CN102024 Performance KPI Scorecard - TAR GMS
CN102024 Performance KPI Scorecard - TAR GMS
Principles No KPI Name Units Target Accountability Frequency Jan-2017 Feb-2017 Mar-2017 Q1 Apr-2017 May-2017 Jun-2017 Q2 Jul-2017 Aug-2017 Sep-2017 Q3 Oct-2017 Nov-2017 Dec-2017
Daily
Reporting 1 Level 3 Plan Reporting % 100% Contractor to complete (where 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
applicable)
Non-Conformance 0 0 0 0 0 0 0 0 0 0 0 0
2 Number <1 Contractor to complete Monthly 0% 0 0
Reporting 1: Frequency
Non-Conformance Average 0 0 0 0 0 0 0 0 0 0 0 0
3 <10 days Contractor to complete Monthly 0% 0 0
Reporting 2: Resolution Duration
One per 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
4 GOC Compliance % 100% Contractor to complete 0% 0% 0%
call-off
Quality and
Performance
Non-Destructive Engineering 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
6 % 100% Contractor to complete Monthly 0% 0% 0%
(NDE) Company Approval
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0 0 0 0 0 0 0 0 0 0 0
On-time submission of GOC report. Report to include management integrity database / procedure, full GOC reporting is critical to progress proceeding works in timely manner, and to maintain One GOC dossier to be submitted per CTR, within
4 GOC Compliance
package of job from design to handover to Operations (to include hydrotesting, radiography, etc.). accurate records. 24 hours of completion of WORKS.
Quality and
Performance
Welds failure rates, displayed as percentage of welding activity. Number of weld failures / number of weld jobs
5 Weld Failure Rate To measure quality of welding. Reinforce importance of meeting QA/QC and safety standards.
Weld daily report to include information on welder qualifications and update on Weld Procedures. completed (shown as %)
Non-Destructive Engineering All third party companies must be ROO approved/verified. Required QA/QC documents, certifications and To ensure quality of non-destructive engineering and maintain focus on meeting QA/QC and Percentage of third party NDE companies that are
6
(NDE) Company Approval equipment information to be submitted as per COMPANY requirements. safety standards. ROO approved.
Contractor Management Site To record the number of CONTRACTOR management site visits. Management to be defined as senior To ensure CONTRACTOR management presence at worksites to maintain focus on safety Number of site visits to Rumaila field by
7
Visits CONTRACTOR PERSONNEL, who are not named on the relevant CTR. and quality. CONTRACTOR management, per month.
Accuracy and timely submittal of monthly cost report submitted to COMPANY by CONTRACTOR. Quality % of cost reports issued to COMPANY on time and
CONTRACTOR shall effectively track contract costs and issue accurate cost report on a
Commercial 9 Accuracy of Cost Report to include all call-offs to be correctly detailed. accurate, i.e. without amendments requested by
monthly basis.
Cost Controller.
All works must be undertaken with call-off order coverage. The call-off should accurately describe the
OR in Place Prior to Works % of work completed with sufficient contractual
10 work activity, and any extension to the required resources must be pre-approved by the CAM and To monitor any work which is completed without the required contractual cover.
Commencing cover.
captured via an OR amendment.
To show training provided by CONTRACTOR for CONTRACTOR PERSONNEL - to include refresher Measure shall track the level of specific training for CONTRACTOR PERSONNEL. Details
Training 11 Technical Training Average training hours completed per employee
training courses. regarding training effectiveness and performance improvement as a result are also requested.