck
947 11/9/2021 388+594 LHS MJB slab) 20 Nos. for LP3- M40(RCC) 10.50 0.00 10.50 4.200 0.000 7.382 4.830 8.190 33.600
LP3
948 11/9/2021 374+937 LHS MJB Pile Cap of LA1 M35(RCC) 75.00 0.0 75.0 25.350 6.375 53.025 35.325 53.925 301.425
PCC for RP1A Pile
949 11/9/2021 383+934 RHS MJB M15(PCC) 6.0 0.0 6.0 1.350 0.480 4.548 3.000 4.608 17.340
cap

950 11/9/2021 383+934 LHS MJB PCC for LP7 Pile cap M15(PCC) 9.0 0.0 9.0 2.025 0.720 6.822 4.500 6.912 26.010

PCC for staging for


951 11/9/2021 383+934 RHS MJB M15(PCC) 5.0 0.0 5.0 1.125 0.400 3.790 2.500 3.840 14.450
Pier cap of RP9
952 11/10/2021 374+937 LHS MJB Pile no- 03 of LA2 M35(Pile) 22.5 0.0 22.5 7.920 1.980 15.480 10.215 15.683 99.000
953 11/10/2021 383+934 LHS MJB Pile no- 02 of LP1A M35(Pile) 31.5 0.0 31.5 11.088 2.772 21.672 14.301 21.955 138.600
954 11/10/2021 383+934 LHS MJB Pile no- 03 of LP1A M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 136.400
955 11/10/2021 383+934 LHS MJB Pier shaft of LP7 M45(RCC) 37.5 0.0 37.5 14.700 3.675 25.388 16.913 25.800 192.937
Abutment Shaft of
956 11/10/2021 388+594 RHS MJB M40(RCC) 7.00 0.00 7.00 2.800 0.000 4.921 3.220 5.460 22.400
RA1
957 11/11/2021 388+594 LHS MJB Pile no- 04 of LA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 125.400
958 11/11/2021 388+594 LHS MJB Pile no- 08 of LA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 125.400
959 11/11/2021 383+934 LHS MJB Pile no- 04 of LP1A M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 125.400
960 11/11/2021 383+934 RHS MJB Pier shaft of RP7 M45(RCC) 44.5 0.0 44.5 17.444 4.361 30.127 20.070 30.616 228.953
Precast Panel (Deck
961 11/11/2021 388+594 LHS MJB slab) 06 Nos. for LP2- M40(RCC) 3.75 0.00 3.75 1.500 0.000 2.636 1.725 2.925 12.000
LP3
962 11/12/2021 388+594 LHS MJB Pile no- 12 of LA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 125.400
963 11/12/2021 388+594 LHS MJB Pile no- 10 of LA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 125.400
964 11/12/2021 383+934 RHS MJB Pile no- 04 of RA1 M35(Pile) 28.0 0.0 28.0 9.856 2.464 19.264 12.712 19.516 123.200
Pier Shaft Starter of
965 11/12/2021 388+594 RHS MJB RP5 & Girder packing M50(RCC) 5.00 0.0 5.00 2.100 0.525 3.425 2.285 3.200 24.950
block casting
PCC for Pile cap of
966 11/12/2021 374+937 LHS MJB M15(PCC) 5.0 0.0 5.0 1.125 0.400 3.790 2.500 3.840 14.450
LP1
967 11/12/2021 383+934 Labour room Labour room PCC M15(PCC) 5.5 0.0 5.5 1.238 0.440 4.169 2.750 4.224 15.895
968 11/13/2021 388+594 LHS MJB Pile no- 06 of LA2 M35(Pile) 24.0 4.5 28.5 10.032 2.508 19.608 12.939 19.865 125.400
969 11/13/2021 388+594 LHS MJB Pile no- 09 of LA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 125.400
970 11/13/2021 388+594 LHS MJB Pile no- 05 of LA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 125.400
971 11/13/2021 383+934 RHS MJB Pile no- 12 of RA1 M35(Pile) 28.0 0.0 28.0 9.856 2.464 19.264 12.712 19.516 123.200
972 11/13/2021 383+934 RHS MJB Pile no- 03 of RA1 M35(Pile) 28.0 0.0 28.0 9.856 2.464 19.264 12.712 19.516 123.200
973 11/13/2021 383+934 RHS MJB Pile no- 05 of RA1 M35(Pile) 28.0 0.0 28.0 9.856 2.464 19.264 12.712 19.516 123.200
Pier Shaft LA2 final
974 11/13/2021 374+564 LHS ROB lift & Pier shaft starter M40(RCC) 11.00 0.00 11.00 4.400 0.000 7.733 5.060 8.580 35.200
RA2
975 11/13/2021 383+934 Pedestal Pedestal Casting M25 1.5 0.0 1.50 0.435 0.152 1.085 0.716 1.098 5.573
976 11/14/2021 383+934 RHS MJB Pile no- 02 of RA1 M35(Pile) 12.0 16.0 28.0 9.856 2.464 19.264 12.712 19.516 147.840
977 11/14/2021 383+934 RHS MJB Pile no- 06 of RA1 M35(Pile) 28.0 0.0 28.0 9.856 2.464 19.264 12.712 19.516 147.840
978 11/14/2021 383+934 RHS MJB Pile no- 11 of RA1 M35(Pile) 27.0 0.0 27.0 9.504 2.376 18.576 12.258 18.819 142.560
Precast Girder No-
979 11/14/2021 383+934 RHS MJB M50(PSC) 105.75 0.0 105.75 44.415 11.104 72.439 48.328 67.680 555.188
5,6,7&8 of RP7-RP8
Abutment Shaft-2 of
980 11/14/2021 388+594 RHS MJB M40(RCC) 0.00 7.0 7.00 2.800 0.000 4.921 3.220 5.460 25.200
RA1
PCC for Pile cap of
981 11/14/2021 374+937 LHS MJB M15(PCC) 0.0 6.0 6.0 1.350 0.480 4.548 3.000 4.608 17.340
LP1
982 11/15/2021 388+594 LHS MJB Pile no- 07 of LA2 M35(Pile) 22.5 6.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
983 11/15/2021 383+934 RHS MJB Pile no- 07 of LP1A M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 163.680
984 11/15/2021 383+934 LHS MJB Pile no- 06 of LP1A M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 163.680
985 11/15/2021 388+594 LHS MJB Pier shaft of LP4 M45(RCC) 31.5 0.0 31.5 12.348 3.087 21.326 14.207 21.672 162.068
Precast Panel (Deck
986 11/15/2021 388+594 LHS MJB slab) 06 Nos. for LP2- M40(RCC) 0.00 3.25 3.25 1.300 0.000 2.285 1.495 2.535 10.400
LP3
987 11/15/2021 383+934 Pedestal Pedestal Casting M25 1.5 3.0 4.50 1.305 0.455 3.254 2.147 3.294 16.718
988 11/15/2021 374+564 Pedestal Pedestal Casting M25 0.0 4.0 4.00 1.160 0.404 2.892 1.908 2.928 14.860
PCC for Pier cap-RP8
989 11/15/2021 383+934 RHS MJB M15(PCC) 4.0 0.0 4.0 0.900 0.320 3.032 2.000 3.072 11.560
staging work
PCC for Pier cap-RP1
990 11/15/2021 384+570 RHS MJB M15(PCC) 4.0 0.0 4.0 0.900 0.320 3.032 2.000 3.072 11.560
staging work
991 11/16/2021 383+934 RHS MJB Pile no.7 of RA1 M35(Pile) 28.0 0.0 28.0 9.856 2.464 19.264 12.712 19.516 147.840
992 11/16/2021 374+937 LHS ROB Pile no. 4 of LA2 M35(Pile) 19.0 0.0 19.0 6.688 1.672 13.072 8.626 13.243 100.320
993 11/16/2021 383+934 RHS MJB Pile no. 9 of RA1 M35(Pile) 26.0 0.0 26.0 9.152 2.288 17.888 11.804 18.122 137.280
994 11/16/2021 374+551 RHS ROB Pier shaft RA2 1st Lift M40(RCC) 22.50 0.00 22.50 8.123 2.048 15.817 10.350 17.550 72.000

Precast panel 11 nos


995 11/16/2021 388+594 LHS MJB M40(RCC) 5.75 0.00 5.75 2.076 0.523 4.042 2.645 4.485 18.400
LP2 LP3
996 11/16/2021 383+934 Pedestal Pedestal Casting M25 1.5 0.0 1.50 0.435 0.152 1.085 0.716 1.098 5.573
997 11/16/2021 388+594 RHS MJB Pile no.9 of RA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
998 11/17/2021 Lamdapura Camp Precast panel bed PCC M15(PCC) 13.5 0.0 13.5 3.038 1.080 10.233 6.750 10.368 39.150
999 11/17/2021 388+594 RHS MJB Pile no. 12 of RA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1000 11/17/2021 383+934 Pedestal Pedestal Casting M25 3.0 0.0 3.00 0.870 0.303 2.169 1.431 2.196 11.160
1001 11/17/2021 383+934 LHS MJB Pile no. 09 of LP1A M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 163.680
Pier shaft starter of
1002 11/17/2021 383+934 RHS MJB M45(RCC) 2.0 0.0 2.0 0.784 0.196 1.354 0.902 1.376 10.290
RP10
1003 11/17/2021 374+564 Pedestal Pedestal Casting M25 4.0 0.0 4.00 1.160 0.404 2.892 1.908 2.928 14.860
1004 11/17/2021 383+934 LHS MJB Pile no.10 of LP1A M35(Pile) 29.0 0.0 29.0 10.208 2.552 19.952 13.166 20.213 153.120
1005 11/17/2021 388+594 RHS MJB Pile no.07 of RA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1006 11/17/2021 383+934 RHS MJB Pile no.08 of RA1 M35(Pile) 28.0 0.0 28.0 9.856 2.464 19.264 12.712 19.516 147.840
Girder No-1,2,3&4 of
1007 11/18/2021 383+934 LHS MJB M50(PSC) 6.00 100.5 106.50 44.730 11.183 72.953 48.671 68.160 559.125
LP6-LP7
PCC for Pile cap of
1008 11/18/2021 383+934 RHS MJB M15(PCC) 5.5 0.0 5.5 1.238 0.440 4.169 2.750 4.224 15.895
RP1
PCC for Pile cap of
1009 11/18/2021 383+934 RHS MJB M15(PCC) 6.5 0.0 6.5 1.463 0.520 4.927 3.250 4.992 18.785
RP2
1010 11/18/2021 388+594 RHS MJB Pile no.4 of RA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1011 11/18/2021 388+594 RHS MJB Pier shaft of RP1 M45(RCC) 33.0 0.0 33.0 12.936 3.234 22.341 14.883 22.704 169.785
1012 11/18/2021 383+934 Pedestal Pedestal Casting M25 7.0 0.0 7.00 2.030 0.707 5.061 3.339 5.124 26.005
1013 11/18/2021 383+934 RHS MJB Pile Head of RP1 M35(RCC) 2.50 0.0 2.5 0.845 0.213 1.767 1.178 1.797 10.048
1014 11/18/2021 388+594 RHS MJB Pile no.02 of RA2 M35(Pile) 27.0 0.0 27.0 9.504 2.376 18.576 12.258 18.819 142.560
1015 11/18/2021 383+934 LHS MJB Pile no.03 of LP1A M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 168.960
Precast panel 20 nos
1016 11/19/2021 388+594 LHS MJB M40(RCC) 12.50 0.00 12.50 4.513 1.138 8.788 5.750 9.750 40.000
LP2 LP3
1017 11/19/2021 383+934 RHS MJB Pile no.8 of RA1 M35(Pile) 28.0 0.0 28.0 9.856 2.464 19.264 12.712 19.516 147.840
1018 11/19/2021 374+564 RHS MJB RA1 Pier Cap Staging M15(PCC) 3.0 0.0 3.0 0.675 0.240 2.274 1.500 2.304 8.670
1019 11/19/2021 388+594 RHS MJB Pile no.11 of RA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1020 11/19/2021 388+594 RHS MJB Pier Cap RP3 M45(RCC) 0.0 88.5 88.5 34.692 8.673 59.915 39.914 60.888 455.333
1021 11/19/2021 379+725(PNC) Box Culvert PCC for Box Culvert M15(PCC) 6.5 0.0 6.5 1.463 0.520 4.927 3.250 4.992 18.785 Pnc subhelav
1022 11/19/2021 383+934 RHS MJB Pile no. 1 of RA1 M35(Pile) 28.0 0.0 28.0 9.856 2.464 19.264 12.712 19.516 147.840
1023 11/19/2021 388+594 RHS MJB Pile no. 3 of RA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480

Girder No-5,6,7 /1 of
1024 11/20/2021 374+564 LHS MJB M50(PSC) 0.0 54.0 54.0 22.680 5.670 36.990 24.678 34.560 283.500
LP1-LP2/LP3-LA2

1025 11/20/2021 383+934 LHS MJB Pile no.2 of LP2 M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 163.680
1026 11/20/2021 384+570 RHS MJB Abutment Cap RA1 M40(RCC) 0.0 46.0 46.0 16.606 4.186 32.338 21.160 35.880 147.200
1027 11/20/2021 379+725(PNC) Box Culvert PCC for Box Culvert M15(PCC) 5.5 0.0 5.5 1.238 0.440 4.169 2.750 4.224 15.895 Pnc subhelav
1028 11/20/2021 388+594 RHS MJB Pier Shaft of RP5 M45(RCC) 30.5 0.0 30.5 11.956 2.989 20.649 13.756 20.984 156.922
1029 11/20/2021 383+934 RHS MJB Pier Shaft of RP10 M45(RCC) 37.5 0.0 37.5 14.700 3.675 25.388 16.913 25.800 192.937
1030 11/20/2021 388+594 RHS MJB Pile no.8 of RA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1031 11/20/2021 388+594 RHS MJB Pile no.5of RA2 M35(Pile) 28.0 0.0 28.0 9.856 2.464 19.264 12.712 19.516 147.840
1032 11/20/2021 388+594 RHS MJB Pile no.2of RA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1033 11/21/2021 383+934 LHS MJB Pile no.3 of LP2 M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 168.960
1034 11/21/2021 383+934 LHS MJB Pile no.8 of LP2 M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 163.680
1035 11/21/2021 374+937 LHS MJB Pile Cap of LP1 M35(RCC) 89.00 0.0 89.0 30.082 7.565 62.923 41.919 63.991 357.691
1036 11/21/2021 374+564 RHS ROB Pier Shaft RA2 2nd lift M40(RCC) 11.00 0.00 11.00 3.971 1.001 7.733 5.060 8.580 35.200
1037 11/21/2021 374+937 LHS ROB Pier Shaft LA1 1st lift M40(RCC) 20.00 0.00 20.00 7.220 1.820 14.060 9.200 15.600 64.000
1038 11/22/2021 383+934 LHS MJB Pile no.10 of LP2 M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 163.680
1039 11/22/2021 383+934 LHS MJB Pile no.1of LP2 M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 163.680
1040 11/22/2021 383+934 RHS MJB Pile Cap Pcc of RP3 M15(PCC) 10.0 0.0 10.0 2.250 0.800 7.580 5.000 7.680 28.900
Precast panel 10 no.s
1041 11/22/2021 388+594 LHS MJB M40(RCC) 6.50 0.00 6.50 2.347 0.592 4.570 2.990 5.070 20.800
of LP2-LP3
1042 11/22/2021 374+937 RHS MJB Pile no.1 of RP1 M35(Pile) 22.0 0.0 22.0 7.744 1.936 15.136 9.988 15.334 116.160
1043 11/22/2021 388+594 LHS MJB Pile Cap Pcc of LA2 M15(PCC) 10.0 0.0 10.0 2.250 0.800 7.580 5.000 7.680 28.900
Precast panel 08 nos
1044 11/23/2021 388+594 LHS MJB M40(RCC) 0.00 5.00 5.00 1.805 0.455 3.515 2.300 3.900 16.000
LP2- LP3
1045 11/23/2021 383+934 LHS MJB Pile Cap Pcc of LP7 M15(PCC) 6.0 0.0 6.0 1.350 0.480 4.548 3.000 4.608 17.340
1046 11/23/2021 384+570 LHS MJB Pile Cap Pcc of LA2 M15(PCC) 6.5 0.0 6.5 1.463 0.520 4.927 3.250 4.992 18.785
1047 11/23/2021 374+937 RHS ROB Pile Cap Pcc of RA2 M15(PCC) 4.5 0.0 4.5 1.013 0.360 3.411 2.250 3.456 13.005
1048 11/23/2021 374+937 LHS ROB Pile no.2 of LA2 M35(Pile) 22.0 0.0 22.0 7.744 1.936 15.136 9.988 15.334 116.160
1049 11/23/2021 383+934 LHS MJB Pile no.9 of LP2 M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 163.680
1050 11/23/2021 383+934 LHS MJB Pile no.1 of LP9 M35(Pile) 30.5 0.0 30.5 10.736 2.684 20.984 13.847 21.258 161.040
1051 11/23/2021 383+934 LHS MJB Pile no.1 of LP3 M35(Pile) 33.0 0.0 33.0 11.616 2.904 22.704 14.982 23.001 174.240
1052 11/23/2021 388+594 RHS MJB Pile no.6 of RA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
Precast panel 20 nos
1053 11/24/2021 388+594 LHS MJB M40(RCC) 0.00 10.50 10.50 4.200 0.000 7.339 4.788 8.159 43.050
LP2- LP3
1054 11/24/2021 383+934 LHS MJB Pile no.3 of LP3 M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 158.400
1055 11/24/2021 383+934 MJB Labor room PCC M15(PCC) 6.5 0.0 6.5 1.463 0.520 4.927 3.250 4.992 18.785
1056 11/24/2021 383+934 LHS MJB Pile no.2 of LP3 M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 168.960
1057 11/24/2021 383+934 RHS MJB Pile no.1 of RP11 M35(Pile) 28.0 0.0 28.0 9.856 2.464 19.264 12.712 19.516 147.840
1058 11/24/2021 388+594 RHS MJB Pile no.10 of RA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1059 11/25/2021 Lamdapura Camp Steel Yard Steel Yard Pcc M15(PCC) 5.0 0.0 5.0 1.125 0.400 3.790 2.500 3.840 14.450
1060 11/25/2021 388+594 Pedestal Pedestal Casting M25 4.0 0.0 4.00 1.160 0.404 2.892 1.908 2.928 14.860

1061 11/25/2021 383+934 RHS MJB RP7 Pier Staging work M15(PCC) 4.5 0.0 4.5 1.013 0.360 3.411 2.250 3.456 13.005

Precast panel 18 nos


1062 11/25/2021 388+594 LHS MJB M40(RCC) 0.00 10.50 10.50 4.200 0.000 7.339 4.788 8.159 43.050
LP2- LP3
1063 11/25/2021 383+934 LHS MJB Pile no.4 of LP3 M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 158.400
1064 11/25/2021 383+934 LHS MJB Pile no.5 of LP3 M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 158.400
Launching packing
1065 11/26/2021 Lamdapura Camp M50(PSC) 0.00 8.5 8.50 3.570 0.893 5.823 3.885 5.440 44.625
box
Stocking Yard
1066 11/26/2021 Lamdapura Camp M15(PCC) 3.5 0.0 3.5 0.788 0.280 2.653 1.750 2.688 10.115
pedestal pcc
RP7 Pier Cap Staging
1067 11/26/2021 383+934 RHS MJB M15(PCC) 2.0 0.0 2.0 0.450 0.160 1.516 1.000 1.536 5.780
work
Precast panel 10 nos
1068 11/26/2021 388+594 LHS MJB M40(RCC) 0.00 5.50 5.50 2.200 0.000 3.844 2.508 4.274 22.550
LP2- LP3
1069 11/26/2021 383+934 RHS MJB Pile no.2 of RP11 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1070 11/26/2021 383+934 LHS MJB Pile no.6 of LP3 M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 158.400
1071 11/27/2021 383+934 LHS MJB Pile no.1 Of LA1 M35(Pile) 18.0 10.0 28.0 9.856 2.464 19.264 12.712 19.516 147.840
1072 11/27/2021 383+934 LHS MJB Pile no.2 of LA1 M35(Pile) 10.0 0.0 10.0 3.520 0.880 6.880 4.540 6.970 52.800 &CONTINUE
1073 11/27/2021 384+570 LHS MJB Pile Cap of LP2 M35(RCC) 110.00 36.0 146.0 49.348 12.410 103.222 68.766 104.974 586.774 &CONTINUE
Precast panel 25 nos
1074 11/27/2021 388+594 LHS MJB M40(RCC) 0.00 13.50 13.50 5.400 0.000 9.436 6.156 10.490 55.350
LP2- LP3
1075 11/28/2021 374+937 RHS MJB Pile no.6 Of RP1 M35(Pile) 22.0 0.0 22.0 7.744 1.936 15.136 9.988 15.334 116.160
1076 11/28/2021 383+934 LHS MJB Pile no.2 of LA1 M35(Pile) 18.0 0.0 18.0 6.336 1.584 12.384 8.172 12.546 95.040
1077 11/28/2021 384+570 LHS MJB Pile Cap of LP2 M35(RCC) 50.00 0.0 50.0 16.900 4.250 35.350 23.550 35.950 253.800
1078 11/28/2021 374+937 RHS MJB Pile Cap of RA2 M35(RCC) 76.50 0.0 76.5 25.857 6.503 54.085 36.032 55.003 388.314
1079 11/28/2021 383+934 RHS MJB Pile no.3 Of RP11 M35(Pile) 27.0 0.0 27.0 9.504 2.376 18.576 12.258 18.819 142.560
1080 11/28/2021 383+934 LHS MJB Pile no.3 Of LA1 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1081 11/29/2021 Lamdapura Camp Stoking Yard Raft M30(RCC) 25.5 0.0 25.5 8.466 2.142 18.232 12.010 18.539 98.354
1082 11/29/2021 383+934 LHS MJB Pile no.4 of LA1 M35(Pile) 27.0 0.0 27.0 9.504 2.376 18.576 12.258 18.819 142.560
1083 11/29/2021 383+934 RHS MJB Pile Cap of RP1 M35(RCC) 94.50 60.5 155.0 52.390 13.175 109.585 73.005 111.445 786.780
Precast panel 12 nos
1084 11/29/2021 388+594 RHS MJB M40(RCC) 6.50 0.00 6.50 2.600 0.000 4.544 2.964 5.051 26.650
RA1-RP1
Precast panel 25 nos
1085 11/30/2021 388+594 RHS MJB M40(RCC) 13.00 0.00 13.00 5.200 0.000 9.087 5.928 10.101 53.300
RA1-RP1
1086 11/30/2021 383+934 LHS MJB Pile no.5 of LA1 M35(Pile) 30.5 0.0 30.5 10.736 2.684 20.984 13.847 21.258 161.040
1087 11/30/2021 383+934 RHS MJB Pile Cap of RP2 M35(RCC) 96.00 54.0 150.0 50.700 12.750 106.050 70.650 107.850 761.400
1088 11/30/2021 383+934 RHS MJB Pile no.4 of RP11 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1089 11/30/2021 383+934 LHS MJB Pile no.7 of LP3 M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 158.400
1090 11/30/2021 383+934 LHS MJB Pile no.1 of RA2 M35(Pile) 0.0 28.5 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1091 11/30/2021 384+934 Labour Room PCC M15(PCC) 5.0 0.0 5.0 1.125 0.400 3.790 2.500 3.840 14.450
1092 11/30/2021 374+564 Labour Room PCC M15(PCC) 4.0 0.0 4.0 0.900 0.320 3.032 2.000 3.072 11.560
1093 12/1/2021 383+934 LHS MJB Pile no.1 of LP11 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1094 12/2/2021 Nil Nil Nil Nil Nil Nil Nil 0.0 0.000 0.000 0.000 0.000 0.000 0.000
Precast panel 13 nos
1095 12/3/2021 388+594 RHS MJB M40(RCC) 0.00 7.00 7.00 2.800 0.000 4.893 3.192 5.439 28.700
RA1-RP1

1096 12/3/2021 Lamdapura Camp Stoking Yard Pedestal M30(RCC) 3.5 0.0 3.5 1.162 0.294 2.503 1.648 2.544 13.500
1097 12/3/2021 383+934 RHS MJB Pile Cap of LP7 M35(RCC) 102.00 45.0 147.0 49.686 12.495 103.929 69.237 105.693 746.172
1098 12/3/2021 383+934 RHS MJB RA1 PCC M15(PCC) 11.5 0.0 11.5 2.588 0.920 8.717 5.750 8.832 33.235
1099 12/3/2021 383+934 LHS MJB Pile no.6 of LA1 M35(Pile) 24.0 0.0 24.0 8.448 2.112 16.512 10.896 16.728 126.720
1100 12/3/2021 383+934 RHS MJB Pile no.2 of RA2 M35(Pile) 14.0 14.5 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1101 12/3/2021 383+934 LHS MJB Pile no.7 of LA1 M35(Pile) 0.0 28.5 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1102 12/3/2021 383+934 RHS MJB Pile no.5 of RP11 M35(Pile) 20.0 8.5 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1103 12/3/2021 383+934 LHS MJB Pile no.3 of LP9 M35(Pile) 24.5 4.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1104 12/3/2021 374+937 LHS MJB Pile no.1 of LA2 M35(Pile) 0.0 21.5 21.5 7.568 1.892 14.792 9.761 14.985 113.520
Girder Boxing and
1105 12/3/2021 Lamdapura Camp M50(PSC) 1.50 0.0 1.50 0.630 0.158 1.028 0.686 0.960 7.875
Packing
Pier Shaft LP1 Final
1106 12/4/2021 374+937 RHS ROB M40(RCC) 14.50 0.00 14.50 5.235 1.320 10.194 6.670 11.310 65.540
lift
1107 12/4/2021 383+934 RHS MJB Pier Cap RP6 M45(RCC) 72.0 18.0 90.0 35.280 8.820 60.930 40.590 61.920 506.700
1108 12/4/2021 383+934 LHS MJB Pile no.8 of LA1 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1109 12/4/2021 383+934 LHS MJB Pile no.9 of LA1 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1110 12/4/2021 383+934 RHS MJB Pile no.3 of LP11 M35(Pile) 23.5 5.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1111 12/4/2021 383+934 LHS MJB Pile no.2 of LP11 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1112 12/5/2021 374+564 RHS ROB M40(RCC) 48.00 0.00 48.00 19.200 0.000 33.552 21.888 37.296 196.800
Pier Cap RP1
1113 12/5/2021 374+561 RHS ROB M40(RCC) 6.00 30.00 36.00 12.996 3.276 25.308 16.560 28.080 162.720
1114 12/5/2021 383+934 RHS MJB Pile no.6 of RP11 M35(Pile) 16.5 12.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1115 12/5/2021 383+934 LHS MJB Pile no.11 LA1 M35(Pile) 28.5 0.0 28.5 11.543 0.000 19.921 13.139 21.917 98.040
1116 12/5/2021 383+934 LHS MJB Pile no.10 LA1 M35(Pile) 4.0 24.5 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1117 12/5/2021 383+934 LHS M35(Pile) 0.0 9.0 9.0 3.168 0.792 6.192 4.086 6.273 47.520
MJB Pile no.4 of LP9
1118 12/5/2021 383+934 LHS M35(Pile) 19.5 0.0 19.5 7.898 0.000 13.631 8.990 14.996 67.080
1119 12/5/2021 384+570 LHS MJB Pier Shaft LP2 M45(RCC) 6.0 0.0 6.0 2.580 0.000 4.188 2.790 4.620 20.640
1120 12/5/2021 384+934 LHS MJB LP1 PCC M15(PCC) 4.0 0.0 4.0 0.900 0.320 3.032 2.000 3.072 11.560
1121 12/5/2021 383+934 LHS MJB LP2 PCC M15(PCC) 0.0 10.5 10.5 2.363 0.840 7.959 5.250 8.064 30.345
1122 12/5/2021 374+564 RHS ROB RP1 PCC M15(PCC) 4.5 0.0 4.5 1.013 0.360 3.411 2.250 3.456 13.005
1123 12/6/2021 388+594 LHS MJB Pier Cap LP4 M50(PSC) 58.50 30.0 88.50 39.648 0.000 63.366 42.215 64.340 435.420
1124 12/6/2021 383+934 LHS MJB Pile no.12 of LA1 M35(Pile) 28.0 0.5 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1125 12/6/2021 383+934 RHS MJB Pile no.3 of RA2 M35(Pile) 6.0 22.5 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1126 12/6/2021 383+934 LHS MJB Pile no.4 of LP11 M35(Pile) 17.5 11.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1127 12/6/2021 383+934 LHS MJB Pile no.8 of LP3 M35(Pile) 17.0 15.0 32.0 11.264 2.816 22.016 14.528 22.304 168.960
1128 12/6/2021 383+934 LHS MJB Pile no.5 of LP11 M35(Pile) 14.5 14.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1129 12/6/2021 383+934 RHS MJB Pier Shaft Stater RP1 M45(RCC) 2.0 0.0 2.0 0.784 0.196 1.354 0.902 1.376 10.280
1130 12/6/2021 383+934 Pedestal Pedestal Casting M25 3.5 0.0 3.50 1.015 0.354 2.531 1.670 2.562 13.003
1131 12/6/2021 374+937 LHS MJB PCC of LA2 M15(PCC) 5.0 0.0 5.0 1.125 0.400 3.790 2.500 3.840 14.450
1132 12/7/2021 374+937 RHS MJB Pier Shaft RA2 M40(RCC) 11.50 0.00 11.50 4.151 1.047 8.085 5.290 8.970 51.980
Precast Pannel RA1-
1133 12/7/2021 388+594 RHS MJB M40(RCC) 3.75 0.00 3.75 1.500 0.000 2.621 1.710 2.914 15.375
RP1 7 nos.

1134 12/7/2021 Lamdapura Camp Stoking Yard Pedestal M30(RCC) 23.0 0.0 23.0 7.636 1.932 16.445 10.833 16.721 88.711
1135 12/7/2021 383+934 LHS MJB Pile no.6 of LP11 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1136 12/7/2021 383+934 LHS MJB Pile no.9 of LP3 M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 158.400
1137 12/7/2021 383+934 LHS MJB Pile no.7 of LP11 M35(Pile) 0.0 29.0 29.0 10.208 2.552 19.952 13.166 20.213 153.120
1138 12/7/2021 383+934 RHS MJB Pile no.7 of RP11 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1139 12/7/2021 383+934 LHS MJB Pile no.10 of LP3 M35(Pile) 15.0 15.0 30.0 10.560 2.640 20.640 13.620 20.910 158.400
1140 12/7/2021 383+934 LHS MJB Pile no.5 of LP9 M35(Pile) 14.5 14.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1141 12/7/2021 M35(RCC) 39.00 43.5 82.5 27.885 7.013 58.327 38.857 59.317 418.770
384+570 RHS MJB Pile Cap of RP2
1142 12/7/2021 M35(RCC) 55.00 0.0 55.0 20.900 0.000 39.545 26.070 43.505 188.100
PCC Near Electrical
1143 12/8/2021 Lamdapura Camp M15(PCC) 0.5 0.0 0.5 0.113 0.040 0.379 0.250 0.384 1.445
Room
1144 12/8/2021 Lamdapura Camp PCC Steel Yard M15(PCC) 2.0 0.0 2.0 0.450 0.160 1.516 1.000 1.536 5.780
1145 12/8/2021 383+934 LHS MJB Pile no.8 of LP11 M35(Pile) 0.0 26.0 26.0 9.152 2.288 17.888 11.804 18.122 137.280
1146 12/8/2021 383+934 RHS MJB Pile no.4 of RA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1147 12/8/2021 383+934 LHS MJB Pile no.1 of LA2 M35(Pile) 27.5 1.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1148 12/8/2021 383+934 LHS MJB Pile no.1 of LP1B M35(Pile) 6.0 24.0 30.0 10.560 2.640 20.640 13.620 20.910 158.400
1149 12/8/2021 383+934 LHS MJB Pile no.2 of LP1B M35(Pile) 31.5 0.0 31.5 11.088 2.772 21.672 14.301 21.955 166.320
Precast Pannel RA1-
1150 12/8/2021 388+594 RHS MJB M40(RCC) 3.50 0.00 3.50 1.400 0.000 2.447 1.596 2.720 14.350
RP1 6 nos.
1151 12/8/2021 M35(RCC) 13.00 6.0 19.0 6.422 1.615 13.433 8.949 13.661 96.444
384+570 RHS MJB Pile Cap of RP2
1152 12/8/2021 M35(RCC) 31.50 0.0 31.5 11.970 0.000 22.649 14.931 24.917 107.730
1153 12/8/2021
1154 12/8/2021
1114

Total Consumption of Materials dated 12/8/2021 71.218 14.531 139.839 92.329 143.934 988.709

Total Concrete Production dated 12/8/2021 201.00

Total Consumption of Materials up to Dt.- 12/8/2021 10118.104 2143.969 19471.005 12891.056 19788.959 121272.532

Total Concrete Production up to Dt.- 12/8/2021 27952.25


DAILY PRODUCTION: AKP V_ATELP-1057

Concrete M-35 Concrete M-55 Concrete M-55 Concrete M-55 Concrete M-55
M-25 RCC M-30 RCC M-35 RCC M-35 Pile Concrete M-35 M-40 RCC M-45 RCC M-50 PSC Concrete M-55
Month M-15 PCC M-25 RCC
Flyash
M-30 RCC
Flyash
M-35 RCC
Flyash
M-35 Pile
Flyash Hume Pipe
Hume Pipe M-40 RCC
Flyash Flyash
M-45 RCC M-50PSC M-50 PSC
C-53 (C-53)
C-43/Micro C-53/Wash C-43/Wash
FlyAsh Silica C-53/Flyash Sand Sand

PV PV1 PV1 PV1 PV1 PV1 PV1 PV1 PV1 PV1 PV1 PV1 PV1 PV1 PV1 PV2 PV1 PV2 PV3 PV1 PV2 PV3 PV4 PV5
UNIT M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3
Code 2500000005 2500000020 2500000104 2500000010 2500000102 2500000011 2500000109 2500000021 2500000277 2500000273 2500000274 25000000130 2500000012 2500000013 25000000013 2500000172 2500000172 2500000172 2500000326 2500000326 2500000326 2500000326 2500000326
6/1/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/2/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/3/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/4/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/5/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/6/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/7/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/8/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/9/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/10/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/11/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/12/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/13/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/14/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/15/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/16/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/17/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/18/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/19/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/20/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/21/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/22/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/23/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/24/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/25/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/26/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/27/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/28/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/29/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/30/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
- - - - - - - - - - - - - - - - - - - - - - - 0

TOTAL 0.00 0 0 0.00 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 #REF!

ORDER NO. 833954 833955


PLANT PRODUCTION AKPV -ATEPL_1057

Material Unit Code PV Alt Item Component Description Code Unit Mix Production Qty Consumption
BOM
Concrete M-15 M3 Cement PPC BAG 4.000 0.000 0.00
Concrete M-15 M3 Coarse Sand MT 0.944 0.000 0.00
Concrete M-15 M3 Grit (12.5 to 4.75 mm/10MM) MT 0.603 0.000 0.00
Concrete M-15 M3 Grit (26.5 to 12.5 mm/20mm) MT 0.607 0.000 0.00
Concrete M-15 M3 Admixture KG 0.000 0.000 0.00

Concrete M-25 M3 Cement PPC BAG 7.000 0.000 0.00


Concrete M-25 M3 Coarse Sand MT 0.818 0.000 0.00
Concrete M-25 M3 Grit (12.5 to 4.75 mm/10MM) MT 0.469 0.000 0.00
Concrete M-25 M3 Grit (26.5 to 12.5 mm/20mm) MT 0.669 0.000 0.00
Concrete M-25 M3 Admixture KG 0.000 0.000 0.00

Concrete M-30 M3 Cement PPC BAG 7.600 0.000 0.00


Concrete M-30 M3 Coarse Sand MT 0.812 0.000 0.00
Concrete M-30 M3 Grit (12.5 to 4.75 mm/10MM) MT 0.537 0.000 0.00
Concrete M-30 M3 Grit (26.5 to 12.5 mm/20mm) MT 0.655 0.000 0.00
Concrete M-30 M3 Admixture KG 0.000 0.000 0.00

Concrete M-35 M3 Cement PPC BAG 8.000 0.000 0.00


Concrete M-35 M3 Coarse Sand MT 0.799 0.000 0.00
Concrete M-35 M3 Grit (12.5 to 4.75 mm/10MM) MT 0.439 0.000 0.00
Concrete M-35 M3 Grit (26.5 to 12.5 mm/20mm) MT 0.673 0.000 0.00
Concrete M-35 M3 Admixture KG 0.000 0.000 0.00

Concrete M-50 M3 Cement PPC BAG 9.000 0.000 0.00


Concrete M-50 M3 Coarse Sand MT 0.757 0.000 0.00
Concrete M-50 M3 Grit (12.5 to 4.75 mm/10MM) MT 0.523 0.000 0.00
Concrete M-50 M3 Grit (26.5 to 12.5 mm/20mm) MT 0.642 0.000 0.00
Concrete M-50 M3 Admixture KG 0.000 0.000 0.00

Subtotal 0.00

MATERIAL REQUIREMENT AKP-V ATELLP DATE 19.05.2023

Component description Component Unit Required SAP Stock Shortage


Cement 43 Grade 2000000090 BAG 0.00 0
Cement 53 Grade 2000000089 BAG 0.00 0
Micro fine silica 1900001481 KG 0.00 0
Fly Ash 2000000217 MT 0.00 0
Coarse Sand 2000000123 MT 0.00 0
Wash Sand 2000000123 MT 0.00 0
Grit (12.5 to 4.75 mm/10MM) 2400000006 MT 0.00 0
Grit (26.5 to 12.5 mm/20mm) 2400000005 MT 0.00 0
Admixture 1400000083 KG 0.00 0
0.00

You might also like