NO.CNEEC-NEPRI-REPORT-BOILER-01-05 Date: 13 - Oct – 2011
Subsystem: Auxiliary boiler system Start Time: 10 - Oct – 2011 8:30 Finish Time: 11 - Oct – 2011 17:00 Work Item: Ignition test NO. Check Items Check Results Finish servicing power to the equipment of auxiliary 1 Yes □ No □ boiler Finish servicing power to the control system of auxiliary 2 Yes □ No □ boiler 3 Check the equipment of auxiliary boiler is OK Yes □ No □ Finish feeding water to boiler, the level of drum is 4 Yes □ No □ ignition need 5 Push the button of boiler ignition Yes □ No □ 6 The auxiliary boiler starts the process of ignition Yes □ No □ 7 Blower running , setting up the pressure of the air Yes □ No □ 8 Oil supply pump running ,supplying the oil of ignition Yes □ No □ Open the magnetic valve of the ignition gun, the gun 9 Yes □ No □ ignites successfully Open the feeding oil magnetic valve and returning oil 10 Yes □ No □ magnetic valve of the oil burner The oil burner ignites successfully and the flame 11 Yes □ No □ detector detects the fire 12 The ignition test is finished Yes □ No □