R12-I00C18– DB for Start-Up Distribution Center Project

COMMENTS RESOLUTION SHEET

SUBMISSION
ARCCO Document No. ACONEX DOCUMENT NUMBER DOCUMENT TITLE DATE
REVISION.

R12-I00C18-RCO-XX-GF- R12-I00C18-RCO-XX-GF-SDW-ST-
R12-I00C18 - Stair with Ramp 03 Structural Details C2 12March2023
SDW-ST-40005 40005

SN RSG COMMENTS ARCCO RESPONSE REMARKS

See comments/corrections on the attach copy of shop Drawing for


1. Comments reflected in the revise drawing.
Stair with ramp 03 structural details.

Subject to the final approval of RSG with regards to the submitted


2. Noted.
Shop drawing of Stair with ramp 03 structural details

It is Noted as Design and Build project, the responsibility of the


3. contractor to design & deliver functional and operational systems that Noted.
comply with codes requirements and contract.

4. Refer to Atkins comments Noted.


SN RSG COMMENTS ARCCO RESPONSE REMARKS

5. Resubmit drawings with full compliance with markups provided. Noted. Comments reflected in the revise drawing.

Stairs and ramps handles shall be galvanized or coated with


6. Noted.
approved C5 corrosion protection paint.

Reference to approved MAT document number shall be provided in


7. Material submittal still need to be provided.
the general notes.

8. Refer to comments. Noted.


General Notes

1. ALL DIMENSIONS USED HEREIN ARE IN MILLIMETERS (MM)


UNLESS OTHERWISE SPECIFIED;

2. REFER TO R12-I00C28-RCO-CAL-ST-0016 FOR THE DESIGN


CALCULATION;

3. CONCRETE COMPRESSIVE STRENGTH:


- LEAN CONCRETE: 20 MPA (SRC);
- FOUNDATION: 35 MPA (SRC);
- RETAINING WALL: 35 MPA (SRC);
- SLAB & STEPS: 35 MPA (OPC);

4. ALL REINFORCEMENT ARE GRADE 60;

5. ALL CONCRETE IN CONTACT WITH SOIL WILL BE APPLIED WITH


2 COATS OF BITUMNOUS PAINT;

6. FOR SOIL UNDER FOUNDATION, FDT SHALL BE CONDUCTED


WITH MINIMUM 95% MDD & ANTI-TERMITE APPLICATION SHALL
BE MADE IMMEDIATELY AFTER DRYING THE SURFACE, 1000 GAUGE
(250 MICRIONS) POLYTHENE SHEET SHOULD BE INSTALLED PRIOR
TO POURING OF S.O.G CONCRETE.

7. REFER TO R12-I00C28-RCO-XX-XX-SDW-AR-60006 FOR SCHEDULE


OF STAIR WITH RAMP AND EXIT STAIRS;

C2 09.03.2023 ISSUED FOR APPROVAL ARCCO


C1 27.02.2023 ISSUED FOR APPROVAL ARCCO
Rev. Date Reason For Issue Chk

SHOP DRAWING
Key Plan.

THIS
AREA

STAIR & RAMP-03

STAIR 06
OFFICE DRIVER WAITING AREA
STORAGE

BUILDING LEVEL
+7.20 M

STAIR 06

DRIVER WAITING AREA

Contractor shall
correct the section as
per plan

**** Consultant

Main Contractor:

A L R A E E L
ENGINEERING
CONSTRUCTION &
DEVELOPMENT CO.
L T D , K S A
Client

Project

START UP
DISTRIBUTION FACILITY
CENTER (SUDC)
Drawing Title

-
STAIR WITH RAMP 03
STRUCTURAL DETAILS
-
Model File Reference
N/A
Drawn By Checked By Approved By

Contractor shall GAP GAP ARCCO


correct the section as
Project No Issue Date Scale at ISO A0
per plan R12-I00C28 09.03.2023 N.T.S.
Drawing Number Revision
R12-I00C28-RCO-XX-GF-SDW-ST-40005 C2