Professional Documents
Culture Documents
19 May-23 Akp_atelp Production Summary & Lab Report
19 May-23 Akp_atelp Production Summary & Lab Report
Month M-10 PCC Flyash M-15 PCC Flyash M-15 PCC M-20 Flyash M-25 RCC M-25 RCC Flyash M-30 RCC M-30 RCC Flyash M-35 RCC M-35 RCC Flyash M-35 Pile M-35 Pile Flyash M-40 RCC M-40 RCC M-45 RCC M-45 RCC Flyash M-50PSC M-50 PSC Flyash
Flyash
UNIT M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3
Code 2500000003 2500000005 2500000100 2500000006 2500000020 2500000104 2500000010 2500000102 2500000011 2500000109 2500000105 2500000021 2500000012 2500000130 2500000221 2500000013 2500000172 2500000248
11/1/2021 2.5 95 5.75 5.75 39.5
11/2/2021 3.5 92 54.50
11/3/2021 62 15.75 105.00
11/4/2021
11/5/2021 156 28.5 5.75 44.5
11/6/2021 5 6 31 8.50
11/7/2021 62 2.25
11/8/2021 10 156 59.5
11/9/2021 20 75 62 33.50 6
11/10/2021 85 7.00 37.5
11/11/2021 85.5 3.75 44.5
11/12/2021 10.5 85 5.00
11/13/2021 1.50 169.5 11.00
11/14/2021 6 83 7.00 105.75
11/15/2021 8 8.50 90.5 3.25 31.5
11/16/2021 1.50 101.5 28.25
11/17/2021 13.5 7.00 145 2
11/18/2021 12 7.00 2.5 87.5 33 106.50
11/19/2021 9.5 113 12.50 88.5
11/20/2021 5.5 116 46 68 54
11/21/2021 89 63 31.00
11/22/2021 20 84 6.50
11/23/2021 17 145 5.00
11/24/2021 6.5 118.5 10.50
11/25/2021 9.5 4.00 60 10.50
11/26/2021 5.5 58.5 5.50 8.50
11/27/2021 146 38 13.50
11/28/2021 126.5 95.5
11/29/2021 25.5 155 27 6.5
11/30/2021 9 150 117.5 13.00
TOTAL Nov-21 0 173.5 0 0 0 29.5 25.5 0 0 1062 0 2460.5 125.75 172.25 0 395 8.5 430.75
Name of Work :- Construction of Eight lane access controlled expressway starting from junction with SH-63 near Pratap Nagar village and ending at junction with NE-1 near Dodka village of Vadodara District (Ch-
824+920 to 844+382 , Design Ch-372+500 to 391+962) section Delhi -Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the state of Gujrat. (Package-31)
4 2-Mar-21 Lamdapura Camp Casting Yard Longitudinal bed PCC M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 0.000
5 3-Mar-21 Lamdapura Camp Casting Yard Longitudinal bed-2 M40 7.5 3.000 0.000 5.273 3.450 5.850 0.000
6 3-Mar-21 Lamdapura Camp Batching plant siSilo column final lift M25 3.0 1.020 0.000 2.208 1.455 2.427 0.000
7 3-Mar-21 Lamdapura Camp Weigh bridge Weigh bridge column M25 2.5 0.850 0.000 1.840 1.213 2.023 0.000
Longitudinal bed
8 4-Mar-21 Lamdapura Camp Casting Yard M40 1.0 0.400 0.000 0.703 0.460 0.780 0.000
Pedestal
9 4-Mar-21 Lamdapura Camp Casting Yard Longitudinal bed PCC M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 0.000
10 4-Mar-21 Lamdapura Camp Junior Mess PCC M15 (PCC) 5.0 1.300 0.000 3.800 2.505 4.180 0.000
29 12-Mar-21 Lamdapura Camp Casting yard PCC for Junior Quarter M15 (PCC) 12.0 3.120 0.000 9.120 6.012 10.032 24.960
Longitudinal bed-2
30 13-Mar-21 Lamdapura Camp Casting Yard M40 14.0 5.600 0.000 9.842 6.440 10.920 44.800
Stressing end
Abutment cap-2
31 13-Mar-21 Lamdapura Camp Casting Yard M35 (RCC) 27.0 10.260 0.000 19.413 12.798 21.357 87.210
Anchoring end
PCC for Jr Quarter &
32 13-Mar-21 Lamdapura Camp Jr. Quarter M15 (PCC) 8.5 2.210 0.000 6.460 4.259 7.106 17.680
Bathroom
Longitudinal bed-3
34 15-Mar-21 Lamdapura Camp Casting Yard M40 21.0 8.400 0.000 14.763 9.660 16.380 67.200
Stressing end
Longitudinal bed
35 15-Mar-21 Lamdapura Camp Casting Yard M40 1.5 0.600 0.000 1.055 0.690 1.170 4.800
Pedestal
PCC for Longitudinal
36 15-Mar-21 Lamdapura Camp Jr. Quarter M15 (PCC) 5.5 1.430 0.000 4.180 2.756 4.598 11.440
bed-1
Longitudinal bed-3
37 16-Mar-21 Lamdapura Camp Casting Yard M40 10.0 4.000 0.000 7.030 4.600 7.800 32.000
Stressing end
Longitudinal bed-2
38 16-Mar-21 Lamdapura Camp Casting Yard M40 1.5 0.600 0.000 1.055 0.690 1.170 4.800
Pedestal
39 17-Mar-21 Lamdapura Camp Casting Yard Longitudinal bed-3 M40 15.0 6.000 0.000 10.545 6.900 11.700 48.000
Tie member
40 17-Mar-21 Lamdapura Camp Casting Yard Longitudinal bed-1 & M40 2.5 1.000 0.000 1.757 1.150 1.950 8.000
2 anchoring end
Abutment cap-1 1st
41 17-Mar-21 Lamdapura Camp Casting Yard lift anchoring end & M35 (RCC) 7.5 2.850 0.000 5.393 3.555 5.933 24.225
Abt Wall
42 17-Mar-21 Lamdapura Camp Casting yard Raft for Gantry wall M25 6.0 2.040 0.000 4.416 2.910 4.854 17.340
Abutment cap-3
44 18-Mar-21 Lamdapura Camp Casting Yard M35 (RCC) 29.0 11.020 0.000 20.851 13.746 22.939 93.670
stressing end
46 18-Mar-21 Lamdapura Camp Casting yard Raft for Gantry wall M25 6.0 2.040 0.000 4.416 2.910 4.854 17.340
47 18-Mar-21 Lamdapura Camp Casting yard PCC for LG bed -1 & 2 M15 (PCC) 3.5 0.910 0.000 2.660 1.754 2.926 7.280
50 19-Mar-21 Lamdapura Camp Casting yard PCC for LG bed -1 & 2 M15 (PCC) 3.0 0.780 0.000 2.280 1.503 2.508 6.240
51 19-Mar-21 Lamdapura Camp Casting yard PCC for LG bed - 3 M15 (PCC) 3.5 0.910 0.000 2.660 1.754 2.926 7.280
52 19-Mar-21 Lamdapura Camp Casting yard PCC for LG bed - 4 M15 (PCC) 5.0 1.300 0.000 3.800 2.505 4.180 10.400
53 19-Mar-21 Lamdapura Camp Casting yard PCC for Gantry wall M15 (PCC) 4.0 1.040 0.000 3.040 2.004 3.344 8.320
Longitudinal bed- 3
54 19-Mar-21 Lamdapura Camp Casting Yard M40 2.0 0.800 0.000 1.406 0.920 1.560 6.400
pedestal
Longitudinal bed
55 20-Mar-21 Lamdapura Camp Casting Yard M40 0.5 0.200 0.000 0.352 0.230 0.390 1.600
Pedestal
56 20-Mar-21 Lamdapura Camp Casting yard Raft for Gantry wall M25 6.0 2.040 0.000 4.416 2.910 4.854 17.340
Weigh bridge
57 20-Mar-21 Lamdapura Camp Weigh bridge M25 5.5 1.870 0.000 4.048 2.668 4.450 15.895
retaining wall
PCC for LG bed 4 & LG
58 20-Mar-21 Lamdapura Camp Casting yard bed 1&2 middle floor M15 (PCC) 6.0 1.560 0.000 4.560 3.006 5.016 12.480
PCC
59 20-Mar-21 Lamdapura Camp Casting yard PCC for gantry rail line M15 (PCC) 0.5 0.130 0.000 0.380 0.251 0.418 1.040
Longitudinal bed-3
60 21-Mar-21 Lamdapura Camp Casting Yard M40 1.0 0.400 0.000 0.703 0.460 0.780 3.200
Pedestal
PCC for LG bed 4 & LG
61 21-Mar-21 Lamdapura Camp Casting yard bed 1&2 middle floor M15 (PCC) 1.0 0.260 0.000 0.760 0.501 0.836 2.080
PCC
62 21-Mar-21 Lamdapura Camp Casting yard PCC for gantry rail line M15 (PCC) 3.5 0.910 0.000 2.660 1.754 2.926 7.280
63 23-Mar-21 Lamdapura Camp Casting Yard Longitudinal bed-3 M40 6.0 2.400 0.000 4.218 2.760 4.680 19.200
Abutment cap-2 1st
64 23-Mar-21 Lamdapura Camp Casting Yard M40 2.0 0.800 0.000 1.406 0.920 1.560 6.400
lift anchoring end
Abutment cap-2 1st
65 23-Mar-21 Lamdapura Camp Casting Yard M35 (RCC) 5.0 1.900 0.000 3.595 2.370 3.955 16.150
lift anchoring end
Abutment cap-2 2nd
66 23-Mar-21 Lamdapura Camp Casting Yard M35 (RCC) 1.5 0.570 0.000 1.079 0.711 1.187 4.845
lift stressing end
Raft for Gantry wall
67 23-Mar-21 Lamdapura Camp Casting yard M25 5.0 1.700 0.000 3.680 2.425 4.045 14.450
stressing end
76 26-Mar-21 Lamdapura Camp Casting Yard Longitudinal bed-3 M40 20.5 8.200 0.000 14.411 9.430 15.990 65.600
Pedestal Longitudinal
77 26-Mar-21 Lamdapura Camp Casting Yard M40 1.5 0.600 0.000 1.055 0.690 1.170 4.800
bed-3
Raft for Gantry wall
78 26-Mar-21 Lamdapura Camp Casting yard M25 6.0 2.040 0.000 4.416 2.910 4.854 17.340
RHS
79 26-Mar-21 Lamdapura Camp Casting yard PCC for Abt Cap -4 M15 (PCC) 1.5 0.390 0.000 1.140 0.752 1.254 3.120
Anchor Pile-1 near
80 27-Mar-21 383+916 MJB M35 (Pile) 38.0 15.390 0.000 26.562 17.518 29.222 152.000
Test Pile
81 27-Mar-21 Lamdapura Camp Casting yard Wall Gantry rail line M25 2.5 0.850 0.000 1.840 1.213 2.023 7.225
91 Anchor Pile-2 for Test M35 (Pile) 34.5 13.973 0.000 24.115 15.905 26.531 167.670
2-Apr-21 383+916 MJB
Pile
92 3-Apr-21 Lamdapura Camp Casting Yard Longitudinal bed-4 M40 10.0 4.000 0.000 7.030 4.600 7.800 32.000
Abutment cap-4
93 3-Apr-21 Lamdapura Camp Casting Yard M35 (RCC) 29.0 11.020 0.000 20.851 13.746 22.939 93.670
stressing end
95 4-Apr-21 Lamdapura Camp Casting Yard Longitudinal bed-4 M40 6.0 2.400 0.000 4.218 2.760 4.680 19.200
Raft for Gantry wall
96 4-Apr-21 Lamdapura Camp Casting yard M25 5.0 1.700 0.000 3.680 2.425 4.045 14.450
stacking yard end
Abutment cap-3 2nd
97 4-Apr-21 Lamdapura Camp Casting Yard M35 (RCC) 1.5 0.570 0.000 1.079 0.711 1.187 4.845
lift anchoring end
98 4-Apr-21 Lamdapura Camp Casting yard PCC for Gantry raft M15 (PCC) 2.5 0.650 0.000 1.900 1.253 2.090 5.200
99 5-Apr-21 Lamdapura Camp Casting Yard Longitudinal bed-4 M40 12.0 4.800 0.000 8.436 5.520 9.360 38.400
Longitudinal bed-2&3
100 5-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 8.5 2.210 0.000 6.460 4.259 7.106 17.680
middle floor PCC
101 5-Apr-21 384+570 MJB Pile No-9 at RP-1 M35 (Pile) 26.5 10.733 0.000 18.524 12.217 20.379 128.790
102 6-Apr-21 Lamdapura Camp Casting Yard Longitudinal bed-4 M40 11.0 4.400 0.000 7.733 5.060 8.580 35.200
Longitudinal bed-2&3
103 6-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 8.0 2.080 0.000 6.080 4.008 6.688 16.640
middle floor PCC
Longitudinal bed-2&3
107 8-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 11.0 2.860 0.000 8.360 5.511 9.196 22.880
middle floor PCC
108 8-Apr-21 Lamdapura Camp Casting yard PCC for Gantry Wall M15 (PCC) 3.0 0.780 0.000 2.280 1.503 2.508 6.240
Gantry wall stacking
109 8-Apr-21 Lamdapura Camp Casting yard M25 4.0 1.360 0.000 2.944 1.940 3.236 11.560
yard end
110 Anchor Pile-3, near M35 (Pile) 36.0 14.580 0.000 25.164 16.596 27.684 174.960
8-Apr-21 383+916 MJB
test pile
Longitudinal bed- 4
111 9-Apr-21 Lamdapura Camp Casting Yard M40 1.5 0.600 0.000 1.055 0.690 1.170 4.800
Pedesta
Abutment cap-4 1st
112 9-Apr-21 Lamdapura Camp Casting Yard M35 (RCC) 6.25 2.375 0.000 4.494 2.963 4.944 20.188
lift Stressing end
113 9-Apr-21 384+570 MJB Pile no-10 for LP1 M35 (Pile) 29.0 11.745 0.000 20.271 13.369 22.301 140.940
114 12-Apr-21 Lamdapura Camp Casting yard PCC for Gantry wall M15 (PCC) 4.0 1.040 0.000 3.040 2.004 3.344 7.200
Raft for Gantry wall
115 12-Apr-21 Lamdapura Camp Casting yard M25 0.5 0.170 0.000 0.368 0.243 0.405 0.725
stacking yard end
116 12-Apr-21 384+570 LHS MJB Pile no-09 at LP1 M35 (Pile) 24.0 9.720 0.000 16.776 11.064 18.456 54.000
117 Anchor pile-4 for test M35 (Pile) 36.0 14.580 0.000 25.164 16.596 27.684 81.000
12-Apr-21 383+916 MJB
pile
118 13-Apr-21 Lamdapura Camp Casting yard PCC for Gantry wall M15 (PCC) 6.0 1.560 0.000 4.560 3.006 5.016 10.800
Gantry wall stacking
119 13-Apr-21 Lamdapura Camp Casting yard M25 6.0 2.040 0.000 4.416 2.910 4.854 8.700
yard end
120 13-Apr-21 384+570 RHS MJB Pile no-07 at RP1 M35 (Pile) 26.0 10.530 0.000 18.174 11.986 19.994 58.500
Longitudinal bed-2&3
121 14-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 3.0 0.780 0.000 2.280 1.503 2.508 5.400
middle floor PCC
Longitudinal bed-2&3
127 15-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 4.160
middle floor PCC
128 15-Apr-21 Lamdapura Camp Casting yard Raft for Gantry Wall M25 5.0 1.700 0.000 3.680 2.425 4.045 14.450
129 15-Apr-21 384+570 LHS MJB Pile no-08 at LP1 M35 (Pile) 29.0 11.745 0.000 20.271 13.369 22.301 116.000
Longitudinal bed-4
130 16-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 3.0 0.780 0.000 2.280 1.503 2.508 6.240
middle floor PCC
131 16-Apr-21 Lamdapura Camp Casting yard Gantry Wall Raft M15 (PCC) 1.0 0.260 0.000 0.760 0.501 0.836 2.080
132 16-Apr-21 Lamdapura Camp Casting Yard Tie Beam M35 (RCC) 5.00 1.900 0.000 3.595 2.370 3.955 16.150
133 16-Apr-21 384+570 RHS MJB Pile no-08 at RP1 M35 (Pile) 28.5 11.543 0.000 19.921 13.139 21.917 114.000
134 17-Apr-21 Lamdapura Camp Casting yard Rebar Cage M15 (PCC) 1.5 0.390 0.000 1.140 0.752 1.254 3.120
135 17-Apr-21 Lamdapura Camp Casting yard Rebar Cage M15 (PCC) 1.0 0.260 0.000 0.760 0.501 0.836 2.080
136 17-Apr-21 Lamdapura Camp Casting yard Rebar Cage M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 4.160
137 17-Apr-21 Lamdapura Camp Casting yard Rebar Cage M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 4.160
138 17-Apr-21 Lamdapura Camp Casting yard Gantry Raft M25 2.5 0.850 0.000 1.840 1.213 2.023 7.225
139 17-Apr-21 Lamdapura Camp Casting yard Gantry Raft M25 6.0 2.040 0.000 4.416 2.910 4.854 17.340
140 18-Apr-21 Lamdapura Camp Casting yard Rebar Cage M15 (PCC) 1.5 0.390 0.000 1.140 0.752 1.254 3.120
141 18-Apr-21 Lamdapura Camp Casting yard Rebar Cage M15 (PCC) 3.0 0.780 0.000 2.280 1.503 2.508 6.240
Office Side Septic
142 18-Apr-21 Lamdapura Camp Casting yard M25 3.0 1.020 0.000 2.208 1.455 2.427 8.670
Tank Slab
143 18-Apr-21 384+570 LHS MJB Pile no-05 at LA2 M35 (Pile) 31.5 12.758 0.000 22.019 14.522 24.224 126.000
144 19-Apr-21 384+570 RHS MJB Pile no-03 at RP1 M35 (Pile) 28.0 11.340 0.000 19.572 12.908 21.532 112.000
145 19-Apr-21 Lamdapura Camp Casting yard Rebar Cage M15 (PCC) 3.0 0.780 0.000 2.280 1.503 2.508 6.240
146 19-Apr-21 Lamdapura Camp Casting yard Rebar Cage M15 (PCC) 4.0 1.040 0.000 3.040 2.004 3.344 8.320
147 19-Apr-21 Lamdapura Camp Casting yard Rebar Cage M15 (PCC) 4.0 1.040 0.000 3.040 2.004 3.344 8.320
148 19-Apr-21 383+916 LHS MJB Pile no-08 at LP6 M35 (Pile) 28.0 11.340 0.000 19.572 12.908 21.532 112.000
Pedestal (Longitudinal
149 20-Apr-21 Lamdapura Camp Casting Yard M40 2.5 1.000 0.000 1.757 1.150 1.950 8.000
bed-4)
150 20-Apr-21 Lamdapura Camp Casting yard Rebar Cage M15 (PCC) 3.0 0.780 0.000 2.280 1.503 2.508 6.240
151 20-Apr-21 Lamdapura Camp Casting yard Rebar Cage M15 (PCC) 1.0 0.260 0.000 0.760 0.501 0.836 2.080
152 20-Apr-21 Lamdapura Camp Casting Yard Tie Beam M35 (RCC) 3.00 1.140 0.000 2.157 1.422 2.373 9.690
153 20-Apr-21 Lamdapura Camp Casting yard Gantry Wall Raft M25 4.0 1.360 0.000 2.944 1.940 3.236 11.560
154 20-Apr-21 Lamdapura Camp Casting Yard Tie Beam M35 (RCC) 1.00 0.380 0.000 0.719 0.474 0.791 3.230
155 21-Apr-21 Lamdapura Camp Casting yard LHS Gantry Wall M25 3.0 1.020 0.000 2.208 1.455 2.427 8.670
156 21-Apr-21 Lamdapura Camp Casting yard RHS Gantry Wall M25 1.0 0.340 0.000 0.736 0.485 0.809 2.890
157 21-Apr-21 384+570 LHS MJB Pile no-07 at LP1 M35 (Pile) 30.0 12.150 0.000 20.970 13.830 23.070 120.000
158 21-Apr-21 Lamdapura Camp Casting yard Tower foundation M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 4.160
159 21-Apr-21 384+570 RHS MJB Pile no-04 at RP1 M35 (Pile) 26.0 10.530 0.000 18.174 11.986 19.994 104.000
RHS Gantry Wall
160 22-Apr-21 Lamdapura Camp Casting yard M25 2.0 0.680 0.000 1.472 0.970 1.618 5.780
Shaft
161 23-Apr-21 Lamdapura Camp Casting yard RHS Gantry Wall M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 4.160
162 23-Apr-21 383+916 LHS MJB Pile no-08 at LP6 M35 (Pile) 30.0 12.150 0.000 20.970 13.830 23.070 120.000
163 23-Apr-21 383+916 LHS MJB Pile no-02 at LP6 M35 (Pile) 29.5 11.948 0.000 20.621 13.600 22.686 118.000
164 24-Apr-21 Lamdapura Camp Casting yard RHS Gantry Wall Raft M25 5.0 1.700 0.000 3.680 2.425 4.045 14.450
165 24-Apr-21 384+570 RHS MJB Pile no-05 at RP1 M35 (Pile) 27.5 11.138 0.000 19.223 12.678 21.148 110.000
166 25-Apr-21 384+570 RHS MJB Pile no-04 at RA1 M35 (Pile) 28.0 11.340 0.000 19.572 12.908 21.532 112.000
167 25-Apr-21 383+916 LHS MJB Pile no-03 at LP6 M35 (Pile) 28.0 11.340 0.000 19.572 12.908 21.532 112.000
Foundation of
168 26-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 1.0 0.260 0.000 0.760 0.501 0.836 2.080
Transformer
LG Bed -3&4 Middle
169 26-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 3.0 0.780 0.000 2.280 1.503 2.508 6.240
Floor PCC
LG Bed -3&4 Middle
170 26-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 4.0 1.040 0.000 3.040 2.004 3.344 8.320
Floor PCC
171 27-Apr-21 384+570 LHS MJB Pile no-07 at LA2 M35 (Pile) 31.0 12.555 0.000 21.669 14.291 23.839 124.000
172 27-Apr-21 Lamdapura Camp Casting yard RHS Gantry Wall Raft M25 3.5 1.190 0.000 2.576 1.698 2.832 10.115
173 28-Apr-21 384+570 RHS MJB Pile no-01 at RP1 M35 (Pile) 28.5 11.543 0.000 19.921 13.139 21.917 114.000
RHS Gantry Wall
174 28-Apr-21 Lamdapura Camp Casting yard M25 4.0 1.360 0.000 2.944 1.940 3.236 11.560
Shaft
175 28-Apr-21 Lamdapura Camp Casting Yard Tie Beam M35 (RCC) 1.50 0.570 0.000 1.079 0.711 1.187 4.845
LG Bed -3&4 Middle
176 28-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 4.160
Floor PCC
LG Bed -3&4 Middle
177 28-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 3.0 0.780 0.000 2.280 1.503 2.508 6.240
Floor PCC
178 28-Apr-21 Lamdapura Camp Casting yard Gantry Wall RHS M15 (PCC) 1.5 0.390 0.000 1.140 0.752 1.254 3.120
LG Bed -3&4 Middle
179 28-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 4.160
Floor PCC
180 28-Apr-21 384+570 LHS MJB Pile no-03 at LP1 M35 (Pile) 30.0 12.150 0.000 20.970 13.830 23.070 120.000
181 LG Bed -3&4 Middle M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 4.160
29-Apr-21 Lamdapura Camp Casting yard
Floor PCC
LG Bed -3&4 Middle
182 29-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 2.0 0.520 0.000 1.520 1.002 1.672 4.160
Floor PCC
183 30-Apr-21 383+916 LHS MJB Pile no-09 of LP6 M35 (Pile) 29.0 11.745 0.000 20.271 13.369 22.301 116.000
184 30-Apr-21 384+570 LHS MJB Pile no-02 of LP1 M35 (Pile) 29.5 10.384 2.596 20.296 13.393 20.562 129.800
LG Bed -3&4 Middle
185 30-Apr-21 Lamdapura Camp Casting yard M15 (PCC) 3.5 0.788 0.280 2.653 1.750 2.688 10.150
Floor PCC
186 30-Apr-21 383+916 LHS MJB Pile no-04 of LP6 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
RHS Gantry Wall
187 1-May-21 Lamdapura Camp Casting yard M25 3.5 1.015 0.354 2.531 1.670 2.562 13.003
Shaft
188 1-May-21 384+570 RHS MJB Pile no-02 at RP1 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
RHS Gantry Wall
189 2-May-21 Lamdapura Camp Casting yard M25 1.5 0.435 0.152 1.085 0.716 1.098 5.573
Shaft
190 3-May-21 383+916 LHS MJB Pile no-02 at LP6 M35 (Pile) 31.0 10.912 2.728 21.328 14.074 21.607 136.400
191 3-May-21 Lamdapura Camp Casting yard RHS Gantry Wall Raft M25 6.0 1.740 0.606 4.338 2.862 4.392 22.290
PCC Flooring of LG
192 3-May-21 Lamdapura Camp Casting yard M15 (PCC) 3.0 0.675 0.240 2.274 1.500 2.304 8.670
Bed 3
193 4-May-21 388+594 LHS MJB Pile no-02 at LP3 M35 (Pile) 31.5 11.088 2.772 21.672 14.301 21.955 138.600
PCC Flooring of LG
194 5-May-21 Lamdapura Camp Casting yard M15 (PCC) 3.0 0.675 0.240 2.274 1.500 2.304 8.670
Bed 4
Office Parking Area
195 5-May-21 Lamdapura Camp Camp Office M15 (PCC) 1.0 0.225 0.080 0.758 0.500 0.768 2.890
PCC
196 5-May-21 388+594 LHS MJB Pile no-09 at LP1 M35 (Pile) 34.0 11.968 2.992 23.392 15.436 23.698 149.600
LHS Gantry Wall
197 5-May-21 Lamdapura Camp Casting yard M25 3.0 0.870 0.303 2.169 1.431 2.196 11.145
Shaft
PCC Flooring of LG
198 6-May-21 Lamdapura Camp Casting yard M15 (PCC) 3.0 0.675 0.240 2.274 1.500 2.304 8.670
Bed 4
PCC Flooring of LG
199 7-May-21 Lamdapura Camp Casting yard M15 (PCC) 2.0 0.450 0.160 1.516 1.000 1.536 5.780
Bed 4
200 7-May-21 388+594 LHS MJB Pile no-08 at LP1 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
PCC Flooring of LG
201 8-May-21 Lamdapura Camp Casting yard M15 (PCC) 5.0 1.125 0.400 3.790 2.500 3.840 14.450
Bed 4
202 8-May-21 384+570 LHS MJB Pile no-02 of LP1 M35 (Pile) 28.0 9.856 2.464 19.264 12.712 19.516 123.200
203 8-May-21 388+594 LHS MJB Pile no-01 of LP3 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
PCC Flooring of LG
204 9-May-21 Lamdapura Camp Casting yard M15 (PCC) 6.0 1.350 0.480 4.548 3.000 4.608 17.340
Bed 4
205 9-May-21 388+594 LHS MJB Pile no-03 of LP3 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
206 10-May-21 388+594 LHS MJB Pile no-02 of LP2 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
207 11-May-21 388+594 LHS MJB Pile no-08 of LP2 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
208 11-May-21 388+594 LHS MJB Pile no-03 of LP1 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
209 12-May-21 388+594 RHS MJB Pile no-08 of RP3 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
210 12-May-21 384+570 Girder No- 3&4 of M50 (PSC) 58.5 26.208 0.000 42.061 27.729 42.588 242.775
LHS MJB
LA1-LP1
211 13-May-21 388+594 LHS MJB Pile no-07 of LP1 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
212 13-May-21 388+594 LHS MJB Pile no-03 of LP2 M35 (Pile) 29.5 10.384 2.596 20.296 13.393 20.562 129.800
213 13-May-21 388+594 LHS MJB Pile no-07 of RP3 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
214 13-May-21 384+570 Girder No- 01 & 02 of M50 (PSC) 50.0 22.400 0.000 35.950 23.700 36.400 195.000
LHS MJB
LA1-LP1
215 14-May-21 388+594 LHS MJB Pile no-06 of LP1 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
216 15-May-21 Lamdapura Camp Batching Plant- Batching Plant-2
M25 2.5 0.725 0.253 1.807 1.193 1.830 9.288
2 Foundation Foundation
217 15-May-21 388+594 LHS MJB Pile no-09 of RP2 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
218 15-May-21 388+594 RHS MJB Pile no-04 of LP3 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
219 15-May-21 388+594 LHS MJB Pile no-06 of RP3 M35 (Pile) 29.0 11.745 0.000 20.271 13.369 22.301 65.250
220 17-May-21 388+594 LHS MJB Pile no-09 of LP2 M35 (Pile) 30.0 12.150 0.000 20.970 13.830 23.070 97.200
221 17-May-21 388+594 LHS MJB Pile no-04 of LP1 M35 (Pile) 30.0 12.150 0.000 20.970 13.830 23.070 97.200
222 17-May-21 374+937 MJB Test Pile M35 (Pile) 18.5 6.512 1.628 12.728 8.399 12.894 81.400
223 20-May-21 388+594 LHS MJB Pile no-08 of RP2 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
224 20-May-21 388+594 LHS MJB Pile no-09 of LP3 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
225 21-May-21 388+594 LHS MJB Pile no-05 of LP1 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
226 22-May-21 388+594 LHS MJB Pile no-05 of RP3 M35 (Pile) 32.5 11.440 2.860 22.360 14.755 22.653 143.000
227 22-May-21 388+594 LHS MJB Pile no-10 of LP2 M35 (Pile) 33.0 11.616 2.904 22.704 14.982 23.001 145.200
228 23-May-21 388+594 LHS MJB Pile no-06 of LP3 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
229 23-May-21 388+594 LHS MJB Pile no-07 of RP2 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
230 24-May-21 388+594 LHS MJB Pile no-02 of LP1 M35 (Pile) 32.5 11.440 2.860 22.360 14.755 22.653 143.000
231 24-May-21 388+594 LHS MJB Pile no-07 of LP2 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
232 24-May-21 388+594 RHS MJB Pile no-01 of RP3 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
233 24-May-21 388+594 RHS MJB Pile no-04 of RP2 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
234 24-May-21 384+570 Girder No- 05 & 06 of M50 (PSC) 50.5 22.624 0.000 36.310 23.937 36.764 237.350
LHS MJB
LA1-LP1
235 25-May-21 384+570 Girder No- 07 & 08 of M50 (PSC) 51.0 22.848 0.000 36.669 24.174 37.128 239.904
LHS MJB
LA1-LP1
236 26-May-21 383+934 LHS MJB Pile no-07 of LP6 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
237 26-May-21 388+594 LHS MJB Pile no-08 of LP3 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
238 26-May-21 388+594 LHS MJB Pile no-06 of LP2 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
239 26-May-21 388+594 RHS MJB Pile no-03 of RP2 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
240 26-May-21 388+594 LHS MJB Pile no-01 of LP1 M35 (Pile) 32.5 11.440 2.860 22.360 14.755 22.653 143.000
241 26-May-21 388+594 RHS MJB Pile no-02 of RP3 M35 (Pile) 26.0 9.152 2.288 17.888 11.804 18.122 114.400
242 27-May-21 388+594 LHS MJB Pile no-07 of LP3 M35 (Pile) 6.0 2.112 0.528 4.128 2.724 4.182 26.400
243 27-May-21 388+594 LHS MJB Pile no-04 of LP2 M35 (Pile) 4.5 1.584 0.396 3.096 2.043 3.137 19.800
244 27-May-21 384+570 LHS MJB Pile no-10 of RP1 M35 (Pile) 1.0 0.352 0.088 0.688 0.454 0.697 4.400
245 28-May-21 388+594 RHS MJB Pile no-04 of RP3 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
246 28-May-21 388+594 RHS MJB Pile no-10 of RP2 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
247 28-May-21 383+934 LHS MJB Pile no-06 of LP6 M35 (Pile) 30.5 10.736 2.684 20.984 13.847 21.258 134.200
248 29-May-21 388+594 LHS MJB Pile no-12 of LA2 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
249 29-May-21 388+594 LHS MJB Pile no-10 of LP3 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
250 29-May-21 Lamdapura Camp PCC for Girder M15 (PCC) 6.0 1.350 0.480 4.548 3.000 4.608 17.340
Casting yard
stacking yard
251 30-May-21 388+594 RHS MJB Pile no- 05 of RP2 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
252 30-May-21 388+594 LHS MJB Pile no- 05 of LP2 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
253 30-May-21 388+594 LHS MJB LP1 Pile cap PCC M15 (PCC) 9.0 2.025 0.720 6.822 4.500 6.912 26.010
254 30-May-21 Lamdapura Camp B. Plant-2, Silo PCC for Silo M15 (PCC) 4.5 1.013 0.360 3.411 2.250 3.456 13.005
Foundation Foundation
255 30-May-21 Lamdapura Camp Casting Yard PCC for Girder M15 (PCC) 6.0 1.350 0.480 4.548 3.000 4.608 17.340
stacking yard
256 31-May-21 374+937 LHS MJB Pile no- 01 of LP1 M35 (Pile) 23.5 8.272 2.068 16.168 10.669 16.380 103.400
257 31-May-21 388+594 RHS MJB Pile no- 03 of RP3 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
258 31-May-21 388+594 RHS MJB Pile no- 01 of RP2 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
259 1-Jun-21 Lamdapura Camp Casting yard Gantry Wall Shaft M25 FLYASH 2.5 0.725 0.253 1.807 1.193 1.830 9.288
260 1-Jun-21 Lamdapura Camp Casting Yard Raft for stacking yard M30 FLYASH 32.0 10.304 2.688 22.880 15.264 23.264 123.424
M35 (Pile)
261 1-Jun-21 388+594 LHS MJB Pile no- 01 of LP2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
262 2-Jun-21 388+594 LHS MJB Pile no- 09 of LA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
263 2-Jun-21 388+594 RHS MJB Pile no- 02 of RP2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
264 2-Jun-21 388+594 RHS MJB Pile no- 09 of RP3 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
265 2-Jun-21 383+916 RHS MJB Pile no- 09 of RP6 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH
267 3-Jun-21 Lamdapura Camp Casting Yard Raft for stacking yard M30 FLYASH 33.0 10.626 2.772 23.595 15.741 23.991 127.281
M35 (Pile)
268 3-Jun-21 388+594 LHS MJB Pile no- 04 of LA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
269 3-Jun-21 383+916 RHS MJB Pile no- 01 of RP6 29.0 10.208 2.552 19.952 13.166 20.213 127.600
FLYASH
Hammer
Hammer casting for
270 4-Jun-21 Lamdapura Camp casting for pile M25 FLYASH 3.5 1.015 0.354 2.531 1.670 2.562 13.003
pile laod testing
laod testing
Subhelav Camp
271 4-Jun-21 Box Culvert Box Culvert segment M30 FLYASH 36.0 11.592 3.024 25.740 17.172 26.172 138.852
(PNC), Casting Yard
M35 (Pile)
272 4-Jun-21 388+594 RHS MJB Pile no- 08 of LA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
273 4-Jun-21 383+916 RHS MJB Pile no- 02 of RP6 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
Subhelav Camp
274 5-Jun-21 Box Culvert Box Culvert segment M30 FLYASH 30.0 9.660 2.520 21.450 14.310 21.810 115.710
(PNC), Casting Yard
M35 (Pile)
275 5-Jun-21 388+594 RHS MJB Pile no-11 of LA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
276 5-Jun-21 388+594 RHS MJB Pile no-09 of RP4 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
277 5-Jun-21 388+594 RHS MJB Pile no-09 of RA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
278 5-Jun-21 388+594 RHS MJB Pile no-06 of RP2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
279 5-Jun-21 383+934 LHS MJB Pile no-05 of LP6 31.5 11.088 2.772 21.672 14.301 21.955 138.600
FLYASH
287 Lamdapura Camp Pedestal fpr girder M30 FLYASH 4.0 1.288 0.336 2.860 1.908 2.908 15.428
7-Jun-21 Casting yard
stacking yard
M35 (Pile)
288 7-Jun-21 388+594 RHS MJB Pile no-08 of RP4 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
289 7-Jun-21 388+594 LHS MJB Pile no-06 of LA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
290 7-Jun-21 384+570 LHS MJB Pile no-06 of LP1 29.0 10.208 2.552 19.952 13.166 20.213 127.600
FLYASH
M35 (Pile)
291 7-Jun-21 383+934 RHS MJB Pile no-10 of RP6 32.0 11.264 2.816 22.016 14.528 22.304 140.800
FLYASH
PCC for girder M15 (PCC)
292 8-Jun-21 Lamdapura camp Casting yard 5.0 1.125 0.400 3.790 2.500 3.840 14.450
stacking yard FLYASH
M35 (Pile)
293 8-Jun-21 388+594 RHS MJB Pile no-01 of RA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
294 8-Jun-21 383+934 RHS MJB Pile no-06 of RP6 29.0 10.208 2.552 19.952 13.166 20.213 127.600
FLYASH
M35 (Pile)
295 8-Jun-21 384+570 LHS MJB Pile no-01 of LP1 29.0 10.208 2.552 19.952 13.166 20.213 127.600
FLYASH
296 9-Jun-21 388+594 LHS MJB Pile cap PCC of LP2 M15 (PCC) 8.5 2.210 0.000 6.460 4.259 7.106 15.300
Febrication PCC for febrication
297 9-Jun-21 Lamdapura Camp M15 (PCC) 6.0 1.560 0.000 4.560 3.006 5.016 10.800
Yard yard
Electric panel Pcc for Electric panel M15 (PCC)
298 9-Jun-21 Lamdapura camp 2.0 0.450 0.160 1.516 1.000 1.536 5.780
foundation foundation FLYASH
299 9-Jun-21 388+594 RHS MJB Pile no-07 of RP4 M35 (Pile) 10.5 4.253 0.000 7.339 4.841 8.075 34.020
300 9-Jun-21 383+934 RHS MJB Pile no-05 of RP6 M35 (Pile) 30.0 12.150 0.000 20.970 13.830 23.070 97.200
301 9-Jun-21 388+594 LHS MJB Pile no-03 of LA2 M35 (Pile) 28.5 11.543 0.000 19.921 13.139 21.917 92.340
302 9-Jun-21 383+934 RHS MJB Pile no-07 of RP6 M35 (Pile) 30.0 12.150 0.000 20.970 13.830 23.070 97.200
303 9-Jun-21 388+594 RHS MJB Pile no-11 of RA2 M35 (Pile) 28.5 11.543 0.000 19.921 13.139 21.917 92.340
M35 (Pile)
304 9-Jun-21 388+594 RHS MJB Pile no-07 of RP4 18.0 6.336 1.584 12.384 8.172 12.546 79.200
FLYASH
305 10-Jun-21 Lamdapura Camp Security gate PCC for security gate M15 (PCC) 1.0 0.260 0.000 0.760 0.501 0.836 1.800
M35 (Pile)
385 22-Jun-21 388+594 LHS MJB Pile no-06 of LA1 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
386 22-Jun-21 388+594 RHS MJB Pile no-06 of RA2 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
387 22-Jun-21 383+934 RHS MJB Pile no-09 of RP10 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH
M35 (Pile)
388 22-Jun-21 383+934 RHS MJB Pile no-03 of RP10 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH
M35 (Pile)
389 22-Jun-21 383+934 RHS MJB Pile no-10 of RP10 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH
390 22-Jun-21 388+594 MJB Pile Head M50 2.0 0.896 0.000 1.438 0.948 1.456 8.960
M15 (PCC)
391 23-Jun-21 388+594 MJB Pile cap PCC 4.0 0.900 0.320 3.032 2.000 3.072 11.560
FLYASH
392 23-Jun-21 384+570 RHS MJB Pile no-04 of RA2 M35 (Pile) 32.0 12.960 0.000 22.368 14.752 24.608 103.680
M35 (Pile)
393 23-Jun-21 384+570 LHS MJB Pile no-04 of LA1 26.0 9.152 2.288 17.888 11.804 18.122 114.400
FLYASH
M35 (Pile)
394 23-Jun-21 388+594 RHS MJB Pile no-03 of RP1 28.5 10.032 2.508 19.608 12.939 19.865 125.400
FLYASH
M35 (Pile)
395 23-Jun-21 383+934 RHS MJB Pile no-07 of RP10 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH
M35 (Pile)
396 23-Jun-21 383+934 RHS MJB Pile no-01 of RP10 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH
M35 (Pile)
397 23-Jun-21 383+934 RHS MJB Pile no-06 of RP10 30.0 10.560 2.640 20.640 13.620 20.910 132.000
FLYASH
Cement &
444 3-Jul-21 388+594 RHS MJB Pile Cap of LP3 M35(RCC) 145.0 49.010 12.325 102.515 68.295 104.255 582.755
Flyash
Pedestal for Girder Cement &
445 3-Jul-21 Lamdapura Camp Casting Yard M30 6.0 1.932 0.504 4.290 2.862 4.362 23.142
Stacking yard Flyash
Batching Plant- Material Bin support Cement &
446 3-Jul-21 Lamdapura Camp M15 (PCC) 2.0 0.450 0.160 1.516 1.000 1.536 5.780
2 foundation fixing Flyash
Cement &
447 4-Jul-21 384+570 LHS MJB Pile no-08 of LA1 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Flyash
Cement &
448 4-Jul-21 388+594 RHS MJB Pile no-10 of RP1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Anchor Pile-2, near Cement &
449 4-Jul-21 388+594 MJB M35 (Pile) 28.0 9.856 2.464 19.264 12.712 19.516 123.200
Test Pile Flyash
Cement &
450 4-Jul-21 383+934 LHS MJB Pile no- 03 of LP8 M35(RCC) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Batching Plant- Material Bin support Cement &
451 4-Jul-21 Lamdapura Camp M15 (PCC) 6.0 1.350 0.480 4.548 3.000 4.608 17.340
2 foundation fixing Flyash
Cement &
452 5-Jul-21 384+570 RHS MJB Pile no-06 of RA1 M35 (Pile) 33.5 11.792 2.948 23.048 15.209 23.350 147.400
Flyash
453 5-Jul-21 388+594 RHS MJB Pile no-01 of RA1 M35 (Pile) 28.5 11.543 0.000 19.921 13.139 21.917 92.340 Cement
Cement &
454 5-Jul-21 388+594 RHS MJB Pile no-01 of RP1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
455 5-Jul-21 388+594 RHS MJB Pile Head of RP2 M50 6.0 2.688 0.000 4.314 2.844 4.368 26.880 Cement
Cement &
456 6-Jul-21 383+934 RHS MJB Pile no-02 of RP8 M35 (Pile) 25.5 8.976 2.244 17.544 11.577 17.774 112.200
Flyash
Cement &
457 6-Jul-21 383+934 RHS MJB Pile no-01 of RP9 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Flyash
Cement &
458 6-Jul-21 383+934 RHS MJB Pile no-02 of RP9 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Flyash
Cement &
459 6-Jul-21 388+594 RHS MJB Pile Cap PCC of RP2 M15 (PCC) 10.0 2.250 0.800 7.580 5.000 7.680 28.900
Flyash
Cement &
460 6-Jul-21 Lamdapura Camp Casting yard Gantry Wall Shaft M25 3.5 1.015 0.354 2.531 1.670 2.562 13.003
Flyash
Cement &
461 6-Jul-21 388+594 LHS MJB Pier Starter LP3 M45 2.0 0.784 0.196 1.354 0.902 1.376 10.290
Flyash
Cement &
462 7-Jul-21 383+934 RHS MJB Pile no-03 of RP9 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
463 7-Jul-21 383+934 RHS MJB Pile no-03 of RP8 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Flyash
Cement &
464 7-Jul-21 383+934 LHS MJB Pile no-04 of LP8 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Flyash
Cement &
465 7-Jul-21 388+594 MJB Anchor pile-3 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Flyash
Cement &
466 7-Jul-21 388+594 RHS MJB Pile no-10 of RA1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
467 7-Jul-21 388+594 Labour Hutment M15 (PCC) 2.0 0.450 0.160 1.516 1.000 1.536 5.780
Flyash
PCC for Pile Cap Cement &
468 7-Jul-21 384+570 M15 (PCC) 1.0 0.225 0.080 0.758 0.500 0.768 2.890
(rectification) Flyash
Batching Plant- Material Bin support Cement &
469 7-Jul-21 Lamdapura Camp M15 (PCC) 9.5 2.138 0.760 7.201 4.750 7.296 27.455
2 Foundation fixing, Flyash
Cement &
470 8-Jul-21 383+934 RHS MJB Pile no-08 of RP8 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Flyash
Cement &
471 8-Jul-21 383+934 RHS MJB Pile no-06 of RP9 M35 (Pile) 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Flyash
Cement &
472 8-Jul-21 388+594 RHS MJB Pile no-05 of RP1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
473 8-Jul-21 388+594 RHS MJB Pile no-02 of RA1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Raft for Girder Cement &
474 8-Jul-21 Lamdapura Camp Casting Yard M30 33.0 10.626 2.772 23.595 15.741 23.991 127.281
Stacking yard Flyash
Cement &
475 8-Jul-21 Lamdapura Camp Casting yard Gantry Wall M25 1.5 0.435 0.152 1.085 0.716 1.098 5.573
Flyash
Cement &
476 8-Jul-21 Lamdapura Camp Security gate PCC at Security gate M15 (PCC) 2.0 0.450 0.160 1.516 1.000 1.536 5.780
Flyash
Cement &
477 9-Jul-21 383+934 RHS MJB Pile no-05 of RP9 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
478 9-Jul-21 383+934 RHS MJB Pile no-01 of RP8 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
479 9-Jul-21 383+934 RHS MJB Pile no-07 of RP9 M35 (Pile) 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Flyash
Anchor Pile no-04 for Cement &
480 9-Jul-21 388+594 RHS MJB M35 (Pile) 31.0 10.912 2.728 21.328 14.074 21.607 136.400
test pile Flyash
Cement &
481 9-Jul-21 388+594 RHS MJB Pile no-06 of RP1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
PCC for Pile Cap - Cement &
482 9-Jul-21 384+570 RHS MJB M15 (PCC) 7.5 1.688 0.600 5.685 3.750 5.760 21.675
RA2 Flyash
PCC for Pile Cap - Cement &
483 9-Jul-21 384+570 RHS MJB M15 (PCC) 6.0 1.350 0.480 4.548 3.000 4.608 17.340
RA2 Flyash
Cement &
484 10-Jul-21 383+934 RHS MJB Pile no-04 of RP9 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
485 10-Jul-21 388+594 RHS MJB Pile no-09 of RA1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
486 10-Jul-21 383+934 RHS MJB Pile no-05 of RP8 M35 (Pile) 31.5 11.088 2.772 21.672 14.301 21.955 138.600
Flyash
PCC for Pile Cap - Cement &
487 10-Jul-21 384+570 RHS MJB M15 (PCC) 6.0 1.350 0.480 4.548 3.000 4.608 17.340
LA1 Flyash
Pedestal for Girder Cement &
488 10-Jul-21 Lamdapura Camp Casting Yard M30 5.0 1.610 0.420 3.575 2.385 3.635 19.285
Stacking yard Flyash
Cement &
489 11-Jul-21 388+594 RHS MJB Pile Cap of RP3 M35 (RCC) 147.0 49.686 12.495 103.929 69.237 105.693 590.793
Flyash
Cement &
490 11-Jul-21 383+934 RHS MJB Pile no-08 of RP9 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
491 11-Jul-21 383+934 LHS MJB Pile no-08 of LP8 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
PCC for Pile Cap - Cement &
492 11-Jul-21 384+570 LHS MJB M15 (PCC) 9.5 2.138 0.760 7.201 4.750 7.296 27.455
LP1 Flyash
Cement &
493 12-Jul-21 388+594 RHS MJB Pile no-03 of RA1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
494 12-Jul-21 383+934 RHS MJB Pile no-06 of RP8 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
495 12-Jul-21 383+934 RHS MJB Pile no-09 of RP8 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
PCC for Pile Cap - Cement &
496 12-Jul-21 388+594 RHS MJB M15 (PCC) 10.0 2.250 0.800 7.580 5.000 7.680 28.900
RP4 Flyash
Cement &
497 13-Jul-21 388+594 RHS MJB Pile no-04 of RA1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
498 13-Jul-21 383+934 RHS MJB Pile no-10 of RP9 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
499 13-Jul-21 383+934 RHS MJB Pile no-09 of RP9 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
PCC for Pile Cap - Cement &
500 13-Jul-21 383+934 LHS MJB M15 (PCC) 9.5 2.138 0.760 7.201 4.750 7.296 27.455
LP6 Flyash
Mechanical Workshop Cement &
501 13-Jul-21 Lamdapura Camp MJB M15 (PCC) 12.0 2.700 0.960 9.096 6.000 9.216 34.680
PCC Flyash
Cement &
502 14-Jul-21 388+594 RHS MJB Pile no-05 of RA1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
503 14-Jul-21 383+934 RHS MJB Pile no-04 of RP8 M35 (Pile) 29.5 10.384 2.596 20.296 13.393 20.562 129.800
Flyash
Cement &
504 14-Jul-21 383+934 RHS MJB Pile no-10 of RP8 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
505 14-Jul-21 383+934 LHS MJB Pile no-07 of LP8 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
506 14-Jul-21 388+594 RHS MJB Pile Cap of RP2 M35(RCC) 148.00 50.024 12.580 104.636 69.708 106.412 594.812
Flyash
Cement &
507 15-Jul-21 388+594 RHS MJB Pile no-06 of RA1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
508 15-Jul-21 383+934 RHS MJB Pile no-07 of RP8 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
509 15-Jul-21 383+934 RHS MJB Pile no-06 of RP7 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Precast I Girder No-
Cement &
510 15-Jul-21 384+570 LHS MJB 05, 06, 07 & 08 of M50 (PSC) 103.0 43.260 10.815 70.658 47.071 66.023 459.380
Flyash
LP1-LA2
Cement &
511 15-Jul-21 388+594 LHS MJB Pier shaft LP3 M45(RCC) 34.50 13.524 3.381 23.357 15.560 23.736 177.503
Flyash
PCC for Pile Cap - Cement &
512 15-Jul-21 388+594 RHS MJB M15 (PCC) 6.0 1.350 0.480 4.548 3.000 4.608 17.340
LA1 Flyash
Cement &
513 16-Jul-21 388+594 RHS MJB Pile no-07 of RA1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
514 16-Jul-21 383+934 RHS MJB Pile no-05 of RP7 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
515 16-Jul-21 383+934 LHS MJB Pile no-05 of LP7 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
516 16-Jul-21 383+934 RHS MJB Pile no-07 of RP7 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
517 16-Jul-21 388+594 LHS MJB Pile Cap of LP1 M35(RCC) 150.0 50.700 12.750 106.050 70.650 107.850 602.850
Flyash
Cement &
518 17-Jul-21 388+594 RHS MJB Pile no-08 of RA1 M35 (Pile) 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Flyash
Cement &
519 17-Jul-21 383+934 RHS MJB Pile no-04 of RP7 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
520 17-Jul-21 383+934 LHS MJB Pile no-05 of LP8 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
521 17-Jul-21 383+934 RHS MJB Pile no-09 of RP7 M35 (Pile) 33.0 11.616 2.904 22.704 14.982 23.001 145.200
Flyash
Pier shaft Starter RP2 Cement &
522 17-Jul-21 388+594 RHS MJB M45 (RCC) 3.5 1.372 0.343 2.370 1.579 2.408 18.008
& RP3 Flyash
HM Plant Cement &
523 17-Jul-21 Subhelav Camp(PNC) HM Plant Foundation M25 10.5 3.045 1.061 7.592 5.009 7.686 39.008
Foundation Flyash
Cement &
524 18-Jul-21 383+934 RHS MJB Pile no-08 of RP7 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
HM Plant Cement &
525 18-Jul-21 Subhelav Camp(PNC) HM Plant Foundation M10 (PCC) 5.0 0.850 0.450 3.625 2.155 4.100 12.150
Foundation Flyash
Cement &
526 19-Jul-21 384+570 RHS MJB Pile Cap of RP1 M35(RCC) 150.0 50.700 12.750 106.050 70.650 107.850 602.850
Flyash
Cement &
527 19-Jul-21 383+934 MJB PCC for Borewell M10 (PCC) 1.0 0.170 0.090 0.725 0.431 0.820 2.430
Flyash
Cement &
528 20-Jul-21 383+934 LHS MJB Pile no-06 of LP7 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
529 20-Jul-21 383+934 RHS MJB Pile no-03 of RP7 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
530 20-Jul-21 383+934 LHS MJB Pile no-09 of LP8 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
531 21-Jul-21 374+551 LHS ROB Pile no-06 of LP1 M35 (Pile) 14.0 4.928 1.232 9.632 6.356 9.758 61.600
Flyash
Cement &
532 21-Jul-21 388+594 RHS MJB Pier shaft RP2 M45 (RCC) 32.5 12.740 3.185 22.003 14.658 22.360 167.212
Flyash
Cement &
533 21-Jul-21 383+934 LHS MJB Pile no-09 of LP10 M35 6.0 2.112 0.528 4.128 2.724 4.182 26.400
Flyash
Cement &
534 21-Jul-21 Lamdapura Camp MJB Febrication yard M35 5.0 1.760 0.440 3.440 2.270 3.485 22.000
Flyash
Cement &
535 22-Jul-21 383+934 RHS MJB Pile no-02 of RP7 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Precast I Girder No-
Cement &
536 22-Jul-21 384+570 RHS MJB 01, 02, 03 & 04 of M50 (PSC) 103.0 43.260 10.815 70.658 47.071 66.023 459.380
Flyash
RP1-RA1
Cement &
537 22-Jul-21 388+594 RHS MJB Pier shaft Starter RP1 M45 (RCC) 1.5 0.588 0.147 1.016 0.677 1.032 7.717
Flyash
PCC for Pile Cap - Cement &
538 22-Jul-21 383+934 RHS MJB M15 (PCC) 10.0 2.250 0.800 7.580 5.000 7.680 28.900
LP10 Flyash
Cement &
539 22-Jul-21 Lamdapura Camp Girder Stacking yard M15 (PCC) 5.5 1.238 0.440 4.169 2.750 4.224 15.895
Flyash
Cement &
540 23-Jul-21 383+934 RHS MJB Pile no-01 of RP7 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
541 23-Jul-21 383+934 LHS MJB Pile no-06 of LP8 M35 (Pile) 29.0 10.208 2.552 19.952 13.166 20.213 127.600
Flyash
Cement &
542 23-Jul-21 374+551 LHS MJB Pile no-01 of LP1 M35 (Pile) 14.0 4.928 1.232 9.632 6.356 9.758 61.600
Flyash
Cement &
543 23-Jul-21 388+594 RHS MJB Pier shaft starter LP1 M45 (RCC) 2.0 0.784 0.196 1.354 0.902 1.376 10.290
Flyash
PCC for Pile Cap - Cement &
544 23-Jul-21 388+594 RHS MJB M15 (PCC) 10.0 2.250 0.800 7.580 5.000 7.680 28.900
RP1 Flyash
Cement &
545 24-Jul-21 374+551 LHS MJB Pile no-05 of LP1 M35 (Pile) 14.0 4.928 1.232 9.632 6.356 9.758 61.600
Flyash
Precast I Girder No-
Cement &
546 24-Jul-21 384+570 RHS MJB 05, 06, 07 & 08 of M50 (PSC) 112.0 47.040 11.760 76.832 51.184 71.792 499.520
Flyash
RP1-RA1
PCC for Pile Cap - M15 (PCC) 0.225 0.080 0.758 0.500 0.768 2.890 Cement &
547 27-Jul-21 383+934 RHS MJB 1.0
LP10 Flyash
548 29-Jul-21 388+594 RHS MJB Pier shaft RP3 M45 (RCC) 32.0 12.544 3.136 21.664 14.432 22.016 164.640
549 29-Jul-21 LamdapuraCamp Steel Yard PedesSteel Yard Pedestal M15 (PCC) 1.5 0.338 0.120 1.137 0.750 1.152 4.335
Cement &
550 30-Jul-21 374+551 RHS MJB Pile no-04 of LP1 M35 (Pile) 12.0 4.224 1.056 8.256 5.448 8.364 52.800
Flyash
Precast I Girder No-
Cement &
551 30-Jul-21 384+570 RHS MJB 01, 02, 03 & 04 of M50 (PSC) 103.0 43.260 10.815 70.658 47.071 66.023 459.380
Flyash
RP1-RA2
Steel Yard
552 30-Jul-21 Lamdapura Camp Steel Yard Pedestal M15 (PCC) 1.0 0.225 0.080 0.758 0.500 0.768 2.890 d
Pedestal
Cement &
553 31-Jul-21 384+570 LHS MJB Pier shaft LP1 M45 (RCC) 13.5 5.292 1.323 9.140 6.089 9.288 69.458
Flyash
Cement &
554 31-Jul-21 374+564 LHS ROB Pile no-03 of LP1 M35(Pile) 12.0 4.224 1.056 8.256 5.448 8.364 52.800
Flyash
Cement &
555 31-Jul-21 374+564 LHS ROB Pile no-02 of LP1 M35(Pile) 12.0 4.224 1.056 8.256 5.448 8.364 52.800
Flyash
Cement &
556 8/1/2021 374+564 RHS ROB Pile no-01 of RP1 M35 (Pile) 12.0 4.224 1.056 8.256 5.448 8.364 52.800
Flyash
Cement &
557 8/1/2021 383+934 RHS MJB Pile cap PCC - RP9 M15 (PCC) 10.0 2.250 0.800 7.580 5.000 7.680 28.900
Flyash
Cement &
558 8/2/2021 374+564 RHS ROB Pile no-05 of RP1 M35 (Pile) 13.0 4.576 1.144 8.944 5.902 9.061 57.200
Flyash
Cement &
559 8/2/2021 374+564 LHS ROB Pile Cap PCC - LP1 M15 (PCC) 6.0 1.350 0.480 4.548 3.000 4.608 17.340
Flyash
Cement &
560 8/2/2021 388+594 MJB PCC M15 (PCC) 2.0 0.450 0.160 1.516 1.000 1.536 5.780
Flyash
Cement &
561 8/2/2021 Lamdapura Camp PCC near Office M15 (PCC) 1.5 0.338 0.120 1.137 0.750 1.152 4.335
Flyash
Cement &
562 8/3/2021 374+564 RHS ROB Pile no-04 of RP1 M35 (Pile) 13.0 4.576 1.144 8.944 5.902 9.061 57.200
Flyash
Cement &
563 8/3/2021 374+564 RHS ROB Pile no-06 of RP1 M35 (Pile) 16.0 5.632 1.408 11.008 7.264 11.152 70.400
Flyash
Cement &
564 8/3/2021 388+594 LHS MJB Pile Cap of LP1 M35 (RCC) 152.0 51.376 12.920 107.464 71.592 109.288 610.888
Flyash
Cement &
565 8/3/2021 383+934 RHS ROB Pile Cap PCC - RP6 M15 (PCC) 10.0 2.250 0.800 7.580 5.000 7.680 28.900
Flyash
Cement &
566 8/4/2021 374+564 RHS ROB Pile no-03 of RP1 M35 (Pile) 13.0 4.576 1.144 8.944 5.902 9.061 57.200
Flyash
Cement &
567 8/4/2021 374+564 RHS ROB Pile no-02 of RP1 M35 (Pile) 13.0 4.576 1.144 8.944 5.902 9.061 57.200
Flyash
679 9/2/2021 374+937 RHS MJB Pile no- 04 of RP1 M35(Pile) 24.0 0.0 24.0 8.448 2.112 16.512 10.896 16.728 105.600
680 9/2/2021 383+934 RHS MJB Pile no-02 of RP2 M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Precast Girder No- 05,
681 9/2/2021 388+594 RHS MJB 06, 07 & 08 of RA1 - M50(PSC) 104.0 0.0 104.0 43.680 10.920 71.240 47.528 66.560 546.000
RP1
682 9/3/2021 374+937 RHS MJB Pile no- 02 of RP1 M35(Pile) 15.0 0.0 15.0 5.280 1.320 10.320 6.810 10.455 66.000
Abutment Shaft-2 of
683 9/3/2021 388+594 LHS MJB M40(RCC) 4.0 0.0 4.0 1.444 0.364 2.776 1.852 2.824 18.984
LA1
684 9/3/2021 374+564 RHS ROB PCC for RA1 M15(PCC) 1.0 0.0 1.0 0.225 0.080 0.758 0.500 0.768 2.890
685 9/4/2021 374+937 RHS MJB Pile no- 02 of RP1 M35(Pile) 7.0 0.0 7.0 2.464 0.616 4.816 3.178 4.879 30.800
686 9/4/2021 383+934 LHS MJB Pier Shaft of LP6 M45(RCC) 38.0 0.0 38.0 14.896 3.724 25.726 17.138 26.144 195.510
complete total
dispatched qty.
712 9/17/2021 374+564 LHS ROB Pile Cap of LP1 M35(RCC) 8.50 0.0 8.5 2.873 0.723 6.010 4.004 6.111 34.162 including
previous day:-
80.5 cum
Precast Cribs pedestal 1.450 0.505 3.615 2.385 3.660 18.575
713 9/18/2021 383+934 MJB M25 5.0 0.0 5.00
5nos.
714 9/18/2021 383+934 LHS MJB Pile no- 09 of LP1 M35(Pile) 33.0 0.0 33.0 11.616 2.904 22.704 14.982 23.001 145.200
Precast panel nos.5 for
715 9/18/2021 388+594 LHS MJB M40(RCC) 2.75 0.0 2.75 0.993 0.250 1.942 1.293 1.972 9.944
LA1-LP1
716 9/19/2021 383+934 MJB Precast pedestal M25 3.0 0.0 3.00 0.870 0.303 2.169 1.431 2.196 11.145
717 9/19/2021 383+934 LHS MJB Pile no- 06 of LP1 M35(Pile) 37.0 0.0 37.0 13.024 3.256 25.456 16.798 25.789 162.800
718 9/20/2021 0 0 0 0 0 0 0 0 0 0 0 0 0 0
719 9/21/2021 383+934 LHS MJB Pile no- 05 of LP1 M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Precast Girder No-
720 9/22/2021 388+594 RHS MJB M50(PSC) 106.0 0.0 106.0 45.580 11.130 72.610 48.442 67.840 528.940
5,6,7&8 of RP2-RP3
721 9/22/2021 383+934 RHS ROB Pile Cap of LP1 M35(RCC) 50.00 0.0 50.0 16.900 4.250 35.350 23.550 35.950 200.950
722 9/22/2021 388+594 LHS MJB PCC for LA1 Pedestal M15(PCC) 4.5 0.0 4.5 1.013 0.360 3.411 2.250 3.456 13.005
723 9/22/2021 374+564 RHS ROB Pile Cap of RA1 M35(RCC) 8.0 0.0 8.0 2.704 0.680 5.656 3.768 5.752 32.152
724 9/22/2021 Lamdapura Camp Steel Yard PCC at Steel yard M15(PCC) 1.0 0.0 1.0 0.225 0.080 0.758 0.500 0.768 2.890
725 9/23/2021 383+934 RHS MJB Pile Cap of RP9 M35(RCC) 98.00 4.0 102.0 34.476 8.670 72.114 48.042 73.338 409.938
Precast panel 09 nos.
726 9/23/2021 388+594 LHS MJB M40(RCC) 4.5 0.0 4.5 1.624 0.410 3.177 2.115 3.226 16.272
for LA1-LP1
728 9/24/2021 383+934 LHS MJB Pile no- 06 of LP5 M35(Pile) 35.5 0.0 35.5 12.496 3.124 24.424 16.117 24.743 156.200
Precast pedestal 10 2.320 0.808 5.784 3.816 5.856 29.720
729 9/24/2021 383+934 MJB M25 8.0 0.0 8.00
nos.
Precast Girder No-
730 9/25/2021 388+594 RHS MJB 05,06,07&08 of RP2- M50(PSC) 105.5 0.0 105.5 44.310 11.077 72.268 48.214 67.520 526.445
RP3
Precast panel 09 nos.
731 9/25/2021 388+594 LHS MJB M40(RCC) 4.75 0.0 4.75 1.715 0.432 3.354 2.233 3.406 17.176
for LA1-LP1
732 9/25/2021 383+934 LHS MJB Pile no- 08 of LP5 M35(Pile) 35.5 0.0 35.5 12.496 3.124 24.424 16.117 24.743 156.200
Precast pedestal 05 1.160 0.404 2.892 1.908 2.928 14.860
733 9/25/2021 383+934 MJB M25 4.0 0.0 4.00
nos.
734 9/26/2021 374+564 RHS ROB Pier shaft RP1 1st lift M40(RCC) 23.50 0.0 23.50 8.484 2.139 16.591 11.045 16.850 111.625
735 9/27/2021 383+934 LHS MJB Pile no- 09 of LP5 M35(Pile) 35.5 0.0 35.5 12.496 3.124 24.424 16.117 24.743 156.200
736 9/28/2021 383+934 LHS MJB Pile no- 07 of LP5 M35(Pile) 35.5 0.0 35.5 12.496 3.124 24.424 16.117 24.743 156.200
Precast panel 09 nos.
737 9/28/2021 388+594 LHS MJB M40(RCC) 4.75 0.0 4.75 1.715 0.432 3.354 2.233 3.406 17.176
for LA1-LP1
Precast Girder No-
738 9/29/2021 388+594 RHS MJB 01,02,03,04 of RP3- M50(PSC) 105.0 0.0 105.0 44.100 11.025 71.925 47.985 67.200 523.950
RP4
Precast panel 04 nos.
739 9/29/2021 388+594 LHS MJB M40(RCC) 2.00 0.0 2.00 0.722 0.182 1.412 0.940 1.434 7.232
for LA1-LP1
Labour's Room
740 9/30/2021 384+570 PCC at labours room M15(PCC) 2.5 0.0 2.5 0.563 0.200 1.895 1.250 1.920 7.225
PCC
741 9/30/2021 374+564 LHS MJB Pile Cap of LA1 M35(RCC) 60.00 0.0 60.0 20.280 5.100 42.420 28.260 43.140 241.140
742 9/30/2021 383+934 LHS MJB Pile no- 10 of LP5 M35(Pile) 35.5 0.0 35.5 12.496 3.124 24.424 16.117 24.743 156.200
743 9/30/2021 383+934 MJB MS Pipe fixing M25 0.5 0.0 0.50 0.145 0.051 0.362 0.239 0.366 1.858
Labour's Room
744 10/1/2021 374+564 PCC at labours room M15(PCC) 1.0 0.0 1.0 0.225 0.080 0.758 0.500 0.768 2.890
PCC
745 10/1/2021 388+594 LHS MJB Pier Cap of LP1 M45(RCC) 30.0 6.0 36.0 14.112 3.528 24.372 16.236 24.768 185.220
746 10/1/2021 388+594 LHS MJB Pier Cap of LP1 M45(RCC) 52.5 0.0 52.5 22.575 0.000 36.645 24.413 40.425 215.250
747 10/1/2021 383+934 RHS MJB Pile no- 06 of RP5 M35(Pile) 35.5 0.0 35.5 14.378 0.000 24.815 16.366 27.300 138.450
748 10/1/2021 383+934 MJB MS Pipe fixing M25 0.5 0.0 0.50 0.145 0.051 0.362 0.239 0.366 1.858
Electric pole fixing 0.580 0.202 1.446 0.954 1.464 7.430
749 10/1/2021 383+934 MJB M25 2.0 0.0 2.00
and illumination
Precast Girder No-
750 10/2/2021 374+564 LHS ROB 03,04,05,&06 of LP3- M50(PSC) 53.0 0.0 53.0 22.260 5.565 36.305 24.221 33.920 264.470
LA2
751 10/2/2021 383+934 RHS MJB Pile no- 08 of RP5 M35(Pile) 12.5 24.0 36.5 12.848 3.212 25.112 16.571 25.440 160.600
752 10/2/2021 383+934 RHS MJB Pile no- 10 of RP5 M35(Pile) 29.5 6.0 35.5 12.496 3.124 24.424 16.117 24.743 156.200
753 10/2/2021 383+934 RHS MJB Pile Cap of RP6 M35(RCC) 53.50 96.0 149.5 50.531 12.708 105.697 70.414 107.491 600.841
754 10/3/2021 383+934 RHS MJB Pile no- 09 of RP5 M35(Pile) 35.5 0.0 35.5 12.496 3.124 24.424 16.117 24.743 156.200
755 10/3/2021 383+934 RHS MJB Pile no- 07 of RP5 M35(Pile) 35.5 0.0 35.5 12.496 3.124 24.424 16.117 24.743 156.200
Precast Girder No-
756 10/4/2021 388+594 RHS MJB 05,06,07,&08 of RP3- M50(PSC) 104.5 0.0 104.5 43.890 10.973 71.583 47.757 66.880 521.455
RP4
Precast panel 07 nos.
757 10/4/2021 388+594 LHS MJB M40(RCC) 3.50 0.0 3.50 1.264 0.319 2.471 1.645 2.510 12.656
for LA1-LP1
758 10/4/2021 383+934 RHS MJB Pile no- 08 of RP2 M35(Pile) 33.0 0.0 33.0 11.616 2.904 22.704 14.982 23.001 145.200
Labour's Room
759 10/5/2021 388+594 PCC for labours room M15(PCC) 6.5 0.0 6.5 1.463 0.520 4.927 3.250 4.992 18.785
PCC
Precast panel 06 nos.
760 10/5/2021 388+594 LHS MJB M40(RCC) 3.25 0.0 3.25 1.173 0.296 2.294 1.527 2.330 11.752
for LA1-LP1
761 10/5/2021 374+937 LHS MJB Pile no- 06 of LP1 M35(Pile) 10.0 0.0 10.0 3.520 0.880 6.880 4.540 6.970 44.000 Continue….
Precast panel Precast panel flooring
762 10/5/2021 Lamdapura Camp M15(PCC) 6.0 0.0 6.0 1.350 0.480 4.548 3.000 4.608 17.340
casting yard PCC
Precast pedestal 0.870 0.303 2.169 1.431 2.196 11.145
763 10/5/2021 388+594 MJB M25 3.0 0.0 3.00
casting
764 10/6/2021 383+934 RHS MJB Pile no- 09 of RP1A M35(Pile) 33.0 0.0 33.0 11.616 2.904 22.704 14.982 23.001 145.200
765 10/6/2021 374+937 LHS MJB Pile no- 01 of LA1 M35(Pile) 25.0 0.0 25.0 8.800 2.200 17.200 11.350 17.425 110.000
766 10/6/2021 374+937 LHS MJB Pile no- 03 of LA1 M35(Pile) 22.0 0.0 22.0 7.744 1.936 15.136 9.988 15.334 96.800
Balance Qty-10
767 10/6/2021 374+937 LHS MJB Pile no- 06 of LP1 M35(Pile) 10.0 0.0 10.0 3.520 0.880 6.880 4.540 6.970 44.000 cum. (Previous
day)
Cover Block
768 10/6/2021 Lamdapura Camp Cover Block Casting M35(RCC) 0.25 0.0 0.25 0.085 0.021 0.177 0.118 0.180 1.005
Casting
Precast Girder No-
769 10/7/2021 388+594 RHS MJB 01,02,03,&04 of RP4- M50(PSC) 92.0 12.5 104.5 43.890 10.973 71.583 47.757 66.880 521.455
RP5
770 10/7/2021 383+934 RHS MJB Pile no- 10 of RP1A M35(Pile) 0.0 30.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
771 10/7/2021 383+934 RHS MJB Pile no- 08 of RP1A M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
772 10/7/2021 388+594 LHS MJB Abutment Cap of LA1 M45(RCC) 47.0 0.0 47.0 18.424 4.606 31.819 21.197 32.336 241.815
773 10/8/2021 383+934 RHS MJB Pile no- 01 of RP1A M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
774 10/8/2021 383+934 RHS MJB Pile no- 02 of RP1A M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
Precast panel 06 nos.
775 10/8/2021 388+594 LHS MJB M40(RCC) 3.00 0.0 3.00 1.083 0.273 2.118 1.410 2.151 10.848
for LA1-LP1
Precast Girder No-
776 10/9/2021 388+594 RHS MJB 05,06,07,&08 of RP4- M50(PSC) 103.5 0.0 103.5 43.470 10.868 70.898 47.300 66.240 516.465
RP5
Pier shaft starter of
777 10/9/2021 383+934 LHS MJB M45(RCC) 2.0 0.0 2.0 0.784 0.196 1.354 0.902 1.376 10.290
RP6
Precast panel 06 nos.
778 10/9/2021 388+594 LHS MJB M40(RCC) 3.25 0.0 3.25 1.173 0.296 2.294 1.527 2.330 11.752
for LA1-LP1
779 10/9/2021 374+564 RHS ROB Pier Shaft of RP1 M40(RCC) 10.50 0.0 10.50 3.790 0.956 7.413 4.935 7.528 37.968
780 10/9/2021 374+937 RHS MJB Pile no- 01 of RA1 M35(Pile) 20.0 0.0 20.0 7.040 1.760 13.760 9.080 13.940 88.000
781 10/9/2021 383+934 RHS MJB Pile no- 03 of RP1A M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 136.400
782 10/9/2021 374+937 LHS MJB Pile no- 02 of LA1 M35(Pile) 20.0 0.0 20.0 7.040 1.760 13.760 9.080 13.940 88.000
Precast pedestal 0.870 0.303 2.169 1.431 2.196 11.145
783 10/9/2021 388+594 MJB M25 3.0 0.0 3.00
casting
785 10/10/2021 383+934 RHS MJB Pile no- 04 of RP1A M35(Pile) 16.0 15.0 31.0 10.912 2.728 21.328 14.074 21.607 136.400
786 10/10/2021 383+934 RHS MJB Pile no- 05 of RP1A M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 136.400
787 10/10/2021 374+937 LHS MJB Pile no- 04 of LA1 M35(Pile) 20.0 0.0 20.0 7.040 1.760 13.760 9.080 13.940 88.000
Precast panel 04 nos.
788 10/11/2021 388+594 LHS MJB M40(RCC) 2.25 0.0 2.25 0.812 0.205 1.588 1.057 1.613 8.136
for LA1-LP1
789 10/11/2021 383+934 RHS MJB Pile no- 06 of RP1A M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 136.400
790 10/11/2021 383+934 RHS MJB Pile no- 07 of RP1A M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 136.400
791 10/11/2021 374+937 RHS MJB Pile no- 03 of RA1 M35(Pile) 22.0 0.0 22.0 7.744 1.936 15.136 9.988 15.334 96.800
792 10/12/2021 383+934 RHS MJB Pile no- 02 of RP2 M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
PCC for office PCC for office room at
793 10/12/2021 374+937 M15(PCC) 2.0 0.0 2.0 0.450 0.160 1.516 1.000 1.536 5.780
room at site site
794 10/13/2021 388+594 RHS MJB Pier shaft RP4 M45(RCC) 31.5 0.0 31.5 12.348 3.087 21.326 14.207 21.672 162.068
795 10/13/2021 384+570 RHS MJB Pile Cap of RA1 M35(RCC) 100.00 10.0 110.0 37.180 9.350 77.770 51.810 79.090 442.090
796 10/13/2021 374+937 RHS MJB Pile no- 05 of LP1 M35(Pile) 25.0 0.0 25.0 8.800 2.200 17.200 11.350 17.425 110.000
797 10/13/2021 383+934 LHS MJB Pile no- 01 of LP1B M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Precast pedestal 0.870 0.303 2.169 1.431 2.196 11.145
798 10/13/2021 388+594 MJB M25 3.0 0.0 3.00
casting
Precast pedestal 0.580 0.202 1.446 0.954 1.464 7.430
799 10/13/2021 374+564 ROB M25 2.0 0.0 2.00
casting
800 10/14/2021 383+934 RHS MJB Pier shaft RP6 M45(RCC) 39.0 0.0 39.0 15.288 3.822 26.403 17.589 26.832 200.655
801 10/14/2021 374+564 LHS ROB Pile Cap of LA2 M35(RCC) 63.00 0.0 63.0 21.294 5.355 44.541 29.673 45.297 253.197
802 10/14/2021 374+564 RHS ROB Pile no- 4 of RA1 M35(Pile) 20.0 0.0 20.0 8.100 0.000 13.980 9.220 15.380 78.000
803 10/14/2021 383+934 RHS MJB Pile no- 09 of RP1B M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
804 10/14/2021 383+934 RHS MJB Pile no- 10 of RP1B M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
805 10/14/2021 383+934 RHS MJB Pile no- 2 of RP1B M35(Pile) 30.0 0.0 30.0 12.150 0.000 20.970 13.830 23.070 117.000
Precast panel 04 nos.
806 10/14/2021 388+594 LHS MJB M40(RCC) 5.25 0.0 5.25 1.895 0.478 3.706 2.468 3.764 18.984
for LA1-LP1
807 10/15/2021 374+564 RHS ROB Pile no- 02 of RA1 M35(Pile) 20.0 0.0 20.0 8.100 0.000 13.980 9.220 15.380 78.000
808 10/15/2021 383+934 RHS MJB Pile no- 03 of RP1B M35(Pile) 29.0 0.0 29.0 11.745 0.000 20.271 13.369 22.301 113.100
809 10/16/2021 383+934 RHS MJB Pier shaft RP6 M45(RCC) 2.0 0.0 2.0 0.784 0.196 1.354 0.902 1.376 10.290
810 10/16/2021 384+570 LHS MJB Pile Cap of LA1 M35(RCC) 85.00 0.0 85.0 28.730 7.225 60.095 40.035 61.115 341.615
811 10/16/2021 384+570 LHS MJB Pile Cap of LA1 M35(RCC) 22.00 0.0 22.0 8.360 0.000 15.818 10.428 17.402 71.060
812 10/16/2021 374+564 RHS ROB Pile no- 4 of LP1 M35(Pile) 21.5 0.0 21.5 8.708 0.000 15.029 9.912 16.534 83.850
Precast Girder No-
813 10/16/2021 388+594 RHS MJB M50(PSC) 107.3 0.0 107.3 45.045 11.261 73.466 49.013 68.640 535.178
1,2,3&4 RP5-RA2
814 10/16/2021 383+934 RHS MJB Pile no- 4 of RP1B M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
815 10/16/2021 383+934 RHS MJB Pile no- 5 of RP1B M35(Pile) 30.0 0.0 30.0 12.150 0.000 20.970 13.830 23.070 117.000
PCC for RP7 &RP8
816 10/16/2021 383+934 RHS MJB M15(PCC) 5.0 0.0 5.0 1.125 0.400 3.790 2.500 3.840 14.450
Reparing Work
Precast panel 13 nos.
817 10/16/2021 388+594 LHS MJB M40(RCC) 6.75 0.0 6.75 2.437 0.614 4.765 3.173 4.840 24.408
for LA1-LP1
818 10/17/2021 383+934 RHS MJB Pile no- 8 of RP1B M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
819 10/17/2021 383+934 RHS MJB Pile no- 7 of RP1B M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
820 10/17/2021 383+934 RHS MJB Pile no- 6 of RP1B M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
Pier Shaft 1st lift of
821 10/17/2021 374+564 LHS ROB M40(RCC) 23.00 0.0 23.00 8.303 2.093 16.238 10.810 16.491 83.168
LP1
822 10/17/2021 383+934 RHS MJB PCC for RP1 Pile Cap M15(PCC) 9.0 0.0 9.0 2.025 0.720 6.822 4.500 6.912 26.010
824 10/17/2021 374+937 RHS MJB PCC for RA1 Pile Cap M15(PCC) 4.0 0.0 4.0 0.900 0.320 3.032 2.000 3.072 11.560
825 10/17/2021 Lamdapura Camp Steel Yard PCC for Steel Yard M15(PCC) 5.0 0.0 5.0 1.300 0.000 3.800 2.505 4.180 10.400
Precast Girder No-
826 10/18/2021 388+594 RHS MJB M50(PSC) 108.00 0.0 108.0 45.360 11.340 73.980 49.356 69.120 538.920
5,6,7&8 RP5-RA2
827 10/18/2021 374+937 LHS MJB Pile no- 03 of LP1 M35(Pile) 21.0 0.0 21.0 7.392 1.848 14.448 9.534 14.637 92.400
Abutment Shaft of
828 10/18/2021 384+570 RHS MJB M40(RCC) 4.50 0.0 4.5 1.624 0.410 3.177 2.115 3.226 16.272
RA1 (a)
Precast Panel (Deck
829 10/18/2021 388+594 LHS MJB M40(RCC) 4.25 0.0 4.25 1.534 0.387 3.000 1.997 3.047 15.368
slab) 08 Nos.
PCC for RP8 Reparing
830 10/18/2021 383+934 RHS MJB M15(PCC) 4.0 0.0 4.0 0.900 0.320 3.032 2.000 3.072 11.560
Work
831 10/18/2021 374+937 LHS MJB PCC for LA1 Pile Cap M15(PCC) 4.5 0.0 4.5 1.013 0.360 3.411 2.250 3.456 13.005
832 10/18/2021 384+570 Labour room PCC for Labour room M15(PCC) 3.0 0.0 3.0 0.675 0.240 2.274 1.500 2.304 8.670
833 10/19/2021 384+570 LHS MJB Pile no- 09 of LP2 M35(Pile) 31.5 0.0 31.5 11.088 2.772 21.672 14.301 21.955 138.600
834 10/19/2021 383+934 RHS MJB Pile repairing for RP7 M35(Pile) 2.0 0.0 2.0 0.704 0.176 1.376 0.908 1.394 8.800
Pier shaft starter for
835 10/19/2021 383+934 RHS MJB M45(RCC) 3.5 0.0 3.5 1.372 0.343 2.370 1.579 2.408 18.008
LP10 & LP8
Precast Panel for LP1-
836 10/19/2021 388+594 LHS MJB LP2 (Deck slab) 08 M40(RCC) 4.25 0.0 4.25 1.534 0.387 3.000 1.997 3.047 15.368
Nos.
837 10/19/2021 383+934 RHS MJB PCC for RP2 Pile Cap M15(PCC) 8.5 0.0 8.5 1.913 0.680 6.443 4.250 6.528 24.565
890 10/28/2021 374+564 LHS ROB Pier Shaft LA1 1st Lift M40(RCC) 23.00 0.0 23.00 8.303 2.093 16.238 10.810 16.491 83.168
Total Production
Qty. including
904 10/31/2021 388+594 RHS MJB Pile Cap of RP1 M35(RCC) 96.00 0.0 96.0 32.448 8.160 67.872 45.216 69.024 385.824 previous day
(53+96) = 149.0
Cum
905 11/1/2021 383+934 RHS MJB Pile no- 07 of RP3 M35(Pile) 34.0 0.0 34.0 11.968 2.992 23.392 15.436 23.698 149.600
906 11/1/2021 383+934 RHS MJB Pile no- 05 of RP3 M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
907 11/1/2021 384+570 RHS MJB Pile no- 11 of RP2 M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 136.400
908 11/1/2021 383+934 RHS MJB Pier shaft of RP9 M45(RCC) 37.5 0.0 37.5 14.700 3.675 25.388 16.913 25.800 192.937
Pier shaft starter of
909 11/1/2021 383+934 RHS MJB M45(RCC) 2.0 0.0 2.0 0.784 0.196 1.354 0.902 1.376 10.290
RP8
Precast Panel for LP1-
LP2 (Deck slab) 04
910 11/1/2021 388+594 LHS MJB M40(RCC) 3.75 0.00 3.75 1.354 0.341 2.648 1.763 2.689 13.560
Nos. & 14 Nos. for
LP3-LP3
Precast Panel for LP1-
LP2 (Deck slab) 04
911 11/1/2021 388+594 LHS MJB M40(RCC) 0.00 5.75 5.75 2.300 0.000 4.042 2.645 4.485 18.400
Nos. & 14 Nos. for
LP3-LP3
Gantry Wall at girder
912 11/1/2021 Lamdapura Camp Casting Yard M40(RCC) 2.00 0.0 2.00 0.722 0.182 1.412 0.940 1.434 7.232
stacking yard
913 11/1/2021 374+564 ROB Labour Room PCC M15(PCC) 2.5 0.0 2.5 0.563 0.200 1.895 1.250 1.920 7.225
Precast Girder No-
914 11/2/2021 374+564 RHS ROB M50(PSC) 54.50 0.0 54.50 22.890 5.723 37.333 24.907 34.880 271.955
1,2,3&4 of RP1-RP2
915 11/2/2021 383+934 RHS MJB Pile no- 06 of RP3 M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
916 11/2/2021 383+934 RHS MJB Pile no- 10 of RP3 M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 132.000
917 11/2/2021 384+570 RHS MJB Pile no- 12 of RP2 M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 140.800
PCC for Pile cap of
918 11/2/2021 384+570 LHS MJB M15(PCC) 3.5 0.0 3.5 0.788 0.280 2.653 1.750 2.688 10.115
LP2
Precast Girder No-
919 11/3/2021 374+564 RHS ROB M50(PSC) 105.00 0.0 105.00 44.100 11.025 71.925 47.985 67.200 523.950
1,2,3&4 of RP1-RP2
920 11/3/2021 388+594 LHS MJB Pile no- 01 of LA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 125.400
921 11/3/2021 383+934 RHS MJB Pile no- 09 of RP3 M35(Pile) 33.5 0.0 33.5 11.792 2.948 23.048 15.209 23.350 147.400
Pier shaft of LA1 2nd
922 11/3/2021 374+564 LHS ROB M40(RCC) 11.50 0.00 11.50 4.151 1.047 8.119 5.405 8.246 41.584
lift
Precast Panel (Deck
923 11/3/2021 388+594 LHS MJB slab) 08 Nos. for LP3- M40(RCC) 4.25 0.00 4.25 1.534 0.387 3.000 1.997 3.047 15.368
LP3
924 11/4/2021 0 0 0 0 0 0.00 0.0 0.00 0.000 0.000 0.000 0.000 0.000 0.000
925 11/5/2021 388+594 LHS MJB Pile no- 03 of LA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 125.400
Concrete
926 11/5/2021 388+594 RHS MJB Pile Cap of RP5 M35(RCC) 113.00 43.0 156.0 52.728 13.260 110.292 73.476 112.164 626.964 production
continue..
927 11/5/2021 383+934 RHS MJB Pier shaft of RP8 M45(RCC) 44.5 0.0 44.5 17.444 4.361 30.127 20.070 30.616 228.953
Precast Panel (Deck
928 11/5/2021 388+594 LHS MJB slab) 11 Nos. for LP3- M40(RCC) 5.75 0.00 5.75 2.300 0.000 4.042 2.645 4.485 18.400
LP3
929 11/6/2021 383+934 LHS MJB Pile no- 09 of LP1 M35(Pile) 0.0 31.0 31.0 10.912 2.728 21.328 14.074 21.607 136.400
950 11/9/2021 383+934 LHS MJB PCC for LP7 Pile cap M15(PCC) 9.0 0.0 9.0 2.025 0.720 6.822 4.500 6.912 26.010
Girder No-5,6,7 /1 of
1024 11/20/2021 374+564 LHS MJB M50(PSC) 0.0 54.0 54.0 22.680 5.670 36.990 24.678 34.560 283.500
LP1-LP2/LP3-LA2
1025 11/20/2021 383+934 LHS MJB Pile no.2 of LP2 M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 163.680
1026 11/20/2021 384+570 RHS MJB Abutment Cap RA1 M40(RCC) 0.0 46.0 46.0 16.606 4.186 32.338 21.160 35.880 147.200
1027 11/20/2021 379+725(PNC) Box Culvert PCC for Box Culvert M15(PCC) 5.5 0.0 5.5 1.238 0.440 4.169 2.750 4.224 15.895 Pnc subhelav
1028 11/20/2021 388+594 RHS MJB Pier Shaft of RP5 M45(RCC) 30.5 0.0 30.5 11.956 2.989 20.649 13.756 20.984 156.922
1029 11/20/2021 383+934 RHS MJB Pier Shaft of RP10 M45(RCC) 37.5 0.0 37.5 14.700 3.675 25.388 16.913 25.800 192.937
1030 11/20/2021 388+594 RHS MJB Pile no.8 of RA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1031 11/20/2021 388+594 RHS MJB Pile no.5of RA2 M35(Pile) 28.0 0.0 28.0 9.856 2.464 19.264 12.712 19.516 147.840
1032 11/20/2021 388+594 RHS MJB Pile no.2of RA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1033 11/21/2021 383+934 LHS MJB Pile no.3 of LP2 M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 168.960
1034 11/21/2021 383+934 LHS MJB Pile no.8 of LP2 M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 163.680
1035 11/21/2021 374+937 LHS MJB Pile Cap of LP1 M35(RCC) 89.00 0.0 89.0 30.082 7.565 62.923 41.919 63.991 357.691
1036 11/21/2021 374+564 RHS ROB Pier Shaft RA2 2nd lift M40(RCC) 11.00 0.00 11.00 3.971 1.001 7.733 5.060 8.580 35.200
1037 11/21/2021 374+937 LHS ROB Pier Shaft LA1 1st lift M40(RCC) 20.00 0.00 20.00 7.220 1.820 14.060 9.200 15.600 64.000
1038 11/22/2021 383+934 LHS MJB Pile no.10 of LP2 M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 163.680
1039 11/22/2021 383+934 LHS MJB Pile no.1of LP2 M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 163.680
1040 11/22/2021 383+934 RHS MJB Pile Cap Pcc of RP3 M15(PCC) 10.0 0.0 10.0 2.250 0.800 7.580 5.000 7.680 28.900
Precast panel 10 no.s
1041 11/22/2021 388+594 LHS MJB M40(RCC) 6.50 0.00 6.50 2.347 0.592 4.570 2.990 5.070 20.800
of LP2-LP3
1042 11/22/2021 374+937 RHS MJB Pile no.1 of RP1 M35(Pile) 22.0 0.0 22.0 7.744 1.936 15.136 9.988 15.334 116.160
1043 11/22/2021 388+594 LHS MJB Pile Cap Pcc of LA2 M15(PCC) 10.0 0.0 10.0 2.250 0.800 7.580 5.000 7.680 28.900
Precast panel 08 nos
1044 11/23/2021 388+594 LHS MJB M40(RCC) 0.00 5.00 5.00 1.805 0.455 3.515 2.300 3.900 16.000
LP2- LP3
1045 11/23/2021 383+934 LHS MJB Pile Cap Pcc of LP7 M15(PCC) 6.0 0.0 6.0 1.350 0.480 4.548 3.000 4.608 17.340
1046 11/23/2021 384+570 LHS MJB Pile Cap Pcc of LA2 M15(PCC) 6.5 0.0 6.5 1.463 0.520 4.927 3.250 4.992 18.785
1047 11/23/2021 374+937 RHS ROB Pile Cap Pcc of RA2 M15(PCC) 4.5 0.0 4.5 1.013 0.360 3.411 2.250 3.456 13.005
1048 11/23/2021 374+937 LHS ROB Pile no.2 of LA2 M35(Pile) 22.0 0.0 22.0 7.744 1.936 15.136 9.988 15.334 116.160
1049 11/23/2021 383+934 LHS MJB Pile no.9 of LP2 M35(Pile) 31.0 0.0 31.0 10.912 2.728 21.328 14.074 21.607 163.680
1050 11/23/2021 383+934 LHS MJB Pile no.1 of LP9 M35(Pile) 30.5 0.0 30.5 10.736 2.684 20.984 13.847 21.258 161.040
1051 11/23/2021 383+934 LHS MJB Pile no.1 of LP3 M35(Pile) 33.0 0.0 33.0 11.616 2.904 22.704 14.982 23.001 174.240
1052 11/23/2021 388+594 RHS MJB Pile no.6 of RA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
Precast panel 20 nos
1053 11/24/2021 388+594 LHS MJB M40(RCC) 0.00 10.50 10.50 4.200 0.000 7.339 4.788 8.159 43.050
LP2- LP3
1054 11/24/2021 383+934 LHS MJB Pile no.3 of LP3 M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 158.400
1055 11/24/2021 383+934 MJB Labor room PCC M15(PCC) 6.5 0.0 6.5 1.463 0.520 4.927 3.250 4.992 18.785
1056 11/24/2021 383+934 LHS MJB Pile no.2 of LP3 M35(Pile) 32.0 0.0 32.0 11.264 2.816 22.016 14.528 22.304 168.960
1057 11/24/2021 383+934 RHS MJB Pile no.1 of RP11 M35(Pile) 28.0 0.0 28.0 9.856 2.464 19.264 12.712 19.516 147.840
1058 11/24/2021 388+594 RHS MJB Pile no.10 of RA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1059 11/25/2021 Lamdapura Camp Steel Yard Steel Yard Pcc M15(PCC) 5.0 0.0 5.0 1.125 0.400 3.790 2.500 3.840 14.450
1060 11/25/2021 388+594 Pedestal Pedestal Casting M25 4.0 0.0 4.00 1.160 0.404 2.892 1.908 2.928 14.860
1061 11/25/2021 383+934 RHS MJB RP7 Pier Staging work M15(PCC) 4.5 0.0 4.5 1.013 0.360 3.411 2.250 3.456 13.005
1096 12/3/2021 Lamdapura Camp Stoking Yard Pedestal M30(RCC) 3.5 0.0 3.5 1.162 0.294 2.503 1.648 2.544 13.500
1097 12/3/2021 383+934 RHS MJB Pile Cap of LP7 M35(RCC) 102.00 45.0 147.0 49.686 12.495 103.929 69.237 105.693 746.172
1098 12/3/2021 383+934 RHS MJB RA1 PCC M15(PCC) 11.5 0.0 11.5 2.588 0.920 8.717 5.750 8.832 33.235
1099 12/3/2021 383+934 LHS MJB Pile no.6 of LA1 M35(Pile) 24.0 0.0 24.0 8.448 2.112 16.512 10.896 16.728 126.720
1100 12/3/2021 383+934 RHS MJB Pile no.2 of RA2 M35(Pile) 14.0 14.5 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1101 12/3/2021 383+934 LHS MJB Pile no.7 of LA1 M35(Pile) 0.0 28.5 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1102 12/3/2021 383+934 RHS MJB Pile no.5 of RP11 M35(Pile) 20.0 8.5 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1103 12/3/2021 383+934 LHS MJB Pile no.3 of LP9 M35(Pile) 24.5 4.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1104 12/3/2021 374+937 LHS MJB Pile no.1 of LA2 M35(Pile) 0.0 21.5 21.5 7.568 1.892 14.792 9.761 14.985 113.520
Girder Boxing and
1105 12/3/2021 Lamdapura Camp M50(PSC) 1.50 0.0 1.50 0.630 0.158 1.028 0.686 0.960 7.875
Packing
Pier Shaft LP1 Final
1106 12/4/2021 374+937 RHS ROB M40(RCC) 14.50 0.00 14.50 5.235 1.320 10.194 6.670 11.310 65.540
lift
1107 12/4/2021 383+934 RHS MJB Pier Cap RP6 M45(RCC) 72.0 18.0 90.0 35.280 8.820 60.930 40.590 61.920 506.700
1108 12/4/2021 383+934 LHS MJB Pile no.8 of LA1 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1109 12/4/2021 383+934 LHS MJB Pile no.9 of LA1 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1110 12/4/2021 383+934 RHS MJB Pile no.3 of LP11 M35(Pile) 23.5 5.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1111 12/4/2021 383+934 LHS MJB Pile no.2 of LP11 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1112 12/5/2021 374+564 RHS ROB M40(RCC) 48.00 0.00 48.00 19.200 0.000 33.552 21.888 37.296 196.800
Pier Cap RP1
1113 12/5/2021 374+561 RHS ROB M40(RCC) 6.00 30.00 36.00 12.996 3.276 25.308 16.560 28.080 162.720
1114 12/5/2021 383+934 RHS MJB Pile no.6 of RP11 M35(Pile) 16.5 12.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1115 12/5/2021 383+934 LHS MJB Pile no.11 LA1 M35(Pile) 28.5 0.0 28.5 11.543 0.000 19.921 13.139 21.917 98.040
1116 12/5/2021 383+934 LHS MJB Pile no.10 LA1 M35(Pile) 4.0 24.5 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1117 12/5/2021 383+934 LHS M35(Pile) 0.0 9.0 9.0 3.168 0.792 6.192 4.086 6.273 47.520
MJB Pile no.4 of LP9
1118 12/5/2021 383+934 LHS M35(Pile) 19.5 0.0 19.5 7.898 0.000 13.631 8.990 14.996 67.080
1119 12/5/2021 384+570 LHS MJB Pier Shaft LP2 M45(RCC) 6.0 0.0 6.0 2.580 0.000 4.188 2.790 4.620 20.640
1120 12/5/2021 384+934 LHS MJB LP1 PCC M15(PCC) 4.0 0.0 4.0 0.900 0.320 3.032 2.000 3.072 11.560
1121 12/5/2021 383+934 LHS MJB LP2 PCC M15(PCC) 0.0 10.5 10.5 2.363 0.840 7.959 5.250 8.064 30.345
1122 12/5/2021 374+564 RHS ROB RP1 PCC M15(PCC) 4.5 0.0 4.5 1.013 0.360 3.411 2.250 3.456 13.005
1123 12/6/2021 388+594 LHS MJB Pier Cap LP4 M50(PSC) 58.50 30.0 88.50 39.648 0.000 63.366 42.215 64.340 435.420
1124 12/6/2021 383+934 LHS MJB Pile no.12 of LA1 M35(Pile) 28.0 0.5 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1125 12/6/2021 383+934 RHS MJB Pile no.3 of RA2 M35(Pile) 6.0 22.5 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1126 12/6/2021 383+934 LHS MJB Pile no.4 of LP11 M35(Pile) 17.5 11.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1127 12/6/2021 383+934 LHS MJB Pile no.8 of LP3 M35(Pile) 17.0 15.0 32.0 11.264 2.816 22.016 14.528 22.304 168.960
1128 12/6/2021 383+934 LHS MJB Pile no.5 of LP11 M35(Pile) 14.5 14.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1129 12/6/2021 383+934 RHS MJB Pier Shaft Stater RP1 M45(RCC) 2.0 0.0 2.0 0.784 0.196 1.354 0.902 1.376 10.280
1130 12/6/2021 383+934 Pedestal Pedestal Casting M25 3.5 0.0 3.50 1.015 0.354 2.531 1.670 2.562 13.003
1131 12/6/2021 374+937 LHS MJB PCC of LA2 M15(PCC) 5.0 0.0 5.0 1.125 0.400 3.790 2.500 3.840 14.450
1132 12/7/2021 374+937 RHS MJB Pier Shaft RA2 M40(RCC) 11.50 0.00 11.50 4.151 1.047 8.085 5.290 8.970 51.980
Precast Pannel RA1-
1133 12/7/2021 388+594 RHS MJB M40(RCC) 3.75 0.00 3.75 1.500 0.000 2.621 1.710 2.914 15.375
RP1 7 nos.
1134 12/7/2021 Lamdapura Camp Stoking Yard Pedestal M30(RCC) 23.0 0.0 23.0 7.636 1.932 16.445 10.833 16.721 88.711
1135 12/7/2021 383+934 LHS MJB Pile no.6 of LP11 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1136 12/7/2021 383+934 LHS MJB Pile no.9 of LP3 M35(Pile) 30.0 0.0 30.0 10.560 2.640 20.640 13.620 20.910 158.400
1137 12/7/2021 383+934 LHS MJB Pile no.7 of LP11 M35(Pile) 0.0 29.0 29.0 10.208 2.552 19.952 13.166 20.213 153.120
1138 12/7/2021 383+934 RHS MJB Pile no.7 of RP11 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1139 12/7/2021 383+934 LHS MJB Pile no.10 of LP3 M35(Pile) 15.0 15.0 30.0 10.560 2.640 20.640 13.620 20.910 158.400
1140 12/7/2021 383+934 LHS MJB Pile no.5 of LP9 M35(Pile) 14.5 14.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1141 12/7/2021 M35(RCC) 39.00 43.5 82.5 27.885 7.013 58.327 38.857 59.317 418.770
384+570 RHS MJB Pile Cap of RP2
1142 12/7/2021 M35(RCC) 55.00 0.0 55.0 20.900 0.000 39.545 26.070 43.505 188.100
PCC Near Electrical
1143 12/8/2021 Lamdapura Camp M15(PCC) 0.5 0.0 0.5 0.113 0.040 0.379 0.250 0.384 1.445
Room
1144 12/8/2021 Lamdapura Camp PCC Steel Yard M15(PCC) 2.0 0.0 2.0 0.450 0.160 1.516 1.000 1.536 5.780
1145 12/8/2021 383+934 LHS MJB Pile no.8 of LP11 M35(Pile) 0.0 26.0 26.0 9.152 2.288 17.888 11.804 18.122 137.280
1146 12/8/2021 383+934 RHS MJB Pile no.4 of RA2 M35(Pile) 28.5 0.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1147 12/8/2021 383+934 LHS MJB Pile no.1 of LA2 M35(Pile) 27.5 1.0 28.5 10.032 2.508 19.608 12.939 19.865 150.480
1148 12/8/2021 383+934 LHS MJB Pile no.1 of LP1B M35(Pile) 6.0 24.0 30.0 10.560 2.640 20.640 13.620 20.910 158.400
1149 12/8/2021 383+934 LHS MJB Pile no.2 of LP1B M35(Pile) 31.5 0.0 31.5 11.088 2.772 21.672 14.301 21.955 166.320
Precast Pannel RA1-
1150 12/8/2021 388+594 RHS MJB M40(RCC) 3.50 0.00 3.50 1.400 0.000 2.447 1.596 2.720 14.350
RP1 6 nos.
1151 12/8/2021 M35(RCC) 13.00 6.0 19.0 6.422 1.615 13.433 8.949 13.661 96.444
384+570 RHS MJB Pile Cap of RP2
1152 12/8/2021 M35(RCC) 31.50 0.0 31.5 11.970 0.000 22.649 14.931 24.917 107.730
1153 12/8/2021
1154 12/8/2021
1114
Total Consumption of Materials dated 12/8/2021 71.218 14.531 139.839 92.329 143.934 988.709
Total Consumption of Materials up to Dt.- 12/8/2021 10118.104 2143.969 19471.005 12891.056 19788.959 121272.532
Concrete M-35 Concrete M-55 Concrete M-55 Concrete M-55 Concrete M-55
M-25 RCC M-30 RCC M-35 RCC M-35 Pile Concrete M-35 M-40 RCC M-45 RCC M-50 PSC Concrete M-55
Month M-15 PCC M-25 RCC
Flyash
M-30 RCC
Flyash
M-35 RCC
Flyash
M-35 Pile
Flyash Hume Pipe
Hume Pipe M-40 RCC
Flyash Flyash
M-45 RCC M-50PSC M-50 PSC
C-53 (C-53)
C-43/Micro C-53/Wash C-43/Wash
FlyAsh Silica C-53/Flyash Sand Sand
PV PV1 PV1 PV1 PV1 PV1 PV1 PV1 PV1 PV1 PV1 PV1 PV1 PV1 PV1 PV2 PV1 PV2 PV3 PV1 PV2 PV3 PV4 PV5
UNIT M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3
Code 2500000005 2500000020 2500000104 2500000010 2500000102 2500000011 2500000109 2500000021 2500000277 2500000273 2500000274 25000000130 2500000012 2500000013 25000000013 2500000172 2500000172 2500000172 2500000326 2500000326 2500000326 2500000326 2500000326
6/1/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/2/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/3/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/4/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/5/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/6/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/7/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/8/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/9/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/10/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/11/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/12/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/13/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/14/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/15/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/16/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/17/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/18/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/19/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/20/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/21/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/22/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/23/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/24/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/25/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/26/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/27/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/28/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/29/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
6/30/2023 - - - - - - - - - - - - - - - - - - - - - - - 0
- - - - - - - - - - - - - - - - - - - - - - - 0
Material Unit Code PV Alt Item Component Description Code Unit Mix Production Qty Consumption
BOM
Concrete M-15 M3 Cement PPC BAG 4.000 0.000 0.00
Concrete M-15 M3 Coarse Sand MT 0.944 0.000 0.00
Concrete M-15 M3 Grit (12.5 to 4.75 mm/10MM) MT 0.603 0.000 0.00
Concrete M-15 M3 Grit (26.5 to 12.5 mm/20mm) MT 0.607 0.000 0.00
Concrete M-15 M3 Admixture KG 0.000 0.000 0.00
Subtotal 0.00