SL.

NO ITEM DESCRIPTION (for Labour Rates) UNITS RATE QUANTITY AMOUNT

1 Earthwork excavation cft 10 0


2 Earth filling cft 5 0
Shuttering (slab, 3 side beam & 4 side column
3 sft 65 7055 458575
calulate in shuttering)
4 Bar bending kg 8 0
5 P.C.C Concrete sft 55 0

7 concrete( slab,beam,column & linter beam) cft 24 2518.5 60444

9 9″ Brick work cft 120 2800 336000


10 4.5″ Block work sft 45 550 24750
11 DPC rft 30 0 0
12 Internal Ceiling Plastering sft 20 3000 60000
13 Internal Wall plastering sft 12 3750 45000
14 External Wall plastering sft 15 3500 52500

15 Woodend Door & Windows frame Fixing sft 78 0

16 Water proof plastering sft 200 0


17 (Lead & Lift ) 0
18 First floor 0
19 Second floor 0.15 0
20 Third floor 0.2 0
1037269