OCL IRON AND STEEL LTD SSH062- PROGRESS REPORT UPTO -6.6.24
1X 230 TPH
LAMLOI P.O.GARVANA,
RATGANGPUR-770017,
ORISSA.
Page 1
SL.NO DESCRIPTION Engineering MRN Manufacturing
8 02-07 - HANGER RODS / U RODS, BRIDGE CHANNELS FOR COMBUST C N/A N/A
12 02-13 - HANGER RODS/ U RODS, BRIDGE CHANNELS FOR SH/EVAPORAT C N/A N/A
13 02-16 - HANGER RODS / U RODS, BRIDGE CHANNELS FOR HORIZONTA C N/A N/A
14 02-21 - BEAMS, BRACINGS & GUIDES FOR PLATFORMS - MAIN LEVEL C N/A N/A
15 02-22 - BEAMS, BRACINGS & GUIDES FOR PLATFORMS - INTERMEDIAT C N/A N/A
40 16-08 - SUPPORTS FOR LINKS, DOWNCOMERS, RISERS AND STARTUP A C N/A N/A
41 16-09 - SUPPORTS FOR FINAL SUPER HEATER OUTLET LINK C N/A N/A
53 19-03 - BED ASH COOLER I/L & O/L DUCTING C 10/06/2024 20/06/2024
22-08 - DAMPERS & POWER CYLINDER FOR COLD PRIMARY AIR DUCTING
69 C C 10/06/2024
22-09 - DAMPERS & POWER CYLINDER FOR COLD SECONDARY AIR DUCT
70 C C 10/06/2024
22-16 - DAMPERS & POWER CYLINDER FOR HOT SECONDARY AIR DUCTI
76 C 10/06/2024 15/06/2024
84 24-06 - OUTER ROOF ASSEMBLY WITH PENTHOUSE AND BUS DUCT C C 10/06/2024
85 24-07 - HOPPER ASSEMBLY WITH GAS SCREEN & HEATING JACKET C C 09/06/2024
94 29-02 - BOILER FEED WATER PIPING ( FROM DEAERATOR TO ECONOM C N/A N/A
95 29-03 - MAIN STEAM PIPING AFTER BOILER ISOLATION VALVE C N/A N/A
SN
PONO SUPPLIER NAME DESCRIPTION DELIVERY DATE
O
1 SSH062/0004/S S068S - SAPCON INSTRUMENTS PVT.LTD. ESP ACCESSORIES,FUEL LEVEL INDICATOR DISPATCHED
2 SSH062/0005/S S052S - SHAVO NORGREN (I) PVT.LTD AIR FILTER REGULATOR RFD
12 SSH062/0017/S F010S - FAINGER LESER VALVES (P) LTD. SAFETY VALVE RFD
19 SSH062/0026/S 002ENTERPRISE
S291S - SUBHAM - ESP ACCESSORIES - THERMOSTAT FOR SUPPORT INSULATOR HEATER-RANGE:30 TO200DEG.C-230V-5A
DISPATCHED
Page 6
PROJECT SCHEDULE -BO
37 SSH062/0047/S J019S - JASH ENGINEERING LIMITED KNIFE EDGE GATE VALVE 29/06/2024
39 SSH062/0050/S S151S - STELLAS ENGINEERING COMPANY CHAIN,TURN BUCKLE,MORRIS WHEEL,CHAIN FOR MORRIS WHEEL RFD
40 SSH062/0051/S M136S-M P JAIN TUBING SOLU TUBE.,PVC INSULATED COPPER TUBE DISPATCHED
TEE.,ELBOW.,UNION.,ADAPTOR,NIPPLE.,U_CLAMP,REDUCER.,COU
H004S - HP VALVES & FITTINGS INDIA
41 SSH062/0052/S PLING.,CONNECTOR.,NYLON TUBE,NEEDLE VALVE,REDUCING RFD
PRIVATE LIMITED
TEE,REDUCING ELBOW,REDUCING UNION,STRAIGHT UNION
* RFD -THE PROFORMA INVOICE AGAINST READINESS OF THE COMPONENTS ARE SENT TO CUSTOMER.
Page 7
Project tracker
SEQUENCE OF EVENTS
1 PO RECEIVED 06/02/2024
CUSTOMER REQUESTED TO
PROVIDE PPA,DUCTING
6 19/02/2024 27/02/2024
DRAWING,BFP,MOTOR & BO
SPECIFICATIONS.
COMMUNICATION MATRIX
8 20/02/2024
RECEIVED FROM CUSTOMER
CUSTOMER REQUESTED TO
PROVIDE THE CFBC DRAWING
9 21/02/2024 28/02/2024 24/02/2024 0
NO.BK-069-36-18-1-10 AND BK-
069-36-18-1-009.
CUSTOMER REQUESTED TO
10 PROVIDE GA & LDO SYSTEM 21/02/2024 28/02/2024
DRAWING.
E&I REQUIREMENTS AND
11 DETAILS PROVIDED TO 21/02/2024
CUSTOMER
MOTOR SPECIFICATIONS
16 27/02/2024
SUBMITTED TO CUSTOMER
Page 8
Project tracker
STAIRCASE &
LADDER DRAWINGS, LIST OF
34 DRAWINGS & CUMULATIVE RAW 13/03/2024
MATERIAL LIST IS SUBMITTED
TO CUSTOMER.
DOWNCOMER,RISER,SUPER
HEATER,LINKS SUPPORTS (16-
35 14/03/2024
08 PGMA) DRAWINGS ARE
SUBMITTED TO CUSTOMER.
JUNCTION BOX AND SOLENOID
36 COIL BOX WIRING DRAWINGS 14/03/2024
ARE SUBMITTED TO CUSTOMER.
SPECIFICATION OF SWAS HAS
37 BEEN SUBMITTED TO 14/03/2024
CUSTOMER.
VIBRATION MONITORING
38 SYSTEM HAS BEEN SUBMITTED 14/03/2024
TO CUSTOMER.
PLATFORM FLOOR GRILLS
39 DRAWING HAS BEEN SUBMITTED 14/03/2024
TO THE CUSTOMER.
EXPANSION MEASUREMENT
COMPONENT/ ITEMS (03-07
40 15/03/2024
PGMA) DRAWINGS HAS BEEN
SUBMITTED TO THE CUSTOMER.
Page 9
Project tracker
Page 10
Project tracker
Page 11
Project tracker
FABRICATION DRAWINGS(OCL)
- ESP - 24-02 - SUPPORTING
85 STRUCTURE & ACCESS 18/04/2024
PLATFORMS FOR ESP HAS BEEN
SUBMITTED TO CUSTOMER.
ASH HANDLING SYSTEM FOR 23-
02 FLUE GAS DUCTING -
86 18/04/2024
CUSTOMER SCOPE HAS BEEN
SUBMITTED TO CUSTOMER
FABRICATION DRAWINGS(OCL)
- ESP - 24-03 - CASING &
87 INSPECTION DOORS WITH GAS 18/04/2024
SCREEN FOR ESP HAS BEEN
SUBMITTED TO CUSTOMER.
FABRICATION DRAWINGS(OCL)
- ESP - 24-06 - OUTER ROOF
88 18/04/2024
ASSEMBLY HAS BEEN
SUBMITTED TO CUSTOMER.
FABRICATION DRAWINGS(OCL) -
ESP - 24-07 - HOPPER
89 18/04/2024
ASSEMBLY- HAS BEEN
SUBMITTED TO CUSTOMER.
FABRICATION DRAWINGS(OCL)
- ESP - 24-08 - COLLECTING
90 SYSTEM SUSPENSION 18/04/2024
ASSEMBLY- HAS BEEN
SUBMITTED TO CUSTOMER.
FABRICATION DRAWINGS(OCL)
- ESP - 24-09 -EMITTING
91 SYSTEM FRAME WORK HAS 18/04/2024
BEEN SUBMITTED TO
CUSTOMER.
FABRICATION DRAWINGS(OCL)
- ESP - 24-10 - EMITTING
92 SYSTEM RAPPING MECHANISM 18/04/2024
HAS BEEN SUBMITTED TO
CUSTOMER.
24-11- COLLECTING SYSTEM
RAPPING MECHANISM
93 18/04/2024
DRAWINGS HAS BEEN
SUBMITTED TO CUSTOMER.
24-12- INLET GAS
DISTRIBUTION SYSTEM
94 RAPPING MECHANISM 18/04/2024
DRAWINGS HAS BEEN
SUBMITTED TO CUSTOMER.
24-13- EMITTING SYSTEM
SUSPENSION. DRAWINGS HAS
95 18/04/2024
BEEN SUBMITTED TO
CUSTOMER.
Page 12
Project tracker
Page 13
Constrains
SL.N PROFORMA
CATEGORY DATE RECIEVABLE VALUE RECEIVED PERIOD IN DAYS
O NO
* KINDLY RELEASE THE PAYMENT TO MEET OUT THE PROJECT SCHEDULE AND FURTHER ACTIVITIES.
Page 14